{"document":{"slug":"rec-20260325-5208","title":"Response of Data Center Coalition to the 02/23/2026 Initial Brief of PJM Interconnection, L.L.C. and the 02/23/2026 Initial Brief of the PJM Transmission…","issued":"2026-03-25","accession":"20260325-5208","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Data Center Coalition","kind":"brief","file":"sources/filings/text/20260325-5208_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5208","tier":"record","sha256":"1c32cbd4542be208f4c7d334a298686a823987ccd2dd220dded915f294dd7d28","pages":13,"tokens":2775,"emptyPages":[],"textThemes":["flex","colo"]},"pages":[{"page":1,"startToken":0,"endToken":212,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Interconnection, L.L.C., et al \n \n) \nDocket Nos. EL25-49-000 \n \n \n \n \n \n \n) \n \n         EL25-49-001 \n \n \n \n \n \n \n \n) \nLarge Loads Co-Located at Generating \n) \nDocket No. AD24-11-000 \nFacilities \n \n \n \n \n) \n \n \n \n \n \n \n) \nConstellation Energy Generation, L.L.C. \n) \nDocket No. EL25-20-000 \nv. \n \n \n \n \n \n) \nPJM Interconnection, L.L.C.  \n \n) \n(Consolidated) \n \nRESPONSE OF THE DATA CENTER COALITION \nPursuant to Rule 211 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission’s (“Commission”)1, the Data Center Coalition (“DCC”), respectfully \nsubmits this Response to the February 23, 2026 Initial Brief of  PJM Interconnection, L.L.C. \n(“PJM”)2 and the February 23, 2026 Initial Brief of the PJM Transmission Owners (“TOs”)3 in \nthis Order to Show Cause Proceeding.  \nI. \nIntroduction  \nDCC appreciates the Commission’s leadership in initiating this proceeding and its \nrecognition that existing transmission service frameworks are not well-suited to accommodate \nthe rapid growth of large, co-located loads. The Commission’s directive to develop new \ntransmission service constructs reflects a thoughtful and innovative effort to modernize \n \n1 18 C.F.R. § 385.211 (2025). \n2 Initial Brief of PJM Interconnection, L.L.C., Docket No. EL25-49-000 (Feb. 23, 2026) (“PJM Initial Brief”). \n3 Initial Brief and Joint Responses of the Indicated PJM Transmission Owners, Docket No. EL25-49-000 (Feb. 23, \n2026) (“TOs Initial Brief”)."},{"page":2,"startToken":212,"endToken":464,"text":"2 \n \ntransmission policy in a manner that supports reliability, affordability, and economic \ndevelopment. \nDCC supports the Commission’s objective of enabling new large loads to interconnect in \na timely and efficient manner, including through arrangements that pair load with generation \nresources. Co-location is not the only pathway to achieve these goals, but it is an important and \npromising one that can provide system benefits, including more efficient siting, potential \nreductions in transmission impacts — such as avoided or deferred transmission buildout, reduced \ncongestion, and associated system cost savings — and alignment with broader federal and state \npolicy objectives encouraging coordinated development of load and generation. \nHowever, as the Commission has recognized, the success of these new service constructs \ndepends on their implementation. While PJM and the TOs have proposed frameworks intended \nto comply with the Commission’s directives, DCC is concerned that, as currently structured, \nthese proposals will not enable commercially viable arrangements. Instead, the proposals \nintroduce significant operational rigidity, limit flexibility, and create disincentives that will \nimpede the development of co-located load and associated generation. This is fundamentally at \nodds with the Commission’s December directive. \nDCC respectfully submits that targeted modifications are necessary to ensure that the \nframework ultimately adopted by the Commission is workable, flexible, and aligned with the \nCommission’s stated objectives. \nII. \nPJM’s Clarifications Confirm that the Proposed Framework Does Not Preserve the \nCore Value Proposition of Co-Location \nDCC appreciates PJM’s recent stakeholder engagement and efforts to clarify the intended \noperation of the proposed service constructs, including through its March 16, 2026 workshop"},{"page":3,"startToken":464,"endToken":740,"text":"3 \n \nmaterials.4  These materials provide important insight into how PJM intends to operationalize \nInterim Network Integration Transmission Service (“Interim NITS”) and Contract Demand \nTransmission Services. \nIn particular, PJM confirms that, under Interim NITS, co-located load “will not have \nrights to the capacity/energy from any specific co-located generation” and that