{"document":{"slug":"rec-20260116-4000","title":"Non-Decisional: Emerald AI submits comment to FERC's Chairman and Commissioners regarding the FERC Co-Location Show Cause to PJM , (the two redactions…","issued":"2026-01-16","accession":"20260116-4000","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"EMERALD AI","kind":"comments","file":"sources/filings/text/20260116-4000_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260116-4000","tier":"record","sha256":"fe8be34bc2940ed37ee2a1993124ff526301b0ea6f98280a8237760ad6226757","pages":7,"tokens":1830,"emptyPages":[7],"textThemes":["flex","colo"]},"pages":[{"page":1,"startToken":0,"endToken":366,"text":"Thank you for the time connecting with your office at the FERC holiday festivities last \nmonth.  \nI am Emerald AI’s senior advisor on power and utilities strategy and was pleased to \nhave with me at FERC, Emerald AI’s CEO Dr. Varun Sivaram. As we discussed, \nEmerald AI is a pioneering technology company, backed by NVIDIA, whose software \nmakes AI data centers flexible users of power—capable of receiving dispatch signals \nfrom system operators and adjusting the power use of AI computations in tandem with \nutilizing any potential onsite energy resources. \nBelow are some takeaways from my review of the FERC Co-Location Show Cause to \nPJM (“Show Cause Framework and Emerald AI Validations”). The Show Cause order \naddresses the immediate mechanics of co-location – the information below provides a \npicture into the behind-the-scenes tech stack and strategy that will make this possible in \nreality, largely backed by orchestration solutions Emerald AI is building and deploying in \nthe field today at AI factory GPU clusters which benefit from co-located assets, or, no \nco-located generation assets.  \nEmerald AI’s goal is to ensure that there are live projects operating in the field on US \nelectric grids within the next two years to prove out a flexible fast track for loads with \nsoftware-defined flexibility that can help balance the grid with or without 1:1 co-located \ngeneration. In 2025, Emerald AI conducted four demonstrations in partnership with \nEPRI, NVIDIA, utilities, and leading AI companies across the United States and United \nKingdom to prove AI power flexibility across four commercial, production-grade data \ncenters. In 2026, Emerald AI will announce with NVIDIA and Digital Realty the world’s \nfirst commercial-scale power-flexible “AI Factory”: the 96MW Aurora AI data center in \nManassas, Virginia (Dominion transmission and distribution service territory). \nWe’d be pleased to continue conversations with your office and with technical SMEs on \nour work to practically achieve flexibility solutions.  Please do not hesitate to reach out \nto us for a briefing at any time. \n  \nBest Regards, \n  \nArushi Sharma Frank \nEmerald AI Senior Advisor, Power & Utilities Strategy \nArushi.sharmafrank@emeraldai.co | alt: arushisharmafrank@live.com \nPh: 571.572.9037 \n  \nAttachments: \n1. Emerald AI One-Year Review \n2. Bios: Emerald AI CEO | Chief Scientist | Utilities Power Senior Advisor"},{"page":2,"startToken":366,"endToken":460,"text":"PJM Show Cause Framework and Emerald AI Validations \nTakeaways \n•       Emerald AI’s validations in the field on live data center computation loads \n(training and inference) provide the physical and operational evidence that PJM’s \nproposed \"Contract Demand\" tariffs are safe. They prove that a co-located load can \nserve as its own \"shock absorber,\" creating a dispatchable reliability asset that sits \nbehind the meter but solves front-of-meter constraints with a combination of \nbankable flexibility solutions that include computation orchestration (shifting, \nslowing, pausing, calibrating while assuring required customer computational \nperformance) and co-management of dispatch from generation and batteries."},{"page":3,"startToken":460,"endToken":814,"text":"Emerald’s validations demonstrate that computation load can be a dynamic, dispatchable \nresource that can actively manage dispatch risk, effectively serving as its own \"locational \ndispatch solution” baked into a larger schema for operating computation (data center) \nfacilities in the novel ways proposed in the Show Cause order (firm contract demand \ntransmission service; non-firm contract demand transmission service; interim network \nintegration transmission service). \n1.      