{"document":{"slug":"rec-20260316-5220","title":"Comments of Digital Power Network on the 02/23/2026 compliance filing submitted by PJM Interconnection, L.L.C","issued":"2026-03-16","accession":"20260316-5220","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Digital Power Network","kind":"comments","file":"sources/filings/text/20260316-5220_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5220","tier":"record","sha256":"92727e823e0bfeed92cad5e386d1998b542362b16bc21f9f6ae3581187347a9f","pages":7,"tokens":2284,"emptyPages":[],"textThemes":["flex","colo","study"]},"pages":[{"page":1,"startToken":0,"endToken":347,"text":"March 16, 2026 \n \nHonorable Debbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, NE, Room 1A \nWashington, DC 20426 \n \nRe: Comments of the Digital Power Network on PJM Interconnection, L.L.C., Docket \nNo. ER26-1479-000 \n \nDear Secretary Reese, \nPursuant to Rule 211 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission (“Commission” or “FERC”), 18 C.F.R. § 385.211, the Digital Power \nNetwork (“DPN”) respectfully submits these comments on the February 23, 2026 \ncompliance filing submitted by PJM Interconnection, L.L.C. (“PJM”) in the above-captioned \nproceeding.1 \nDPN, an affiliate of the Digital Chamber, is the largest coalition of Bitcoin miners and digital \ninfrastructure providers, representing over 80% of the U.S. public Bitcoin mining hashrate, \nwith a significant compute presence in the PJM region that is increasingly evaluating co-\nlocated and behind-the-meter configurations. PJM’s February 23 compliance filing is \ntherefore of substantial importance to DPN’s membership. As PJM explains, the filing was \nsubmitted pursuant to section 206 of the Federal Power Act in response to the \nCommission’s December 18, 2025 Order in Docket No. EL25-49, et al., which directed PJM \nto revise its behind-the-meter generation tariff provisions, establish new transmission \nservice pathways for co-located load, and revise its necessary studies process.2 \nDPN appreciates the Commission’s and PJM’s efforts to bring greater clarity to the \ntreatment of co-located load arrangements. Greater tariff specificity is needed. At the same \ntime, the Commission should ensure that PJM’s compliance revisions do not inadvertently \neliminate the operational flexibility that makes many emerging large loads valuable to the \ngrid. Flexible loads, including many Bitcoin mining facilities, can rapidly curtail, respond to \nsystem conditions, and participate in demand response and related reliability-supporting \n \n1 PJM Interconnection, L.L.C., Compliance Filing in Response to Order in Docket No. EL25-49, et al., Docket \nNo. ER26-1479-000, at 1 (filed Feb. 23, 2026) (“Feb. 23 Compliance Filing”); see also PJM Interconnection, \nL.L.C., 193 FERC ¶ 61,217, at 2-4, 70-71, 112-114 (2025) (“December 18 Order”). \n2 Feb. 23 Compliance Filing at 1-3; December 18 Order at 2."},{"page":2,"startToken":347,"endToken":694,"text":"programs. The final framework should preserve incentives and financial certainty for those \ncharacteristics rather than force such resources into rigid service constructs through solely \nfocusing on reliability services over financial viability. \n \nI. BACKGROUND \nOn February 23, 2026, PJM submitted tariff revisions to comply with the Commission’s \nDecember 18, 2025 Order in Docket No. EL25-49, et al.3 PJM states that the filing \naddresses three principal matters: revisions to retail behind-the-meter generation (“Retail \nBTMG”), the establishment of new transmission services for eligible customers taking \nservice on behalf of co-located load, and revisions to the necessary studies process for \nexisting interconnection customers seeking to serve co-located load.4 PJM further explains \nthat the filing is paired with a separate initial brief concerning the rates, terms, and \nconditions associated with those new transmission services.5 \nAs relevant here, PJM’s filing proposes a new definition of Retail Behind-the-Meter \nGeneration that would impose a 50 MW materiality threshold for new Retail BTMG, subject \nto transition and legacy treatment for certain existing arrangements.6 PJM also proposes \nthat facilities qualifying as Retail BTMG would be excluded from co-located load \nconfigurations.7 \nPJM further proposes new service pathways for co-located load, including Interim Network \nIntegration Transmission Service (“Interim NITS”), Firm Contract Demand Transmission \nService, and Non-Firm Contract Demand Transmission Service.8 PJM explains