{"document":{"slug":"rec-20260316-5300","title":"Limited Protest of Advanced Energy United et al. in response to PJM Interconnection, L.L.C.’s 02/23/2026 compliance filing","issued":"2026-03-16","accession":"20260316-5300","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Advanced Energy UnitedSolar Energy Industries Association","kind":"protest","file":"sources/filings/text/20260316-5300_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5300","tier":"record","sha256":"916f72f53f8571588480b1f4e572efee3059c7c14d092d557214ef175302e13b","pages":14,"tokens":3945,"emptyPages":[],"textThemes":["colo","study","flex","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":339,"text":"UNITED STATES OF AMERICA  \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION  \n \n \n \n \n \n \n \n \n)  \n \n \nPJM Interconnection, L.L.C \n)  \n \nDocket No.  ER26-1479-000 \n \n \n \n \n \n \n)  \n \n \n \n \n \n \n \n \n \nLIMITED PROTEST OF ADVANCED ENERGY UNITED AND THE SOLAR ENERGY \nINDUSTRIES ASSOCIATION \n \nPursuant to Rule 211 of the Federal Energy Regulatory Commission (“Commission”) \nRules of Practice and Procedure,1 Advanced Energy United (“United”)2 and the Solar Energy \nIndustries Association (“SEIA”)3 submit these comments in response to PJM Interconnection, \nL.L.C.’s (“PJM”) February 23, 2026 compliance filing4 to address the Commission’s directives \nin its December 18, 2025 Order (“Co-location Order”)5 to revise its behind the meter generation \n(“BTMG”) tariffs, establish three new transmission service tariffs, and revise its study \nprocesses.6   \nPJM’s compliance with the Co-Location Order will impact the cost and speed at which \nthe region is able to serve the massive influx of new large loads being built. PJM’s proposed \n \n1 18 C.F.R. § 385.211 (2025). \n2 Advanced Energy United is a national association of businesses that are making the energy we use secure, \nclean and affordable. Advanced Energy United is the only industry association in the United States that represents \nthe full range of advanced energy technologies and services, both grid-scale and distributed. Advanced energy \nincludes energy efficiency, demand response, energy storage, wind, solar, hydro, nuclear, electric vehicles, and \nmore. The comments expressed in this filing represent the position of Advanced Energy United but may not \nrepresent the views of any particular member. \n3 The comments contained in this filing represent the position of SEIA as a trade organization on behalf of the solar \nindustry, but do not necessarily reflect the views of any particular member with respect to any issue.  \n4 PJM Interconnection, L.L.C., 60-Day Compliance Filing for Co-Located Load Related Revisions to Open Access \nTransmission Tariff to Comply with Commission Order in Docket No. EL25-49, et al., ER26-1479 (February 23, \n2026) (“PJM Compliance Filing”).   \n5 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at PP 2, 161, 231-36 (2025) (“Co-Location Order”). \n6 Co-Location Order at P 160."},{"page":2,"startToken":339,"endToken":632,"text":"2 \ntariff revisions fundamentally fail to comply with the directive and intent of the Co-Location \nOrder, which was to encourage flexible load that is able to interconnect quickly with limited \nimpact on the grid. Instead, PJM’s Compliance Filing imposes unnecessary barriers on the \nresources most able to be built quickly to serve new and existing load and maintain grid \nreliability amidst the current surge in demand. The Commission should reject PJM’s Compliance \nFiling and direct it to refile tariffs that comply with the requirements of the Co-Location Order to \naccommodate new loads in an affordable, reliable, and efficient manner.    \nI. \nBackground \nPJM is facing an unprecedented surge of new load wanting to connect to the system, \nincluding a massive influx of data centers and large-scale manufacturing. This has placed \nsignificant stress on the region’s ability to meet its resource adequacy requirements, at a time \nwhen the interconnection of new generation has been stalled as PJM works through a backlog of \nrequests and implements new reforms. Developers and large loads have turned to co-location \nstrategies and BTMG as solutions to this growing problem.  \nThe Commission recognized the need to provide greater regulatory certainty to guide \nincreased interest in both existing and novel behind-the-meter configurations when it issued the \nCo-Location Order. Specifically, the Commission found PJM’s tariff to be unjust and \nunreasonable because it did not include service options that allow customers to be flexible during \ncertain conditions.7 The Commission ordered PJM to develop three new transmission services \nthat would allow loads to take non-firm service for all or part of their facilities on a temporary or \npermanent basis.8 As part of that Order, the Commission also directed PJM to revise its BTMG \n \n7 Id at P 2 \n8 Id at P 176-177."