{"document":{"slug":"rec-20260223-5189-4","title":"Att. C - Wharton Affidavit","issued":"2026-02-23","accession":"20260223-5189","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/filings/text/20260223-5189_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5189","tier":"record","parent":"rec-20260223-5189","sha256":"5267d0fe8580b1b037b8342a32db46335cf6b1bdb22db26c9735d9633865bfef","pages":12,"tokens":3774,"emptyPages":[],"textThemes":["colo","flex"]},"pages":[{"page":1,"startToken":0,"endToken":9,"text":"Attachment C \n \n \n \n \n \n \n \nAffidavit of Matthew Wharton, \nManager, Reliability Engineering"},{"page":2,"startToken":9,"endToken":193,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, \nInc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, \nInc. AEP Kentucky Transmission Company, \nInc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, \nInc. Appalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n              Docket Nos. EL25-49-000 \n                                   EL25-49-001"},{"page":3,"startToken":193,"endToken":442,"text":"2 \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public \nUtilities, Division of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic \nIndiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \nLarge Loads Co-Located at Generating \nFacilities  \nConstellation Energy Generation, LLC \nv.  \nPJM Interconnection, L.L.C. \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n                                  AD24-11-000 \n \n \n                                   EL25-20-000 \n                                 (Consolidated) \n                                                    \n \nAFFIDAVIT OF MATTHEW WHARTON \nON BEHALF OF PJM INTERCONNECTION, L.L.C. \n \n1. \nMy name is Matthew Wharton, PE, and my business address is 2750 Monroe Blvd., \nAudubon, Pennsylvania 19403.  My current title is Manager, Reliability Engineering at \nPJM Interconnection, L.L.C. (“PJM”).  I am submitting this affidavit in support of PJM’s \nproposed revisions to the PJM Open Access Transmission Tariff (“Tariff”) to comply with \nthe Federal Energy Regulatory Commission’s (“Commission” or “FERC”) directives in its \nDecember 18, 2025 order1 to establish three new transmission services for Eligible \nCustomers seeking to take service on behalf of Co-Located Load.     \n \n2. \nSpecifically, in this affidavit, I explain: \n \n• How PJM operationally carries out its key responsibilities as the “air traffic \ncontroller” of the PJM Region’s high-voltage electric transmission system to \nensure reliability, manage power flow, and handle emergency operations as the \nregion’s North American Electric Reliability Corporation (“NERC”)-registered \nReliability Coordinator, Balancing Authority, and Transmission Operator; and  \n \n1 PJM Interconnection, L.L.C, 193 FERC ¶ 61,217, at PP 2, 161, 231-36 (2025)."},{"page":4,"startToken":442,"endToken":851,"text":"3 \n• The operational complexities associated with Remedial Action Schemes \n(“RAS”) and PJM’s application of the applicable requirements of NERC \nmandatory reliability standard PRC-012-2.2 \nI. \nQUALIFICATIONS  \n3. \nI joined PJM in January of 2013 and was continuously employed by PJM until April 2021.  \nI returned in January 2022 and have been continuously employed by PJM ever since.  As \nManager, Reliability Engineering, I am responsible for coordinating next-day and real-time \noperating plans between PJM, its member Transmission Owners and Generation Owners, \nand our neighboring entities.  This function includes ensuring the real-time reliable \noperation of the power grid and generation connected to it, in accordance with all PJM and \nNERC reliability standards pertaining to the functions of Reliability Coordinator, \nBalancing Authority, and Transmission Operator.  Prior to my role in the Reliability \nEngineers, I served as Manager, Transmission Planning – MAAC & South, in which I \nperformed planning coordinator functions in a managerial role.   \n \n4. \nPrior to these positions in PJM’s Reliability Engineering Department, I was an Associate \nEngineer (Electrical) in the Design Engineering department at PSEG Nuclear LLC in the \nHope Creek Nuclear Power Plant, as an Engineer in the PJM – Transmission Services \ndepartment, as a Sr. Engineer in the PJM – Transmission Operations department, as an \nAssociate Director in the Guidehouse – Energy, Sustainability, and Infrastructure \ndepartment, as a Reliability Engineer in the PJM – Reliability Engineering Department, as \nPrincipal Reliability Engineer – Reliability Engineering, and then as Manager, \nTransmission Planning – MAAC & South at PJM.  \n \n5. \nI hold a Bachelor of Science degree in Electrical Engineering, from The College of New \nJersey, a Master of Science degree in Electrical Engineering from Drexel University, and \na Master of Science degree in Engineering Management from Drexel University. \n \n6. \nIn addition to my formal education, I am currently a NERC Certified System Operator at \nthe Reliability Coordinator level (Certification Number: RC201607020), PJM Certified \nTransmission Owner Operator (Certificate Number: PT2016080), PJM Certified \nGeneration Dispatcher (Certificate Number: PG2016642), and a licensed Professional \nEngineer in the state of New Jersey (License Number: 24GE05437900).  \n \nII. \nPJM’S ROLE IN SYSTEM OPERATIONS  \n \n7. \nPJM is a Commission-approved Regional Transmission Organization that independently \ndirects operations on the PJM Transmission System.  Importantly, PJM does not physically \nand directly control transmission equipment, but rather acts as the “air traffic controller,” \ncoordinating and directing system operations with its Member Transmission Owners.  Put \n \n2 PRC-012-2 – Remedial Action Schemes, North American Electric Reliability Corporation (Apr. 28, 2025), \nhttps://www.nerc.com/globalassets/standards/reliability-standards/prc/prc-012-2.pdf (“NERC Reliability Standard \nPRC-012-2”)."},{"page":5,"startToken":851,"endToken":1341,"text":"4 \nanother way, just as air traffic controllers do not own or fly the airplanes, PJM does not \nown or operate the generation or transmission facilities of the PJM Region.   \n \n8. \nLike an air traffic controller, PJM directs energy “traffic,” ensuring that electricity from \ngenerators moves safely to load.  PJM has decision-making authority to act and/or to direct \nactions to be taken by Transmission Operators, Transmission Owners, Generator \nOperators, Load-Serving Entities, and Purchasing-Selling Entities within its Reliability \nCoordinator Area to preserve the integrity and reliability of the Bulk Electric System.3 \n \n9. \nPJM is the Reliability Coordinator, Balancing Authority, and Transmission Operator for \nthe PJM Region.  First, as the federally-designated Reliability Coordinator for the PJM \nRegion, PJM coordinates the operation of transmission and generation on a second-by-\nsecond, hour-by-hour, and day-to-day basis throughout the year.  PJM must comply with \nreliability standards set by NERC, with oversight from FERC.   \n \n10. \nSecond, as the region’s Balancing Authority, PJM ensures electricity supply continuously \nmatches load in real-time to reliability serve the over 67 million customers within our \nregion.  PJM’s system operators maintain frequency control by directing Generator \nOperators to increase or lower generation output to maintain the delicate balance of supply \nand demand on the high-voltage electric transmission system at the standard frequency of \n60 cycles per second (i.e., 60 Hertz in the United States).  PJM is a centrally dispatch \nBalancing Authority, which uses Security Constrained Economic Dispatch that utilizes \nleast-cost solutions while controlling active transmission constraints to ensure load is \nserved.  A reliable centrally dispatched Balancing Authority relies on Network Integration \nTransmission Service (“NITS”) to ensure that generation is not “bottled”4 and is \ndeliverable to load, as Dr. Sami Abdulsalam explains in his affidavit.5   \n \n11. \nThird, as the PJM Region’s Transmission Operator, PJM manages the physical \ntransmission grid, directing power flow over 88,333 miles of transmission lines to \nminimize  congestion and prevent equipment overload to the extent possible.   \n \n12. \nPJM manages the reliability of the transmission grid by maintaining an uninterrupted flow \nof high-voltage electricity, monitoring congestion, and by preventing and, if necessary, \naddressing outages and emergencies within the PJM footprint.  