{"document":{"slug":"rec-20260223-5190","title":"Initial Brief and Joint Responses of the Indicated PJM Transmission Owners to Paper Hearing Questions","issued":"2026-02-23","accession":"20260223-5190","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"brief","file":"sources/filings/text/20260223-5190_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5190","tier":"record","sha256":"3f57fef70271fbc5cefb29e92dec072f542ecd9f47cda57505a5ed12a8d538ca","pages":26,"tokens":8629,"emptyPages":[],"textThemes":["flex","colo","cost","study"]},"pages":[{"page":1,"startToken":0,"endToken":349,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C., et al.  \n )  \nDocket No. EL25-49-000 \n )  \nDocket No. EL25-49-001 \n ) \nLarge Loads Co-Located at Generating Facilities ) \nDocket No. AD24-11-000 \n ) \nConstellation Energy Generation, LLC  \n \n )  \nDocket No. EL25-20-000 \nv.  \n \n ) \nPJM Interconnection, L.L.C.  \n )  \n(Consolidated) \nINITIAL BRIEF AND JOINT RESPONSES  \nOF THE INDICATED PJM TRANSMISSION OWNERS \nTO \nPAPER HEARING QUESTIONS  \nPursuant to the Commission’s December 18, 2025 order in PJM Interconnection, L.L.C., \n193 FERC ¶ 61,217, at P 193 (2025) (“Order”), the Indicated PJM Transmission Owners \n(collectively the “PJM Transmission Owners”)1 submit this initial brief and joint responses to the \npaper hearing questions that the Commission presented in the Order.  These paper hearing \nquestions involve the rates, terms and conditions of service for the new transmission services that \n1\nFor the purpose of this filing, the Indicated PJM Transmission Owners are: American Electric Power Service \nCorporation on behalf of its affiliates, Appalachian Power Company, Indiana Michigan Power Company, Kentucky \nPower Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian \nTransmission Company, AEP Indiana Michigan Transmission Company, AEP Kentucky Transmission Company, \nAEP Ohio Transmission Company, and AEP West Virginia Transmission Company; The Dayton Power and Light \nCompany d/b/a AES Ohio; Dominion Energy Services, Inc. on behalf of Virginia Electric and Power Company d/b/a \nDominion Energy Virginia; Duke Energy Business Services, LLC for Duke Energy Kentucky, Inc. and Duke Energy \nOhio, Inc.; Duquesne Light Company; East Kentucky Power Cooperative; Exelon Corporation on behalf of its \naffiliates Atlantic City Electric Company, Baltimore Gas and Electric Company, Commonwealth Edison Company, \nCommonwealth Edison Company of Indiana, Inc., Delmarva Power & Light Company, PECO Energy Company \n(“PECO”), and Potomac Electric Power Company; FirstEnergy Service Company, on behalf of its affiliates American \nTransmission Systems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate Transmission \nLLC, The Potomac Edison Company, Monongahela Power Company, Keystone Appalachian Transmission Company, \nand Trans-Allegheny Interstate Line Company (collectively, the “FirstEnergy Companies”); PPL Electric Utilities \nCorporation; Public Service Electric and Gas Company (“PSE&G”); Rockland Electric Company; and the Southern \nMaryland Electric Cooperative (“SMECO”)."},{"page":2,"startToken":349,"endToken":653,"text":"2 \nthe Commission directed to be added to the PJM Open Access Transmission Tariff (“Tariff”) for \nEligible Customers2 serving co-located load in PJM. \nI. \nINTRODUCTION \nIn the Order, the Commission found that PJM’s Tariff “is unjust and unreasonable \nbecause it does not contain provisions addressing with sufficient clarity or consistency the rates, \nterms, and conditions of service that apply to generators serving Co-Located Load and Eligible \nCustomers taking transmission service on behalf of Co-Located Load.”3  Specifically, the \nCommission found PJM’s Tariff “unjust and unreasonable because it does not include types of \ntransmission service that reflect Eligible Customers taking service on behalf of Co-Located \nLoads that are willing and able to limit their use of the transmission system under certain \nconditions.”4\nThe Commission ordered PJM to offer three new forms of transmission service under its \nTariff: (i) Firm Contract Demand transmission service; (ii) Non-Firm Contract Demand \ntransmission service and (iii) interim, non-firm transmission service.5  The Commission also \nestablished a paper hearing to determine the just and reasonable rates, terms, and conditions for \nthese new transmission services.6\nThe PJM Transmission Owners are submitting joint responses to the paper hearing \nquestions in this initial round of briefing because, pursuant to the Consolidated Transmission \n2\nAll capitalized terms that are not otherwise defined herein shall have the meaning set forth in the PJM Tariff \nor Amended and Restated Operating Agreement of PJM Interconnection, L.L.C. \n3\nOrder at P 2.  The Commission defines Co-Located Load as a “configuration [that] refers to end-use customer \nload that is physically connected to the facilities of an existing or planned Customer Facility on the Interconnection \nCustomer’s side of the Point of Interconnection to the PJM Transmission System.”  Id. at P 164.  \n4\nId. at P 2. \n5\nId. at P 160. \n6\nId. at PP 2, 194."},{"page":3,"startToken":653,"endToken":1303,"text":"3 \nOwners Agreement (“CTOA”), between the PJM Transmission Owners and PJM, the PJM \nTransmission Owners have the rights and obligation to develop and file the rates for these new \nservices.7  As the Commission has recognized, the PJM Transmission Owners have exclusive \nand unilateral rights regarding regional rates and rate design under the PJM Tariff and the cost \nallocation provisions of Schedule 12 of the PJM Tariff.8  Accordingly, these responses are \nrequired consistent with the CTOA and related precedent.9\nThe Commission’s review of the proposed rates and terms for the new services required \nin the Order should be primarily guided by two principles: (1) rates for the new services must be \nconsistent with longstanding cost allocation principles, and (2) the new services must be \nimplemented in a manner that does not compromise system reliability.10  In the context of the \n7\nSee Pa.-N.J.-Md. Interconnection, 105 FERC ¶ 61,294 (2003), order on compliance, 108 FERC ¶ 61,033 \n(2004) (approving Settlement Agreement, Docket No. OA97-261-006 et al. (filed Oct. 3, 2003), as modified, \nModification of Settlement Agreement, Docket No. OA97-261-009 et al., §§ 3.2, 4.2(B); 4.3, 4.5 (filed Jan. 20, 2004 \nand corrected Jan. 23, 2004)).  The Settlement Agreement is incorporated into PJM OATT, § 9 and the CTOA at § \n7.3.1, PJM Interconnection, L.L.C., Rate Schedules, TOA, TOA-42 Rate Schedule FERC No. 42 (1.0.0).  Moreover, \nthe PJM Transmission Owners have contractual rights and obligations to engage in coordination and consultation with \nPJM and the PJM Members Committee with respect to changes to other terms and conditions of the PJM OATT.  See\nCTOA, at § 7.5.1.  The PJM Transmission Owners are submitting joint responses to the paper hearing questions and \nexpressing views herein in light of the current status of the proceeding and reserve all rights, including the right to \nrevise or supplement these responses.  With respect to Exelon and FirstEnergy, nothing herein waives or limits any \narguments made on rehearing or appeal by Exelon or FirstEnergy. \n8\nSee, e.g., Neptune Reg’l Transmission Sys., LLC v. PJM Interconnection, L.L.C., 175 FERC ¶ 61,247, at P \n47 (2021); PPL Elec. Utils. Corp., 177 FERC ¶ 61,123, at PP 34 and 36 (2021).  