{"document":{"slug":"rec-20260225-5219","title":"Notice of Compliance Filing in ER26-1479-000 of PJM Interconnection, L.L.C.,","issued":"2026-02-25","accession":"20260225-5219","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"notice","file":"sources/filings/text/20260225-5219_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260225-5219","tier":"record","sha256":"2dfb4e0051b2d9eedde9b558af671f9bf821cc2aa1b32a4efff759cf7a37995a","pages":2,"tokens":311,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":235,"text":"PJM Interconnection, L.L.C. \n2750 Monroe Boulevard \nAudubon, PA 19403 \n \nMark J. Stanisz \nAssociate General Counsel \nPh: (610) 666-4707   \nMark.Stanisz@pjm.com \nFebruary 24, 2026 \n \n \nVIA ELECTRONIC FILING \n \n \n \n \n \n \n \nHonorable Debbie-Anne A. Reese, Secretary  \nFederal Energy Regulatory Commission  \n888 First Street, NE, Room 1A \nWashington, DC 20426 \n \nRe: \nPJM Interconnection, L.L.C., Docket No. EL25-49-000, et al. \nCompliance Filing in Docket No. ER26-1479-000 \n \nDear Secretary Reese:  \n \nThis letter, being served on all parties to the above-referenced proceeding, confirms \nthat PJM Interconnection, L.L.C. (“PJM”) submitted on February 23, 2026 a filing in \nDocket No. ER26-1479-000 (Accession No. 20260223-5181) in compliance with the \nFederal Energy Regulatory Commission’s 60-day compliance directives in the December \n18, 2025 order.1 PJM requested a placeholder effective date of 12/31/9998.  On February \n24, 2026, the Commission set 5 pm ET on March 16, 2026 for comments on this filing.   \n \n \n \n \n \n \nRespectfully submitted, \n \n \nCraig Glazer \nVice President – Federal \nGovernment Policy \nPJM Interconnection, L.L.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005 \n(202) 423-4743 \ncraig.glazer@pjm.com  \n           /s/   Mark J. Stanisz \n \nMark J. Stanisz \nAssociate General Counsel \nThomas DeVita \nAssociate General Counsel \nChenchao Lu \nAssociate General Counsel \n2750 Monroe Blvd, \nAudubon, PA 19403 \n(610) 666-8800 \nmark.stanisz@pjm.com  \nthomas.devita@pjm.com  \nchenchao.lu@pjm.com  \nCounsel for PJM Interconnection, L.L.C. \n \n \n1 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025)."},{"page":2,"startToken":235,"endToken":311,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each \nperson designated on the official service list compiled by the Secretary in these \nproceedings. \n \nDated at Audubon, P.A., this 24th day of February, 2026.   \n \n/s/ Mark J. Stanisz \n \n  \nMark J. Stanisz \nAssociate General Counsel \nPJM Interconnection, L.L.C. \n2750 Monroe Blvd.  \nAudubon, PA 19403 \n(610) 666-4707  \nMark.Stanisz@pjm.com \n \nAttorney for  \nPJM Interconnection, L.L.C."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":0,"startToken":0,"endToken":235},{"p":2,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":2,"endAt":487,"startToken":235,"endToken":311}]}