{"document":{"slug":"rec-20260120-5297","title":"Eolian, L.P. et al. submit Request for Rehearing of the 12/18/2025 Order","issued":"2026-01-20","accession":"20260120-5297","docket":"EL25-49-002","group":"PJM co-location compliance","filer":"Eolian, L.P.Antora Energy LLC","kind":"rehearing request","file":"sources/filings/text/20260120-5297_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260120-5297","tier":"record","sha256":"05b6a972d8afd80334b4b42cea973a39b95e176f3ac77bedb9c797dca470fda8","pages":13,"tokens":3206,"emptyPages":[],"textThemes":["colo","study","flex"]},"pages":[{"page":1,"startToken":0,"endToken":177,"text":"1\nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, \nIncorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, \nInc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, \nInc. \nAEP Indiana Michigan Transmission \nCompany, Inc. AEP Kentucky Transmission \nCompany, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, \nInc. Appalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \n     )             Docket Nos.  \n    EL25-49-000 \n) \n \n \n \nEL25-49-001"},{"page":2,"startToken":177,"endToken":380,"text":"2\nWheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public \nUtilities, Division of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic \nIndiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission \nCompany \n \nLarge Loads Co-Located at Generating \nFacilities  \n \nAD24-11-000 \nConstellation Energy Generation, LLC \n \nv.  \n \nPJM Interconnection, L.L.C. \nEL25-20 \n(Consolidated) \n \n \n \nRequest for Clarification of Eolian LP, Antora Energy LLC, and Verrus LLC \nPursuant to Rule 212 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission (“Commission” or “FERC”),1 Eolian L.P. (Eolian), Antora Energy LLC, \nand Verrus LLC request clarification of the Commission’s December 18 Order in the above-\ncaptioned proceeding (Order). Specifically, the undersigned parties ask the Commission to \nclarify that where the Order provides that a Co-Located load may “request only the minimum \nlevel of interconnection service it deems necessary to effectuate its Co-Location Arrangement,”2 \nthat it means the Co-Located Load may nominate a net withdrawal limit in the same manner that \n \n1 18 C.F.R. § 385.212. \n2 Order at P 232."},{"page":3,"startToken":380,"endToken":666,"text":"3\nit may nominate a net injection limit. Making this clarification will ensure that Co-Located loads \npaired with energy storage can use their full technical capabilities to avoid unnecessary network \nupgrades, thereby advancing the Commission’s twin goals of protecting ratepayers and \nadvancing speed-to-power within PJM.  \nThe Commission’s order is a big step forward in delivering a commonsense solution to \ngrowing demand. As Commissioner Rosner explains, it does so by “enabl[ing] large loads to \nreduce how much they lean on the grid, while ensuring that they pay their fair share.”3 In the \nOrder, the Commission found PJM’s tariff unjust and unreasonable because it does not include \ntransmission service reflecting that some Co-Located Loads “are willing and able to limit their \nenergy withdrawals from the transmission system.”4 The Commission found that extending new \ntransmission service options is necessary to ensure that Co-Located Loads pay only for the \nservices they use, and also to ensure that Co-Located Loads use their ability to limit withdrawals \nto avoid “costly and inefficient transmission system buildout.”5 The Commission’s logic should \ncompel complementary reforms to the generator interconnection process, because that process \nalso may evaluate withdrawals from the Co-Located Load and therefore may also result – absent \nclarification – in “costly and inefficient transmission system buildout.”  \nThe Commission should make clear that PJM must enable interconnection customers to \nnominate withdrawal limits in the interconnection process, just as it requires PJM to allow \ngenerators to limit their proposed output. Accurate modeling of withdrawals is particularly \ncritical to the ability of Co-Located Loads incorporating energy storage to connect without \ntriggering transmission upgrade needs. Due to their unique technical capabilities and ability to \n \n3 Id. at P 4. \n4 Id. at P 177. \n5 Id."