{"document":{"slug":"rec-20260309-5267","title":"Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to the 02/20/2026 Motion for Leave to Answer and Answer, and the 01/20/2026 Request for…","issued":"2026-03-09","accession":"20260309-5267","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"rehearing request","file":"sources/filings/text/20260309-5267_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260309-5267","tier":"record","sha256":"33ffc26cb9e23e6452fec1e851a851d650550f0432d23d975058197225c90046","pages":9,"tokens":2399,"emptyPages":[],"textThemes":["colo","adequacy","flex"]},"pages":[{"page":1,"startToken":0,"endToken":244,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Interconnection, L.L.C. \n \nLarge Loads Co-Located at \nGenerating Facilities \n \nConstellation Energy Generation, \nLLC \n \nv. \n \nPJM Interconnection, L.L.C. \n \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n \n \nDocket No. EL25-49-000 \n \nDocket No. AD24-11-000 \n \n \nDocket No. EL25-20-000 \n \nMOTION FOR LEAVE TO ANSWER AND ANSWER OF  \nPJM INTERCONNECTION, L.L.C.  \n \nPursuant to Rules 212 and 213 of the Rules of Practice and Procedure of the Federal \nEnergy Regulatory Commission (“Commission”),1 PJM Interconnection, L.L.C. (“PJM”), \nsubmits this motion for leave to answer and answer to the February 20, 2026 motion for \nleave to answer and answer and January 20, 2026 Request for Clarification or, in the \nAlternative, Rehearing (the “Request”) of Constellation Energy Generation, LLC \n(“Constellation” or “Requester”)2 seeking rehearing of the Commission’s December 18 \nOrder in the above-captioned docket.3 \n \nThe Request should be denied because the requested relief is inconsistent with the \nDecember 18 Order and PJM’s existing rules specified in the Open Access Transmission \n \n1 18 C.F.R. §§ 385.212 and 385.213 (2025). \n2 PJM Interconnection, L.L.C., Motion for Leave to Answer and Answer of Constellation Energy Generation, \nLLC, Docket Nos. EL25-49-000, et al. (Feb. 20, 2026) (“February 20 Answer”); PJM Interconnection, \nL.L.C., Request for Clarification or, in the Alternative, Rehearing of Constellation Energy Generation, LLC, \nDocket Nos. EL25-49-000, et al. (Jan. 20, 2026) (“Request”). \n3 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (“December 18 Order”)."},{"page":2,"startToken":244,"endToken":660,"text":"2 \nTariff (“Tariff”).  Specifically, the Request misconstrues the “existing rules for non-firm \nexports”4 in an attempt to rebuff the requirement in the December 18 Order that a Capacity \nResource is required to relinquish its Capacity Interconnection Rights (“CIRs”) for the \nportion of the resource that is serving Co-Located Load.5  This false analogy should be \nrejected because recallable exports must still satisfy their must-offer requirement.6  The \nRequester advocates for an interpretation that would, instead, permit resources with \ncapacity commitments that also serve Co-Located Load to be treated as recallable without \nbeing required to meet the existing energy market must-offer requirement.7  Indeed, the \nRequester acknowledges that the energy offer price rules would need to be revised8 \nnotwithstanding such matter being out of scope.  The Commission should not consider such \na request upon rehearing as potential changes to energy offer price rules are not within the \nscope of this proceeding.   \nPJM further submits this answer to clarify precedent cited in the February 20 \nAnswer.9  While “electric capacity is the ability to produce [energy] when called upon,”10 \n \n4 Request at 1. \n5 The Commission’s February 20, 2025 Show Cause Order defined Co-Located Load as a “configuration \n[that] refers to end-use customer load that is physically connected to the facilities of an existing or planned \nCustomer Facility on the Interconnection Customer’s side of the Point of Interconnection to the PJM \nTransmission System.”  PJM Interconnection, L.L.C., 190 FERC ¶ 61,115, at P 3 & n.4 (2025) (“Show Cause \nOrder”); Request at 1.  \n6 PJM Interconnection, L.L.C., 139 FERC ¶ 61,057, at P 205 (2012).   \n7 February 20 Answer at 3 (debating “the requirement to offer their full [capacity] in the energy and reserves \nmarkets every day”) (quoting IMM Answer at 4); Request for Rehearing at 3 (“Constellation seeks \nclarification that the Commission did not intend to . . . insist the generation that is capable of supplying the \ngrid during a capacity performance event delist.”) (emphasis added). \n8 February 20 Answer at 4. \n9 See February 20 Answer at 2-4. \n10 PPL EnergyPlus, LLC v. Solomon, 766 F.3d 241, 247 (3d Cir. 2014) (internal citations omitted); see also \nAffirmed Energy, LLC v. FERC, No. 25-1091, Slip Op. at 42 (D.C. Cir. Feb. 10, 2026) (“Capacity is not \nactual electricity, but rather a ‘commitment to produce electricity or forgo the consumption of electricity’ in \na future delivery year.”); Cent. Hudson Gas & Elec. Corp. v. FERC, 783 F.3d 92, 98 (2d Cir. 2015) \n(continued . . .)"},{"page":3,"startToken":660,"endToken":953,"text":"3 \nit is inaccurate to say that Capacity Resources are only “called upon” to satisfy their \ncapacity obligations during emergencies under the existing rules.11  Rather, under the \nexisting market rules, committed Capacity Resources are expected to satisfy the obligations \nassociated with such commitments during the entire Delivery Year, not just during \nemergency conditions.12  Any “adjustments to the energy offer price rules to accommodate \nthe non-firm supply of co-located load from a capacity resource”13 that would change what \nmay be included in cost-based offers were not contemplated by the December 18 Order \nand are not consistent with the status quo treatment of resources with the capability to \nexport.14   \nFinally, a flawed comparison is drawn between exports to neighboring systems and \nservice to load internal to the PJM system that is not PJM-capacity backed.  These two \nscenarios are materially different.  In the case of recallable exports to neighboring systems \nsuch as the Midcontinent Independent System Operator and New York Independent \nSystem Operator, those systems have their own capacity requirements and resources; and \nthe non-firm exports are simply accomplishing the efficiencies of economic dispatch.  In \nthe case of Co-located Load internal to the PJM system, that Co-Located Load would be, \nin the Requester’s view, not capacity backed.   \nFor these reasons, the Commission was correct in its December 18th Order when it \ndetermined that service to such Co-Located Load should preclude such capacity from \n \n(“[S]uppliers sell a commitment to produce electric energy if called upon to do so during a specified future \ntime period, rather than electric energy itself.”). \n11 February 20 Answer at 2; see Request at 4. \n12 See Tariff, Attachment DD, section 6.6(a). \n13 February 20 Answer at 4. \n14 See Operating Agreement, Schedule 2, section 5."},{"page":4,"startToken":953,"endToken":1249,"text":"4 \ncontinuing to qualify as Capacity Resources in PJM’s capacity market.  Indeed, even the \nRequester admits that the existing energy market must offer requirements and energy offer \nprice rules, which are outside the scope of this proceeding, would need to be modified in \norder to allow a resource to principally serve the Co-Located Load, except only during \nemergencies, and still be a Capacity Resource.15       \nI. \nANSWER  \nA. \nCapacity Resources Cannot and Should Not Be Permitted to Receive \nCapacity Payments for Megawatts Committed to Serving Co-Located \nLoad. \n1. \nThe Commission Correctly Concluded that an Existing \nGeneration Capacity Resource Should Not Begin Serving Co-\nLocated Load that is Not Network Load Until It Has Delisted its \nCIRs for the Portion of the Generation Capacity Used to Serve \nCo-Located Loads. \nThe Commission explained in its December 18 Order that, “[i]n accordance with \nthe existing rules for removing Capacity Resource status, … an existing generating facility \nmay not begin serving Co-Located Load that is not Network Load until it has delisted its \nCIRs for the portion of the generating facility to be designated to serve any Co-Located \nLoad that is not receiving [Network Integration Transmission Service (NITS)].”16  Neither \nthe Commission’s definition for Co-Located Load nor anything in the PJM governing \ndocuments would allow a generation resource to permanently double book itself in both \nPJM’s capacity market and also as a resource that is designated to serve a Co-Located Load \nthat does not receive NITS.  