{"document":{"slug":"rec-20260114-5185","title":"Motion for Extension of Time, Shortened Answer Period and Request for Expedited Action of the Indicated PJM Transmission Owners","issued":"2026-01-14","accession":"20260114-5185","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"answer","file":"sources/filings/text/20260114-5185_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260114-5185","tier":"record","sha256":"6c7f33058056e06c27f5c67c7d8101b62a48a7bc48239ff0164efbae9626fa9a","pages":7,"tokens":1891,"emptyPages":[],"textThemes":["colo","procedure"]},"pages":[{"page":1,"startToken":0,"endToken":335,"text":"1 \nUNITED STATES OF AMERICA \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C., et al. \n  )  \nDocket Nos. EL25-49-000 \n  ) \n   EL25-49-001 \n  ) \nLarge Loads Co-Located at Generating Facilities  ) \nDocket No. AD24-11-000 \n  ) \nConstellation Energy Generation, LLC \n  ) \nDocket No. EL25-20-000     \n  ) \nv. \n  ) \n(consolidated) \n  ) \nPJM Interconnection, L.L.C. \n  ) \nMOTION FOR EXTENSION OF TIME, SHORTENED ANSWER PERIOD \nAND REQUEST FOR EXPEDITED ACTION \nOF THE  \nINDICATED PJM TRANSMISSION OWNERS \nPursuant to Rules 212 and 2008(a) of the Rules of Practice and Procedure of the Federal \nEnergy Regulatory Commission (“Commission”),1 the Indicated PJM Transmission Owners2\n(collectively the “PJM Transmission Owners”) respectfully request that the Commission grant \na thirty (30) day extension of time for submission of (i) revisions to PJM Interconnection, \n1\n18 C.F.R. §§ 385.212, 385.2008(a) (2025). \n2\nFor the purpose of this filing, the Indicated PJM Transmission Owners are: American Electric Power \nService Corporation on behalf of its affiliates, Appalachian Power Company, Indiana Michigan Power Company, \nKentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP \nAppalachian Transmission Company, AEP Indiana Michigan Transmission Company, AEP Kentucky \nTransmission Company, AEP Ohio Transmission Company, and AEP West Virginia Transmission Company; The \nDayton Power and Light Company d/b/a AES Ohio; Dominion Energy Services, Inc. on behalf of Virginia Electric \nand Power Company d/b/a Dominion Energy Virginia; Duke Energy Business Services, LLC for Duke Energy \nKentucky, Inc. and Duke Energy Ohio, Inc.; Duquesne Light Company; East Kentucky Power Cooperative; Exelon \nCorporation on behalf of its affiliates Atlantic City Electric Company, Baltimore Gas and Electric Company, \nCommonwealth Edison Company, Commonwealth Edison Company of Indiana, Inc., Delmarva Power & Light \nCompany, PECO Energy Company (“PECO”), and Potomac Electric Power Company; FirstEnergy Service \nCompany, on behalf of its affiliates American Transmission Systems, Incorporated, Jersey Central Power & Light \nCompany, Mid-Atlantic Interstate Transmission LLC, The Potomac Edison Company, Monongahela Power \nCompany, Keystone Appalachian Transmission Company, and Trans-Allegheny Interstate Line Company \n(collectively, the “FirstEnergy Companies”); PPL Electric Utilities Corporation; Rockland Electric Company; and \nSouthern Maryland Electric Cooperative."},{"page":2,"startToken":335,"endToken":672,"text":"2 \nL.L.C.’s (“PJM”) Tariff “to require that the Eligible Customer taking transmission service on \nbehalf of a Co-Located Load takes one of three transmission services[;]”3 and (ii) initial and \nreply briefs in the paper hearing that the Commission established in its order issued on \nDecember 18, 2025 in this proceeding4 to allow the PJM Transmission Owners to develop and \npropose new PJM-wide transmission rates and rate structures and to communicate and \ncoordinate with PJM and other impacted parties and stakeholders, including the Organization \nof PJM States (“OPSI”) and the Consumer Advocates of PJM States.  This additional time will \npromote administrative efficiency and ultimately benefit the Commission and parties to this \nproceeding. \nThe PJM Transmission Owners are authorized to state that the PJM Industrial Customer \nCoalition does not oppose this motion. \nI. \nBACKGROUND \nIn the December Order, the Commission found “that PJM’s Tariff is unjust and \nunreasonable because it does not contain provisions addressing with sufficient clarity or \nconsistency the rates, terms, and conditions of service that apply to generators serving Co-\nLocated Load and Eligible Customers5 taking transmission service on behalf of Co-Located \nLoad.”6  Specifically, the Commission found PJM’s Tariff “unjust and unreasonable because it \n3\nSee PJM Interconnection. L.L.C., 193 FERC ¶ 61,217, at P 193 (2025) (“December Order”) (The three \ntransmission services include: “(1) [Network Integration Transmission Service] NITS or a new interim, non-firm \ntransmission service while Network Upgrades to provide full NITS service are constructed, (2) a new Firm \nContract Demand transmission service, or (3) a new Non-Firm Contract Demand transmission service.  