{"document":{"slug":"rec-20260316-5340","title":"Joint Protest of Calibrant Energy et al. to PJM Interconnection, LLC’s proposed revisions to its Open Access Transmission Tariff","issued":"2026-03-16","accession":"20260316-5340","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Calibrant EnergyAntora Energy LLCEolian, L.P. ,Convergent Energy and Power LP ,Mainspring Energy ,","kind":"protest","file":"sources/filings/text/20260316-5340_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5340","tier":"record","sha256":"621e9d0f5576fd69f0aec07bc718a276a3e1c4f7e8881651c6437652d7fd71f6","pages":18,"tokens":5479,"emptyPages":[],"textThemes":["colo","adequacy","cost","retail"]},"pages":[{"page":1,"startToken":0,"endToken":307,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n) \nPJM Interconnection, LLC \n) \nDocket No. ER26-1479-000 \n) \n \nJOINT PROTEST OF BTMG PARTIES \n \nPursuant to Rule 211 of the Federal Energy Regulatory Commission’s (Commission) \nRules of Practice and Procedure,1 Calibrant Energy (Calibrant), Antora Energy, Inc. (Antora), \nConvergent Energy and Power (Convergent), Eolian L.P. (Eolian), and Mainspring Energy, Inc. \n(Mainspring) (together, BTMG Parties) respectfully submit this protest to PJM Interconnection, \nLLC’s (PJM) proposed revisions to its Open Access Transmission Tariff (Tariff) behind-the-\nmeter generation (BTMG) provisions in compliance with the Commission’s December 18, 2025 \norder (Co-Location Order).2 BTMG Parties request that the Commission reject PJM’s filing and \nrequire further compliance to ensure that PJM’s revised Retail BTMG rules comply with the Co-\nLocation Order and are just, reasonable, and not unduly discriminatory or preferential. \nPJM’s proposed Retail BTMG definition must be rejected because it does not comply \nwith the Commission’s directives in the Co-Location Order. Most significantly, PJM failed to \nfile revisions that impose a “MW threshold for the amount of load that Network Customers may \nnet by using BTMG” as directed in ordering paragraph (F) of the Co-Location Order.3 Rather \n \n1 18 C.F.R. § 385.211. \n2 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at PP 2, 161, 231-36 (2025) (Co-Location \nOrder). \n3 Id. at Ordering P (F); see also id. P 179 (“we direct PJM to maintain the current BTMG rules \nfor customers that fall below a new MW materiality threshold for the amount of load at a \nparticular electrical location that Network Customers may net using BTMG.”); id. P 221 (“We \ntherefore direct PJM, within 60 days of the date of issuance of this order, to propose a new MW \nthreshold for the amount of load at a particular electrical location that Network Customers may \nnet by using BTMG.”)."},{"page":2,"startToken":307,"endToken":624,"text":"2 \n \nthan limit what load a Network Customer may net, PJM proposes a limit on the amount of \nnameplate generation that may qualify as a Retail BTMG. A threshold based on generation is \nplainly not a limit based on the load that is being netted. Such a nameplate generation-based \nthreshold is also unjust and unreasonable and unduly discriminatory because it would also \nunnecessarily constrain commercial opportunities to serve loads with BTMG without better \nprotecting reliability or commensurate reductions in resource adequacy or cost shift risks and \ntreat differently BTMGs with similar resource adequacy and cost shift impacts. In the alternative, \nthe Commission should require PJM to increase its proposed nameplate rating-based materiality \nthreshold for Retail BTMG eligibility to 200 MW to preserve load opportunities to realize the \ncommercial benefit of sizing nameplate generation above the amount of load that a retail \ncustomer seeks to net while still achieving the Commission’s aim of limiting resource adequacy \nimpacts and cost shift concerns.  \nPJM’s proposed grandfathering and transition period provisions also are not just and \nreasonable. PJM’s proposed use of the December 18, 2025 date of the Co-Location Order as the \ndeadline for transition period and grandfathering eligibility threatens to needlessly exclude retail \ncustomers that recently finalized or will imminently finalize projects after months or years of \ndevelopment effort at a cost of millions of dollars while providing limited system benefit. This \noutcome would be particularly inequitable because the Co-Location Order provided notice to \nmarket participants that a materiality threshold based on the amount of load that a BTMG may \nnet would be adopted. As a result, retail customers that finalized or will soon finalize \narrangements in reliance on an expectation that a net load-based threshold would be adopted \ncould be entirely excluded from netting eligibility. PJM should therefore be required to provide a \nmodest additional period of time for the grandfathering and transition period by using the date of"},{"page":3,"startToken":624,"endToken":939,"text":"3 \n \na Commission Order acting on PJM’s filing, or, at minimum, 180 days from the December 18, \n2025 date of the Co-Location Order (June 16, 2026),4 as the date from which the grandfathering \nand transition period run. The modest addition of several weeks to the eligibility deadline would  \nbetter afford a workable transition for market participants that does not penalize developers for \nattempting to develop resources during a historic resource adequacy crisis in PJM.5  \nI. \nBTMG PARTIES’ INTEREST IN THE PROCEEDING \nCalibrant develops energy generation and storage assets throughout the United States. \nCalibrant and its partners have developed and expect to continue to develop projects in PJM \nthrough a range of configurations, including BTMG and co-located projects supporting large \nloads. Specifically, Calibrant has several existing BTMG projects and projects that are currently \nbeing developed worth millions of dollars that will be impacted by PJM’s proposed revisions to \nits Retail BTMG rules.  \nAntora is a U.S. manufacturer of thermal batteries, which are domestically built in San \nJose, California, and developer of thermal storage projects for industrial facilities in the U.S. and \nabroad.  \nConvergent develops, owns, and operates distributed energy storage and storage plus \nsolar resources for large commercial, industrial, and utility customers across North American \nmarkets, including PJM. Convergent has resources in operation and in development in PJM, \n \n4 BTMG Developers suggest this date because it would allow the small number of customers \nactively finalizing deals to vindicate their investments and commercial expectations, but note \nthat a shorter additional period would similarly be beneficial to vindicate the expectations of at \nleast some of those customers. \n5 PJM 2027/2028 Base Residual Auction Report, at 3 (Dec. 17, 2025), https://www.pjm.com/-\n/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf \n(explaining that the Base Residual Auction for the 2027/2028 Delivery Year cleared 6,516.6 \nMW short of the reliability requirement)."},{"page":4,"startToken":939,"endToken":1203,"text":"4 \n \nincluding behind-the-meter distribution and transmission connected battery energy storage \nsystems, front-of-the-meter distribution connected battery energy storage systems, both with and \nwithout attached solar systems, and a 20 MW flywheel resource in Hazleton, Pennsylvania.  \nEolian develops energy generation and storage assets throughout the United States and \nhas originated 27 GW of operating capacity to date. Eolian and its partners have developed \nprojects supporting large loads in multiple regions across the United States, including PJM.  \nMainspring is a U.S.-headquartered manufacturer of modular, fuel-flexible, and \ndispatchable linear generators, a new type of power generator. Mainspring was founded in 2010 \nand its first commercial units were deployed in 2020. The company has been rapidly scaling \nsince 2023, deploying its innovative technology across a wide spectrum of customer types and \nuse cases. The company’s customers include investor-owned utilities, public power utilities, \nmunicipal water treatment facilities, biogas facilities, data centers, grocery store chains, cold \nfood storage, and hospital systems.  Mainspring’s linear generators can be installed behind a \ncustomer’s utility meter or as a front of the meter grid asset. Mainspring’s linear generators are \ncurrently operating across multiple sites in PJM territory and are in development across \nadditional sites. \nBTMG Parties therefore have a substantial interest in this proceeding. Granting this \nlimited protest will critically support development of BTMG resources while managing \nreliability and resource adequacy risks.6  \nII. \nARGUMENT \nA. \nThe Commission must reject PJM’s BTMG materiality threshold because it \ndoes not comply with the Co-Location Order, is not just and reasonable, and is \nunduly discriminatory. \n \n \n6 Co-Location Order, 193 FERC ¶ 61,217 at PP 186, 221."},{"page":5,"startToken":1203,"endToken":1566,"text":"5 \n \n1. \nPJM’s proposed materiality threshold does not comply with the \nCommission’s Co-Location Order. \n \nThe Commission must reject PJM’s proposed BTMG materiality threshold because it \ndoes not comply with the Commission’s directive in the Co-Location Order. PJM failed to file \nrevisions that impose a “MW threshold for the amount of load that Network Customers may net \nby using BTMG” as directed in ordering paragraph (F) of the Order.7 Rather than limit what load \na Network Customer may net, PJM proposes a limit on the amount of nameplate generation that \nmay qualify as BTMG.8 Generation is not load. A threshold based on generation capacity is \nplainly not a limit based on the load that is being netted. \nThe Co-Location Order is not ambiguous on this point; the