The December 18 Order did not indicate that generation \nserving and being compensated by Co-Located Load arrangements should also be deemed \navailable to participate as a PJM Capacity Resource and receive capacity payments from \n \n15 February 20 Answer at 4. \n16 December 18 Order at P 230 (citing Tariff, Attachment DD, section 6.6)."},{"page":5,"startToken":1249,"endToken":1619,"text":"5 \nPJM load.  However, the Requester appears to suggest that “non-firm contract demand \ntransmission service” implicitly allows for continued capacity market participation.17  \nTransmission service products and PJM’s capacity product are separate and distinct.  \nNothing in the creation of any type of interruptible transmission service to internal load \nleads to changing the requirements for a generation facility to qualify and participate as a \nCapacity Resource.  The Commission should not advance such a novel and post hoc \nproduct in response to the Request. \n2. \nCapacity \nResources \nMust \nSatisfy \ntheir \nMust-Offer \nRequirement, and Neither the December 18 Order nor the \nCurrent Rules Contemplate Adjusting the Must-Offer \nRequirement Based Upon Service to Non-Capacity Backed Co-\nLocated Load within the PJM System. \nThe Requester asserts that it will not be selling capacity twice because the \ngenerator’s capacity would be sold only once—to PJM—and that arguments to the contrary \nconflate energy and capacity.18  It is true that “[e]lectric energy is the actual electricity that \nelectric generators produce and which residential and business customers ultimately use.  \nBy contrast, electric capacity is the ability to produce [energy] when called upon.”19  The \nRequest, however, misapplies this precept to PJM’s capacity market design.   \nThat is, the Request’s arguments are premised on the argument that capacity must \nonly be available for a few emergency hours per year to avoid Performance Assessment \n \n17 Request at 1, 4. \n18 February 20 Answer at 2; see PJM Interconnection, L.L.C., Answer and Motion for Leave to Answer of \nthe Independent Market Monitor for PJM, Docket Nos. EL25-49-000, et al., at 4 (Feb. 5, 2026) (“Market \nMonitor’s Answer”). \n19 PPL EnergyPlus, LLC v. Solomon, 766 F.3d 241, 247 (3d Cir. 2014) (internal citations omitted); see also \nAffirmed Energy, LLC v. FERC, No. 25-1091, Slip Op. at 42 (D.C. Cir. Feb. 10, 2026) (“Capacity is not \nactual electricity, but rather a ‘commitment to produce electricity or forgo the consumption of electricity’ in \na future delivery year.”); Cent. Hudson Gas & Elec. Corp. v. FERC, 783 F.3d 92, 98 (2d Cir. 2015) \n(“[S]uppliers sell a commitment to produce electric energy if called upon to do so during a specified future \ntime period, rather than electric energy itself.”)."},{"page":6,"startToken":1619,"endToken":1944,"text":"6 \nIntervals and charges.20  That is incorrect.  Under the current Reliability Pricing Model \n(“RPM”) rules, capacity represents a resource’s availability to be called upon and provide \ncapacity every day of the Delivery Year, not just for those few emergency hours which \nmay occur.21  Load does not pay for annual capacity obligations only for emergency hours.  \nRather, the obligations of a committed Capacity Resource include the requirement to make \nsuch resource available to PJM throughout the relevant Delivery Year.22  Otherwise, a \nresource’s commitment to provide capacity would not actually support or correlate with \nthe resource adequacy needs of the PJM Region throughout the Delivery Year.  In short, \nthe obligations of a committed Capacity Resource throughout the associated Delivery Year \nare incompatible with having a resource’s daily output permanently committed to non-\nNetwork Load. \nIt is true that the “must-offer requirement, when implemented, should not impede \nresources from exporting energy on a non-firm or recallable basis, i.e., that the must-offer \nrequirement will not operate in [a] manner that requires the resource to sit idle.”23  But this \nstatement does not mean that a must-offer requirement cannot be imposed on a recallable \nresource.  Rather, it means that recallable resources that are able to meet their must-offer \nrequirement should not be excluded.  