See also Am. Mun. Power, Inc. v. \nFERC, 86 F.4th 922, 927 (D.C. Cir. 2023) (“PJM’s authority to oversee and operate the electrical grid is limited to \nthat granted to it by transmission owners in the Owners Agreement.”). \n9\nThe PJM Transmission Owners have developed the rate design proposals reflected in these responses through \nthe Section 205 Working Group, established under the authority of the Transmission Owner Agreement \nAdministrative Committee (“TOAAC”).  See CTOA § 8.1.  These proposals have not yet been submitted to the \nTOAAC for approval. \n10\nSee Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Servs. by \nPub. Utils.; Recovery of Stranded Costs by Pub. Utils. and Transmitting Utils., Order No. 888, FERC Stats. & Regs. \n¶ 31,036 (1996) (cross-referenced at 75 FERC ¶ 61,080), on reh’g, Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 \n(cross-referenced at 78 FERC ¶ 61,220), on reh’g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), on reh’g, Order No. \n888-C, 82 FERC ¶ 61,046 (1998), aff’d in relevant part sub nom., Transmission Access Policy Study Grp., v. FERC, \n225 F.3d 667 (D.C. Cir. 2000), aff’d sub nom., N.Y. v. FERC, 535 U.S. 1 (2002); Preventing Undue Discrimination \n& Preference in Transmission Serv., Order No. 890, 118 FERC ¶ 61,119, order on reh’g, Order No. 890-A, 121 FERC \n¶ 61,297 (2007), order on reh’g, Order No. 890-B, 123 FERC ¶ 61,299 (2008), order on reh’g, Order No. 890-C, 126 \nFERC ¶ 61,228, order on clarification, Order No. 890-D, 129 FERC ¶ 61,126 (2009); Transmission Plan. & Cost \nAllocation by Transmission Owning & Operating Pub. Utils., Order No. 1000, 136 FERC ¶ 61,051 (2011), order on"},{"page":4,"startToken":1303,"endToken":1699,"text":"4 \nnew services designed to accommodate Co-Located Load arrangements, these principles \nmanifest as follows.  First, the rates and terms for the new transmission services must ensure that \nCo-Located Load customers11 pay their appropriate share of transmission system costs, including \nthose related to the benefits of being connected and synchronized with the extensive PJM \nTransmission System, which reliably serves 67 million customers.  Absent this sharing, existing \nratepayers, including network customers, will be forced to unfairly subsidize Co-Located Load \ncustomers, a result that would be unjust, unreasonable, unduly discriminatory, or preferential.12\nSecond, the new transmission services required in the Order must be subject to \nappropriate terms and conditions to ensure that the implementation of these new services does \nnot compromise system reliability.  Co-Located Loads, as well as any on-site generators used to \nserve those loads, are not islanded.  They are fully connected and synchronized with the \ntransmission system, like all other loads and generators.  As such, the full amounts of on-site \nload and generation have the ability to impact the system.  Because PJM proposes that it will not \nidentify network upgrades to accommodate transmission service requests for Co-Located Load \nbeyond those amounts that an Eligible Customer designates for Network Integration \nTransmission Service (“NITS”) or Firm Contract Demand Service, the continued reliability of \nthe system will necessarily depend on the utilization of protection schemes.  Thus, these \nprotection schemes must be subject to comprehensive and rigorous testing and inspection, \nreh’g, Order No. 1000-A, 139 FERC ¶ 61,132, order on reh’g & clarification, Order No. 1000-B, 141 FERC ¶ 61,044 \n(2012), aff’d sub. nom. S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41 (D.C. Cir. 2014); Bldg.  for the Future Through \nElec. Reg’l Transmission Planning & Cost Allocation, Order No. 1920, 89 FR 49280 (June 11, 2024), 187 FERC ¶ \n61,068, order on reh’g, Order No. 1920-A, 89 FR 97174 (Dec. 6, 2024), 189 FERC ¶ 61,126 (2024), order on reh’g, \nOrder No. 1920-B, 191 FERC ¶ 61,026 (2025); see also 16 U.S.C. § 824o(b). \n11\nAll references to Co-Located Load customers throughout should be read to mean an Eligible Customer taking \nservice under the PJM Tariff on behalf of one or more co-located loads.  \n12\nSee 16 U.S.C. §§ 824d, 824e (requiring that all rates subject to the Commission’s jurisdiction be just and \nreasonable, and prohibiting rates that are unjust, unreasonable, unduly discriminatory or preferential)."},{"page":5,"startToken":1699,"endToken":2006,"text":"5 \nincluding well-designed implementation and operational requirements to protect the PJM \nTransmission System and the network customers that rely on that system from unacceptable \nreliability risk. \nGuided by these principles and as detailed below and in the testimony supporting these \nresponses, the PJM Transmission Owners have developed rate design proposals in response to \nthe Order for the three new transmission services required in the Order.13  The PJM Transmission \nOwners also have developed rate design proposals for a new Grid Reliance Charge related to the \nnew services.  Whereas PJM has responsibility for proposing tariff terms and conditions, as the \nowners of the PJM Transmission System, the PJM Transmission Owners have a significant \ninterest in certain planning and operational issues relating to Eligible Customers that choose to \ntake one or more of these new services.  Accordingly, the PJM Transmission Owners offer their \nsuggestions for appropriate practices and requirements relating to the protection schemes that \nwill be necessary to ensure ongoing system reliability.14\n13\nAlthough the Commission’s paper hearing questions do not address rates for the interim, non-firm \ntransmission service, consistent with the Order, the PJM Transmission Owners propose to apply the NITS rate to \nEligible Customers taking interim, non-firm transmission service.  See Prepared Direct Joint Testimony of Peter \nBlazunas, Lance Schafer, and Hanhan Hammer, Exhibit No. PTO-0001 at Section IV.C. (“Blazunas, Schafer, and \nHammer Direct Joint Testimony”).  See also Order at P 200 (“Eligible Customers taking this interim, non-firm \ntransmission service on behalf of Co-Located Loads would pay the NITS rate for the new service . . . .”). \n14\nBecause the primary purpose of this initial response is to set out the PJM Transmission Owners’ rate design \nproposals, the PJM Transmission Owners reserve their rights to supplement their responses in subsequent briefing \nrounds, particularly as it relates to the questions that do not directly relate to rate design issues."},{"page":6,"startToken":2006,"endToken":2356,"text":"6 \nII. \nRESPONSES TO PAPER HEARING QUESTIONS \n1. What are the appropriate rates, terms, and conditions for the new Firm Contract \nDemand transmission service, including whether it would be just and reasonable \nto apply the current zonal firm PTPS charges to this new service and whether it \nwould be just and reasonable and consistent with cost causation to include charges \nfor any of PJM’s administrative services? \nThe PJM Transmission Owners propose that the rate for Firm Contract Demand Service \nbe based on the zonal NITS rates and the underlying NITS revenue requirements.  