{"document":{"slug":"rec-20260316-5254","title":"Comments of Invenergy Renewables LLC et al. in response to PJM Interconnection, L.L.C.’s Initial Brief in the Order to Show Cause Proceeding and Compliance…","issued":"2026-03-16","accession":"20260316-5254","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Invenergy Renewables LLCInvenergy Thermal LLC","kind":"comments","file":"sources/filings/text/20260316-5254_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5254","tier":"record","sha256":"85c10d3f66bfb3a222f3b7f45f67d84bcace17d50a31c1f61137a02f581f11f3","pages":8,"tokens":2075,"emptyPages":[],"textThemes":["colo","study","cost"]},"pages":[{"page":1,"startToken":0,"endToken":238,"text":"1 \n \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \nPJM Interconnection, L.L.C., et al. \n \n) \nDocket No. EL25-49-000 \n \n \n \n) \nLarge Loads Co-Located at Generating Facilities \n) \nDocket No. AD24-11-000 \n \n \n \n) \nConstellation Energy Generation, LLC \n \n) \nDocket No. EL25-20-000 \nv. \n \n \n) \nPJM Interconnection, L.L.C. \n \n) \n(Consolidated) \n \n \n \n) \nPJM Interconnection, L.L.C.  \n \n) \nDocket No. ER26-1479-000 \n \n \nCOMMENTS OF INVENERGY RENEWABLES LLC AND  \nINVENERGY THERMAL LLC \n \nInvenergy Renewables LLC and Invenergy Thermal LLC (collectively, “Invenergy”) \nrespectfully submit these comments in response to PJM Interconnection, L.L.C.’s (“PJM”) Initial \nBrief in the Order to Show Cause Proceeding,1 as well as PJM’s Compliance Filing submitted in \nDocket No. ER26-1479-000.2 Invenergy seeks clarification regarding the study processes for \ngenerator interconnection and transmission service, as well as the definition of Eligible Customer.  \nThe Show Cause proceeding is a needed first step to address the growing demand from \nmanufacturing, data centers, and artificial intelligence. Invenergy applauds PJM for its \nconsiderable work to date and raises the following issues in the interest of crafting durable and \nworkable rules for co-located generation and load.  \nSpecifically, while the purpose of PJM’s multiple filings is to facilitate co-located projects, \n \n1 PJM Interconnection, L.L.C., Initial Brief of PJM Interconnection, L.L.C., Docket No. EL25-49-000 (Feb. 23, \n2026) (“Initial Brief”).  \n2 PJM Interconnection, L.L.C., 60-Day Compliance Filing for Co-Located Load Related Revisions to Open Access \nTransmission Tariff, Docket No. ER26-1479-000 (Feb. 23, 2026) (“Compliance Filing”)."},{"page":2,"startToken":238,"endToken":557,"text":"2 \n \n \nPJM’s Initial Brief and compliance filings would continue to treat generator interconnection \nstudies and transmission service studies for co-located projects as distinct processes operating on \ndifferent timelines, rather than as a synchronized process that must be coordinated to finance and \ntimely construct co-located projects. As Invenergy explained in its initial comments in Docket \nEL25-49, coordinating generator interconnection and transmission service studies can reduce \nsystemwide costs by matching generation with load, resulting in a common set of network \nupgrades to accommodate both requests, and reduce the likelihood that uncoordinated study \nprocesses result in potentially unneeded network upgrades. Synchronizing the generator \ninterconnection and transmission study processes would therefore provide practical benefits to \ndevelopers, who could more easily finance and bring projects online more quickly, and save \nratepayers money.  \nI. \nCOMMENTS \n \nA. \nPJM Should Adopt a Coordinated Study Process for Co-Located Loads and \nGeneration. \n \nIn response to the Commission’s directive to provide clear and consistent procedures for \ngeneration serving co-located load,3 PJM submitted tariff revisions to: (1) clarify the necessary \nstudy process for existing generation seeking to serve co-located load,4 (2) address the types of \ninterconnection services generators may request, including provisional5 and surplus \ninterconnection service,6 (3) clarify that generators may request interconnection service below \n \n3 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at PP 226, 232, 233, 234 (2025) (“Replacement Rate Order”). \n4 See Compliance Filing at 24-28; id., Proposed Tariff, Parts III and VII.  \n5 See PJM Interconnection, L.L.C., 30-Day Compliance Filing With Order on Show Cause at 2, 5-7, Docket No. \nER26-1088-000 (Jan. 20, 2026) (“Interconnection Filing”); id., Proposed Tariff, Part I, section 1, Definitions – O – \nP – Q; id., Part VII, Subpart A, section 300, Definitions P; id., Part VIII, Subpart A, section 400, Definitions P. \n6 See Interconnection Filing at 2, 5; id., Proposed Tariff, Part VIII, Subpart A, section 401(C); id., Part VIII, Subpart \nE, section 414(A)."},{"page":3,"startToken":557,"endToken":939,"text":"3 \n \n \ntheir full maximum output,7 and (4) permit generators to use existing study processes to accelerate \nnew service requests that do not have to pay for network upgrades.8 PJM in its Initial Brief has \nseparately proposed the non-rate terms of service for the new firm contract, non-firm contract, and \ninterim NITS transmission services, including the study processes for each.9  \nWith limited exceptions,10 PJM’s filings perpetuate a bifurcated study process for generator \ninterconnection and transmission service requests. There is no requirement that the studies be done \nin concert, on similar time frames, or using similar study assumptions. As a result, the distinct \nstudies may identify duplicative or unnecessary network upgrades, and co-located generators and \ntheir associated load will each have to execute generator interconnection agreements or \ntransmission service agreements without knowing the outcome of the other study process. A co-\nlocated generator could, for instance, be required to execute a generator interconnection agreement \nwithout knowing whether its associated load can get transmission service at all, much less the \nexpected costs of any upgrades required to serve that load. Likewise, a co-located load may be \nrequired to contract for transmission service without knowing whether the associated generation \nwill materialize. Given that PJM’s proposed transmission products in part anticipate co-located \nloads netting their co-located generation from their transmission service requests, the failure to \ncoordinate these study processes may result in a cascade of restudies should load execute \ntransmission service agreements only to discover that the associated co-located generator cannot \n \n7 Interconnection Filing at 2, 4; id., Proposed Tariff, Part VIII, Subpart B, section 403(A)(1)(q); id, Part VIII, \nSubpart E, section 413; id., Part VIII, Subpart C, sections 404(A)(2)(a)(v), (A)(7). \n8 Interconnection Filing at 2, 5; id., Proposed Tariff, Part VIII, Subpart C, sections 406(A)(2), 408(A)(2)(d). \n9 Initial Brief at 5-13, 24-25, 30-31, 33-34, 66-68, 70-71. \n10 Generation customers must identify the Eligible Customer and type of transmission service in their \ninterconnection agreements and study requests. See Proposed Tariff Revisions, Part VIII, Subpart A, section \n401(H)(3)(b)(i) – (iii). The Eligible Customer must also identify details about the co-located generator in its \ntransmission service request. See Proposed Tariff, Part XI, Subpart B, section 710.2(iii)-(iv)."},{"page":4,"startToken":939,"endToken":1340,"text":"4 \n \n \ntimely interconnect, or those loads will have to draw power exclusively from the grid, thereby \nstressing the system in exactly the manner this proceeding is intended to prevent. \nMoreover, as a practical matter, few generation and load developers will be willing to \nexecute generator interconnection or transmission service agreements—and thereby commit tens, \nif not hundreds of millions of dollars, to develop a project—without knowing whether it has a \nreasonable prospect of moving forward; and the banks financing such projects will also be loathe \nto commit capital without reviewing both generator interconnection and transmission service study \nresults articulating the expected cost of the project. The co-location study processes should be \ndesigned to limit uncertainty,11 not exacerbate it. Without reforms to coordinate these study \nprocesses, the benefits of co-location will never materialize at scale.  \n  Beyond these practical realities, coordinating interconnection and transmission service \nstudies will enhance reliability and make more efficient use of the transmission system. If \ntransmission service and generation interconnection are studied under two separate processes, they \ncould use a different set of study assumptions, models, and timelines, and therefore may each \nidentify network upgrades that would not be necessary were these processes coordinated. \nSynchronizing the two study processes therefore comports with FERC’s goals of promoting \n \n11 Replacement Rate Order at PP 225-29, 231-35 (directing PJM to revise generator interconnection processes for \nco-located load in order to “clarify” the steps necessary to effectuate co-location arrangements); see Improvements \nto Generator Interconnection Procs. & Agreements, Order No. 2023, 184 FERC ¶ 61,054, at P 18 (2023) (“Order \nNo. 2023”) (describing FERC’s interconnection goals to “establish a faster and more efficient interconnection \nqueueing process, and promote a more efficient and cost-effective allocation of network upgrade costs”); e.g. cf. \nEDF Renewable Energy, Inc. v. MISO, 168 FERC ¶ 61,173, at P 20 (2019) (finding the lack of transparency in \naffected system studies coordination processes resulted in cost uncertainty, presenting a “significant obstacle to the \ndevelopment of new resources” and “hinder[ing] the timely development of new resources”, which resulted in an \nunjust and unreasonable tariff); see also N. Indiana Pub. Serv. Co., 155 FERC ¶ 61,058, at P 60 (2016) (directing \nPJM and MISO to inform stakeholders on how transmission planning in each region interacts, which will improve \ncoordination and reduce risks like planning and financing, thereby increasing the likelihood that the projects \nsuccessfully navigate the study process and get built)."},{"page":5,"startToken":1340,"endToken":1676,"text":"5 \n \n \nefficiency and speed,12 and the Show Cause proceeding’s directive to enhance the clarity of the \nco-location processes.13   \nAlthough the Commission did not require PJM to combine transmission service and \ninterconnection studies into a single queue, coordination between the two processes is necessary \nto effectuate the co-location arrangements contemplated by the Show Cause Order and \nReplacement Rate Order. Invenergy therefore requests that the Commission and PJM clarify as \npart of this proceeding how such transmission and generator interconnection study processes, \nincluding the study processes for interconnecting new generation and modifying existing \ngeneration, can work in tandem to provide the certainty to generators and load that is necessary to \nensure these processes work as the Commission intended.  \nB. \nEligible Customer Definition As Applied Should Be Clarified.  \n \nConsistent with the pro forma Open Access Transmission Tariff, PJM’s Tariff defines \nEligible Customer: \n(i) \nAny electric utility (including any Transmission Owner and any power \nmarketer), Federal power marketing agency, or any person generating \nelectric energy for sale for resale is an Eligible Customer under the \nTariff.  Electric energy sold or produced by such entity may be electric \nenergy produced in the United States, Canada or Mexico.  However, with \nrespect to transmission service that the Commission is prohibited from \nordering by Section 212(h) of the Federal Power Act, such entity is \neligible only if the service is provided pursuant to a state requirement that \nthe Transmission Provider or Transmission Owner offer the unbundled \ntransmission service, or pursuant to a voluntary offer of such service by a \nTransmission Owner. \n(ii) \nAny retail customer taking unbundled transmission service pursuant to a \nstate requirement that the Transmission Provider or a Transmission \nOwner offer the transmission service, or pursuant to a voluntary offer of \nsuch service by a Transmission Owner, is an Eligible Customer under the \nTariff.  