such generation is \ntreated as part of the “network” resource pool rather than as a dedicated supply resource for the \nco-located load.5 PJM further explains that, while it would endeavor to dispatch co-located \ngeneration to reduce curtailment risk, such dispatch would not eliminate that risk. \nFrom a customer perspective, the fundamental reason to pursue co-location is to achieve \nspeed to energization and greater operational predictability by pairing load with generation. \nHowever, under PJM’s proposed framework, even a customer that brings sufficient co-located \ngeneration to meet its load cannot avoid curtailment risk. If co-location does not provide any \nmeaningful ability to mitigate curtailment or ensure more predictable service, it is unclear why a \ncustomer would pursue this pathway at all. \nThis raises a fundamental question as to whether PJM’s proposal reflects the outcome the \nCommission intended in establishing Interim NITS. The Commission’s objective was to enable \nmore flexible and timely service arrangements for co-located load. PJM’s proposed framework \nin which customers may still be curtailed despite bringing their own generation does not appear \nto align with that objective. \nPJM’s March 16 clarification confirms that, under the proposed framework, co-location \ndoes not provide any assured or priority access to on-site generation for load taking Interim \n \n4 PJM, Co-Located Load Use Cases Presentation at 12 (Mar. 16, 2026), available at 20260316-item-02---co-\nlocated-load-use-cases---presentation.pdf \n5 Id."},{"page":4,"startToken":740,"endToken":1021,"text":"4 \n \nNITS. Instead, both load and generation are fully integrated into the network construct, and the \nlinkage between the two is effectively severed.6 Further, the proposal does not even recognize an \nintermediate operational state in which co-located generation can operate in parallel with the grid \non a limited, non-exporting or non-market-participating basis while completing interconnection \nrequirements. Instead, generation is effectively treated as either fully integrated into PJM’s \nnetwork construct or not available at all. \nIf a customer that develops or procures on-site generation cannot rely on that generation \nto serve its load or aid in avoiding curtailment with any degree of predictability, co-location loses \nits functional meaning and appeal. The Commission should therefore require PJM to modify its \nproposal to ensure that co-located generation provides meaningful and predictable service to the \nco-located load that enabled its development by ensuring that new co-located generation confers \ncurtailment protection to its associated load—up to its output—except under system emergency \nconditions requiring manual load shed (e.g., EEA Level 3). \nIII. \nThe Proposal Unnecessarily Restricts the Use of Non-Firm Service and Precludes \nIncremental Solutions  \nDCC is also concerned that PJM’s proposed limitations on Non-Firm Contract Demand \nService (“Non-Firm CDS”) create an artificial barrier to incremental and timely service. PJM’s \nstakeholder materials confirm that Non-Firm CDS is limited to use when the co-located \ngenerator is unavailable and must be requested in advance, with load consumption from the grid \nlimited to approved firm and non-firm service levels.7  PJM further illustrates that where a \ncustomer is not granted the full amount of requested firm service due to transmission constraints, \n \n6 Id. \n7 PJM, Co-Located Load Use Cases Presentation at 5, 7 (Mar. 16, 2026)."},{"page":5,"startToken":1021,"endToken":1291,"text":"5 \n \nthe customer is not permitted to use additional Non-Firm CDS to serve the remaining load until \nupgrades are complete.8  \nDCC recognizes that PJM views Non-Firm CDS as a limited, backup product and \nemphasizes reliability considerations in constraining its use. However, PJM has not \ndemonstrated why Non-Firm service that is (a) requested in advance, (b) subject to PJM \napproval, (c) fully curtailable, and (d) supported by required protection and control mechanisms, \nmay appropriately be used to address generator outages but may not be used to address \ntemporary transmission constraints. This restrictive interpretation is inconsistent with the \nCommission’s directives in the Show Cause Order. In Paragraphs 214 and 215, the Commission \nestablished Non-Firm Contract Demand service as a flexible, as-available transmission product \nthat may be used “from time to time when transmission capacity is available” and “as needed \nduring