{"document":{"slug":"rec-20251210-5232","title":"Comments of American Electric Power Service Corporation on the Motion of Constellation Energy Generation, LLC","issued":"2025-12-10","accession":"20251210-5232","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"American Electric Power Service Corporation","kind":"comments","file":"sources/filings/text/20251210-5232_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251210-5232","tier":"record","sha256":"9062144e0cefd8da6c5f9057d09108d8809cda7e012591c5258a903232beebcc","pages":5,"tokens":939,"emptyPages":[],"textThemes":["colo"]},"pages":[{"page":1,"startToken":0,"endToken":265,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n \n) \nDocket No.  EL25-49-000 \nLarge Loads Co-Located at Generating \nFacilities\n) \nDocket No. AD24-11-000 \nConstellation Energy Generation, LLC \n \nv. \n \nPJM Interconnection, L.L.C.\n) \n \n) \n \n)\nDocket No. EL25-20-000 \n(consolidated) \n \nCOMMENTS OF AMERICAN ELECTRIC POWER SERVICE CORPORATION ON \nTHE MOTION OF  \nCONSTELLATION ENERGY GENERATION, LLC  \n \nPursuant to Rules 212 and 2131 of the Rules of Practice and Procedure of the Federal \nEnergy Regulatory Commission (“FERC” or “Commission”), American Electric Power Service \nCorporation, on behalf of its affiliates Appalachian Power Company, Indiana Michigan Power \nCompany, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, \nWheeling Power Company, AEP Appalachian Transmission Company, Inc., AEP Indiana \nMichigan Transmission Company, Inc., AEP Kentucky Transmission Company, Inc., AEP Ohio \nTransmission Company, Inc., and AEP West Virginia Transmission Company, Inc. (collectively, \n“AEP”), submits these comments on the Motion to file Supplemental Comments that was filed by \nConstellation Energy Generation, LLC (“Constellation”) on December 5, 2025 and in support of \nthe Answers filed by the Indicated PJM Transmission Owners and PJM Interconnection, LLC \n(“PJM”).2  \n \n1  See 18 C.F.R. §§ 385.212, 385.213. \n2  The Indicated PJM Transmission Owners filed an Answer on December 8, 2025, and PJM submitted its Answer on \nDecember 5, 2025.  AEP respectfully moves for leave to file these comments out-of-time.  The Commission accepts \nlate filings when they will aid the Commission in its decision-making process, which is the case here.  See e.g., Am. \nTransmission Co. LLC, 105 FERC ¶61,388 at P 12 (2003) (accepting late-filed comments because the comments \n(cont'd)"},{"page":2,"startToken":265,"endToken":599,"text":"2 \n \nAEP has experienced first-hand the rapid growth of large loads in our service territory and \nrecognizes the importance of enabling this development. AEP is committed to providing reliable \nservice, supporting economic growth, and working with all customers to determine how to best \nmeet their energy needs. AEP supports co-location and is cognizant of the importance of data \ncenters to our national security.  AEP is committed to working with the Department of Energy, the \nCommission, and state and regional partners to identify and implement further actions to ensure \nthat our nation has the energy resources and infrastructure to support America’s next generation \nof innovation and industrial growth. \nCollectively, AEP is one of the largest electric utilities in the United States. We serve \napproximately 5.6 million customers across our 11-state footprint, and we develop, own, operate, \nand maintain the largest transmission system in North America. AEP participates in four RTOs \n(PJM, SPP, MISO, and ERCOT).  Our transmission system serves as the backbone in three of the \nRTOs–PJM, SPP and ERCOT–and directly serves approximately 10 percent of the electricity \ndemand in the Eastern Interconnection, and approximately 11 percent of the electricity demand in \nERCOT. The Columbus, Ohio metropolitan area has become a major hub for data center \ndevelopment and is one of the top 10 data center regions in the country. \nI. \nComments \nAEP supports co-location.  If structured properly, this configuration can provide a viable \noption to address the needs of certain customers, while ensuring other customers are treated fairly \nin the process.  Given the pace of change, every option needs to remain on the table to meet this \n \nprovide information that assists the Commission in its decision-making process).  Furthermore, the comments are \nbeing filed only a few days out-of-time, which does not cause undue prejudice or delay.  See e.g., North American \nElectric Reliability Corporation, 182 FERC ¶ 61094 at P 33 (2023) (granting leave to file late-filed reply comments \ngiven interest in the proceeding and the absence of undue prejudice or delay)."},{"page":3,"startToken":599,"endToken":859,"text":"3 \n \nunprecedented demand.  However, we cannot forget core principles—every customer needs to pay \nfor the transmission system if they are receiving service. \nThe Commission should reject Constellation’s motion, which if granted would result in \naffordability concerns for customers. Furthermore, this issue is already being addressed by the \nCommission’s actions in other proceedings. In fact, the Motion recognizes that the subject matter \nof the captioned proceedings overlaps the issues in the recently-initiated, industry-wide ANOPR \nproceeding.3  A national resolution of co-location is consistent with the President’s Executive \nOrder which focuses on the need for development of AI infrastructure as a national, not regional, \nimperative.  The Commission is actively working to complete the ANOPR process by the April \n30, 2026, date the Secretary of Energy has directed, and this process should drive consistent change \nacross the nation.  For these reasons, the ANOPR proceeding is the appropriate forum to address \nco-location issues.  \nFor the reasons stated above, FERC should reject Constellation’s Motions in this \nproceeding.   \n \n \n \n \n \n       Respectfully submitted, \n \n \n/s/ Stacey Burbure \nStacey Burbure \nSenior Vice President, Transmission \nDevelopment & Joint Ventures \nAmerican Electric Power Service Corporation \n8500 Smiths Mill Road \nNew Albany, OH 43054 \nTelephone: 614-933-2334  \nEmail: slburbure@aep.com \n \n/s/ John C. Crespo                        \nJohn C. Crespo \nDeputy General Counsel – Regulatory & \nNuclear \nCarrie L. Bumgarner \nSenior Counsel \nAmerican Electric Power Service Corporation \n1 Riverside Plaza \nColumbus, OH 43215 \nTelephone: (614) 716-3727 \nE-mail: jccrespo@aep.com\n \n3  \nSecretary Chris Wright, DOE, Ensuring the Timely and Orderly Interconnection of Large Loads: Advance \nNotice of Proposed Rulemaking (“ANOPR”), Docket No. RM26-4-000 (Oct. 27, 2025)(“DOE ANOPR Filing”)."},{"page":4,"startToken":859,"endToken":878,"text":"4 \n \nTelephone: (614) 716-2941 \nE-mail: clbumgarner@aep.com \n \nOn behalf of American Electric Power Service \nCorporation \n \n \n \n \nDecember 10, 2025"},{"page":5,"startToken":878,"endToken":939,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list in the above captioned dockets. \nDated this 10th day of December, 2025. \n \n \n/s/ LaChon Turner \nLaChon Turner \nParalegal \nAmerican Electric Power Service Corporation \n801 Pennsylvania Ave NW \nSuite 735 \nWashington, DC 20004 \n(202) 383-3465 \nlturner@aep.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":1436,"startToken":0,"endToken":487},{"p":2,"at":1436,"title":"I. Comments","method":"printed heading","endPage":5,"endAt":0,"startToken":487,"endToken":878},{"p":5,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":5,"endAt":408,"startToken":878,"endToken":939}]}