{"document":{"slug":"rec-20260325-5191","title":"Reply Brief and Protest of Enchanted Rock, LLC in response to PJM Interconnection, L.L.C.’s initial brief filed on 02/23/2026","issued":"2026-03-25","accession":"20260325-5191","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Enchanted Rock, LLC","kind":"protest","file":"sources/filings/text/20260325-5191_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5191","tier":"record","sha256":"0c9e6d99b6eb12dfc17391ef79a3728e721aa3925d4f4d37e34d3adde324cb8e","pages":12,"tokens":3508,"emptyPages":[],"textThemes":["colo","flex","cost"]},"pages":[{"page":1,"startToken":0,"endToken":290,"text":"UNITED STATES OF AMERICA  \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Interconnection, L.L.C., et al. \n) \nDocket No. EL25-49-000 \nLarge Loads Co-located at Generating \nFacilities \n) \n) \n) \n \nDocket No. AD24-11-000   \nConstellation Energy Generation, LLC \n    v.  \nPJM Interconnection, L.L.C. \n) \n) \n) \n) \n \nDocket No. EL25-20-000 \n \n(consolidated) \n \n) \nPJM Interconnection, L.L.C.  \n \n     )  \n \n \n  Docket No. ER26-1479-000 \n \n   \n \nREPLY BRIEF AND PROTEST OF ENCHANTED ROCK \n \nPursuant to Rule 2111 of the Federal Energy Regulatory Commission (“FERC” or \n“Commission”)’s rules of practice and procedure, and ordering paragraphs (D) and (E) of the \nOrder on Show Cause Proceeding, Directing Compliance Filings, Establishing Paper Hearing, \nand Granting in Part and Denying in Part Complaint, issued by the Commission on December \n18, 2025,2 Enchanted Rock, LLC (“Enchanted Rock”) hereby files this reply brief and protest \n(collectively, “Protest”) to: 1) respond to PJM Interconnection, L.L.C.’s (“PJM”) initial brief, \nsubmitted on February 23, 2026;3 and 2)  respond to PJM’s February 23, 2026 compliance filing \nsubmitted in response to the Commission’s December 18 Order.4     \n \n1 18 C.F.R. § 385.211 (2026). \n2 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (“December 18 Order”); see also PJM Interconnection, \nL.L.C., Notice of Extension of Time, Docket Nos. EL25-49-000, et al., at 3 (Jan. 23, 2026) (granting a 7-day \nextension of the deadline in ordering paragraph (D) of the December 18 Order for parties to submit reply briefs).   \n3 Initial Brief of PJM Interconnection, L.L.C., Docket Nos. EL25-49-000, et al. (Feb. 23, 2026) (“PJM Initial \nBrief”).  \n4 See 60-Day Compliance Filing for Co-Located Load Related Revisions to Open Access Transmission Tariff to \nComply with Commission Order in Docket No. EL25-49, et al, Docket No. ER26-1479-000 (Feb. 23, 2026) (“PJM \nFebruary 23 Compliance Filing”)."},{"page":2,"startToken":290,"endToken":732,"text":"2 \nThis Protest challenges a limitation that PJM seeks to impose related to the provision of \nInterim Network Integration Transmission Service (“Interim NITS” 5).  More specifically, as \ndescribed by PJM to stakeholders –  but not set forth in its Initial Brief, Illustrative Tariff or the \nFebruary 23 Compliance Filing – PJM intends to prohibit Co-Located Load from receiving any \ncapacity or energy from a Co-Located Generating Facility while the Co-Located Load is taking \nInterim NITS (sometimes referred to herein as the “Proposed Interim NITS Limitation”).6  For \nthe reasons set forth below in further detail, PJM’s Proposed Interim NITS Limitation runs afoul \nof the Commission’s applicable findings and directives in the December 18 Order, including \nCommissioner Rosner’s unequivocal statements in his concurring opinion to the December 18 \nOrder explaining that a Co-Located Load “can take service directly from the generator” while the \nCo-Located Load is taking Interim NITS7 (sometimes referred to herein as the “Interim Period”). \nMoreover, PJM’s Proposed Interim NITS Limitation, if enacted, would make it \ncommercially impractical for Eligible Customers to ever utilize Interim NITS to serve their Co-\nLocated Load, thus undermining the Commission’s goals of establishing Interim NITS in order \nto “facilitate the timely provision of transmission service to Eligible Customers taking \n \n5 All capitalized terms not otherwise defined herein shall have the same meaning set forth in the PJM Open Access \nTransmission