normal, non-emergency system operating conditions.” The Commission further required \nthat this service “must be available during normal operations,” subject to curtailment when \nnecessary.9  \nWhile the Commission provided generator outage as an example use case, it did not limit \nthe service to that circumstance. To the contrary, the Commission’s plain language contemplates \nbroader availability whenever excess transmission capacity exists and reliability can be \nmaintained. By contrast, PJM’s proposal effectively confines Non-Firm CDS to a narrow, \noutage-only function and prohibits its use to address foreseeable and manageable transmission \nconstraints. This limitation is not supported by the Order and improperly narrows a Commission-\ndirected service designed to provide flexible, incremental access to the transmission system. \n \n8 Id. at 11. \n9 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 at 214–215 (2025)."},{"page":6,"startToken":1291,"endToken":1575,"text":"6 \n \nAs a result, PJM’s proposal does not merely interpret the Commission’s directive—it \nmaterially narrows it. By constraining Non-Firm CDS to a limited outage-only function, PJM \neliminates the very flexibility the Commission sought to introduce. This approach prevents \ncustomers from utilizing available transmission capacity to serve load on a conditional, as-\navailable basis and instead forces an “all-or-nothing” framework in which load cannot be served \nuntil full firm service is available. Such an outcome is inconsistent with commercial realities and \nundermines the Commission’s objective of enabling more timely and flexible transmission \nservice for co-located load. \nIV. \nThe Proposal Does Not Provide a Workable Pathway for Phased Development or \nLoad Ramping \nThe proposed framework also fails to accommodate the phased and incremental \ndevelopment that characterizes large load projects. PJM’s proposal requires that gross load and \ngeneration configurations be specified upfront and treats material changes in those \nconfigurations as requiring new applications and studies (see PJM Initial Brief). At the same \ntime, PJM prohibits the mixing of NITS and Contract Demand Transmission Services for the \nsame load. \nWhile PJM has acknowledged limited flexibility in certain circumstances, it does not \nprovide a clear or workable pathway for customers to (a) ramp load over time, (b) transition \nbetween service constructs, or (c) seek to align transmission service with phased project \ndevelopment. This lack of clarity is particularly problematic given that data center and other \nlarge load facilities are typically developed in stages. The absence of a defined ramping \nframework introduces uncertainty, increases the risk of delay, and may require repeated study \ncycles that are not aligned with project timelines. The Commission should require PJM to \nestablish clear rules and processes that enable incremental load additions without triggering"},{"page":7,"startToken":1575,"endToken":1863,"text":"7 \n \nunnecessary re-study or requiring customers to fundamentally restructure their service \narrangements. \nV. \nCurtailment Risk and Operational Parameters Remain Insufficiently Defined  \nPJM’s proposal relies heavily on curtailment as a mechanism to maintain system \nreliability, but it does not provide sufficient clarity regarding how curtailment will be applied in \npractice. PJM does establish a general curtailment priority among service types. However, the \nframework does not clearly define: (a) the operational relationship between co-located load and \nco-located generation; (b) the specific conditions under which curtailment will be triggered; (c) \nthe extent of advance notice that will be provided; (d) the expected duration or frequency of \ncurtailment events; or (e) how curtailment will be implemented in mixed service configurations. \nMoreover, PJM acknowledges that existing systems do not fully support the granularity \nrequired to implement certain aspects of the proposed services, which may necessitate additional \noperational workarounds or infrastructure.10 At the same time, PJM proposes an extremely \nstringent penalty framework under which a single failure to comply with load shedding or \ncurtailment instructions results in automatic disqualification from service.11  This “one-strike” \nconsequence is particularly concerning in light of the operational ambiguity described above. \nGiven the lack of clearly defined curtailment triggers, procedures, and system \nimplementation details, it is unreasonable to impose such severe penalties for a single non-\ncompliance event. Customers are being asked to comply with operational requirements that \nremain largely undefined, while bearing the full risk of immediate and potentially long-term loss \nof service for any failure—an approach that is patently unacceptable and emblematic of PJM’s \n \n10 PJM Initial Brief at 65–66. \n11 PJM Initial Brief at 41–43 (providing that a single instance of failing to follow curtailment or load shed \nprocedures results in disqualification)."