{"document":{"slug":"rec-20260223-5189-3","title":"Att. B - Abdulsalam Affidavit","issued":"2026-02-23","accession":"20260223-5189","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/filings/text/20260223-5189_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5189","tier":"record","parent":"rec-20260223-5189","sha256":"950bf2de1b88fde5fd6cd658e9eae69974d762040b7e6d87b518c232b6e469da","pages":9,"tokens":2853,"emptyPages":[],"textThemes":["flex","colo"]},"pages":[{"page":1,"startToken":0,"endToken":11,"text":"Attachment B \n \n \n \n \n \n \n \nAffidavit of Dr. Sami Abdulsalam, \nDirector of Transmission Planning"},{"page":2,"startToken":11,"endToken":192,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, \nInc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, \nInc. AEP Kentucky Transmission Company, \nInc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, \nInc. Appalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n              Docket Nos. EL25-49-000 \n                                   EL25-49-001"},{"page":3,"startToken":192,"endToken":444,"text":"2 \nWheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public \nUtilities, Division of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic \nIndiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \nLarge Loads Co-Located at Generating \nFacilities  \nConstellation Energy Generation, LLC \nv.  \nPJM Interconnection, L.L.C. \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n                                  AD24-11-000 \n \n \n                                   EL25-20-000 \n                                 (Consolidated) \n                                                    \nAFFIDAVIT OF DR. SAMI ABDULSALAM, \nON BEHALF OF PJM INTERCONNECTION, L.L.C. \n \n1. \nMy name is Sami Abdulsalam, Ph.D., P.Eng. I am the Director of Transmission Planning \nfor PJM Interconnection, L.L.C. (“PJM”). My business address is 2750 Monroe Boulevard, \nAudubon, Pennsylvania 19403. I am submitting this affidavit in support of PJM’s proposed \nrevisions to the PJM Open Access Transmission Tariff (“Tariff”) to comply with the \nFederal Energy Regulatory Commission’s (“Commission” or “FERC”) directives in its \nDecember 18, 2025 order1 to establish three new transmission services for Eligible \nCustomers (“EC”) seeking to take service on behalf of Co-Located Load.     \n \n2. \nSpecifically, in this affidavit, I explain: \n \n• Why Network Integration Transmission Service (“NITS”) is used for internal \n(non-border) transmission service in the PJM Region, and the planning and \noperational benefits that NITS provides to the PJM Region; \n \n• The complexity associated with Non-Firm Contract Demand Transmission \nService from an operations and planning perspective; and  \n \n1 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (“December 18, 2025 Order”)."},{"page":4,"startToken":444,"endToken":886,"text":"3 \n \n• The corresponding reasons why PJM is recommending that Non-Firm Contract \nDemand Transmission Service be limited to a maximum of 100% of the \ngeneration Maximum Facility Output. \n \nI. \nQUALIFICATIONS  \n3. \nI joined PJM in January of 2022.  I have been in my current position as the Director of PJM \nTransmission Planning since March 2024, and I previously served as the Senior Manager \nof PJM Transmission Planning.  My principal responsibility is to lead the development of \nPJM’s Regional Transmission Expansion Plan.  This function centers on the planning of \nthe regional transmission system for the provision of reliable electric service in accordance \nwith North American Electric Reliability Corporation Reliability Standards, as well as PJM \nand Transmission Owner reliability and operational criteria.  I will also lead the team that \nwill implement PJM’s Long-Term Regional Transmission Planning Protocol, as accepted \nby FERC. \n \n4. \nPrior to this position, I served as Senior Manager, Consulting at Siemens PTI where I was \nresponsible for power system analysis, transmission planning, and protection studies; as \nPrincipal Engineer at Sustainable Grid Power, Inc.; and, for more than ten years, held \nvarious transmission planning positions of increasing responsibility, including Director, \nTransmission Planning and Director, Transmission System Projects, at the Alberta Electric \nSystem Operator in Canada.  \n \n5. \nEarlier in my career, I held various positions in the oil and gas industry, and was an \nOperational Engineer in thermal power plants in Egypt.  My academic research focused on \npower system performance under voltage stability/high power transfer conditions as well \nas dynamic and transient behavior of power systems. \n \n6. \nI hold a Bachelor of Science degree and Master of Science degree in Electrical Engineering \nreceived from the University of El-Mansoura in Egypt in 1997 and 2001, respectively.  