{"document":{"slug":"rec-20260325-5203","title":"Joint Response of the Indicated PJM Transmission Owners to PJM Interconnection, L.L.C.’s Initial Brief filed on 02/23/2026","issued":"2026-03-25","accession":"20260325-5203","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"brief","file":"sources/filings/text/20260325-5203_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5203","tier":"record","sha256":"ae230a80271a0de70d965de192dd3f440942caaf5ad8bab498e0f84938c4b0b4","pages":26,"tokens":7168,"emptyPages":[],"textThemes":["colo","flex","study"]},"pages":[{"page":1,"startToken":0,"endToken":321,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C., et al.  \n )  \nDocket No. EL25-49-000 \n )  \nDocket No. EL25-49-001 \n ) \nLarge Loads Co-Located at Generating Facilities ) \nDocket No. AD24-11-000 \n ) \nConstellation Energy Generation, LLC  \n \n )  \nDocket No. EL25-20-000 \nv.  \n \n ) \nPJM Interconnection, L.L.C.  \n )  \n(Consolidated) \nJOINT RESPONSE OF  \nTHE INDICATED PJM TRANSMISSION OWNERS \nPursuant to the Commission’s December 18, 2025 order in PJM Interconnection, L.L.C., \n193 FERC ¶ 61,217 (2025) (“Order”), the Indicated PJM Transmission Owners (collectively the \n“PJM Transmission Owners”)1 submit this joint response to the initial brief filed by PJM \nInterconnection, L.L.C. (“PJM”) on February 23, 2026 (“PJM Initial Brief”).   \n1\nFor the purpose of this filing, the Indicated PJM Transmission Owners are: American Electric Power Service \nCorporation on behalf of its affiliates, Appalachian Power Company, Indiana Michigan Power Company, Kentucky \nPower Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian \nTransmission Company, AEP Indiana Michigan Transmission Company, AEP Kentucky Transmission Company, \nAEP Ohio Transmission Company, and AEP West Virginia Transmission Company; The Dayton Power and Light \nCompany d/b/a AES Ohio; Dominion Energy Services, Inc. on behalf of Virginia Electric and Power Company d/b/a \nDominion Energy Virginia; Duke Energy Business Services, LLC for Duke Energy Kentucky, Inc. and Duke Energy \nOhio, Inc.; Duquesne Light Company; East Kentucky Power Cooperative; Exelon Corporation on behalf of its \naffiliates Atlantic City Electric Company, Baltimore Gas and Electric Company, Commonwealth Edison Company, \nCommonwealth Edison Company of Indiana, Inc., Delmarva Power & Light Company, PECO Energy Company , and \nPotomac Electric Power Company; FirstEnergy Service Company, on behalf of its affiliates American Transmission \nSystems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate Transmission LLC, The \nPotomac Edison Company, Monongahela Power Company, Keystone Appalachian Transmission Company, and \nTrans-Allegheny Interstate Line Company (collectively, the “FirstEnergy Companies”); PPL Electric Utilities \nCorporation; Public Service Electric and Gas Company; Rockland Electric Company; and the Southern Maryland \nElectric Cooperative."},{"page":2,"startToken":321,"endToken":634,"text":"2 \nI. \nINTRODUCTION AND BACKGROUND  \nIn the Order, the Commission ordered PJM to offer three new forms of transmission service \nunder its Tariff: (i) Firm Contract Demand transmission service; (ii) Non-Firm Contract Demand \ntransmission service and (iii) interim, non-firm transmission service under the PJM Open Access \nTransmission Tariff (“Tariff”) for Eligible Customers2 serving co-located load in PJM.3  The \nCommission also established this paper hearing process to determine the just and reasonable rates, \nterms, and conditions for these new transmission services.4  For the paper hearing process, the \nCommission provided for initial briefs, responses to initial briefs and replies to those responses.5\nThe PJM Transmission Owners are submitting this response in order to reply to PJM’s Initial Brief \nfiled on February 23, 2026. \nIn the PJM Initial Brief, PJM addresses the paper hearing questions posed in the Order \nregarding non-rate terms and conditions associated with the three new transmission services \nrequired by the Commission.6  The PJM Initial Brief also contains supporting affidavits, along \nwith illustrative tariff records (“Illustrative Tariff”), containing tariff provisions to implement \nPJM’s proposed terms and conditions.  The PJM Transmission Owners applaud PJM on the \nsubstantial progress it has made in a short time towards developing the non-rate terms and \nconditions required to effectuate the new transmission services and support the general structure \nfor effectuating those services that PJM proposes in the PJM Initial Brief.  Moreover, assuming \n2\nAll capitalized terms that are not otherwise defined herein shall have the meaning set forth in the PJM Tariff \nor Amended and Restated Operating Agreement of PJM Interconnection, L.L.C.. \n3\nOrder at P 160. \n4\nId. at PP 2, 194.  \n5\nId. at P 220.  \n6\nConsistent with the PJM Consolidated Transmission Owners Agreement (“CTOA”), PJM’s Initial Brief \nappropriately defers to the PJM Transmission Owners to propose rates for the new transmission services.  See PJM \nInitial Brief at 1-2."},{"page":3,"startToken":634,"endToken":937,"text":"3 \nthat the new transmission services are ultimately required to be implemented, an action with which \nsome PJM Transmission Owners strongly disagree, the PJM Transmission Owners agree that most \nof the modifications and new provisions that PJM proposes to include in its Tariff are just and \nreasonable.  This response focuses on a limited number of items that require clarification or modest \nchanges, or where additional detail is necessary. \nII. \nJOINT RESPONSE TO PJM’s INITIAL BRIEF \nA.\nIssues Relating to the Interaction Between Firm Contract Demand Service \nand Non-Firm Contract Demand Service. \nIn the PJM Initial Brief, PJM states that for an Eligible Customer taking Contract Demand \nService, the portion of the Co-Located Load for which a co-located generating facility will dedicate \nits output may be covered by Non-Firm Contract Demand Transmission Service and any portion \nof the gross demand of a Co-Located Load that is not covered by a co-located generating facility \nmust be covered by Firm Contract Demand Transmission Service.7  In total, the cumulative amount \nof Firm and Non-Firm Contract Demand Transmission Service must equal the entire gross demand \nof the Co-Located Load.8  This approach is reflected in PJM’s Illustrative Tariff, which would \nrequire an Eligible Customer applying for Contract Demand Service to apply for a combination of \nFirm and Non-Firm Contract Demand Transmission Service to cover the Co-Located Load’s entire \ngross load.9\n7\nPJM Initial Brief at 6-7.  