},{"page":3,"startToken":632,"endToken":923,"text":"3 \nrules.9 In response to the Co-Location Order, PJM held stakeholder meetings in an effort to \ninform members and solicit feedback on the proposals. While PJM made modest revisions in \nresponse to this feedback, the Compliance Filing still falls short of the requirements of the Co-\nLocation Order.     \n \nII. \nLimited Protest \n \nA. BTMG rules are overly restrictive and do not accommodate optimized \nhybrid configurations   \nPJM’s Compliance Filing fails to comply with the Co-Location Order’s clear directive to \nset a net megawatt (“MW”) materiality threshold based on the amount of load a customer may \nnet using BTMG and should therefore be rejected. The Co-Location Order directed PJM to \n“maintain the current BTMG rules for customers that fall below a new MW materiality threshold \nfor the amount of load at a particular electrical location that Network Customers may net using \nBTMG” and for customers utilizing BTMG arrangements that meet certain transition and \ngrandfathering criteria.10 In response, PJM proposes a 50 MW materiality threshold for BTMG, \nmeasured based on the cumulative nameplate rating of all BTMG at the same electrical location, \nexcluding backup generation and BTMG that meets certain transition and grandfathering \ncriteria.11  While the exclusion of backup generation appropriately avoids disincentivizing \nreliance on backup generation that can bring a net benefit to the reliability of the system, PJM’s \napplication of the 50 MW threshold to the nameplate capacity of the BTMG, rather than the \namount of load the customer may net, as required by the Co-Location Order, is a material \ndeviation from the requirements of the Co-Location Order and should be rejected. PJM’s \n \n9 Id at P 179. \n10 Id. (emphasis added). \n11 PJM Compliance Filing, Transmittal Letter at page 11-14; Tariff, Part VIII, Subpart A, section 400 \nDefinitions R."},{"page":4,"startToken":923,"endToken":1228,"text":"4 \ndeviation will unnecessarily constrain the different configurations of BTMG that may otherwise \nemerge based on the Co-Location Order’s requirements.  \nThe Commission’s Order is appropriately focused on the impact of netting on the PJM \nsystem, whereas PJM’s definition is myopically focused on the nameplate capacity of the \nBTMG. This proposed threshold is inconsistent with how PJM assesses capacity accreditation in \nthe Reliability Pricing Model (“RPM”) and lacks the necessary flexibility to accommodate \nresource diversity and hybrid configurations such as storage paired with solar or other \ntechnologies that have compatible production profiles and are capable of providing firm capacity \nvia precise operational control. Modern BTMG assets are equipped with advanced telemetry \nsystems and the capability to allow for instant load following. These resources can be leaned on \nduring times of transmission congestion and limited capacity. Consider a 30 MW industrial \ncustomer with existing firm service and sufficient land to host large-scale behind-the-meter \nresources. A hybrid configuration consisting of 30 MW of solar PV and 30 MW of battery \nstorage—designed to operate as non-export and provide microgrid capabilities during grid \noutages—would no longer be available under the cumulative 50 MW nameplate limit. This is the \ncase even though the configuration is intended only to serve the customer’s 30 MW peak load. \nOther reasons why a BTMG asset may have a nameplate capacity that exceeds the customer’s \nnetting include (1) a facility serving an industrial site with thermal as well as electrical needs; (2) \na project that is oversized to account for uptime and availability considerations to meet \nperformance and redundancy needs; or (3) a project that is oversized at the onset to account for \nnear- and long-term degradation. \nBecause PJM failed to follow the Commission’s directive in this regard, the Commission \nshould reject PJM’s proposal. Any revised proposal from PJM must set a materiality threshold"},{"page":5,"startToken":1228,"endToken":1545,"text":"5 \nbased on the customer’s netting, not the nameplate capacity of the BTMG. A reasonable \napproach would be to permit facilities to exceed the proposed 50 MW nameplate capacity \nthreshold for BTMG provided that the customer’s netting is limited to 50 MW.  