{"document":{"slug":"rec-20260316-5207","title":"Protest and Comments of Eastman Chemical Company on PJM Interconnection, L.L.C.'s 60- day compliance filing submitted on 02/23/2026","issued":"2026-03-16","accession":"20260316-5207","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"EASTMAN CHEMICAL COMPANY","kind":"protest","file":"sources/filings/text/20260316-5207_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5207","tier":"record","sha256":"bb93bf17f8aa929a7e25d8adee39a6c6987973714e9a5853e5ee25da64606515","pages":9,"tokens":2099,"emptyPages":[],"textThemes":["colo"]},"pages":[{"page":1,"startToken":0,"endToken":195,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., \n \n \n) \nDocket No. ER26-1479-000 \n60-Day Compliance Filing for  \n \n) \nCo-Located Load Related Revisions to  \n) \nOpen Access Transmission Tariff to  \n) \nComply with Commission Order in  \n) \nDocket No. EL25-49, et al. \n \n \n) \n \nPROTEST AND COMMENTS OF EASTMAN CHEMICAL COMPANY \n \n \nPursuant to Rule 211 of the Rules of Practice and Procedure of the Federal \nEnergy Regulatory Commission (FERC or Commission), 18 C.F.R. § 385.211 (2025), \nEastman Chemical Company (Eastman) submits this protest and comments on the 60-\nday compliance filing that PJM Interconnection, L.L.C. (PJM) submitted to FERC on \nFebruary 23, 2026 (Compliance Filing). For the reasons set forth herein, the \nCommission should deny portions of the Compliance Filing because they do not \ncomport with the Commission’s specific directives in the Order1 and would result in \neconomic harm to Eastman. \nI. \nBACKGROUND \nA. \nEastman’s Kingsport Facility \n \nEastman is an industrial products manufacturer located in Kingsport, Tennessee, \nwith significant on-site generation at its facilities in Kingsport (Kingsport facilities). \nThe on-site generation facilities carry a name-plate capacity of 194 MW, with \n \n1 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (Order)."},{"page":2,"startToken":195,"endToken":464,"text":"2 \ngeneration facilities installed in phases from 1929 through 1994. Eastman has had an \ninterconnection to the grid through Kingsport Power Company d/b/a American Electric \nPower Company (Kingsport Power) since the mid-1970s.  \n \nWhile the Kingsport facility requires a significant amount of energy to fulfill its \nproduction targets, the bulk of the electricity and steam for industrial processes are \nproduced onsite at the Kingsport facility, on an as needed basis, by relying on a tightly \ncoupled generator-steam network. Eastman purchases only a relatively small amount \nof electricity (9 MWe on average) from Kingsport Power.2  \n \nEastman has been operating under its current service agreement with Kingsport \nPower since July 1, 1998. This service agreement was subject to a one-year term and \nhas rolled over year to year under the terms of the agreement. As part of this service \nagreement, Kingsport Power has agreed to provide Eastman back-up power and surplus \npower. Eastman pays charges for both of these services. For almost 50 years, Eastman \nhas relied on its interconnection with Kingsport Power, and for at least the past 28 years \non this service agreement and the commensurate netting provisions to ensure that its \nenergy costs remain economically reasonable at the Kingsport facility. \n \nAdditionally, due to the configuration of its tightly coupled generator-steam \ncombined heat and power network (comprised of 17 boilers—6 coal and 11 natural \ngas—and 19 turbine generators), Eastman is never able to pull the full load of power \n \n2 See “Integrated Energy System Investigation for the Eastman Chemical \nCompany,” Oak Ridge National Laboratory, at 9, \nhttps://www.osti.gov/servlets/purl/1643929 (May 2020)."},{"page":3,"startToken":464,"endToken":696,"text":"3 \nfrom the grid.3 Approximately 90 percent of the energy produced by Eastman’s network \nis in the form of steam to satisfy the thermal demand of the facility’s chemical \nmanufacturing units. If Eastman’s on-site generation of steam and electricity is \nsubstantially reduced, Eastman’s chemical manufacturing units are derated and shut \ndown due to a lack of steam, and Eastman’s electric load is reduced proportionally. \nB. \nCommission Order \n \nIn the Order, the Commission required PJM to implement considerable changes \nto the “behind the meter generation” (BTMG) rules to eliminate the netting approach \nthat allows BTMG network customers to pay for the services they use from PJM. As \nrelevant to this protest, FERC directed PJM “to propose a new MW threshold for the \namount of load at a particular electrical location that Network Customers may net by \nusing BTMG.”4 In addition, FERC directed PJM to revise its Tariff to “grandfather \nentities with existing contracts for the specific purpose of effectuating a BTMG \narrangement for the current term remaining under the existing contract.”5 FERC also \ndirected PJM to allow for a three-year transition period for those retail BTMG facilities \nto shift to the new services that FERC directed PJM to create. \nC. \nPJM Compliance Filing \n \nIn the Compliance Filing, PJM proposed the following definition for “Retail \nBehind The Meter Generation”: \n \n3 Id. \n4 Order at P 221. \n5 Id. at P 224."