{"document":{"slug":"rec-20260116-5200","title":"The Indicated PJM Interconnection, L.L.C. Transmission Owners submit Request for Rehearing of the 12/18/2025 Order","issued":"2026-01-16","accession":"20260116-5200","docket":"EL25-49-002","group":"PJM co-location compliance","filer":"Exelon CorporationThe FirstEnergy Transmission Companies","kind":"rehearing request","file":"sources/filings/text/20260116-5200_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260116-5200","tier":"record","sha256":"5a5e02d7122b92a7693c4b598696a7f5cc4bcdbd570f8e2bf49954d53f89e4b1","pages":58,"tokens":20381,"emptyPages":[],"textThemes":["colo","study","flex","cost"]},"pages":[{"page":1,"startToken":0,"endToken":262,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n \n) \nDocket No. EL25-49-001 \n \nLarge Loads Co-Located at Generating \nFacilities \n) \nDocket No. AD24-11-000 \nConstellation Energy Generation, LLC \n \nv. \n \nPJM Interconnection, L.L.C. \n) \n \n) \n \n) \nDocket No. EL25-20-001 \n(consolidated) \n \n \nREQUEST FOR REHEARING OF THE INDICATED PJM TRANSMISSION OWNERS \n \nPursuant to Federal Power Act (“FPA”) section 3131 and Rule 7132 of the Rules of Practice \nand Procedure of the Federal Energy Regulatory Commission (“FERC” or “Commission”), the \nIndicated PJM Interconnection, L.L.C. (“PJM”) Transmission Owners (“Indicated TOs”)3 request \nrehearing of the Commission’s order in the above-captioned dockets.4  The Commission’s 206 \nOrder is arbitrary and capricious and not based upon reasoned decision making.  The \nCommission’s directive for changes to the PJM Open Access Transmission Tariff (“PJM Tariff”) \nexceeds the Commission’s jurisdiction and is not permitted under the FPA. \n \n1  \n16 U.S.C. § 825l(a). \n2  \nSee 18 C.F.R. § 385.713. \n3  \nThis filing was prepared on behalf of the following PJM Transmission Owners:  Exelon Corporation, on behalf \nof Atlantic City Electric Company, Baltimore Gas and Electric Company, Commonwealth Edison Company \n(“ComEd”), Commonwealth Edison Company of Indiana, Inc., Delmarva Power & Light Company, PECO \nEnergy Company, and Potomac Electric Power Company; FirstEnergy Service Company, as agent for its affiliates \nAmerican Transmission Systems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate \nTransmission LLC, Keystone Appalachian Transmission Company, The Potomac Edison Company, \nMonongahela Power Company and Trans-Allegheny Interstate Line Company (collectively, the “FirstEnergy \nTransmission Companies”). \n4  \nPJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (“206 Order”)."},{"page":2,"startToken":262,"endToken":647,"text":"2 \n \nBefore turning to the problems with the Commission’s decision to impose new Contract \nDemand Network Service (“CD Service”)5 and a new interim non-firm transmission service \n(“Interim Service”), the Indicated TOs wish to express their support for certain helpful \nclarifications in the 206 Order: (1) An Eligible Customer6 serving a co-located load must be \ndesignated because it is the Eligible Customer that seeks and obtains transmission service and pays \nfor it;7 (2) Transmission service to co-located loads must be metered (apart from metering of any \nretail energy sales or distribution services);8 (3) Existing Network Integration Transmission \nService (“NITS” or “Network Service”) should be based on Gross Load; 9 and (4) Behind the Meter \nGeneration (“BTMG”) provisions do not apply to co-located loads or provide a basis to take \ntransmission service on a basis other than gross load.10   \n \n5  \n“CD Service” herein refers both to the firm and non-firm options prescribed by the 206 Order. \n6  \nAn “Eligible Customer” is defined in the PJM Tariff to mean the following:  \n(i) Any electric utility (including any Transmission Owner and any power marketer), Federal power \nmarketing agency, or any person generating electric energy for sale for resale is an Eligible \nCustomer under the Tariff.  Electric energy sold or produced by such entity may be electric \nenergy produced in the United States, Canada or Mexico.  However, with respect to transmission \nservice that the Commission is prohibited from ordering by Section 212(h) of the Federal Power \nAct, such entity is eligible only if the service is provided pursuant to a state requirement that the \nTransmission Provider or Transmission Owner offer the unbundled transmission service, or \npursuant to a voluntary offer of such service by a Transmission Owner. \n(ii) Any retail customer taking unbundled transmission service pursuant to a state requirement that \nthe Transmission Provider or a Transmission Owner offer the transmission service, or pursuant \nto a voluntary offer of such service by a Transmission Owner, is an Eligible Customer under the \nTariff.  As used in Tariff, Part VI, Eligible Customer shall mean only those Eligible Customers \nthat have submitted a Completed Application. \nPJM Tariff, OATT Definitions – E-F, at 2. \n7  \nSee 206 Order, 193 FERC ¶ 61,217 at P 241. \n8  \nSee id. P 206. \n9  \nSee id. P 194. \n10  See id. P 186."},{"page":3,"startToken":647,"endToken":968,"text":"3 \n \nThese clarifications should sufficiently answer the relevant questions presented by this \nproceeding.  While the Indicated TOs appreciate the Commission’s leadership in addressing this \nissue, the 206 Order goes beyond these clarifications and attempts to fix something that is not \nbroken.  There are indeed issues requiring attention in the PJM wholesale markets—including \nresource adequacy, reliability, and affordability challenges for reasons other than transmission \nservice offerings and rates—but the creation of new forms of transmission service does not address \nthose challenges and instead risks making those very real problems worse.    \n“The reasonableness of a rate is assessed in light of the FPA’s goals of promoting reliable \nservice at reasonable rates and developing plentiful energy supplies.”11  The existing transmission \nservices under the existing PJM Tariff are consistent with those goals and are just and reasonable.  \nNo one has satisfied the burden under FPA section 20612 to demonstrate that the existing tariff is \nunjust and unreasonable.  Nor has the burden been satisfied to demonstrate that the Commission’s \nreplacement rate is just and reasonable.  The Commission’s replacement rate that imposes new CD \nService and Interim Service options could directly place at risk the reliability of PJM’s electric \ngrid and grant an undue preference to certain categories of customers.  The new services could \nallow co-located load to pay for a different share of transmission system embedded costs than other \ncustomers, thereby resulting in rates that are not just and reasonable. \nIt appears that the primary driver of the Commission’s ruling was a desire to speed service \nto certain customers—those who are co-located with generators.13  The Indicated TOs support the \ndesire to allow prompt service to all customers at locations that make efficient use of the existing \n \n11  Constellation Mystic Power, LLC v. FERC, 45 F.4th 1028, 1035 (D.C. Cir. 2022). \n12  16 U.S.C. § 824e. \n13  See, e.g., 206 Order, 193 FERC ¶ 61,217 at P 200."},{"page":4,"startToken":968,"endToken":1295,"text":"4 \n \nsystem, but the CD Service and Interim Service do nothing to advance those goals.  Instead, the \nnew services are premised on the fiction that a customer taking CD Service or Interim Service \nimposes different burdens on the grid than customers taking traditional network service.  From this \nfalse premise the Commission draws two conclusions.  First, the Commission concludes that, \nbecause co-located loads impose fewer burdens on the system, such facilities, and especially co-\nlocated load facilities combined with system protection commitments, should be encouraged \nthrough special incentives to minimize the need for system upgrades.  As demonstrated later \nherein, new load already has powerful incentives to site their facilities and utilize protective \nequipment to minimize the need for system upgrades and to avoid the delays attendant to system \nupgrades.  But the question of whether new transmission upgrades are needed to accommodate a \nnew load must be based on engineering and technical data, such as the extent of the load, its \noperating characteristics, and how the system will react under various scenarios to changes in the \nload.  Such studies will not be based simply on theoretical net load regardless of whether imperfect \nprotective systems are in place.   \nThe false presumption that co-located facilities impose reduced burdens on the system \ndrives a second Commission assumption that co-located loads should pay lower rates than other \nusers.  This proposition violates a long-held Commission policy that all users of the transmission \nnetwork should pay the same load-ratio share of network cost, regardless of claims that some users \nimpose different burdens on the system.  As demonstrated herein, the demands on the system of \nco-located loads are material and no less significant than the burdens on the system of other \ntransmission users whose demands for special rates consistently have been rejected.  Placing the \nmeter for the load at a different location, or establishing a contractual arrangement for service \nthereto, does nothing to alter the physics of operating the system.  As explained in detail later, co-"},{"page":5,"startToken":1295,"endToken":1662,"text":"5 \n \nlocated loads derive significant operational and financial benefits from being interconnected with \nthe grid.  These benefits significantly outweigh the cost of paying full network service rates. \nThere has been no demonstration that the existing rate is not just and reasonable, and the \nCommission has not demonstrated that any replacement rate is anything other than arbitrary and \ncapricious.  The Commission should therefore reverse its decision and reaffirm that the existing \nPJM tariff is just and reasonable. \nI. \nStatement of Issues/Specification of Error. \nIn accordance with 18 C.F.R. § 385.713(c)(1) and (2), the Indicated TOs provide the \nfollowing specification of errors and statement of issues, including citations to representative \nCommission and judicial precedent. \n1. The Burden Under FPA Section 206 Has Not Been Met: The Existing Rate Has \nNot Been Shown to Be Unjust and Unreasonable.  See 16 U.S.C. § 824e(a); Pub. \nCitizen, Inc. v. FERC, 7 F.4th 1177, 1183 (D.C. Cir. 2021) (explaining that “[t]he \nburden of proving” that a rate is unjust or unreasonably is placed on “the party that \ninitiated the proceeding”). \na. There is No Evidence In the Record That Co-Located Loads Are \nUnable to Obtain Reliable, Timely, and Reasonably Priced Service \nUsing the Existing Network Service Construct.  Therefore, the \nCommission \nFails \nTo \nSatisfy \nthe \nRequirement \nUnder \nthe \nAdministrative Procedure Act That Its Decision Be Supported With \nSubstantial Evidence. \ni. The Administrative Procedure Act (“APA”) requires the \nCommission to “examine the relevant data and articulate a \nsatisfactory explanation for its action including a ‘rational \nconnection between the facts found and the choice made,’” and \nto base its decision on substantial evidence; because FERC has \nfailed to do so, its decision is arbitrary and capricious.  Motor \nVehicle Mfrs. Ass’n v. State Farm Mut. Auto. Ins. Co. (“State \nFarm”), 463 U.S. 29, 43 (1983) (citation omitted); see Fla. Gas \nTransmission Co. v. FERC (“Florida Gas”), 604 F.3d 636, 639 \n(D.C. Cir. 2010) (“[T]he Commission ‘must be able to demonstrate \nthat it has made a reasoned decision based upon substantial evidence \nin the record.’”) (citation omitted); Consol. Edison Co. of N.Y. v. \nNLRB, 305 U.S. 197, 229 (1938) (explaining that substantial"},{"page":6,"startToken":1662,"endToken":2051,"text":"6 \n \nevidence means “more than a mere scintilla”); see also 5 U.S.C. \n§ 706. \nii. The PJM Tariff provides two transmission service options \n(Network Integration Transmission Service and Point-to-Point \nTransmission Service) and includes provisions to explain how \nthose services work and how Network Customers will be Served.  \nSee PJM Tariff at §§ 31.1, 31.2, 31.3, 31.6 and 32; see also generally \nPJM Tariff , OATT Definitions. \niii. To the extent that parties have argued they are unable to \ninterconnect or are experiencing delays, that is false and any \ndelay is of their own making.  See, e.g., Exelon Dec. 8, 2025 \nComments at 3-4; Complaint Requesting Fast Track Processing of \nConstellation Energy Generation, LLC, Docket No. EL25-20, at Ex. \n5 Attach 1 (providing Exelon’s Nov. 12, 2024 Letter).  FERC \narbitrarily and capriciously disregarded evidence in the record \nthat Network Service under the current tariff is feasible and has \nbeen used for co-location arrangements.  Compare PJM \nInterconnection, L.L.C., 189 FERC ¶ 61,078 (2024) and PJM \nInterconnection, L.L.C., Docket No. ER24-2172-000, Application \nAttach. A, Amended ISA, at Schedule F, Part F.4 (June 1, 2024), \nwith Press Release, Talen Energy, Talen Energy Expands Nuclear \nEnergy \nRelationship \nwith \nAmazon \n(June \n11, \n2025), \nhttps://ir.talenenergy.com/news-releases/news-release-\ndetails/talen-energy-expands-nuclear-energy-relationship-amazon.  \nSee also Exelon Dec. 8, 2025 Comments at 6. \niv. Ignoring data in the record regarding the ability of co-located \nload to interconnect to the transmission system violates the APA \nand renders FERC’s decision arbitrary and capricious.  See \nState Farm, 463 U.S. at 43. \nv. There is no evidence in the record that the cost of Network \nService impacts the development of data centers.  Nor is there \nevidence to support that Network Service imposes unnecessary \nupgrades on all customers.  Nor is there evidence that new forms \nof transmission service will allow for faster interconnection.  See \nFlorida Gas, 604 F.3d at 639 (“[T]he Commission ‘must be able to \ndemonstrate that it has made a reasoned decision based upon \nsubstantial evidence in the record.’”) (citation omitted); Consol. \nEdison Co. of N.Y., 305 U.S. at 229 (explaining that substantial \nevidence means “more than a mere scintilla”); see also 5 U.S.C. \n§ 706. \nvi. The Commission has not met its burden under FPA section 206 \nbecause it acknowledges that the existing transmission services"},{"page":7,"startToken":2051,"endToken":2549,"text":"7 \n \nremain just and reasonable options.  See 206 Order, 193 FERC \n¶ 61,217 at P 195 (finding Network Service charged on a gross \ndemand basis to be “one just and reasonable transmission service \noption”). \nb. The Commission Did Not Engage in Reasoned Decision Making \nBecause It Did Not Explain its Departure from FERC Precedent or \nRefute that, Because the Existing PJM Tariff Provides Service on the \nSame Basis for All Customers, the Existing PJM Tariff Does Not Grant \nan Undue Preference.  See F.C.C. v. Fox Television Stations, Inc., 556 \nU.S. 502, 515 (2009) (“[T]he requirement that an agency provide reasoned \nexplanation for its action would ordinarily demand that it display awareness \nthat it is changing position.  An agency may not, for example, depart from \na prior policy sub silentio or simply disregard rules that are still on the \nbooks.”); New England Power Generators Ass’n v. FERC, 881 F.3d 202, \n211 (D.C. Cir. 2018) (“Although case-by-case adjudication sometimes \nresults in decisions that seem at odds but can be distinguished on their facts, \nit is the agency’s responsibility to provide a reasoned explanation of why \nthose facts matter.”); W. Deptford Energy, LLC v. FERC, 766 F.3d 10, 20 \n(D.C. Cir. 2014) (“It is textbook administrative law that an agency must \n‘provide[ ] a reasoned explanation for departing from precedent or treating \nsimilar situations differently,’ and Commission cases are no exception.”) \n(citations omitted); Cal. Pub. Utils. Comm’n v. FERC, 879 F.3d 966, 977 \n(9th Cir. 2018) (“FERC departed from this policy without acknowledgment \nor explanation.  This departure was arbitrary and capricious.”); Sw. Airlines \nCo. v. FERC, 926 F.3d 851, 856 (D.C. Cir. 2019) (“‘A full and rational \nexplanation’ becomes ‘especially important’ when, as here, an agency \nelects to ‘shift [its] policy’ or ‘depart[ ] from its typical manner of’ \nadministering a program. . . . [FERC] must at least ‘acknowledge’ its \nseemingly inconsistent precedents and either offer a reason ‘to distinguish \nthem’ or ‘explain its apparent rejection of their approach’ . . . . But however \nthe agency justifies its new position, what it may not do is ‘gloss[ ] over or \nswerve[ ] from prior precedents without discussion.’”) (most alterations in \noriginal) (citations omitted); see also 16 U.S.C. § 824d(b) (prohibiting a \npublic utility from making or granting an “undue preference or advantage” \nor from maintaining “any unreasonable difference in rates, charges, service, \nfacilities, or in any other respect, . . . as between classes of service”); \nTransCanada Power Mktg. Ltd. v. FERC, 811 F.3d 1, 12–13 (D.C. Cir. \n2015) (remanding because FERC did not adequately explain its position). \ni. The Commission has a long-standing policy of rejecting \nattempts by network transmission customers to avoid paying \ntheir load ratio share of system cost.  