This allowance \nshould be contingent upon the facility utilizing approved telemetry and automated system \ncontrols to ensure the customer’s actual impact on the transmission system remains within \nspecified, safe limits. Manual 14D already includes metering and reporting requirements for \nBTMG and loads utilizing BTMG, which should allow PJM to address the majority of concerns \nregarding the effect of netting load via BTMG; to the extent PJM believes that updates to these \nprovisions of the manuals are necessary to implement additional reasonable telemetry and \ncontrol requirements necessary to effectuate netting, PJM may work with stakeholders through \nnormal channels to do so. Measuring a resource by its theoretical maximum output—rather than \nits actual, controlled impact—is a regulatory relic that undermines the benefits of the Co-\nLocation Order. PJM failed to follow the requirements of the Co-Location Order and its \nCompliance Filing should therefore be rejected.     \nB. Transition and Grandfathering Rules Must Ensure a Smooth Transition to \nAvoid Adverse Reliability Impacts \nGenerators and both existing and new large loads have turned to the existing BTMG rules \nas a logical response to conditions in the PJM region. The PJM Base Residual Auction (“BRA”) \nsends capacity price signals to customers and developers of the supply and demand on the \nsystem. The temporary closure of PJM’s interconnection queue to new generation,12 significant \n \n12 PJM effectively closed its interconnection process to new applicants in 2022 and expects to initiate the first cluster \nstudy of new requests in April 2026. See “PJM Completes Interconnection Reform Transition Cycle 1 Studies” \n(September 22, 2025). https://insidelines.pjm.com/pjm-completes-interconnection-reform-transition-cycle-1-\nstudies/#:~:text=In%20July%202023%2C%20PJM%20began,and%20coal%20(29%20MW)."},{"page":6,"startToken":1545,"endToken":1875,"text":"6 \nprice increases in the BRA,13 anticipated resource adequacy shortfalls in coming years, and \nrising transmission costs and significant transmission upgrade needs have resulted in some end \nuse customers making business decisions to address these issues outside of PJM’s markets. \nThose efforts have resulted in investments that will lead to additional generation and \ntransmission capacity—albeit behind the meter— in the PJM region at a time when such capacity \nis sorely needed. Upending those efforts, as PJM’s proposal does, would result in financial injury \nto the parties involved as they are prevented from participating as anticipated due to a new \nregulatory requirement that was not in place when capital was allocated to the development and \ndeployment of these projects. Even worse, PJM’s proposal would harm reliability and \naffordability in the PJM region by causing existing projects to cease operations and/or by leading \ncustomers to abandon planned projects already well underway. The PJM region needs more \nvaluable capacity as soon as possible and should not be creating regulatory barriers that counter-\nproductively disincentivize already planned or capitalized projects from continuing to be \navailable in PJM. \nThe Co-Location Order appropriately recognized the potential disruption of a transition \nto new BTMG and co-location requirements, and directed PJM to take two steps to avoid adverse \nimpacts: (1) grandfathering entities with existing contracts through the end of the term of such \nagreements, and (2) implementing a three-year transition period for any existing BTMG not \neligible for grandfathered treatment.14 \nIn response to the first directive, PJM proposes to “allow existing BTMG arrangements to \nqualify for legacy treatment so long as there is an existing contractual agreement for the purpose \n \n13 The BRA Increased by over 1,000% between the 2024/2025 planning year to the 2027/2028 planning year even \nwith a price cap instituted. See “2027/2028 Base Residual Auction Report (December 17, 2025. \nhttps://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf   \n14 Co-Location Order at P 179."},{"page":7,"startToken":1875,"endToken":2163,"text":"7 \nof effectuating a BTMG arrangement (e.g., bilateral agreement, interconnection agreement, etc.) \nthat was in effect prior to December 18, 2025.”15 In response to the second directive, PJM \nproposes that any existing retail BTMG not eligible for grandfathering would continue to be \neligible to participate as BTMG through December 18, 2028.16 \nThe Commission must balance concerns about expediently addressing unjust and \nunreasonable rates with concerns from parties that have relied on the existing Tariff.17 For the \nproposed changes to avoid worsening PJM’s tight resource adequacy conditions, the \ngrandfathering and transition rules must be robust enough to protect BTMG projects that are \nalready in various stages of development. Planning, constructing, and interconnecting these \nresources is a multi-year process including significant capital outlays that rely on longstanding \nmarket fundamentals; any new rules must endeavor to respect the progress made by existing \nprojects. PJM’s Compliance Filing fails to ensure a smooth and predictable transition and is \ncontrary to the Co-Location Order’s