{"document":{"slug":"rec-20260223-5190-3","title":"Exhibit No. PTO-0002","issued":"2026-02-23","accession":"20260223-5190","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"attachment","file":"sources/filings/text/20260223-5190_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5190","tier":"record","parent":"rec-20260223-5190","sha256":"75e7d3a9faa3f853cbc7766d205a4bd001d3cba1228346eda16440cd8748edd6","pages":12,"tokens":3234,"emptyPages":[],"textThemes":["cost","study"]},"pages":[{"page":1,"startToken":0,"endToken":402,"text":"RESUMES OF PETER BLAZUNAS, LANCE SCHAFER, AND HANHAN HAMMER \n \n \nPG. 1 \nPETER BLAZUNAS \nVICE PRESIDENT \nPROFESSIONAL HISTORY \nConcentric Energy Advisors, Inc.  \nVice President (January 2026 – Present) \nAssistant Vice President (January 2024 – December 2025) \nSenior Project Manager (January 2023 - December 2023) \nProject Manager (October 2021 - December 2022)  \n \nCurrently serve as the project manager and expert witness for a long-term staff augmentation \nengagement with Narragansett Electric Company (“NECO”, also known as Rhode Island \nEnergy) following its acquisition by PPL from National Grid. Staff augmentation services \ninclude the provision of expert witness testimony and analyst support in the litigation of gas \nand electric rate mechanism proceedings, the execution of both internal and external monthly \nreporting, the development of written processes and procedures, and the training of new \npersonnel.  \n \nExecutes projects and initiatives related to cost of service and rate design and, where \nappropriate, serves as an expert witness in regulatory proceedings. \n \nA recent engagement included the provision of expert witness testimony with respect to rate \ndesign in a multi-year rate plan application for an electric utility in Maryland.  \n \nManages all phases of assigned projects with teams of senior staff and supporting analysts \nacross multiple offices. \nMr. Blazunas primarily provides regulatory strategy and rate case expertise as it pertains to \nregulated electric and gas utility rate proceedings. Mr. Blazunas joined Concentric in October \n2021 after spending nine years in positions of progressively greater responsibility in the regulatory \ndepartments of large investor-owned electric utilities. Prior to joining Concentric, Mr. Blazunas \nmanaged a team at Exelon Corp. responsible for the cost of service, revenue allocation, rate \ndesign, revenue decoupling, and rate administration functions for Exelon’s Pepco Maryland \nand District of Columbia jurisdictions. Mr. Blazunas has experience testifying in both traditional \nbase distribution rate case and multiyear rate plan proceedings, as well as in developing, \nsupporting, and implementing utility of the future initiatives, including transportation \nelectrification programs. Mr. Blazunas has testified as an expert witness before the Rhode Island \nPublic Utilities Commission, the Public Utilities Commission of Ohio, the Maryland Public Service \nCommission, the Public Service Commission of the District of Columbia, and the Delaware \nPublic Service Commission. Mr. Blazunas holds a B.A. in Economics from the University of Dayton \nand an M.A. in Economics from the University of Akron. He has taught both graduate and \nundergraduate Economics at the University of Akron and undergraduate Economics at \nCuyahoga Community College. \nExhibit No. PTO-0002\nPage 1 of 12"},{"page":2,"startToken":402,"endToken":806,"text":"Resumes of Peter Blazunas, Lance Schafer, and Hanhan Hammer \n PG. 2 \nPepco (Exelon Corp.), Washington, D.C.  \nManager of Rate Administration (November 2018 – January 2021) \nSenior Rate Analyst (July 2017 – November 2018) \n \nManaged a team of four rate analysts responsible for the cost of service and rate design \nfunctions with respect to Pepco’s base distribution rates.  \n \nServed as the rate design witness for Pepco’s Maryland and District of Columbia base \ndistribution rate case and multi-year rate plan proceedings, with a focus on revenue allocation, \nrate design, and decoupling in both traditional and non-traditional contexts.  \n \nServed as the rate design and cost recovery witness for several of Exelon’s Pepco Holdings Inc. \n(“PHI\") jurisdictions with respect to transportation electrification.  \n \nOversaw the development of self-contained cost-of-service (“COS”) and rate design Microsoft \nExcel models for use in regulatory proceedings.  \n \nGuided the creation of concise and well-written processes and procedures as it relates to the \ndevelopment of base distribution rates, numerous distribution riders, and transmission retail \nrates.  \n \nDirected the development of internal project plan templates for use in executing initiatives \nrelated to the implementation of traditional and innovative rates.  \n \nSupervised the development of internal documents to direct Pepco’s policy positions on a range \nof issues in work group settings with a diverse set of external stakeholders (primarily, the \nMaryland Public Service Commission Public Conference 44 Rate Design Working Group and the \nDistrict of Columbia Public Service Commission Rate Design Working Group). \nFirst Energy Corp., Akron, OH  \nState Regulatory Analyst (January 2012 – June 2017) \n \nServed as the lead analyst for the FirstEnergy Ohio operating companies’ Delivery Capital \nRecovery Rider (“Rider DCR”). Duties included the preparation of a detailed quarterly filing \nwith the Public Utilities Commission of Ohio (“PUCO”) that requires complex revenue \nrequirement calculations, extensive intra-company communication and collaboration in the \ndevelopment of financial inputs, month-to-month analysis, and participation in an annual audit \nconducted by an outside consultant on behalf of the PUCO.  \n \nDuties also included (a) the role of Rates and Regulatory Affairs Department point of contact \nfor internal customers in relation to the application of The Cleveland Electric Illuminating \nCompany’s and The Toledo Edison Company’s tariffs and (b) participation in various state \nregulatory proceedings, including testifying in front of the PUCO. \nCuyahoga Community College, Highland Hills, OH \nAdjunct Faculty (Hybrid) (January 2022 – May 2022) \n \nCourses Taught: Principles of Microeconomics (Undergraduate) \nUniversity of Akron, Akron, OH \nAssistant Lecturer (In-Person) (September 2023 – Present) \nExhibit No. PTO-0002\nPage 2 of 12"},{"page":3,"startToken":806,"endToken":937,"text":"Resumes of Peter Blazunas, Lance Schafer, and Hanhan Hammer \n PG. 3 \n \nCourses Taught: Economic Decision Making for Business (Graduate); Regulatory Economics \n(Undergraduate/Graduate) \nAssociate Lecturer (Online) (January 2018 – May 2018) \n \nCourses Taught: Survey of Basic Economics (Undergraduate) \nAssociate Lecturer (In-Person) (August 2012 – May 2017) \n \nCourses Taught: Principles of Microeconomics and Principles of Macroeconomics \n(Undergraduate) \nEDUCATION \nUniversity of Akron (Akron, Ohio), December 2011 \nMaster of Arts, Economics  \nUniversity of Dayton (Dayton, Ohio), May 2009 \nBachelor of Arts, Economics, Summa Cum Laude \nCONTINUED EDUCATION \nUtility Accounting and Finance Seminar, January 2018 \nFinancial Accounting Institute, Washington, D.C. \nMorgan Stanley Investment Banking Client Training Program, April 2016 \nTraining the Street, New York City, NY \nEdison Electric Institute Advanced Ratemaking Course, August 