{"document":{"slug":"rec-20260316-5379","title":"Comments of Crusoe Technologies LLC in response to PJM Interconnection, L.L.C.’s 60-Day Compliance Filing for Co-Located Load Related Revisions to Open…","issued":"2026-03-16","accession":"20260316-5379","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Crusoe Energy Systems, Inc.","kind":"comments","file":"sources/filings/text/20260316-5379_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5379","tier":"record","sha256":"c7de1dfcff335f34c7c18e4aeb845fc8b49580a62287c9595388c44e21c61bfd","pages":11,"tokens":2615,"emptyPages":[],"textThemes":["colo","study","flex"]},"pages":[{"page":1,"startToken":0,"endToken":266,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Interconnection, L.L.C.  \n \n  \n \n \nDocket No. ER26-1479-000 \n \n \nCOMMENTS OF CRUSOE TECHNOLOGIES LLC \n \n \nIn accordance with Rules 212 and 213 of the Federal Energy Regulatory Commission’s \n(Commission) Rules of Practice and Procedure1 Crusoe Technologies LLC (Crusoe) \nrespectfully submits these comments in response to PJM Interconnection, L.L.C.’s (PJM) 60-\nDay Compliance Filing2 filed on February 23, 2026 (PJM Compliance Filing).  The PJM \nCompliance Filing was submitted in response to the Commission’s December 18, 2025 Order \non Show Cause Proceeding,3 regarding the co-location of large loads in PJM. \nI. \nSUMMARY OF COMMENTS \nCrusoe appreciates PJM’s efforts to advance large load interconnection and its \nthoughtful engagement with stakeholders in developing a workable approach.  Crusoe supports \npolicy efforts that facilitate “bring your own power” frameworks and are built on an energy-\nfirst model that allow co-located generation to enhance grid reliability, reduce ratepayer costs, \nand accelerate the buildout of AI infrastructure.  Crusoe believes that certain targeted revisions \nto PJM’s compliance filing will help ensure the Commission’s December 18 Order achieves its \npurpose of enabling large loads to interconnect quickly and reliably while protecting the \ntransmission system and other ratepayers. \n \n1 18 C.F.R. §§ 385.212, 385.213 (2025). \n2 PJM Interconnection, L.L.C., 60-Day Compliance Filing for Co-Located Load Related to Revisions to \nOpen Access Transmission Tariff to Comply with Commission Order in Docket No. EL25-49, et al., \nFERC Docket No. ER26-1479-000 (Feb. 23, 2026) (PJM Compliance Filing).  \n3 PJM Interconnection, L.L.C., et al., 193 FERC ¶ 61,217 (2025) (December 18 Order)."},{"page":2,"startToken":266,"endToken":542,"text":"Docket No. ER26-1479-000 \n \n2 \n \nFirst, PJM’s proposed 50 MW materiality threshold for new Retail Behind-the-Meter \nGeneration (Retail BTMG) is too low and could produce unjust and unreasonable outcomes for \nlarger co-located loads.  The Commission should direct PJM to revise the threshold upward and \ncalibrate it to the size of the co-located load at the relevant electrical location.  Second, while \nPJM’s Interim Network Integration Transmission Service (Interim NITS) is a useful tool to \nhelp facilitate large load interconnections, it should be clarified to ensure that co-located \ngeneration is able to supply co-located load during curtailment events, including while the \ngenerator is still being studied in the interconnection process.  \nThird, while Crusoe supports PJM’s proposed menu of three new transmission service \noptions, the Commission should direct PJM to provide clear Tariff procedures for establishing, \nadjusting, and terminating Contract Demand quantities over time and clarify how point-to-point \nservice coordinates with co-location arrangements.   \nFinally, a well-designed Necessary Studies process is the cornerstone of a successful \nCo-Located Load interconnection framework.  The Commission has a clear opportunity to \nestablish a process that is both expeditious and predictable — one that gives developers the \ncertainty they need to invest with confidence and move projects forward at the speed the \nmarket demands.   \nTo realize this opportunity, the Commission should take three affirmative steps.  First, \nestablish binding study timelines with enforceable milestones that bring discipline and \naccountability to the review process.  