This statement is a caveat to the Commission’s \ndirective that PJM require “non-emergency generation capacity resources to submit offers \nfor” reserves by clarifying that resources that have met their must-offer requirement but \nhaven’t been committed in the Day-ahead Energy Market as reserves should not be \n \n20 See February 20 Answer at 3; Request for Rehearing at 3; see also Market Monitor’s Answer at 4. \n21 Reliability Assurance Agreement (“RAA”), Article 1, Definitions; RAA, Schedule 8; see Tariff, \nAttachment DD, section 6.6(a); Tariff, Attachment DD, section 8.2. \n22 Operating Agreement, Schedule 1, section 1.10.1A(d). \n23 PJM Interconnection, L.L.C., 139 FERC ¶ 61,057, at P 205 (2012)."},{"page":7,"startToken":1944,"endToken":2258,"text":"7 \nprohibited from exporting energy such that they would otherwise be required to “sit idle.”24  \nThe Requester instead contemplates a hypothetical resource in a Co-Located Load \narrangement which (1) would not meet the hourly must-offer requirement, and (2) would \nnot “sit idle,” as it would be serving Co-Located Load.25    \nBy contrast, a generation resource serving Co-Located Load within the PJM \nfootprint is not similarly situated to a generation resource exporting that energy for a \nlimited duration.  Co-Located Load arrangements are likely to be for extended multi-year \ncontracts as the load and attendant infrastructure are being built for that purpose.  \nAccordingly, the Request seeks a determination that is inconsistent with the Tariff and the \nCommission’s longstanding reliance on markets to provide just and reasonable rates and \nwould significantly disrupt PJM markets.  As such, the Request should be denied. \nII. \nMOTION FOR LEAVE TO ANSWER \nAlthough the Commission’s rules do not generally permit answers to requests for \nrehearing,26 the Commission will accept such an answer where, as here, it assists the \nCommission in its decision-making process.27  PJM therefore respectfully requests that the \nCommission grant leave and accept this answer. \nIII. \nCONCLUSION \n \nFor the reasons stated above, PJM requests that the Commission reject the Request. \n \n \n24 Id. (noting that such requirements were “consistent with the existing obligation for capacity resources to \noffer energy from all their capacity to the PJM day-ahead energy market”). \n25 Id. (explaining that the Commission’s concern was specifically that PJM not implement the must-offer \nrequirement such that it would operate in a “manner that requires the resource to sit idle”). \n26 18 C.F.R. § 385.713(d).  \n27  See, e.g., Appalachian Power Co., 161 FERC ¶ 61,070, at P 15 (2017); Columbia Gas Transmission, LLC, \n146 FERC ¶ 61,116, at P 1 n.3 (2014); New England Power Pool, 109 FERC ¶ 61,252, at P 12 (2004)."},{"page":8,"startToken":2258,"endToken":2334,"text":"8 \nRespectfully submitted,  \n              \n \n \n \n \n  /s/ Daniel Vinnik  \n \nCraig Glazer \nVice President – Federal Government \nPolicy \nPJM Interconnection, L.L.C. \n1200 G Street, NW, Suite 600 \nWashington, DC 20005 \n(202) 423-4743 (phone) \n(202) 393-7741(fax) \ncraig.glazer@pjm.com \n \nDaniel Vinnik \nCounsel \nPJM Interconnection, L.L.C. \n2750 Monroe Blvd. \nAudubon, PA* 19403 \n(*Licensed in the District of \nColumbia and Illinois) \n(267) 858-9451 (phone) \ndaniel.vinnik@pjm.com \n \nMarch 9, 2026 \n \nCounsel for \nPJM Interconnection, L.L.C."},{"page":9,"startToken":2334,"endToken":2399,"text":"CERTIFICATE OF SERVICE \n \n \nI hereby certify that I have this day, March 9, 2026, served the foregoing document \nupon each person designated on the official service lists compiled by the Secretary in this \nproceeding. \n/s/ Daniel Vinnik \nDaniel Vinnik \nCounsel \nPJM Interconnection, L.L.C. \n2750 Monroe Blvd. \nAudubon, PA 19403 \n(267) 858-9451 (phone) \ndaniel.vinnik@pjm.com \n \nAttorney for  \nPJM Interconnection, L.L.C."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":4,"endAt":418,"startToken":0,"endToken":1018},{"p":4,"at":418,"title":"I. ANSWER","method":"printed heading","endPage":4,"endAt":431,"startToken":1018,"endToken":1020},{"p":4,"at":431,"title":"A. Capacity Resources Cannot and Should Not Be Permitted to Receive","method":"printed heading","endPage":7,"endAt":933,"startToken":1020,"endToken":2083},{"p":7,"at":933,"title":"II. MOTION FOR LEAVE TO ANSWER","method":"printed heading","endPage":7,"endAt":1274,"startToken":2083,"endToken":2135},{"p":7,"at":1274,"title":"III. CONCLUSION","method":"printed heading","endPage":9,"endAt":0,"startToken":2135,"endToken":2334},{"p":9,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":9,"endAt":420,"startToken":2334,"endToken":2399}]}