2013 \nEdison Electric Institute, Madison, WI \n \nExhibit No. PTO-0002\nPage 3 of 12"},{"page":4,"startToken":937,"endToken":1335,"text":"Resumes of Peter Blazunas, Lance Schafer, and Hanhan Hammer \n \nPG. 4 \nSPONSOR  \nDATE  \nCASE/APPLICANT  \nDOCKET  \nSUBJECT \nDelaware Public Service Commission\nDelmarva Power and Light \nCompany \n2018 \nDelmarva Power \nand Light Company \nDocket No. \n17-1094 \nRate Design and Cost Recovery \n(Transportation \nElectrification) \nPublic Service Commission of the District of Columbia\nPotomac Electric Power \nCompany  \n2019 \nPotomac Electric \nPower Company \nFormal Case \nNo. 1156 \nRate Design (Multi-Year Rate \nPlan) \nPotomac Electric Power \nCompany \n2019 \nPotomac Electric \nPower Company \nFormal Case \nNo. \n1145/1159 \nRate Design and Cost Recovery \n(Undergrounding Application) \nPotomac Electric Power \nCompany \n2018 \nPotomac Electric \nPower Company \nFormal Case \nNo. 1130 \nRate Design and Cost Recovery \n(Transportation \nElectrification) \nMaryland Public Service Commission\nPotomac Electric Power \nCompany \n2025 \nPotomac Electric \nPower Company \nCase No. 9820 \nRate Design (Fully Forecasted \nTest Year) \nPotomac Electric Power \nCompany \n2023 \nPotomac Electric \nPower Company \nCase No. 9702 \nRate Design (Multi-Year Rate \nPlan) \nDelmarva Power and Light \nCompany \n2022 \nDelmarva Power \nand Light Company \nCase No. 9681 \nRate Design (Multi-Year Rate \nPlan) \nPotomac Electric Power \nCompany  \n2020 \nPotomac Electric \nPower Company \nCase No. 9655 \nRate Design (Multi-Year Rate \nPlan) \nPotomac Electric Power \nCompany  \n2019 \nPotomac Electric \nPower Company \nCase No. 9602 \nRate Design (Traditional Rate \nCase) \nPotomac Electric Power \nCompany  \n2018\nPotomac Electric \nPower Company \nCase No. 9472\nRate Design (Traditional Rate \nCase) \nPublic Utilities Commission of Ohio \nThe Cleveland Electric \nIlluminating Company  \n2017 \nThe Cleveland \nElectric Illuminating \nCompany \nCase No. 16-\n2213-EL-CSS \nCustomer Complaint Case \nThe Toledo Edison Company \n2014 \nThe Toledo Edison \nCompany \nCase No. 13-\n2145-EL-CSS \nCustomer Complaint Case \nRhode Island Public Utilities Commission \nRhode Island Energy\n2025\nRhode Island \nEnergy \nDocket No. \n25-45-GE \nRate Design (General Rate \nCase) \nRhode Island Energy \n2025 \nRhode Island \nEnergy \nDocket No. \n25-23-REG \nRate Design and Cost Recovery \n(Renewable Energy Program) \nRhode Island Energy\n2025\nRhode Island \nEnergy \nDocket No. \n25-04-REG \nRate Design and Cost Recovery\n(Annual Retail Rate Filing) \nRhode Island Energy \n2024 \nRhode Island \nEnergy \nDocket No. \n24-48-REG \nRate Design and Cost Recovery \n(Renewable Energy Program) \nRhode Island Energy \n2024 \nRhode Island \nEnergy \nDocket No. \n24-29-NG \nRate Design and Cost Recovery \n(Distribution Adjustment \nCharge and Gas Cost Recovery) \nRhode Island Energy \n2024 \nRhode Island \nEnergy \nDocket No. \n23-45-EL \nRate Design and Cost Recovery \n(Renewable Resource Rider) \nRhode Island Energy\n2024\nRhode Island \nEnergy \nDocket No. \n24-18-EL \nRate Design and Cost Recovery \n(Electric Revenue Decoupling \nMechanism) \nExhibit No. PTO-0002\nPage 4 of 12"},{"page":5,"startToken":1335,"endToken":1578,"text":"Resumes of Peter Blazunas, Lance Schafer, and Hanhan Hammer \n \nPG. 5 \nSPONSOR  \nDATE  \nCASE/APPLICANT  \nDOCKET  \nSUBJECT \nRhode Island Energy\n2024\nRhode Island \nEnergy \nDocket No. \n24-17-EL \nRate Design and Cost Recovery\n(Residential Assistance \nRecovery Filing) \nRhode Island Energy\n2024\nRhode Island \nEnergy \nDocket No. \n24-07-EL \nRate Design and Cost Recovery\n(Annual Retail Rate Filing) \nRhode Island Energy \n2023 \nRhode Island \nEnergy \nDocket No. \n23-05-EL \nTariff Advice (Net Metering) \nRhode Island Energy \n2023 \nRhode Island \nEnergy \nDocket No. \n23-23-NG \nRate Design and Cost Recovery \n(Distribution Adjustment \nCharge and Gas Cost Recovery) \nRhode Island Energy \n2023 \nRhode Island \nEnergy \nDocket No. \n23-24-REG \nRate Design and Cost Recovery \n(Renewable Energy Program) \nRhode Island Energy\n2023\nRhode Island \nEnergy \nDocket No. \n23-03-EL \nRate Design and Cost Recovery\n(Annual Retail Rate Filing) \nRhode Island Energy  \n2022 \nRhode Island \nEnergy \nDocket No. \n22-04-REG \nRate Design and Cost Recovery \n(Renewable Energy Program) \nRhode Island Energy \n2022 \nRhode Island \nEnergy \nDocket No. \n22-13-NG \nRate Design and Cost Recovery \n(Distribution Adjustment \nCharge) \nRhode Island Energy \n2022 \nRhode Island \nEnergy \nDocket No. \n5098 \nRate Design (Rider \nReconciliation) \nRhode Island Energy\n2022\nRhode Island \nEnergy \nDocket No. \n22-20-NG \nRate Design and Cost Recovery \n(Gas Cost Recovery) \nRhode Island Energy \n2022 \nRhode Island \nEnergy \nDocket No. \n22-54-NG \nRate Design and Cost Recovery \n(Infrastructure, Safety, and \nReliability Program) \nRhode Island Energy \n2022 \nRhode Island \nEnergy \nDocket No. \n22-53-EL \nRate Design and Cost Recovery \n(Infrastructure, Safety, and \nReliability Program) \n \n \n \nExhibit No. PTO-0002\nPage 5 of 12"},{"page":6,"startToken":1578,"endToken":1907,"text":"Resumes of Peter Blazunas, Lance Schafer, and Hanhan Hammer \n \nPG. 6 \nLANCE SCHAFER \nSENIOR PROJECT MANAGER \nPROFESSIONAL HISTORY \nConcentric Energy Advisors (2024-Present) \nSenior Project Manager \nPepco Holdings, Inc. (2018-2024) \nManager Rate Administration \nPrincipal Regulatory Analyst \nSenior Rate Analyst \n \nServed as one of the Company’s class cost of service study witnesses, with testimony filed in \nthe District of Columbia, Maryland, and Delaware  \n \nBuilt Pepco’s class cost of service study model (used in both Maryland and the District of \nColumbia, and soon to be adopted by Delmarva Power & Light in its Maryland jurisdiction) \n \nFiled testimony in support of the Smart LED Streetlight Initiative in Maryland on the subjects \nof cost recovery and rate design \n \nSupervised and served as subject matter expert in diverse filings, projects, and working \ngroups related to rate design and cost of service \n \nOversaw the filing of surcharges, retail transmission rates, and other revenue-recovery \nmechanisms \n \nBuilt, in Excel, models such as bill calculators, an LED streetlight cost conversion comparison \nmodel, and a company-owned public EV charger revenue unbundling model that allows the \nCompany to convert revenue charged at a “market” rate to rate-schedule equivalent amounts \nin order to be properly booked by accounting \n \nTrained to witness status a Company class cost of service expert \n \nSupervised three direct reports and additionally trained employees who were not my direct \nreports \nLance Schafer joined Concentric in September 2024 after ten years of experience in the utility \nregulation field with increasing responsibilities. Most recently, Mr. Schafer managed a team at \nPepco Holdings, Inc., responsible for class cost of service, rate design, and rate administration \nfunctions for the Pepco DC, Pepco MD, and Delmarva Power MD jurisdictions. Mr. Schafer has \nprovided testimony in traditional base distribution rate cases, multi-year rate plans, and \nstreetlighting proceedings on the subjects of cost of capital, class cost of service, and rate \ndesign before several Public Service Commissions. He holds a Master of Business Administration \nfrom the University of Missouri, Columbia.  \nExhibit No. PTO-0002\nPage 6 of 12"},{"page":7,"startToken":1907,"endToken":2159,"text":"Resumes of Peter Blazunas, Lance Schafer, and Hanhan Hammer \n \nPG. 7 \nPower System Engineering, Inc. (2016-2018) \nRate and Regulatory Analyst \nRate and Financial Analyst \n \nFiled revenue requirements analyses and testimony on behalf of electric cooperatives before \nthe Kentucky Public Service Commission \n \nBuilt Power System Engineering, Inc.’s depreciation model, with which the company \nlaunched depreciation study offerings (until my exit) \n \nWorked on revenue requirements, cost of service, and rate design studies for both regulated \nand self-regulated electric cooperatives \n \nParticipated in rate-design-related projects. Examples include solar cost-shift studies and a \nseries of case studies written for the NRECA revolving around the theme of fixed-cost \nrecovery \nMissouri Department of Economic Development – Division of Energy and Office of the Public \nCounsel (2014-2016) \nPlanner III \nPublic Utility Financial Analyst \n \nFiled financial analyses and testimony before the Missouri Public Service Commission to \nestablish the cost of capital for regulated public utilities \n \nMonitored financial and energy-related policy pertaining to regulated public utilities such as \nenergy efficiency programs, utility rate structure, revenue adjustment mechanisms, cost of \ncapital, and credit standing \n \nSubmitted policy testimony before the Missouri Public Service Commission related to energy \nefficiency and its effects on utilities' financial standing \n \nEdited and wrote content for Missouri’s first-ever Comprehensive State Energy Plan \nEDUCATION \nUniversity of Missouri – Crosby MBA Program \nMaster of Business Administration, Emphasis in Finance \nUniversity of California, Irvine \nMaster of Arts in French Literature \n \nUniversity of Missouri, Columbia \nBachelor of Arts in English \nDESIGNATIONS AND PROFESSIONAL AFFILIATIONS \n \nSociety of Depreciation Professionals \nExhibit No. PTO-0002\nPage 7 of 12"},{"page":8,"startToken":2159,"endToken":2384,"text":"RESUMES OF PETER BLAZUNAS, LANCE SCHAFER, AND HANHAN HAMMER \n \nPG. 8 \nSPONSOR \nDATE \nCASE/APPLICANT \nDOCKET NO. \nSUBJECT \nDelaware Public Service Commission \nDelmarva Power & \nLight Company. \n2020 \nDelmarva Power & \nLight Company. \nDocket 20-0150 \nCost of Service Study \nTestimony - Gas \nDelmarva Power & \nLight Company. \n2020 \nDelmarva Power & \nLight Company. \nDocket 20-0140 \nCost of Service Study \nTestimony - Electric \nKentucky Public Service Commission \nFarmers Rural Electric \nCooperative \nCorporation \n2016 \nFarmers Rural Electric \nCooperative \nCorporation \n2016-00365 \nRevenue \nRequirements \nTestimony  \nInter-County Energy \nCooperative \n2018 \nInter-County Energy \nCooperative \n2018-00129 \nRevenue \nRequirements \nTestimony. \nMaryland Public Service Commission \nPotomac Electric \nPower Company \n(Pepco) \n2021 \nPotomac Electric \nPower Company \n(Pepco) \nCase No. 9655 \nCost of Service Study \nTestimony  - Electric \nand Streetlight Rate \nDesign and Cost \nRecovery Testimony  \nPotomac Electric \nPower Company \n(Pepco) \n2023 \nPotomac Electric \nPower Company \n(Pepco) \nCase No. 9702 \nCost of Service Study \ntestimony  - Electric \nand Administrative \nCredit Rate Design \nand Cost Recovery \nTestimony \nPotomac Electric \nPower Company \n(Pepco) \n2025\nPotomac Electric \nPower Company \n(Pepco) \nCase No. 9820\nCost of Service Study \ntestimony  - Electric \nand Administrative \nCredit Rate Design \nand Cost Recovery \nTestimony \nMissouri Public Service Commission \nOffice of the Public \nCounsel in Union \nElectric Company \nd/b/a Ameren \nMissouri’s