},{"page":4,"startToken":696,"endToken":1064,"text":"4 \nBehind The Meter Generation that is used to serve a retail load served by \na Network Customer located at the same electrical location, where such \ngeneration has a cumulative nameplate rating of no greater than 50 MW \n(not including back-up generation at the same electrical location as the \nretail load that can only be used to serve such retail load during conditions \nthat may threaten the integrity or reliability of the PJM Region or the \nregional power system). Notwithstanding the foregoing and for a \ntransition period through December 18, 2028, Retail Behind The Meter \nGeneration includes any generation with a cumulative nameplate rating \ngreater than 50 MW used to serve a retail load served by a Network \nCustomer to net load prior to December 18, 2025. Provided further, Retail \nBehind The Meter Generation includes any generation used to serve a \nretail load served by a Network Customer to net load if it is the subject of \na contractual arrangement (including but not limited to a bilateral \nagreement or interconnection agreement) that was in effect as of \nDecember 18, 2025 through the end of the term of such agreement, which \nmay be renewed or extended per the terms of such agreement. Further, \nRetail Behind The Meter Generation also includes any generation with a \ncumulative nameplate rating greater than 50 MW used to serve a retail \nload served by a Network Customer to net load that, as of December 18, \n2025, was a Qualifying Facility consistent with the requirements of the \nPublic Utility Regulatory Policies Act of 1978, as amended, and its \nimplementing regulations. Any facility that qualifies as Retail Behind \nThe Meter Generation shall be excluded from Co-Located Load \nconfigurations. \nUnder PJM’s proposed definition of “retail behind the meter generation,” Eastman’s \nKingsport facility would likely qualify under the three-year transition period, and \nthereafter, under the grandfathering provision. \nII. \nPROTEST \n \nEastman protests the Compliance Filing because the proposed threshold ignores \nthe operational realities of industrial plant BTMG facilities; the proposed threshold is \ntoo low; and because the proposed threshold is “all or nothing.” In addition, Eastman \ncomments on the proposed grandfathering and seeks clarification that grandfathering \nshould apply to the facilities that are operating under a currently effective BTMG"},{"page":5,"startToken":1064,"endToken":1315,"text":"5 \nservice agreement, rather than simply the existing service agreement (as renewed or \nextended). \n \nFirst, the proposed BTMG changes ignore the operational realities of a facility \nlike Eastman’s Kingsport facility. The Commission acknowledged that not all loads \nusing BTMG are large loads that create reliability and resource adequacy risks that the \nCommission described in the Order.6 The Kingsport facility is a BTMG load that does \nnot create reliability and resources adequacy risks because the Kingsport facility uses \nthe electric generation at its facilities not only to provide electric power to the facilities, \nbut also to generate steam necessary for the industrial processes that take place within \nthe facilities. If the Kingsport facility is unable to generate power, it is unable to \ngenerate steam, which reduces the industrial output at the facility along with reducing \nthe need for additive power from the grid. Thus, the limited times when the Kingsport \nfacility would have the greatest need for additional power (i.e., when its generators are \nrunning at full capacity) are the times when the grid is most likely able to provide \nadditional power – which Eastman pays for through its service agreement with \nKingsport power. In contrast, in periods of grid distress, the Kingsport facility is more \nlikely to support the grid through using its own BTMG to power the Kingsport facility \nthan it is to create operational constraints for the grid. Accordingly, PJM and FERC \nshould recognize the importance that industrial BTMG facilities have in maintaining \n \n6 Order at P 221."},{"page":6,"startToken":1315,"endToken":1584,"text":"6 \nthe stability of the grid by maintaining BTMG netting for facilities like the Eastman \nKingsport facility, not through punishing them to make uneconomic choices. \n \nSecond, if FERC and PJM do not maintain netting for BTMG facilities like the \nKingsport facility because of their operating realities, FERC must require PJM to \nimplement a threshold of at least 200 MW on a permanent basis. The nameplate \ncapacity of the generation at the Kingsport facility is 194 MW. However, the Kingsport \nfacility cannot pull that amount through its interconnection with Kingsport Power, nor \ncould it operate solely on electrical power delivered from the grid. Yet the Kingsport \nfacility has been able to operate its BTMG facilities reliably and without creating \nreliability and resource adequacy risks on the grid. This is largely due to the incentives \nthat BTMG netting provides to industrial facilities