directive in the substantive \nportions of the order, including the rationale underlying the Commission’s Federal Power Act \n(FPA) Section 206 finding and the relevant ordering paragraph, each require action to limit the \nload that a customer may net.9 The Commission found PJM’s existing BTMG provision are not \njust and reasonable because they “do not limit the amount of qualifying load that a Network \nCustomer may net by using BTMG and do not provide any protections against this potential \ntransmission and resource adequacy planning problem or against the costs of maintaining \nsufficient resources to serve these loads being shifted onto other customers.”10 The Commission      \nwas motivated by the potential for large amounts of netting to occur through BTMG \n \n7 Id. at Ordering P (F); see also, id. P 221 (“We therefore direct PJM, within 60 days of the date \nof issuance of this order, to propose a new MW threshold for the amount of load at a particular \nelectrical location that Network Customers may net by using BTMG.”). \n8 PJM Filing at 7 (“‘Retail Behind The Meter Generation’ shall refer to Behind The Meter \nGeneration that is used to serve a retail load served by a Network Customer located at the same \nelectrical location, where such generation has a cumulative nameplate rating of no greater than \n50 MW.”) \n9 Co-Location Order, 193 FERC ¶ 61,217 at PP 186, 221, (F). \n10 Id. P 186."},{"page":6,"startToken":1566,"endToken":1916,"text":"6 \n \narrangements, given that “PJM, per its Tariff, is obligated to serve transmission customers using \nBTMG but does not consider such customers in transmission and resource adequacy planning.”11 \nThe scale of the reduction in load (i.e., what PJM considers and plans for versus what PJM may \nactually need to serve) is the dispositive factor that determines whether the potential for resource \nadequacy problems and cost-shifts are problematic—not the nameplate of the generation used to \neffect the load reduction. \n2. \nFailure to reject PJM’s non-compliant proposal would violate notice \nrequirements. \n \nPJM’s deviation from the Co-Location Order’s compliance directive is material. As \ndiscussed further below, a materiality threshold based on nameplate generation harms BTMG \nParties, other developers of BTMG, and customers who seek to rely on BTMG by unjustly and \nunreasonably limiting the configurations that may qualify as BTMG. Parties were not on notice, \ngiven the clarity of the Co-Location Order’s directive to impose a limit on net loads, that the \nCommission’s determination could encompass a materiality threshold based on nameplate \ngeneration. 12 Parties such as the BTMG Parties therefore lacked an opportunity to request \nrehearing of a determination that harms their interests. Accepting PJM’s filing would violate \nBTMG Parties and other parties’ procedural rights to notice and to seek rehearing and to \npotentially appeal the Co-Location Order.13  \n \n11 Id.  \n12 Cf Southwest Power Pool, Inc., 182 FERC ¶ 61,100 at PP 34-35 (2023) (granting rehearing \nand reversing the Commission’s acceptance of proposed tariff provisions over concerns about \n“lack of adequate notice to interested parties” that “do[] not comport with the notice \nrequirement” of the FPA and Commission regulations). \n13 To the extent that the Commission seeks to permit PJM to propose a materiality threshold \nother than one based on net loads, the procedurally proper means to achieve such an outcome \nwould be for the Commission to grant rehearing, amend the directives in the Co-Location Order, \nand explain its reasoning to justify the new substantive outcome, which would allow aggrieved \nparties to then raise their concerns on rehearing. See 16 U.S.C. § 825l (a) (“the Commission may"},{"page":7,"startToken":1916,"endToken":2226,"text":"7 \n \n3. \nPJM’s proposal based on nameplate generation is not just and \nreasonable because it limits commercial opportunities for BTMG without \nproviding additional commensurate system benefits. \n \nPJM’s materiality threshold based on nameplate generation unnecessarily constrains \naccess to BTMG arrangements without providing commensurate system benefits and is \ntherefore unjust and unreasonable. By focusing on nameplate generation, PJM’s proposal cuts \noff the potential for the routine, relatively small-scale upsizing of generation above the amount \nof load that is netted, taking off the table a number of valuable BTMG configurations without \nproviding additional system benefits in terms of reducing the risk of resource adequacy or cost-\nshifting concerns.  \nThe Commission recognized the value of BTMG netting in the Co-Location Order, citing \nprior precedent finding that netting “encourages load response during periods when generation \nof transmission are in short supply and prices are rising” and may contribute to charges for use \nof PJM’s transmission system that are consistent with the principle of cost causation.14 The \nCommission sought to address risks, however, associated with BTMG netting at a very large \nscale made possible by the proliferation of large loads such as data centers in PJM.15 As \nreflected in the Commission’s directive to PJM to implement a materiality threshold that is \nbased on reductions in load, the resource adequacy and cost-shifting risks of BTMG depend \nupon the scale of the netting that is allowed. As the Commission explained, “not all loads using \nBTMG are large loads that create the reliability and resource adequacy risks described above.”16 \n \n. . . upon reasonable notice . . . modify or set aside, in whole or in part, any finding or order \nmade or issued by it . . .”) (emphasis added). \n14 Co-Location Order, 193 FERC ¶ 61,217 at P 7 (citing PJM Interconnection, L.L.C., 107 FERC \n¶ 61,113, at PP 27-28 (2004)). \n15 Id. at P 186. \n16 Id. at P 221."},{"page":8,"startToken":2226,"endToken":2570,"text":"8 \n \nThe Commission thus found that the just and reasonable replacement rate should strike a \nbalance by limiting large scale BTMG netting while enabling smaller scale netting that does not \ncontribute to reliability and resource adequacy risks in the same way. \nPJM’s proposed materiality threshold upsets that balance by limiting the availability of \nBTMG arrangements for loads even at the smaller scale. As seasoned developers of BTMG in \nPJM, BTMG Parties are aware of several common BTMG arrangements that would net no more \nthan 50 MW of load, and therefore not raise the kinds of reliability, resource adequacy, or cost-\nshifting risks of concern, but that would rely on more than 50 MW of nameplate generation. For \nexample, it is not uncommon for BTMG configurations to rely on combinations of resources \nthat have different availability profiles, such as solar and storage, to firm up the generation. In \nsuch arrangements, the combined nameplate generation is greater than the load reduction sought \nto be achieved in order to ensure that reduction can be achieved during the required hours of \nload operation. It is also common for nameplate BTMG to be somewhat oversized for loads that \nhave the most stringent commercial expectations of reliable operation (the so-called “five nines” \nof reliable operation), as is the case for certain data centers. Such oversizing of the BTMG may \nbe commercially valuable because it ensures the load can continue to be served by BTMG \nduring partial outages, like when a unit may need to be taken offline to perform planned or \nunplanned maintenance. Or, in another routine case, customers may choose to upsize the scale \nof a battery storage system to address battery degradation that occurs over time, and to ensure \nthat there is no disruption in operation of the load while replacement of that capacity occurs.        \nUnder each of these scenarios, the load netted would remain below the 50 MW threshold \nand therefore fall within the scope of the small scale BTMG netting that Commission found \nshould be permitted under the Co-Location Order. Yet PJM’s proposal would prevent such"},{"page":9,"startToken":2570,"endToken":2864,"text":"9 \n \nbeneficial arrangements from qualifying as BTMG, creating a barrier to this kind of \narrangement without providing commensurate system benefits to justify the limitation.  \n4. \nPJM’s proposal is also unduly discriminatory because it treats \nsimilarly situated load configurations differently. \n \nUsing a nameplate-based materiality threshold rather than one based on the amount of \nload that can be netted treats behind the meter generators with similar impacts on resource \nadequacy and cost shifting differently and is therefore unduly discriminatory. As discussed \nabove, the relevant characteristic of customers relying on BTMG is the scale of the reduction in \nload that they seek to achieve, because large scale reductions may result in resource adequacy \nand cost-shifting concerns. But PJM’s proposal treats BTMG configurations that achieve the \nsame netting of load differently. For example, 30 MW of BTMG combined heat and power \ngeneration at one site and a hybrid 30 MW gas turbine plus 30 MW battery storage system at a \ndifferent site, serving a different retail customer, can each be designed and operated to have the \nsame impact on the grid, where each achieves no greater than a 30 MW reduction in the \nrespective retail customer’s load, but the customer with the 30 MW BTMG diesel generation \nwould be eligible for netting under PJM’s rules while the customer with a 60 MW combined \nnameplate hybrid system would not. This is particularly objectionable given that PJM’s Effective \nLoad Carrying Capability (ELCC) recognizes the different resource adequacy profiles that \ndifferent resources have and requires real-world addition to meet resource adequacy needs,17 \nwhile PJM’s proposed BTMG rules would bind loads to nameplate metrics that do not reflect \nhow these resources perform in the real world. \n \n17 See PJM Interconnection, L.L.C., 191 FERC ¶ 61,203, at P 3 (2025)."