Second, focus study scope where it matters most — on \nreliability impacts directly attributable to non-exporting resources — ensuring reviews are \ntargeted, efficient, and technically sound.  Third, adopt and publish a clear, transparent standard \nfor study triggers, giving all stakeholders a common roadmap and eliminating the ambiguity"},{"page":3,"startToken":542,"endToken":788,"text":"Docket No. ER26-1479-000 \n \n3 \n \nthat slows project development.  Together, these measures will transform the Necessary Studies \nprocess into a genuine enabler of Co-Located Load interconnection — providing the speed, \ntransparency, and reliability that both the Commission and the market need to unlock the full \npotential of co-location. \nII. \nBACKGROUND \nCrusoe is a vertically integrated Artificial Intelligence (AI) infrastructure company that \nbuilds, owns, and operates data centers specifically optimized for the high-performance \ncomputing requirements of AI and machine learning workloads.  Crusoe’s “bring your own \npower” philosophy is founded on the goal of harnessing stranded and otherwise wasted energy \nto power computation.  Crusoe's business model is built on an energy-first approach—where \nco-located generation, when structured correctly, simultaneously advances grid reliability, \nreduces ratepayer costs, and accelerates AI infrastructure.  Crusoe appreciates PJM's \nengagement with stakeholders on this matter and recognizes that PJM's decisions here may \nserve as a national model. \nCrusoe supports the Commission's goal of creating a clear, workable framework with \noptionality for interconnecting new large loads embedded in the new transmission service \noptions.  Our goal is speed to power responsibly.  Crusoe’s guiding principle is straightforward: \nmove the compute to the energy, not the other way around.  Traditional data center \ndevelopment follows the grid – waiting for interconnection approvals, straining existing \ninfrastructure, and too often driving up electricity costs for the communities it enters.  Crusoe \ntakes the opposite approach and instead locates AI workloads near sources of abundant, often \nunderutilized energy – tapping into places traditional data centers do not reach."},{"page":4,"startToken":788,"endToken":1057,"text":"Docket No. ER26-1479-000 \n \n4 \n \nCrusoe's primary operations involve sourcing and developing cost-effective energy, \nincluding natural gas, renewable power (e.g., wind, solar) and battery storage, to power its data \ncenter facilities.  Crusoe leverages its in-house manufacturing capabilities to rapidly deploy \ncomputing infrastructure that provides reliable, low-latency cloud services, including access to \nleading-edge graphics processing units (GPUs), to enterprise customers and AI developers.  \nThrough its energy-first approach, Crusoe aims to reduce both the cost and the environmental \nimpact of utility-scale computing infrastructure. \nIII. \nCOMMENTS \nA. \nPJM’s Proposed 50 MW Materiality Threshold for New Retail BTMG \nShould Be Revised Upward. \n \nPJM proposes a materiality threshold of up to 50 MW for a new generator to qualify as \nRetail BTMG, contending that this threshold corresponds with the PJM Board’s definition of \nlarge load additions (i.e., individual loads of 50 MW or greater at a single point of \ninterconnection).  Crusoe respectfully submits that this threshold is misaligned with the \nregulatory purpose it purports to serve and will undermine the very policy goals the \nCommission sought to advance in the December 18 Order. \n \nThe 50 MW threshold, while aligned with the PJM Board’s definition of large load \nadditions, was designed as an administrative planning threshold, not as a bright-line test for \nwhat constitutes a reliability risk.  Applying the threshold as the sole determinant of Retail \nBTMG eligibility conflates two distinct regulatory purposes.  A planning metric developed to \nidentify large load additions for administrative purposes is not, and should not become, a proxy \nfor measuring when behind-the-meter generation creates transmission system risk.  The \nCommission should decline to treat these two distinct purposes as interchangeable."