In their initial brief, the PJM Transmission Owners refer to Firm and Non-Firm \nContract Demand Services (“PJM Transmission Owners Initial Brief”).  For purposes of this response, the PJM \nTransmission Owners have adopted the terms for these services used in the PJM Initial Brief: Firm and Non-Firm \nContract Demand Transmission Services. \n8\nPJM Initial Brief at Attachment A, Section 709.2. \n9\nPJM Initial Brief at Attachment A, Section 710.2."},{"page":4,"startToken":937,"endToken":1253,"text":"4 \nThe PJM Transmission Owners support these basic requirements but further clarification \nis necessary.  First, based on the materials provided in the PJM Initial Brief,10 as well as subsequent \nstakeholder presentations made by PJM, it appears that PJM contemplates that an Eligible \nCustomer’s initial application for a certain amount of Non-Firm Contract Demand Transmission \nService would essentially serve as a “holding” request, and the actual reservation and use of Non-\nFirm Contract Demand Transmission Service would require the Eligible Customer to submit \nindividual requests for service in advance of the interval during which it wishes to obtain such \nservice.  For instance, if an Eligible Customer’s co-located generator will be on scheduled outage \nfor a month, the Eligible Customer would be required to request, in advance of that month, Non-\nFirm Contract Demand Transmission Service for that month, at which point PJM would determine \nwhether or not the requested amount of Non-Firm service is available.  Moreover, the amount that \nPJM determines is available for a particular requested interval or intervals would presumably serve \nas the basis for determining the relevant charge to the Eligible Customer for Non-Firm Contract \nDemand Transmission Service.  PJM should confirm these understandings are correct and add \nappropriate language to its proposed Tariff provisions. \nMoreover, PJM should clarify pertinent details relating to this process.  For instance, \nSection 710.3 of PJM’s Illustrative Tariff sets forth a study process to determine what levels of \nFirm and Non-Firm Contract Demand Transmission Service can be provided to an Eligible \nCustomer.  However, it is not clear if this process is meant to cover only the initial service study, \nor also subsequent determinations as to available Non-Firm capacity based on specific reservation \nrequests.  Regardless, more detail should be provided as to the process for evaluating and granting \nspecific reservation requests for Non-Firm Contract Demand Transmission Service, including the \n10\nPJM Initial Brief at 9-10, Attachment B at 5-6."},{"page":5,"startToken":1253,"endToken":1548,"text":"5 \ntimelines associated with such requests.  For instance, PJM explains that Non-Firm Contract \nDemand Transmission Service is available only when a generating facility dedicated to serving \nCo-Located Load is on outage, but it is not clear what reservation requirements and timelines \nwould apply to forced outages.  Based on the Order,11 the PJM Transmission Owners assume that \nNon-Firm Contract Demand Transmission Service will be available for periods from one month \nto one hour in duration, but this should be specified in the relevant PJM Tariff language. \nB.\nThe Study Process for Co-Located Load Arrangements Should be Clarified to \nRecognize the Priority of Load Integration Studies. \nIn its Initial Brief, PJM proposes a study process for Contract Demand Transmission \nService whereby PJM will determine, in accordance with PJM Manuals, any studies necessary to \nprovide the requested transmission service.12  For Interim Network Integration Transmission \nService (“NITS”), PJM will determine whether additional studies beyond those required to \nevaluate the Eligible Customer’s request for NITS are needed for Interim NITS.13  If additional \nstudies are required, PJM will inform the Eligible Customer and then tender to the customer an \napplication and study agreement within 15 days.  PJM’s proposal appropriately recognizes the \nimportant role of the affected PJM Transmission Owner(s) in evaluating load interconnection \nrequests, stating that PJM will notify the affected PJM Transmission Owner(s) after receiving an \napplication for Contract Demand Transmission Service or Interim NITS, and specifying that if \nstudies are required, it will consider the results of any studies conducted by the PJM Transmission \nOwners.14  This approach serves as a just and reasonable foundation for studying Contract Demand \n11\nSee Order at P 215. \n12\nPJM Initial Brief at 24-25. \n13\nPJM Initial Brief at 70-71. \n14\nPJM Initial Brief at 24, 68."},{"page":6,"startToken":1548,"endToken":1852,"text":"6 \nTransmission Service or Interim NITS requests, but more detail should be added to clarify that the \nload integration studies conducted by the PJM Transmission Owners will be conducted first and \ninform any studies required by PJM relating to an Eligible Customer’s request for transmission \nservice and co-located generation interconnection.  \nAs the PJM Transmission Owners explained in their initial brief, they will still need to \nperform load integration studies for any Co-Located Load arrangements, similar to what they do \ntoday with respect to any large load customers, but with an expanded study scope due to the \naddition of co-located generation.15  Nothing in PJM’s proposal prevents the PJM Transmission \nOwners from conducting these necessary large load analyses to ensure local reliability.  To the \ncontrary, PJM’s Illustrative Tariff provisions specifically indicate that PJM “will coordinate with \nthe affected Transmission Owner(s) to complete studies, including load integration studies, which \nwill provide data relevant to the determination of whether (and to what level as applicable)” \nrequested Firm and Non-Firm Contract Demand Transmission Service can be provided.16\nThe PJM Transmission Owners support this approach.  It is critically important that PJM \nand the PJM Transmission Owners work closely and collaboratively in order to ensure that large \nloads, including those co-located with generation, can be quickly and efficiently interconnected.  \nThe PJM Transmission Owners are fully committed to achieving this goal.  However, more detail \nis necessary as to how a PJM Transmission Owner’s load integration studies will be sequenced \nwith Eligible Customer requests to PJM for Contract Demand and Interim NITS Transmission \nServices, as well as any related generator interconnection studies.  