Under this \napproach, Eligible Customers taking Firm Contract Demand Service will pay the same base \ncharge per megawatt (“MW”) as NITS customers, except that unlike NITS customers their \ndemand will be their specified firm contract demand equal to the firm contract demand amount \n(in MWs) multiplied by a single zonal rate for both NITS and Firm Contract Demand Service \ncustomers.  Eligible Customers taking Firm Contract Demand Service will also pay a Grid \nReliance Charge for their remaining on-site load, which is not covered by Firm Contract Demand \nService.  The design of the Grid Reliance Charge is discussed in response to Question 3 below. \nAdditional details regarding the PJM Transmission Owners’ proposal for calculating \nFirm Contract Demand Service rates are set forth in the accompanying Direct Joint Testimony of \nPeter Blazunas, Lance Schafer, and Hanhan Hammer of Concentric Energy Advisors, Inc.15  As \nexplained therein, in Zones with formula transmission rates, the single annual rate applicable to \nboth NITS and Firm Contract Demand Service rates will be established in the same basic manner \nas NITS rates are today.16  This rate will be calculated based on each transmission owner’s \nannual net revenue requirement, as determined pursuant to the formula rates contained in \n15\nBlazunas, Schafer, and Hammer Direct Joint Testimony at Section IV.A. \n16\nId. at 6.  A handful of PJM transmission owners continue to utilize stated rates, which in some cases are \nbased on black-box settlements and may need to be accounted for in specific stated rates for the new firm and non-\nfirm contract demand services."},{"page":7,"startToken":2356,"endToken":2628,"text":"7 \nAttachment H to the PJM Tariff.  That annual net revenue requirement will then be divided by \nthe single coincident peak load, which will include both NITS customer load (including interim \nnon-firm transmission service customers) and the total contract demand for all Firm Contract \nDemand Service customers.17  This will result in a single $/MW-year rate that will apply to both \nNITS and Firm Contract Demand Service customers.  A simple example of this rate calculation \nis set forth below, with a more detailed example contained in the Blazunas, Schafer, and \nHammer Direct Joint Testimony.18\nExample 1 – Firm Contract Demand Service Rate Calculation \nTransmission Owner “ABC” \n1 ABC Net Revenue Requirement – $5,000,000 \n2 ABC NITS Customer Coincident Peak Demand – 400 MW \n3 ABC Firm Contract Demand Service Customer Demand – 100 MW \n4 ABC Total Demand – 500 MW \n5 ABC NITS and Firm Contract Demand Service Rate [Line 1 / Line 4] = \n$10,000/MW/Year \nAs discussed in further detail below, both NITS and Firm Contract Demand Service \ncustomers will receive bill credits for revenues associated with the Grid Reliance Charge as well \nas revenues from Non-Firm Contract Demand Service customers, based on their share of the \ncoincident peak load, to ensure that there is no double-recovery of any revenue requirement \namounts.  The procedures for establishing zonal NITS/Firm Contract Demand Service rates and \nupdating the underlying annual revenue requirements will remain unchanged, and Firm Contract \nDemand Service customers will be treated the same as NITS customers under each PJM \nTransmission Owner’s formula rate protocols.  \n17\nId. at 6. \n18\nBlazunas, Schafer, and Hammer Direct Joint Testimony at Exhibit No. PTO-0004."},{"page":8,"startToken":2628,"endToken":2941,"text":"8 \nThe PJM Transmission Owners are proposing to charge the same rate for Firm Contract \nDemand Service and NITS because the level of service provided to both customers is, for all \nrelevant purposes, the same.  Both NITS and Firm Contract Demand Service are firm services \nfor which network upgrades will be planned and constructed as necessary, with the only \ndifference being that upgrades for NITS customers are identified based on existing and \nanticipated load growth while upgrades for Firm Contract Demand Service customers will be \nidentified based on their contracted demand level.  Firm Contract Demand Service customers \nwill be able to serve their contracted demand through capacity procured by PJM just like NITS \ncustomers and will not be required to designate specific points of receipt and delivery.   \nThere is no need or benefit to developing a separate Firm Contract Demand Service rate \nor utilizing the existing Firm Point-to-Point Service (“PTPS”) rates.19  Firm PTPS rates are \ngenerally based on the same revenue requirement as the NITS rate, and the nature of Firm \nContract Demand Service, as contemplated in the Order, is essentially a variation of NITS with a \nspecified contract demand level.  Consequently, PJM will need to treat and plan for Firm \nContract Demand Service load in the same manner that it plans for load using NITS, thus \nproviding service to the Firm Contract Demand Service load on a comparable basis with NITS \nload.  Because NITS and Firm Contract Demand customers receive comparable benefits, using \nthe same rate for NITS and Firm Contract Demand Service is consistent with the Commission’s \ncost allocation principles, particularly the requirement that transmission customers be allocated \ncosts roughly commensurate with the estimated benefits they receive.20  On the other hand, it \nwould be unjust and unreasonable and unduly discriminatory to charge Firm Contract Demand \n19\nId. at 7-8. \n20\nSee, e.g., Order No. 1000 at P 622."},{"page":9,"startToken":2941,"endToken":3254,"text":"9 \nService customers a rate that is lower than one based on the NITS rate, as doing so would \nsubsidize Firm Contract Demand Service customers at the expense of NITS customers.21\nMoreover, in PJM, PTPS is only utilized for purposes of service at the PJM border.  That will not \nbe the case for Co-Located Load customers taking Firm Contract Demand Service to serve their \ncontract demand within PJM.    \nBasing the rate for Firm Contract Demand Service on the NITS rate also has the \nadvantage of minimizing changes to current PJM billing and settlements practices.  As for NITS \ntoday, the PJM Transmission Owners anticipate that PJM will perform the billing function for \ntransmission, capacity, and energy charges for customers taking Firm Contract Demand Service, \nwhile load serving entities (“LSEs”) will perform their current roles of submitting the metrics \nthat PJM uses to calculate those charges, such as a customer’s peak load share information.  This \nwill permit PJM to provide the credits to NITS and Firm Contract Demand Service customers \ndirectly in their monthly invoices outside of the formula rate calculation of zonal NITS \ncharges.22\nIt  is also appropriate to use the single coincident peak to calculate the Firm Contract \nDemand Service rate just like the NITS rate, because the Order establishes Firm Contract \nDemand Service as an annual service.23\nFinally, the PJM Transmission Owners understand that PJM will include administrative \nservice charges to Eligible Customers taking Firm Contract Demand Service, which is just and \nreasonable and consistent with cost causation.  The PJM Transmission Owners understand that \n21\nBlazunas, Schafer, and Hammer Direct Joint Testimony at 7-8. \n22\nThis process is discussed in further detail in the Blazunas, Schafer, and Hammer Direct Joint Testimony at \n8. \n23\nOrder at P 213 (“We find that the new Firm Contract Demand transmission service must have a minimum \nterm of one year, similar to NITS.”)