Tariff (“PJM Tariff”), or the Illustrative Language For New Tariff (“Illustrative Tariff”) filed with the \nPJM Initial Brief, as applicable. \n6 See PJM Staff, Co-Located Load Use Cases, at 12 (March 16, 2026),(“Co-located load taking Interim NITS \nservice will not have rights to the capacity/energy from any specific co-located generation”), available at: \nhttps://www.pjm.com/-/media/DotCom/committees-groups/workshops/cllsco/2026/20260316/20260316-item-02---\nco-located-load-use-cases---presentation.pdf (“PJM Staff March 16 Presentation”); see also PJM Staff, \nPreliminary/Working Draft of Concepts as of January 23, 2026: Transmission Services Proposal – High Level \nOverview, at 4 (Jan. 23, 2026), (“[i]f curtailed, [Eligible Customer] cannot take energy from co-located generator.”), \navailable at: https://www.pjm.com/-/media/DotCom/committees-\ngroups/workshops/cllsco/2026/20260126/20260126-item-01---transmission-services-concepts-for-discussion.pdf.  \n(“PJM Staff January 23 Draft Concepts”). \n7 See December 18 Order. Commissioner Rosner, Concurring at P 11 (“Rosner Concurrence”). In the December 18 \nOrder, the Commission issued several directives to PJM related to establishing a “new interim, non-firm \ntransmission service.”  See, e.g., December 18 Order at P 160.  PJM has proposed to define this new transmission \nservice as “Interim NITS.”  See, e.g., PJM Initial Brief at 1.  For the sake of efficiency and clarity, Enchanted Rock \nwill refer to this new transmission service only as “Interim NITS” herein."},{"page":3,"startToken":732,"endToken":1011,"text":"3 \ntransmission service on behalf of Co-Located Loads, while preserving reliability for other \ntransmission customers,”8 and to address interconnection delays faced by large load \ninterconnection customers.9 \nFor these reasons, and the reasons set forth herein, Enchanted Rock respectfully requests \nthat in any final order issued in the above-captioned proceedings, that the Commission 1) hold \nthat PJM’s Proposed Interim NITS Limitation is prohibited, and 2) direct PJM to file revisions to \nits tariff to clarify that a Co-Located Load can be served by its Co-Located Generating Facility \nduring the Interim Period, consistent with the applicable holdings and directives in the December \n18 Order.     \nI. \n BACKGROUND \ni. \nJustification for Interim NITS \nIn response to the Commission’s February 20, 2025 order to show cause,10 several parties \nrecommended that “the Commission explore the potential to develop a new level of non-firm or \ninterruptible transmission service that prioritizes connection of new flexible loads, regardless of \nwhether they are co-located with generation.”11  Among these parties was Enchanted Rock, \nwhich filed extensive comments supporting the establishment of a new, interim non-firm \ntransmission service to enable large load customers to interconnect faster while maintaining \noverall reliability of the transmission system.12   \nAs the Commission recognized in its December 18 Order, “Enchanted Rock supports a \ntransitional non-firm service where the load relies on PJM to provide energy, but where the load \n \n8 See December 18 Order at P 201.  \n9 See id.  \n10 PJM Interconnection, et al., 190 FERC ¶ 61,115 (2025) (“Show Cause Order”).   \n11 December 18 Order at P 80 (citations omitted). \n12 See Response of Enchanted Rock, LLC, Docket Nos. EL25-49-000, et al. (Apr. 23, 2025) (“Enchanted Rock April \n23 Comments”)."},{"page":4,"startToken":1011,"endToken":1311,"text":"4 \nis under a commitment to dispatch co-located generation during PJM curtailments.”13  The \nCommission further recognized that Enchanted Rock proposed that “the co-located facilities \ncould be quickly interconnected and would only require curtailment in a small number of hours \nof a year, allowing more efficient use of generation resources and transmission capacity, \nlowering costs to customers, and buying time for new infrastructure to be built.”14 \nThe Commission noted that in order to “facilitate more rapid interconnection and \noperation of Co-Located Loads” PJM and other parties discussed “the development of a new \ntransitional service that would allow new Co-Located Load to withdraw electricity from the PJM \ntransmission system earlier than may be otherwise achievable if those new Co-Located Loads \ncould only be designated as Network Load and served once all of the Network Upgrades \nnecessary to provide the requested NITS are complete.”15   \nii. \nCommission Directives Related to Interim NITS \nIn response to these parties’ comments, the Commission directed PJM to “create a new \ninterim, non-firm transmission service  . . .  [to] allow an Eligible Customer that has requested \nNITS on behalf of a Co-Located Load to take non-firm transmission service that can be \ninterrupted until the Network Upgrades necessary to provide NITS are complete and the Co-\nLocated Load can be designated as Network Load.”16  This “new interim, non-firm transmission \nservice” is what PJM defines as “Interim NITS.” \nThe Commission further held that Interim NITS would help to address interconnection \ndelays faced by large load customers by “allowing an Eligible Customer that has requested to \ntake NITS on behalf of a Co-Located Load to, through this new transmission service, receive an \n \n13 See December 18 Order at P 80 (citing Enchanted Rock April 23 Comments at 10-12).  \n14 See id. \n15See id. at P 200 (citations omitted). \n16 See id."},{"page":5,"startToken":1311,"endToken":1689,"text":"5 \ninterruptible transmission service before the Network Upgrades necessary to designate and serve \nthe Co-Located Load as Network Load are complete.”17   Moreover, the Commission held that \n“when curtailed, Eligible Customers taking this transmission service on behalf of Co-Located \nLoads may be able to continue to take energy from the Interconnection Customer with which \nthey are co-located if PJM’s Tariff otherwise allows.”18  The Commission directed PJM to file \ntariff revisions implementing this new service.19  \n \nNotably, in his concurring opinion to the December 18 Order, Commission Rosner \ndescribed the Commission’s rationale behind ordering the establishment of Interim NITS in \nfurther detail, as well as how it is intended to be implemented in practice: \ntoday’s order directs PJM to establish a new interim service (see Figure 4) to \nprovide a bridge while the infrastructure needed to serve a large load with \ntraditional front-of-meter network transmission service is being built.  This interim \nservice leverages speed in the near-term and unlocks the benefits of a full grid \nconnection in the long-term.  It will allow co-located loads and generators seeking \nfront-of-meter service to access the grid faster than they can today.  In exchange for \nincreased speed, these loads will bear the risk of being curtailed when the grid is \nconstrained until the transmission upgrades needed to provide service are \nconstructed.  But that doesn’t mean that the load will always have to shut down \ncompletely during peak periods.  Rather, if the co-located load is paired with a \nnew generator, and that generator is still waiting to begin its own front-of-meter \nservice, the load can take service directly from the generator in the interim until \nboth “graduate” to full, front-of-meter service.  This pathway is important because \ntraditional, front-of-meter network transmission service provides the broadest \nbenefits to both load and generators—a network load can be served by any \ngenerator on the grid, and a network generator can sell its power to any customer \non the grid.20   \n \nAdditionally, in Commissioner Rosner’s Figure 4 describing Interim NITS, it states that \nthe “Generator can serve load while awaiting grid connection or when grid is unavailable.”21  \n \n17 See December 18 Order at P 201.  \n18 Id.  \n19 See id. \n20 Rosner Concurrence at P 11(emphasis removed, emphasis added).     \n21 See Rosner Concurrence, Figure 4."},{"page":6,"startToken":1689,"endToken":2007,"text":"6 \nAccordingly, as made unequivocally clear by Commissioner Rosner’s concurring statements, the \nCommission intended for a Co-Located Load taking Interim NITS to be able to utilize energy \nand capacity provided by a Co-Located Generating Facility during the period in which the Co-\nLocated Load and Co-Located Generating Facility are being studied for full NITS (i.e., during \nthe temporary Interim Period).  