requirements regarding grandfathering. Therefore, the \nCompliance Filing should be rejected. \nFirst, to prevent any disruptive administrative burdens, any project “in process” as of the \ntransition date should be eligible for grandfathering if it has made significant progress toward \ncompletion. This should include projects that have contractual arrangements in place, even if \nthey are not yet fully operational. To reach the stage of development where a contractual \narrangement has been put in place, there have already been significant resources invested in a \nproject. Preventing a project from executing on that contractual obligation simply because it has \nnot completed construction as of the date that the Order was issued, which was unknowable \n \n15 Transmittal Letter at 9. \n16 Transmittal Letter at 11.  \n17 See Co-Location Order, P 223."},{"page":8,"startToken":2163,"endToken":2475,"text":"8 \nwhen the project was initiated, would cause harm to the market and strand significant \ninvestments that were made to add flexibility to the system. PJM’s Compliance Filing as it stands \nwill result in significant stranded assets and should therefore be rejected. \nPJM states that it “will explore with stakeholders whether Manual language should be \ndeveloped to help elaborate on what types of agreements may qualify.”18 To help inform such \ndiscussion, the Commission should clarify that such agreements may include utility \ninterconnection study agreements; engineering, procurement, and construction contracts; and any \nform of binding agreement between the BTMG developer and the load. In the Co-Location \nOrder, the Commission “acknowledge[d] the possibility that entities may also have contracted \nfor the specific purpose of effectuating a BTMG arrangement” and directed PJM to grandfather \nsuch entities “[t]o the extent an entity is a party to an existing contract for such a purpose.”19 The \nCommission should clarify that the above listed agreements or any other agreement “for the \nspecific purpose of effectuating a BTMG arrangement” should qualify as a “contractual \narrangement” eligible for grandfathering under PJM’s proposed Retail BTMG definition. \nWithout this clarity, developers that have spent significant time and effort responding to the \nexisting regulatory and market realities face the risk of delay and additional regulatory burdens \nthat could remove projects already under study or even under construction.  \nSecond, to further avoid harm to projects already well underway, PJM should shift back \nits grandfathering date to the effective date of PJM’s compliance filing. As noted above, \ncustomers and developers have been pursuing BTMG opportunities under PJM’s current rules in \nresponse to market and grid conditions. Prior to the issuance of the Show Cause Order, it was \nunknown to both customers and developers whether, when, and how PJM’s current rules to \n \n18 Transmittal Letter at n32. \n19 Co-Location Order at P 224."},{"page":9,"startToken":2475,"endToken":2786,"text":"9 \nBTMG would be changed. Even today, there remains significant uncertainty overhanging new \nrules for BTMG in the PJM region, with key questions such as the materiality threshold for \nRetail BTMG pending before the Commission. PJM acknowledges these lingering uncertainties \nwhen it states that the effective date for its own compliance is uncertain.20 Setting the \ngrandfathering date at the date of issuance of the Co-location Order would unnecessarily cut off \nprojects that were moving forward in good faith under then-existing rules. Furthermore, the \nBTMG transition must be considered in the context of the new co-location framework. Projects \npreviously operating or moving forward under the BTMG construct that become ineligible for \nRetail BTMG treatment (i.e., because they are ineligible for grandfathering and exceed the \nmateriality threshold) will be compelled to consider shifting to the new co-location pathways if \nthey do not wish to cease operations or halt development. Setting the BTMG grandfathering date \nearlier than the effective date for the new co-location pathways would leave a problematic gap \nfor projects already underway that will exacerbate regulatory and market uncertainty to the \ndetriment of reliability in PJM. The three-year transition is not an antidote to this uncertainty, as \nit provides only temporary relief and does not change the ultimate outcome for projects \npreviously pursuing permanent BTMG status. \nThird, PJM’s proposal is currently unclear whether grandfathering status applies to the \nBTMG asset or to the site itself, which makes the proposal unjust and unreasonable. \nGrandfathering is not merely a matter of fairness; it is a matter of resource optimization. Existing \nindustrial sites hold significant potential to provide additional flexibility to the grid if they are \npermitted to expand their BTMG footprint. For example, an industrial site that has an existing \ncontract with a 60 MW co-generation facility may also have the ability to add some amount of \n \n20 Transmittal Letter at 35."