As electricity usage changes \nthroughout the day, PJM must balance supply and demand by telling generation how much \nenergy to supply while simultaneously working with PJM Transmission Owners to ensure \nthat transmission lines and facilities are functioning properly.   \n \n13. \nOperating the electric system is a balancing act that requires continuous monitoring of the \nsystem.  From PJM’s dual, fully redundant control rooms, PJM’s system operators work \n \n3 See Systems Operation Division, PJM Manual 37: Reliability Coordination, PJM Interconnection, L.L.C. (Rev. 22, \nMay 11, 2025), https://www.pjm.com/-/media/DotCom/documents/manuals/m37.pdf.  \n4 “Bottled” in this context means a generation that cannot output the electricity it creates to the grid or is undeliverable \nto the grid. \n5 Affidavit of Dr. Sami Abdulsalam on Behalf of PJM Interconnection L.L.C. (Attachment B) ¶¶ 7-8."},{"page":6,"startToken":1341,"endToken":1830,"text":"5 \n24 hours a day, seven days a week to anticipate and respond, on a second-by-second basis, \nto shifts in demand for power and changes in the flow of electricity, equipment problems, \nweather conditions and other factors to maintain safe and reliable service while meeting \ncustomer needs for electricity when and where it’s needed.  System operators are \nresponsible for directing generators to increase or lower generation to maintain the delicate \nbalance between the supply and demand for electricity.  They monitor the equipment on \nthe transmission system (such as transmission lines, transformers) to ensure they are loaded \nand operated within their limits.  Additionally, they monitor the transmission equipment \nfor the “what could go wrong,” also known as “contingency analysis,” to ensure the system \nwill remain secure and safe, even if something does go wrong.  \n \n14. \nFrom an Industry perspective, there are multiple efforts reviewing the Operational, \nPlanning, and Security impacts of the large load.  One of the most notable whitepapers was \ndeveloped by NERC, Characteristics and Risks of Emerging Large Loads,6 in which I am \nlisted for supporting the development of the paper.  From a high level, the operational risks \ninclude forecasting, balancing and reserves, lack of real-time coordination, stability, and \npower quality.  Two of the NERC Whitepaper’s recommendations include (i) tasking two \nNERC Working Groups to develop load models that can show the characteristics and risks \nfor simulations, and (ii) to assess possible protection system impacts to the Bulk Power \nSystem.  Industry has recognized and is responding to the potential and substantial impacts \nfrom large loads.7  \n \nIII. \nTHE OPERATIONAL COMPLEXITIES ASSOCIATED WITH REMEDIAL \nACTION SCHEMES AND PJM’S APPLICATION OF NERC RELIABILITY \nSTANDARD PRC-012-2 \n \n15. \nA Special Protection System (“SPS”) or Remedial Action Scheme (“RAS”) is designed to \ndetect abnormal system conditions (e.g., abnormal system configuration) and to \nautomatically take appropriate corrective action to maintain system stability, acceptable \nsystem voltages, and acceptable facility loading.  The term SPS has more historical context \nas NERC set the industry term for these protection schemes as Remedial Action Schemes, \nas defined in the NERC Glossary of Terms8 and described in PJM Manual 7.9  Whereas \n“normal” protective relaying systems are typically designed to isolate faulted elements, a \nRAS may take actions seemingly unrelated to the cause such as the tripping of local or remote \n \n6 Characteristics and Risks of Emerging Large Loads: Large Loads Task Force White Paper, North American Electric \nReliability \nCorporation \n(July \n2025), \nhttps://www.nerc.com/globalassets/who-we-are/standing-\ncommittees/rstc/whitepaper-characteristics-and-risks-of-emerging-large-loads.pdf (“NERC Whitepaper”). \n7 NERC Whitepaper at vii. \n8 Glossary of Terms Used in NERC Reliability Standards, North American Electric Reliability Corporation (Feb. 17, \n2026), https://www.nerc.com/globalassets/standards/reliability-standards/glossary_of_terms.pdf (“NERC Glossary of \nTerms”). \n9 System Planning Division Transmission Planning Department, PJM Manual 07: PJM Protection Standards, PJM \nInterconnection, L.L.C. (Rev. 5, Sep. 25, 2025), https://www.pjm.com/-/media/DotCom/documents/manuals/m07.pdf \n(“PJM Manual 7”)."