As a part \nof this compliance obligation, PJM must ensure a transmission service agreement that reflects the rates[,] terms, \nand conditions of these new transmission service options is available to Eligible Customers.”).\n4\nId. \n5\nAll capitalized terns that are not otherwise defined herein shall have the meaning set forth in the PJM \nOpen Access Transmission Tariff or Amended and Restated Operating Agreement of PJM Interconnection, L.L.C. \n6\nDecember Order at P 2."},{"page":3,"startToken":672,"endToken":974,"text":"3 \ndoes not include types of transmission service that reflect Eligible Customers taking service on \nbehalf of Co-Located Loads that are willing and able to limit their use of the transmission \nsystem under certain conditions.”7  The Commission concluded that it is necessary for PJM to \noffer three new forms of transmission service under its Open Access Transmission Tariff \n(“OATT”), and identified these three new forms of transmission service as: (i) interim, non-\nfirm transmission service; (ii) Firm Contract Demand transmission service; and (iii) Non-Firm \nContract Demand transmission service. \nThe Commission also held that additional record evidence is needed to set the \nappropriate replacement rates, terms, and conditions for the three new forms of transmission \nservice in PJM.  As a result, the Commission established paper hearing procedures and listed \neleven questions that it asked the parties to address “with specificity.”8  The Commission set \nthe date for filing any initial brief in Docket No. EL25-49-000 as on or before February 16, \n2026.  The deadline to file responses to PJM’s initial brief is March 18, 2026, and the deadline \nto file replies to those responses is April 17, 2026.9\nI. \nMOTION FOR EXTENSION OF TIME \nAn extension of time for the initial filing deadline10 is warranted because this proceeding \ninvolves highly complex and interrelated issues that require careful analysis and coordination \nbetween PJM, PJM Transmission Owners, and other PJM stakeholders.  In particular, the \nDecember Order requires PJM Transmission Owners to develop and propose new PJM-wide \n7\nId. \n8\nId. at P 219. \n9\nId. at P 220. \n10\nBecause February 16 is a federal holiday, the PJM ITOs understand that initial briefs would, without an \nextension, be due on February 17, the first business day after the deadline set forth in the December Order. See 18 \nC.F.R. §§ 385.2007 (2025)."},{"page":4,"startToken":974,"endToken":1403,"text":"4 \ntransmission rates and rate structures11 and mandates compliance measures that will \nfundamentally alter existing tariff provisions and operational practices.  These changes \nimplicate numerous technical, legal, and procedural considerations, including the integration of \nnew transmission services with existing offerings under the PJM OATT, alignment with cost \nrecovery mechanisms, and consistency with governing documents.  Addressing these \ncompliance obligations demands extensive consultation among stakeholders, PJM, and other \nimpacted parties, including OPSI and Consumer Advocates of PJM, as well as detailed \nevaluation of tariff revisions to ensure conformity with the Federal Power Act and Commission \nprecedent.  Given the breadth and complexity of these issues, additional time is necessary to \ndevelop a comprehensive and accurate compliance approach that fully satisfies all legal and \nregulatory requirements.   \nThe PJM Transmission Owners respectfully request a 30-day extension to the deadline \nfor filing (i) revisions to PJM’s Tariff to effectuate three new forms of transmission service for \nCo-Located Load; and (ii) initial briefs, which would also push out the deadline for filing reply \nbriefs by 30 days.12  Good cause exists to grant this modest extension of time.  The three forms \nof transmission service required in the December Order are both new and unique to PJM.  As \nsuch, devising and developing a rate proposal to effectuate these brand new services will require \n11\nThese matters directly implicate PJM Transmission Owners’ contractual and Federal Power Act filing \nrights. See Pennsylvania-New Jersey-Maryland Interconnection, 108 FERC ¶ 61,033 (2004) (approving \nSettlement Agreement, Docket No. OA97-261-006 et al. (filed Oct. 3, 2003), as modified by Modification of \nSettlement Agreement, Docket No. OA97-261-009 et al., §§ 3.2, 4.2(B); 4.3, 4.5 (filed Jan. 20, 2004 and corrected \nJan. 23, 2004)  The Settlement Agreement is incorporated into PJM OATT, § 9 and the Consolidated Transmission \nOwners Agreement at § 7.3.1, PJM Interconnection, L.L.C., Rate Schedules, TOA, TOA-42 Rate Schedule FERC \nNo. 42 (1.0.0) (“CTOA”).  