},{"page":4,"startToken":666,"endToken":1003,"text":"4\ndeploy quickly, energy storage is an essential piece of the solution to enabling timely connection \nof large electricity customers. While energy storage currently comprises a small portion of the \noverall resource mix in PJM, there are many projects in development and storage is an integral \npiece of multi-technology solutions for large customers. The Commission’s Order is an important \nstep in enabling such solutions but without clarification, ambiguity in how such solutions are to \nbe studied in the interconnection process could continue to stymie their development.  \nI. \nBACKGROUND \nA. \nEnergy storage resources are critical for meeting data center loads quickly \n \nand reliably \n \nEnergy storage resources are positioned to play a critical role in meeting demand from \nnew large loads, especially co-located data center loads. A key reason is that batteries are \nuniquely well suited to respond to the minute-to-minute volatility of data center loads. Natural \ngas turbines and reciprocating engines can play an important role in providing energy to a Co-\nLocated Load, but are not capable of following the highly volatile load profiles of AI data \ncenters, and risk damage when they do.6 For these reasons, battery storage is being deployed \nacross a range of data center applications, including many that also incorporate thermal \ngeneration. \nEnergy storage resources are also faster to deploy and can meet the aggressive schedules \nof data center loads. For example, 7,722 MW of the 26,618 MW selected in PJM’s RRI were \n \n6 Authors from Siemens Energy note” “In large data centers, demand swings can reach 100 MW or more, occurring \nmultiple times per minute on sub-second timescales. . . The unpredictable demand profile created by these transients \ncan be challenging for gas turbines or reciprocating engines, which are designed for relatively stable baseload \noperation. . . .Even the most advanced droop control governing in gas turbines cannot handle the rapid changes in \nfrequency. If left unmitigated over time, severe damage can occur, shortening the lifespan of gas turbine units.” \nDanny Clayton and Nico Jansen van Rensburg, Pipeline & Gas Journal (Dec. 1, 2025)."},{"page":5,"startToken":1003,"endToken":1340,"text":"5\nfrom batteries.7 And, of the “new” projects selected in the RRI (as opposed to uprates), all but \none of the projects scheduled to deploy this decade are batteries.8 Market rules that do not utilize \nstorage to its full capabilities will necessarily slow progress. \nThe Order is premised in no small part on the concept that Co-Located loads can manage \ntheir total withdrawals from the grid, and that their capability to do so should be enabled to \nreduce overall system costs. Energy storage resources are better positioned than any other \nresource to manage the total withdrawals from a Co-Located load quickly and reliably. As \nConstellation explained in this docket, using battery energy storage systems to provide backup \nservice at data centers “can supply a consistent level of energy for several hours,” allowing a \ndeveloper to “minimize costs related to system design.”9  \nB. \nRequest for Clarification \nClarification is necessary to realize the Commission’s intent of ensuring that Co-Located \nLoads do not pay for services that they do not use and do not trigger network upgrades that they \ndo not need. The Commission’s order requires PJM to establish rules for Interconnection \nCustomers serving co-located load,10 both for new service requests,11 and for modifications to \nexisting facilities through the necessary study process.12 For both processes, we seek clarification \nthat interconnection customers serving co-located load must be permitted to nominate net \n \n7 PJM, Reliability Resource Initiative Results Summary (May 6, 2025), available at https://www.pjm.com/-\n/media/DotCom/committees-groups/committees/pc/2025/20250506/20250506-item-06---reliability-resource-\ninitiative---summary-results.pdf.  \n8 The lone exception is the Three Mile Island restart, which was in planning well before selected in the RRI. See, \nPJM, Reliability Resource Initiative Additional Summaries (May 6, 2025) at 6 – 8, available at \nhttps://www.pjm.com/-/media/DotCom/committees-groups/committees/pc/2025/20250506/20250506-rri-addendum-\n--post-meeting.pdf.  \n9 Answer of Constellation Energy Generation, LLC, at 98-99 (April 23, 2025). \n10 Order at P 187. \n11 Id. at PP 231-236. \n12 Id. at PP 225-230."