},{"page":7,"startToken":1830,"endToken":2325,"text":"6 \nsystem elements (including generators), generator runback, and load shedding for the \npurpose of maintain system or equipment reliability. \n16. \nA RAS should not be installed as a substitute for good system design or operating practices.  \nPJM Manuals reflect this caution of relying on such schemes on a permanent basis.  The \nimplementation of a RAS is generally limited to temporary conditions involving the outage \nof critical equipment.  The decision to employ a RAS should consider the complexity of \nthe scheme and the consequences of misoperation, as well as its benefits.  The use of a \nRAS, like any protection scheme, entails the risk that it will misoperate.  However, the \nconsequences of a RAS misoperation are often more severe than those of fault protection \nschemes.10  While a RAS may be a temporary solution until the transmission system is \nreinforced, PJM Manuals indicate that PJM’s systems and operating procedures were \ndesigned to be served by NITS, eliminating the need for RAS while ensuring generation \ncan be dispatched to serve load.11  \n17. \nPJM has a well-defined process in PJM Manual 3, section 1.7 (PJM Procedure to Review \nRemedial Action Schemes (RAS)),12 for new, retiring, or functional modifications to a \nRAS.  All RAS must meet the NERC RAS definition and comply with the NERC \nReliability Standard PRC-012-2, as well as other NERC Reliability Standards applicable \nto RAS (e.g., PRC-005-613).  \n \n18. \nFor any RAS, PJM, in its role as the Reliability Coordinator, reviews the scheme and \nprovides feedback to the RAS-entity within four full calendar months or a schedule that is \nmutually agreed upon in keeping with R2 of NERC Reliability Standard PRC-012-2.  The \nscheme will be reviewed for the need and reliability purposes.  Then the owner will be \nprovided with feedback for recommendations.  If the RAS is a viable scheme, it will be \ndocumented in PJM Manual 03B: Transmission Operation Procedures (CEII).  Consistent \nwith PJM Manual 3, to achieve Reliability Coordinator (i.e., PJM) endorsement, the RAS \nwill need to be endorsed by the following PJM Stakeholder Committees: \na. PJM System Operator Committee  \nb. PJM Relay Subcommittee (Conditional if impacting facilities 200 kV or above) \nc. PJM Operating Committee  \nd. PJM Market Implementation Committee  \ne. PJM Planning Committee  \nf. PJM Markets and Reliability Committee  \n \n \n10 See PJM Manual 7.  \n11 See System Operations Division, PJM Manual 13: Emergency Operations, PJM Interconnection, L.L.C., section \n2.3 (Rev. 97, Nov. 20, 2025), https://www.pjm.com/-/media/DotCom/documents/manuals/m13.pdf. (a Manual Load \nDump Action is the last controlling action available to operators to resolve capacity or transmission issues). \n12 Transmission Operations, PJM Manual 03: Transmission Operations, PJM Interconnections, L.L.C., section 1.7 \n(Rev. 69, Nov. 20, 2025), https://www.pjm.com/-/media/DotCom/documents/manuals/m03.pdf (“PJM Manual 3”). \n13 Standard PRC-00562 – Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance, \nNorth \nAmerican \nElectric \nReliability \nCorporation \n(Apr. \n28, \n2025), \nhttps://www.nerc.com/globalassets/standards/reliability-standards/prc/prc-005-6.pdf."},{"page":8,"startToken":2325,"endToken":2606,"text":"7 \n19. \nTo implement a RAS, PJM and Transmission Owner system operators will need to be \ntrained prior to use within real-time operation.  The training ensures operators know the \nconditions for which the RAS will be utilized and the actions the RAS scheme will perform. \nPJM operators have the responsibility for directing the arming and disarming of the RAS \nscheme during real-time operations.  Ultimately, the PJM and Transmission Owner will \nneed to properly screen for the contingency plus the RAS action in their respective Energy \nmanagement Systems.14 \n \n20. \nThe PJM transmission system is robust and constitutes a tightly coupled network.  \nPractically, this means the load centers are electrically close to each other and the \ntransmission system has multiple elements connecting to each other.  \n \n21. \nThere is the possibility of interactions between RAS schemes in a tightly coupled network.  \nAs detailed from the NERC Incident Review, Considering Simultaneous Voltage-Sensitive \nLoad Reductions,15 a failed lightning arrestor on the 230 kV transmission system led to the \nloss of approximately 1,500 megawatts within the PJM region at multiple substations.16  \nThe diagram below illustrates the event.  Although this event was not triggered by a \nmisoperation of a RAS, the risk of having multiple RASs within a single area increases the \nlikelihood of a misoperation. \n \n \n14 See PJM Manual 3.  \n15 Incident Review: Considering Simultaneous Voltage-Sensitive Load Reductions, North American Electric \nReliability \nCorporation \n(Jan. \n8, \n2025), \nhttps://www.nerc.com/globalassets/our-work/reports/event-\nreports/incident_review_large_load_loss.pdf. \n16 Matthew Gooding, Virginia narrowly avoided power cuts when 60 data centers dropped off the grid at once, Data \nCenter Dynamics (Mar. 20, 2025), https://www.datacenterdynamics.com/en/news/virginia-narrowly-avoided-power-\ncuts-when-60-data-centers-dropped-off-the-grid-at-once/."},{"page":9,"startToken":2606,"endToken":3180,"text":"8 \n22. \nA RAS is designed for specific conditions to occur prior to activating.  Since the PJM \nnetwork is tightly coupled with multiple transmission lines, the RAS or multiple RASs will \nneed to monitor and activate for a multitude of conditions.  Typically, a RAS monitors one \nspecific condition and is armed to respond to one condition.  Thus, each condition would \nrequire its own RAS that can be independently armed or disarmed.  This is not ideal to \noperate or control the system with each scheme carrying additional risk.  Moreover, the \ntransmission system is a dynamic system that is constantly changing with generation online \nor transmission outages.  The conditions for a RAS may change based on the dynamic \nsystem conditions.  As such, a pre-defined RAS may not be sufficient for all scenarios.  \n \nSimilarly, with a network diagram as described above, all the interim or non-firm loads \nwithin an electrically close area may have similar violations. This could create a scenario \nwhere the loss of a facility requires reducing or dropping all the interim or non-firm load \nwithin that area.  This quick and large change in PJM system load could cause Area Control \nError (“ACE”) deviations—the metric that evaluates generation to load balancing, and \ngenerator stability issues.17  Each Balancing Authority is required to calculate a Reporting \nACE.  This is an important calculation that is required to be available at a minimum of \n99.5% of each calendar year and a minimum accuracy of 0.001 Hz.  The Reporting ACE \nis used to ensure the frequency of the Eastern Interconnection (“EI”) is maintained.  There \nis a potential with a “local failure or misoperation” of a RAS in PJM could impact the entire \nEI, depending on the amount of load that is quickly removed from the system.  This is a \nrisk identified as part of the Frequency Stability portion of the NERC Whitepaper stating: \n“All these issues have the potential to cause further operation of protection systems.  With \neach protection system operation, more [Bulk Power System] equipment is taken out of \nservice, and the possibility for cascading outages grows.”18 \n \n23. \nThe term “stability limits” refers to the ability of an electric system to maintain or regain \nan equilibrium state during normal operations or a contingency event or system \ndisturbance.  A “contingency event” refers to an unplanned outage of a system element \n(lines, transformers), loss of generation, sudden large load changes, or loss of other power \nsystem elements (circuit breakers, switches, reactive devices). \n \n24. \nA generator is constantly matching equal but opposite forces by the system load.  A sudden \nlarge loss of load within a short time frame, from the perspective of a generator, is like \nriding a bike uphill and having the chain snap.  The pedals will speed up because the bike \nrider (generator) cannot instantaneously respond to the chain snapping (loss of load).  If \nthe rider was working hard, they could catapult over the handlebars and get injured \n(damage).  There is a similar response from nearby generators where there is a sudden loss \nof large load.  