I \nreceived a Ph.D. in Electrical Engineering from the University of Alberta in Edmonton, \nAlberta, Canada in 2007.  I also completed a post-doctoral fellowship in the Electrical and \nComputer Engineering Department at the University of Alberta, Edmonton, Alberta, \nCanada from 2007 to 2008.  In addition, I am a registered Professional Engineer (P.Eng.) \nin Alberta, Canada.  \n \nII. \nWHY NITS IS USED FOR INTERNAL TRANSMISSION SERVICE IN THE PJM \nREGION \n7. \nIn PJM, NITS is used for internal (non-border) transmission service in the PJM Region.  \nThe NITS type of transmission service enables a high level of reliability across the region \nunder system normal and abnormal operating conditions. This type of service ensures the \ntransmission network and the needed capacity to serve such load and allows PJM to plan \nfor and secure the requisite level of service needed to accommodate changes in system \nconditions and the resource mix, as it shifts with time. NITS also ensures the system overall"},{"page":5,"startToken":886,"endToken":1406,"text":"4 \nis “proactively” planned to a forecasted level of service and the needed resource capacity \nto maintain the reliability of service is secured ahead of time. Given the level of reliability \noffered by the NITS to its transmission service loads, such loads rarely face situations of \ncurtailments or load shedding, as they are usually limited to extreme transmission outage \nconditions or resource emergency conditions. \n \n8. \nIn addition, PJM serves a system load that is high in density compared to its geographic \nfootprint. The high load density in the PJM Region means that a higher load level is served \nfrom a single point of service/delivery. As a result, a higher number of customers could be \nexposed to interruption risk under malfunction, misoperation, or unplanned interaction \nbetween more than one necessary control technologies or protection systems, which may \ninclude Remedial Action Schemes (“RAS”). Hence, the reliability of service is critical to \navoid impacting large lumps of loads under normal and contingency (outage) conditions in \naccordance with PJM planning criteria. Loads with non-firm transmission service would \nnot benefit from either (i) the availability of service under normal and abnormal system \noperating conditions and (ii) the proactive transmission planning and capacity \nprocurements. There is no guarantee to the availability of transmission capacity nor \nresource adequacy to support such type of load when it requests the service, nor do they \naffect any adjustments to transmission development or capacity procurements on a \nforward-looking basis. \nIII. \nTHE COMPLEXITY ASSOCIATED WITH NON-FIRM CONTRACT DEMAND \nTRANSMISSION SERVICE FROM AN OPERATIONS AND PLANNING \nPERSPECTIVE \n9. \nIn order to ensure reliable and secure performance of the interconnected system, PJM must \nensure the system operates strictly within the planned-for conditions. Hence, for any Co-\nLocated Load arrangement, needed special protection schemes will be installed and set to \nensure such load does not withdraw energy in excess of the megawatt level permitted under \nits effective service agreement. A non-firm type of transmission service will need to be \nevaluated on a per-request basis and will be tied to necessary control technologies or \nprotection systems, which may include RAS (together, “protection systems”) to ensure that \nthe contracted-for withdrawal level is not exceeded and that the pre-scheduled, non-firm \nwithdrawal level can only be reliably enabled  under conditions that PJM has agreed to. \n10. \nHence, PJM will allow for expedited interconnection of a Co-Located Load requesting \nNITS—through Interim NITS—even while the required network upgrades are pending or \nunder construction through the design and implementation of temporary and practical \nprotection systems. Such protection systems will allow for reliable operation of the \ntransmission system pending energization of the identified upgrades and during the \n“interim” arrangement, on the further condition that such load will be curtailed prior to \nloads taking NITS. The temporary nature of such a protection system for this type of firm \nservice is necessary to ensure the integrity and reliable operation of the transmission system \nas a whole since protection systems are designed based on system conditions anticipated \nat that time and will continue to change as system conditions evolve. With increased \nadoption of protection systems, these schemes may also interact under abnormal operating"},{"page":6,"startToken":1406,"endToken":1946,"text":"5 \nconditions leading to unintended consequences or even