},{"page":6,"startToken":1340,"endToken":1641,"text":"6\nwithdrawal limitations for purposes of these interconnection study processes.13 The \nCommission’s order requires PJM to develop transmission service frameworks that allow \ncustomers to take curtailable service based on the use of special protection schemes that enable \nreliable, curtailable service based on technical and engineering requirements set by PJM,14 and \nrequires PJM to enable an interconnection customer to request the “minimum level of \ninterconnection service it deems necessary.”15 We seek clarification that, as applied to an \ninterconnection request by a Co-Located Load that includes energy storage components, this \nmeans that to the extent PJM performs study steps involving withdrawal assumptions from both \nthe storage facility components and the co-located load components, these study steps must \nallow the interconnection customer to provide for limits to the injection and withdrawal rights for \nthe generation and co-located load facilities reflecting the proposed integration of those facilities. \n1. \nThe order’s requirements and necessary clarification \nThe Commission’s Order finds that “the PJM Tariff is unjust and unreasonable because it \nlacks sufficient clarity and consistency with respect to the rules for Co-Location Arrangements” \nand on this basis directs changes to the new service request process, as well as the necessary \nstudy process for modifications to existing facilities. With regard to “Interconnection Customers \nseeking to use new generating facilities to serve Co-Located Load,” the Commission requires \nPJM to clarify that it “shall consider requests for interconnection service below the full \ngenerating capability of the generating facility, so that an Interconnection Customer may request \ninterconnection service at a level below its maximum facility output to serve Co-Located \n \n13 See Comments of Bloom Energy Corporation at 11 (requesting an interconnection study process that limits net \nload impacts to “the nominated net grid withdrawal” of the co-located facilities). \n14 Order at P 212. \n15 Id. at P 232."},{"page":7,"startToken":1641,"endToken":1957,"text":"7\nLoad.”16 The Order specifies that “[t]his revision will clarify that an Interconnection Customer \nseeking to use a new generating facility to serve a Co-Located Load may request only the \nminimum level of interconnection service it deems necessary to effectuate its Co-Location \nArrangement.”17 With regard to the necessary study process, the Commission requires PJM “to \nadd to the Tariff a description of the scope of the analysis that it will perform as part of the \nnecessary study process when an Interconnection Customer seeks to use its existing generating \nfacility to serve Co-Located Load,” which must include a description of “the information that the \nInterconnection Customer must provide about the Co-Located Load for purposes of the \nnecessary study.”18 \nWhile these directives from the Commission make clear that an interconnection customer \nmust be able to request service below a generator’s full output capability, they do not explicitly \naddress how PJM must modify its tariff with regard to the study assumptions used for \ninterconnection requests involving energy storage resources co-located with loads. With energy \nstorage resources, the assumptions that PJM uses for purposes of the resource’s withdrawals \nfrom the grid are an important part of the study process. PJM’s study process sets forth rules for \nhow withdrawals from energy storage facilities will be modeled, and PJM recently submitted a \ncompliance filing in Docket No. ER24-2045 to effectuate the Commission’s requirement in \nOrder No. 2023 to use operating assumptions in interconnection studies that reflect the proposed \ncharging behavior of electric storage resources.19 Missing from that framework, however, is a \ndescription of whether and how such studies may factor in co-located load when a co-located \ngeneration facility is proposed. To fill that gap, the Commission should require that, to the extent \n \n16 Order at P 232. \n17 Id. \n18 Id. at P 227.  \n19 See PJM Transmittal Letter, Docket No. ER24-2045, at 39-42 (Oct. 22, 2025)."