See, e.g., Nat’l R.R. \nPassenger Corp. v. PPL Elec. Utils. Corp., 171 FERC ¶ 61,237 at \nPP 40–41, denying clarification & addressing arguments raised on \nreh’g, 173 FERC ¶ 61,043 at PP 13–14 (2020); see Promoting \nWholesale Competition Through Open Access Non-Discriminatory"},{"page":8,"startToken":2549,"endToken":3017,"text":"8 \n \nTransmission Services by Public Utilities; Recovery of Stranded \nCosts by Public Utilities and Transmitting Utilities, Order No. 888-\nA, FERC Stats. & Regs. ¶ 31,048, 62 Fed. Reg. 12,274, 12,324 \n(Mar. 14, 1997), order on reh’g, Order No. 888-B, 81 FERC ¶ \n61,248 (1997), order on reh’g, Order No. 888-C, 82 FERC ¶ 61,046 \n(1998), aff’d in relevant part sub nom. Transmission Access Pol’y \nStudy Grp. v. FERC, 225 F.3d 667 (D.C. Cir. 2000), aff’d sub nom. \nNew York v. FERC, 535 U.S. 1 (2002); see also, e.g., Fla. Mun. \nPower Auth. v. FERC, 411 F.3d 287 (D.C. Cir. 2005); Fla. Power \n& Light Co., 113 FERC ¶ 61,290 (2005), aff’d on rehearing, 116 \nFERC ¶ 61,012 (2006), aff’d on appeal sub nom. Fla. Mun. Power \nAgency v. FERC, 264 F. App’x 4 (D.C. Cir. 2008) (per curiam); \nIdaho Power Co., 106 FERC ¶ 61,329 (2004); Ameren Servs. Co. v. \nPrairieland Energy Inc., 131 FERC ¶ 61,125 (2010); Ariz. Pub. \nServ. Co., 151 FERC ¶ 61,191 (2015); Preventing Undue \nDiscrimination and Preference in Transmission Service, Order No. \n890, 119 FERC ¶ 61,119 (“Order No. 890”), order on reh’g, Order \nNo. 890-A, 121 FERC ¶ 61,297 (2007), order on reh’g, Order No. \n890-B, 123 FERC ¶ 61,299 (2008), order on reh’g, Order No. 890-\nC, 126 FERC ¶ 61,228, order on clarification, Order No. 890-D, \n129 FERC ¶ 61,126 (2009). \nc. The Loads Rely Upon the Entire Embedded Transmission System to \nServe Their Full Gross Load.  Therefore, FERC’s Decision is Arbitrary \nand Capricious Because the Embedded Transmission System Costs \nShould Be Charged For Those Transmission Services.  See Decl. of \nDavid Weaver, PE, Attachment 1 to Exelon Comments, Docket No. EL25-\n20 (Dec. 12, 2024); see also PJM Interconnection, L.L.C., Docket \nNo. EL25-20-000, Indicated TOs June 3, 2025 Answer, Declaration of \nDanielle S. Powers, at P 29. \ni. The Commission’s failure to consider the benefits of grid \ninterconnection makes the 206 Order arbitrary and capricious.  \nSee State Farm, 463 U.S. at 43. \nii. The Commission’s 206 Order is arbitrary and capricious \nbecause it failed to consider the unique issues that attend co-\nlocation with nuclear plants.  See id.; Decl.  of David Weaver, PE, \nAttachment 1 to Exelon Comments, Docket No. EL25-20 (Dec. 12, \n2024). \n2. The Burden Has Not Been Met Under FPA Section 206: FERC’s Replacement \nRate is Not Just and Reasonable.  See 16 U.S.C. § 824e(a); Advanced Energy \nMgmt. All. v. FERC, 860 F.3d 656, 663 (D.C. Cir. 2017) (“If the Commission finds \nthat a rate is ‘unjust, unreasonable, unduly discriminatory or preferential, the \nCommission shall determine the just and reasonable rate ... and shall fix the same \nby order,’” and “[i]t is the Commission’s job—not the petitioner’s—to find a just"},{"page":9,"startToken":3017,"endToken":3439,"text":"9 \n \nand reasonable rate.”) (alterations in original) (citation omitted); Emera Maine v. \nFERC, 854 F.3d 9, 21 (D.C. Cir. 2017); Atl. City Elec. Co. v. FERC, 295 F.3d 1, \n10 (D.C. Cir. 2002).  The 206 Order failed to address the fact that reliability is \nrelevant to the inquiry of whether a rate is just and reasonable.  See \nConstellation Mystic Power, LLC v. FERC, 45 F.4th 1028, 1035 (D.C. Cir. 2022) \n(“The reasonableness of a rate is assessed in light of the FPA’s goals of promoting \nreliable service at reasonable rates and developing plentiful energy supplies.”); \nNAACP v. FPC, 425 U.S. 662, 669–70 (1976) (“[T]he principal purpose of [the \nFPA is] to encourage the orderly development of plentiful supplies of electricity \n. . . at reasonable prices.”). \na. Allowing Special Treatment For Co-Located Load Violates the FPA’s \nRequirement That There Be No Undue Preference Or Unreasonable \nDifference In Rates Between Classes of Service.  See 16 U.S.C. § 824d(b). \ni. To the extent that the Commission suggests that the \ntransmission provider may move forward with interconnection \nbefore studies are completed, such course of action would \njeopardize reliability and would be in tension with NERC \nreliability standards.  See, e.g., See NERC, FAC-002-4 – Facility \nInterconnection \nStudies \n(2022), https://www.nerc.com/globalassets/standards/reliability-\nstandards/fac/fac-002-4.pdf; NERC, 181 FERC ¶ 61,126 (2022) \n(approving FAC-002-4). \nii. There is no lawful basis to require tariff changes to impose new \nforms of service that give certain customers a reduced share of \nembedded costs compared to all other users when they receive \nthe same benefits.  See Coal. of MISO Transmission Customers v. \nFERC, 45 F.4th 1004, 1009 (D.C. Cir. 2022). \nb. The Commission’s Emphasis on Protective Systems Is In Tension With \nthe Commission’s Open Access Policies and Therefore Is Arbitrary and \nCapricious.  The Commission Also Erred In Minimizing the Fact that \nProtective Systems Can and Have Failed.  See NERC, Characteristics \nand Risks of Emerging Large Loads: Large Loads Task Force White Paper, \nat \n13 \n(July \n2025), \nhttps://www.nerc.com/globalassets/who-we-\nare/standing-committees/rstc/whitepaper-characteristics-and-risks-of-\nemerging-large-loads.pdf. \ni. The Commission erred in adopting a policy in tension with its \nopen access policies.  See Promoting Wholesale Competition \nThrough Open Access Non-Discriminatory Transmission Services \nby Public Utilities; Recovery of Stranded Costs by Public Utilities \nand Transmitting Utilities, Order No. 888-A, FERC Stats. & Regs. \n¶ 31,048, 62 Fed. Reg. 12,274 (Mar. 14, 1997), order on reh’g, \nOrder No. 888-B, 81 FERC ¶ 61,248 (1997), order on reh’g, Order"},{"page":10,"startToken":3439,"endToken":3900,"text":"10 \n \nNo. 888-C, 82 FERC ¶ 61,046 (1998), aff’d in relevant part sub \nnom. Transmission Access Pol’y Study Grp. v. FERC, 225 F.3d 667 \n(D.C. Cir. 2000), aff’d sub nom. New York v. FERC, 535 U.S. 1 \n(2002). \nc. The 206 Order is Arbitrary and Capricious in Abandoning the Main \nConstruct of Service to Load, Which is That Customers Share In the \nEmbedded Costs of the System.  The Commission Also Erred in \nAdopting a Generator Funding Model for The Funding of Network \nUpgrades for Co-Located Load with No Supporting Evidence.  See \nFlorida Gas, 604 F.3d at 639 (“[T]he Commission ‘must be able to \ndemonstrate that it has made a reasoned decision based upon substantial \nevidence in the record.’”) (citation omitted); Consol. Edison Co. of N.Y., \n305 U.S. at 229 (explaining that substantial evidence means “more than a \nmere scintilla”); see also 5 U.S.C. § 706. \ni. FERC’s order is arbitrary and capricious in abandoning the \nmain construct of service to load, which is that customers share \nin the embedded costs of the system.  See State Farm, 463 U.S. at \n43; Coal. of MISO Transmission Customers, 45 F.4th at 1009 \n(quoting S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41, 53 (D.C. Cir. \n2014) (per curiam)). \nii. The Commission’s proposal that co-located load must self-fund \nany needed transmission upgrades is arbitrary and capricious \nbecause FERC has not explained its decision to depart from \nprior precedent.  See F.C.C. v. Fox Television Stations, Inc., 556 \nU.S. at 515 (“[T]he requirement that an agency provide reasoned \nexplanation for its action would ordinarily demand that it display \nawareness that it is changing position.  An agency may not, for \nexample, depart from a prior policy sub silentio or simply disregard \nrules that are still on the books.”); New England Power Generators \nAss’n, 881 F.3d at 211 (“Although case-by-case adjudication \nsometimes results in decisions that seem at odds but can be \ndistinguished on their facts, it is the agency’s responsibility to \nprovide a reasoned explanation of why those facts matter.”); W. \nDeptford Energy, LLC, 766 F.3d at 20 (“It is textbook administrative \nlaw that an agency must ‘provide[ ] a reasoned explanation for \ndeparting from precedent or treating similar situations differently,’ \nand Commission cases are no exception.”) (citations omitted); Cal. \nPub. Utils. Comm’n, 879 F.3d at 977 (“FERC departed from this \npolicy without acknowledgment or explanation.  This departure was \narbitrary and capricious.”); Sw. Airlines Co., 926 F.3d at 856 (“‘A \nfull and rational explanation’ becomes ‘especially important’ when, \nas here, an agency elects to ‘shift [its] policy’ or ‘depart[ ] from its \ntypical manner of’ administering a program. . . . [FERC] must at \nleast ‘acknowledge’ its seemingly inconsistent precedents and either"},{"page":11,"startToken":3900,"endToken":4304,"text":"11 \n \noffer a reason ‘to distinguish them’ or ‘explain its apparent rejection \nof their approach’ . . . . But however the agency justifies its new \nposition, what it may not do is ‘gloss[ ] over or swerve[ ] from prior \nprecedents without discussion.’”) (most alterations in original) \n(citations omitted); see also 16 U.S.C. § 824d(b) (prohibiting a \npublic utility from making or granting an “undue preference or \nadvantage” or from maintaining “any unreasonable difference in \nrates, charges, service, facilities, or in any other respect, . . . as \nbetween classes of service”); TransCanada Power Mktg. Ltd., 811 \nF.3d at 12–13 (remanding because FERC did not adequately explain \nits position). \niii. The 206 Order departs from traditional cost causation \nprinciples and fails to explain or justify its departure.  See, e.g., \nNat’l R.R. Passenger Corp. v. PPL Elec. Utils. Corp., 173 FERC ¶ \n61,043, at PP 13–14 (2020); see also Fox Television Stations, Inc., \n556 U.S. at 515 (“[T]he requirement that an agency provide \nreasoned explanation for its action would ordinarily demand that it \ndisplay awareness that it is changing position.  An agency may not, \nfor example, depart from a prior policy sub silentio or simply \ndisregard rules that are still on the books.”) (citation omitted). \niv. The Commission provides no record evidence nor a reasoned \nexplanation for why co-located load should not be charged like \nother load, i.e., with the upgrade cost recovered as part of the \ntransmission rates charged to all customers.  Transmission \nowners are permitted to earn a reasonable return on the \ninvestments necessary to construct, operate, and maintain \ntransmission facilities, including those network upgrades \nrequired to serve co-located load.  See, e.g., Fed. Power Comm’n \nv. Hope Nat. Gas Co., 320 U.S. 591 (1944); Bluefield Water Works \n& Improvement Co. v. Pub. Service Comm’n of W. Va., 262 U.S. \n679 (1923). \nd. The Commission is Wrong in Suggesting That CD Service Will \nPromote Efficiency or Change Siting. \ni. The Commission’s decision to require options for CD Service \ndoes not change how the study process or the regional planning \nprocess should work.  See PJM Tariff §§  31.1-31.3, 31.6, 32. \nii. The Commission’s decision against the netting of behind the \nmeter generation and the stated reasons for that decision cannot \nbe logically reconciled with the structure it proposed for the new \ntransmission services and its decision is therefore arbitrary and \ncapricious.  See State Farm, 463 U.S. at 43."},{"page":12,"startToken":4304,"endToken":4782,"text":"12 \n \ne. The \nCommission’s \nDisregard \nof \nReliability \nConsiderations \nUnderscores that the Replacement Rate is Not Just and Reasonable.  \nSee Constellation Mystic Power, LLC, 45 F.4th at 1035 (“The \nreasonableness of a rate is assessed in light of the FPA’s goals of promoting \nreliable service at reasonable rates and developing plentiful energy \nsupplies.”); NAACP v. FPC, 425 U.S. at 669–70 (“[T]he principal purpose \nof [the FPA is] to encourage the orderly development of plentiful supplies \nof electricity . . . at reasonable prices.”). \n3. FERC Exceeded Its Jurisdiction.  See 16 U.S.C. § 824(b). \na. FERC’s Replacement Rate Violates the Major Questions Doctrine.  See \nWest Virginia v. EPA, 597 U.S. 697, 723 (2022); Whitman v. Am. Trucking \nAss’ns, 531 U.S. 457, 468 (2001) (“Congress, we have held, does not alter \nthe fundamental details of a regulatory scheme in vague terms or ancillary \nprovisions—it does not, one might say, hide elephants in mouseholes.”); see \nalso Midship Pipeline Co., v. FERC, 45 F.4th 867, 877 (5th Cir. 2022) \n(vacating part of the Commission’s order and remanding the remainder \nbecause “[t]he FERC’s interpretation of the NGA to give the agency power \nto determine ‘the reasonable cost’ of remediation efforts ‘change[d] the plot \nline’ of its enabling legislation, and was therefore erroneous” and “[t]he \nFERC lacks such authority under the NGA, and it likewise lacked authority \nto order an ALJ to make such a determination indirectly”) (quoting West \nVirginia v. EPA, 597 U.S. at 723); see Atl. City Elec. Co. v. FERC, 295 F.3d \n1, 8 (D.C. Cir. 2002) (As a federal agency, “FERC is a ‘creature of statute,’ \nhaving ‘no constitutional or common law existence or authority, but only \nthose authorities conferred upon it by Congress. Thus, if there is no statute \nconferring authority, FERC has none.”) (citation omitted). \nb. The Commission’s New Approach Infringes on State Retail Authority. \ni. The Commission’s new approach infringes on state jurisdiction \nand is distinguishable from wholesale demand response \nprograms.  See 16 U.S.C. § 824(b); see also FERC v. Elec. Power \nSupply Ass’n, 577 U.S. 260, 270, 278–79 (2016); FERC, Energy \nPrimer: A Handbook for Energy Market Basics, at 41 (Jan. 17, \n2024), \nhttps://www.ferc.gov/news-events/news/ferc-staff-issues-\n2024-energy-primer-handbook-energy-market-basics. \nii. The Commission is unable to do indirectly what it cannot do \ndirectly.  Cf. Nat’l Fuel Gas Supply Corp. v. FERC, 909 \nF.2d 1519, 1522 (D.C. Cir. 1990) (“once want of power to do this \ndirectly were established, the existence of power to achieve the same \nend indirectly through the conditioning power might well be \ndoubted” (quoting Sunray Mid-Continent Oil Co. v. FPC, 364 \nU.S. 137, 152 (1960) and citing Richmond Power & Light v. \nFERC, 574 F.2d 610, 620 (D.C. Cir. 1978) (the Commission may \nnot achieve indirectly through conditioning power of Federal Power"},{"page":13,"startToken":4782,"endToken":5108,"text":"13 \n \nAct what it is otherwise prohibited from achieving directly)); Am. \nGas Ass’n v. FERC, 912 F.2d 1496, 1510 (D.C. Cir. 1990) (“[T]he \nCommission may not use its § 7 conditioning power to do \nindirectly . . . things that it cannot do at all.”); see also FERC v. Elec. \nPower Supply Ass’n, 577 U.S. at 288 (“The FPA ‘leaves no room \neither for direct state regulation of the prices of interstate \nwholesales’ or for regulation that ‘would indirectly achieve the same \nresult.’”) (citation omitted). \nII. \nThe Burden Under FPA Section 206 Has Not Been Met: The Existing Rate \nHas Not Been Shown To Be Unjust And Unreasonable. \n \nThe FPA requires that the rates and charges of a public utility “in connection with the \ntransmission or sale of electric energy subject to the jurisdiction of the Commission, and all rules \nand regulations affecting or pertaining to such rates or charges shall be just and reasonable.”14  \n“[A]ny such rate or charge that is not just and reasonable is . . . unlawful.”15  Under FPA section \n206, the Commission may, by its own motion or upon complaint from a third party, remedy any \n“rate [or] charge” or “any rule, regulation, practice, or contract affecting such rate [or] charge” \nfound to be “unjust [or] unreasonable.”16  “The burden of proving an unjust or unreasonable rate \nrests with the party that initiated the proceeding—that is, the Commission or the third-party \ncomplainant.”17  In other words, a respondent to a FPA section 206 complaint is not required to \nmake an affirmative showing that its existing rate is still just and reasonable.   \nFor the reasons below, complainants in the above-captioned dockets (i.e., the Commission \nand Constellation) have failed to meet their burden of demonstrating that PJM’s current rate is \nunjust and unreasonable.   \n \n14  16 U.S.C. § 824d(a). \n15  Id. \n16  Id. § 824e(a). \n17  Pub. Citizen, Inc. v. FERC, 7 F.4th 1177, 1183 (D.C. Cir. 2021)."},{"page":14,"startToken":5108,"endToken":5462,"text":"14 \n \nA. There is No Evidence In The Record That Co-Located Loads Are Unable to \nObtain Reliable, Timely, And Reasonably Priced Service Using The Existing \nNetwork Service Construct.  