},{"page":5,"startToken":1057,"endToken":1311,"text":"Docket No. ER26-1479-000 \n \n5 \n \n \nLarge loads come in many sizes, and co-location arrangements can vary significantly.  \nThe Retail BTMG threshold should be flexible and non-discriminatory to account for these \ndifferences.  A fixed 50 MW cap raises serious concerns about disparate treatment of large \nloads of different sizes.  PJM’s own filing acknowledges that a lower threshold risks forcing \nexisting BTMG resources offline during the transition period—an outcome that would increase \ngrid burden, not reduce it, by converting currently netted load into full network load without \ncorresponding new capacity additions.4  This outcome warrants careful consideration by the \nCommission, as it does not reflect a principled distinction among similarly situated customers. \n \nStripping a new large load of netting rights if it has Retail BTMG greater than 50 MW \npenalizes the very co-location configurations that can ease grid congestion.  BTMG \narrangements can benefit the transmission system in many ways, such as by serving load on a \nstreamlined basis, avoiding queue delays in the generator interconnection process, and by \nreducing the need for expensive grid upgrades.  These are not speculative benefits – they are \nthe precise outcomes the Commission’s bring your own power framework was designed to \nproduce. \n \nThe optimal sizing of Retail BTMG (such as solar plus battery energy storage systems or \nsome other combination) to support AI data center would most certainly exceed 50 MW.  \nAccordingly, Crusoe supports an approach that limits the size of Retail BTMG in proportion to \nthe size of the load.   \n \n4 PJM Compliance Filing at 12 (Sec. III.A.2.c)."},{"page":6,"startToken":1311,"endToken":1615,"text":"Docket No. ER26-1479-000 \n \n6 \n \nB. \nPJM’s Proposed Interim NITS Framework Must Allow Co-Located \nGeneration and Retail BTMG to Serve Co-Located Load During \nCurtailment Events on the Grid.  \n \nPJM proposes Interim NITS as a transition service until the transmission system can \nsupport the large load customer’s NITS request.5  According to PJM, “Interim NITS is \npremised on the notion that the Co-Located Load is willing and able to limit its energy \nwithdrawals from the Transmission System prior to NITS being available.6  Crusoe supports \nInterim NITS as a bridge service where it adds genuine value: the period during which a single \nbuilding or phase of a data center campus is coming online while co-locating  generation and/or \nRetail BTMG is still being built and interconnected.  In that context, Interim NITS provides a \nworkable, near-term solution to allow load to operate on the transmission system. \nPJM’s proposed approach to implementing Interim NITS, however, appears to treat new \nCo-Located Generating Facilities as equivalent to full PJM Resources prior to the Co-Located \nGenerating Facilities receiving firm Network Resource status.  It is not clear if PJM intends to \nprevent Co-Located Generating Facilities or Retail BTMG from supplying energy to Co-\nLocated Load during a grid curtailment event if the Co-Located Load is at that time being \nserved via Interim NITS.  If that is PJM’s proposal, it would create a large disincentive to large \nload customers from utilizing Interim NITS as an option for speedy interconnection.  If large \nload customers cannot rely upon their own Co-Located Generating Facilities or Retail BTMG \nduring the Interim NITS period, it would create a significant disincentive and effectively nullify \nInterim NITS as a viable transmission service option and commercial pathway. \n \n5 Initial Brief of PJM Interconnection, L.L.C., Docket No. EL25-49, at 67 (Feb. 23, 2026) (PJM Brief). \n6 PJM Brief at 71."},{"page":7,"startToken":1615,"endToken":1903,"text":"Docket No. ER26-1479-000 \n \n7 \n \n \nThis concern is not unique to Crusoe.  Large loads electing to take Interim NITS accept \nthe risk of grid curtailment, but they should not have to completely shut down during a grid \ncurtailment if they can rely on co-located generation or Retail BTMG without relying on the \ntransmission grid.  