{"document":{"slug":"rec-20260205-5144","title":"Answer and Motion for Leave to Answer of the Independent Market Monitor for PJM to the Request for Clarification or, in the Alternative, Rehearing filed on…","issued":"2026-02-05","accession":"20260205-5144","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Monitoring Analytics, LLC","kind":"rehearing request","file":"sources/filings/text/20260205-5144_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260205-5144","tier":"record","sha256":"f5ebf20e117b860a6922eeb8d702c29ec052a2c039ba382988974c23187175fa","pages":9,"tokens":2605,"emptyPages":[],"textThemes":["colo","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":184,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n \nLarge Loads Co-Located at Generating \nFacilities \n \nConstellation Energy Generation, LLC \n \n     v \n \nPJM Interconnection, L.L.C. \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n \nDocket No. EL25-49-000 \n \nDocket No. AD24-11-000 \n \n \nDocket No. EL25-20-000 \n \n \n(Consolidated) \nANSWER AND MOTION FOR LEAVE TO ANSWER OF \nTHE INDEPENDENT MARKET MONITOR FOR PJM  \nPursuant to Rules 212 and 213 of the Commission’s Rules and Regulations,1 \nMonitoring Analytics, LLC, acting in its capacity as the Independent Market Monitor for \nPJM2 (“Market Monitor”), submits this answer to the request for clarification or in the \nalternative rehearing of Constellation Energy Generation, LLC, filed on January 20, 2026 \n(“CEG”).3 CEG seeks clarification of the order issued in this proceeding on December 18, 2025 \n                                                          \n1  \n18 CFR §§ 385.212 & 385.213 (2025). \n2 \nCapitalized terms used herein and not otherwise defined have the meaning used in the PJM Open \nAccess Transmission Tariff (“OATT”) or the PJM (“OA”) or the PJM Reliability Assurance \nAgreement (“RAA”). \n3  \nRequest for Clarification or, in the Alternative, Rehearing of Constellation Energy Generation, LLC, \nDocket Nos. EL25-49-000, et al."},{"page":2,"startToken":184,"endToken":533,"text":"2 \n(“December 18th Order”).4 CEG’s request, if granted, would significantly increase the cost of \npower to PJM customers. This is contrary to the Statement of Principles Regarding PJM \nprovided by the White House and PJM Governors (“Statement of Principles”).5 This is \ncontrary to the Commission’s approach that recognizes the principles of cost causation.6 \nCEG’s request for clarification is not a clarification but a request for a radical change in the \nstructure of PJM markets. CEG’s request for clarification should be denied because it directly \ncontradicts a key provision of the December 18th Order and would undermine PJM markets. \nThe same is true of CEG’s alternative request for rehearing, which should also be denied. \nI. ANSWER \nA. Generators Should Not Be Permitted to Sell Capacity Twice. \nCEG requests clarification (at 3–6) that a generator that is a Generation Capacity \nResource should be able to sell the same capacity at the same time to a data center and to PJM \ncustomers with the requirement that the energy from the capacity would be required to serve \nPJM load “during a capacity emergency.” CEG asserts that this is such a good idea that it \nshould be actively encouraged. CEG states that this approach would have no impact on the \ncapacity price or reliability.  \nCEG’s short statement effectively and efficiently captures the position that CEG has \nbeen taking for at least five years, across multiple proceedings. CEG’s statement assumes that \nexisting generating capacity and its energy output can be sold directly to a data center, \noutside PJM markets, effectively removing the capacity and energy from PJM markets. The \nCommission has not approved that option, and should not do so here. CEG’s request is for a \n                                                          \n4  \nPJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025).  \n5  \nSee Statement of Principles Regarding PJM: The National Energy Dominance Council within the \nWhite House and the Undersigned Governors Urge PJM Expeditiously to File Proposed Tariff \nRevisions at FERC that Reflect the Set of Principles Stated Below (January 15, 2026) (“Statement of \nPrinciples”). \n6  \nSee December 18th Order, for example, at P 5."