Therefore, the Commission Fails To Satisfy The \nRequirement Under The APA That Its Decision Be Supported With \nSubstantial Evidence. \n \nUnder the APA, the Commission “must examine the relevant data and articulate a \nsatisfactory explanation for its action including a ‘rational connection between the facts found and \nthe choice made’”18 and must base its decision on substantial evidence in the record.19  Substantial \nevidence means “more than a mere scintilla,” that is, “such relevant evidence as a reasonable mind \nmight accept as adequate to support a conclusion.”20  The Commission’s 206 Order does not satisfy \nthis requirement. \nThe Commission states that “PJM’s Tariff is unjust and unreasonable because it does not \ncontain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions \nof service that apply to Interconnection Customers21 serving Co-Located Load and Eligible \nCustomers taking transmission service on behalf of Co-Located Load.”22  The Commission also \nstates that “the absence of such provisions leaves entities unable to determine what steps they must \ntake to effectuate Co-Location Arrangements of various configurations.”23 \nThis finding has no citation to evidence.  There is none.  Under the current PJM Tariff, \nthere are two transmission service options: (1) Network Integration Transmission Service (“NITS” \n \n18  State Farm, 463 U.S. at 43 (citation omitted). \n19  See, e.g., Fla. Gas Transmission Co. v. FERC, 604 F.3d 636, 639 (D.C. Cir. 2010) (“[T]he Commission ‘must be \nable to demonstrate that it has made a reasoned decision based upon substantial evidence in the record.’” (quoting \nPac. Gas & Elec. Co. v. FERC, 373 F.3d 1315, 1319 (D.C. Cir. 2004))); see also 5 U.S.C. § 706.  \n20  Consol. Edison Co. of N.Y., 305 U.S. at 229. \n21  PJM’s Tariff defines “Interconnection Customer” to “mean a Generation Interconnection Customer and/or \na Transmission Interconnection Customer.” PJM Tariff, OATT Definitions – I – J - K, at 4. \n22  206 Order, 193 FERC ¶ 61,217 at P 175. \n23  Id."},{"page":15,"startToken":5462,"endToken":5894,"text":"15 \n \nor “Network Service”);24 and (2) Point-to-Point Transmission Service.25  There is no inability to \ndetermine how to serve load in PJM, whether or not co-located; the PJM Tariff already has \nprovisions explaining how Network Service works and how loads of Network Customers will be \nserved.  The starting point is Section 31.1 of the PJM Tariff, which (mirroring the Commission’s \nown pro forma Open Access Transmission Tariff (“OATT”)) requires that Network Loads are to \nbe specified in the Service Agreement.  The PJM Tariff sets forth in Sections 31.2 and 31.3 the \nprocedures for identifying new Network Loads that will be served by the Network Customer.  If, \nand to the extent that, study is required of the request, the requirements of that study are spelled \nout in Section 32 of the PJM Tariff.  And, in recognition of the fact that loads change after \ncommencement of service, Section 31.6 provides the process by which to report on changing loads.  \nThese tariff provisions have been in place for decades, and are not even mentioned in the 206 \nOrder, which does not begin to explain how the Network Service construct and existing PJM Tariff \nrules and precedent fail to provide a mechanism for reasonable service to loads of all sorts. \nThe Commission cites the Constellation Complaint and comments submitted by \nConstellation in support of its claim that there is “uncertainty.”26  But the actual situation described \nin the Constellation Complaint giving rise to the purported uncertainty revealed that any delay \nresulted from a decision made by Constellation in its attempt to bypass retail service requirements \n \n24  Under the PJM Tariff, “Network Transmission Service” “mean[s] transmission service provided pursuant to the \nrates, terms and conditions set forth in Tariff, Part III, or transmission service comparable to such service that is \nprovided to a Load Serving Entity that is also a Transmission Owner.”  PJM Tariff, OATT Definitions – L – M – \nN, at 13-14.  The PJM Tariff defines “Network Integration Transmission Service” as “the transmission service \nprovided under Tariff, Part III.  There are two types of firm Network Integration Transmission Service:  Regional \nNetwork Integration Transmission Service and firm Cross-Border Network Integration Transmission Service.  \nNon-firm Network Integration Transmission Service includes Secondary Service.”  Id. at 12–13. \n25  Under the PJM Tariff, “Point-To-Point Transmission Service” “mean[s] the reservation and transmission of \ncapacity and energy on either a firm or non-firm basis from the Point(s) of Receipt to the Point(s) of Delivery \nunder Tariff, Part II.”  Id., OATT Definitions – O – P – Q, at 10. \n26  206 Order, 193 FERC ¶ 61,217 at P 175."},{"page":16,"startToken":5894,"endToken":6195,"text":"16 \n \nand to obtain service in violation of Illinois law.  This can be seen in Attachment 1 of Exhibit 5 to \nConstellation’s November 22, 2024, Complaint filed in Docket No. EL25-20-000.27  That \nattachment is a November 12, 2024, letter from ComEd to Constellation concerning \ninterconnection requests at the LaSalle and Byron nuclear facilities.  In that letter, ComEd details \ncertain design issues with Constellation’s proposal and then explains that the “end use load is retail \nload under both Illinois and federal law and cannot be interconnected solely through amendments \nto the LaSalle or Byron [interconnection service agreements].”28  ComEd went on to explain its \ncontinued belief that, \nthere is no lawful path to interconnect end use load at LaSalle and \nByron without that load taking service as a retail customer of \nComEd and we cannot continue to review proposals for co-location \nof end use load at LaSalle and Byron on some other basis.29   \n \nComEd suggested that Constellation make the requested design changes and submit “an \napplication for retail service.”30  Instead, Constellation decided to disregard Illinois law and \nexisting tariff mechanisms that apply to entities requesting to serve retail customers.   \nExisting retail and transmission services were and still are available to Constellation, just \nnot at Constellation’s preferred arrangement—that is, an arrangement that tried to excuse the co-\nlocated load from paying for Network Service.  To the extent clarification was needed, the \nCommission has now clarified (in portions of the 206 Order that the PJM Indicated Transmission \nOwners support) that these arrangements must be properly metered and must designate and involve \n \n27  See Complaint Requesting Fast Track Processing of Constellation Energy Generation, LLC, at Ex. 5 Attach. 1, \nDeclaration of James R. McCoskey (filed Nov. 22, 2024). \n28  Id. at Ex. 5 Attach. 1, at 2. \n29  Id. \n30  Id."},{"page":17,"startToken":6195,"endToken":6490,"text":"17 \n \ntransmission service to an Eligible Customer.  Constellation’s retail bypass attempt was an effort \nto evade exactly those rules.  With the Commission’s clarification that those rules cannot be \nevaded, service can proceed in an orderly fashion.  No uncertainty exists and thus the allegation of \nuncertainty does not support finding the PJM Tariff unjust and unreasonable and fixing a new rate \nwith new interim service and CD Service based upon net load of a co-located load customer. \nIndeed, when customers do not attempt to evade metering and take service instead through \nan Eligible Customer, their load service requests proceed on a timely basis.  For example, as Exelon \nexplained in recent comments, in 2025, ComEd received more than 25 customer service \napplications for large load service, representing new load in excess of 20 GW.31  There is no \nsuggestion in the record that any customer is encountering problems with those requests (and if \nthere was a problem, it would no doubt have been raised).  The Commission ignored this data, and \nits decision is therefore arbitrary and capricious and not reasoned decision making.  By ignoring \nthe record evidence, the Commission violated the requirement that an “agency must examine the \nrelevant data and articulate a satisfactory explanation for its action including a ‘rational connection \nbetween the facts found and the choice made.’”32   \nThe recently revised co-location arrangements involving Talen Energy and its subsidiary \nSusquehanna Nuclear, LLC demonstrate that the current PJM Tariff works and needs no \nimprovements.  In Docket Nos. ER24-2172-000 and ER24-2172-001 (“Susquehanna ISA \nProceeding”),33 there was a proposal to allow co-located load to avoid purchasing Network Service \n \n31  See Exelon December 8, 2025 Comments at 6. \n32  State Farm, 463 U.S. at 43 (citation omitted). \n33  See Susquehanna ISA Order, 189 FERC ¶ 61,078."},{"page":18,"startToken":6490,"endToken":6808,"text":"18 \n \nthrough the use of a behind-the-meter arrangement.34  The Commission correctly rejected the \nproposed interconnection service agreement (“ISA”) in the Susquehanna ISA Proceeding. 35  Talen \nsubsequently announced that “[t]he existing Susquehanna co-located load arrangement between \nTalen and Amazon will transition to a ‘front-of-the-meter’ arrangement after the completion of \ntransmission reconfigurations expected in the Spring of 2026, concurrent with Susquehanna’s \nrefueling outage.”36  Talen effectively conceded that PJM Network Service works, which is to say \nthat Network Service under the existing PJM Tariff provides for timely service, and is a service \nupon which all customers may rely.  There is simply no evidence suggesting otherwise. \nIn its 206 Order, the Commission also found that “PJM’s Tariff is unjust and unreasonable \nbecause it does not include transmission services that reflect an Eligible Customer taking service \non behalf of a Co-Located Load that is willing and able to limit its energy withdrawals from the \ntransmission system under certain conditions.”37  The point here seems to be that, under the \nexisting PJM Tariff, some large load/data center customers will be deterred from taking service \nbecause they have to pay too much in circumstances in which they are “willing and able to limit \n[their] energy withdrawals from the transmission system,” but again there is no evidence that the \ncost of paying for Network Service deters service or has any impact whatsoever on development \nof data centers.38  Clearly, there is not a lack of data center development in the PJM Region—quite \n \n34  See PJM Interconnection, L.L.C., Docket No. ER24-2172-000, Application Attach. A, Amended ISA, at Schedule \nF, Part F.4 (June 3, 2024). \n35  Susquehanna ISA Order, 189 FERC ¶ 61,078. \n36  Press Release, Talen Energy, Talen Energy Expands Nuclear Energy Relationship with Amazon (June 11, \n2025), https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-\nrelationship-amazon. \n37  206 Order, 193 FERC ¶ 61,217 at P 159. \n38  See id."},{"page":19,"startToken":6808,"endToken":7184,"text":"19 \n \nthe opposite is true.  The data center development interest in PJM is overwhelming.39  As shown \nin the Exelon example, data center applications have been flowing in across PJM under the existing \nPJM Tariff rate structure. \nThe Commission also states that “[r]equiring [Network Service] could necessitate \ninefficient and costly transmission buildout and costs paid by transmission customers that may not \nbe necessary if Eligible Customers taking transmission service on behalf of Co-Located Loads are \nwilling to limit their energy withdrawals and take a transmission service that requires fewer \nNetwork Upgrades to provide.”40  Again, this is unsupported by evidence.  Any suggestion that \ntraditional Network Service imposes unnecessary transmission upgrade costs on all existing \ncustomers41 ignores the fact that network studies are based on physics and engineering—not the \nratemaking applicable to a particular service request.  For example, if a 500 MW load with various \noperating characteristics locates on the grid, its impact must be studied or reliability will be \nthreatened.  If, under various operating conditions (including the potential failure of protection \nsystems that seek to enforce a “net load” commitment), it could cause voltage collapse or other \nreliability concerns, those risks must be addressed.  Charging the load on a CD Service basis does \nnot change the physical and engineering impacts of the load.  Certainly, if the load installs systems \naimed at limiting its use of the grid, those might change the system impacts and need for upgrades, \n \n39  \nSee Exelon, Investor Meetings, at 18 (Winter 2026), https://investors.exeloncorp.com/static-files/0cd39e2e-\nea59-432b-afd7-b432025fe649 (reporting a projected 18+ GW and growing data center pipeline in Exelon’s territory); \nFirstEnergy, \n3Q \n2025 \nStrategic \n& \nFinancial \nHighlights, \nat \n6 \n(Oct. \n22, \n2025), \nhttps://investors.firstenergycorp.com/investor-materials/webcasts-and-presentations/presentation-details/2025/Third-\nQuarter-2025-Strategic-and-Financial-Highlights/default.aspx (projecting cumulative data center demand to be \n15,450 MW for 2035 based on both contracts and pipeline, i.e., “customers with reasonable level of confidence of \nconstruction”); PJM, RTEP 2024 Regional Transmission Expansion Plan, at 17 (Apr. 17, 2025), \nhttps://www.pjm.com/-/media/DotCom/library/reports-notices/2024-rtep/2024-rtep-report.pdf (“PJM is experiencing \nsignificant load growth driven primarily from the proliferation of data centers . . . .”). \n40  See 206 Order, 193 FERC ¶ 61,217 at P 199. \n41  See id. at P 67 (summarizing Constellation’s arguments)."},{"page":20,"startToken":7184,"endToken":7533,"text":"20 \n \nbut the same can be said for similar systems applied to other loads.  Nothing in the record says that \nsuch systems are more beneficial for co-located load projects than for any other load.  Nothing in \nthe record supports the use of different ratemaking principles when such installations are in place.  \nTo the contrary, as discussed below, the Commission has consistently rejected arguments that \ndifferent ratemaking should be applied even where there are physical limits to the amount of \ntransmission system use.42 \nUltimately, in the study process, if the customer’s co-located load site is the one that \nrequires the least transmission upgrades compared to other sites suggested by the customer, using \nthe customer’s gross load, then that can be determined during the study process.  The fact that a \nload is located near a generator may well reduce system impacts—a good thing—but that holds \ntrue regardless of whether the load has contracted with the generator it abuts, or with remote \ngeneration.    \nThe Commission states that “[p]arties further argue that Co-Located Loads may be able to \nreceive transmission service faster with use of a new, limited transmission service product than \nthey would if they selected NITS, to the extent that providing NITS would require Network \nUpgrades that the limited transmission service would not.”43  There is simply no evidence relied \nupon to support this assertion.  Good siting decisions, for co-located arrangements or otherwise, \ncan lead to speedier service, with less need for system upgrades, but there is no support in the \nrecord for the notion that a new ratemaking arrangement (CD Service) will alter what must be \nstudied in assessing the physics and engineering of any proposed new configuration.  Further, the \nsuggestion that an agreement to limit net power withdrawals from the system to zero should permit \n \n42  See Fla. Power & Light Co., 113 FERC ¶ 61,290 (2005), aff’d on rehearing, 116 FERC ¶ 61,012 (2006), aff’d on \nappeal sub nom. Fla. Mun. Power Agency v. FERC, 264 F. App’x 4 (D.C. Cir. 2008) (per curiam). \n43  206 Order, 193 FERC ¶ 61,217 at P 205."},{"page":21,"startToken":7533,"endToken":7901,"text":"21 \n \nfast-track interconnection again flatly ignores physical and engineering reality.  There is no \nquestion that, even when no net power is being withdrawn from the system (i.e., when the load is \nless than the capacity of the co-located generator), the transmission system is affected and needed \nby the load – indeed, the Commission agreed with this proposition when it found that co-located \nloads do utilize load-following based on gross rather than net load.44  Load following means that \nthe ups and downs of the load cause flows on the grid in synchrony with those ups and downs.  \nEven in a case where there are no net draws, load fluctuations of hundreds of MW could occur and \ncould impact the grid, even with protective systems in place to prevent net power withdrawals.  By \nsuggesting that the loads in such circumstances can be interconnected with a fast-track approach \nwithout studying physical impacts that threaten system integrity, the 206 Order is endorsing an \nunsound approach that is contrary to the public interest and based on absolutely no discernible \nevidence.  It is therefore not supported by substantial evidence.45 \nArrangements to reduce load under peak or emergency conditions might be beneficial—or \nmight not, if the potential concern is instabilities that arise due to the characteristics of the load \nitself rather than issues elsewhere on the system.  