This makes sense, as large load customers (particularly data \ncenters), cannot bear commercial risks associated with being fully offline for any material \namount of time, meaning that in order to utilize Interim NITS, Co-Located Load will need to be \nserved by their Co-Located Generating Facilities during periods in which they may be curtailed.   \niii. \nPJM’s Proposed Implementation of Interim NITS \nIn response to the Commission’s directives related to Interim NITS in the December 18 \nOrder, PJM filed the February 23 Compliance Filing (which provided a “shell” of Tariff, Part XI, \nto show that Interim NITS will be housed in a new Part XI of PJM’s Tariff22), and its Initial \nBrief, including the Illustrative Tariff.23  Sections 700-707 of Subpart A, Part IX of PJM’s \nIllustrative Tariff contain the non-rate terms and conditions related to PJM’s proposed \nimplementation of Interim NITS.   \nNotably, nowhere in PJM’s February 23 Compliance Filing, Initial Brief or applicable \nsections of its Illustrative Tariff does PJM make any mention of Proposed Interim NITS \nLimitation.  Notwithstanding this fact, PJM has clearly indicated to its stakeholders that when it \nactually implements Interim NITS, it intends to ensure that “Co-located load taking Interim \nNITS service will not have rights to the capacity/energy from any specific co-located \n \n22 See PJM February 23 Compliance Filing at 19. \n23 PJM noted that its proposed tariff language is “illustrative” because it was filed as part of the paper hearing record \nand PJM is not formally filing it until the Commission rules on the record. See PJM Initial Brief at 2."},{"page":7,"startToken":2007,"endToken":2430,"text":"7 \ngeneration,”24 and that (“[i]f curtailed, [Eligible Customer] cannot take energy from co-located \ngenerator.”25 \nII. \nPROTEST \ni. \nThe Proposed Interim NITS Limitation Cannot Be Imposed by PJM Because it is \nNot Part of PJM’s Filed Rate \n \nWhile none of PJM’s February 23 Compliance Filing, its Initial Brief or Illustrative Tariff \nmake any mention of Proposed Interim NITS Limitation,26 PJM instead seeks to impose the \nProposed Interim NITS Limitation through means not specified in the PJM Tariff.  However, any \nprohibition on a Co-Located Load’s ability to be served by a Co-Located Generating Facility \nduring the Interim Period must be specified in the PJM Tariff, as the prohibition significantly \nimpacts how Eligible Customers taking Interim NITS must operate their Co-Located Load \nduring periods in which they are curtailed, and as discussed further below in Section II.ii, renders \nInterim NITS entirely unworkable.  Therefore, because the Proposed Interim NITS Limitation is \ncertainly a practice “that affect[s] rates and service significantly, that [is] \nreasonably susceptible of specification, and that [is] not so generally understood in any \ncontractual arrangement as to render recitation superfluous,” it must be included within the PJM \nTariff (i.e., PJM’s filed rate) in order to be effectuated.27  PJM has not included any language \n \n24 See PJM Staff March 16 Presentation at 12.  \n25 See PJM Staff January 23 Draft Concepts at 4.  \n26 Importantly, Section 701.3 of PJM’s Illustrative Tariff, which is entitled “Restrictions on Use of Service”, contains \nno language that would implement the Proposed Interim NITS Limitation.    \n27 See, e.g., Midcontinent Indep. Sys. Operator, Inc., 158 FERC ¶ 61,003, at P 69 & n.113 (2017) (citations and \ninternal quotes omitted).  See also Sw. Power Pool, Inc., 170 FERC ¶ 61,125, at PP 35-36 & n.92 (2020) (noting that \nthe filed rate doctrine “entitles customers to rely upon what is in a tariff, regardless of any ‘one-way’ assertions \nmade by the utility outside of Commission filings.” (citing W. Deptford Energy, LLC v. FERC, 766 F.3d 10, 24 (D.C. \nCir. 2014) (rejecting the Commission’s argument that interconnection studies provided notice for financial \nresponsibility for upgrades because the Commission provided “‘no reasoned explanation for expanding the notice \nexception to encompass such one-way assertions, especially since generators have no apparent way to challenge any \ncosts such studies purport to assign’”)); Old Dominion Elec. Coop. v. FERC, 892 F.3d 1223, 1232 (D.C. Cir. 2018) \n(finding that a website statement at issue was not filed with the Commission, which “is required for all rate \nchanges”))."