rate case. \n2014 \nOffice of the Public \nCounsel in Union \nElectric Company \nd/b/a Ameren \nMissouri’s rate case. \nER-2014-025 \nCost of Capital \nTestimony  \nExhibit No. PTO-0002\nPage 8 of 12"},{"page":9,"startToken":2384,"endToken":2553,"text":"RESUMES OF PETER BLAZUNAS, LANCE SCHAFER, AND HANHAN HAMMER \n \n \nPG. 9 \nSPONSOR \nDATE \nCASE/APPLICANT \nDOCKET NO. \nSUBJECT \nOffice of the Public \nCounsel in the Empire \nDistrict Electric \nCompany’s rate case. \n2014 \nOffice of the Public \nCounsel in the Empire \nDistrict Electric \nCompany’s rate case \nER-2014-0351 \nCost of Capital \nTestimony  \nPublic Service Commission  of the District of Columbia \nPotomac Electric \nPower Company \n(Pepco) \n2019 \nPotomac Electric \nPower Company \n(Pepco) \nFC 1156 \nCost of Service Study \nTestimony - Electric \nPotomac Electric \nPower Company \n(Pepco) \n2022 \nPotomac Electric \nPower Company \n(Pepco) \nFC 1130 & FC 1155 \nProposed Rate \"MDU-\nPIV\", a multi-dwelling \nunit, plug-in-vehicle \nrate \nPotomac Electric \nPower Company \n(Pepco) \n2022 \nPotomac Electric \nPower Company \n(Pepco) \nFC 1167 \nRate proposal \nTestimony.  Rider \nDCFC was a load-\nfactor-limiter-style \nrate for DCFC plug-in-\nvehicle charging. \nRhode Island Public Utility Commission \nThe Narragansett \nElectric Company \nd/b/a Rhode Island \nEnergy \n2025\nThe Narragansett \nElectric Company \nd/b/a Rhode Island \nEnergy \n25-45-GE\nAllocated Cost of \nService Study (ACOSS) \n \n \n \n \nExhibit No. PTO-0002\nPage 9 of 12"},{"page":10,"startToken":2553,"endToken":2871,"text":"RESUMES OF PETER BLAZUNAS, LANCE SCHAFER, AND HANHAN HAMMER \n \n \nPG. 10 \nHANHAN HAMMER \nSENIOR PROJECT MANAGER \nEXPERTISE & KEY SKILLS \n \nEnergy Industry Expertise – 15+ years of experience in ISO/RTO markets and stakeholder \nprocess, utility regulation, transmission ratemaking, wholesale and retail tariff design, \nmarket revenue forecasting, resource and transmission planning, and regulatory compliance. \n \nRegulatory Strategy & Testimony – Extensive experience preparing tariff filings, provided \nexpert witness testimony, and advising clients through FERC and state regulatory \nproceedings. \n \nWholesale Markets – Led design of market rules for DERs, energy storage, and ancillary \nservices; skilled in market power analysis, revenue forecasting, and locational marginal price \nformation. \n \nStrategic Communication – Effective at translating complex regulatory and technical issues \ninto clear insights for executives, regulators, policymakers, and industry forums. \n \nProject & Team Leadership – Strong record of managing cross-functional teams, guiding \ncomplex initiatives under fixed budgets, and delivering results. Directed cross-functional \nproject teams, ensuring projects were completed on scope, budget, and schedule; presented \nfindings to executives and regulators to support high-stakes decision-making. \nPROFESSIONAL HISTORY \nConcentric Energy Advisors (2024 – Present) \nSenior Project Manager \n \nShaped client regulatory strategy by supporting filings and expert testimony on large load \ntariffs, transmission ratemaking, ancillary service rates in merger cases, and market power \nanalyses, directly informing multimillion-dollar business decisions. \n \nAdvised utilities and developers on compliance and opportunity capture under evolving \nfederal and state rules (e.g., Order 2222, transmission–distribution coordination, data center \ninterconnection/colocation), enabling clients to position early for regulatory and market \nadvantages. \nMs. Hammer is a recognized expert in the energy industry with more than 15 years of experience \nin utility regulation and ISO/RTO markets. At