},{"page":10,"startToken":2864,"endToken":3223,"text":"10 \n \nAdditionally, PJM’s proposal would needlessly expose retail loads served by BTMG just \nabove the materiality threshold to starkly different treatment than retail loads served by BTMG at \nor just below the threshold despite similar impacts on the grid. Under PJM’s proposed nameplate \nthreshold, a 50 MW BTMG is eligible for netting but a 50.1 MW BTMG, which has near \nindistinguishable grid impacts, is fully ineligible to net. Under a threshold allowing 50 MW of \nnetting, on the other hand, a BTMG that could avoid 50 MW of load would be eligible to net 50 \nMW while one that could avoid 50.1 MW of net load would also be eligible to net 50 MW. \nWhile BTMG Parties recognize the need for line drawing in establishing market rules, a \nthreshold based on net load would protect against the reliability and cost shift impacts that the \nCommission sought to address while providing for more continuous treatment to BTMGs on \neither side of the threshold line. \n5. \nA materiality threshold based on the amount customers may net is \nreadily implementable and the Commission should require PJM to adopt it \nupon further compliance. \n \nPJM does not justify its failure to propose a materiality threshold based on net load other \nthan to argue without supporting factual evidence that because “load sizes can fluctuate” and \nthe nameplate rating of a generator “is static,” its proposal provides a clear and bright line.18 \nBut a threshold based on the amount that customer can net is readily implementable. Existing \nBTMG is already subject to metering and reporting requirements under PJM Manual 14D.19 \nUnder those requirements, or as a condition of BTMG interconnection agreements, and/or the \n \n18 PJM Filing at 14 (arguing therefore that its proposal is “consistent with or superior to” that the \nnetting approach required by the Co-Location Order). \n19 PJM, Manual 14D: Generator Operational Requirements, Revision: 70, at 179 (Dec. 17, \n2025), https://www.pjm.com/-/media/DotCom/documents/manuals/m14d.pdf/ (“BTMG that is \n10 MW or greater (or has been identified as requiring metering for operational security reasons) \nmust have both revenue metering and telemetering for operational security purposes.”)."},{"page":11,"startToken":3223,"endToken":3631,"text":"11 \n \nretail customer’s Electric Service Agreement with the Electric Distribution Utility, BTMG \nlarger than 10 MW typically have installed sophisticated telemetry to ensure that exports and \nwithdrawals from the grid remain within the required limits of the BTMG arrangement. BTMG \nParties believe, based on its experience as BTMG developers in PJM, that the additional steps \nthat may be necessary to monitor, control, and report on the amount of load being reduced by \nBTMG are technologically feasible, commercially viable, and readily implementable.20 Indeed, \nBTMG Parties’ battery electric storage systems are sub-metered, and their output can be \ncontrolled with sub-two-second precision. Because BTMG Parties’ BTMG resources often \nalready participate in PJM’s most operationally rigorous markets, including Regulation, the \nresources must already be capable of precise signal-following and sub-metering at the battery \nsystem. If BTMG resources are capable of meeting the stringent telemetry and control \nrequirements necessary for Regulation participation, the same metering and control capabilities \ncan clearly support netting for the purposes of the materiality threshold.21 In sum, the metering, \n \n20 Elsewhere in its filing, PJM points to the challenges of so-called hybrid approaches, stating \nthat allowing for such an approach would “impose significant costs” if BTMG had “to install \npreviously unnecessary metering equipment (that, for some facilities, may be cost prohibitive)” \nand “amplifies compliance risks for units because it might require many facilities to monitor and \nreport different generator output and load thresholds in relation to the threshold.” Id. at 11. It is \nnot clear if PJM intends these statements to apply to BTMG in general, or just to hybrid \napproaches. In any event, PJM does not provide any factual support for these assertions, and \nthese statements do not match BTMG Parties’ experience as developers of BTMG in PJM. To \nthe contrary, BTMG arrangements larger than 10 MW typically already have experience with \nsuch metering equipment, monitoring and reporting obligations, and would not find such \nrequirements cost prohibitive. \n21 Further, to ensure compliance with both non-export requirements (under the BTMG \ninterconnection agreement) and maximum power draw limits (under the ESA contract