Further, such arrangements will have the same \npotential benefit regardless of whether there is a contractual supply arrangement with a nearby \ngenerator and regardless of whether it pays for transmission service based on net or gross load. \nFurther, if there was doubt in anyone’s mind that Network Service is both feasible and a \njust and reasonable option, the Commission’s 206 Order removes such doubt by admitting that \nNetwork Service remains just and reasonable.  The Commission states that, \n \n44  See, e.g., id. P 160. \n45  See Florida Gas, 604 F.3d at 639 (“[T]he Commission ‘must be able to demonstrate that it has made a reasoned \ndecision based upon substantial evidence in the record.’”) (citation omitted); Consol. Edison Co. of N.Y., 305 \nU.S. at 229 (explaining that substantial evidence means “more than a mere scintilla”); see also 5 U.S.C. § 706."},{"page":22,"startToken":7901,"endToken":8220,"text":"22 \n \nit continues to be just and reasonable for an Eligible Customer \ntaking transmission service on behalf of Co-Located Load to elect, \nas one of the required transmission services from which the Eligible \nCustomer must choose, to take NITS. . . .  NITS provides significant \nbenefits because a NITS customer gains the right to be served from \nthe transmission system at any time, and PJM and the transmission \nowners incorporate NITS load into their transmission planning.46   \n \nThe Commission also states that, “[w]hile [it] find[s] that NITS charged on a gross demand \nbasis is one just and reasonable transmission service option for Eligible Customers taking \ntransmission service on behalf of Co-Located Loads, it is not the only option.”47  The Commission, \nthus, acknowledges that the existing service options are feasible and just and reasonable, but the \nCommission merely wants more options.  That, however, is not a permissible basis to take action \nunder FPA section 206.  Having found the tariff just and reasonable under the first prong of section \n206, there is no second prong remedy stage for the Commission to initiate.  Giving certain \ncustomers preferential treatment for cost allocation is not an appropriate means to exercise the \nCommission’s FPA section 206 powers. \nIn short, the 206 Order is fatally flawed because it does not adhere to the requirements of \nSection 206 and provides no evidentiary support for the building-block assumptions upon which \nit purports to stand. \nB. The Commission Did Not Engage in Reasoned Decision Making Because It \nDid Not Explain its Departure from FERC Precedent or Refute that, Because \nthe Existing PJM Tariff Provides Service on the Same Basis for All \nCustomers, the Existing PJM Tariff Does Not Grant an Undue Preference.   \n \nAs an initial matter, picking and choosing customers to receive preferential rate treatment \nruns contrary to the FPA’s requirement that “[n]o public utility shall, with respect to any \n \n46  Id. P 195 (footnote omitted). \n47  Id."},{"page":23,"startToken":8220,"endToken":8574,"text":"23 \n \ntransmission or sale subject to [FERC’s] jurisdiction . . . (1) make or grant any undue preference \nor advantage to any person or subject any person to any undue prejudice or disadvantage, or (2) \nmaintain any unreasonable difference in rates, charges, service, facilities, or in any other respect, \neither as between localities or as between classes of service.”48   \nThe Commission has a long-standing policy of rejecting attempts by network transmission \ncustomers to avoid paying their load ratio share of system cost.  As the Commission recognized in \nthe 206 Order, citing the Amtrak case, the Commission “has rejected cost causation arguments \nmade by network customers that sought to lower their load ratio share based on actual use of the \ntransmission system.”49  This policy has long persisted for very good reason.  The “assessment of \n[Network Integration Transmission Service] is not based on actual use over a particular \ntransmission path, but rather based on the network customer’s right to use the entire system” and \nits effects on that system.50   \nThe Amtrak case, which rejected an attempt by a network customer in PJM to pay for less \nthan its full gross load, was not an outlier, but instead reflected decades of Commission precedent, \nrejecting challenges to uniform application of the rule that Network Service would be based on the \nentire gross load of the network customer, regardless of arguments (such as those advanced by \nAmtrak) that the customer could purportedly limit use of the system.  For example, this exact issue \nwas addressed in Order No. 888-A and resulting appeals.  In Order No. 888-A, the Commission \n \n48  16 U.S.C. § 824d(b). \n49  206 Order, 193 FERC ¶ 61,217 at P 196 & n.412 (citing Nat’l R.R. Passenger Corp. v. PPL Elec. Utils. Corp, \n171 FERC ¶ 61,237, at P 41 (2020), denying clarification and addressing reh’g, Nat’l R.R. Passenger Corp. v. \nPPL Elec. Utils. Corp., 173 FERC ¶ 61,043 (2020) (“Amtrak”); PJM Interconnection, L.L.C., 169 FERC ¶ 61,041, \nat P 60 (2019)). \n50  Nat’l R.R. Passenger Corp. v. PPL Elec. Utils. Corp., 173 FERC ¶ 61,043, at PP 13–14 (2020)."},{"page":24,"startToken":8574,"endToken":8986,"text":"24 \n \nheld that customers cannot “split” their load at a delivery point—if some of the load takes Network \nService, all of the load must be designated for Network Service: \nThe concept of allowing a “split system” or splitting a discrete load \nis antithetical to the concept of network service.  A request for \nnetwork service is a request for the integration of a customer’s \nresources and loads.  Quite simply, a load at a discrete point of \ndelivery cannot be partially integrated—it is either fully integrated \nor not integrated.  Furthermore, such a split system creates the \npotential for a customer to “game the system” thereby evading some \nor all of its load-ratio cost responsibility for network services.51 \nThat ruling was expressly upheld on appeal by the U.S Court of Appeals for the District of \nColumbia Circuit (“D.C. Circuit”), which accepted the Commission’s reasoning, finding that \nobjections were “not well-taken.”52  Application of the ruling in Order No. 888-A is dispositive:  \nBecause the Commission has recognized that these customers use the transmission system for \nsome services (such as load following and black start), the notion that the customer can use the \nsystem for those services but not others, that it is “partially integrated,” flies in the face of the \nCommission’s Order 888-A ruling. \nThe issue was likewise addressed in a long series of cases involving Florida Municipal \nPower Agency (“FMPA”) and transmission service it was taking from Florida Power and Light.  \nAs recounted by the D.C. Circuit in 2005, years of litigation in that case involved the attempt by \nFMPA to avoid paying for Network Service based on its overall gross load, with the Commission \nconsistently rejecting all arguments by FMPA against such load splitting.53  In the 2005 decision, \n \n51  Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by Public \nUtilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888-A, 78 FERC \n¶ 61,220 (1997), order on reh’g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), order on reh’g, Order No. 888-C, \n82 FERC ¶ 61,046 (1998), aff’d in relevant part sub nom. Transmission Access Pol’y Study Grp. v. FERC, 225 \nF.3d 667 (D.C. Cir. 2000), aff’d sub nom. New York v. FERC, 535 U.S. 1 (2002). \n52  Transmission Access Pol’y Study Grp., 225 F.3d at 726. \n53  Fla. Mun. Power Auth. v. FERC, 411 F.3d 287 (D.C. Cir. 2005) (describing history of case back to 1993)."},{"page":25,"startToken":8986,"endToken":9432,"text":"25 \n \nthe court remanded one argument by FMPA, which is that physical constraints on the transmission \nsystem made it physically impossible for its entire load to be served by the FPL system.54  On \nremand, the Commission found that even in the case of physical impossibility of serving the entire \nload, the gross load construct was most appropriate, rejecting arguments that a network customer \nshould pay for any less than its entire system load.55 \nThe Commission has consistently followed this precedent.56  For example, in Idaho Power, \nthe Commission rejected Bonneville Power Administration’s (“BPA”) attempt to remove certain \nof its load from its load ratio share.57  The Commission explained that, contrary to Order No. 888, \n“BPA’s proposal would essentially leave the behind the meter loads . . . as part of BPA’s network \nload served by Idaho Power’s transmission service, but eliminate the requirement that such loads \nbe metered, i.e., included in BPA’s load ratio share, because Idaho Power’s transmission service \nmay only be needed in rare instances.”58  Similarly, in Order No. 890,59 commenters complained \nthat assigning transmission-related costs to customers that reduce their use of the transmission \n \n54  Id. at 292 (remanding because “FERC . . . failed to explain why network customers should be charged by the \ntransmission provider for network service that the provider is physically constrained from offering and, relatedly, \nwhy physical impossibility should not be recognized as an exception to the general rule against permitting partial \nload ratio pricing for network customers”). \n55  Fla. Power & Light, 113 FERC  ¶ 61,290 (2005), aff’d on rehearing, 116 FERC ¶ 61,012 (2006), aff’d on appeal, \n264 F. App’x 4 (D.C. Cir. 2008). \n56  See, e.g., Idaho Power Co., 106 FERC ¶ 61,329 (2004) (“Idaho Power”); Ameren Servs. Co. v. Prairieland Energy \nInc., 131 FERC ¶ 61,125 (2010) (finding that network customer failed to comply with the tariff by not designating \nits total load as network load); Ariz. Pub. Serv. Co., 151 FERC ¶ 61,191 (2015) (finding that a network customer's \nrequest to designate less than its entire load as network load violated both the transmission provider’s OATT and \nlong standing Commission policy, which require network customers to designate their entire load as network load \nto receive network service). \n57  Idaho Power, 106 FERC ¶ 61,329 at P 14. \n58  Id. \n59  Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, 119 FERC ¶ 61,119 \n(“Order No. 890”), order on reh'g, Order No. 890-A, 121 FERC ¶ 61,297 (2007), order on reh'g, Order No. 890-\nB, 123 FERC ¶ 61,299 (2008), order on reh'g, Order No. 890-C, 126 FERC ¶ 61,228, order on clarification, \nOrder No. 890-D, 129 FERC ¶ 61,126 (2009)."},{"page":26,"startToken":9432,"endToken":9858,"text":"26 \n \nprovider’s system to serve load is inconsistent with the Commission’s cost-causation principles. \nThe Commission rejected such arguments, stating that its existing policy already provides \ncustomers with the opportunity to reduce network service costs to the extent a customer is not \nrelying on the transmission system to meet its energy needs (i.e., by taking point-to-point \ntransmission service instead of network service).60 \nIn the 206 Order, the Commission now has departed from these decades of precedent and, \ncontrary to the APA, has failed adequately to explain its departure.61  The Commission’s prior \ndeterminations of the fairness of load ratio allocation (based on gross load—even in the case of \npurported physical impossibility of service to full load) of embedded costs hold true.  If the new \ndata center load is one third of the load in a PJM zone, it should pay one third of embedded costs \nof providing service in that zone.  If it pays less, other customers pay a disproportionate share of \ncosts of the system.  There is no reasoned basis for these distinctions. \nThe Commission justifies its decision to depart from precedent (i.e., to base CD Service \nrates on net rather than gross load) with the assertion that co-located loads impose less burden on \nthe grid compared to other customers, and presumably receive fewer benefits.  But prior attempts \nto create a new third type of transmission service have relied on the exact same argument—\ncustomers have made fact-based arguments that their uses of the transmission system are somehow \ndifferent from, and less impactful than, the uses of the system by other customers.  The \n \n60  See Order No. 890, 119 FERC ¶ 61,119. \n61  See  Fox Television Stations, Inc., 556 U.S. at 515 (“the requirement that an agency provide reasoned explanation \nfor its action would ordinarily demand that it display awareness that it is changing position. An agency may not, \nfor example, depart from a prior policy sub silentio or simply disregard rules that are still on the books.”).  At \nparagraph 211 of the 206 Order, the Commission says that the current load-splitting proposal is different from \nprior situations because PJM need only plan for the specified contract demand rather than the full load, but this \nargument is not a difference from prior cases at all, such as the FPL case where there was no contention that FPL \nwas redesigning its system to serve the full load of FMPA, or the Amtrak case where the entire premise of the \nargument was that Amtrak made only rare and limited use of the system."},{"page":27,"startToken":9858,"endToken":10162,"text":"27 \n \nCommission consistently has rejected these requests for special rates.  The Declaration of Danielle \nS. Powers (“Powers Declaration”), submitted by the Indicated TOs, explains why the assessment \nof Network Service is not based on actual use over specific transmission paths.62  All customers \nhave different usage of the grid.  Many customers’ reliance upon the grid varies during different \ntimes of the year and can be distinguished from other customers’ uses.  As the Powers Declaration \nexplained, there may be a ski resort that operates only in winter and runs its snow guns at night or \na large greenhouse that operates its lighting at night.63  These customers may have distinct load \nshapes or load factors, but they pay the same rate for Network Service as do high load factor \ncustomers.  Such customers pay the full Network Service rate, but because Network Service \ncharges are allocated based on contribution to the system coincident peak, some customer charges \nmay be lower on average than others if their operations occur disproportionately outside of the \npeak hours.  No additional rate discount is necessary or given.  Up until now, the Commission has \nconsistently applied this approach of not carving out special rates for different customer classes \nfor good reason—every customer can attempt to make arguments why their usage should result in \na decrease of their share of the embedded costs of the transmission system.  Utilities have an \nobligation to serve load and that load needs to be able to call on service regardless of whether they \nactually utilize the system to the maximum allowable extent since weather and other factors are \nunpredictable.  Hence, actual usage does not reflect the benefit.  Entertaining such arguments \n \n62  See PJM Interconnection, L.L.C., Docket No. EL25-20-000, Indicated TOs June 3, 2025 Answer, Declaration of \nDanielle S. Powers at P 29. \n63  Id."},{"page":28,"startToken":10162,"endToken":10521,"text":"28 \n \nwould frustrate the rate design that the Commission has applied across the board and that was put \nin place following Order No. 888.64 \nThe existing PJM Tariff allows end-use load and generation to co-locate in a timely manner \nand on terms that are fair to all other users of the grid and commensurate with cost causation \nprinciples.  The existing PJM Tariff effectuates the principle that those that benefit from the \ntransmission system should contribute to the embedded costs of the system and is consistent with \nthe pro forma OATT in providing for Network Service and Point-to-Point Service, an important \ncomponent of Order No. 888.65  Under the existing rate design, the PJM Tariff provides for \ntransmission owners to recover on a postage stamp basis the embedded costs of their respective \nportions of the transmission grid from network customers.   \nAlthough the Commission disagrees that Network Service on a gross demand basis should \nbe required for co-located load, the Commission, in the same breath, recognizes that such an option \nis “one part of a just and reasonable . . . rate.”66  The Commission states that because the “record \ndemonstrates that Eligible Customers taking transmission service on behalf of Co-Located Loads \nare willing and able to limit their energy withdrawals from the transmission system under certain \nconditions,” “[i]t would be inconsistent with cost causation principles to require Eligible \nCustomers taking transmission service on behalf of Co-Located Loads that limit their energy \nwithdrawals to take NITS on a gross demand basis.”67  These findings are entirely disconnected \n \n64  See, e.g., Recovery of Stranded Costs by Pub. Utils. and Transmitting Utils., Order No. 888, 75 FERC ¶ 61,080 \n(1996), order on reh’g, Order No. 888-A, 78 FERC ¶ 61,220, order on reh’g, Order No. 888-B, 81 FERC ¶ 61,248 \n(1997), order on reh’g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff’d in relevant part sub nom. Transmission \nAccess Pol’y Study Grp. v. FERC, 225 F.3d 667 (D.C. Cir. 2000) (TAPS), aff’d sub nom. New York v. FERC, 535 \nU.S. 1 (2002). \n65  See, e.g., id. \n66  206 Order, 193 FERC ¶ 61,217 at P 199. \n67  Id."