{"document":{"slug":"rec-20260316-5268","title":"Comments of Energy Artisans, LLC re PJM Interconnection, L.L.C. Compliance Filing submitted on 02/23/2026","issued":"2026-03-16","accession":"20260316-5268","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Energy Artisans, LLC","kind":"comments","file":"sources/filings/text/20260316-5268_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5268","tier":"record","sha256":"3dfea537dbf0432ccff2aeb41f146d588212ea00131d9279474bccd48816945b","pages":3,"tokens":1430,"emptyPages":[],"textThemes":["flex","colo","study"]},"pages":[{"page":1,"startToken":0,"endToken":526,"text":"1 \n8060 Main Street \nEllicott City, MD 21043 \n866-95-ENERG (36374)\nProtest re: PJM Interconnection, L.L.C. Compliance Filing (Docket No. ER26-1479-000) \nDate of Filing: February 23, 2026  \nSubject: Co-Located Load Related Revisions to Open Access Transmission Tariff \nIntroduction \nEnergy Artisans (\"EA\") is an established membership organization formed in 2017 that is comprised of industry \nexperts to serve various client needs.  The group is anchored by individuals who have decades of energy market \nexperience in general purchasing, wholesale and behind-the-meter power plant development and operation, as well \nas bulk and retail energy delivery, fuel purchasing and delivery, efficiency measures, and direct participation at the \nmembership and stakeholder level in PJM. \nEA respectfully submits these formal comments in protest of the Compliance Filing submitted by PJM \nInterconnection, L.L.C. (\"PJM\") on February 23, 2026. While PJM ostensibly seeks to address reliability and \nresource adequacy risks pursuant to the Commission’s December 18, 2025, Order to Show Cause, the proposed \nrevisions to the Open Access Transmission Tariff (\"OATT\") represent a fundamental misalignment of cost and \nbenefit.  \nPJM’s filing attempts to solve reliability concerns by imposing an untenable economic environment upon \ncommercial and industrial (C&I) users through restrictive materiality thresholds and discriminatory study \nrequirements. As currently structured, PJM’s proposal is unjust, unreasonable, and unduly discriminatory under \nSection 206 of the Federal Power Act. Consequently, EA urges the Commission to reject these revisions to ensure \nthat the region’s C&I backbone does not suffer detrimental and unintended consequences for administrative \nconvenience. \n1. Evaluation of Negative Economic Impact on Commercial and Industrial Users \nThe proposed revisions to the Behind the Meter Generation (\"BTMG\") rules threaten the foundational economic \nstability of the PJM region. For over twenty years, C&I facilities have operated under BTMG netting rules to \noptimize energy efficiency and manage operational costs. PJM’s proposal to implement a 50 MW \"Materiality \nThreshold\" for Retail BTMG is an arbitrary cap that ignores the long-term, capital-intensive investment cycles of \nlarge-scale industrial facilities. By capping the ability to net at 50 MW, PJM effectively strangles the growth of \nhigh-efficiency industrial sites that were financed on the premise of netting on-site generation against total load. \nThe financial implication of this 50 MW cap for two C&I clients we have managed would be between $7MM and \n$36MM/annually.  These are representative of impacts on various other clients, and are not inconsequential to their \noverall costs.  \nThe financial burden is further exacerbated by the \"Necessary Study Process\" described in this filing. PJM seeks to \nforce \"Project Developers\" (industrial users) to fund exhaustive thermal, short circuit, and stability studies. Beyond \nthese administrative costs, the filing mandates that users bear the full expense of: Network Upgrades, identified \nduring the study process; Complex Control Technologies and Protection Systems, allegedly required to prevent \n\"unauthorized grid withdrawals\"; and Redundant Metering Equipment necessitated by PJM’s refusal to adopt a \nmore flexible regulatory approach.  All this for systems on end users’ property supplying their electric usage \nrequirements.  This is a breach of fundamental privacy, and such rules are not applicable to other alternative fueled \nsystems that provide onsite work which is backed up by potential electric use should those systems fail."},{"page":2,"startToken":526,"endToken":1133,"text":"2 \n8060 Main Street \nEllicott City, MD 21043 \n866-95-ENERG (36374)\nStrategic Implications of the Economic Burden: \n• \nDe Facto Penalty on Efficiency: These costs function as a punitive tax on cogeneration and Qualifying \nFacilities (\"QFs\") protected under the Public Utility Regulatory Policies Act (\"PURPA\"). By making it \nadministratively and financially impossible for large QFs to operate under the new OATT, PJM undermines \nthe economic and energy efficiency benefits inherent in waste heat recovery. \n• \nForced-Exit Strategy: PJM’s rejection of a hybrid approach—which would allow facilities to net up to a \nthreshold—on the grounds that it is cost-prohibitive is a tacit admission. PJM is essentially acknowledging \nthat its all-or-nothing requirement is a deliberate barrier to entry designed to force large loads off of BTMG \nstatus and onto the grid. \n• \nStranded Assets: Forcing decades-old facilities to undergo modern \"Necessary Studies\" and install \npreviously unnecessary metering will cause many to cease operations, leading to higher Network Loads \nand exacerbating the resource adequacy issues PJM