capacity), \nwhile accounting in real time for the behavior of on-site load and other generation, BTMG \nParties’ systems employ two additional safeguards: Minimum Import Power and Maximum \nImport Power controls. These controls establish operating margins around both net-zero export \nand the customer’s contracted capacity, ensuring that system operations remain fully compliant \nwith all applicable obligations at all times. In short, because BTMG resources must have these"},{"page":12,"startToken":3631,"endToken":3918,"text":"12 \n \ntelemetry, and control capabilities already deployed for existing BTMG resources demonstrate \nthat BTMG can reliably comply with the operational requirements necessary to implement a \nnetting-based threshold.  \nFinally, to the extent that PJM lacks experience with monitoring and reporting on BTMG \nin its footprint, any current lack of transparency surrounding BTMG arrangements is not a \nbasis for failing to adopt an approach that will develop these institutional capabilities and \ntransparency today. Improved transparency and consistent reporting by both BTMG operators \nand LSEs would provide PJM with a clearer understanding of existing deployment levels and \nshould alleviate concerns associated with implementing limits on BTMG netting. \nAccordingly, FERC should reject PJM’s proposed materiality threshold and require PJM \nto adopt a materiality threshold that allows BTMGs to net up to 50 MW of load.  \nB. \nIf the Commission accepts PJM’s non-compliant nameplate capacity-based \nthreshold for Retail BTMG eligibility, it should at least require PJM to adopt the \n200 MW threshold to limit potential harm. \n \nPJM asks, if the Commission does not accept PJM’s proposed Retail BTMG revisions, \nfor the Commission to “allow an interim materiality threshold to be in place for the start of the \ntransition period,” potentially to be further refined in later filings.22 As to the potential level of \nthis interim threshold, PJM “observes that the PJM Industrial Customer Coalition . . . indicated \nthat ‘a threshold of 200 MW would, as a practical matter, permit most existing industrial and \ninstitutional loads to continue to benefit from the major energy investments they have made over \ndecades . . . .’”23 Moreover, PJM’s willingness to accept a 200 MW nameplate generation \n \ncapabilities for other requirements, a threshold based on netting is technologically and \ncommercially feasible. \n22 PJM Filing at 14-15. \n23 Id. at 15."},{"page":13,"startToken":3918,"endToken":4226,"text":"13 \n \nmateriality threshold while it gathers more information on the need for a more stringent threshold \nis a strong indication that PJM believes such a threshold would be sufficient to address concerns \nabout reliability, resource adequacy, and cost-shifting. \nBTMG Parties maintain that the Commission should require PJM to comply with the \nplain language of the Co-Location Order, as discussed above. If the Commission is inclined to \naccept PJM’s nameplate capacity-based threshold,24 however, it should require PJM to adopt the \nalternative 200 MW threshold identified in PJM’s filing rather than PJM’s proposed 50 MW \nthreshold. This higher MW threshold would more appropriately preserve load opportunities \n(such as the examples provided above) to realize the commercial benefit of sizing nameplate \ngeneration above the amount of load that a retail customer seeks to net while still achieving the \nCommission’s aim of limiting resource adequacy impacts and cost shift concerns.  \nC. \nThe Commission must reject PJM’s BTMG grandfathering provisions \nbecause the proposed transition period and grandfathering deadlines are unjust and \nunreasonable to existing BTMG customers. \n \nBTMG Parties also request that the Commission reject the deadlines that PJM proposes \nfor BTMG resources to qualify for PJM’s grandfathering and transition provisions. \nNotwithstanding PJM’s proposed 50 MW nameplate BTMG eligibility threshold, PJM proposes \nto grandfather BTMGs that were in certain arrangements as of December 18, 2025, i.e., the date \nthat the Commission issued the Co-Location Order.25 Specifically, PJM proposes to provide a \nthree year transition period of continued eligibility for BTMGs larger than 50 MW serving retail \nloads prior to December 18, 2025, and to grandfather eligibility for BTMGs used to serve retail \n \n24 To the extent that the Commission permits PJM to retain a nameplate capacity-based \nthreshold, BTMG Parties understand that nameplate capacity will be based on the amount \ncontemplated in relevant interconnection agreements or similar documents. \n25 Id. at 8-11."