."},{"page":10,"startToken":3254,"endToken":3584,"text":"10 \nPJM will impose these charges on Firm Contract Demand Service customers on the same basis it \ncharges all transmission customers currently, which is based on actual measured demand.  \n2. What are the appropriate rates, terms, and conditions for the new Non-Firm \nContract Demand transmission service, including whether it would be just and \nreasonable to apply the current zonal non-firm PTPS charges to this new \ntransmission service and whether it would be just and reasonable and consistent \nwith cost causation to include charges for any of PJM’s administrative services? \nThe PJM Transmission Owners propose that Non-Firm Contract Demand Service \ncustomers pay a charge for their as-reserved contract demand amount (in MWs) multiplied by a \nzonal Non-Firm Contract Demand Service rate determined based on the specific term of service.  \nThe PJM Transmission Owners propose to use the same Firm Contract Demand Service rate for \npurposes of establishing the maximum rate for Non-Firm Contract Demand Service.  Eligible \nCustomers taking Non-Firm Contract Demand Service will also pay a Grid Reliance Charge for \ntheir on-site load that is not covered by Firm Contract Demand Service.  However, in order to \nprotect against double-charging Non-Firm Contract Demand Service customers, the Grid \nReliance Charge will be subtracted from the Non-Firm Contract Demand Service charge on a \nMWh basis for each MWh of Non-Firm Contract Demand Service included in a transmission \nservice reservation request.   \nNon-Firm Contract Demand Service customers will take service and pay for their \nreserved amount of demand based on system availability, and Non-Firm Contract Demand \nService will be available for terms ranging from one hour to one month.24  As discussed in the \nBlazunas, Schafer, and Hammer Direct Joint Testimony, in other respects the Non-Firm Contract \nDemand Service rate will be computed in the same manner as the Firm Contract Demand Service \n24\nDaily and hourly rates will be distinguished based on on-peak days (Monday–Friday, except for certain \nholidays) and off-peak days (Saturday and Sunday, including the applicable holidays that fall on a weekday)."},{"page":11,"startToken":3584,"endToken":3987,"text":"11 \nrate.25  To ensure against double recovery, all revenues received from Non-Firm Contract \nDemand Service charges will be credited to NITS and Firm Contract Demand Service customers \nbased on their share of the coincident peak load.  The example contained in the Blazunas, \nSchafer, and Hammer Direct Joint Testimony also shows the proposed methodology for \ncalculating and crediting Non-Firm Contract Demand Service rates.26  A simplified example of \nthe maximum Non-Firm Contract Demand Service rate is set forth below, building off of \nExample 1 in the discussion of the Firm Contract Demand Service rate above: \nExample 2 – Non-Firm Contract Demand Service Rate Calculation \nTransmission Owner “ABC” \n1 ABC NITS and Firm Contract Demand Service Rate – $10,000/MW/Year27\n2 ABC Grid Reliance Charge – $2,580/MW/Year28\n3 ABC Non-Firm Contract Demand – 50 MW \n4 ABC Non-Firm Contract Demand Maximum Rate [Line 1 - Line 2] = $7,420/MW/Year \n5 ABC Non-Firm Contract Demand Revenues [Line 3 * Line 4] = $371,000 annual \nrevenues returned as bill credits to NITS and Firm Contract Demand Service customers \nUsing the same maximum rate for Firm Contract Demand Service and Non-Firm \nContract Demand Service is just and reasonable.  The Commission has traditionally permitted \nnon-firm PTPS to be priced at (but not above) the rate used for firm PTPS,29 and many \ntransmission owners have set the same maximum rates for firm and non-firm service, including \nin PJM.30  Because pursuant to PJM’s proposed operational procedures, Non-Firm Contract \n25\nBlazunas, Schafer, and Hammer Direct Joint Testimony at 11-12. \n26\nId. at 26-31. \n27\nRefer to Example 1 in the discussion of the Firm Contract Demand Service charge above for the derivation \nof the $10,000/MW/Year rate. \n28\nRefer to Example 3 below for the calculation of the Grid Reliance Charge. \n29\nSee Order No. 888 at 31,780 (noting the importance of allowing pricing flexibility and indicating that the \nnon-firm rate is capped at the firm rate).\n30\nSee Schedules 7 and 8 of the PJM Tariff.  The PJM Transmission Owners recognize that non-firm PTPS \ncustomers in PJM are currently subject to a discounted rate of $0.67/kWh.  Currently, the only customers that utilize \nPTPS in PJM are those entities taking service at the PJM border.  However, requiring this discount be extended to a \nbroader class of customers taking service throughout PJM rather than simply at the PJM border would not be just and"},{"page":12,"startToken":3987,"endToken":4405,"text":"12 \nDemand Service customers will have the benefit of PJM re-dispatching generation prior to \ncurtailing Non-Firm Contract Demand Service where applicable, Non-Firm Contract Demand \nService will represent a superior level of service compared to non-firm PTPS.  Combined with \nthe additional flexibility that Non-Firm Contract Demand Service customers will have with \nrespect to arranging and scheduling Non-Firm Contract Demand Service, and given that Non-\nFirm Contract Demand Service customers will not pay for generation capacity,31 it is just and \nreasonable to set the maximum Non-Firm Contract Demand Service rate equal to the rate for \nFirm Contract Demand Service customers on a $/MWh basis.32\nCurrently, PJM has the ability to offer discounts for Non-Firm Point-to-Point Service \nsubject to certain requirements, and based on criteria established by the PJM Transmission \nOwners.33  The PJM Transmission Owners propose similar flexibility for Non-Firm Contract \nDemand Service.  The Commission directed the implementation of a Non-Firm Contract \nDemand Service to act as a limited supplemental service that may be needed for the benefit of \nFirm Contract Demand Service customers to ensure that such customers can serve on-site load, \nreasonable.  As discussed above, the PJM Transmission Owners will consider on a going-forward basis whether a \ndiscount is appropriate and just and reasonable for Non-Firm Contract Demand Service, based on system conditions \nand use patterns. \n31\nSee Order at P 218 (“The new Non-Firm Contract Demand transmission service will not include a charge for \ngeneration capacity.”). \n32\nThis would be comparable to the rules the Commission established in Order No. 888 with respect to the \nrelationship between firm and non-firm point-to-point transmission service rates.  See Order No. 888 at 31,780. \n33\nSchedules 7 and 8 of the PJM Tariff state: \n[t]hree principal requirements apply to discounts for transmission service as follows: (1) any offer \nof a discount made by the Transmission Provider must be announced to all Eligible Customers solely \nby posting on the OASIS, (2) any customer-initiated requests for discounts (including requests for \nuse by one’s wholesale merchant or an Affiliate’s use) must occur solely by posting on OASIS, and \n(3) once a discount is negotiated, details must be immediately posted on the OASIS. For any \ndiscount agreed upon for service on a path, from point(s) of receipt to point(s) of delivery, the \nTransmission Provider must offer the same discounted transmission service rate for the same time \nperiod to all Eligible Customers on all unconstrained transmission paths that go to the same point(s) \nof delivery on the Transmission System."