},{"page":29,"startToken":10521,"endToken":11070,"text":"29 \n \nfrom prior FERC precedent discussed above, where the Commission rejected cost-causation \narguments by the likes of Amtrak, FMPA, and BPA, who made essentially identical arguments that \nthey would limit use of the provider’s system.  The 206 Order makes no attempt to explain why it \ndeparted from that precedent.68  The Commission has also not explained why co-located load \nshould be treated any differently, much less preferentially.  The 206 Order is therefore deficient.69 \nUnder the APA, the Commission must explain why circumstances have changed such that \nthis proceeding requires departure from past efforts by customers to pay for less than gross load.70  \nThe Commission made no serious attempt to do so.  Nor has the Commission distinguished why \nother existing customers will not qualify for discounts—many of whom can argue that they impose \nlesser demand on the grid by some measure.  Furthermore, the 206 Order makes no effort to explain \nthe decision to change that rule in PJM and only in PJM.  That failure to provide explanation \nrenders FERC’s decision arbitrary and capricious and violates the APA.71  Ultimately, this is not \n \n68  See id. P 196 & n.412 (citing Amtrak, 171 FERC ¶ 61,237 at P 41; PJM Interconnection, L.L.C., 169 FERC \n¶ 61,041 at P 60 (2019)). \n69  TransCanada Power Mktg. Ltd. v. FERC, 811 F.3d 1, 12-13 (D.C. Cir. 2015) (remanding because FERC did not \nadequately explain its position). \n70  See Fox Television Stations, Inc., 556 U.S. at 515 (“the requirement that an agency provide reasoned explanation \nfor its action would ordinarily demand that it display awareness that it is changing position.  An agency may not, \nfor example, depart from a prior policy sub silentio or simply disregard rules that are still on the books.”); see \nalso Constellation Mystic Power,  45 F.4th at 1057 (finding the Commission’s decision to be arbitrary and \ncapricious and that “the Commission’s ‘failure to provide an intelligible explanation . . . amounts to a failure to \nengage in reasoned decisionmaking’”) (citation omitted); New England Power Generators Ass’n, Inc. v. FERC, \n881 F.3d 202, 211 (D.C. Cir. 2018) (“Although case-by-case adjudication sometimes results in decisions that \nseem at odds but can be distinguished on their facts, it is the agency’s responsibility to provide a reasoned \nexplanation of why those facts matter.” (citing BP Energy Co. v. FERC, 828 F.3d 959, 968 (D.C. Cir. 2016) \n(vacating finding of no undue discrimination where Commission identified differences between two natural-gas \ncompanies but failed to adequately explain why they provide a rational basis for the difference in treatment))); \nW. Deptford Energy, LLC v. FERC, 766 F.3d 10, 20 (D.C. Cir. 2014) (“It is textbook administrative law that an \nagency must ‘provide[ ] a reasoned explanation for departing from precedent or treating similar situations \ndifferently,’ . . . and Commission cases are no exception . . . .”) (alteration in original) (citations omitted). \n71  See, e.g., Cal. Pub. Utils. Comm’n, 879 F.3d at 977 (“FERC departed from this policy without acknowledgment \nor explanation. This departure was arbitrary and capricious.”); Sw. Airlines Co., 926 F.3d at 856 (“‘A full and \nrational explanation’ becomes ‘especially important’ when, as here, an agency elects to ‘shift [its] policy’ or \n‘depart[ ] from its typical manner of’ administering a program. . . .  [FERC] must at least ‘acknowledge’ its \n(cont'd)"},{"page":30,"startToken":11070,"endToken":11433,"text":"30 \n \nreasoned decision making and will create a nightmare as other customers in PJM and beyond raise \na host of similar arguments that their transmission rates should be modified based on their allegedly \ndifferent use of the system, which is a reason why the Commission never mandated this in the past.  \nThe Commission’s provision of an option for CD Service in the replacement tariff is based on a \nfalse presumption that co-located loads rely differently on the grid than other loads and therefore \nshould pay different rates.  As discussed above, the Commission repeatedly has found that different \nusage patterns should not exempt loads from paying a gross load-ratio share.  As demonstrated in \nthe next section, the very assertion that co-located projects impose fewer burdens on the grid, and \nreceive fewer benefits from being interconnected, is itself unsupported and untrue. \nC. The Loads Rely Upon The Entire Embedded Transmission System To Serve \nTheir Full Gross Load.  Therefore, FERC’s Decision is Arbitrary and \nCapricious Because The Embedded Transmission System Costs Should Be \nCharged For Those Transmission Services. \nNotwithstanding well-established Commission policy and judicial precedent to the \ncontrary, the 206 Order establishes a new preferential transmission rate available only for co-\nlocated loads.  Not only is this new rate unduly discriminatory (as discussed herein), but it is based \non a false premise that the combination of transmission system burdens and user benefits of co-\nlocated loads are so insignificant as to justify the establishment of a lower, preferential rate.  The \nCommission is wrong, with respect to both the actual burdens on the system and the benefits to \nco-located projects of being interconnected to the grid. \nAs for benefits, the Commission has recognized that co-located loads benefit from black \nstart and load following service,72 and that such service properly should be charged based on gross \n \nseemingly inconsistent precedents and either offer a reason ‘to distinguish them’ or ‘explain its apparent rejection \nof their approach’ . . . But however the agency justifies its new position, what it may not do is ‘gloss[ ] over or \nswerve[ ] from prior precedents without discussion.’”) (alterations in original) (citation omitted). \n72  See 206 Order, 193 FERC ¶ 61,217 at PP 209, 219 (3), (4)."},{"page":31,"startToken":11433,"endToken":11737,"text":"31 \n \nload.  Load following services are supplied from a diverse range of the interconnected generation \nfacilities located throughout the system.  These services cannot be provided without use of all the \ntransmission system’s resources and personnel.  Moreover, because it is a universal rule that \ngenerators cannot operate every hour of every year and that unexpected outages can and do occur, \ntransmission interconnections provide an avenue for data center loads to readily acquire back-up \npower when co-located generation facilities are not available.  Based solely on these uses of the \ntransmission system, co-located loads have no greater claim to preferential rates than other, \nsimilarly situated transmission customers who have been denied such preferences. \nIn addition to diminishing the not-unique burdens imposed on the grid by co-located load, \nthe Commission fails to consider the many advantages to co-located loads when they connect to \nthe transmission system.  These advantages become apparent when one compares islanded co-\nlocation projects to similar projects that are interconnected to the transmission grid.  Islanded \nprojects require extensive back-up generation to assure reliable sources of power for data center \nloads.  It is very difficult and expensive to supply islanded generation with black start capabilities \nor instantaneous load following.  All back-up generation on an islanded project will sit idle when \nnot needed to serve the islanded load, thereby forgoing significant revenues from selling the \nsurplus power into the wholesale market.  These lost opportunity sales revenues alone could likely \ncover the fully embedded costs of Network Service.  Ultimately, islanded generation projects are \nmore risky and therefore more difficult to finance.  Grid interconnection is valuable, which is why \nthe pending proposals do not just create isolated islands.  In determining that traditional Network \nService without the option of additional services mandated by the Commission is unjust and \nunreasonable, the Commission considered none of these benefits of grid interconnection.  Failure"},{"page":32,"startToken":11737,"endToken":12044,"text":"32 \n \nto consider the benefits of grid interconnection makes the 206 Order arbitrary and capricious and \nunreasoned.73 \nAdditionally, the 206 Order’s finding that the existing PJM Tariff is not just and reasonable \nis arbitrary and capricious because the Commission failed to consider the unique issues that attend \nco-location with nuclear plants.  A nuclear facility must be interconnected to the grid as a Nuclear \nRegulatory Commission licensing obligation74 and it cannot follow load in any meaningful sense.75  \nTherefore, every swing in a load that is co-located with a nuclear plant—from zero MW to full \nload—will impact the grid.76  There is no question that a nuclear co-location arrangement is \ndependent on the grid because the nuclear unit serving the load is not permitted by its license to \noperate without a robust grid interconnection.77  Further, load that is co-located with a nuclear unit \ndepends on services such as load following, voltage support, black start, and other ancillary \nservices that will be and can only be delivered over the grid.78  Because nuclear units cannot \nprovide these services, there is full dependence on the transmission system because the nuclear \nunit lacks the ability to increase and decrease output in response to the demand from the co-located \nload.79  The transmission system services are used every second of every hour—not just when the \ngenerator fails or the load exceeds the output of the connected nuclear unit.80  Because the nuclear \n \n73  See State Farm, 463 U.S. at 43. \n74  See, e.g., Decl. of David Weaver, PE at PP 11-12, Attachment 1 to Exelon Comments, Docket No. EL25-20 (Dec. \n12, 2024). \n75  See, e.g., id. at P 18. \n76  See id. at PP 18-19. \n77  See id. at PP 11-13, 16. \n78  See id. at PP 14-19. \n79  See id. \n80  See id."},{"page":33,"startToken":12044,"endToken":12568,"text":"33 \n \nunit runs full out all the time (aside from refueling and other equipment-related outages), from an \nengineering and physics perspective, a load served by a co-located nuclear plant uses the system \nin the same way as a load that is served by remote resources.  In both cases the nuclear plant’s \noutput remains constant, and all needs of the load are addressed by remote generation that moves \nup and down to follow the load.81  The Commission’s failure to respond to these arguments \nconcerning the unique aspects of nuclear generation in its decision is a violation of the APA.82 \nIII. \nThe Burden Has Not Been Met Under FPA Section 206: FERC’S Replacement \nRate is Not Just and Reasonable. \n \nWhatever the 206 Order is, the one thing it is not is a viable FPA Section 206 action.  Under \nFPA section 206,83 there are two steps: only after the Commission finds a rate to be unjust and \nunreasonable, may it set a replacement rate.84  No one has met the burden at either step.   \nAs discussed above, the Commission and complainants fail at the first step of FPA section \n206 because the PJM Tariff provides for two transmission services (i.e., Network Service and \nPoint-to-Point Service) that the Commission continues to recognize as just and reasonable and \n \n81  See id. at PP 2, 24.  While we describe this as a nuclear issue, renewable resources are often in the same position, \nunable to alter their output in the short-term and thus leaving all load and voltage fluctuation to the broader grid.  \nMost thermal resources can alter their output, but often not instantaneously.  Whether they can “absorb” sudden \nload fluctuations of an abutting load so that the grid is not impacted remains to be studied, but in any case they \nwould not absorb the load fluctuations absent installation of control systems that provide for such absorption, \nwhich is a different thing from systems that protect against net withdrawals of power. \n82  See New England Power Generators Ass’n, Inc., 881 F.3d at 211 (finding “that FERC did not engage in the \nreasoned decisionmaking required by the Administrative Procedure Act” because it “failed to respond to the \nsubstantial arguments put forward by Petitioners and failed to square its decision with its past \nprecedent”); Canadian Ass’n of Petroleum Producers, 254 F.3d at 299 (“Unless the Commission answers \nobjections that on their face seem legitimate, its decision can hardly be classified as reasoned.”) (citations \nomitted); Tesoro Alaska Petroleum Co. 234 F.3d at 1294 (“The Commission’s failure to respond meaningfully to \nthe evidence renders its decisions arbitrary and capricious.”). \n83  16 U.S.C. § 824e(a).  \n84  See id; see also Advanced Energy Mgmt. All., 860 F.3d at 663 (“If the Commission finds that a rate is ‘unjust, \nunreasonable, unduly discriminatory or preferential, the Commission shall determine the just and reasonable \nrate … and shall fix the same by order,’” and “[i]t is the Commission’s job—not the petitioner’s—to find a just \nand reasonable rate.”) (alterations in original) (citation omitted); Emera Maine, 854 F.3d at 21; Atl. City Elec. \nCo., 295 F.3d at 10."},{"page":34,"startToken":12568,"endToken":12891,"text":"34 \n \nthose two services are offered to all customers without undue preference.  The 206 Order also fails \nat the second step of FPA section 206 because the proposed replacement rate is not just and \nreasonable, would grant an undue preferential rate for co-located loads, and would exacerbate the \nresource adequacy, reliability constraints, and affordability concerns in PJM—all contrary to the \nFPA. \n“[T]he principal purpose of [the FPA is] to encourage the orderly development of plentiful \nsupplies of electricity . . . at reasonable prices.”85  “The reasonableness of a rate is assessed in light \nof the FPA’s goals of promoting reliable service at reasonable rates and developing plentiful energy \nsupplies.”86  It necessarily follows that reliability is relevant to the inquiry of whether a rate is just \nand reasonable.  Yet, the Commission’s proposed replacement rate was directed without any \nexamination of the reliability and resource adequacy implications.  The Indicated TOs maintain \nthat co-located load using transmission grid services should be required to be in front-of-the-meter \nto ensure reliability, transparency, and appropriate cost allocation. \nIn the 206 Order, FERC directed revisions to the PJM Tariff to \n \nclarify that an Interconnection Customer seeking to serve a Co-\nLocated Load with a newly interconnecting generating facility may: \n(1) request interconnection service at a level below its maximum \nfacility output; (2) use existing procedures in the PJM Tariff to \naccelerate the study of the interconnection service request if the \nrequest has no cost allocation for Network Upgrades and does not \nrequire further studies; (3) request provisional interconnection \nservice; and (4) request Surplus Interconnection Service.87 \n \nAs part of the replacement rate, PJM was also directed to revise the PJM Tariff to establish three \nnew transmission services that “reflect that Eligible Customers taking service on behalf of Co-\n \n85  NAACP v. FPC, 425 U.S. 662, 669–70 (1976). \n86  Constellation Mystic Power, LLC, 45 F.4th at 1035. \n87  206 Order, 193 FERC ¶ 61,217 at P 176."},{"page":35,"startToken":12891,"endToken":13146,"text":"35 \n \nLocated Loads are willing and able to limit their energy withdrawals from the transmission system \nunder certain conditions.”88  The three options directed by the Commission are as follows:  \n(1) Eligible Customers seeking to take Network Service on behalf \nof Co-Located Load may take a new interim, non-firm \ntransmission service until all Network Upgrades necessary to \nprovide the requested Network Service are complete;  \n \n(2) a Firm Contract Demand transmission service that an Eligible \nCustomer can choose to take on behalf of a Co-Located Load \ninstead of taking Network Service; and  \n \n(3) a Non-Firm Contract Demand transmission service that an \nEligible Customer can choose to take on behalf of a Co-Located \nLoad instead of taking Network Service.89   \n \nFor the new Interim Service, FERC states that Eligible Customers “would avoid paying generator \ncapacity costs in return for their willingness to curtail their withdrawals in advance of emergency \nconditions (i.e., it will be curtailed before existing firm transmission services and the new Firm \nContract Demand Transmission Service).”90 \nThere is no basis for the Commission to direct these new services, and the Commission has \nnot pointed to any other regional transmission organization, independent system operator, or public \nutility where such transmission services are used or required.  