Operationalizing \"Firm Contract Demand\" (Figure 2): \nEmerald’s technology allows for privatization of delivery risk to computation loads \ngreater than what a firm grid power ceiling could provide, as proposed in Figure 2. \nThe diagram only contemplates that if there is a 100 MW firm service limit above \nwhich the grid offers no reliability, the customer must bring 900 MW of reliable \nonsite generation to fill the gap. Emerald’s validations (specifically the Aurora AI \nFactory and Nature Energy peer-reviewed data from the Salt River Project demo \nwith Oracle, NVIDIA, and EPRI) finesse this logic. By dynamically flexing compute \npower—the firm cap is a dispatch signal around which the developer of the power \nsupply can choose to privatize the reliability risk through software controls rather \nthan exclusively through hardware redundancy.  From the grid’s perspective, the \nappearance of generation to match the load does not change. From the site \noperator’s perspective, the matching of load to generation is a shaping of \ngeneration dispatch hours and computation flexibility hours, paired together for a \nhyper efficient solution to meet reliability needs without compromising compute \nservice-level agreements. \n  \n2.      Figure 3: Making \"Non-Firm\" (Figure 3) Bankable_ Validating the \"As-Available\" \nUse Case \nThe Show Cause order positions Non-Firm Contract Demand as a backstop \nsolution where the grid has no obligation to serve, potentially implying that standard \ndata centers cannot function here without 100% redundant backup. Emerald’s \nplatform transforms \"as-available\" service into a commercially viable operational \nmode: the AI factory can actively reshape its demand profile to match the \"0 to 1000 \nMW\" fluctuation shown in PJM’s Figure 3. An AI load can accept a Non-Firm tariff \nwithout overbuilding diesel infrastructure, effectively privatizing the curtailment risk \nthrough compute modulation that aligns with the \"as-available\" reality of the \ntransmission system."},{"page":4,"startToken":814,"endToken":1235,"text":"3.      Anti-Toggling (Guarding against unreserved use): Emerald AI’s technology \nplatform is primed to provide an all-around virtual protection scheme to manage \naround regulatory anxiety that a co-located load will accidentally drift into \n\"unreserved use\" during a generator trip or system disturbance, leaning on system \ninertia and causing a blackout. The Salt River Project (SRP) demonstration validated \nthat Emerald’s platform acts as a virtual \"protection scheme\" or governor. By \nsuccessfully cutting power draw by ~25% for three hours during a peak event while \nmeeting performance targets, the technology provides the mechanical assurance \nthat the facility will not drift. It ensures the load physically adheres to the \ncontracted service level, directly satisfying the FERC requirement for strict \ncompliance with the new tariff boundaries and mitigating the \"free rider\" reliability \nconcern. \n  \n4.      Locational Dispatch: The AI Factory as a Nodal Asset Based on the Order on \nShow Cause section establishing the new Firm Contract Demand and Non-Firm \nContract Demand services (Paragraphs 204–209), the Commission frames the load \nmodeling as a static constraint at a specific point of interconnection, rather than as \na dynamic, price-responsive node. This is largely the product of the capacity market \nconstruct in which these tariff changes typically live, where PJM plans transmission \nand procures reserve capacity for fixed blocks (sinks) of load at specific PJM \nbuses.  Emerald AI’s platform—particularly via the coming capabilities of the Aurora \ndemonstration site (Nvidia, Digital Realty – Dominion transmission and distribution \nservice territory, Manassas, VA)—introduces the missing variable: the ability for \nsite-specific load to actively respond to LMPs and local congestion. While the Order \ndiscusses \"curtailment\" for Non-Firm service (Paragraph 209), it frames this strictly \nas a reliability action (\"curtailed during emergency operations\"), not as an economic \nresponse to Locational Marginal Pricing (LMP). The service is currently defined by \nreservation priority, not by an economic dispatch curve. \n  \nA core objective of the Aurora project will be to lean into the dynamic capabilities of \nthe load, factor that capability into Dominion’s planning, and support similar \noutcomes for PJM review—specifically, allowing for a framework to model the site-\nspecific load as a resource that resolves congestion or prevents it through \nconstraint management. The core differentiator between how load is planned and \n“called on” for economic dispatch in PJM versus ERCOT is also the heart of the \ndisagreement regarding the reliability contribution of flexible load between PJM and \nthe PJM Market Monitor. This topic is explored here and arrives at where Emerald AI \nbelieves the markets must land: future iterations of these tariff designs must"},{"page":5,"startToken":1235,"endToken":1508,"text":"provide RTOs an option to utilize large electronic loads as dispatchable ISO \nresources, placing them on the same footing as nodal dispatchable generators. \n  \n5.      