},{"page":14,"startToken":4226,"endToken":4666,"text":"14 \n \nload subject to contractual arrangements or as Qualifying Facilities under the Public Utility \nRegulatory Policies Act of 1978 as of December 18, 2025.26 These deadlines threatens to deny \nmany customers that have been diligently developing BTMG resources over the past several \nyears the ability to benefit from millions in investments that could otherwise help to mitigate the \nhistoric reliability crisis in PJM.27 Moreover, it imposes this harsh outcome during a time when \nPJM’s interconnection queue pause28 and uncertainty over the rules for co-located arrangements \nleft BTMG the main remaining viable path for new resources. Instead, the Commission should \nreject PJM’s proposed transition period and grandfathering deadlines and direct PJM to adopt a \nmodest additional period of time29 to allow grandfathering and transition period eligibility for \nBTMGs that were in specified arrangements as of the date of the Commission’s order on PJM’s \ncompliance filing, or, in the alternative, 180 days from the December 18, 2025 date of the Co-\nLocation Order (i.e., June 16, 2026). 30 \n \n26 Id. \n27 PJM 2027/2028 Base Residual Auction Report, at 3 (Dec. 17, 2025), https://www.pjm.com/-\n/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-report.pdf \n(explaining that the Base Residual Auction for the 2027/2028 Delivery Year cleared 6,516.6 \nMW short of the reliability requirement). \n28 See PJM Interconnection, L.L.C., 181 FERC ¶ 61,162, at P 60 (2022).  \n29 The Commission has authority to direct such an extension because the Co-Location Order did \nnot specify the date from which the grandfathering period should run. \n30 The Commission has found filings with inadequate transition periods unjust and unreasonable \nand directed filing of revised provisions including longer transitions. See Midwest Indep. \nTransmission Sys. Operator, Inc., 138 FERC ¶ 61,233, at P 104 (2012) (finding unjust and \nunreasonable a proposal requiring projects with outstanding interconnection requests to transition \nto proposed revised generator interconnection procedures one day after issuance of the order \naccepting them and directing submission of revisions allowing a 90 day transition from the date \nof an order accepting the revised generator interconnection procedures). The Commission has \nalso “rejected revisions where it found settled expectations outweighed any benefits or where it \nfound proposed revisions resulted in no benefit at all or were even discriminatory.” ISO New \nEngland Inc. & New England Power Pool, 145 FERC ¶ 61,095, at P 29 (2013); ISO New \nEngland Inc., 134 FERC ¶ 61,128, at PP 39-40 (2011); see also Cap. Power Corp. v. FERC, 156 \nF.4th 644, 651–52 (D.C. Cir. 2025) (“FERC failed to adequately explain why these reliance \ninterests were either inconsequential or outweighed by countervailing considerations . . . FERC"},{"page":15,"startToken":4666,"endToken":4997,"text":"15 \n \nAccepting PJM’s proposed grandfathering and transition period deadlines could leave \nretail customers who have been developing projects for several years and have invested millions \nin infrastructure to serve loads wholly ineligible to net, upsetting commercial expectations and \nthreatening project viability. Conversely, requiring a modest additional time period prior to \ncommencement of the grandfathering and transition eligibility deadlines would avoid significant \nharm to those customers while maintaining firm deadlines for PJM’s new Retail BTMG \nparadigm going forward, as the Co-Location Order contemplates. In addition, extending the \ngrandfathering and transition period deadlines will not impose material reliability or resource \nadequacy costs onto the system or other customers because only the limited class of BTMG \ndevelopers that were very close to finalizing their projects will be able to benefit from it—i.e., \nthose that have the greatest investments at risk should PJM’s proposed deadlines stand. This \nclass is limited because the lead times required to develop generation infrastructure far exceed \nthe time contemplated in the modest extension requested here, especially given supply chain \nconstraints and siting challenges. The limited addition of time to the grandfathering and \ntransition eligibility deadlines would therefore provide critical benefits to resources that have \nworked diligently in recent months to pair development of retail loads with new supply while \nimposing minimal adverse impacts on others.  \nA modest extension to the deadlines for the purpose of the transition period or \ngrandfathering eligibility is all the more necessary given the degree to which PJM’s filing \n \nnever considered a more gradual elimination of reactive-power compensation . . . Nor did FERC \nexplain why immediate elimination is reasonable despite the generators’ long-term power \nobligations and accompanying investments. Put differently, although compensation cannot be \nguaranteed forever, that does not suggest it could reasonably be eliminated overnight.”). Here, \nthe requested additional time prior to commencement of the grandfathering and transition period \ndeadline is required to mitigate disruption of settled expectations and therefore to ensure that the \nbenefits of the proposed revisions outweigh their impact to settled expectations."