},{"page":13,"startToken":4405,"endToken":4669,"text":"13 \nfor instance, when its on-site generator is experiencing an outage, but not as a substitute for Firm \nContract Demand Service.  Also relevant is the fact that the historical purpose of a discount on \nnon-firm transmission service is to encourage the efficient use of the transmission system – i.e.,\nto ensure that the system is being utilized optimally.  Before determining whether a discount is \nappropriate for Non-Firm Contract Demand Service, and if so what level it should be set at, it is \nnecessary for the PJM Transmission Owners to gather data on how Non-Firm Contract Demand \nService customers are utilizing the service, taking into account the intended purpose of the \nservice, and the effect of that utilization on the system.  Accordingly, the PJM Transmission \nOwners will consider on a going-forward basis whether a discount is appropriate for Non-Firm \nContract Demand Service based on system conditions and use patterns and, if so, the criteria and \nlimits under which PJM will apply the discount.  Any discount offered for Non-Firm Contract \nDemand Service would be offered by PJM based on rules and criteria established by the PJM \nTransmission Owners designed to incentivize the efficient use of Non-Firm Contract Demand \nService and the transmission system.   \nFinally, as with Firm Contract Demand Service, the PJM Transmission Owners \nunderstand that PJM proposes to charge Non-Firm Contract Demand Service customers for \napplicable PJM administrative charges based on actual demand, in the same manner as it does \nwith respect to transmission service customers currently.  The PJM Transmission Owners agree \nthat this proposal is just and reasonable and consistent with cost causation principles."},{"page":14,"startToken":4669,"endToken":5016,"text":"14 \n3. As noted above, a Co-Location Arrangement is synchronized to the transmission \nsystem.  Should the rate paid by an Eligible Customer on behalf of a Co-Located \nload taking only the new Non-Firm Contract Demand transmission service that \nelects to not reserve any amount of that service for a period of time (e.g., one \nmonth) reflect not only charges for regulation and black start services, but also an \nadditional charge given that regulation and black start services could not be \nprovided without the transmission system?  If so, how should that additional \ncharge be determined? \nThe PJM Transmission Owners are proposing to charge a Grid Reliance Charge to \nEligible Customers taking the new Contract Demand services based on the difference between \nthe amount of their firm contract demand for Firm Contract Demand Service or, in the case of \nNon-Firm Contract Demand Service customers, the amount of their reserved service, and their \ntotal (gross) on-site load.34  The proposed Grid Reliance Charge is designed to reflect the costs of \nusing the transmission system to deliver black start and regulation services, as well as providing \nthe inherent benefits that all customers, including Contract Demand customers, receive as a \nresult of their synchronization to and reliance on the grid.35  The Grid Reliance Charge also \nrecognizes the costs associated with the operations, maintenance, and other activities that PJM \nTransmission Owners will need to perform for the grid and to accommodate the increased \nnumber of protection schemes that will be required for Co-Located Load customers.  As \ndiscussed further below, and in the Blazunas, Schafer, and Hammer Direct Joint Testimony, the \nPJM Transmission Owners initially propose to calculate this charge for each zone based on an \naverage fixed percentage of the portion of transmission depreciation and operations and \nmaintenance (“O&M”) expense associated with providing grid reliance services, and then \napplying that percentage to each PJM Transmission Owner’s Attachment H annual transmission \n34\nOrder at P 216.   \n35\nCompensation for providing black start and regulation services, as distinct from delivery of those services, \nwill be received by the providers of those services."},{"page":15,"startToken":5016,"endToken":5334,"text":"15 \nrevenue requirement.36  The initial percentage is 25.8 percent, subject to adjustment every five \nyears as discussed below. \nAs Commissioner Chang stated in her concurrence to the Order, a minimum charge such \nas the Grid Reliance Charge is “particularly essential to protecting customers against \ntransmission cost shifts under the new framework established through [the Order].”37\nCommissioner Chang went on to explain that all Co-Located Loads are synchronized with the \ngrid through their generators, and rely on the PJM grid.38  The PJM Transmission Owners agree.  \nThe Grid Reliance Charge is necessary and appropriate to ensure that Co-Located Load \ncustomers pay their appropriate share of transmission system costs.  Co-Located Load and its \nassociated generation is electrically connected to the transmission system (not islanded) and \ntherefore benefits from the existence and reliable operation of the transmission system and \nshould contribute to paying the costs of continuing to reliably operate the system regardless of \nthe amount of energy withdrawn.  Even with a zero MW contract demand, a large Co‑Located \nLoad and generation arrangement will still depend on the grid for the delivery of various \nancillary services and a suite of synchronization support services, such as stable frequency, \ninertia, stability services (damping, angle stability), fault current capability, and ride-through and \nprotection coordination.  In short, a Co-Located Load’s net withdrawals do not fully reflect its \nactual reliance on the grid. \nAlthough the proliferation of large Co-Located Load arrangements is a relatively recent \nphenomenon, the Commission has long recognized that an integrated transmission system \n36\nAs noted above, a handful of PJM transmission owners continue to utilize stated rates, which in some cases \nare based on black-box settlements and may need to be accounted for in specific stated rates for the new firm and non-\nfirm contract demand services.  This also applies to the Grid Reliance Charge. \n37\nOrder, Chang, Comm’r, concurring at P 5. \n38\nId. at P 6."},{"page":16,"startToken":5334,"endToken":5664,"text":"16 \nprovides broad reliability benefits to all customers of the system.39  This recognition has guided \nCommission decisions relating to issues such as ratemaking and cost allocations.40  Consistent \nwith this longstanding policy, as well as cost allocation rules,41 it is appropriate to require Co-\nLocated Load customers to pay their appropriate share of costs of relying on the system to \ndeliver necessary ancillary services and grid support to reliably connect their on-site load and \ngeneration.   \nThe Grid Reliance Charge methodology proposed by the PJM Transmission Owners \nrepresents a just and reasonable means of estimating the grid reliance benefits to Co-Located \nLoad with an appropriate level of precision, while ensuring that the Grid Reliance Charge can be \nfairly and efficiently implemented.42  Pursuant to this methodology, the Grid Reliance Charge \nwill be determined on an annual basis by multiplying an average fixed percentage of the portion \nof transmission costs associated with providing grid reliance services by each PJM Transmission \nOwner’s Attachment H annual transmission revenue requirement.  