},{"page":8,"startToken":2430,"endToken":2766,"text":"8 \nintended to implement the Proposed Interim NITS Limitation in its Illustrative Tariff, meaning \nthat it cannot be imposed by PJM.   \nii. \nPJM’s Proposed Interim NITS Limitation Would Render Interim NITS \nUnworkable and Conflicts With the Commission’s Directives in the \nDecember 18 Order \n \nAs noted previously, the Commission established Interim NITS in order to allow “an \nEligible Customer that has requested to take NITS on behalf of a Co-Located Load to . . .receive \nan interruptible transmission service before the Network Upgrades necessary to designate and \nserve the Co-Located Load as Network Load are complete.”28  The core purpose of Interim NITS \nis to allow a large load customer to interconnect faster in exchange for being interruptible (i.e., \ncurtailable) when the transmission system is stressed and firm transmission service must be \nprioritized for Network Customers taking NITS.  Importantly, Interim NITS is designed to be \ntemporary,29 and only be in place until Network Upgrades are constructed, and both the Co-\nLocated Load and Co-Located Generating Facility can take or provide full Network Service, \nrespectively. This is reflected clearly in Commissioner Rosner’s concurrence to the December 18 \nOrder, in which he stated that “if the co-located load is paired with a new generator, and that \ngenerator is still waiting to begin its own front-of-meter service, the load can take service \ndirectly from the generator in the interim until both ‘graduate’ to full, front-of-meter service.”30  \nPJM’s Proposed Interim NITS Limitation would prohibit Co-Located Generating \nFacilities from serving Co-Located Load during the Interim Period, which would mean that the \nCo-Located Load would be exposed to actual shutdowns when curtailed.  Absent the ability to be \n \n28 See December 18 Order at P 201.   \n29 See, e.g., December 18 Order at P 200. Enchanted Rock has no objection to Co-Located Generating Facilities \nbeing prohibited from serving their Co-Located Loads that have previously obtained Interim NITS once both the \ngenerator and load have been studied as full, front-of-the-meter Network Resources, following the Interim Period.   \n30 See Rosner Concurrence at P 11."},{"page":9,"startToken":2766,"endToken":3068,"text":"9 \nserved by the Co-Located Generating Facility, the Co-Located Load would in fact “always have \nto shut down completely during peak periods,”31 – which is the precise outcome that the \nCommission sought to avoid by seeking to instead enable the “[co-located] load [] [to] take \nservice directly from the generator in the [I]nterim [Period].”32   \nBased on Enchanted Rock’s experience, large load customers, which Interim NITS is \ndesigned to serve, will accept the risk of being curtailed in exchange for faster interconnection.  \nHowever, these customers cannot commercially bear the risk of being completely shut down \nwhen curtailed.  Data centers and similar critical infrastructure facilities typically operate under \ncontractual reliability requirements demanding continuous uptime of 99.999% or greater.  \nMarket rules that would require these customers’ Co-Located Loads to be curtailed, but that \nwould allow a Co-Located Generating Facility to serve the Co-Located Load while it is being \ncurtailed, would be operationally and commercially manageable. However, PJM’s Proposed \nInterim NITS Limitation forecloses that option and would effectively force large load customers \ntaking Interim NITS to risk actually being shut down during periods in which they are curtailed, \nrendering Interim NITS commercially impractical and unworkable.  \nOther parties agree with Enchanted Rock’s assessment of PJM’s Proposed Interim NITS \nLimitation.  