{"document":{"slug":"rec-20260223-5190-4","title":"Exhibit No. PTO-0003","issued":"2026-02-23","accession":"20260223-5190","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"attachment","file":"sources/filings/text/20260223-5190_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5190","tier":"record","parent":"rec-20260223-5190","sha256":"7bc9dc61ad044c661a7afa272a3b29e48d4ec3e894b07fd9d82f690d55cf9071","pages":3,"tokens":668,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":280,"text":"Exhibit No. PTO-0003 \n      Page 1 of 3\nSummary of Calculated Grid Reliance Charge (GRC) Percentages by Company\nLine No. \nUtility \nGRC Percentage\n(A) \n(B) \n(C)\n1\nAtlantic City Electric \n37.1%\n2\nAppalachian Power Co \n22.1%\n3\nIndiana Michigan Power Co \n22.1%\n4 \nAEP-East A \nKentucky Power Co \n22.1%\n5 \nGroup \nKingsport Power Co \n22.1%\n6\nOhio Power Co \n22.1%\n7\nWheeling Power Company \n22.1%\n8\nAEP Appalachian Transmission Co \n21.8%\n9\nAEP Indiana Michigan \n21.8%\n10\nAEP Kentucky Transmission Co \n21.8%\n11\nAEP Ohio Transmission Co \n21.8%\n12\nWest Virginia Transmission Co \n21.8%\n13\nMon Power \n22.5%\n14 \nSouth FE Group Potomac Edison \n22.5%\n15\nWest Penn Power (FE) \n22.5%\n16\nKeystone ATC \n48.7%\n17\nATSI \n24.6%\n18\nBaltimore Gas and Electric \n30.5%\n19\nComEd \n32.1%\n20\nDayton Power and Light \n14.8%\n21\nDuke Energy Ohio & Kentucky \n18.3%\n22\nVirginia Electric Power Co \n25.4%\n23\nDelmarva Power and Light Co \n31.8%\n24\nOld Dominion Electric Coop \n73.2%\n25\nDuquesne Light Co \n20.4%\n26\nJCPL \n35.4%\n27\nMAIT \n29.2%\n28\nPECO Energy \n29.6%\n29\nPEPCO \n21.3%\n30\nPPL Electric \n20.0%\n31\nUGI Utilities \n18.3%\n32\nPSEG \n28.3%\n33\nNEET MidAtlantic \n14.1%\n34\nSilver Run Electric \n25.8%\n35\nTAILCo \n21.2%\n36\nTransource WV \n18.2%\n37\nAverage Grid-Reliance Charge Percentage \n25.8%\nExcludes:\n- AMP - AEP\n- AMP - ATSI\n- AMP - DAYTON\n- East Kentucky Power Coop\n- Ohio Valley Electric Cooperative\n- Rockland Electric Company\n- SMECo\n- Transource MD\n- Transource PA\n- Valley Link MD\n- Valley Link VA\n- Valley Link MD\nAEP-East B \nGroup"},{"page":2,"startToken":280,"endToken":471,"text":"Exhibit No. PTO-0003\nUtility: \nAtlantic City Electric\nPage 2 of 3\nTransmission O&M Work Table \n(Inputs taken from FF1 pp. 320-323)\nLine No. \nExcluded / Included \nAccount \nO&M Account \nAmount\n(A) \n(B) \n(C) \n(D) \n(E)\nOperation Expense\n1\nExcluded \n560 \nOperation Supervision and Engineering \n5,430,906\n2\nIncluded \n561 \nLoad Dispatching \n29,347\n3\nIncluded \n562 \nStation Expenses\n4\nIncluded \n563 \nOverhead Line Expenses\n5\nIncluded \n564 \nUnderground Line Expenses\n6\nExcluded \n565 \nTransmission Electricity by Others\n7\nExcluded \n566 \nMiscellaneous Transmission Expenses \n     4,428,115\n8\nExcluded \n567 \nRents\nTOTAL Operation \n9,888,368\nMaintenance Expense\n9\nExcluded \n568 \nMaintenance Supervision and Engineering\n10\nExcluded \n569 \nMaintenance of Structures \n326,679\n11\nIncluded \n570 \nMaintenance of Station Equipment \n     7,087,049\n12\nIncluded \n571 \nMaintenance of Overhead Lines \n     8,979,626\n13\nIncluded \n572 \nMaintenance of Underground Lines\n14\nExcluded \n573 \nMaintenance of Miscellaneous Transmission Plant \n        190,367\n15\nTOTAL Maintenance \n16,583,721\n16\nTOTAL O&M Transmission Expenses (Operation Total + Maintenance Total) \n26,472,089\n17\nTotal Included (= sum of all \"included\" accounts) \n   16,096,022\n18\nTotal Included Percentage (line 17 / line 16) \n60.8%"},{"page":3,"startToken":471,"endToken":668,"text":"Exhibit No. PTO-0003\nUtility: \nAtlantic City Electric\nPage 3 of 3\nLine No.\nLine No. \nCorresponding to\nAttachment H-1A\nAtlantic City Electric Attachment H-1A\nDescription \nAmount \nGRC Percentage\nGRC Amount\n(= GRC % *\nAmount)\n(A) \n(B) \n(C) \n(D) \n(E) \n(F)\n1\n85 \nO&M \n$      38,519,879\n2\n60 \n     Transmission O&M (a subsection of the line above) \n$     26,375,673 \n60.80%       1 6,037,397\n3\n97 \nDepreciation & Amortization \n$      74,781,788\n4\n86 \n     Transmission Depreciation Expense (a subsection of the line above) \n$     71,962,130 \n100.00%       7 1,962,130\n5 \n157 \nNet Revenue Requirement \n$    237,470,160 \n      8 7,999,528\n6 \nGRC Percentage of Net Revenue Requirement = (F) line 5 / (D) line 5 \n37.1%\n7 \n175 \nNetwork Service Rate ($/MW/Year) \n$           8 3,665\n8 \nAverage Grid-Reliance Charge Percentage \n25.8%\n9 \n[*] \nGRC Rate ($/MW/Year) = GRC Percentage * Network Service Rate (line 7 x line 8) \n$           2 1,556\n[*] Does not account for any adjustment for the difference between the measure of demand used to calculate the transmission rates for NITS, Interim, Non-Firm Service, and Firm \nContract Demand Service, and the appropriate measure of demand used to design the final GRC rate."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":102,"startToken":0,"endToken":488},{"p":3,"at":102,"title":"Attachment H-1A","method":"printed heading","endPage":3,"endAt":1203,"startToken":488,"endToken":668}]}