Using annual depreciation and \nO&M expenses to establish the Grid Reliance Charge is appropriate because these expenses best \ncapture the portions of a transmission owner’s revenue requirement relating to the ongoing \nreliable operation of the grid.   \nA detailed discussion of the methodology for calculating the Grid Reliance Charge is set \nforth in the Blazunas, Schafer, and Hammer Direct Joint Testimony.43  As explained by Mr. \nSchafer, the fixed percentage allocator is based on costs included in transmission plant and \n39\nSee, e.g., W. Mass. Elec. Co. v. FERC, 165 F.3d 922, 927 (D.C. Cir. 1999). \n40\nSee, e.g., Order No. 890-B at PP 61, 62 (citing Niagara Mohawk Power Corp., 42 FERC ¶ 61,143, at 61,531 \n(1988)); see also Order No. 1000 and Order No. 1920. \n41\nSee supra note 10. \n42\nSee Ill. Commerce Comm’n v. FERC, 576 F.3d 470, 477 (7th Cir. 2009). \n43\nBlazunas, Schafer, and Hammer Direct Joint Testimony at Section V."},{"page":17,"startToken":5664,"endToken":5959,"text":"17 \ntransmission O&M FERC accounts, derived from FERC Form No. 1 Reports of the PJM \nTransmission Owners, that provide grid reliance capability.44  Mr. Schafer adopted a \nconservative approach in a number of respects, such as by excluding amortization and general \nplant depreciation, as well as administrative and general (A&G) expenses.45  The allocator will \nbe multiplied by each PJM Transmission Owner’s rate for NITS and Firm Contract Demand \nService to arrive at an “unadjusted” Grid Reliance Charge rate.  This unadjusted rate will then be \nmultiplied by a ratio that accounts for the difference between the demand used to account for the \nNITS and Firm Contract Demand Service rate (NITS customer load plus Firm Contract Demand \nService load) and Co-Located Load customers’ gross load, to arrive at the final Grid Reliance \nCharge for each Zone.46\nThe Grid Reliance Charge will be calculated on a zonal basis, as opposed to a blended, \nPJM-wide basis.  Because black start service is procured zonally, delivery obligations are \ninherently local.  Likewise, most synchronization support is provided at the local rather than \nregional level.  These factors support calculating the Grid Reliance Charge on a zone-by-zone \nbasis, just like the Firm Contract Demand Service and Non-Firm Contract Demand Service rates.   \nThe PJM Transmission Owners also propose to recalculate and update the allocation \npercentages used to establish the Grid Reliance Charge every five years, using the same \naveraging approach.  This will ensure a reasonable level of year-to-year rate stability while \nensuring that the allocators do not become overly stale over time.   \nFinally, the PJM Transmission Owners propose to treat the revenues from the Grid \nReliance Charge by applying them as a dollar-for-dollar credit to NITS and Firm Contract \n44\nId. at 19-24. \n45\nId. at 22. \n46\nId. at 24-25."},{"page":18,"startToken":5959,"endToken":6305,"text":"18 \nDemand Service customers located in the relevant Zone based on their share of the coincident \npeak load.  This will ensure that the Grid Reliance Charge does not result in a double recovery \nfor the PJM Transmission Owners or inappropriate cost shifts. \nA detailed example showing the calculation and crediting of the Grid Reliance Charge is \nset forth in the Blazunas, Schafer and Hammer Direct Joint Testimony.47  However, a simplified \nexample showing the determination and application of the Grid Reliance Charge is set forth \nbelow, using the same assumptions as Examples 1 and 2 above: \nExample 3 – Grid Reliance Charge Calculation \nTransmission Owner “ABC” \n1 ABC NITS and Firm Contract Demand Service Rate – $10,000/MW/Year48\n2 Fixed Grid Reliance Percentage Allocator – 25.8% (applicable to all TOs) \n3 ABC Grid Reliance Charge (Unadjusted) [Line 1 * Line 2] = $2,580/MW/Year \n4 ABC Grid Reliance Charge Demand Adjustment Ratio – .9 \n5 ABC Final Grid Reliance Charge [Line 3 * Line 4] = $2,322/MW/Year \n6 ABC Firm Contract Demand Service Demand – 100 MW \n7 ABC on-site Load in Excess of Firm Contract Demand Load – 300 MW \n8 ABC Grid Reliance Charge Revenues [Line 5 * Line 7] = $696,600 annual revenues, \nreturned as bill credits to NITS and Firm Contract Demand Service customers \n4. As noted above, a Co-Location Arrangement is synchronized to the transmission \nsystem.  Should the rate paid by an Eligible Customer on behalf of a Co-Located \nload taking only a de minimis amount of the new Firm or Non-Firm Contract \nDemand transmission services reflect not only (i) charges for regulation and black \nstart service and (ii) the transmission service charges for that de minimis amount \nof service, but also an additional charge reflecting that the Co-Location \nArrangement is physically connected and synchronized to the PJM transmission \nsystem?  If so, how should that additional charge be determined? \nSee response to Question 3. \n47\nId. at 27-28. \n48\nRefer to Example 1 in the discussion of the Firm Contract Demand Service charge above for the derivation \nof the $10,000/MW/Year rate."},{"page":19,"startToken":6305,"endToken":6619,"text":"19 \n5. What is the appropriate penalty charge or other remedial action that PJM should \ntake to address any unreserved use of the PJM transmission system for an Eligible \nCustomer taking Firm Contract Demand transmission service on behalf of a Co-\nLocated load? \nRobust penalty provisions are a necessary component of the new services required by the \nCommission.  First, and most importantly, any penalties must be sufficient to meaningfully deter \nCo-Located Load customers from exceeding their contract demand and making unreserved use \nof the transmission system.  Because network upgrades are planned and built only to \naccommodate load covered by Firm Contract Demand Service or NITS, it is of the utmost \nimportance that Co-Located Loads respect their contractual limits, including any related \ncurtailment or other instructions from PJM.  This concern is particularly acute because many of \nthese arrangements will likely involve substantial amounts of load—hundreds, if not thousands \nof MWs—being served by on-site generation but still connected to the grid.  If these limits are \nnot respected, the reliability consequences to the system could be severe.  Therefore, operational \npenalties must be structured to meaningfully deter load customers that exceed reserved service \namounts.  Financial penalties alone are insufficient.  \nThe PJM Transmission Owners understand that PJM intends to propose operational \npenalties, and agree with PJM that the imposition of such penalties is appropriate.  The PJM \nTransmission Owners believe that any penalty regime should rely on both operational \nconsequences and complementary financial penalties.  The PJM Transmission Owners \nunderstand that, at a high level, PJM’s proposal would be to refer to FERC enforcement or \napplicable reliability organizations any failure to comply with PJM operating instructions.  