As noted by the Data Center Coalition (“DCC”) in their answer to PJM’s February \n23 Compliance Filing, the DCC stated that the Proposed Interim NITS Limitation “is unworkable \nbecause curtailment should limit use of the grid, not prevent the customer from using the co-\nlocated resource it supplied, which supports Interim NITS in the first place. If the customer \ncannot use that generation during curtailment, Interim NITS provides no practical value.”33  \n \n31 See id. \n32 See id.  \n33 See Comments of the Data Center Coalition, Docket No. ER26-1479-000, at 6 (Mar. 16, 2026) (emphasis added)."},{"page":10,"startToken":3068,"endToken":3280,"text":"10 \nSimilarly, Crusoe Technologies LLC noted that “[i]f large load customers cannot rely upon their \nown Co-Located Generating Facilities . . . during the Interim NITS period, it would create a \nsignificant disincentive and effectively nullify Interim NITS as a viable transmission service \noption and commercial pathway.”34 \nFor the foregoing reasons, the Proposed Interim NITS Limitation plainly conflicts with \nthe Commission’s holdings and directives related to Interim NITS in the December 18 Order and \nundermines the entire Interim NITS market construct. For these additional reasons, the Proposed \nInterim NITS Limitation is not just and reasonable and must not be permitted to stand by the \nCommission.35   \n \n \n \n \n \n \n \n \n \n \n \n \n34 Comments of Crusoe Technologies, LLC, Docket No. ER26-1479-000, at 6 (Mar. 16, 2026).   \n35 See also PJM Interconnection, L.L.C., 175 FERC ¶ 61,084 (2021) (rejecting an FPA Section 205 filing as unjust \nand unreasonable where the proposed tariff changes did not achieve PJM’s stated reliability objective and therefore \nfailed to accomplish its purpose); NRG Power Mktg., LLC v. FERC, 430 U.S. App. D.C. 224, 226, 862 F.3d 108, 110 \n(2017) (noting that FERC cannot accept a proposal that results in a fundamentally different rate design than what \nwas proposed, particularly if it fails to resolve the issues it aimed to address)."},{"page":11,"startToken":3280,"endToken":3457,"text":"11 \nIII. \n CONCLUSION \nFor the foregoing reasons, Enchanted Rock respectfully requests that the Commission \nconsider this Protest.  Moreover, Enchanted Rock respectfully requests that in any final order \nissued in the above-captioned proceedings, that the Commission 1) hold that PJM’s Proposed \nInterim NITS Limitation is prohibited, and 2) direct PJM to file revisions to its tariff to clarify \nthat a Co-Located Load can be served by its Co-Located Generating Facility during the Interim \nPeriod, consistent with the applicable holdings and directives in the December 18 Order. \n \n \n \n \nJoel Yu \nSenior Vice President, Policy & External Affairs \nEnchanted Rock, LLC \n1113 Vine Street, Suite 101 \nHouston, TX 77002 \n \nJyu@enchantedrock.com \n \nJames Huang \n \nDirector, Wholesale Markets Policy \nEnchanted Rock, LLC \n1113 Vine Street, Suite 101 \nHouston, TX 77002 \nJhuang@enchantedrock.com \n \nRespectfully submitted, \n \n/s/ Steven Shparber \n \nSteven Shparber \nOmar Bustami \nNakia Arrington  \nMintz, Levin, Cohn, Ferris, Glovsky and \nPopeo, P.C. \n555 12th Street NW, Suite 1100 \nWashington, D.C. 20004 \n(202) 434-7417 \n \n \n \nSShparber@mintz.com  \n \n \n \nOBustami@mintz.com \nNLArrington@mintz.com  \n \n \n \n \n \n \n \n \n \nCounsel to Enchanted Rock, LLC \n \n \n  Dated: March 25, 2026"},{"page":12,"startToken":3457,"endToken":3508,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day caused the foregoing and its attachments to be served \nupon each person designated on the official service list compiled by the Secretary in the captioned \nproceeding. \nDated at Washington, D.C., this 25th day of March 2026. \n/s/ Steven Shparber"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":707,"startToken":0,"endToken":836},{"p":3,"at":707,"title":"I. BACKGROUND","method":"printed heading","endPage":7,"endAt":116,"startToken":836,"endToken":2024},{"p":7,"at":116,"title":"II. PROTEST","method":"printed heading","endPage":11,"endAt":4,"startToken":2024,"endToken":3281},{"p":11,"at":4,"title":"III. CONCLUSION","method":"printed heading","endPage":12,"endAt":0,"startToken":3281,"endToken":3457},{"p":12,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":12,"endAt":307,"startToken":3457,"endToken":3508}]}