},{"page":8,"startToken":1863,"endToken":2121,"text":"8 \n \nbroader effort to avoid implementing the Commission’s directive while shifting all compliance \nrisk onto customers. \nIn addition, PJM does not adequately address the extent to which curtailment compliance \nmay depend on transmission owner facilities, communications systems, or other infrastructure \nthat is outside the direct control of the load customer. In such circumstances, it is unclear why \nthe load customer would bear the full consequence of a curtailment failure. Assigning strict, one-\nstrike liability to customers for failures that may be caused, in whole or in part, by third-party \nsystems is unjust and unreasonable, and further underscores the inequitable allocation of risk \nembedded in PJM’s proposal. \nWhile DCC recognizes the importance of preserving operator flexibility to maintain \nreliability, the combination of undefined operational parameters and severe, strict-liability \npenalty provisions creates an unreasonable allocation of risk. Customers cannot reasonably \nassess or manage curtailment risk without greater transparency and structure, nor can they be \nexpected to accept a framework in which a single event—potentially outside their control—\nresults in loss of service. The Commission should require PJM to provide additional detail and \nguardrails to ensure that curtailment operates as a predictable and bounded tool, and that any \nassociated penalty framework is proportionate, clearly defined, and appropriately allocates \nresponsibility among relevant parties. \nVI. \nThe Proposal is Materially Incomplete and Relies on Future Developments  \nDCC is also concerned that the proposed framework leaves numerous critical elements \nundefined or deferred. As described in PJM’s filings, key aspects of the proposal—including \ntelemetry and metering requirements, tracking of unreserved use, settlement implications, and"},{"page":9,"startToken":2121,"endToken":2358,"text":"9 \n \ncertain penalty provisions—remain under development or are identified as requiring future tariff \nrevisions (see PJM Initial Brief). \nA framework that relies on significant future development for core operational and \nfinancial components raises concerns regarding whether the proposed services are sufficiently \ndefined to be found just and reasonable at this stage. The Commission should ensure that the \nessential elements of the proposed services are clearly specified and operationally feasible prior \nto approval. \nVII. \nThe Proposed Implementation Timeline Warrants Refinement  \nPJM proposes an implementation timeline extending to mid-2029, citing, among other \nconsiderations, capacity market alignment and system development needs (see PJM Initial \nBrief). DCC recognizes that certain aspects of the proposed framework may require system \nchanges and coordination with existing market constructs. However, PJM has not demonstrated \nthat all elements of the proposed services must be deferred for several years, nor has it identified \nopportunities for phased or interim implementation. Given the immediate and growing demand \nfor large load interconnection, the Commission should consider whether certain components of \nthe framework can be implemented on an accelerated or staged basis to provide near-term \nbenefits while longer-term systems are developed. \nVIII. \nConclusion  \nDCC appreciates the Commission’s leadership in advancing this important proceeding \nand its commitment to enabling the efficient integration of large loads and associated generation \nresources. PJM’s proposal represents a meaningful effort to respond to the Commission’s \ndirectives, and PJM’s recent stakeholder engagement has provided helpful clarification regarding"},{"page":10,"startToken":2358,"endToken":2595,"text":"10 \n \nthe intended operation of the proposed services. However, those clarifications also highlight \nfundamental issues that must be addressed to ensure that the framework is workable in practice. \nAs currently structured, the