{"document":{"slug":"rec-20260309-5165","title":"PJM Interconnection, L.L.C. submits second supplemental Information Report re timeline for stakeholder deliberation on the reliability backstop procurement…","issued":"2026-03-09","accession":"20260309-5165","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/filings/text/20260309-5165_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260309-5165","tier":"record","sha256":"765668b851bd1d186871573be52879a9fd932087d59a963aca0e81df60aea6e9","pages":3,"tokens":483,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":216,"text":"PJM Interconnection, L.L.C. \n2750 Monroe Blvd \nAudubon, PA 19403 \n \nDaniel Vinnik \nCounsel \nT: (267) 858-9451 \nDaniel.Vinnik@pjm.com \n \nMarch 9, 2026 \n \nHonorable Debbie-Anne A. Reese  \nSecretary  \nFederal Energy Regulatory Commission \n888 First Street, N.E. Room 1A \nWashington, D.C.  20426 \n \nRe: \nPJM Interconnection L.L.C., Docket Nos. EL25-49-000 and -001 \nSecond Supplemental Informational Report \n \nDear Secretary Reese: \n \nAs referenced in the February 23, 2026 supplemental informational report,1 PJM \nInterconnection, L.L.C. (“PJM”) submits this second supplemental informational filing to update \nthe Federal Energy Regulatory Commission (“Commission”) regarding the timeline for \nstakeholder deliberation on the reliability backstop procurement mechanism.  \nI. \nINFORMATIONAL FILING \nSince the February 23, 2026 supplemental informational report, PJM has continued to \ndiscuss the framework of a reliability backstop procurement mechanism with stakeholders. \nThrough these stakeholder workshops, PJM heard from various stakeholders on potential options \nand pitfalls associated with various reliability backstop procurement mechanisms.  Based on the \ndiscussions to date, PJM plans to develop a comprehensive reliability backstop proposal for \nstakeholder consideration by mid-April.  Accordingly, while PJM is working to develop a \n \n1 PJM Interconnection, L.L.C., Supplemental Informational Report at 3, Docket No. EL25-49-000 (Feb. 23, 2026) \n(pledging to notify the Commission of changes to the anticipated timeline for developing the updated reliability \nbackstop procurement mechanism)."},{"page":2,"startToken":216,"endToken":419,"text":"Honorable Debbie-Anne A. Reese, Secretary \nMarch 9, 2026 \nPage 2 of 3 \n \n2 \n \ncomprehensive proposal to present to stakeholders in a future Reliability Backstop Procurement \nWorkshop meeting, PJM will not be hosting another meeting until April.   \nUpon resumption of the Reliability Backstop Procurement Workshop meetings, PJM \nexpects to review PJM’s proposal with stakeholders and will be open to additional feedback, \nincluding alternative proposals, before finalizing a package with stakeholders by the end of May.  \nThis timeline will continue to allow PJM to implement the reliability backstop procurement before \nthe end of this year.   \nII. \nCONCLUSION \nPJM pledges to keep the Commission informed of the timeline for submission of a filing \nto the Commission if changes to the current timeline become necessary.  PJM appreciates the \nCommission and stakeholders’ dedication and engagement on this matter. \nRespectfully submitted, \n/s/ Daniel Vinnik \nCraig Glazer \nVice President – Federal Government Policy \nPJM Interconnection, L.L.C. \n1200 G Street, N.W. \nSuite 600 \nWashington, D.C. 20005 \n(202) 423-4743 \nCraig.Glazer@pjm.com \n \nDaniel Vinnik \nCounsel \nPJM Interconnection, L.L.C. \n2750 Monroe Boulevard \nAudubon, PA* 19403 \n*(Licensed in the District of \nColumbia and Illinois) \n(267) 858-9451 \nDaniel.Vinnik@pjm.com  \n \n \n \nOn behalf of \nPJM Interconnection, L.L.C."},{"page":3,"startToken":419,"endToken":483,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this 9th day of March, 2026 caused a copy of the foregoing \ndocument to be served upon each person designated on the official service lists compiled by the \nSecretary in this proceeding. \n/s/ Daniel Vinnik \nDaniel Vinnik \nCounsel \nPJM Interconnection, L.L.C. \n2750 Monroe Boulevard \nAudubon, PA 19403 \n(267) 858-9451 \nDaniel.Vinnik@pjm.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":770,"startToken":0,"endToken":105},{"p":1,"at":770,"title":"I. INFORMATIONAL FILING","method":"printed heading","endPage":2,"endAt":645,"startToken":105,"endToken":309},{"p":2,"at":645,"title":"II. CONCLUSION","method":"printed heading","endPage":3,"endAt":0,"startToken":309,"endToken":419},{"p":3,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":3,"endAt":392,"startToken":419,"endToken":483}]}