The Tariff should specify that \nTransmission Owners’ load integration studies will be completed first and thereby inform the \n15\nPJM Transmission Owners Initial Brief at 25-26. \n16\nPJM Initial Brief at Attachment A, Section 710.3 (emphasis added)."},{"page":7,"startToken":1852,"endToken":2129,"text":"7 \ndetermination of whether and what additional studies are necessary for purposes of an Eligible \nCustomer’s request for transmission service on behalf of a Co-Located Load and the \ninterconnection of any on-site generation.  Transmission Owners will always need to study new \nload additions to ensure that they can be reliably interconnected to the grid, regardless of the type \nof transmission service being requested.  Any facilities that the Transmission Owners determines \nare necessary to reliably interconnect the load can inform additional transmission and generation \nstudies.  Therefore, conducting load integration studies first will maximize the speed and efficiency \nof the overall process and avoid potential duplication of effort and expense between the PJM \nTransmission Owners and PJM. \nC.\nPJM’s Proposed Provisions Relating to Necessary Control Technologies and \nProtection Systems Should Be Clarified and Expanded. \nPJM’s proposal appropriately includes requirements for necessary control technologies and \nprotective systems in order to protect the transmission system and limit an Eligible Customer’s \nwithdrawals.  Pursuant to these requirements, the Transmission Provider, affected Transmission \nOwner(s) and Eligible Customer shall establish the necessary control technologies and protection \nsystems for each service agreement.17  The PJM Transmission Owners request two clarifications \nto these provisions. \nFirst, PJM should make clear that in order for an Eligible Customer to take any form of \nnew transmission services, whether it be Interim NITS, or Firm or Non-Firm Contract Demand, \nthe customer must comply with requirements to implement necessary control technologies and \nprotection systems.  Currently, PJM’s proposed Tariff language refers to such requirements in the \ncontext of Interim NITS and Non-Firm Contract Demand Transmission Service, but not Firm \n17\nPJM Initial Brief at Attachment A, Sections 705.5 and 713.6."},{"page":8,"startToken":2129,"endToken":2463,"text":"8 \nContract Demand Transmission Service.18  It is important, however, that each new transmission \nservice be conditioned, as determined through studies of each individual customer’s arrangements, \non the implementation of control technologies and protection systems to ensure that a Co-Located \nLoad does not exceed its specified level of transmission service.  This is because PJM will only be \nplanning and operating the system to reliably accommodate the contractually specified level of \ntransmission service.   \nThe PJM Transmission Owners appreciate that PJM’s proposal will require an Eligible \nCustomer to take a combination of Firm and Non-Firm Contract Demand Transmission Service to \ncover its entire gross load when co-located generation is unavailable.  However, regardless of the \ntype of services being taken, necessary control technology and system protections must be \nimplemented.  Therefore, in order to avoid confusion regarding an Eligible Customer’s obligations, \nPJM should add language to its Illustrative Tariff provisions making clear that Interim NITS, as \nwell as both Firm and Non-Firm Contract Demand Transmission Service, are contingent on the \nimplementation of necessary control technologies and protection systems, where applicable. \nSecond, PJM should modify the Illustrative Tariff provisions to make clear that necessary \ncontrol technologies and protection systems may (some would say should) be required on the \ncustomer’s side or both the customer’s side and the Transmission Owner’s side of the point of \ninterconnection.  As the PJM Transmission Owners explained in their initial brief, the use of \ncontrol technologies and protection systems to protect the grid from large amounts of on-site load \nexceeding their contractual withdrawal limitations, whether on an instantaneous, shorter-term, or \n18\nSee, e.g., PJM Initial Brief at Attachment A, Section 708 (“Prior to the Commencement of Service, for an \nEligible Customer to take Non-Firm Contract Demand Transmission Service on behalf of a Co-Located Load, the \nEligible Customer must demonstrate the implementation of the necessary control technologies and protection systems, \napproved by the Transmission Provider to allow the Eligible Customer to effectively limit withdrawals from the \nTransmission System to serve such Co-Located Load.”) (emphasis added)."},{"page":9,"startToken":2463,"endToken":2792,"text":"9 \nlonger-term basis, rather than building more permanent transmission solutions, is novel.19  This \napproach will require providing Transmission Owners with flexibility to determine how best to \nensure reliability on their respective systems, including whether contractual limitations agreed to \nby Co-Located Load customers are best secured by control technologies and protection systems \non only the Co-Located Load side or on both the Co-Located Load and independently on the \nTransmission Owner side of the point of interconnection.  PJM’s Tariff provisions should be \nsufficiently broad to encompass both approaches.20\nIn addition to these clarifications, additional detail will need to be developed to further \ndefine the requirements associated with the control technologies and protection systems necessary \nto ensure that Co-Located Loads do not exceed their relevant withdrawal limitations.  The PJM \nTransmission Owners recognize that PJM is planning to include further details on this issue in \nPJM Manuals, but regardless of where this detail resides, it is important that PJM work closely \nwith the PJM Transmission Owners and other stakeholders to develop this detail so that all parties \nunderstand their respective rights and obligations.  In their initial brief, the PJM Transmission \nOwners suggested a number of criteria relating to the use of control technologies and protection \nsystems, and the PJM Transmission Owners urge PJM and the Commission to adopt these criteria, \nto the extent they are not already contained in PJM’s proposal.21\nThe PJM Transmission Owners understand that PJM is considering, in other stakeholder \ninitiatives, questions regarding potential study priorities for large loads that bring their own \n19\nPJM Transmission Owners Initial Brief at 23-24. \n20\nSee, e.g., PJM Initial Brief at Attachment A, Section 702.5 (noting that the provision of “Interim NITS” \nservice will be conditioned upon the “Eligible Customer constructing, maintaining, and operating the facilities on its \nside of the Delivery Point necessary to reliably deliver capacity and energy from the Transmission Provider’s \nTransmission System to the Eligible Customer”). \n21\nPJM Transmission Owners Initial Brief at 23-24."