The PJM tariff should allow a Co-Located Generating Facility to serve its \nCo-Located Load directly—without grid injection—while still being studied through the \napplicable generator interconnection study process.  \nC. \nPJM’s Proposed Three New Transmission Service Options Should Be \nAccepted, With Additional Guidance on Contract Demand Procedures. \n \nCrusoe strongly supports the Commission’s decision to create a menu of transmission \nservice options.  The ability to right-size transmission service to actual grid dependence is a \nsmart policy approach that aligns cost of transmission service with actual usage.  Crusoe \nsupports PJM’s proposed three new transmission service options that will benefit large load \ncustomers.  According to PJM, large load customers will have the option to take a combination \nof Firm and Non-Firm Contract Demand Transmission Service, so long as the combined \nservice fully covers the co-located load's total load.7  The new transmission service options will \nencourage flexible co-location structures that will enable speedy and reliable interconnection \nfor large loads. \nFirm Contract Demand Transmission Service is the appropriate long-term service for \ndata centers that have stable, predictable on-site generation and limited grid draw.  Non-Firm \nContract Demand provides valuable optionality for sites where grid dependence varies.  This is \nespecially true for Crusoe’s phased campus development model, where generation and load \ncome online in stages.  The three-service menu allows Crusoe to right-size its transmission \n \n7 Initial Brief of PJM Interconnection, L.L.C., Docket No. EL25-49-000 at 7 (Feb. 23, 2026)."},{"page":8,"startToken":1903,"endToken":2139,"text":"Docket No. ER26-1479-000 \n \n8 \n \nservice obligations as each phase matures, avoiding unnecessary costs during buildout while \nensuring the grid is protected at every stage.   \nHowever, the illustrative Tariff language in the PJM Brief leaves certain critical \nquestions unanswered regarding how the contract demand MW quantity is established and \nmodified over time.8  The compliance filing does not (1) explain how the initial contract \ndemand quantity is determined (i.e., whether by customer request, as determined by study, or \nby some other mechanism), (2) address whether contract demand quantities can be adjusted as \nload grows in phases or (3) specify how point-to-point transmission service interacts with co-\nlocation arrangements where both generation and load sit on the developer's side of the Point of \nChange in Ownership.   \nThese are important implementation details for a multi-gigawatt campus developer like \nCrusoe.  An inability to adjust contract demand quantities in step with phased load growth \nwould require either over-purchasing transmission service in early phases or risk non-\ncompliance as load grows.  The Commission should ensure that the final Tariff language does \nnot place large load customers in this position by directing PJM to provide detailed procedures \nfor establishing, adjusting, and terminating Contract Demand quantities, and to clarify how \npoint-to-point transmission service coordinates with co-location configurations in the final \nTariff language. \n \n8 PJM Brief, Attachment A, Illustrative Language for New Tariff, Part XI; Attachments F-3A and F-4; \nand Other Illustrative Tariff Revisions."},{"page":9,"startToken":2139,"endToken":2420,"text":"Docket No. ER26-1479-000 \n \n9 \n \nD. \nThe Necessary Studies Process Must Be Expeditious and Not Become a \nBarrier to Co-Located Load Development. \n \nThe Necessary Studies process must be fast, predictable, and not become a barrier to \ninterconnecting new Co-Located Load.  A Necessary Studies process that introduces open-\nended timelines, redundant review of generation resources that are not being injected into the \ngrid, or unclear criteria for what triggers a study will directly undermine this goal.  The PJM \nNecessary Studies should be designed with stakeholders and practical timelines in mind. \nCrusoe recommends a series of workshops with industry to design these timelines.  