},{"page":8,"startToken":1957,"endToken":2353,"text":"8\nthat PJM includes the co-located load in such studies,20 it must allow the interconnection \ncustomer to provide withdrawal limits for both the energy storage resource components and the \nco-located load. This clarification should apply to both new interconnection service request study \nprocesses, as well as the necessary study process. Further, just as the Commission requires “PJM \nto describe the information that the Interconnection Customer must provide about the Co-\nLocated Load for purposes of the necessary study,”21 the Commission should also require PJM to \nspecify what information about the Co-Located Load is required for purposes of the new service \nrequest study process. As Antora previously explained, without such information, any process \nthat includes the impact of the proposed load may not capture the proposed “load shape and \nflexibility,” or account for special protection schemes proposed to be integrated into the co-\nlocated facilities.22 In other words, the Commission should clarify that PJM must not include \noverlapping load and energy storage withdrawal impacts in its generator interconnection study \nprocess unless it does so accurately, based on information about both the load and storage \ncomponents of the facility, and the proposed net withdrawal limits of the facility. Without such \ndirection, there is a risk that imprecise or inaccurate modeling assumptions will identify network \nupgrades that are not needed to integrate the proposed facilities with the grid. \n \n20 We recommend that the Commission avoid necessarily requiring the co-located load to be modeled as part of such \nstudies, as the decision whether to include load may depend on the timing of the load interconnection request study \nprocesses vis-à-vis the generation interconnection request; and the question of whether and how the load is modeled \nmay implicate complex questions concerning the interaction between the load and generation interconnection \nprocesses. However, the Commission should require that, to the extent that load is included within the generation \ninterconnection study assumptions, it must be incorporated in a manner that allows for the interconnection customer \nto provide for joint withdrawal limits between the storage and load components, based on the facility’s capabilities \nand plan for operation, as supported by information about the generation resource and load submitted by the \ninterconnection customer. \n21 Order at P 227. \n22 Motion to Intervene Out of Time and Comments of Antora Energy LLC In Response to the Commission’s Co-\nlocation Order, at 9-10 (April 23, 2025)."},{"page":9,"startToken":2353,"endToken":2645,"text":"9\n2. \nClarification is required in order to ensure just and reasonable rates \nThe Order finds the existing PJM tariff unjust and unreasonable because it lacks clear \nprovisions to govern the “rates, terms, and conditions of service that apply to Interconnection \nCustomers serving Co-Located Load and Eligible Customers taking transmission service on \nbehalf of Co-Located Load.”23 The requested clarification aims to address precisely this defect: \nthe absence of clear rules that govern how co-located load paired with storage will be studied in \nthe generator interconnection process. The PJM tariff, as currently drafted, does not specify how \nstorage withdrawals will be modeled when a storage facility is seeking to co-locate with a large \nload. \nThis absence of clear tariff provisions means that without clarification, there is a risk that \nthe interconnection study process could include assumptions that the load and the charging load \nof the storage resource create bluntly overlapping grid impacts (e.g. coincident withdrawals at \npeak), when in fact the storage resources and co-located load could be managed to limit the \noverall withdrawal of the co-located resource and to avoid withdrawal when doing so would \ncreate grid impacts necessitating network upgrades. The record demonstrates that interconnection \ncustomers can build facilities that integrate a variety of “onsite self-supply resources—such as \nfuel cells, gas turbines, or battery storage” and use “controls and protection mechanisms” such \nthat the integrated facility “can limit maximum flows into and out of” co-located facilities.24 Yet \nas Bloom Energy Corporation explains, PJM’s tariff has “no existing protocols” for studying new \ngeneration (including energy storage) together with load.25  \n \n23 Order at P 175. \n24 Comments of Bloom Energy Corporation, Attachment, Brattle Report at 9, 27 (April 23, 2025). \n25 Comments of Bloom Energy Corporation at 10."