},{"page":10,"startToken":2792,"endToken":3090,"text":"10 \ngeneration.  Any such priority process should ensure that its interaction with the new transmission \nservices does not create opportunities for customers to game the system; for instance, by adding \nde minimis amounts of co-located generation to trigger the priority, or by taking Firm Contract \nDemand Transmission Service equal to their entire on-site load to gain a priority over NITS \ncustomers.   \nFinally, it is important to recognize that, based on recent discussions at the NERC Large \nLoad Technical Conference, regulatory expectations for emerging large loads are evolving.  At \nthat conference, NERC and other reliability organizations indicated they are considering extending \ncertain reliability standards currently applicable to generation owners to large load customers, \nreflecting their view that these facilities increasingly function as grid infrastructure rather than \ntraditional end use customers.22  This process is of key importance because currently there is no \ncompliance entity on the load side to tie to NERC obligations, resulting in significant potential \nliability and exposure to Transmission Owners and other entities with defined NERC obligations, \nas well as increased risks to system reliability \nD.\nDevelopment of Telemetry Requirements. \nIn its Initial Brief, PJM states that to ensure adequate reliability and stability of PJM’s \nTransmission System, it expects to develop telemetry requirements and require Co-Located Load \nto meet such requirements in order to monitor Co-Located Load’s use of the transmission system.23\nThe PJM Transmission Owners support PJM’s proposal to develop and implement telemetry \nrequirements as described in the Initial Brief.24  Such requirements are an important reliability \n22\nSee, e.g., NERC, Assessment of Gaps in Existing Practices, Requirements, and Reliability Standards for \nEmerging Large Loads (Feb. 24, 2026), https://www.nysrc.org/wp-content/uploads/2026/03/NYSRC-LLWG-3-Att.-\n1-NERC-LLWG-Tech-Conference-Presentations.pdf at 63-70. \n23\nPJM Initial Brief at 59. \n24\nPJM Initial Brief at 59-61."},{"page":11,"startToken":3090,"endToken":3381,"text":"11 \nmeasure and are consistent with broader developments at the North American Electric Reliability \nCouncil (“NERC”), as discussed above. \nE.\nPenalties for Unreserved Use. \nIn its Initial Brief, PJM proposes operational penalties for Eligible Customers taking \nInterim NITS or Contract Demand Service that would apply when: (i) an Eligible Customer fails \nto follow established Load Shedding and Curtailment procedures; or (ii) necessary control \ntechnology and protection systems misoperate.25  For the first instance of a control \ntechnology/protection system misoperation, PJM proposes a 120 day pause in service, which may \nbe shortened or extended by mutual agreement.  The PJM Transmission Owners strongly urge  that \nthe relevant Transmission Owner’s approval must be included in the process of allowing service \nto be reinstated, and this requirement should be added to the Tariff language.  Upon a second \nmisoperation, or if an Eligible Customer fails to follow Load Shedding and Curtailment procedures \neven once, PJM proposes a strict liability rule resulting in the disqualification of an Interim NITS \ncustomer thereby forcing them to take traditional NITS or forcing a customer taking a Contract \nDemand Service to then take either Interim NITS or traditional NITS.26\nAs stated in their initial brief, the PJM Transmission Owners agree with PJM that the \nimposition of operational penalties is appropriate, but also believe that any penalty regime should \nrely on both operational consequences and complementary financial penalties.27  In its Initial Brief, \nPJM states that it supports a financial penalty for unreserved use, and intends to work with the \nPJM Transmission Owners to explore such a financial penalty.28  The PJM Transmission Owners \n25\nPJM Initial Brief at 40. \n26\nPJM Initial Brief at 41-46. \n27\nPJM Transmission Owners Initial Brief at 19-20. \n28\nPJM Initial Brief at 50-51."},{"page":12,"startToken":3381,"endToken":3693,"text":"12 \nappreciate and agree with PJM’s comments on this issue, and propose a financial penalty charge \nstructure with two components: (1) a base penalty charge, which applies to each individual hour \nin which the reserved transmission service limit is exceeded, and (2) a penalty ratchet, which \napplies when such exceedances occur repeatedly.  The PJM Transmission Owners provide a basic \noutline of this proposal below, with more details forthcoming in future filings in this proceeding.  \nIn addition to this proposed penalty for unreserved use, the PJM Transmission Owners propose to \napply financial penalties in instances in which a Co-Located Load fails to curtail upon instruction.  \nThe PJM Transmission Owners will also provide additional details on this proposal in future \nfilings. \nWhen a Co-Located Load exceeds its reserved transmission service limit, the base penalty \ncharge will be assessed for any hour in which at least one five-minute interval occurs during which \na customer’s metered load at the point of interconnection exceeds its reserved transmission service.  \nSuch a five-minute interval is defined as an Exceedance Interval, and such an hour is defined as \nan Exceedance Hour.  The base penalty charge will apply to each Exceedance Hour.  The penalty \nrachet applies when multiple Exceedance Hours occur during a particular time period.  It is \ndesigned to discourage recurring reliance on unreserved transmission capacity. \nUnder the penalty rachet framework, the penalty charges escalate as the frequency of \nunreserved transmission use increases.  Specifically, if more than one Exceedance Hour occurs on \nthe same day, an additional daily penalty applies.  If exceedances occur on multiple days within \nthe same week, an additional weekly penalty applies; likewise, if exceedances occur in multiple \nweeks within the same month, an additional monthly penalty applies.  Each of these penalties will \ninvolve escalating financial liabilities for prolonged periods of time.  By progressively increasing \nthe economic consequences of repeated penalties, the penalty ratchet reinforces the expectation"},{"page":13,"startToken":3693,"endToken":3958,"text":"13 \nthat Co-Located Load customers manage their load in a manner consistent with their reserved \ntransmission service. \nF.