claims to mitigate. \n2. Argument Against Discriminatory Treatment \nThe filing represents a clear violation of the Federal Power Act’s requirement for just and reasonable rates due to \nits discriminatory application. PJM establishes a 50 MW cumulative nameplate cap for \"Retail BTMG\" (C&I users) \nwhile maintaining a massive 3,000 MW regional cap for \"Non-Retail BTMG\" (municipal and cooperative systems).. \nFurthermore, PJM’s manipulation of the legal boundary of the site is a transparent attempt to restrict BTMG \neligibility. In its filing, PJM aggressively defends the use of the Point of Change in Ownership (“PCO”) rather than \nthe Point of Interconnection (“POI”). This technical shift is strategically designed to shrink the legal definition of \nthe facility boundary, thereby capturing more load for grid-service billing and excluding it from the BTMG actual \nuse category. \nPJM’s filing admits that many of these industrial configurations have \"been in existence without noted impact \nfor decades\". This admission renders the sudden imposition of the 50 MW cap and restrictive PCO definitions \narbitrary. If no impact has been noted for twenty years, the reliability risk is clearly a manufactured pretext for cost-\nshifting.  We have had direct experience with customers whose BTMG was as large as 150 MW behind loads in \nexcess of 200 MW with no adverse impacts. \n3. Proposed Alternative: 200 MW Threshold and Interruptible Transmission Service \nA constructive alternative exists that balances grid integrity with the industrial sector's operational reality. The PJM \nICC advocates for an Interim/Alternative Materiality Threshold of 200 MW, anchored in the Actual Use principle. \nPrior to data centers there have been many large industrial loads with correspondingly large BTMG.  As established \nin the PJM ICC Request for Rehearing/Clarification in Docket EL25-49, filed on January 20, 2026, and supported \nby the C&I clients we represent and our direct experience, the 200 MW threshold is a far more practical solution \nfor existing industrial and institutional loads that have long relied on their on-site investments to manage electric \nand other commodity costs efficiently.  For sites exceeding this 200 MW threshold, the Commission should direct \nPJM to utilize the proposed \"Interim Network Integration Transmission Service\" (Interim NITS) under the new Part \nXI of the Tariff. This service is non-firm and interruptible, providing PJM with the operational safety switch it \nneeds to manage reliability during peak emergencies without forcing cost-prohibitive upgrades or complete \ndisconnection on industrial users.  There is a corollary in natural gas: firm and interruptible service.  It is critical \nthat interruptible gas customer cease using gas when instructed by the applicable pipeline or utility system.  Failure \nto do so results in extreme financial penalties and the offending customer may even be shutoff if system integrity is"},{"page":3,"startToken":1133,"endToken":1430,"text":"3 \n8060 Main Street \nEllicott City, MD 21043 \n866-95-ENERG (36374)\ncompromised.  We fail to see any reason why large customers above this threshold could not have an automatic \nshutoff of electricity for failure to comply.  In fact, numerous smaller systems and sites have been subject to transfer-\ntrip schemes for similar reasons for decades. \nComparison: PJM Proposal vs. Industrial Alternative \nFeature \nCurrent PJM Proposal (50 MW Limit) \nIndustrial Alternative (200 MW + \nInterruptible Tier) \nReliability \nImpact \nHigh risk of forcing efficient units offline; \nincreases firm demand. \nMaintains stability via Interim NITS (Part XI) \nfor largest users. \nCapital Cost to \nUser \nExtreme; requires Network Upgrades and \nredundant metering. \nMinimal; grounded in the \"Actual Use\" \nprinciple for existing sites. \nGrid Flexibility Rigid \"all or nothing\" approach; forced grid-\ndependency. \nHigh; utilizes non-firm, interruptible service for \npeak management. \nRegulatory \nBaseline \nIgnores PURPA efficiency and 20-year \ninvestment cycles. \nProtects QF status and manufacturing \ncompetitiveness. \nAppeal for Commission Action \nPJM has fundamentally failed to prove that a 50 MW threshold is the least cost or most equitable way to manage \nco-located load, especially while exempting municipal entities from similar constraints. \nWe implore the Commission to summarily reject the February 23 Compliance Filing. At a minimum, the \nCommission should stay its implementation and direct a formal paper hearing to: \n1. Evaluate the 200 MW threshold based on the \"Actual Use\" principle; \n2. Mandate the inclusion of an interruptible tier using Interim NITS for all large loads; \n3. Reject the restrictive \"Point of Change in Ownership\" definition as an arbitrary shrinking of the site \nboundary; and \n4. Enforce PURPA protections for cogeneration facilities that PJM seeks to penalize. \nThe Commission cannot allow PJM to undermine the industrial backbone of the region through arbitrary caps and \nprotectionist barriers. \nRespectfully submitted, \n \n \n \nH. Bertram Wilson, CFA \nManaging Director"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":268,"startToken":0,"endToken":38},{"p":1,"at":268,"title":"Introduction","method":"printed heading","endPage":3,"endAt":2045,"startToken":38,"endToken":1424},{"p":3,"at":2045,"title":"H. Bertram Wilson, CFA","method":"printed heading","endPage":3,"endAt":2086,"startToken":1424,"endToken":1430}]}