As used in Tariff, Part VI, Eligible Customer shall mean only \n \n12 See Order No. 2023, 184 FERC ¶ 61,054 at P 18. \n13 Replacement Rate Order, 193 FERC ¶ 61,217 at PP 225, 231."},{"page":6,"startToken":1676,"endToken":1958,"text":"6 \n \n \nthose Eligible Customers that have submitted a Completed Application.14 \n \nInvenergy seeks confirmation on how the Commission and PJM view this definition when \napplied to the co-located generator and co-located load. In Order No. 888, the Commission noted \nthat Eligible Customers could include municipal utilities, cooperatives, investor-owned utilities, \nindependent power producers, and qualifying facilities, among others.15 \nWhile the Commission cannot mandate wheeling directly to end-use customers under \nSection 212(h) of the FPA, the Commission has determined that its jurisdiction extends to all \nunbundled transmission in interstate commerce by public utilities.16 Thus, as provided in the \ndefinition of Eligible Customer, where a state retail choice program results in unbundled retail \naccess, customers may take transmission service as an Eligible Customer.17 It is therefore \nInvenergy’s understanding that a co-located load could qualify as an Eligible Customer in a retail \nchoice jurisdiction. In addition, Invenergy seeks clarity on the following questions:  \n(1) In the context of co-location arrangements, would a co-located generator \nqualify as an Eligible Customer on behalf of the co-located load?  \n(2) Does a co-located generator’s status as an Eligible Customer depend on whether \nthe co-location arrangement is in a jurisdiction that has mandated retail choice?  \nII. \nCONCLUSION \nInvenergy respectfully requests that PJM and the Commission consider these comments \nand make such adjustments as necessary to ensure just and reasonable rates, terms, and conditions \nfor co-located arrangements. \n \n \n14 Tariff, Part I, section 1, Definitions – E – F.  \n15 Promoting Wholesale Competition Through Open Access Nondiscriminatory Transmission Servs. by Pub. \nUtils.; Recovery of Stranded Costs by Pub. Utils. and Transmitting Utils., Order No. 888, FERC Stats. & Regs. ¶ \n31,036 at 31,688 (1996).  \n16 Id. at 31,689. \n17 Id."},{"page":7,"startToken":1958,"endToken":2019,"text":"7 \n \n \n \n \nRespectfully submitted, \n \n \n  \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nMarch 16, 2026 \n/s/ Tyler O’Connor   \nTyler O’Connor \nKathryn Douglass \nCrowell & Moring LLP \n1001 Pennsylvania Avenue, NW \nWashington, DC  20004 \n202-624-2500 \ntoconnor@crowell.com \nkdouglass@crowell.com \n \nWilliam Borders \nExecutive Vice President, Legal & Chief \nCompliance Officer \nInvenergy \nOne South Wacker Drive, Ste. 1500 \nChicago, IL 60606 \nwborders@invenergy.com \n \nCounsel for Invenergy Renewables LLC \nand Invenergy Thermal LLC"},{"page":8,"startToken":2019,"endToken":2075,"text":"8 \n \n \nCERTIFICATE OF SERVICE \n \nI hereby certify that on this 16th day of March, 2026, a copy of the foregoing document \nhas been electronically served upon each person designated on the official service list in this \nproceeding. \n \n/s/ Kathryn Douglass \nKathryn Douglass \nCrowell & Moring LLP \n1601 Wewatta Street, Ste. 815 \nDenver, CO 80202 \nkdouglass@crowell.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":967,"startToken":0,"endToken":365},{"p":2,"at":967,"title":"I. COMMENTS","method":"printed heading","endPage":2,"endAt":983,"startToken":365,"endToken":367},{"p":2,"at":983,"title":"A. PJM Should Adopt a Coordinated Study Process for Co-Located Loads and","method":"printed heading","endPage":5,"endAt":831,"startToken":367,"endToken":1458},{"p":5,"at":831,"title":"B. Eligible Customer Definition As Applied Should Be Clarified.","method":"printed heading","endPage":6,"endAt":1402,"startToken":1458,"endToken":1876},{"p":6,"at":1402,"title":"II. CONCLUSION","method":"printed heading","endPage":8,"endAt":7,"startToken":1876,"endToken":2020},{"p":8,"at":7,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":8,"endAt":366,"startToken":2020,"endToken":2075}]}