\nComments on Specific Proposed Tariff Provisions. \nIn addition to the general comments set forth above, the PJM Transmission Owners have \nidentified a number of suggested modifications or requests for clarification relating to the \nIllustrative Tariff records proposed by PJM. \n1.\nInterim Network Integrated Transmission Service Provisions. \na.\nSection 702.4 – Technical Requirements Prior to \nCommencement of Service. \nSection 702.4 of PJM’s Illustrative Tariff states that the Eligible Customer must (i) install \n“necessary hardware and software to limit energy withdrawals, including metering equipment;” \n(ii) provide PJM an operational contact and backup contact that is to be available 24 hours a day \nand 7 days a week, (iii) certify that it “is staffed with PJM Certified Operators pursuant to PJM \nManual 40;” (iv) demonstrate “its ability to receive voice and electronic signals from [PJM];” (v) \ndemonstrate that it “has operational control to respond to operating instructions from [PJM] to \nreduce or disconnect the Co-Located Load within 5 minutes or as specified in PJM Manuals;” and \n(vi) demonstrate that it “has operational control of the necessary control technologies and \nprotection systems set forth in . . . section 705, as applicable.”29\nThese technical requirements should also require an Eligible Customer to satisfy any \napplicable Transmission Owner-imposed technical requirements.  As the entities managing the \nload interconnection process, including any load integration studies, the PJM Transmission \nOwners will play a key role in ensuring the technical sufficiency of Co-Located Load connections \nand operations.  \n29\nPJM Initial Brief at Attachment A, Section 702.4."},{"page":14,"startToken":3958,"endToken":4251,"text":"14 \nb.\nSection 703.2 – New Co-Located Loads Connected with the \nTransmission Provider.  \nSection 703.2 of PJM’s Illustrative Tariff states: \nPrior to the Service Commencement Date of Network Integration Transmission Service, if \nan Eligible Customer designates a new Co-Located Load, or increases the size of the \ndesignated Co-Located Load, the new Co-Located Load shall be studied pursuant to a new \nApplication.30\nIn order to fully account for increases in the size of the designated Co-Located Load, the \nPJM Transmission Owners propose the following revision to Section 703.2.\nPrior to the Service Commencement Date of Network Integration Transmission Service, if \nan Eligible Customer designates a new Co-Located Load, or increases the size of the \ndesignated Co-Located Load, the new or increased Co-Located Load shall be studied \npursuant to a new Application. \nc.\nSection 703.3 – Information Updates. \nUnder Section 703.3 of PJM’s Illustrative Tariff, in order to maintain operational visibility \nby PJM of the system and thus to ensure reliability, Eligible Customers will have an ongoing \nobligation to provide the Transmission Provider with timely written or electronic notice of material \nchanges in the demand characteristics of the Co-Located Load and the supply characteristics of \nthe Co-Located Generating Facility.31  PJM, however, does not indicate how or where the term \n“material change” will be defined.   \nPJM should provide additional information as to what would constitute a “material change” \nin the demand characteristics of the Co-Located Load, particularly with respect to: (i) large, but \nforeseeable, load ramps that occur on a defined or scheduled basis; and (ii) the timing requirements \nfor submitting a new application once such changes are anticipated or occur. \n30\nPJM Initial Brief at Attachment A, Section 703.2. \n31\nPJM Initial Brief at Attachment A, Section 703.3."},{"page":15,"startToken":4251,"endToken":4551,"text":"15 \nd.\nSection 705.3 – Load Shedding.  \nPJM proposes that to the extent a contingency requires Transmission Owners and Eligible \nCustomers taking Interim NITS to shed load, such load shedding shall occur in accordance with \npreviously established procedures as set forth in the relevant transmission service agreement and \nPJM Manuals.32  There should be load shedding practice guidelines applicable to Co-Located Load \narrangements established by PJM.  Such load shedding guidelines will make it less complicated \nand more efficient for PJM to manage Co-Located Load arrangements.  Such practices will also \nensure that Co-Located Load customers will understand the relevant process when they seek to \nconnect and their load shedding priority when they are withdrawing energy from the grid.  \nThe PJM Transmission Owners are particularly concerned with automatic load shedding \nschemes.  If a large load were to suddenly appear due to a forced outage of a Co-Located Load’s \non-site generation, even a fast disconnection by the customer could cause issues if the \ndisconnection is not fast enough.  With large loads rapidly looking to interconnect coupled with \nthe retirement of synchronous generation facilities, the lack of inertia may cause sudden localized \nfrequency decline.  If such an event occurs near a location where there is an automatic load \nshedding scheme, unintentional activation of the automatic load shedding scheme could result in \nunwanted shedding of nearby customer loads in addition to the Co-Located Load.   \ne.\nSection 705.5 – Necessary Control Technologies and Protection \nSystems. \nSection 705.5 of PJM’s Illustrative Tariff concerns necessary control technologies and \nprotection systems and provides:  \nTo ensure protection of the Transmission System, and to ensure that the Eligible \nCustomer taking Interim Network Integration Transmission Service on behalf of a \nCo-Located Load limits its energy withdrawals from the Transmission System to \n32\nPJM Initial Brief at Attachment A, Section 705.3."},{"page":16,"startToken":4551,"endToken":4907,"text":"16 \nits approved level of Interim Network Integration Transmission Service, including \nduring a period in which the Transmission Provider has directed Curtailment or \nLoad Shedding, prior to the Service Commencement Date, the Transmission \nProvider, affected Transmission Owner(s), and the Eligible Customer shall \nestablish necessary control technologies and protection systems in accordance with \nthe PJM Manuals, which may include a Remedial Action Scheme, for each Service \nAgreement for Interim Network Integration Transmission Service. The necessary \ncontrol technologies and protection systems must be developed in accordance with \nthe PJM Manuals and be approved by the Transmission Provider.  