},{"page":10,"startToken":2786,"endToken":3104,"text":"10 \nbehind-the-meter battery storage; if grandfathering applies to the customer site, the 60 MW co-\ngeneration facility would presumably remain under Retail BTMG, but even 10 MW of battery \nstorage would not be eligible to participate as BTMG. However, if it is the co-generation facility \nthat is grandfathered, the customer should still be eligible to add BTMG up to the new \nmateriality threshold, and the additional 10 MW of battery storage could participate as BTMG. \nWhen justifying the 50 MW materiality threshold for Retail BTMG going forward, PJM explains \nthat “a lower threshold of 10 or 20 MW would likely exclude from Retail BTMG a much larger \nvolume of retail customers whose grid impacts are small or de minimis when compared with the \nCo-Located Load coming online today.”21 PJM also rightly identifies that existing BTMG \narrangements have been in place for decades in some cases, with no known operational issues.22 \nGrandfathering the generation while allowing these existing customers to pursue additional \nBTMG below the materiality threshold is a logical extension of PJM’s observation that the \nexisting BTMG at these sites is not problematic, and additions below the materiality threshold \nwould have little or no impact. If the Commission accepts PJM’s proposal in this regard, the \nCommission must clarify that customers with existing BTMG generation that is grandfathered \ncan add additional new BTMG. \nClarifying that customers with grandfathered BTMG are allowed a “clean slate” to pursue \nadditional BTMG up to the materiality threshold would also allow the existing customer base in \nthe PJM region to be part of the solution to PJM’s urgent resource adequacy and grid \ninfrastructure needs. Many of these existing customers have neither the desire nor the economic \nincentive to pursue the newer, more complex “co-location” pathways proposed by PJM, and \nsmaller projects (like the 10 MW battery in the example above) will almost certainly be boxed \n \n21 Transmittal Letter at 12. \n22 Id."},{"page":11,"startToken":3104,"endToken":3381,"text":"11 \nout by the cost and complexity of undergoing the full PJM interconnection process. PJM \nexpresses concern in its Compliance Filing that existing Retail BTMG resources may forgo \ninterconnecting into the PJM system if excluded from Retail BTMG, and that this would \nexacerbate reliability concerns.23 By the same logic, allowing customers with grandfathered \nBTMG to pursue new BTMG that they would not otherwise pursue under a co-location \narrangement would have the effect of improving reliability by reducing the capacity needs of \nthese customers. \nTo maximize grid reliability and customer benefit, the Commission should clarify that \nPJM’s Compliance Filing allows loads with grandfathered BTMG a “clean slate” to net an \nadditional 50 MW of BTMG. If PJM’s Compliance Filing is interpreted to disallow the \nexpansion of BTMG on these established sites, it will effectively prevent existing industrial loads \nfrom contributing new flexibility to the system, which is an unjust and unreasonable result. The \nPJM system will be more resilient if it does not rely solely on new loads to deliver additional \ngrid flexibility. Forcing established industrial players to pursue co-location arrangements in order \nto add any incremental behind-the-meter generation, even when that new generation is below the \nagreed materiality threshold, ignores \"low-hanging fruit\" that could benefit the reliability of the \nPJM region. The Commission should clarify this is not the case. \nC. Streamlining Interconnection for Non-Exporting Co-Located Facilities \nPJM’s proposal to require site-located generation to enter the interconnection queue24 is \nunjust and unreasonable. The PJM Compliance Filing requires both new and existing BTMG \narrangements that exceed the materiality threshold and do not qualify for grandfathering \n \n23 Transmittal Letter at 13. \n24 PJM Compliance Filing at page 24."