that Interim \nNITS would allow an eligible customer seeking NITS for co-located load to receive service on \na non-firm, interruptible basis while required network upgrades are completed.9 Further, \nPJM noted that certain arrangements may subject generators to capacity interconnection \nright (CIR) delisting.10  \nDPN agrees that tariff clarity and more pathways for load flexibility are needed. But the \nCommission should ensure that PJM’s compliance revisions do not reduce the economic \nincentives for flexible large loads to curtail and hinder new generation deployment. \n \nII. COMMENTS \n \n3 Feb. 23 Compliance Filing at 1-3. \n4 Id. at 1-3. \n5 Id. at 2-3. \n6 Id. at 7-9. \n7 Id. at 7. \n8 Id. at 1-3; December 18 Order at 2-4, 96-103. \n9 December 18 Order at 96-97. \n10 Feb. 23 Compliance Filing at 26"},{"page":3,"startToken":694,"endToken":1123,"text":"A. The Commission should ensure that PJM’s new co-located load transmission service \nframework preserves the operational flexibility of flexible loads. \nPJM’s proposal to create formal service pathways for co-located load is an important step \ntoward providing the certainty that project developers need. For years, the lack of clear tariff \ntreatment for co-located load arrangements has created uncertainty for generators and \nlarge loads seeking to develop innovative on-site configurations. DPN therefore supports the \nCommission’s effort to require PJM to establish defined service options for co-located load \nand maximize current grid use.11  \nHowever, the Commission should also ensure that these new service pathways do not come \nat the expense of the flexibility that makes certain large loads valuable to the system. Many \nDPN members, including Bitcoin mining facilities, are large flexible loads that often exceed \n50 MW and can respond rapidly to grid conditions. Their ability to curtail load, manage \noperations dynamically, and participate in demand response is central both to their business \nmodel and to the reliability value they can provide to the grid. The final tariff should \ntherefore preserve, rather than diminish, these capabilities. \nIn particular, the Commission should ensure that the final framework does not unnecessarily \nundermine the economic and operational value of generators paired with flexible co-located \nload. PJM’s proposed necessary studies and interconnection revisions contemplate that \nserving co-located load may require reductions in Capacity Interconnection Rights (“CIRs”).12 \nDPN is concerned that, absent further clarification, those requirements and the structure of \nthe new service pathways could reduce the incentives for flexible load projects to preserve \ncurtailment-capable operating models that benefit the grid. \nMore broadly, DPN is concerned that the service constructs proposed here, while \ndirectionally responsive to the Commission’s order, impose uncertainty regarding the \neconomic viability for flexible loads to partake in non-firm or load-flexible operation models, \neither through firm or non-firm contract demand services. The Commission should ensure \nthat PJM’s compliance framework does not unintentionally limit benefits from demand \nresponse options that are integral to many loads’ operating models and reduce system \nstress. \n \nB. The Commission should ensure that the final framework continues to support demand \nresponse and other reliability-enhancing behavior by flexible loads. \nFlexible loads do not merely consume electricity; they can also support reliability when \nmarket rules and tariff structures preserve the incentives to do so. Many Bitcoin mining \nfacilities curtail during periods of grid stress and can function as highly responsive demand-\nside resources. That operational flexibility can reduce system strain, particularly during \n \n11 December 18 Order at 2-4. \n12 December 18 Order at 109-112; Feb. 23 Compliance Filing at 24-28."},{"page":4,"startToken":1123,"endToken":1530,"text":"periods of high demand or transmission congestion. However, it is crucial to recognize that \nthis flexibility is largely due to the price-sensitive nature of mining operations, in addition to \ntheir interruptibility, making the financial benefits of demand response critical.   \nThe concern for DPN is that overhauling the existing co-location framework may risk \nminimizing the benefits of operational flexibility associated with demand response. If the \nCommission adopts a framework that reduces the ability of flexible loads and their paired \ngenerators to maintain the economic attributes that make curtailment rational, the result \nmay be less, not more, operational flexibility on the system. \nAccordingly, the Commission should clarify that PJM’s compliance revisions must be \nimplemented in a manner that preserves appropriate opportunities for flexible loads to \nparticipate in demand response and other reliability-supporting arrangements as both a \nbusiness and reliability activity, consistent with the technical capabilities of those resources \nand the applicable market rules.  \n \nC. The Commission should require further consideration of PJM’s proposed 50 MW cap on \nnew Retail BTMG. \nDPN is also concerned with PJM’s proposed new 50 MW threshold for Retail BTMG. PJM \nexplains that, under its proposed definition, new Retail BTMG would be limited to facilities \nwith a cumulative nameplate rating of no greater than 50 MW, excluding certain qualifying \nbackup generation, and that facilities qualifying as Retail BTMG would be excluded from co-\nlocated load configurations.13 \nThat proposal may be too restrictive for many digital infrastructure projects. Many digital \ninfrastructure developments operate at scales well above 50 MW. For those projects, \nbehind-the-meter configurations can provide a viable pathway to speed-to-power, particularly \nwhere developers seek to pair load with generation at existing industrial sites, brownfields, \nor other locations with legacy infrastructure. A categorical 50 MW threshold risks foreclosing \nthat pathway for a substantial segment of large computing infrastructure development in the \nPJM region, through imposing additional barriers to utilization. \nDPN recognizes that the Commission directed PJM to establish a materiality threshold for \nRetail BTMG and that PJM has attempted to implement that directive in a clear and \nadministrable manner. But the Commission should carefully consider whether PJM’s \nproposed threshold is broader than necessary to address the concerns identified in the \nunderlying section 206 proceeding.14 In particular, the final framework should not eliminate \npractical development pathways for large loads without a sufficiently developed record \nshowing that such a restrictive threshold is necessary. \n \n13 Feb. 23 Compliance Filing at 7-9. \n14 December 18 Order at 108-10."},{"page":5,"startToken":1530,"endToken":1961,"text":"DPN also urges the Commission to further consider whether a higher interim threshold \nwould be more appropriate given present market conditions. As PJM itself notes in its filing, \nparties in the underlying proceeding argued that a higher threshold, such as 200 MW, could \nbetter preserve existing investments while the region develops additional information about \nthe scale and impacts of large load growth.15 To the extent the Commission finds that \nadditional transition or refinement is warranted, a higher interim threshold would be more \nconsistent with current uncertainty regarding large load growth and could avoid prematurely \nforcing projects into less workable frameworks. \n \nD. The Commission should not require projects to rely on a framework that may compound \nPJM’s already significant queue and study delays without greater justification. \nDPN is particularly concerned that PJM’s proposed treatment of large BTMG resources \nabove 50 MW may force more projects into interconnection and study pathways at a time \nwhen PJM’s interconnection queue and associated study timelines remain a major barrier to \ninfrastructure deployment. PJM’s filing confirms that existing interconnection customers \nseeking to serve co-located load will be subject to the necessary studies process and may \nneed to enter superseding Generator Interconnection Agreements reflecting study results \nand facility modifications.16 \nThe Commission has explained that these reforms are intended to address reliability and \nresource adequacy concerns.17 DPN does not dispute the importance of those objectives. \nBut it is equally important to recognize that load forecasting for emerging large load sectors \nremains highly uncertain. Load modeling in this area is still developing, and forecasts can \nfluctuate materially as technologies, project timelines, and market conditions evolve. In that \nenvironment, a framework that categorically channels a larger set of projects into already-\nburdened study and queue processes may be premature, particularly where the underlying \nforecast assumptions remain unsettled. \nFor many projects, the practical effect of the 50 MW cap will