These three service options provide \npreferential treatment for certain customers in one region of the country where their rates are \nsubsidized by all other customers, and the Commission has required these tariff changes without \nregard to the reliability implications. \n \n88  Id. P 178. \n89  Id. \n90  Id. P 201."},{"page":36,"startToken":13146,"endToken":13457,"text":"36 \n \nA. Allowing Special Treatment For Co-Located Load Violates The FPA’s \nRequirement That There Be No Undue Preference Or Unreasonable \nDifference In Rates Between Classes Of Service.  \nAs explained above, FPA section 205 prohibits any public utility charging transmission \nrates from “mak[ing] or grant[ing] any undue preference or advantage to any person or subject any \nperson to any undue prejudice or disadvantage” or “maintain[ing] any unreasonable difference in \nrates, charges, service, facilities, or in any other respect, either as between localities or as between \nclasses of service.”91  The Commission, by requiring the new forms of service discussed above, \nwould establish rates that grant an undue preference or advantage to co-located loads.  As an initial \nmatter, for all of the new services, the Commission has not pointed to any example in any other \nregional transmission organization’s, independent system operator’s, or public utility’s tariff \nwhere these types of transmission services have been required by the Commission.   \nThe Commission fails to demonstrate that these changes are just and reasonable.  The 206 \nOrder claims that “PJM’s Tariff is unjust and unreasonable because it does not include \ntransmission services that reflect an Eligible Customer taking service on behalf of a Co-Located \nLoad that is willing and able to limit its energy withdrawals from the transmission system under \ncertain conditions.”92  But there already exist mechanisms (such as demand response at the state \nand retail levels) to address when customers can scale back their load or bring other generation to \nbear in order to reduce their withdrawals when called upon.  If co-located loads would like to be \ncompensated for being interruptible, then they should rely upon PJM’s demand response rules, and \nthe 206 Order fails to explain why those rules are inadequate here. Indeed, the Commission \n \n91  16 U.S.C. § 824d(b). \n92  206 Order, 193 FERC ¶ 61,217 at P 159."},{"page":37,"startToken":13457,"endToken":13750,"text":"37 \n \nmaintains that those rules are just and reasonable for co-located loads taking Network Service.93  \nThe point of FPA section 206 is not for the Commission to declare what it thinks would be better \ntariff options—it is to ensure that the tariff on file is just and reasonable.  The services imposed by \nthe 206 Order run into tension with foundational goals of the FPA—to ensure just and reasonable \nrates that do not provide an unreasonable difference among classes of customers or an undue \npreference. \nFor the new Interim Service, there is no basis for the Commission to require this new form \nof service prior to the completion of necessary network upgrades and studies to ensure reliability \nof the system.  The Commission states that “Eligible Customers taking the interim, non-firm \ntransmission service on behalf of Co-Located Loads would avoid paying generator capacity costs \nin return for their willingness to curtail their withdrawals in advance of emergency conditions.”94  \nThe Commission then sets for hearing and asks for “briefing on an appropriate point in emergency \noperations at which to curtail Eligible Customers taking this new interim, non-firm transmission \nservice on behalf of Co-Located Loads.”95  Which is to say that the Commission has not accounted \nfor reliability risks, not knowing how or when these curtailments would be implemented, or how \nthey would protect reliability.  Furthermore, even assuming emergency conditions were clearly \ndefined, additional inconsistencies amongst co-located load in different states could be created by \nfuture State legislation.  For example, a State could require all retail large loads be curtailable \nunder similar emergency conditions, which would effectively cause some retail customers to pay \nNITS while other co-located counterparts would pay a discounted rate.  \n \n93  Id. P 242. \n94  Id. P 201. \n95  Id."},{"page":38,"startToken":13750,"endToken":14116,"text":"38 \n \nAs discussed earlier in this rehearing request, system impacts are not limited to situations \nwhere there are net withdrawals from the system—load following and sudden load fluctuations \npotentially impact reliability regardless of whether there are net withdrawals from the system.96  \nFurther, the Commission fails to explain why system protection schemes installed in non-co-\nlocated load configurations would not provide similar benefits and be deserving of preferential \nrates.  Accordingly, the new service grants an undue preference for co-located loads.  \nSecond, the only issue that CD Services resolve is the level of embedded system costs to be \nallocated to co-located load.  The entire point of Constellation’s complaint was to allow loads with \nco-location arrangements to pay a smaller share of the embedded costs of the grid—leaving those \ncosts to other customers and creating an economic benefit for the co-located generator and/or load, \ndepending on their commercial arrangements.  The 206 Order implements a solution to a problem \nthat does not exist—there is no evidence in the record to this proceeding that data centers are being \nslowed down by paying full transmission rates, which are a tiny portion of overall data center costs \nand not an impediment to data center expansion.  Co-located load and generation projects care \nabout transmission costs economics but most of all seek one thing: reliable power.  That is why it \nmakes sense to interconnect and synchronize with the transmission grid rather than resorting to \nislanded microgrid arrangements.   \nAs previously discussed, interconnecting to the grid burdens the system by adding new loads \nand operating contingencies that must be addressed by system operators.  Grid interconnections \nalso bring significant project benefits such as the ability to sell on-site back-up generation into the \n \n96  If the Commission suggests that the transmission provider move forward with interconnection before such study, \nthat jeopardizes reliability and flies in the face of NERC reliability standards, such as FAC002-4, which imposes \nstrict requirements to study the system impacts of all proposed new interconnections, or modifications to existing \ninterconnections, in order to protect system reliability.  See NERC, FAC-002-4 – Facility Interconnection Studies \n(2022), https://www.nerc.com/globalassets/standards/reliability-standards/fac/fac-002-4.pdf; NERC, 181 FERC \n¶ 61,126 (2022) (approving FAC-002-4)."},{"page":39,"startToken":14116,"endToken":14540,"text":"39 \n \nwholesale markets when it otherwise would sit idle, and the ability to receive load following \nservice from off-site generation.  The totality of these burdens and benefits—benefits which no \ndoubt exceed the cost of Network Service based on gross load—easily justify charging co-located \nloads the same rate as all other transmission customers.  To allow for preferential rate treatment \nfor co-location arrangements would allow those customers to rely upon the grid and its benefits at \na price that is subsidized by all other customers.  That cannot be said to be just and or reasonable.  \nAccordingly, there is no lawful basis for requiring tariff changes to impose this new form of service \nthat gives these customers a reduced share of embedded costs compared to all other users when \nthey receive the same benefits.97  Such a decision is not grounded in reasoned decision making and \nis not supported by substantial evidence.98   \nB. The Commission’s Emphasis On Protective Systems Is In Tension With The \nCommission’s Open Access Policies And Therefore Is Arbitrary And \nCapricious.  The Commission Also Erred In Minimizing The Fact That \nProtective Systems Can And Have Failed. \n \nAs the Indicated TOs have explained, protective systems can provide value, but they are \nno panacea.  They can protect against net withdrawals from the grid (where the load exceeds the \nco-located generation), but do not protect the grid from real impacts that occur even when there is \nconsumption by a co-located customer but no net withdrawal, such as the impacts of load and \nvoltage spikes and oscillations.99  Further, the emphasis on protective systems to prevent backflows \n \n97  See Coal. of MISO Transmission Customers, 45 F.4th at 1009 (alterations in original) (quoting S.C. Pub. Serv. \nAuth. v. FERC, 762 F.3d 41, 53 (D.C. Cir. 2014) (per curiam)) (“The cost-causation principle requires that \n‘[t]he cost of transmission facilities . . . be allocated to those within the transmission planning region that \nbenefit from those facilities in a manner that is at least roughly commensurate with estimated benefits.’”). \n98  See Florida Gas, 604 F.3d at 639 (“[T]he Commission ‘must be able to demonstrate that it has made a reasoned \ndecision based upon substantial evidence in the record.’”) (citation omitted); Consol. Edison Co. of N.Y., 305 \nU.S. at 229 (explaining that substantial evidence means “more than a mere scintilla”); see also 5 U.S.C. § 706. \n99  This follows directly from the Commission’s acknowledgement that these arrangements need load following for \nthe entire gross load, regardless of the absence of net withdrawals."},{"page":40,"startToken":14540,"endToken":14957,"text":"40 \n \nignores an important issue: other providers may want to compete to serve these customers.  The \ngenerators have an interest in designing captive arrangements where the customers cannot access \nalternative supply, but that is not something the Commission should endorse.  To the contrary, it \nflouts the core proposition behind Order No. 888,100 where the Commission established its open \naccess policies.  Transmission asset owners cannot create barriers that inhibit the ability of other \ngeneration on the grid to compete to serve load.  As the Supreme Court recognized, a key \nmotivation behind the open access requirements is that owners’ “control of transmission facilities \ngives them the power either to refuse to deliver energy produced by competitors or to deliver \ncompetitors’ power on terms and conditions less favorable than those they apply to their own \ntransmissions.”101  But that is exactly what generators like Constellation propose.  Their argument \nis that they will convert their generator interconnection facilities into transmission assets and then \ninstall relay systems that make the load captive to its generation.102  In addition to its other flaws, \nthat proposal should be rejected because it is an illegal effort to stifle competition. \nMoreover, the Commission puts too much faith in protective systems operating \ninstantaneously and without failure.  Co-located loads “can pose reliability risks if their generation \nunexpectedly trips off-line and appropriate protection or ride-through systems are not in place \n[because] [t]he operational visibility and controllability of [behind-the-meter] loads are limited, \n \n100  See Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by \nPublic Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888-A, \nFERC Stats. & Regs. ¶ 31,048, 62 Fed. Reg. 12,274, 12,323 (Mar. 14, 1997), order on reh’g, Order No. 888-B, \n81 FERC ¶ 61,248 (1997), order on reh’g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff’d in relevant part sub \nnom. Transmission Access Pol’y Study Grp. v. FERC, 225 F.3d 667 (D.C. Cir. 2000), aff’d sub nom. New York v. \nFERC, 535 U.S. 1 (2002). \n101  New York v. FERC, 535 U.S. 1, 8–9 (2002).  \n102  See, e.g., Aff. of Steven Herling at P 23, Exhibit 4 to Constellation Reply, Docket No. EL25-20 (Apr. 23, 2025) \n(“The protection system, discussed above, is fully redundant and, while it cannot be guaranteed to never fail, it \nis unreasonable to treat the failure of both primary and secondary relay system facilities following the loss of a \ngenerator as anything other than a third contingency.”)."},{"page":41,"startToken":14957,"endToken":15232,"text":"41 \n \nmaking it more challenging to predict system impacts, especially during uncontrolled transitions \nbetween on-site generation and grid supply that may arise due to protection system failures.”103  If, \nafter co-located generation fails, the load unexpectedly shifts to drawing supply from the grid, for \neven a moment, the transmission system sees a rapid demand spike, which may stress and harm \nthe system.104  Moreover, as the Commission acknowledged, “PJM maintains that it is always \npossible that any protection system in an isolated (but not islanded) Co-Location Arrangement \ncould mis-operate, be disabled, or degrade, and that, in the few instances where such schemes exist \non the PJM system, PJM has observed these schemes fail, and the load has taken grid service.”105  \nAs the Commission recognizes from PJM’s comments, “if the protection system fails, the \nlarge load would instantly take significant energy from the system” and “though a few such \nconfigurations may seem tolerable, the risk increases with large quantities of such \nconfigurations.”106  To address this risk, the Commission “direct[s] PJM to apply a penalty rate.”107  \nAssessing penalties, however, only addresses the issue after the fact and does not remediate the \nreliability implications of faulty protective systems.   \nAs previously discussed, because the Commission has not addressed these issues, it has not \nengaged in reasoned decision making and fails to satisfy the APA requirements.  \n \n \n \n103  NERC, Characteristics and Risks of Emerging Large Loads: Large Loads Task Force White Paper, at 13 (July \n2025), \nhttps://www.nerc.com/globalassets/who-we-are/standing-committees/rstc/whitepaper-characteristics-\nand-risks-of-emerging-large-loads.pdf. \n104  Id. \n105  206 Order, 193 FERC ¶ 61,217 at P 44. \n106  Id. P 17. \n107  Id. P 212."},{"page":42,"startToken":15232,"endToken":15546,"text":"42 \n \nC. The 206 Order is Arbitrary And Capricious In Abandoning The Main \nConstruct Of Service To Load, Which Is That Customers Share In The \nEmbedded Costs Of The System.  The Commission Also Erred In Adopting a \nGenerator Funding Model For The Funding Of Network Upgrades For Co-\nLocated Load With No Supporting Evidence \n \nIn the 206 Order, FERC changes the PJM Tariff to “specify[] that an Interconnection \nCustomer seeking to serve Co-Located Load using an existing generating facility must bear the \ncosts of all Network Upgrades that PJM finds are necessary to preserve transmission system \nreliability for existing transmission customers, and that an existing generating facility cannot begin \nservice to a Co-Located Load until all required Network Upgrades are in service.”108  The \nreasoning that the Commission provides is solely that “[t]his requirement will protect existing \ntransmission customers from transmission reliability risks and from bearing the cost of Network \nUpgrades required for an Interconnection Customer to begin serving Co-Located Load.”109 \nAs explained above, the Commission’s policy for decades has been that the embedded costs \nof the transmission system are shared by all customers.  To that end the costs of network upgrades \nare shared by all customers.  This makes sense because “[t]he cost-causation principle requires \nthat ‘[t]he cost of transmission facilities . . . be allocated to those within the transmission planning \nregion that benefit from those facilities in a manner that is at least roughly commensurate with \nestimated benefits.’”110 \nThe Commission’s proposal that co-located load must self-fund any needed transmission \nupgrades is arbitrary and capricious because FERC has not explained its decision to depart from \nprior precedent. This particularly includes the Commission’s prior decisions to “reject[] cost \n \n108  Id. P 176. \n109  Id. \n110  Coal. of MISO Transmission Customers, 45 F.4th at 1009 (second and third alterations in original) (quoting S.C. \nPub. Serv. Auth., 762 F.3d at 53)."},{"page":43,"startToken":15546,"endToken":15909,"text":"43 \n \ncausation arguments made by network customers that sought to lower their load ratio share based \non actual use of the transmission system.”111  \nUnder the PJM Tariff, load pays all transmission costs, except when the transmission \nsystem requires upgrades to accommodate requests by generators to interconnect.  Charging load \nfor the embedded costs of the system, including upgrades, makes sense because all loads benefit \nfrom the transmission network.  Co-located load likewise benefit from the transmission network \nas a whole.  