cascading actions that are not \nforeseen or planned for. \n11. \nIt is to be noted that the transmission facilities serving large loads will likely have multiple \nfeeders supplying the end-user load that will vary in configuration and loading level based \non end-user operating conditions. Moreover, these facilities will have redundancies that \ncan allow for the same load to be supplied from multiple feeders for reliability purposes. \nDesigning a protection system scheme that can selectively drop a pre-defined amount of \nload by discrete actions does not guarantee providing the need offered by a single \nprotection system action and will also rely on multiple measurements and logics that all \ncombined lead to a much-reduced reliability and security level of such a protection system. \nIn addition, the level of load that could be served based on anticipated system conditions \ncan vary, and having the protection systems flexible enough to be “dialed” to a specific \nload-level will add significant complexity as the protection system action to relief the \nreliability constraints could be different depending on the scheduled non-firm load level.  \n12. \nFor Non-Firm Contract Demand Transmission Service, the non-firm withdrawals will be \noffered on a pre-scheduled/requested basis and are not guaranteed. As I mentioned earlier, \nthis load is neither planned for (i.e., PJM’s transmission planning does not consider this \nload and so the system is not designed to accommodate it) nor is this load considered in \nPJM’s resource adequacy planning—therefore, PJM does not secure Capacity Resources \nto meet the load’s needs. Only the portion of the gross load for which the Eligible Customer \nhas contracted for Firm Contract Demand Transmission Service will be enabled through \nany needed transmission development and Capacity Resources. The non-firm service will \nbe offered on a scheduled, per-request basis under system conditions that are not planned-\nfor beforehand. Since the conditions of the system coincident with such service could vary \nwidely, it will be difficult to design a single protection system that covers and adapts all \npotential conditions under which the non-firm service could be offered while maintaining \nreliable system operation. For Non-Firm Contract Demand Transmission Service, PJM will \nbe offering and managing these pre-scheduled services “operationally” and ensure that \npermanent monitoring and aggressive, fast-acting protections are in place if conditions \narise that may compromise reliable system operations. This approach allows for more \nreliable system operation, reduces the number of permanent protection systems on the \nsystem, thereby reducing the likelihood of unintended protection system misoperation that \ncould lead to cascading events.  \nIV. \nWHY IS PJM RECOMMENDING THAT NON-FIRM CONTRACT DEMAND \nTRANSMISSION SERVICE BE LIMITED TO A MAXIMUM OF 100% OF THE \nGENERATION MAXIMUM FACILITY OUTPUT?  \n13. \nThe intent of the December 18, 2025 Order on Co-Located Load appears to be to provide \nEligible Customers co-locating with generation behind a single Point of Interconnection \nflexibility in selecting transmission service that is commensurate with and reflective of \ntheir use of the transmission system and their relative willingness and ability to limit energy \nwithdrawals from the transmission system. But the flexibility to select non-firm \ntransmission service is not intended as a path to avoid reasonable costs of services such \nloads receive (either on basis of use or causation) compared to firm-load services."},{"page":7,"startToken":1946,"endToken":2494,"text":"6 \n14. \nThe order also specifically notes that the flexibility of Non-Firm Contract Demand \nTransmission Service is targeted at Eligible Customers using the transmission system on \nbehalf of a Co-Located Load in a more limited manner2—e.g., Eligible Customers that rely \non a “co-location” arrangement with either a proposed or existing generator that allows the \nEligible Customer to supply their loads directly from the co-located generator without \nusing the transmission system. An Eligible Customer would only need to take non-firm \ntransmission service under limited circumstances—e.g., if the co-located generator is \nunavailable or operating at a reduced capacity.3   \n15. \nThe order also requires Non-Firm Contract Demand Transmission Service to be requested \nahead of time and on a relatively short duration basis (one hour to one month).4 This \nforward request for service implies foreseeable conditions where the Co-Located Load is \nexpected to withdraw power from the PJM network. Such conditions only materialize if \nthe generator is planned to go out of service or face operating conditions requiring its output \nto be derated for a relatively short timeframe. Such flexibility and conditions in operation \ncan only exist if the non-firm load size can be served fully through the co-located generator \n(i.e., the generator is at least 100% of the non-firm load size).  \n16. \nBy contrast, allowing for a non-firm transmission service exceeding 100% of the generator \nMaximum Facility Output (“MFO”), implies that the load is oversized relative to the size \nof the co-located generator, and is intending to lean on and use the transmission system \n100% of the time for all load above the generator MFO. Load that is oversized relative to \nthe size of the co-located generator should be required to take NITS or Firm Contract \nDemand Transmission Service to avoid excessive use of the resources and transmission \nsystem that have been only planned for to serve the NITS and other firm load services.  \n17. \nPJM proposes to limit non-firm transmission service to a maximum of 100% of generator \nMFO to ensure that loads that are “willing and able” to reduce their withdrawal from the \nsystem and can benefit from having a co-located generator on-site be offered their \nrequested level of service without (i) compromising the level of reliability to firm loads, or \n(ii) over utilizing their non-firm contract arrangements at the cost of firm service \nratepayers. At the same time PJM and Transmission Owner operator intervention and \nassistance is reserved to be available on an as-needed basis, rather than becoming a daily, \nif not hourly, burden that can consequently inhibit the work of PJM operations staff. \n18. \nThis concludes my Affidavit. \n \n2 December 18, 2025 Order at P 214 (“The new Non-Firm Contract Demand service will provide an option for Eligible \nCustomers seeking to use the transmission system on behalf of a Co-Located Load in this more limited manner, while \nstill charging customers for regulation and black start services, for the reasons discussed above.”).  \n3 December 18, 2025 Order at P 214; id., concur op. (Commissioner Rosner) at P 6.b (“[A] data center may instead \nelect to purchase Non-Firm Contract Demand Transmission Service if, for example, it only plans to pull energy from \nthe grid temporarily while its co-located generator is undergoing scheduled maintenance.”). \n4 December 18, 2025 Order at P 215."},{"page":8,"startToken":2494,"endToken":2675,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, \nInc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, \nInc. AEP Kentucky Transmission Company, \nInc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, \nInc. Appalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n              Docket Nos. EL25-49-000 \n                                   EL25-49-001"},{"page":9,"startToken":2675,"endToken":2853,"text":"Wheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public \nUtilities, Division of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic \nIndiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \nLarge Loads Co-Located at Generating \nFacilities  \nConstellation Energy Generation, LLC \nv.  \nPJM Interconnection, L.L.C. \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n                                  AD24-11-000 \n \n \n                                   EL25-20-000 \n                                 (Consolidated) \n                                                    \n \nVERIFICATION OF DR. SAMI ABDULSALAM \n \nI, Dr. Sami Abdulsalam, pursuant to 28 U.S.C. § 1746, state, under penalty of perjury, that \nI am the Sami Abdulsalam referred to in the foregoing “Affidavit of Dr. Sami Abdulsalam on \nBehalf of PJM Interconnection, L.L.C.,” that I have read the same and am familiar with the \ncontents thereof, and that the facts set forth therein are true and correct to the best of my \nknowledge, information, and belief. \n/s/ Dr. Sami Abdulsalam \n \nDr. Sami Abdulsalam \nDirector, Transmission Planning \nPJM Interconnection, L.L.C. \n \n \nExecuted on: February 23, 2026"}],"sections":[{"p":1,"at":0,"title":"Attachment B","method":"printed heading","endPage":4,"endAt":188,"startToken":0,"endToken":471},{"p":4,"at":188,"title":"I. QUALIFICATIONS","method":"printed heading","endPage":4,"endAt":2321,"startToken":471,"endToken":785},{"p":4,"at":2321,"title":"II. WHY NITS IS USED FOR INTERNAL TRANSMISSION SERVICE IN THE PJM","method":"printed heading","endPage":5,"endAt":1599,"startToken":785,"endToken":1125},{"p":5,"at":1599,"title":"III. THE COMPLEXITY ASSOCIATED WITH NON-FIRM CONTRACT DEMAND","method":"printed heading","endPage":6,"endAt":2855,"startToken":1125,"endToken":1828},{"p":6,"at":2855,"title":"IV. WHY IS PJM RECOMMENDING THAT NON-FIRM CONTRACT DEMAND","method":"printed heading","endPage":9,"endAt":1501,"startToken":1828,"endToken":2853}]}