},{"page":3,"startToken":533,"endToken":828,"text":"3 \nvery significant and harmful change in policy in the guise of a clarification. CEG then asserts \nthat even when capacity is sold to a data center that it can also sell the same capacity to PJM \ncustomers in the PJM capacity market. In this imaginary world, capacity can be sold twice. \nThe Commission has not approved that option. CEG’s request is for a very significant change \nin policy in the guise of a clarification. CEG’s approach harms affordability and reliability, \ncontrary to the goals of the December 18th Order. \nContrary to the assumption of CEG, the Commission’s definitions of co-located load \nand co-located arrangements do not include any statement about whether the co-located load \nbuys capacity from the PJM markets or is somehow not part of PJM markets.7 As defined by \nthe Commission, co-located load does not mean that the generation is removed from the PJM \nmarkets and sold bilaterally to the co-located load. If existing PJM capacity resources were \npermitted to sell their capacity to data centers outside the capacity market, that would be \ninconsistent with the Commission’s longstanding reliance on markets to replace cost of \nservice regulation to provide just and reasonable rates, disrupt PJM markets irreversibly, \nsignificantly reduce reliability, and significantly increase the cost of power to other PJM \ncustomers. \nThe Commission plans to review and approve replacement rates, terms and \nconditions for interconnection customers serving co-located loads.8 CEG attempts to \npredetermine the outcome of that process. \nContrary to the Statement of Principles provided by the White House and the PJM \nGovernors, CEG’s proposal would shift costs to other customers.9 CEG’s proposal is \ninconsistent with the PJM market design. \n                                                          \n7  \nSee December 18th Order at P 164. \n8  \nSee id. at PP 187–192. \n9  \nStatement of Principles"},{"page":4,"startToken":828,"endToken":1207,"text":"4 \nCEG misunderstands what capacity is. The capacity market exists to make the energy \nmarket work, by providing the additional net revenues required for the incentive to invest in \nnew units and to maintain old units. The definition of capacity is not the ability to provide \nenergy during one peak hour or five peak hours, or a small number of emergency hours. The \nobligations of capacity resources include the requirement to offer their full ICAP in the \nenergy and reserves markets every day. The need for the energy from capacity is not limited \nto one peak hour or five peak hours, or a small number of emergency hours. Capacity is the \nability to generate energy when it is needed and economic at any time over the entire 8,760 \nhours in a year. Capacity resources have the obligation to offer energy in the PJM market \nevery hour of every day. This must offer obligation results in the economic dispatch of \nresources in merit order from the cheapest energy to the most expensive energy. CEG would \nperpetuate the misunderstanding that capacity is only about emergencies. If capacity is only \nabout emergencies then it follows that capacity can be sold to a data center and also sold to \nPJM customers because it can be available for a few hours a year. As an illustration of why \nthat suggestion is not logical and not correct, simply reverse the perspective. The data center \nwould not accept the deal that CEG proposes to PJM customers. A data center would not pay \nfor capacity if it provided energy for only a few emergency hours per year. PJM customers \ndo not pay for capacity that provides energy only for a few emergency hours per year and \nthey should not start now. \nCEG has advocated for the ability to sell capacity twice since at least 2021. CEG’s \nproposal was overwhelmingly rejected by PJM stakeholders in 2022 and 2023. The precursor \nand equivalent to Constellation’s current proposal was introduced by Exelon at the PJM MIC \nmeeting on December 1, 2021 (prior to Exelon’s separation into Exelon and Constellation).10 \n                                                          \n10  \nBrookfield Renewable and Exelon, presentations to the MIC, “Capacity Offer Opportunities for \nGeneration with Co-Located -Load,” Issue Charge and “Capacity Co-Located Load,” Problem/Opportunity \nStatement (December 1, 2021)."},{"page":5,"startToken":1207,"endToken":1583,"text":"5 \nThat proposal (Constellation proposal after separation of Exelon and Constellation) for co-\nlocated load was overwhelmingly rejected in the PJM stakeholder process in poll results \npresented on December 7, 2022, 11 and again in voting results presented on August 9, 2023. 