The necessary \ncontrol technologies and protection systems may be functionally modified from \ntime to time in accordance with the PJM Manuals.  Any functional modification to \nthe necessary control technologies and protection systems must be developed with \nthe affected Transmission Owner(s) and, before taking effect, such functional \nmodification must be approved by the Transmission Provider.33\nThe PJM Transmission Owners strongly agree with PJM’s proposal to impose necessary \ncontrol technologies and protection systems obligations on Eligible Customers.  However, \nadditional detail is needed on how those obligations will be determined and imposed.  For example, \nit is not clear whether the obligation to “establish necessary control technologies and protection \nsystems in accordance with the PJM Manuals,” binds a Transmission Owner to install equipment \nitself, or just to enforce the criteria on a Eligible Customer.34  Moreover, the PJM Transmission \nOwners believe that the “necessary control technologies and protection systems” that must be \ndeveloped in accordance with the PJM Manuals and approved by PJM should also be approved by \nand developed in accordance with the PJM Transmission Owners’ interconnection standards, \nguidelines, and practices.  In addition, to properly address modifications to the necessary control \ntechnologies and protection systems, the PJM Transmission Owners propose the following \nrevision to Section 705.5: \nAny functional modification to the necessary control technologies and protection \nsystems must be developed with the affected Transmission Owner(s) and, before \ntaking effect, such functional modification must be approved by the Transmission \nProvider and coordinated with the affected Transmission Owner(s).   \n33\nPJM Initial Brief at Attachment A, Section 705.5. \n34\nId."},{"page":17,"startToken":4907,"endToken":5179,"text":"17 \nf.\nSection 706.2 – Redispatch Charge. \nSection 706.2 of PJM’s Illustrative Tariff states that “[t]he Eligible Customer and each \nTransmission Owner shall pay any redispatch costs as set forth in Tariff, Attachment K.”35\nHowever, Transmission Owners should not be responsible for redispatch costs because such costs \nwill be caused by Contract Demand Transmission Service customers.  PJM indicated that the \nreference to Transmission Owners in Section 706.2 is incorrect.  Accordingly, PJM should remove \nthis reference from any filed tariff records.  \nIn addition, this provision could result in cost shifts onto other customers because Eligible \nCustomers may represent multiple load customers.36   Therefore, PJM should either: (1) modify \nthe curtailment order so that Non-Firm Contract Demand Transmission Service load is curtailed \nprior to generation redispatch, or (2) reevaluate the applicability of its redispatch cost allocation \nmethodology under Attachment K to better align cost responsibility with cost causation. \n2.\nContract Demand Transmission Service Provisions. \na.\nSection 708 – Provision of Contract Demand Transmission \nServices. \nIn Section 708(c) of its Illustrative Tariff, PJM indicates that, before service begins, an \nEligible Customer seeking to take Non-Firm Contract Demand Transmission Service on behalf of \nCo-Located Load must demonstrate that it has implemented the necessary control technologies \nand protection systems, approved by PJM, to allow the Eligible Customer to limit withdrawals \nfrom the transmission system to serve such Co-Located Load.37\n35\nPJM Initial Brief at Attachment A, Section 706.2. \n36\nThese can include Load Serving Entities such as Electric Distribution Companies as well as other retail \nsuppliers serving numerous retail load customers. \n37\nPJM Initial Brief at Attachment A, Section 708(c)."},{"page":18,"startToken":5179,"endToken":5451,"text":"18 \nPer the discussion above, the PJM Transmission Owners request that PJM clarify Section \n708(c) because the limitation of control technologies and protections systems to Non-Firm requests \nfor service is confusing and potentially problematic.  Appropriate control technologies and \nprotection systems should also be required, when determined necessary upon completion of \nstudies, for an Eligible Customer to take Firm Contract Demand Transmission Service, to ensure \nthey do not exceed their Firm Contract Demand. \nb.\nSection 710.1 – Conditions Precedent for Receiving Service. \nIn Section 710.1 of its Illustrative Tariff, PJM indicates that, subject to terms and conditions \nof its Illustrative Tariff, Part XI, the Transmission Provider will provide Firm Contract Demand \nTransmission Service or Non-Firm Contract Demand Transmission Service or both to any Eligible \nCustomer taking transmission service on behalf of Co-Located Load, subject to certain conditions \nprecedent for receiving service.38\nThe PJM Transmission Owners request that PJM add, as a condition precedent for \nreceiving service, that the Eligible Customer satisfy any load-connection related requirements \nimposed by the applicable PJM Transmission Owner(s).   \nc.\nSection 710.2 – Application Procedures. \nSection 710.2 of PJM’s Illustrative Tariff provides in part that “[i]f requested by the \nTransmission Provider, an application for Firm Contract Demand Transmission Service and/or \nNon-Firm Contract Demand Transmission Service shall provide all of the information included in \n18 C.F.R. § 2.20, including but not limited to: \n(iii) A demonstration that the Co-Located Load on behalf of which the Eligible Customer \nis seeking to obtain service and the Co-Located Generating Facility are located on the same \n38\nPJM Initial Brief at Attachment A, Section 710.1."},{"page":19,"startToken":5451,"endToken":5774,"text":"19 \nside of the Delivery Point to the Transmission Provider’s Transmission System as the Co-\nLocated Load.”39\nThe PJM Transmission Owners request clarification from PJM regarding whether use of \nthe term “Delivery Point” is appropriate here.  Specifically, it seems potentially inconsistent with \nPJM’s proposed definition of Co-Located Load, which is based on facilities located on the same \nside of the Point of Change in Ownership.  If there is an inconsistency, PJM should conform the \nlanguage in this section with its proposed Co-Located Load definition, or if consistent, explain \nhow the use of the term “Delivery Point” is consistent with the proposed definition of Co-Located \nLoad. \nIn addition, the PJM Transmission Owners request that PJM add language to the list of \ninformation to be provided in an application for Firm Contract Demand Transmission Service \nand/or Non-Firm Contract Demand Transmission Service to the effect that the customer has met \napplicable load interconnection study obligations.  