like the Kingsport facility to operate \ntheir generation in a manner that ensures that BTMG is available when the grid is \nconstrained (e.g., maintenance is planned for non-critical periods). Imposing an \narbitrarily low threshold eliminates the netting benefits for those BTMG facilities that \nexceed the threshold and eliminates the grid benefits that those BTMG facilities have \nprovided. In addition, the proposed threshold would remove the economic benefits that \nEastman has relied on to continue operating its BTMG at the Kingsport facilities – i.e., \nthe arbitrarily low threshold renders Eastman’s BTMG uneconomic after almost 28 \nyears of operations. By implementing a 200 MW threshold, FERC and PJM will ensure \nthat BTMG facilities, like the Kingsport facility, which has supported the grid for many \ndecades, are able to operate economically."},{"page":7,"startToken":1584,"endToken":1857,"text":"7 \n \nThird, the Commission must reject PJM’s proposed “all or nothing” approach to \nthe MW threshold. In the Order, FERC directed PJM to create a MW threshold for the \namount of load that Network Customers may net by using BTMG.7 Said differently, \nFERC directed PJM to allow for netting up to a certain level, such that all BTMG \nfacilities would continue to receive some benefits of BTMG. There is nothing just and \nreasonable regarding PJM’s proposal to allow a facility with nameplate generation \ncapacity of 50 MW to net all of its BTMG, but a facility with nameplate generation \ncapacity of 51 MW to net none of its BTMG. FERC should deny the proposed threshold \nlimitations that PJM has proposed and require PJM to submit a revised compliance \nfiling that allows for all BTMG to net up to the threshold level. \n \nFinally, Eastman requests the Commission to clarify that the PJM grandfathering \nprovision would apply to the facilities rather than simply the service agreement. As \ncrafted, the PJM proposal would unnecessarily impede the ability of the BTMG \noperator to amend or modify an existing agreement to better reflect the then-current \noperational realities of BTMG facilities. For example, facilities could be modified to \nbecome more efficient such that an existing agreement should be modified to reflect \nlower electrical energy needs. As drafted, the PJM proposal would no longer allow for \nthose BTMG facilities to be grandfathered because the existing service agreement had \nbeen modified. In short, attaching grandfathering to the BTMG facilities (and capping \ntheir ability to net at the current nameplate capacity) would ensure that BTMG operators \n \n7 Order at P 221."},{"page":8,"startToken":1857,"endToken":2011,"text":"8 \ncan continue to operate their facilities in the most economically efficient manner \npossible without concern over losing grandfathering rights. \n \nFor the foregoing reasons, the Commission should require PJM to continue to \nallow BTMG facilities like the Kingsport facility to net. Alternatively, the Commission \nshould require PJM to increase the MW threshold to 200 MW on a permanent basis and \nallow for netting at any BTMG facility up to the MW threshold. Finally, the \nCommission should require PJM to attach grandfathering to the BTMG facility with a \ncurrently effective service agreement rather than the term of the existing service \nagreement as extended. \nRespectfully submitted, \nBy:   /s/ John Paul Floom \nJohn Paul Floom \n(571) 842-8185 \njpf@floomenergylaw.com \nKaci W. Poor \n(571) 842-8189 \nkwp@floomenergylaw.com \nEmma M. Ross \n(571) 842-8187 \nemr@floomenergylaw.com \nFloom Energy Law PLLC \n3100 Clarendon Blvd. \nSuite 920 \nArlington, VA 22201 \n \nAttorneys for \nDated:  March 16, 2026 \n \n \nEastman Chemical Company"},{"page":9,"startToken":2011,"endToken":2099,"text":"CERTIFICATE OF SERVICE \n \n \nPursuant to Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 \nC.F.R. § 385.2010 (2025), I hereby certify that I have this day served a copy of the \nforegoing document upon each person designated on the official service list compiled \nby the Secretary in this proceeding. \n \nDated at Arlington, Virginia, this 16th day of March 2026. \n \nBy:   /s/ John Paul Floom \nJohn Paul Floom \nFloom Energy Law PLLC \n3100 Clarendon Blvd., Suite 920 \nArlington, VA 22201 \n(571) 842-8185 \njpf@floomenergylaw.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":979,"startToken":0,"endToken":144},{"p":1,"at":979,"title":"I. BACKGROUND","method":"printed heading","endPage":1,"endAt":995,"startToken":144,"endToken":146},{"p":1,"at":995,"title":"A. Eastman’s Kingsport Facility","method":"printed heading","endPage":3,"endAt":422,"startToken":146,"endToken":529},{"p":3,"at":422,"title":"B. Commission Order","method":"printed heading","endPage":3,"endAt":1265,"startToken":529,"endToken":665},{"p":3,"at":1265,"title":"C. PJM Compliance Filing","method":"printed heading","endPage":4,"endAt":1945,"startToken":665,"endToken":1003},{"p":4,"at":1945,"title":"II. PROTEST","method":"printed heading","endPage":9,"endAt":0,"startToken":1003,"endToken":2011},{"p":9,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":9,"endAt":540,"startToken":2011,"endToken":2099}]}