Moreover, the PJM Transmission Owners have contractual rights and obligations to \nengage in coordination and consultation with PJM and the PJM Members Committee with respect to changes to \nother terms and conditions of the PJM OATT.   See CTOA, at § 7.5.1. \n12\nAs noted above, currently initial briefs are due on or before February 16, 2026 with responses to initial \nbriefs due March 18, 2026, and the replies to those responses due April 17, 2026.   Under the 30-day extension, \ninitial briefs would be due on March 18, 2026, responses to initial briefs would be due on April 17, 2026, and the \nreplies to those responses would be due May 18, 2026."},{"page":5,"startToken":1403,"endToken":1686,"text":"5 \na significant amount of resources, time, and effort on the part of the PJM Transmission Owners. \nIn addition, the PJM Transmission Owners will need to consult with PJM regarding issues that \nadministration of the new rate designs could present.  Finally, the PJM Transmission Owners \nwill need additional time to receive input from PJM stakeholders, and other impacted parties, \nincluding the OPSI and the Consumer Advocates of PJM States, regarding the new services \nrates and rate designs.   \nThe PJM Transmission Owners appreciate the Commission’s desire to move \nexpeditiously to implement the new services required by the December Order.  However, given \nthe complexity and timing of the December Order, as well as the need to coordinate among the \nPJM Transmission Owners and with PJM, a 30-day extension is a reasonable accommodation \nin order to provide the parties with adequate time to engage and develop a rate proposal \nnecessary to implement the three new services.  No entity will be unreasonably prejudiced by \nthis modest extension.  To the contrary, parties and other PJM stakeholders, as well as the \nCommission, will all benefit from a well-designed proposal, which this extension will help \nensure. \nII. \nMOTION FOR SHORTENED ANSWER PERIOD AND EXPEDITED ACTION \nIn light of the circumstances described herein, the PJM Transmission Owners request \nthat the Commission shorten the period for answers to this Motion to three (3) days, making \nanswers due no later than January 20, 2026.  The PJM Transmission Owners also respectfully \nrequest that the Commission expedite its consideration of this Motion and promptly issue an \norder immediately after the due date for answers has passed, but no later than January 21, 2026.  \nThe PJM Transmission Owners and other parties will benefit from the Commission’s"},{"page":6,"startToken":1686,"endToken":1840,"text":"6 \nexpeditious decision so they can coordinate with stakeholders and other impacted entities and \nwork effectively towards a well-designed proposal.  \nIII. \nCONCLUSION \nAs discussed above, the PJM Transmission Owners respectfully request that the \nCommission grant a 30-day extension of time for the submission of (i) revisions to PJM’s Tariff \nto effectuate three new forms of transmission service for Co-Located Load; and (ii) initial and \nreply briefs in the paper hearing established by the December Order.  The PJM Transmission \nOwners also request that the Commission establish a shortened period for answers to this \nMotion and issue an order on this Motion as soon as possible, but no later than January 21, \n2026. \nRespectfully submitted, \n/s/ Michael Kunselman \nMichael Kunselman \nRichard P. Sparling \nNicholas J. Cicale \nDavis Wright Tremaine LLP \n1301 K Street NW \nSuite 500 East \nWashington, DC 20005 \nCounsel for FirstEnergy Companies on \nbehalf of the Indicated PJM \nTransmission Owners\nDated:  January 14, 2026"},{"page":7,"startToken":1840,"endToken":1891,"text":"CERTIFICATE OF SERVICE \nI HEREBY CERTIFY that I have this day served the foregoing document on the persons \nlisted on the official service list maintained by the Secretary for this proceeding. \nDated in Washington, D.C. this 14th day of January, 2026. \n/s/ Daniel Klein \nDaniel Klein \nDavis Wright Tremaine LLP"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":877,"startToken":0,"endToken":469},{"p":2,"at":877,"title":"I. BACKGROUND","method":"printed heading","endPage":3,"endAt":1214,"startToken":469,"endToken":861},{"p":3,"at":1214,"title":"I. MOTION FOR EXTENSION OF TIME","method":"printed heading","endPage":5,"endAt":1223,"startToken":861,"endToken":1592},{"p":5,"at":1223,"title":"II. MOTION FOR SHORTENED ANSWER PERIOD AND EXPEDITED ACTION","method":"printed heading","endPage":6,"endAt":151,"startToken":1592,"endToken":1706},{"p":6,"at":151,"title":"III. CONCLUSION","method":"printed heading","endPage":7,"endAt":0,"startToken":1706,"endToken":1840},{"p":7,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":7,"endAt":310,"startToken":1840,"endToken":1891}]}