{"document":{"slug":"rec-20260223-5190-5","title":"Exhibit No. PTO-0004","issued":"2026-02-23","accession":"20260223-5190","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"attachment","file":"sources/filings/text/20260223-5190_005.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5190","tier":"record","parent":"rec-20260223-5190","sha256":"848a443ee0a9ea76c6ed4f7dee2fd1482f4596808c9abfab92b7db2d437b0f7b","pages":2,"tokens":714,"emptyPages":[],"textThemes":["flex"]},"pages":[{"page":1,"startToken":0,"endToken":391,"text":"Example of Rate Designs for Firm Contract Demand Transmission Service, Non-Firm Contract Demand Transmission Service, and Interim, Non-Firm Service\n(1)\n    \nGross Revenue Requirement\n1,000,000,000\n$        \n(2)\n    \nRevenue Credits\n(50,000,000)\n$            \n(3)\n    \nTrue-Up Adjustment\n(50,000,000)\n$            \n(4)\n    \nNet Revenue Requirement\n900,000,000\n$           \n= (1) + (2) + (3)\n(5)\n    \n1 Coincident Peak (MW/Year) - NITS\n7,250\n                        \n(6)\n    \n1 Coincident Peak (MW/Year) - Interim, Non-Firm Service\n500\n                           \n(7)\n    \nFirm Contract Demand (MW/Year) - Firm Contract Demand Transmission Service\n2,000\n                        \n(8)\n    \nTotal MW/Year - Transmission Service\n9,750\n                        \n= (5) + (6) + (7)\n(9)\n    \nTransmission Rate ($/MW/Year)\n92,308\n$                    \n= (4) ÷ (8)\n(10)\n  \nAverage Grid Reliance Charge Percentage\n25.8%\n(11)\n  \nGrid Reliance Charge ($/MW/Year) (Unadjusted)\n23,815\n$                    \n= (9) x (10)\n(12)\n  \nTotal MW/Year - Transmission Service\n9,750\n                        \n= (8)\n(13)\n  \nContract Demand Gross Load in Excess of Firm Contract Demand (MW/Year)\n522\n                           \n(14)\n  \n10,272\n                      \n= (12) + (13)\n(15)\n  \nRatio of Total MW/Year (Transmission Service) to Total MW/Year (Transmission Service Plus Contract Demand Gross Load in Excess of Firm Contract Demand)\n0.9492\n                      \n= (12) / (14)\n(16)\n  \nGrid Reliance Charge ($/MW/Year)\n22,605\n$                    \n= (11) x (15)\n(17)\n  \nContract Demand  (Firm Contract Demand Transmission Service and Non-Firm Contract Demand Transmission Service) Gross Load (MW/Year)\n2,522\n                        \n= (7) + (13)\n(18)\n  \nFirm Contract Demand (MW/Year)\n2,000\n                        \n= (7)\n(19)\n  \nContract Demand Gross Load in Excess of Firm Contract Demand (MW/Year)\n522\n                           \n= (17) - (18)\n(20)\n  \nGrid Reliance Charge Revenue\n11,799,810\n$             \n= (16) x (19)\n(21)\n  \nTotal MW/Year - Transmission Service\n9,750\n                        \n= (8)\n(22)\n  \nBill Credit ($/MW/Year) from Grid Reliance Charge to NITS, Interim, Non-Firm Service, and Firm Contract Demand transmission service Customers\n(1,210)\n$                    \n= -(20) ÷ (21)\n(23)\n  \nTransmission Rate ($/MW/Year)\n92,308\n$                    \n= (9)\n(24)\n  \nGrid Reliance Charge ($/MW/Year)\n22,605\n$                    \n= (16)\n(25)\n  \nTransmission  Maximum Rate ($/MW/Year) - Non-Firm Contract Demand Service\n69,703\n$                    \n= (23) - (24)\n(26)\n  \nNon-Firm Contract Demand (MW/Year)\n275\n(27)\n  \nNon-Firm Contract Demand Transmission Service Revenue\n19,168,325\n$             \n= (25) x (26)\n(28)\n  \nTotal MW/Year - Transmission Service\n9,750\n                        \n= (8)\n(29)\n  \nBill Credit ($/MW/Year) from Non-Firm Contract Demand Transmission Service to NITS, Interim, Non-Firm Service, and Firm Contract Demand Transmission Service Customers\n(1,966)\n$                    \n= -(27) ÷ (28)\nTotal MW/Year (Transmission Service Plus Contract Demand Gross Load in Excess of Firm Contract Demand)\nExhibit No. PTO-0004\nPage 1 of 2"},{"page":2,"startToken":391,"endToken":714,"text":"Example of Rate Designs for Firm Contract Demand Transmission Service, Non-Firm Contract Demand Transmission Service, and Interim, Non-Firm Service\n(30)\n  \nNITS - Transmission Service Rate ($/MW/Year (1CP))\n92,308\n$                    \n=  (9)\n(31)\n  \nNITS - Grid Reliance Charge Bill Credit ($/MW/Year (1CP))\n(1,210)\n$                    \n= (22)\n(32)\n  \nNITS - Non-Firm Contract Demand Transmission Service Bill Credit ($/MW/Year (1CP))\n(1,966)\n$                    \n= (29)\n(33)\n  \nNITS - Net Effective Rate ($/MW/Year (1CP))\n89,132\n$                    \n= (30) + (31) +  (32)\n(34)\n  \nInterim, Non-Firm Service - Transmission Service Rate ($/MW/Year (1CP))\n92,308\n$                    \n=  (9)\n(35)\n  \nInterim, Non-Firm Service - Grid Reliance Charge Bill Credit ($/MW/Year (1CP))\n(1,210)\n$                    \n= (22)\n(36)\n  \nInterim, Non-Firm Service - Non-Firm Contract Demand Transmission Service Bill Credit ($/MW/Year (1CP))\n(1,966)\n$                    \n= (29)\n(37)\n  \nInterim, Non-Firm Service - Net Effective Rate ($/MW/Year (1CP))\n89,132\n$                    \n= (34) + (35) +  (36)\n(38)\n  \nFirm Contract Demand Transmission Service - Transmission Service Rate ($/MW/Year (Firm Contract Demand))\n92,308\n$                    \n=  (9)\n(39)\n  \nFirm Contract Demand Transmission Service - Grid Reliance Charge Bill Credit ($/MW/Year (Firm Contract Demand))\n(1,210)\n$                    \n= (22)\n(40)\n  \nFirm Contract Demand Transmission Service - Non-Firm Contract Demand Transmission Service Bill Credit ($/MW/Year (Firm Contract Demand))\n(1,966)\n$                    \n= (29)\n(41)\n  \nFirm Contract Demand Transmission Service - Net Effective Rate ($/MW/Year (Firm Contract Demand))\n89,132\n$                    \n= (38) + (39) +  (40)\n(42)\n  \nFirm Contract Demand Transmission Service - Grid Reliance Charge ($/MW/Year (Gross Load in Excess of Firm Contract Demand))\n22,605\n$                    \n= (16)\n(43)\n  \nNon-Firm Contract Demand Service - Transmission Maximum Rate ($/MW/Year (Non-Firm Contract Demand))\n69,703\n$                    \n= (25)\n(44)\n  \nNon-Firm Contract Demand Transmission Service - Grid Reliance Charge ($/MW/Year (Gross Load in Excess of Firm Contract Demand))\n22,605\n$                    \n= (16)\nNotes:\n(9)\n    \nRounded to zero decimal places.\n(11)\n  \nRounded to zero decimal places.\n(15)\n  \nRounded to four decimal places.\n(16)\n  \nRounded to zero decimal places.\n(20)\n  \nRounded to zero decimal places.\n(22)\n  \nRounded to zero decimal places.\n(27)\n  \nRounded to zero decimal places.\n(29)\n  \nRounded to zero decimal places.\nExhibit No. PTO-0004\nPage 2 of 2"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 2","method":"page range","endPage":2,"endAt":2579,"startToken":0,"endToken":714}]}