In \naddition, PJM is proposing a “two-strike” approach, pursuant to which if a customer’s protective \nsystems fail to operate as required, PJM would first determine whether to impose a 120-day \n“pause” in service and, with the second failure, would terminate the customer’s Contract"},{"page":20,"startToken":6619,"endToken":6903,"text":"20 \nDemand Service contract and the customer would be required to become a NITS customer if it \nwished to resume service. The PJM Transmission Owners believe this proposal is a good \nstarting point conceptually, but recognize that additional details will need to be developed as to \nhow these operational consequences would be applied.  As such, the PJM Transmission Owners \nreserve the right to provide further input as part of this paper hearing process when further \ninformation becomes available.\nThe PJM Transmission Owners also believe that a financial penalty structure is \nappropriate to complement and supplement operational penalties implemented by PJM.  \nAlthough the PJM Transmission Owners anticipate that operational penalties will provide a \nsignificant deterrent against Co-Located Load customers exceeding their reserved transmission \nservice use, financial penalties could still play a valuable role in enhancing this deterrent as well \nas ensuring the market and other ratepayers are made whole if a Co-Located Load customer \nexceeds its contract demand.  In addition, it may also be appropriate to impose financial penalties \nwhen a Co-Located Load customer deviates from its contract demand even if such deviations are \nmitigated by a Special Protection Scheme (“SPS”) or Remedial Action Scheme (“RAS”) \ninstalled on the Transmission Owner side of the point of interconnection.  The PJM \nTransmission Owners intend to work with PJM in continuing to explore the penalty options and \nwill, if appropriate, offer a proposal at a subsequent stage of this paper hearing process.   \n6. What is the appropriate penalty charge or other remedial action that PJM should \ntake to address any unreserved use of the PJM transmission system for an Eligible \nCustomer taking Non-Firm Contract Demand transmission service on behalf of a \nCo-Located load? \nSee response to Question 5."},{"page":21,"startToken":6903,"endToken":7266,"text":"21 \n7. What are the appropriate mechanisms for an anti-toggling feature for the Firm \nContract Demand transmission service, including the appropriate minimum \nservice period and minimum notice period for discontinuing or modifying the \nlevel of service? \nThe Order indicates that Firm Contract Demand Service should have a minimum term of \none year.  However, as the Commission recognized, there are concerns regarding a customer’s \nability to toggle between firm and non-firm service levels.49  One of the primary concerns with \npermitting Firm Contract Demand Service customers to take service for a single-year term is that \nPJM will be required to procure capacity for these customers, and one-year commitments will \nnot encourage the appropriate price signals necessary to incent additional needed capacity.  \nThere also is a potential concern that Firm Contract Demand Service customers will cause the \nneed for network upgrades to accommodate their Firm Contract Demand Service and then exit \nthe system, thereby potentially shifting costs to other customers.50  To partially address these \nconcerns, the PJM Transmission Owners propose a five-year minimum commitment period for \nFirm Contract Demand Service.  A five-year minimum commitment period is appropriate \nbecause, as noted by the Commission in the Order, it mirrors the commitment period for loads \nseeking to procure their own capacity.51\nWith respect to minimum notice obligations, the PJM Transmission Owners recommend  \nthe Commission adopt the same requirements for Firm Contract Demand Service that currently \napply to notices of termination for NITS under Section 2.5 of the PJM Tariff.52  This is \n49\nOrder at P 213.   \n50\nId. at P 213.  If network upgrades are attributable to the Firm Contract Demand Service, these may require \nseparate payment guarantees to prevent NITS customers from being left “holding the bag” if a Firm Contract Demand \nService customer leaves before the costs of the upgrades are fully paid. \n51\nId. (“PJM’s capacity market includes anti-toggling measures, including the ‘must offer’ requirement for \nexisting Capacity Resources and the five-year minimum commitment for loads seeking to procure their own capacity \nthrough the Fixed Resource Requirement alternative.”).   \n52\nPJM Tariff, Section 2.5 (“Although Regional Network Integration Service is presumed to continue without \nexpiration, it may be terminated where:"},{"page":22,"startToken":7266,"endToken":7616,"text":"22 \nappropriate given the concerns regarding toggling and the resulting potential for cost shifting \ndiscussed above.\n8. What interconnection requirements and operational practices are necessary for \nspecial protection schemes to maintain system reliability (e.g., the need for full \nredundancy of such schemes) in the event that a Co-Located load itself or its \nassociated generator trips offline? \nThe PJM Transmission Owners are not offering a specific proposal at this time relating to \nthese issues, but highlight a number of concerns and key elements relating to interconnection, \nplanning and operational practices for Co-Located Load customers taking Firm Contract \nDemand Service, Non-Firm Contract Demand Service, or interim, non-firm transmission service.   \nSignificant ink has been spilled already in this proceeding regarding the appropriateness \nof relying on protection schemes such as RAS in lieu of requiring Co-Located Load customers to \ntake NITS for their full on-site load.  The PJM Transmission Owners will not repeat those \narguments here.  However, there are certain key facts that the Commission should take into \nconsideration in order to allow the new transmission services to be implemented in a safe and \nreliable manner.  Without network upgrades being planned to serve the entire amount of a \ncustomer’s on-site load, the reliability of the PJM system will necessarily depend on the \nadequate deployment and effective operation of SPS or RAS to ensure that Co-Located Load \ncustomers respect their contractual limitations.  This will result in the PJM system relying on \n1)\nAn incumbent Network Customer will be replaced by a successor Network Customer, in which case the \nincumbent’s service shall only terminate if the successor agrees to commence the taking of service, the \nappropriate service agreement is executed, and all other applicable terms and conditions of the PJM \nGoverning Agreements are satisfied; \n2)\nAn incumbent Network Customer seeks to terminate its service and no successor Network Customer \nexists, in which case the incumbent must provide PJM with forty-two (42) months’ notice prior to the \ncommencement of a Delivery Year, subject to receiving all necessary regulatory approvals for such \ntermination, if any; or  \n3)\nOn such other date mutually agreed upon by the parties.”)."},{"page":23,"startToken":7616,"endToken":7890,"text":"23 \nSPS or RAS, potentially including customer-operated systems, to secure reliable operations.53\nAlthough SPS/RAS are already employed in PJM, the use of multiple SPS/RAS to protect the \ngrid from large amounts of on-site load exceeding their contractual withdrawal limitations rather \nthan more permanent solutions is novel.  