be to eliminate a potentially \nviable behind-the-meter pathway and require reliance on co-located load or broader \ninterconnection processes that are already slow and resource-intensive. The Commission \nshould not assume that this shift is costless. For fast-moving computing infrastructure \nprojects, delay itself can determine whether development occurs in PJM or elsewhere. The \nCommission should therefore require PJM to better justify why 50 MW is the appropriate \nthreshold at this stage and whether a higher threshold, at least on an interim basis, would \nbetter accommodate current uncertainty while PJM and the Commission continue to refine \ntheir understanding of large load impacts. \n \n \n15 Feb. 23 Compliance Filing at 12-13. \n16 Feb. 23 Compliance Filing at 24-30. \n17 December 18 Order at 6-8."},{"page":6,"startToken":1961,"endToken":2276,"text":"III. CONCLUSION \nDPN appreciates that PJM’s filing creates a clearer framework than the status quo. Formal \nservice pathways for co-located load, recognition of non-firm service options, grandfathering \nfor certain legacy BTMG arrangements, and the exclusion of certain backup generation from \nthe 50 MW threshold all reflect an effort to respond to the Commission’s directives in a \npractical manner.18 These features may create useful pathways for some projects, \nparticularly those capable of operating under non-firm or curtailment-based arrangements. \nNonetheless, the Commission should not treat the existence of a more formal framework as \nsufficient in itself. The question in this compliance proceeding is whether PJM’s revisions are \njust, reasonable, and workable as applied to the broad range of large load configurations \nthat will increasingly seek to interconnect and operate in PJM. On that question, DPN \nrespectfully submits that the Commission should require further refinement. \nAt minimum, the Commission should require PJM to: (1) clarify that the new co-located load \nservice framework will preserve meaningful opportunities for flexible loads to participate in \nadequately incentivized demand response and related reliability-supporting arrangements; \n(2) further justify or revisit the proposed 50 MW threshold for new Retail BTMG, including \nconsideration of a higher interim threshold; and (3) ensure that implementation of the new \nframework does not unnecessarily exacerbate queue-related delays or foreclose \ncommercially viable pathways for large flexible loads and data centers seeking timely \ndeployment in PJM. \nDPN respectfully requests that the Commission accept PJM’s compliance filing only to the \nextent it provides needed tariff clarity, while requiring further clarification and modification \nto ensure that the final framework preserves the operational flexibility of large flexible loads, \nmaintains appropriate incentives for demand response and reliability-supporting behavior, \nand does not unnecessarily restrict viable behind-the-meter and co-located development \npathways for Bitcoin mining, AI infrastructure, and other large computing facilities in the PJM \nregion. \n \nRespectfully submitted, \n  \nZunera Mazhar \n \n18 Feb. 23 Compliance Filing at 7-17."},{"page":7,"startToken":2276,"endToken":2284,"text":"Head of Policy & Government Affairs \nDIGITAL POWER NETWORK"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":249,"startToken":0,"endToken":378},{"p":2,"at":249,"title":"I. BACKGROUND","method":"printed heading","endPage":2,"endAt":2137,"startToken":378,"endToken":646},{"p":2,"at":2137,"title":"II. COMMENTS","method":"printed heading","endPage":3,"endAt":0,"startToken":646,"endToken":694},{"p":3,"at":0,"title":"A. The Commission should ensure that PJM’s new co-located load transmission service","method":"printed heading","endPage":3,"endAt":2413,"startToken":694,"endToken":1032},{"p":3,"at":2413,"title":"B. The Commission should ensure that the final framework continues to support demand","method":"printed heading","endPage":4,"endAt":1096,"startToken":1032,"endToken":1274},{"p":4,"at":1096,"title":"C. The Commission should require further consideration of PJM’s proposed 50 MW cap on","method":"printed heading","endPage":5,"endAt":689,"startToken":1274,"endToken":1631},{"p":5,"at":689,"title":"D. The Commission should not require projects to rely on a framework that may compound","method":"printed heading","endPage":6,"endAt":0,"startToken":1631,"endToken":1961},{"p":6,"at":0,"title":"III. CONCLUSION","method":"printed heading","endPage":7,"endAt":58,"startToken":1961,"endToken":2284}]}
