{"document":{"slug":"rec-20260120-5337","title":"Notice of Compliance Filing in ER26-1088-000 of PJM Interconnection, L.L.C.,","issued":"2026-01-20","accession":"20260120-5337","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"notice","file":"sources/filings/text/20260120-5337_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260120-5337","tier":"record","sha256":"aab15485990ddc237d74707db70c0652afb0a08bfb7badc27ff2f0310960b0fc","pages":2,"tokens":262,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":188,"text":"1200 G Street, N.W., Suite 600 \nWashington, D.C.  20005-3898 \nPhone: 202.393.1200 \nFax: 202.393.1240 \nwrightlaw.com \n \nJanuary 20, 2026 \n \nVIA ELECTRONIC FILING \n \nHonorable Debbie-Anne A. Reese, Secretary  \nFederal Energy Regulatory Commission \n888 First Street, N.E. \nWashington, DC  20426 \n \nRe: \nPJM Interconnection, L.L.C., Docket No. EL25-49-000, et al.  \n \nCompliance Filing in Docket No. ER26-1088-000 \nDear Secretary Reese: \n \nThis letter, being served on all parties to the above-referenced proceeding, confirms \nthat PJM Interconnection L.L.C (“PJM”) submitted today a Compliance Filing of Tariff \nchanges in Docket No. ER26-1088-000 (Accession No. 202601205251) in accordance with \nthe Federal Energy Regulatory Commission’s December 28, 2025 order.1  PJM has \nrequested approval of the Tariff changes effective as of the date the Commission accepts \nthe Compliance Filing.  \n \nRespectfully submitted, \n/s/Ruth M. Porter  \n \n \nWendy B. Warren \nRuth M. Porter \nWright & Talisman, P.C. \n1200 G Street N.W., Suite 600 \nWashington, D.C.  20005-3802 \n(202) 393-1200 \nwarren@wrightlaw.com \nporter@wrightlaw.com \n \nAttorneys for \nPJM Interconnection, L.L.C. \n \n \n1 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at PP 2, 161, 231-36 (2025)."},{"page":2,"startToken":188,"endToken":262,"text":"CERTIFICATE OF SERVICE \n \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service lists compiled by the Secretary in these proceedings. \n \nDated at Washington, DC, this 20th day of January 2026. \n \n/s/  Ruth M. Porter \n \nRuth M. Porter \nWright & Talisman, P.C. \n1200 G Street, N.W., Suite 600 \nWashington, DC  20005-3898 \n(202) 393-1200 \nporter@wrightlaw.com \n \nAttorney for \nPJM Interconnection, L.L.C."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":0,"startToken":0,"endToken":188},{"p":2,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":2,"endAt":470,"startToken":188,"endToken":262}]}