},{"page":10,"startToken":2645,"endToken":2934,"text":"10 \nThe Order recognizes that co-located resources can be integrated so as to “limit [the] \nenergy withdrawals” of co-located loads so as to prevent “inefficient and costly transmission \nbuildout.”26 But it does so in the context of requiring PJM to offer non-firm transmission service, \nwithout expressly applying this reasoning to the interconnection study context. In requiring PJM \nto offer co-located loads a menu of transmission service options, the Order ensures that such \nloads have the opportunity to receive service that “reflect[s] their actual impact on the \ntransmission system.”27 But the value presented by the option to obtain non-firm transmission \nservice would be substantially diminished if the generator interconnection process separately \nforces the co-located load to bear the cost and delay of unnecessary network upgrades that do not \n“reflect[s] their actual impact on the transmission system.”28 The Commission should clarify that \nits findings in requiring non-firm service also apply with regard to PJM’s interconnection study \nprocesses, as this is the process that directly identifies necessary transmission upgrades. The \nCommission must require PJM to allow for non-firm withdrawal and integrated operation of co-\nlocated facilities including net withdrawal limits to be integrated into interconnection study \nassumptions because failing to do so “could necessitate inefficient and costly transmission \nbuildout.”29  \nWhile the Order’s clear intent is to protect customers from unnecessary upgrade costs,30 \nthe path to realizing billions in transmission infrastructure savings enabled by facilities that \nincorporate “controls and protection mechanisms used to limit physical withdrawals” is to reflect \nthe controllable nature of those withdrawals in interconnection studies that identify the need for \n \n26 Order at P 199. \n27 Id. at P 162. \n28 Id.  \n29 Id. at P 199. \n30 See id. at P 162."},{"page":11,"startToken":2934,"endToken":3130,"text":"11\ntransmission upgrades.31 By expressly requiring PJM to allow interconnection customers seeking \nto use new generating facilities to serve Co-Located Load to nominate net withdrawal limits, the \nCommission will enable the avoidance of unnecessary upgrades and allow for the faster \nintegration of new customers and a more affordable grid. \nThe Order permits a co-located generator to nominate an injection limit that is less than \nits total capacity.32 The requested clarification is the logical extension of that principle to \nwithdrawals and would result in the same benefits of avoided costs and faster interconnection \ntimes. Conversely, study assumptions that ignore the joint capabilities of energy storage \nresources paired with co-located loads paired would frustrate the objectives of the Order and \nrender its replacement rate ineffectual for those resources. Allowing co-located loads paired with \nstorage to nominate withdrawal limits will encourage innovation that will bring down these \ncosts. It will allow developers to optimize the configuration of load, generation and storage in a \nway that internalizes impacts to the transmission system, bringing down overall system costs and \naccelerating speed to power. \n. \n \n \n \n \n \n \n31 Comments of Bloom Energy Corporation at 2, 5, 11-12. \n32 See Order at P 232."},{"page":12,"startToken":3130,"endToken":3159,"text":"12 \nRespectfully submitted, \n \n \n \n \n \n \n \n \nAriel Horowitz \nHead of Market Strategy \nEolian, L.P. \n \n \nNoah Long \nDirector, State and Regulatory Affairs \nAntora Energy LLC \n \n \nJeff Bladen \nHead of Energy \nVerrus LLC"},{"page":13,"startToken":3159,"endToken":3206,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary of the Commission in this \nproceeding. \n \nDated: January 20, 2026 \nAriel Horowitz \nHead of Market Strategy \nEolian, L.P."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":4,"endAt":579,"startToken":0,"endToken":752},{"p":4,"at":579,"title":"I. BACKGROUND","method":"printed heading","endPage":4,"endAt":595,"startToken":752,"endToken":754},{"p":4,"at":595,"title":"A. Energy storage resources are critical for meeting data center loads quickly","method":"printed heading","endPage":5,"endAt":886,"startToken":754,"endToken":1147},{"p":5,"at":886,"title":"B. Request for Clarification","method":"printed heading","endPage":13,"endAt":0,"startToken":1147,"endToken":3159},{"p":13,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":13,"endAt":298,"startToken":3159,"endToken":3206}]}