},{"page":16,"startToken":4997,"endToken":5265,"text":"16 \n \ndeviates from the Co-Location Order’s requirements in proposing a nameplate capacity-based \nmateriality threshold, as discussed above. The Co-Location Order did not provide retail \ncustomers effective notice that PJM could adopt a nameplate capacity-based threshold, which, as \ndiscussed, could leave them wholly ineligible to net any load if they exceed the 50 MW cutoff. \nAs a result, BTMGs that effectuated contractual arrangements after issuance of the Co-Location \nOrder based on the expectation that any limits would be based on the BTMG’s net effects on the \nsystem could be left entirely ineligible to net either under the new Retail BTMG definition or the \ngrandfathering provisions. Such a restriction would unreasonably upset these entities’ settled \nexpectations.  \nThe December 18, 2025 deadlines for the transition period and grandfathering are \ntherefore unjust and unreasonable. Accordingly, and in particular because the Co-Location Order \ndid not provide actual notice of the form of PJM’s proposed BTMG materiality threshold, the \nCommission should reject PJM’s proposed December 18, 2025 deadlines for grandfathering and \nthe transition period and instead direct PJM to set the date of the Commission’s order on PJM’s \ncompliance filing as the deadlines for such eligibility.  \nIII. \nCONCLUSION \nBTMG Parties respectfully request that the Commission reject PJM’s compliance filing \nand direct PJM to file revisions that (1) impose a materiality threshold for qualifying as BTMG \nbased on the amount of load a customer may net, or, in the alternative, increase the nameplate \nthreshold to the 200 MW referenced in PJM’s filing; and (2) set the deadlines for grandfathering \nand transition period eligibility as the date of the Commission’s order in this proceeding.  \n \n \nRespectfully submitted,"},{"page":17,"startToken":5265,"endToken":5419,"text":"17 \n \n \n/s/ Matt Barnes \n \n \n \n/s/ Kim Smaczniak \nMatt Barnes \n  \n \n \n \nKim Smazniak \nChief Commercial Officer \n \n \nMiles Farmer \nCalibrant Energy \n \n \n \nNathan Lobel \n4830 W. Kennedy Blvd, Suite 600 \n  \nRoselle LLP \nTampa, Florida 33609  \n \n \n300 New Jersey Ave. NW, Suite 300 \nmatthew.barnes@calibrantenergy.com  \nWashington, DC 20001 \n \n \n \n \n \n \nkim.smaczniak@rosellellp.com \n/s/ Noah Long  \n \n \n \nmiles.farmer@rosellellp.com \nNoah Long  \n \n \n \n \nnathan.lobel@rosellellp.com \nDirector, State and Regulatory Affairs  \n \nAntora Energy, Inc.   \n \n \n \n200 West De Vargas St  \nSanta Fe, NM 87501  \nnoah.long@antora.com   \n \n/s/ Katie Guerry \nKatie Guerry \nSVP Regulatory and Government Affairs \nConvergent Energy and Power \n7 Time Square, Suite 3504 \nNY, NY 10036 \nkguerry@convergentep.com \n \n/s/ Eric Stoutenburg  \n \n \n \nEric Stoutenburg \n  \n \n \n \nChief Development Officer  \n \n \nEolian L.P. \n  \n \n \n \n \n988 Howard Ave. Suite 200   \n \n \nBurlingame, CA 94010 \n  \n \n \neric.stoutenburg@eolianenergy.com   \n \n/s/ Brian Kauffman \nBrian Kauffman \nDirect, Wholesale Market Development \nMainspring Energy, Inc. \n3601 Haven Ave. \nMenlo Park, CA 94025 \nbrian.kauffman@mainspringenergy.com"},{"page":18,"startToken":5419,"endToken":5479,"text":"18 \n \nCERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary of the Commission in this \nproceeding. \n \nDated: March 16, 2026 \n/s/ Nathan Lobel \nNathan Lobel \nRoselle LLP \n300 New Jersey Ave. NW, Suite 300 \nWashington, DC 20001 \nnathan.lobel@rosellellp.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":477,"startToken":0,"endToken":700},{"p":3,"at":477,"title":"I. BTMG PARTIES’ INTEREST IN THE PROCEEDING","method":"printed heading","endPage":4,"endAt":1633,"startToken":700,"endToken":1163},{"p":4,"at":1633,"title":"II. ARGUMENT","method":"printed heading","endPage":4,"endAt":1648,"startToken":1163,"endToken":1165},{"p":4,"at":1648,"title":"A. The Commission must reject PJM’s BTMG materiality threshold because it","method":"printed heading","endPage":12,"endAt":920,"startToken":1165,"endToken":3762},{"p":12,"at":920,"title":"B. If the Commission accepts PJM’s non-compliant nameplate capacity-based","method":"printed heading","endPage":13,"endAt":989,"startToken":3762,"endToken":4065},{"p":13,"at":989,"title":"C. The Commission must reject PJM’s BTMG grandfathering provisions","method":"printed heading","endPage":16,"endAt":1304,"startToken":4065,"endToken":5187},{"p":16,"at":1304,"title":"III. CONCLUSION","method":"printed heading","endPage":18,"endAt":6,"startToken":5187,"endToken":5420},{"p":18,"at":6,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":18,"endAt":378,"startToken":5420,"endToken":5479}]}