12 \n13 Delisting is a euphemism for removing existing capacity from the PJM Capacity Market by \nretiring, or exporting to an external balancing authority. CEG proposes to extend the concept \nto mean that any generation owner could remove its capacity from the PJM Capacity Market \nby selling the capacity to a data center. CEG is not content to simply remove its capacity from \nthe capacity market. CEG proposes to sell its capacity to a data center and also sell the same \ncapacity for the same time period to the PJM market. CEG’s assertion that there would be no \nimpact on capacity market prices is simply assumed. If CEG could sell the same capacity \ntwice, it would not have an impact on capacity market prices. However, CEG’s assertion that \nthis would not affect reliability is not correct even under CEG’s imaginary construct. CEG \nfails to address the impact of its proposal on energy market prices. \nIf, for example, the co-located load model were extended to all the nuclear plants in \nPJM, the impact on the PJM grid and markets would be extreme. Power flows on the grid \nthat was built in significant part to deliver low cost nuclear energy to load would change \nsignificantly. Energy prices would increase significantly as low cost nuclear energy is \ndisplaced by higher cost energy on the overall supply curve. If it were correctly recognized \n                                                          \n11  \nMorelli, Lisa “Poll Results Capacity Offer Opportunities for Generation with Co-Located Load,” December \n7, 2022), <https://www.pjm.com/-/media/DotCom/committees-groups/committees/mic/2022/20221207/item-\n06a---co-located-load-poll-results.pdf>. \n12  \nSee Brookfield Renewable U.S. and Constellation, Capacity Sales for Host Generation With \nCurtailable Co-located Load, PJM Market Implementation Committee (August 9, 2023), which can \nbe \naccessed \nat: \n<https://www.pjm.com/-/media/DotCom/committees-groups/committees/mic/2023/\n20230809/20230809-item-02---info-only---constellation-brookfield-co-location-configuration-\npresentation.pdf>. \n13  \nSee Market Implementation Committee Meeting Minutes, August 9, 2023, which can be accessed at \n<https://www.pjm.com/-/media/DotCom/committees-groups/committees/mic/2023/20230809/20230809-\nminutes.pdf->"},{"page":6,"startToken":1583,"endToken":1970,"text":"6 \nthat capacity cannot be sold twice, capacity prices would increase as the supply of capacity \nto the market is reduced.14 Emissions would also increase as thermal resources that are next \nin the supply curve are dispatched to meet load to replace the nuclear energy. Contrary to \nCEG, even a relatively small reduction in system capacity would put PJM reliability at risk. \nRemoval of multiple nuclear plants would significantly reduce reliability below PJM’s \ndefined reliability requirement. CEG’s proposed approach would undermine PJM reliability \nand PJM competitive markets. \nThe fact that the PJM Capacity Market is currently actually significantly short as a \nresult of data center load highlights the significance for future capacity market auctions of \nCEG’s proposal to remove that capacity from the capacity market.15 Removal of even a \nrelatively small amount of capacity from the market would have a significant and relatively \nlong lasting impact on capacity market prices. The gains for the generation owners would \ncome at the expense of other customers in the PJM markets. \nThere is a realistic and market based path forward. Data centers need power. Data \ncenters do not need the approach defined by CEG.  \nThe Commission’s Order was clear (P 230): \nIn accordance with the existing rules for removing Capacity \nResource status, [fn omitted] we also clarify that an existing \ngenerating facility may not begin serving Co-Located Load that is \nnot Network Load until it has delisted its CIRs for the portion of \nthe generating facility to be designated to serve any Co-Located \nLoad that is not receiving NITS. In order for an existing generator \n                                                          \n14  \nThe IMM has quantified some of the potential impacts on capacity and energy markets. See attached \nIMM Comments to the Maryland PSC re Senate Bill 1 Co-Location Study, Administrative Docket PC \n61 (September 24, 2024); IMM Supplemental Comments to the Maryland PSC re Senate Bill 1 Co-\nLocation \nStudy, \nAdministrative \nDocket \nPC \n61 \n(December \n13, \n2024) \n<https://www.monitoringanalytics.com/filings/2024/IMM_Comments_MDPSC_PC61_20240924.pdf>.  \n15  \nSee “Analysis of the 2026/2027 RPM Base Residual Auction–Part A (October, 1, 2025) and the \n“Analysis of the 2027/2028 RPM Base Residual Auction – Part A,” (January 5, 2026), which can be \naccessed \nat \n<https://www.monitoringanalytics.com/reports/Reports/2025.shtml> \nand \n<https://www.monitoringanalytics.com/reports/Reports/2026.shtml>."},{"page":7,"startToken":1970,"endToken":2256,"text":"7 \nto de-list its CIRs to serve Co-Located Load, the Interconnection \nCustomer must revise its ISA or GIA and bear the cost of all \nrequired system upgrades, as noted above.  \nThere is no reason for CEG’s clarification, which is actually a direct contradiction of \nthe clear statement in the Order. \nFor all these reasons, CEG’s requests for clarification related to selling capacity to data \ncenters and to PJM customers is not just and reasonable and should be denied. CEG’s \nalternative request for rehearing should also be denied. \nB. No Clarification on Jurisdiction Is Needed. \nCEG requests “clarification” (at 6–7) that the Commission finding that “which \ngenerating facilities are sited and allowed to serve Co-Located Load is also a question of state \nlaw” does not mean that states can decide which generation facilities are allowed to serve \n“Co-located Load.” CEG also requests clarification (at 7–8) that “a state cannot impose a \nrequirement via the exercise of their jurisdiction over retail sales that attempts to contradict \nor prohibit a transaction or sale that the Commission has said is permitted.”  \nCEG does not identify any flaw in the Commission statements in the December 18th \nOrder concerning jurisdiction. States retain jurisdiction over generation facility siting and \nretail rates, including cost allocation in retail rates.  \nThe Commission plans to review and approve replacement rates, terms and \nconditions for interconnection customers serving co-located loads.16 CEG attempts to \npredetermine the outcome of that process in a way that contradicts the Commission’s order.  \nFor all these reasons, CEG’s request for clarification on jurisdiction issues is not just \nand reasonable and should be denied. CEG’s alternative request for rehearing should also be \ndenied. \n                                                          \n16  \nSee December 18th Order at PP 187–192."},{"page":8,"startToken":2256,"endToken":2540,"text":"8 \nII. MOTION FOR LEAVE TO ANSWER \nThe Commission’s Rules of Practice and Procedure, 18 CFR § 385.213(a)(2), do not \npermit answers to requests for rehearing unless otherwise ordered by the decisional \nauthority. The Commission has made exceptions, however, where an answer clarifies the \nissues or assists in creating a complete record.17 In this answer, the Market Monitor provides \nthe Commission with information useful to the Commission’s decision making process and \nwhich provides a more complete record. Accordingly, to the extent necessary, the Market \nMonitor respectfully requests that this answer be permitted. \nIII. CONCLUSION \nThe Market Monitor respectfully requests that the Commission afford due \nconsideration to this answer as the Commission resolves the issues raised in this proceeding. \nJoseph E. Bowring \nIndependent Market Monitor for PJM \nPresident \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610) 271‐8051 \njoseph.bowring@monitoringanalytics.com \nRespectfully submitted, \n \nJeffrey W. Mayes \nGeneral Counsel \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610) 271‐8053 \njeffrey.mayes@monitoringanalytics.com \nDated:  February 5, 2026 \n                                                          \n17 \nSee, e.g., Cal. Indep. Sys. Operator Corp., 129 FERC ¶ 61,241 at P 16 (2009) (“We will accept the answers \nand responses to the requests for rehearing because they provide information that assisted us in our \ndecision making process.”); ISO New Eng., Inc., 120 FERC ¶ 61,087 at P 30 (2007) (“We will accept the \nparties’ answers to the petitions for rehearing . . . because they have provided information that \nassisted us in our decision-making process.”); KN Wattenberg Transmission LLC, 94 FERC ¶ 61,189 at \n61,671 (2001) (finding good cause to accept an answer to a request for rehearing to ensure a complete \nrecord)."},{"page":9,"startToken":2540,"endToken":2605,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. \nDated at Eagleville, Pennsylvania, \nthis 5th day of February, 2026. \nJeffrey W. Mayes \nGeneral Counsel \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610)271‐8053 \njeffrey.mayes@monitoringanalytics.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":734,"startToken":0,"endToken":300},{"p":2,"at":734,"title":"I. ANSWER","method":"printed heading","endPage":2,"endAt":745,"startToken":300,"endToken":302},{"p":2,"at":745,"title":"A. Generators Should Not Be Permitted to Sell Capacity Twice.","method":"printed heading","endPage":7,"endAt":536,"startToken":302,"endToken":2057},{"p":7,"at":536,"title":"B. No Clarification on Jurisdiction Is Needed.","method":"printed heading","endPage":8,"endAt":3,"startToken":2057,"endToken":2257},{"p":8,"at":3,"title":"II. MOTION FOR LEAVE TO ANSWER","method":"printed heading","endPage":8,"endAt":624,"startToken":2257,"endToken":2351},{"p":8,"at":624,"title":"III. CONCLUSION","method":"printed heading","endPage":9,"endAt":0,"startToken":2351,"endToken":2540},{"p":9,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":9,"endAt":446,"startToken":2540,"endToken":2605}]}