},{"page":12,"startToken":3381,"endToken":3680,"text":"12 \nprovisions to transition toward a co-location arrangement, which entails pursuing a full \ninterconnection agreement with PJM. While it is recognized that co-located loads and generation \nhave a distinct cost and impact on the grid, this does not justify imposing the full, standard \ninterconnection process on resources that do not intend to export power to the grid. Shifting non-\nexporting generating resources to a co-location framework should not, by default, trigger new \ninterconnection requirements. This requirement would artificially inflate the number of projects \nin an already backlogged queue and force projects that will never export power to undergo \nstudies intended for exporting generators. These projects do not require deliverability given their \nintent to serve only the co-located load; given that they will rarely, if ever, trigger network \nupgrades, subjecting them to the standard queue process is a purely administrative hurdle with no \ntechnical or reliability benefit, but significant burden for such projects. The PJM Compliance \nFiling is therefore unjust and unreasonable and should be rejected.  \nTo avoid further slowing the interconnection queue while still ensuring adequate \nscreening of non-exporting co-located generation, PJM should be encouraged to instead establish \na streamlined, expedited process specifically for resources that do not intend to export to the \ngrid. A streamlined process should be specifically established for resources that operate as non-\nexporting co-located generating facilities. Shifting these resources to the new co-location \nframework is a recognition of the grid impact caused by the co-located load, but this transition \nshould not necessitate a full-scale interconnection study for the generation component. In lieu of \nthe traditional interconnection process, PJM should implement an expedited review track that \nfocuses on requirements that are proportional to the actual technical impact the resources have on \nthe grid. This would allow PJM to maintain visibility and safety without subjecting non-"},{"page":13,"startToken":3680,"endToken":3892,"text":"13 \nexporting co-located resources to the multi-year delays and costs associated with the traditional \ngenerator interconnection queue. \nIII. \nConclusion  \nQuickly clarifying new rules for BTMG and co-location pathways in PJM will bring \ndesperately needed regulatory and market certainty that will unlock grid flexibility and increase \nspeed to power while protecting reliability and affordability. Yet overly rigid rules that hinder \ninnovative behind the meter configurations; transition and grandfathering rules that limit, rather \nthan expand, opportunities for behind the meter and co-located resources to contribute to meeting \nresource adequacy needs in PJM; and unnecessarily cumbersome interconnection pathways that \ndampen participation will erode the utility of this regulatory certainty. Swift Commission action \nrejecting PJM’s Compliance Filing and directing revisions to rectify these shortcomings and \ncomply with the Co-Location Order will deliver greater impact and a more durable set of market \nparticipation pathways for co-located and behind-the-meter resources in PJM. \nRespectfully submitted,  \n \n/s/ Mike Haugh           \n \n   \nCaitlin Marquis, Managing Director    \nMike Haugh, Director   \nKelsey Koenig  \nAdvanced Energy United    \n1801 Pennsylvania Ave. N.W., Suite 410     \nWashington, D.C. 20006     \ncmarquis@advancedenergyunited.org  \nmhaugh@advancedenergyunited.org  \nkkoenig@advancedenergyunited.org  \n \n \n \n \n \n \n \n/s/ Melissa Alfano   \nMelissa Alfano   \nSenior Director of Energy Markets Counsel    \nGreg Giunta  \nManager of Regulatory Affairs and Counsel \nSolar Energy Industries Association   \n1425 K St NW Ste. 1000"},{"page":14,"startToken":3892,"endToken":3945,"text":"14 \nWashington, DC 20005   \n(202) 566-2873   \nmalfano@seia.org  \nggiunta@seia.org  \nCERTIFICATE OF SERVICE  \n \nI hereby certify that I have this day served the foregoing document upon each \nperson designated on the official service list compiled by the Secretary in this proceeding.  \n \nDated this 16th day of March 2026. \n  \n/s/ Mike Haugh"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":647,"startToken":0,"endToken":438},{"p":2,"at":647,"title":"I. Background","method":"printed heading","endPage":3,"endAt":307,"startToken":438,"endToken":681},{"p":3,"at":307,"title":"II. Limited Protest","method":"printed heading","endPage":3,"endAt":331,"startToken":681,"endToken":684},{"p":3,"at":331,"title":"A. BTMG rules are overly restrictive and do not accommodate optimized","method":"printed heading","endPage":5,"endAt":1245,"startToken":684,"endToken":1415},{"p":5,"at":1245,"title":"B. Transition and Grandfathering Rules Must Ensure a Smooth Transition to","method":"printed heading","endPage":11,"endAt":1476,"startToken":1415,"endToken":3325},{"p":11,"at":1476,"title":"C. Streamlining Interconnection for Non-Exporting Co-Located Facilities","method":"printed heading","endPage":13,"endAt":137,"startToken":3325,"endToken":3697},{"p":13,"at":137,"title":"III. Conclusion","method":"printed heading","endPage":14,"endAt":84,"startToken":3697,"endToken":3904},{"p":14,"at":84,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":14,"endAt":340,"startToken":3904,"endToken":3945}]}