The generator will speed up and if severe enough, it could cause mechanical \nstress to generator components or damage to the machine.  \n \n \n17 ACE is the “instantaneous difference between a Balancing Authority’s net actual and scheduled interchange, taking \ninto account the effects of Frequency Bias and correction for meter error.”  See NERC Glossary of Terms at 54 of \nPDF (definition of Area Control Error).  \n18 NERC Whitepaper at 25."},{"page":10,"startToken":3180,"endToken":3417,"text":"9 \n25. \nThere is one scenario where a RAS would be overwhelmingly beneficial and would have \na minimal impact on the overall grid.  A RAS will be required for the loss of the Co-\nLocated Generating Facility.  In this instance, PJM would expect the RAS to actuate on the \nloss of the Co-Located Generating Facility and the load served by Non-Firm Contract \nDemand Transmission Service or Interim NITS will automatically be removed from the \nsystem by the RAS scheme.  In other words,  after the co-located generator is offline, only \nthe NITS or Firm Contract Demand Transmission Service will remain connected and \nserved by PJM.  At that point, PJM could evaluate if additional non-firm load could be \nsupported after the loss of generation occurs.  \n \n26. \nThere are some impacts that are outside of the operations that should be noted as well.  The \nfirst is for the RAS-entity, as defined in the NERC Reliability Standard PRC-012-2.  The \nRAS-entity, which will typically but not always (e.g. in the case that the Eligible Customer \ncontracts out the RAS) be the Eligible Customer, will be responsible for meeting NERC \ncompliance.  This includes participating in analyzing the RAS operational performance \nafter a RAS operation or failure, develop/implement Corrective Action Plans, and \nperiodically perform functional testing.  Finally, the Planning Coordinator, in collaboration \nwith the RAS-entity, will need to perform an evaluation of each RAS within its area.  \n \n27. \nThis concludes my Affidavit."},{"page":11,"startToken":3417,"endToken":3598,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, \nInc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, \nInc. AEP Kentucky Transmission Company, \nInc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, \nInc. Appalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n              Docket Nos. EL25-49-000 \n                                   EL25-49-001"},{"page":12,"startToken":3598,"endToken":3774,"text":"Wheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public \nUtilities, Division of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic \nIndiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \nLarge Loads Co-Located at Generating \nFacilities  \nConstellation Energy Generation, LLC \nv.  \nPJM Interconnection, L.L.C. \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n                                  AD24-11-000 \n \n \n                                   EL25-20-000 \n                                 (Consolidated) \n                                                    \n \n \nVERIFICATION OF MATTHEW WHARTON, PE \n \nI, Matthew Wharton, PE, pursuant to 28 U.S.C. § 1746, state, under penalty of perjury, that \nI am the Matthew Wharton referred to in the foregoing “Affidavit of Matthew Wharton, PE on \nBehalf of PJM Interconnection, L.L.C.,” that I have read the same and am familiar with the \ncontents thereof, and that the facts set forth therein are true and correct to the best of my \nknowledge, information, and belief. \n/s/ Matthew Wharton  \nMatthew Wharton  \nManager \nReliability Engineering  \nPJM Interconnection, L.L.C. \n                                                                                    \n \nExecuted on: February 23, 2026"}],"sections":[{"p":1,"at":0,"title":"Attachment C","method":"printed heading","endPage":4,"endAt":189,"startToken":0,"endToken":466},{"p":4,"at":189,"title":"I. QUALIFICATIONS","method":"printed heading","endPage":4,"endAt":2390,"startToken":466,"endToken":772},{"p":4,"at":2390,"title":"II. PJM’S ROLE IN SYSTEM OPERATIONS","method":"printed heading","endPage":6,"endAt":1716,"startToken":772,"endToken":1599},{"p":6,"at":1716,"title":"III. THE OPERATIONAL COMPLEXITIES ASSOCIATED WITH REMEDIAL","method":"printed heading","endPage":12,"endAt":1583,"startToken":1599,"endToken":3774}]}