Grid-Flexible AI Technology Stack - Emerald AI as the Site Orchestrator in \nVirginia: \n  \nThe Aurora project demonstrates a technology stack where Emerald AI acts as the \ncentral orchestrator—the intelligence layer sitting between the site’s internal puzzle \npieces and the utility operator. \n•       The Orchestration Layer: Emerald is not just providing software; it is acting as \nthe bridge between the Site Controller (managing the facility's physical plant) and \nthe Energy Manager (optimizing cost and dispatch). In this architecture, Emerald \ntranslates grid signals into compute actions, effectively turning the data center’s \nserver racks into a dispatchable resource that the utility can \"see\" and trust. \n•       Grid Signal Integration: For Aurora, this means ingesting real-time signals \n \n originating from a combination of PJM \nand Dominion event calls (aggregating Dominion’s specific rider notices (often \ncapped at 120–150 hours/year) with PJM’s broader emergency load management \nalerts). The site engineering team across Nvidia and Emerald are co-designing for an \ninsurance band of curtailment hours: \n \n  \n  \n(While Dominion’s retail customer tariff allows for control events of \"four to six \nhours\", the \"1.6 hours\" average reflects the active response required to shave the \nspecific coincident peak, rather than the full window of the alert.)  Emerald’s \nplatform automates the response to these signals, ensuring the facility sheds load \ninstantly without manual intervention. \n  \n•       Going Beyond \"Cap Flex\": While Dominion’s Cap Flex program is designed for \nexisting customers to flex around known constraints, the Aurora demo factory is a \ngreenfield opportunity to go further, i.e., handle static curtailment, and actively"},{"page":6,"startToken":1508,"endToken":1830,"text":"manage local transmission constraints and congestion signals dynamically. This \nmoves Cap Flex, creating the sandbox for precision tools that could expedite a new \nproject (rather than only cap/limit an existing one looking for more transmission \ncapacity). \n  \n•       Validation via Power Quality Metering: To prove this works, the partners will \ninstall a Power Quality Meter (PQM) at the point of interconnection (a standard \nrequirement for every new connection, including this site). This meter provides the \n\"truth data\" that validates the site's response to grid events, ensuring that when \nEmerald orchestrates a flex down, the grid sees the exact relief it requested. \n  \n6.      Emerald Validation with National Grid UK: The National Grid live trial in London \nin December 2025 with Emerald’s \"Conductor\" platform introduces true Locational \nDispatch. Because the AI factory can modulate its consumption in real-time \n(seconds-based guaranteed curtailment response in furtherance of numerous \nsystem strength/grid need experiments), it provides a counter-flow effect at its \nspecific node. In a co-location scenario (Figure 2 or 3 from FERC diagram above), \nthis means the AI factory can dispatch itself down to relieve local transmission \nconstraints without sole reliance on generation-switching, effectively serving as a \nNon-Wire Alternative (NWA) solution that PJM’s static planning models fail to \ncapture. \n  \n7.  The \"Interim\" Bridge (Figure 4): Accelerating Interconnection \nThe Aurora reference design is intended to turn the \"waiting room\" approach \ndescribed in Figure 4., into the final destination. If an AI factory is certified as \n\"Power-Flexible\" (capable of relieving grid stress), it may never need to graduate to \nthe full \"Firm Service\" upgrades required in Figure 4 noted above. This challenges \nthe baseline assumption that \"Interim\" is just a temporary state; Emerald’s demo \nprojects will validate that for flexible AI loads, \"Interim\" (Non-Firm) coupled with \nintelligent compute modulation is a permanent, stable, and reliable end-state. This \nvision is shared by Emerald’s data center OEM partners and its core investors, \nincluding Nvidia.  \n  \n   [End of Takeaways Primer: Emerald AI Validations]"},{"page":7,"startToken":1830,"endToken":1830,"text":""}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":5,"endAt":0,"startToken":0,"endToken":1235},{"p":5,"at":0,"title":"Pages 5 to 7","method":"page range","endPage":7,"endAt":0,"startToken":1235,"endToken":1830}]}