In this \nregard, PJM should  (1) establish binding timelines for the completion of Necessary Studies \napplicable to Co-Located Load; (2) limit the scope of Necessary Studies where new generation \nresources are not interconnecting to the transmission system to reliability impacts only; and (3) \ncreate a clear, published standard for what triggers a Necessary Study so that developers can \nplan with certainty.  Speed and certainty in the Necessary Studies process are not in tension \nwith reliability, they are prerequisites for delivering the AI infrastructure capacity the nation \nrequires at the pace the market demands. \nIV. \nCONCLUSION \nFor the reasons discussed above, Crusoe Technologies LLC respectfully urges the \nCommission to adopt targeted revisions to PJM’s compliance filing that will facilitate the \nreliable and timely interconnection of large loads, support the development of flexible co-\nlocation arrangements, and ensure that necessary studies and tariff procedures do not create \nunnecessary barriers for innovative energy-first data center models. By refining the materiality \nthreshold for Retail BTMG, clarifying the application of Interim NITS, providing detailed \nguidance for contract demand procedures, and ensuring an expeditious and transparent studies"},{"page":10,"startToken":2420,"endToken":2529,"text":"Docket No. ER26-1479-000 \n \n10 \n \nprocess, the Commission can advance its policy objectives while protecting the interests of the \ntransmission system and ratepayers. Crusoe appreciates the Commission’s and PJM’s ongoing \nengagement with stakeholders and looks forward to continued collaboration in building a \nrobust framework for the next generation of AI infrastructure. \nRespectfully submitted, \n \n \n \n \n \n \n \n \n______________________ \nSara Axelrod  \n \n \n \nCarrie Collier-Brown \nBharath Ravulapati \n \n \n \nLinda Walsh \nCrusoe Technologies LLC \n \n \nMichael Blackwell   \n255 Fillmore Street \n \n \n \nHusch Blackwell LLP   \nDenver, CO 80202 \n \n \n \n1801 Pennsylvania Ave., NW, Suite 1000 \nssteele@crusoe.ai \n \n \n \nWashington, DC  20006 \nbravulapati@crusoe.ai \n \n \nTel: (202) 378-2308 \n \n \n \n \n \n \nlinda.walsh@huschblackwell.com \n \n \n \n \n \n \nmichael.blackwell@huschblackwell.com  \n \n \n \n \n \n \n \n \nCounsel to Crusoe Technologies LLC \nDated: March 16, 2026"},{"page":11,"startToken":2529,"endToken":2615,"text":"CERTIFICATE OF SERVICE \n \n \nPursuant to Rule 2010 of the Federal Energy Regulatory Commission’s Rules of \nPractice and Procedure, 18 C.F.R. § 385.2010, I certify that I served the foregoing document \nupon each person designated on the official service list compiled by the Secretary in this \nproceeding. \n \n \nDated at Washington, D.C. this 16th day of March 2026. \n \n \n/s/ Laura Arboleda Bowie \n \nLaura Arboleda Bowie \nHusch Blackwell LLP  \n1801 Pennsylvania Ave. NW, Suite 1000  \nWashington, D.C. 20006 \nTel: (202) 378-5786 \nlaura.bowie@huschblackwell.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":696,"startToken":0,"endToken":100},{"p":1,"at":696,"title":"I. SUMMARY OF COMMENTS","method":"printed heading","endPage":3,"endAt":341,"startToken":100,"endToken":588},{"p":3,"at":341,"title":"II. BACKGROUND","method":"printed heading","endPage":4,"endAt":647,"startToken":588,"endToken":869},{"p":4,"at":647,"title":"III. COMMENTS","method":"printed heading","endPage":4,"endAt":663,"startToken":869,"endToken":871},{"p":4,"at":663,"title":"A. PJM’s Proposed 50 MW Materiality Threshold for New Retail BTMG","method":"printed heading","endPage":6,"endAt":33,"startToken":871,"endToken":1315},{"p":6,"at":33,"title":"B. PJM’s Proposed Interim NITS Framework Must Allow Co-Located","method":"printed heading","endPage":7,"endAt":547,"startToken":1315,"endToken":1697},{"p":7,"at":547,"title":"C. PJM’s Proposed Three New Transmission Service Options Should Be","method":"printed heading","endPage":9,"endAt":33,"startToken":1697,"endToken":2143},{"p":9,"at":33,"title":"D. The Necessary Studies Process Must Be Expeditious and Not Become a","method":"printed heading","endPage":9,"endAt":1312,"startToken":2143,"endToken":2332},{"p":9,"at":1312,"title":"IV. CONCLUSION","method":"printed heading","endPage":11,"endAt":0,"startToken":2332,"endToken":2529},{"p":11,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":11,"endAt":556,"startToken":2529,"endToken":2615}]}