The addition of this language is necessary to \nsupplement the language in Section 710.3 related to the coordination of the Transmission Provider \nand affected Transmission Owner to complete studies, including load integration studies.40\nd.\nSection 710.5 – Eligible Customer Facilities and Network \nFacilities. \nIn Section 710.5 of its Illustrative Tariff, PJM provides in part that “[t]he provision of Firm \nContract Demand Transmission Service or Non-Firm Contract Demand Transmission Service, or \nboth, shall be conditioned upon the Eligible Customer constructing, maintaining, and operating \nthe facilities (i) on its side of the Delivery Point41 necessary to reliably deliver and receive energy \n39\nPJM Initial Brief at Attachment A, Section 710.2. \n40\nSee PJM Initial Brief at Attachment A, Section 710.3. \n41\nAs with Section 710.2, the PJM Transmission Owners request clarification from PJM regarding whether \nuse of the term “Delivery Point” is appropriate here, or whether this provision should refer to the “Point of Change \nof Ownership” consistent with PJM’s definition of Co-Located Load."},{"page":20,"startToken":5774,"endToken":6044,"text":"20 \nand capacity; and (ii) only in the case of Non-Firm Contract Demand Transmission Service, to \nimplement the necessary control technologies and protection systems required pursuant to Tariff, \nPart XI, Subpart B, section 713 and specified in the Service Agreement for Contract Demand \nTransmission Service, as Transmission Provider may require.”42\nPJM should modify the language in Section 710.5 to make it more generic to ensure that it \ndoes not preclude the concept of required Transmission Owner-side protections, which may \ninclude facilities such as control technologies and protection systems constructed, maintained, and \noperated by the applicable PJM Transmission Owner(s).   \nAs discussed above, the implementation of necessary control technologies and protection \nsystems should also not be limited to Non-Firm Contract Demand Transmission Service.43\nTherefore, the PJM Transmission Owners propose to strike the language “only in the case of Non-\nFirm Contract Demand Transmission Service” from subclause (ii) of Section 710.5. \ne.\nSection 711.3 – Information Updates. \nIn Section 711.3 of its Illustrative Tariff, PJM provides that the Eligible Customer must \nsubmit annual updates to the Transmission Provider regarding (i) the demand characteristics of the \nco-located load, and (ii) the supply characteristics of the designated co-located generating facility, \nconsistent with the information included in its application for Contract Demand Transmission \nService.44  The Eligible Customer must also provide timely written or electronic notice of any \nmaterial changes to that information, as well as any other information listed in Tariff, Part XI, \n42\nPJM Initial Brief at Attachment A, Section 710.5. \n43\nSee supra Section II.C. \n44\nPJM Initial Brief at Attachment A, Section 711.3."},{"page":21,"startToken":6044,"endToken":6305,"text":"21 \nSubpart B, Section 710, or included in its application or otherwise affecting the Transmission \nProvider’s ability to provide reliable service.45\nPJM should clarify in Section 711.3 what constitutes “material changes,” or indicate that \nPJM will provide additional detail in a PJM Manual regarding what constitutes a material change \nfor purposes of this section.  PJM should also revise Section 711.3 to require that notice of material \nchanges to the demand and supply characteristics of Co-Located Load be provided to both the \nTransmission Provider and the affected PJM Transmission Owner(s).  Providing notice to both \nentities is required to help the Transmission Owner(s) better understand any technical changes that \ncould affect the interconnection from a load perspective, and will facilitate effective coordination \nwith PJM. \nf.\nSection 712.2 – Study Procedures for Non-Firm Contract \nDemand Transmission Service. \nSection 712.2 of PJM’s Illustrative Tariff sets forth the study procedures for Non-Firm \nContract Demand Service.46  PJM should revise Section 712.2, as indicated below, to affirmatively \nrequire PJM to notify the affected PJM Transmission Owner(s) of any request for Non-Firm \nContract Demand Service.  It is appropriate that PJM Transmission Owners be notified of such \nrequests given the role PJM Transmission Owners play in studying Co-Located Loads. \nTransmission Provider may will notify the affected Transmission Owner of such request \nfor Non-Firm Contract Demand Transmission Service, and the Transmission Provider will \nalso consider the results of any studies conducted by the affected Transmission Owner(s).47\n45\nId. \n46\nPJM Initial Brief at Attachment A, Section 712.2. \n47\nId."},{"page":22,"startToken":6305,"endToken":6584,"text":"22 \ng.\nSection 713 – Load Shedding and Curtailments for Contract \nDemand Transmission Service. \nSection 713.1 of PJM’s Illustrative Tariff provides, in part, that to the extent practicable, \nPJM will notify the Eligible Customer of any curtailment in a timely manner.48  PJM should revise \nSection 713.1 to require that notice of any curtailment also be provided to any affected PJM \nTransmission Owner or Electric Distribution Company, as both entities play key roles in \nimplementing any load curtailments. \nh.\nSection 713.6 – Necessary Control Technologies and Protection \nSystems for Non-Firm Contract Demand Transmission \nService. \nSection 713.6 of PJM’s Illustrative Tariff provides that, prior to service commencement \ndate, PJM, the affected transmission owner(s), and the Eligible Customer shall establish control \ntechnologies and protection systems consistent with the PJM Manuals, which can include remedial \nRAS, for each service agreement for Non-Firm Contract Demand Transmission Service.49  As \ndiscussed above, PJM should not limit the establishment of necessary control technologies and \nprotection systems to Non-Firm Contract Demand Transmission Service.50\ni.\nSection 714.3 – Redispatch Charge. \nSection 714.3 of PJM’s Illustrative Tariff provides that the Eligible Customer and each \nTransmission Owner shall pay any redispatch costs set forth in Tariff, Attachment K.51  The PJM \nTransmission Owners reiterate their prior comments regarding the elimination of the reference to \nTransmission Owners here.52\n48\nPJM Initial Brief at Attachment A, Section 713.1. \n49\nPJM Initial Brief at Attachment A, Section 713.6. \n50\nSee supra Sections II.C and II.F.2.d. \n51\nPJM Initial Brief at Attachment A, Section 714.3. \n52\nSee supra Section II.F.1.f (discussion of Section 706.2 – Redispatch Charge)."