To address issues arising from this novel approach, the \nPJM Transmission Owners suggest the following:  \n\nThe Commission should adopt rigorous and comprehensive requirements to ensure \nthat this novel reliance on SPS/RAS does not result in adverse reliability impacts, \nincluding potential violations of North American Electric Reliability Corporation \n(“NERC”) criteria.  To that end, the PJM Transmission Owners recommend the \nfollowing:  All SPS and RAS should be fully redundant.  Although failures of \nprotection schemes are relatively rare, they do occur, and given the large amount of \non-site load and generation potentially involved in these arrangements, it is crucially \nimportant to protect against such failures.\n\nThe Commission should require the Co-Located Load customer to pay for PJM and \nPJM Transmission Owner-administered studies to ensure any SPS or RAS can \neffectively mitigate the risks of potential failure modes.   \n\nThe PJM Transmission Owners should have the option to review and agree to any \ncustomer load curtailment procedures or operational control mechanisms.  \n\nAll SPS and RAS must fully meet PJM and PJM Transmission Owner technical criteria. \n\nThe Commission should consider requiring more frequent testing of SPS and RAS \nthan is currently required by NERC Reliability Standards, with particular attention to \n53\nExamples of potential approaches as to how these SPS/RAS might be implemented are discussed in the \naccompanying testimony.  See Blazunas, Schafer and Hammer Direct Joint Testimony at 39."},{"page":24,"startToken":7890,"endToken":8152,"text":"24 \nprotection equipment installed on the customer side of the point of interconnection.  \nResults from tests of customer-side protection schemes should be submitted to both \nPJM and the interconnected PJM Transmission Owner, and any SPS or RAS found to \nbe inadequate/insufficient should be updated accordingly. \n\nThe Commission should permit PJM and the PJM Transmission Owners to \nimplement and enforce reasonable limits on the total amount of load that can be \ncovered by SPS or RAS, particularly for customers in relatively close proximity to \none another or in a transmission-constrained area.   \n\nThe Commission should permit PJM Transmission Owners the option to require the \nimplementation of SPS or RAS on the Transmission Owner’s side of the point of \ninterconnection and to require that the costs associated with such SPS or RAS be fully \nrecoverable. \n\nThe Commission should permit the PJM Transmission Owners to exercise an option \nto own, maintain, and operate any SPS or RAS installed on the customer’s side of the \npoint of interconnection, at the customer’s expense. \n\nThe Commission should direct NERC to establish requirements that Co-Located Load \ncustomers register with NERC so that those customers may be responsible for \nmeeting NERC’s reliability standards, including NERC Reliability Standard PRC-\n012-2.  \nAdditionally, the Commission must strictly enforce compliance with NERC Reliability \nStandard PRC-012-2, which includes nine requirements to address all aspects of RAS.54  The \nPJM Transmission Owners emphasize particularly the importance of requirements 3, 4, and 8 of \n54\nNorth American Electric Reliability Corporation, PRC-012-2 – Remedial Action Schemes (June 12, 2025), \nhttps://www.nerc.com/globalassets/standards/reliability-standards/prc/prc-012-2.pdf."},{"page":25,"startToken":8152,"endToken":8462,"text":"25 \nPRC-012-2.  Requirement R3 outlines the RAS component of Dependability, which is a measure \nof certainty of a device to operate when required.  For instance, if a RAS is installed to meet \nsystem performance requirements, the RAS’s failure to operate when intended would put the \nsystem at risk.  This risk can be mitigated by designing the RAS so that it will accomplish its \nintended purpose while experiencing a single RAS component failure.  Such a design is typically \nachieved through redundancy.  Other strategies include “over-tripping” load or generation, or \nalternative backup schemes.  Requirement R4 of PRC-012-2 requires the reliability planning \ncoordinator to perform a periodic evaluation of each RAS within its planning area, at least once \nevery five years.  These evaluations must determine whether each RAS: (1) mitigates the system \nconditions or contingencies for which it was designated; and (2) avoids adverse interactions with \nother RAS and special protection systems.  The Commission must ensure that any new \nrequirements or flexibility provided to Co-Located Load customers do not hinder the planning \ncoordinator’s ability to complete these evaluations and comply with the reliability standards \ndevised to protect the system from catastrophic failure.  Similarly, Requirement R8 of PRC-012-\n2 requires periodic testing of RAS performance, i.e., every six years for normal RAS and every \n12 years for limited impact RAS.  The Commission should consider whether more frequent \ntesting is advisable, particularly for protection installed on the customer side of the point of \ninterconnection.\nWith respect to interconnection requirements, the PJM Transmission Owners emphasize \nthat they will still need to perform load integration studies for any Co-Located Load \narrangements, just as they do today with respect to any large load customers.  These studies \ncould involve some or all of the following analyses: (i) what, if any, upgrades are needed to \naccommodate the physical gross load amount behind the point of interconnection; (ii) the request"},{"page":26,"startToken":8462,"endToken":8629,"text":"26 \nfor firm contract demand amount in front of the point of interconnection; (iii) the impacts that \nwould result from additional load located on-site (behind the point of interconnection) but being \nserved by on-site (behind the point of interconnection) generation and how those impacts need to \nbe addressed, including appropriate protection schemes; and (iv) what additional measures are \nnecessary to accommodate non-firm contract demand service requests in front of the point of \ninterconnection. \nIII. \nCONCLUSION \nThe PJM Transmission Owners appreciate the opportunity to submit their initial \nresponses to the paper hearing questions posed by the Commission in the Order.  The PJM \nTransmission Owners respectfully request that any subsequent Commission orders addressing \nthese issues adopt the proposals and recommendations set forth herein. \nRespectfully Submitted, \n/s/ Michael Kunselman \nMichael Kunselman  \nRichard P. Sparling \n \nNicholas J. Cicale \nJonathan A. Namazi \nDavis Wright Tremaine LLP \n1301 K Street NW \nSuite 500 East \nWashington, DC 20005 \nCounsel for the FirstEnergy\n  Companies \nOn behalf of the PJM   \n  Transmission Owners\nDated:  February 23, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":151,"startToken":0,"endToken":372},{"p":2,"at":151,"title":"I. INTRODUCTION","method":"printed heading","endPage":6,"endAt":3,"startToken":372,"endToken":2007},{"p":6,"at":3,"title":"II. RESPONSES TO PAPER HEARING QUESTIONS","method":"printed heading","endPage":26,"endAt":505,"startToken":2007,"endToken":8535},{"p":26,"at":505,"title":"III. CONCLUSION","method":"printed heading","endPage":26,"endAt":1181,"startToken":8535,"endToken":8629}]}