The Commission acknowledges as much by finding that the co-located load rely on \nthe network (based on gross load) for load following and black start.112  But load following and \nblack start cannot be delivered in isolation—they depend on diverse resources around the grid \nbeing able to transmit power over functioning stable transmission lines, which is to say that they \ndepend in turn on the network itself, on other operating reserves and voltage support services that \nkeep the grid stable and working, and on network upgrades that allow the grid to support all of the \ndiverse uses of the grid that are simultaneously occurring.   \nBecause co-located load relies upon and reaps significant benefits from the transmission \nsystem and imposes new costs on the system, co-located load should be charged for the benefits it \nreceives from the grid and for the burdens it places upon the grid just like other load.  The \nCommission provides no record evidence nor a reasoned explanation for why co-located load \nshould not be charged like other load, i.e., with the upgrade cost recovered as part of the \ntransmission rates charged to all customers.113  \n \n111  206 Order, 193 FERC ¶ 61,217 at P 196 & n.412 (citing Amtrak, 171 FERC ¶ 61,237 at P 41; PJM \nInterconnection, L.L.C., 169 FERC ¶ 61,041 at P 60 (2019)). \n112  See id. PP 159-160. \n113  See State Farm, 463 U.S. at 43.  Of course, transmission owners must be permitted to earn a reasonable return on \nthe investments necessary to construct, operate, and maintain transmission facilities, including those network \nupgrades required to serve co-located load.  See, e.g., Fed. Power Comm’n., 320 U.S. 591; Bluefield Water Works \n(cont'd)"},{"page":44,"startToken":15909,"endToken":16261,"text":"44 \n \nThe FERC approach to incremental costs differs from the approach taken in the PJM Tariff, \nand the Commission’s own OATT, which assign cost responsibility to all network customers \n(based on their respective load ratio shares) for incremental investments needed to reliably serve \nload expansion (in addition to making all network loads responsible for their share of pre-existing \nembedded system costs).  The 206 Order’s shifting of cost responsibility departs from traditional \ncost causation principles and is randomly applied only to cases where the added load is served \nthrough an existing generator interconnection facility (and even then not fully served, as explained \nabove), as opposed to new loads being served through the broader transmission system.  The 206 \nOrder notably preserves Network Service as a just and reasonable approach, but the Network \nService funding model is in direct conflict with the proposed assignment of costs to co-located \nloads.  The simultaneous existence of conflicting funding models is discriminatory, internally \ninconsistent with the 206 Order’s retention of Network Service, and contrary to FERC’s cost-\ncausation principles.  The 206 Order fails to explain or justify this departure and therefore is \narbitrary and capricious and not the product of reasoned decision making.114 \nThe Commission should not erode its rolled-in rate policy by making exiting incumbent \ngenerators solely responsible for transmission upgrade costs they cause by serving co-located load.  \n \n& Improvement Co., 262 U.S. 679.  For decades, the Commission has recognized this principle by rolling the \ncosts of load-driven network upgrades into transmission rates.  The 206 Order, however, departs from this \nlongstanding approach without substantial record evidence or justification.  Eliminating this opportunity for \ncapital recovery with a reasonable rate of return not only creates regulatory uncertainty that undermines investor \nconfidence, but further discourages investment in the transmission system at a time when such investment is \ncritical.  Since the 2003 blackout, the electric industry has faced persistent challenges in attracting private capital.  \nAbrupt policy shifts—such as narrowing rolled-in rate treatment—exacerbate these challenges, weaken financial \nperformance, and deter investors who rely on stable, predictable returns. \n \n114  See New England Power Generators Ass’n, Inc., 881 F.3d at 211."},{"page":45,"startToken":16261,"endToken":16588,"text":"45 \n \nErosion of the Commission’s rolled-in rate policy is apt to create several issues.  This can be seen \nin several considerations:  \nFirst, in some (if not most) cases, it will be a benefit to other customers to include new co-\nlocated loads in the pool of payers for the existing transmission network rather than setting them \napart and assigning them only the incremental cost for specific upgrades.  By spreading the revenue \nrequirement for the transmission system generally over an increasing number of billing units— \na.k.a. “increasing the denominator”—it reduces what other customers pay for transmission.\n  The \nundeniable fact is that large loads—not only because of their size, but also their high load factors, \nimpose significantly upon the overall transmission (and distribution) revenue requirement needs \nnow, and new co-located loads would do the same.  By contributing to paying the cost of the \noverall system on which they depend, these customers, like other customers, equitably, could help \naddress overall concerns about affordability as the national energy grid transforms.  But, if they \nare required to pay only for incremental investment, they avoid paying for the broader system upon \nwhich they depend and that public benefit is lost.  The more co-located loads are carved out to pay \nseparately for certain transmission infrastructure, the less they will pay for the overall grid and the \nmore other customers will pay as a forced subsidy. \nWhile cost shift outcomes can play out in more than one way in the near term, over the \nlong term the calculus of requiring co-located loads to fund certain upgrades but not pay otherwise \nfor their use of the existing system, can play out in just one way: it is worse for other customers \nwhile it significantly and unduly benefits co-located load customers.  Once a co-located load has \nfulfilled its responsibility (whether immediately or over time) for funding certain upgrades, \nprohibitions on “and” pricing would draw one to the conclusion that they would, immediately or"},{"page":46,"startToken":16588,"endToken":16858,"text":"46 \n \neventually, not be responsible for any further payments for transmission service.115  But the \ntransmission system is not a one-and-done investment.  The system evolves and requires \nmaintenance to ensure reliability, resilience, and quality of service, all of which comes at a cost.  \nAllowing a model where initial investment absolves co-located loads from financial contributions \nassociated with the ongoing use of the system leaves other customers holding the bag and creates \nobvious and problematic inequities. \nSecond, such an approach creates challenging dynamics like those we have seen in the \ngenerator interconnection space. For example, this approach likely benefits earlier loads that \nidentify favorable interconnection points, only for later co-located load customers to trigger \nsignificant upgrades, which once completed may lower costs for future load interconnection \nrequests.  Furthermore, transmission system upgrade needs can be very sensitive to other large \nloads modifying their requests or withdrawing, as well as overlapping issues with other aspects of \ntransmission planning.  Not only do these dynamics threaten to create inequities, they create \nincentives for speculative behavior and point of interconnection “shopping,” with associated \nunpredictable requests and withdrawals.  This is precisely the kind of behavior that became so \nproblematic, resource-intensive, and delay-inducing in the generator interconnection queue.  \nThird, co-located loads may not all be AI data centers.  Allocating transmission system \nupgrade costs up-front to those customers runs counter to the policy objective of promoting \neconomic development by imposing too many near-term financial hurdles.  While some co-located \nloads may have substantial access to capital, significant up-front requirements could hinder \n \n115  See Standardization of Generator Interconnection Agreements and Procedures, 104 FERC ¶ 61,103 at P 694 & \nn.111 (2003)."},{"page":47,"startToken":16858,"endToken":17218,"text":"47 \n \neconomic development, particularly for many commercial and industrial customers that find \nthemselves included in a new paradigm designed to support AI data center interconnections.  \nIt also bears emphasis that large loads, co-located or otherwise, will not always trigger \nsignificant transmission upgrades.  The expectation is data centers, which are sophisticated parties, \nwill make every effort to choose sites where the upgrades will be minor, and the harmful impact \nof their future exemption from transmission costs on other customers will not be offset at all.  In \nshort, it should not be assumed that large loads will trigger system upgrades with costs in excess \nof what they would otherwise contribute to the system if they paid traditional network rates based \non their load-share ratio, and the 206 Order erred in adopting a funding model around such a false \npremise.116   \nD. The Commission Is Wrong In Suggesting That CD Service Will Promote \nEfficiency Or Change Siting. \nTo be clear, under any circumstance, project development teams for new load, whether that \nload is co-located or not, already have a strong incentive to site their facilities on the grid at a \nlocation that minimizes the need for transmission upgrades.  Project developers understand that \nadditional work can add cost, increase complexity, risk project delay, and result in lost opportunity.  \nIn addition, and as discussed above, wise siting decisions will minimize the need for system \nupgrades, which will hasten interconnection.  That benefit is real.  But it has nothing to do with \nthe proposed CD Service.  This is because the impacts to the grid are based on physics and \n \n116  The Commission also lacked evidence to eliminate rolled-in rate treatment as an option for network upgrades.  \nHere again, the Commission failed to satisfy its burden under the APA.  By replacing rolled‑in rate treatment with \ndirect assignment to the co-located generator, without at least providing customers the option to select rolled-in \nrate treatment, the 206 Order is arbitrary and capricious.  In the 206 Order, the Commission failed to (a) address \nmaterial comments demonstrating system-wide benefits of transmission upgrades required by exiting generation, \nor (b) consider the alternative of permitting both rolled‑in rate treatment and direct assignment."},{"page":48,"startToken":17218,"endToken":17533,"text":"48 \n \nengineering.  Whether the service paid for is based on net load or gross load does not change that \nplanning and siting depend on the physics and engineering of the grid.  \nThe Commission’s decision to require options for CD Service does not change how the \nstudy process should work.  Regardless of cost-allocation, ensuring there is a reliable grid is \nessential and understanding what load amount the system needs to support is necessary.  If \ntransmission providers are forced to pretend a 500 MW load is only 50 MW, or even that it is zero, \nand pretend away the physics and engineering impacts, it will threaten reliability and resource \nadequacy and therefore cannot be said to be just and reasonable. \nWhile protective systems can be beneficial, any suggestion that regional planning needs \nare automatically reduced by the establishment of CD Service is also not supported by evidence.  \nNo loads should be taken out of the broader planning process—to do so would only threaten \nreliability of the system.  Grid operators must plan for such eventualities to ensure system \nreliability.117   \nThe Commission finds in the 206 Order that the BTMG “rules in PJM’s Tariff are no longer \njust and reasonable because loads with BTMG are not fully accounted for in resource adequacy \nplanning and shift costs onto other transmission customers contrary to the Commission’s cost \ncausation principles.”118  In other words, the netting of BTMG against load for calculating network \ncost responsibilities effectively shifts transmission costs.  Therefore, in the context of BTMG, \nFERC determined that BTMG should be considered to ensure resource adequacy and that BTMG \noutput should not be netted against load.  The Commission’s decision against the netting of BTMG \nand the stated reasons for that decision cannot be logically reconciled with the structure it proposed \n \n117  See PJM Tariff §§ 31.1-31.3, 31.6, 32. \n118  206 Order, 193 FERC ¶ 61,217 at P 2."},{"page":49,"startToken":17533,"endToken":17855,"text":"49 \n \nfor the new transmission services.  The very reasons that the Commission made this BTMG change \nare the same reasons that the new transmission services are not just and reasonable.  On this basis, \nthe requirement for PJM to offer these services cannot be said to be reasoned decision making and \nthe Commission’s decision is arbitrary and capricious.119   \nE. The Commission’s Disregard of Reliability Considerations Underscores That \nThe Replacement Rate Is Not Just and Reasonable. \nThe new transmission service options reflect that the Commission overlooked important \nreliability concerns.  The Commission claims everything will be fine due to protective systems and \nthe potential penalties for violating CD Service limits on the part of co-located load.  This simply \nignores that loads impact the system even when there is no net power draw on the system.  The \nCommission acknowledges as much when it finds that the loads use the grid for load following \nbased on gross load, not net load.120  Protective systems, even when fully functioning, are intended \nto keep net load at zero or below, but as the Commission has held, it is the gross load that is being \nfollowed by resources elsewhere on the grid every minute of the day, and thus using and impacting \nthe system every minute of the day.121  The suggestion that protective systems that only address \nnet load obviate reliability concerns ignores physical reality.  \nFurther, the Commission in the 206 Order does not squarely address flaws in that reasoning \neven though they were directly raised in the record regarding risks associated with protective \nsystem failures or removal.  Even if protective systems operated perfectly (and they do not \nnecessarily work perfectly) and penalties addressed any residual risk (again, they do not, \nespecially, and indeed, because the penalties are currently unknown), large loads may have an \n \n119  See State Farm, 463 U.S. at 43. \n120  See 206 Order, 193 FERC ¶ 61,217 at P 209. \n121  See id."},{"page":50,"startToken":17855,"endToken":18110,"text":"50 \n \nincentive to exceed their contract limitations for transmission service in some circumstances.  The \nCommission has not explained how reliability planning may proceed in the face of that prospect. \nAdditionally, the Commission acknowledges that it previously submitted that “the speed \nat which Co-Located Load can be added to the transmission system may pose particular resource \nadequacy challenges, especially if Co-Location Arrangements are not adequately and transparently \nreflected in existing resource adequacy planning mechanisms.”122  At the same time, the \nCommission states that it does not have “sufficient evidence to conclude that additional Tariff \nchanges regarding Interconnection Customers electing to use their generating facilities to serve \nCo-Located Load are needed with respect to capacity market rules, reliability, and resource \nadequacy.”123  The Commission’s decision to direct Interim Service be offered until all Network \nUpgrades necessary to provide the requested Network Service are completed overlooks potential \nresource adequacy risks.  This service is, by definition, offered before needed transmission \nupgrades are completed and it is unclear from the 206 Order how it will be determined whether \nthe load may be reliably served.  The purpose of this interim service is “more rapid interconnection \nand operation of Co-Located Loads” and the only reliability check is a determination by PJM that \nit can provide “some level of interim service reliably.”124  The Commission’s decision is arbitrary \nand capricious.  There are no guideposts whatsoever for how PJM should determine that it can \nprovide “some level of interim service reliably.”125   \n \n122  Id. P 243. \n123  Id.  \n124  Id. P 200.  \n125  Id."},{"page":51,"startToken":18110,"endToken":18549,"text":"51 \n \nThe Commission attempts to minimize the concerns by stating that because interconnection \ncustomers of co-located load arrangements must identify an Eligible Customer to take transmission \nservice on behalf of co-located load, the load will be visible.126  But that does not answer the \nquestion of how and by what standards loads would be curtailed to protect reliability, or whether \ncurtailment is even an adequate response to the need to follow gross load on a moment-by-moment \nbasis.  