proposal does not fully implement the Commission’s \ndirectives and instead materially narrows key elements of the framework contemplated in the \nShow Cause Order. In particular, the proposal fails to preserve the core value proposition of co-\nlocation, unnecessarily restricts the use of Non-Firm Contract Demand Service, does not \naccommodate phased development, and relies on operational constructs that remain \ninsufficiently defined. \nFrom a customer perspective, co-location is pursued to achieve faster energization and \ngreater operational predictability. A framework in which customers may still be curtailed despite \nbringing sufficient co-located generation, and are unable to utilize available transmission \ncapacity on an incremental basis, does not provide a commercially viable pathway to achieve \nthose objectives. Taken together, the proposal effectively eliminates the flexibility the \nCommission sought to introduce and replaces it with an “all-or-nothing” structure that delays \nload service and discourages efficient co-location arrangements. \nDCC respectfully urges the Commission to require targeted modifications to ensure that \nthe final framework: \n• preserves meaningful linkage between co-located load and generation where appropriate; \n• allows for flexible and incremental service solutions consistent with the Commission’s \ndirectives; \n• accommodates phased development and load ramping; \n• provides greater clarity regarding operational and curtailment parameters; and \n• can be implemented in a timeframe that supports current and near-term development."},{"page":11,"startToken":2595,"endToken":2705,"text":"11 \n \nWith these refinements, the Commission can ensure that this proceeding results in a \ndurable and commercially viable framework that advances both reliability and economic growth, \nconsistent with the intent of the Show Cause Order. \n \nRespectfully submitted, \n/s/ Aaron Tinjum \nAaron Tinjum \nVice President, Energy \nData Center Coalition \n1250 H Street, NW, Suite 880 \nWashington, DC, 20005 \naaron@datacentercoalition.org \n \n/s/ Cy McNeill \nCy McNeill \nSenior Director, Federal Affairs \nData Center Coalition \n1250 H Street, NW, Suite 880 \nWashington, DC, 20005 \ncy@datacentercoalition.org \n \n/s/ Lucas Fykes \nLucas Fykes \nSenior Director, Energy Policy  \n& Regulatory Counsel \nData Center Coalition \n1250 H Street, NW, Suite 880 \nWashington, DC, 20005 \nlucas@datacentercoalition.org"},{"page":12,"startToken":2705,"endToken":2774,"text":"12 \n \nCERTIFICATE OF SERVICE \n \nI hereby certify that on this day I have served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. Dated at \nWashington, DC this 25th day of March 2026. \n \n/s/ Lucas Fykes \nLucas Fykes \nSenior Director, Energy Policy  \n& Regulatory Counsel \nData Center Coalition \n1250 H Street, NW, Suite 880 \nWashington, DC, 20005 \nlucas@datacentercoalition.org"},{"page":13,"startToken":2774,"endToken":2775,"text":"13"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":886,"startToken":0,"endToken":117},{"p":1,"at":886,"title":"I. Introduction","method":"printed heading","endPage":2,"endAt":1566,"startToken":117,"endToken":422},{"p":2,"at":1566,"title":"II. PJM’s Clarifications Confirm that the Proposed Framework Does Not Preserve the","method":"printed heading","endPage":4,"endAt":1176,"startToken":422,"endToken":909},{"p":4,"at":1176,"title":"III. The Proposal Unnecessarily Restricts the Use of Non-Firm Service and Precludes","method":"printed heading","endPage":6,"endAt":684,"startToken":909,"endToken":1387},{"p":6,"at":684,"title":"IV. The Proposal Does Not Provide a Workable Pathway for Phased Development or","method":"printed heading","endPage":7,"endAt":108,"startToken":1387,"endToken":1587},{"p":7,"at":108,"title":"V. Curtailment Risk and Operational Parameters Remain Insufficiently Defined","method":"printed heading","endPage":8,"endAt":1509,"startToken":1587,"endToken":2073},{"p":8,"at":1509,"title":"VI. The Proposal is Materially Incomplete and Relies on Future Developments","method":"printed heading","endPage":9,"endAt":526,"startToken":2073,"endToken":2194},{"p":9,"at":526,"title":"VII. The Proposed Implementation Timeline Warrants Refinement","method":"printed heading","endPage":9,"endAt":1375,"startToken":2194,"endToken":2309},{"p":9,"at":1375,"title":"VIII. Conclusion","method":"printed heading","endPage":12,"endAt":6,"startToken":2309,"endToken":2706},{"p":12,"at":6,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":13,"endAt":2,"startToken":2706,"endToken":2775}]}