Concentric, she advises utilities, developers, grid \noperators, and regulators on complex regulatory and market issues, including large load tariffs, \ntransmission ratemaking, resource and transmission planning, FERC Order compliance, and \nwholesale market strategies. Her work has helped clients secure critical regulatory approvals, \noptimize capital investments, and unlock new revenue streams. \nExhibit No. PTO-0002\nPage 10 of 12"},{"page":11,"startToken":2871,"endToken":3090,"text":"RESUMES OF PETER BLAZUNAS, LANCE SCHAFER, AND HANHAN HAMMER \n \n \nPG. 11 \n \nDelivered market and revenue analyses that optimized generation and storage investment \ndecisions, improving projected returns and clarifying participation strategies across \nwholesale and retail programs. \n \nRecommended ISO market design enhancements that incentivized preferred generation \nresources, influencing stakeholder discussions and policy direction. \nISO New England (2014-2024) \nPrincipal/Lead Analyst \n \nDesigned wholesale market rules enabling DERs, storage, and renewables to participate; \ndeveloped ancillary service products and reliability solutions. \n \nPrepared tariff filings, provided expert testimony, and presented initiatives to regulators, \nlegislators, and stakeholders. \n \nAdvised project teams and senior management on policy trends and market design \nopportunities. \nSouthwest Power Pool (2011-2014) \nSenior Market Analyst \n \nEvaluated nodal pricing and transmission congestion to support power trading hubs; \nauthored State of the Market reports and presented to stakeholders and FERC. \n \nDeveloped analytic dashboards to monitor market performance, identify trends, and brief \nexecutives and boards. \nPotomac Economics (2009-2011) \nSenior Market Monitor  \n \nMonitored the Midcontinent ISO (MISO) wholesale markets to detect anti-competitive \nbehavior; prepared FERC referrals and supported regulatory enforcement. \n \nAdvised investor-owned utilities on operational efficiency and market performance to inform \nstrategic decisions. \nEDUCATION \nUniversity of Arkansas \nMaster of Business Administration  \nWestern Illinois University \nMaster of Art in Economics  \nAnhui University of Technology \nBachler of Art in Economics and International Trade \nExhibit No. PTO-0002\nPage 11 of 12"},{"page":12,"startToken":3090,"endToken":3234,"text":"RESUMES OF PETER R. BLAZUNAS, LANCE C. SCHAFER, AND HANHAN HAMMER \n \n \n \nPG. 12 \nSPONSOR\nDATE\nCASE/APPLICANT\nDOCKET NO.\nSUBJECT\nFederal Energy Regulatory Commission \nISO New England \nInc. and New \nEngland Power \nPool \n2016 \nISO New England Inc. \nand New England \nPower Pool \nER16-1838-000 \nReal-Time Energy \nMarket and Real-\nTime reserves \nISO New England \nInc. \n2016 \nISO New England Inc. \nER17-680-000 \nNet Commitment \nPeriod \nCompensation \n(“NCPC”) credit \nrules \nISO New England \nInc. and New \nEngland Power \nPool \n2017 \nISO New England Inc. \nand New England \nPower Pool \nER17-1706-000 \nMarket Rule 1 \nRevisions to Permit \nUse of Five-Minute \nRevenue Quality \nMeter Data in \nEnergy Market \nSettlement \nISO New England \nInc. and New \nEngland Power \nPool \n2018 \nISO New England Inc. \nand New England \nPower Pool \nER18-897-000 \nThe designation and \nsettlement of \nOperating Reserves \nin the Real-Time \nEnergy Market \n \n \n \nExhibit No. PTO-0002\nPage 12 of 12"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":5,"endAt":0,"startToken":0,"endToken":1335},{"p":5,"at":0,"title":"Pages 5 to 8","method":"page range","endPage":9,"endAt":0,"startToken":1335,"endToken":2384},{"p":9,"at":0,"title":"Pages 9 to 12","method":"page range","endPage":12,"endAt":958,"startToken":2384,"endToken":3234}]}