Indeed, as noted above, the Commission set for hearing how that should work—currently, \nit is unknown.127  Because “[t]he reasonableness of a rate is assessed in light of the FPA’s goals of \npromoting reliable service at reasonable rates and developing plentiful energy supplies,”128 and \ngiven the foregoing, it cannot be said that these transmission service options are just and \nreasonable.129  The Commission did not conduct assessment of the reliability risks from either a \ngeneration or a transmission perspective in this proceeding.  Accordingly, the Commission failed \nto seriously take into account reliability implications in setting a replacement rate, and its decision \nis therefore not reasoned decision making and is arbitrary and capricious. \nIV. \nFERC Exceeded Its Jurisdiction. \n \n126  See id. P 241. \n127  Id. P 201 (setting for hearing how such emergency curtailment would be implemented and under what standards). \n128  Constellation Mystic Power, LLC, 45 F.4th at 1035. \n129  Cf. Ameren Servs. Co. v. FERC, 880 F.3d 571, 580–81 (D.C. Cir. 2018) (finding that FERC “ma[de] no real \nattempt to holistically assess all of the various risks and benefits to the transmission owner caused by the addition \nof the upgrade facilities,” that “FERC inadequately considered [the] argument that all costs, and risks, are not \nbaked in—that, in fact, shareholders are forced to accept incremental exposure to loss with no corresponding \nbenefit” and therefore, that FERC’s “failure to meaningfully respond to it makes FERC’s decision arbitrary and \ncapricious”) (footnote omitted); Advanced Energy Mgmt. All., 860 F.3d at 664–65 (explaining the Commission’s \nrationales that “support[ed] the Commission’s finding that the energy market rules were unjust and unreasonable,” \nwhich included a rationale that “existing generator outage provisions ‘impede PJM’s ability to ensure reliability’ \nbecause they do not give PJM the authority to rescind approval for a planned outage when there is an emergency”) \n(citation omitted); Cent. Hudson Gas & Elec. Corp. v. FERC, 783 F.3d 92, 111 (2d Cir. 2015) (explaining that \nFERC, in creating the Lower Hudson Zone, considered long-term benefits that would follow accurate price \nsignals, including that it would “alleviate the risk of reliability problems in the long run”)."},{"page":52,"startToken":18549,"endToken":18974,"text":"52 \n \nA. FERC’s Replacement Rate Violates the Major Questions Doctrine. \nAs the Indicated TOs previously explained, there is no basis to change the PJM Tariff under \nFPA section 206 when the purpose of the change is to provide preferential treatment or a preferred \nservice to a certain category of customers.  Such action would violate the major questions doctrine.  \nOnly Congress can carve out federal preemption over state regulation.  If Congress wanted to give \nthe Commission authority to direct its preferred transmission service to benefit certain categories \nof customers, it could have done so.130  It did not do so.  FERC, like all agencies, “ha[s] only those \npowers given to [it] by Congress, and ‘enabling legislation’ is generally not an ‘open book to which \nthe agency [may] add pages and change the plot line.”131  The Commission lacks authority under \nthe FPA to order a new type of transmission service with the sole purpose to benefit co-located \nload and to treat it differently from other loads that have similar system impacts and usage.  \nAccordingly, the replacement rate directed by FERC—because it favors a narrow category of \ncustomers (i.e., co-located load) without reasoned explanation—violates the requirement in the \nFPA that no rate by a public utility grants an undue preference or advantage or unreasonable \n \n130  Cf. Whitman v. Am. Trucking Ass’ns, 531 U.S. 457, 468 (2001) (“Congress, we have held, does not alter the \nfundamental details of a regulatory scheme in vague terms or ancillary provisions—it does not, one might say, \nhide elephants in mouseholes.”); see Atl. City Elec. Co., 295 F.3d at 8 (As a federal agency, “FERC is a ‘creature \nof statute,’ having ‘no constitutional or common law existence or authority, but only those authorities conferred \nupon it by Congress. Thus, if there is no statute conferring authority, FERC has none.”) (citation omitted). \n \n131  West Virginia v. EPA, 597 U.S. 697, 723 (2022) (third alteration in original) (citation omitted); see also Midship \nPipeline Co. v. FERC, 45 F.4th 867, 877 (5th Cir. 2022) (vacating part of the Commission’s order and remanding \nthe remainder because “[t]he FERC’s interpretation of the NGA to give the agency power to determine ‘the \nreasonable cost’ of remediation efforts ‘change[d] the plot line’ of its enabling legislation, and was therefore \nerroneous” and “[t]he FERC lacks such authority under the NGA, and it likewise lacked authority to order an ALJ \nto make such a determination indirectly”) (second alteration in original) (quoting West Virginia v. EPA, 597 U.S. \nat 723)."},{"page":53,"startToken":18974,"endToken":19287,"text":"53 \n \ndifference in rates.132  The Commission never responded to this argument—another violation of \nthe APA.133 \nB.  The Commission’s New Approach Infringes On State Retail Authority.   \n \nThe states, not the Commission, have jurisdiction to decide when and in what \ncircumstances retail load will be curtailed, and how utilities should charge and treat retail \ncustomers in those circumstances.  The Commission has jurisdiction over “the transmission of \nelectric energy in interstate commerce and to the sale of electric energy at wholesale in interstate \ncommerce,” and over “all facilities for such transmission or sale of electric energy.”134  Except as \notherwise provided in the FPA, the states retain jurisdiction over “any other sale of electric energy” \nand “over facilities used for the generation of electric energy or over facilities used in local \ndistribution or only for the transmission of electric energy in intrastate commerce, or over facilities \nfor the transmission of electric energy consumed wholly by the transmitter.”135   \nPublic utilities have a retail obligation to serve.  And the states decide how that obligation \nshould be met.  For example, states might require the provision of backup service to retail \ncustomers who lose supply from their contracted supplier, would regulate the distribution system \ncosts associated with such service that would be charged to the retail customer, and would regulate \nthe costs and terms of the backup service.  Rather than honoring the states’ freedom and flexibility \nto exercise their jurisdiction over such questions, the Commission’s new rule appears to create a \nnew federal construct that defines the extent and terms of service in such situations.  The \n \n132  16 U.S.C. § 824d(b). \n133  See New England Power Generators Ass’n, Inc., 881 F.3d at 211; Canadian Ass’n of Petroleum Producers v. \nFERC, 254 F.3d at 299; Tesoro Alaska Petroleum Co., 234 F.3d at 1294. \n134  16 U.S.C. § 824(b). \n135  Id."},{"page":54,"startToken":19287,"endToken":19626,"text":"54 \n \nCommission does not have authority under the FPA to dictate the terms of retail service in that \nfashion.   \nNotably, the approach adopted by the Commission in the form of new transmission services \nis not similar to wholesale demand response programs where the courts have found that the \nCommission appropriately acted.136  “Wholesale demand response . . . pays consumers for \ncommitments to curtail their use of power, so as to curb wholesale rates and prevent grid \nbreakdowns,” and “wholesale market operators employ demand response bids in competitive \nauctions that balance wholesale supply and demand and thereby set wholesale prices.”137  “The \noperators accept such bids if and only if they bring down the wholesale rate by displacing higher-\npriced generation.  And when that occurs (most often in peak periods), the easing of pressure on \nthe grid, and the avoidance of service problems, further contributes to lower charges.”138 \nUnlike the wholesale demand response programs, which “allow[] any state regulatory body \nto prohibit consumers in its retail market from taking part in wholesale demand response \nprograms,” thereby “not requir[ing] any “‘action[ ] that would violate State laws or regulations,’” \nthe Commission’s new forms of transmission services provide no such limitation.139  As the \nSupreme Court has explained, however, “if indirect or tangential impacts on wholesale electricity \nrates sufficed, FERC could regulate now in one industry, now in another, changing a vast array of \n \n136  See FERC, Energy Primer: A Handbook for Energy Market Basics, at 41 (Jan. 17, 2024), \nhttps://www.ferc.gov/news-events/news/ferc-staff-issues-2024-energy-primer-handbook-energy-market-basics  \n(“Demand response is the reduction in consumption of electricity by customers from their expected consumption \nlevels, in response to either reliability needs or price signals.  Customers will forego power use for short periods, \nshift some energy use from peak periods to other times, or use on-site generation in response to price signals or \nincentives for load reduction.”). \n137  FERC v. Elec. Power Supply Ass’n, 577 U.S. 260, 270, 278–79 (2016). \n138  Id. at 279. \n139  Id. at 275 (third alteration in original) (citation omitted)."},{"page":55,"startToken":19626,"endToken":20044,"text":"55 \n \nrules and practices to implement its vision of reasonableness and justice,” a result that the Court \ncould not “imagine . . . was what Congress had in mind.”140  That is the problem here with FERC’s \nreplacement rate. \nAs the Supreme Court explained, the FPA \n“limit[s] FERC’s sale jurisdiction to that at wholesale,” reserving \nregulatory authority over retail sales (as well as intrastate wholesale \nsales) to the States.  FERC cannot take an action transgressing that \nlimit no matter how direct, or dramatic, its impact on wholesale \nrates.  Suppose, to take a far-fetched example, that the Commission \nissued a regulation compelling every consumer to buy a certain \namount of electricity on the retail market.  Such a rule would \nnecessarily determine the load purchased on the wholesale market \ntoo, and thus would alter wholesale prices.  But even given that \nineluctable consequence, the regulation would exceed FERC’s \nauthority, as defined in § 824(b), because it specifies terms of sale \nat retail—which is a job for the States alone.141 \nFERC’s CD Services similarly interfere with States’ regulation of the terms of sale at retail, \ndictating the terms and circumstances of service to end use customers who lose their contracted \nretail power supplier—an area that is directly within the States’ domain.  The Commission is \nunable to do indirectly what it cannot do directly, which is what it does when it intrudes on state \nregulatory authority over retail service in this fashion.142 \n \n140  Id. at 278. \n141  Id. at 279–80 (alteration in original) (citations omitted). \n142  Cf. Nat’l Fuel Gas Supply Corp. v. FERC, 909 F.2d 1519, 1522 (D.C. Cir. 1990) (“once want of power to do this \ndirectly were established, the existence of power to achieve the same end indirectly through the conditioning \npower might well be doubted”) (quoting Sunray Mid-Continent Oil Co. v. FPC, 364 U.S. 137, 152 (1960) and \nciting Richmond Power & Light v. FERC, 574 F.2d 610, 620 (D.C. Cir. 1978) (the Commission may not achieve \nindirectly through conditioning power of Federal Power Act what it is otherwise prohibited from achieving \ndirectly)); Am. Gas Ass’n, 912 F.2d at 1510 (“[T]he Commission may not use its § 7 conditioning power to do \nindirectly . . . things that it cannot do at all.”); see also FERC v. Elec. Power Supply Ass’n, 577 U.S. at 288 (“The \nFPA ‘leaves no room either for direct state regulation of the prices of interstate wholesales’ or for regulation that \n‘would indirectly achieve the same result.’”) (citation omitted)."},{"page":56,"startToken":20044,"endToken":20167,"text":"56 \n \nIf one takes away the Commission’s intrusion into the terms of retail service (such as the \nissue of what distribution charges and responsibilities should be borne by the load, the terms of \nand charges for backup service to the load, and the terms by which the load might avoid paying \nfor such service) nothing is left of CD Service.  The Commission should encourage transmission \nproviders to treat an Eligible Customer who takes transmission service to serve these loads like all \nother such providers, i.e.,  on the basis of their load ratio share of embedded network costs and \nleave the retail service questions to the retail regulator.  The imposition of CD Service rates to \nusurp these questions exceeds the Commission’s lawful authority."},{"page":57,"startToken":20167,"endToken":20331,"text":"57 \n \nV. \nConclusion \nBecause neither the Commission nor Constellation have satisfied their burden under FPA \nsection 206 and the Commission has not engaged in reasoned decision making in the 206 Order, \nthe Commission should grant rehearing, revoke its directives to establish new transmission service \nofferings, and instead, take no action pursuant to section 206 and find that the existing PJM Tariff \nis just and reasonable.   \n \nRespectfully submitted, \n/s/ William Sauer \nWilliam Sauer \nVice President, Federal Regulatory Affairs  \nExelon Corporation  \n701 Ninth St. N.W.  \nWashington, DC 20001  \nTelephone: 202-868-7499  \nEmail: william.sauer@exeloncorp.com   \n/s/ Bradley R. Perkins  \nBradley R. Perkins \nVice President and Deputy General Counsel \nExelon Corporation \nChase Building \n10 S. Dearborn, 52nd Floor \nChicago, IL 60603 \nTelephone: 312-394-2632 \nEmail: bradley.perkins@exeloncorp.com \n \n \nOn behalf of Exelon Corporation \n \n \n/s/ Amanda P. Parker \nAmanda P. Parker \nCorporate Counsel \nFirstEnergy Service Company \n341 White Pond Drive \nAkron, OH 44320 \nTelephone: (330) 384-4592 \nEmail: aparker@firstenergycorp.com \n \nOn behalf of The FirstEnergy \nTransmission Companies"},{"page":58,"startToken":20331,"endToken":20381,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in the above captioned dockets. \nDated at Chicago, IL this 16th day of January, 2026. \n \n \n/s/ Geneva Kennedy  \nGeneva Kennedy  \nExelon Corporation"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":5,"endAt":524,"startToken":0,"endToken":1371},{"p":5,"at":524,"title":"I. Statement of Issues/Specification of Error.","method":"printed heading","endPage":13,"endAt":503,"startToken":1371,"endToken":4867},{"p":13,"at":503,"title":"II. The Burden Under FPA Section 206 Has Not Been Met: The Existing Rate","method":"printed heading","endPage":14,"endAt":6,"startToken":4867,"endToken":5109},{"p":14,"at":6,"title":"A. There is No Evidence In The Record That Co-Located Loads Are Unable to","method":"printed heading","endPage":22,"endAt":1506,"startToken":5109,"endToken":8136},{"p":22,"at":1506,"title":"B. The Commission Did Not Engage in Reasoned Decision Making Because It","method":"printed heading","endPage":30,"endAt":889,"startToken":8136,"endToken":11209},{"p":30,"at":889,"title":"C. The Loads Rely Upon The Entire Embedded Transmission System To Serve","method":"printed heading","endPage":33,"endAt":590,"startToken":11209,"endToken":12144},{"p":33,"at":590,"title":"III. The Burden Has Not Been Met Under FPA Section 206: FERC’S Replacement","method":"printed heading","endPage":36,"endAt":6,"startToken":12144,"endToken":13147},{"p":36,"at":6,"title":"A. Allowing Special Treatment For Co-Located Load Violates The FPA’s","method":"printed heading","endPage":39,"endAt":944,"startToken":13147,"endToken":14268},{"p":39,"at":944,"title":"B. The Commission’s Emphasis On Protective Systems Is In Tension With The","method":"printed heading","endPage":42,"endAt":6,"startToken":14268,"endToken":15233},{"p":42,"at":6,"title":"C. The 206 Order is Arbitrary And Capricious In Abandoning The Main","method":"printed heading","endPage":47,"endAt":897,"startToken":15233,"endToken":16996},{"p":47,"at":897,"title":"D. The Commission Is Wrong In Suggesting That CD Service Will Promote","method":"printed heading","endPage":49,"endAt":364,"startToken":16996,"endToken":17591},{"p":49,"at":364,"title":"E. The Commission’s Disregard of Reliability Considerations Underscores That","method":"printed heading","endPage":51,"endAt":1256,"startToken":17591,"endToken":18302},{"p":51,"at":1256,"title":"IV. FERC Exceeded Its Jurisdiction.","method":"printed heading","endPage":52,"endAt":6,"startToken":18302,"endToken":18550},{"p":52,"at":6,"title":"A. FERC’s Replacement Rate Violates the Major Questions Doctrine.","method":"printed heading","endPage":53,"endAt":114,"startToken":18550,"endToken":18992},{"p":53,"at":114,"title":"B. The Commission’s New Approach Infringes On State Retail Authority.","method":"printed heading","endPage":57,"endAt":6,"startToken":18992,"endToken":20168},{"p":57,"at":6,"title":"V. Conclusion","method":"printed heading","endPage":58,"endAt":0,"startToken":20168,"endToken":20331},{"p":58,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":58,"endAt":325,"startToken":20331,"endToken":20381}]}