},{"page":23,"startToken":6584,"endToken":6868,"text":"23 \nj.\nSection 715.1 – Monthly Demand Charge. \nThe PJM Transmission Owners note that PJM has reserved Section 715.1 related to the \nMonthly Demand Charge for Non-Firm Contract Demand Transmission Service, which would be \nprovided by the PJM Transmission Owners as the entities with filing rights with respect to the new \ntransmission services.53  This placeholder may be unnecessary as the PJM Transmission Owners \nanticipate establishing a separate schedule for Non-Firm Contract Demand Transmission Service. \n3.\nAttachment F-3A – Service Agreement for Regional Transmission \nService And/or Interim Network Integration Transmission Service \n(For Co-Located Load). \na.\nSection 2.0. \nThe PJM Transmission Owners propose the following revision to correct what appears to \nbe a typo in Section 2.0: \n“Until the facilities listed above are completed, the Transmission Owner provides a Notice \nof Completion to PJM, and the facilities listed above are in service, the Eligible Customer \nmay not only receive Interim Regional Network Integration Transmission Service subject \nto the conditions of Part XI of the Tariff.” \nb.\nSection 4.0. \nAttachment F-3A provides that the Eligible Customer will comply with the necessary \ncontrol technologies and protection systems in Tariff, Part XI, prior to the service commencement \ndate.  Moreover, Section 705.5 in the Illustrative Tariff indicates that such control technologies \nand protection systems will be established “for each Service Agreement for Interim [NITS].”54\nHowever, Attachment F-3A does not contain a section or other placeholder where the customer’s \nrequired control technologies or protection systems will be listed.  PJM should add an appropriate \nsection or placeholder where such facilities and systems can be listed. \n53\nPJM Initial Brief at Attachment A, Section 715.1. \n54\nPJM Initial Brief at Attachment A, Section 705.5."},{"page":24,"startToken":6868,"endToken":7004,"text":"24 \n4.\nAttachment F-4 – Service Agreement for Contract Demand \nTransmission Service (For Co-Located Load). \na.\nSection 5.0. \nAttachment F-4 provides that only the Eligible Customer will comply with the necessary \ncontrol technologies and protection systems in Illustrative Tariff, Part XI, prior to the service \ncommencement date.55  Moreover, Section 710.4 in the Illustrative Tariff indicates that such \ncontrol technologies and protection systems will be “set forth in the Service Agreement for \nContract Demand Transmission Service.”56  However, Attachment F-4 does not contain a section \nor other placeholder where the customer’s required control technologies or protection systems will \nbe listed.  PJM should add an appropriate section or placeholder where such facilities and systems \ncan be listed. \n55\nPJM Initial Brief at Attachment A, Att. F-4. \n56\nPJM Initial Brief at Attachment A, Section 710.4."},{"page":25,"startToken":7004,"endToken":7089,"text":"25 \nIII. \nCONCLUSION \nThe PJM Transmission Owners appreciate the opportunity to submit this joint response to \nPJM’s Initial Brief.  The PJM Transmission Owners respectfully request that any subsequent \nCommission orders addressing these issues consider the recommendations set forth herein. \nRespectfully Submitted, \n/s/ Michael Kunselman \nMichael Kunselman  \nRichard P. Sparling \n \nNicholas J. Cicale \nJonathan A. Namazi \nDavis Wright Tremaine LLP \n1301 K Street NW \nSuite 500 East \nWashington, DC 20005 \nCounsel for the FirstEnergy\n  Companies \nOn behalf of the PJM   \n  Transmission Owners\nDated:  March 25, 2026"},{"page":26,"startToken":7089,"endToken":7168,"text":"CERTIFICATE OF SERVICE \nUnder Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § \n385.2010 (2025), I hereby certify that I have this day served the foregoing document upon each \nperson designated on the official service lists compiled by the Secretary in these proceedings. \nDated at Washington, D.C., this 25th day of March 2026. \n/s/ Daniel Klein \nDaniel Klein \nDavis Wright Tremaine LLP \n1301 K Street NW \nSuite 500 East \nWashington, DC 20005"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":3,"startToken":0,"endToken":322},{"p":2,"at":3,"title":"I. INTRODUCTION AND BACKGROUND","method":"printed heading","endPage":3,"endAt":446,"startToken":322,"endToken":702},{"p":3,"at":446,"title":"II. JOINT RESPONSE TO PJM’s INITIAL BRIEF","method":"printed heading","endPage":3,"endAt":490,"startToken":702,"endToken":709},{"p":3,"at":490,"title":"A. Issues Relating to the Interaction Between Firm Contract Demand Service","method":"printed heading","endPage":5,"endAt":565,"startToken":709,"endToken":1339},{"p":5,"at":565,"title":"B. The Study Process for Co-Located Load Arrangements Should be Clarified to","method":"printed heading","endPage":7,"endAt":805,"startToken":1339,"endToken":1967},{"p":7,"at":805,"title":"C. PJM’s Proposed Provisions Relating to Necessary Control Technologies and","method":"printed heading","endPage":10,"endAt":1238,"startToken":1967,"endToken":2969},{"p":10,"at":1238,"title":"D. Development of Telemetry Requirements.","method":"printed heading","endPage":11,"endAt":140,"startToken":2969,"endToken":3109},{"p":11,"at":140,"title":"E. Penalties for Unreserved Use.","method":"printed heading","endPage":13,"endAt":120,"startToken":3109,"endToken":3710},{"p":13,"at":120,"title":"F. Comments on Specific Proposed Tariff Provisions.","method":"printed heading","endPage":23,"endAt":514,"startToken":3710,"endToken":6661},{"p":23,"at":514,"title":"Attachment F-3A – Service Agreement for Regional Transmission","method":"printed heading","endPage":23,"endAt":1133,"startToken":6661,"endToken":6755},{"p":23,"at":1133,"title":"Attachment F-3A provides that the Eligible Customer will comply with the necessary","method":"printed heading","endPage":24,"endAt":7,"startToken":6755,"endToken":6870},{"p":24,"at":7,"title":"Attachment F-4 – Service Agreement for Contract Demand","method":"printed heading","endPage":24,"endAt":125,"startToken":6870,"endToken":6886},{"p":24,"at":125,"title":"Attachment F-4 provides that only the Eligible Customer will comply with the necessary","method":"printed heading","endPage":25,"endAt":4,"startToken":6886,"endToken":7005},{"p":25,"at":4,"title":"III. CONCLUSION","method":"printed heading","endPage":26,"endAt":0,"startToken":7005,"endToken":7089},{"p":26,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":26,"endAt":469,"startToken":7089,"endToken":7168}]}