{"document":{"slug":"rec-20260325-5220","title":"Response of Northern Virginia Electric Cooperative, Inc. to Initial Brief of PJM Interconnection, L.L.C. and to Initial Brief and Joint Responses of the…","issued":"2026-03-25","accession":"20260325-5220","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"brief","file":"sources/filings/text/20260325-5220_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5220","tier":"record","sha256":"d9c2e61ca76f6ac327bc5e1c04bb70042f858e1b80a962b230bf5718c2446a60","pages":19,"tokens":5157,"emptyPages":[],"textThemes":["colo","flex","cost"]},"pages":[{"page":1,"startToken":0,"endToken":187,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. \nAEP Kentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \nDocket Nos. EL25-49-000 \n                      EL25-49-001"},{"page":2,"startToken":187,"endToken":459,"text":"2 \n \nLinden VFT, LLC \nCity of Cleveland, Department of Public Utilities, \nDivision of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc.\nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \n \nLarge Loads Co-Located at Generating Facilities  \n \n \nConstellation Energy Generation, LLC \n \nv.  \n \nPJM Interconnection, L.L.C. \n \n) \n) \n)\n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n \n \n \n \n \n \n \n \n \n \nAD24-11-000\n \nEL25-20-000\n                    (Consolidated) \n \n \n \n \nRESPONSE OF NORTHERN VIRGINIA ELECTRIC COOPERATIVE, INC. TO \nINITIAL BRIEF OF PJM INTERCONNECTION, L.L.C. AND TO INITIAL BRIEF AND \nJOINT RESPONSES OF THE INDICATED PJM TRANSMISSION OWNERS TO \nPAPER HEARING QUESTIONS  \n \nPursuant to the Federal Energy Regulatory Commission’s (“Commission”) December 18, \n2025 order (“Co-Location Order”),1 Northern Virginia Electric Cooperative, Inc. (“NOVEC”) \nrespectfully submits this response to the initial briefs and joint responses to the paper hearing \nquestions submitted by PJM Interconnection, L.L.C. (“PJM”)2 and the Indicated PJM \nTransmission Owners (“PJM Transmission Owners”).3  \n \n \n1 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, PP 219-20 (2025) (“Co-Location Order”); see also PJM \nInterconnection, L.L.C., Notice of Extension of Time, Docket Nos. EL25-49, et al. (issued Jan. 23, 2026) (Accession \nNo. 20260123-3062) (Extending the due date for responses to initial briefs by seven days, from March 18, 2026, to \nMarch 25, 2026).  \n2 PJM Interconnection, L.L.C., Initial Brief, Docket Nos. EL25-49, et al. (Feb. 23, 2026) (Accession No. 20260223-\n5189) (“PJM Initial Brief”). \n3 Indicated PJM Transmission Owners, Initial Brief and Joint Responses of the Indicated PJM Transmission Owners, \nDocket Nos. EL25-49, et al. (Feb. 23, 2026) (Accession No. 20260223-5190) (“PJM TO Initial Brief”)."},{"page":3,"startToken":459,"endToken":775,"text":"3 \n \nI. \nRESPONSE \nA. Introduction and Background \n \nCo-location in PJM presents contentious issues. An early proposal, based on PJM’s since-\nrescinded Guidance on Co-Located Load (“Guidance Document”),4 was filed in Docket No. \nER24-2172 as an amended Interconnection Service Agreement (“ISA”) between Susquehanna \nNuclear LLC, and PPL Electric Utilities Corporation.5 The Commission rejected the Amended \nISA because PJM had not demonstrated a need to deviate from the pro forma ISA.6 Constellation \nEnergy Generation, LLC (“Constellation”) subsequently filed a complaint to amend PJM’s Open \nAccess Transmission Tariff (“Tariff”) to incorporate the co-location arrangements found in the \nGuidance Document.7 \n \nNOVEC is a not-for-profit electric distribution cooperative owned by its members. \nNOVEC has significant experience with serving data centers over the past 25 years. NOVEC is \none of the country’s largest data center hubs and serves over 50 data center buildings.8 Based on \nits experience, NOVEC opposed Constellation’s complaint in substantial part because \nConstellation proposed to relieve the Co-Located Load of any responsibility for transmission \ncosts, even as that load relied on the transmission system.9 NOVEC is very aware of the potential \neffects on cost allocation that can arise because of the size of data centers and does not agree that \ndata centers or other large loads should be able to use the grid without contributing to its costs. \n \n4 PJM, PJM Guidance on Co-Located Load (March 22, 2024) (updated April 17, 2024), https://www.pjm.com/-\n/media/DotCom/markets-ops/rpm/rpm-auction-info/pjm-guidance-on-co-located-load.ashx. PJM rescinded its \nGuidance Document pending Commission guidance in Docket No. EL25-49.  \n5 PJM, Amendment to Susquehanna ISA, Docket No. ER24-2172-000 (filed June 3, 2024) (Accession No. \n20240603-5012).  \n6 PJM Interconnection, L.L.C., 189 FERC ¶ 61,078, P 85 (2024). \n7 Constellation, Complaint, Docket No. EL25-20-000 (filed Nov. 22, 2024) (Accession No. 20241122-5285) \n(“Constellation Complaint”). \n8 NOVEC, Protest, Docket No. EL25-20-000, at 8-9 (filed Dec. 18, 2024). \n9 Id."},{"page":4,"startToken":775,"endToken":1058,"text":"4 \n \nThe Commission instituted a section 206 show cause proceeding, consolidated the Constellation \ncomplaint with the new show cause proceeding, and directed interested parties to brief a series of \nquestions regarding whether the PJM Tariff needed to be modified to accommodate co-located \nload and, if so, how.10 \n \nThe Commission thereafter issued the Co-Location Order on December 18, 2025. The \nCo-Location Order found that PJM’s Tariff is not just and reasonable because it does not \n“contain provisions addressing with sufficient clarity or consistency the rates, terms, and \nconditions of service that apply to generators serving Co-Located Load and Eligible Customers \ntaking transmission service on behalf of Co-Located Load.”11 But the Commission included \ncritical protections for existing transmission customers not present in other previous iterations of \nco-location service, including requiring prospective Co-Located Loads to fully fund any network \nupgrades before they could take service from an existing generator.12 \n \nIn order to facilitate the service of Co-Located Load, the Commission described three \nnew types of transmission service for Eligible Customers serving Co-Located Load. The \nCommission found that additional record evidence was needed to set the appropriate replacement \nrates, terms, and conditions of those new types of transmission service, so it set a paper hearing \non eleven questions involving the rates, terms, and conditions of service for Firm Contract \nDemand transmission service, Non-Firm Contract Demand transmission service, and Interim \nNetwork Integration Transmission Service (“NITS”).13 PJM and the PJM Transmission Owners \nfiled initial briefs in response to those questions.14  \n \n10 PJM Interconnection, L.L.C., 190 FERC ¶ 61,115 (2025).  \n11 Co-Location Order at P 2.  \n12 Id. P 176. \n13 Id. P 219.  \n14 See PJM Initial Brief; PJM TO Initial Brief."},{"page":5,"startToken":1058,"endToken":1338,"text":"5 \n \n \nThe proposals set forth in the initial briefs strike an appropriate balance between \nrecognizing the reduced usage of the transmission system for Co-Located Load while also \nensuring that such load does not become a “free rider” to the extent that such load does rely on \nand use the transmission system, but does not pay for it. Several important principles should \nguide the Commission’s determination of what constitute just and reasonable rates, terms, and \nconditions for these new services being mandated to accommodate Co-Located Load. First, the \nproposed transmission rates cannot be just and reasonable unless they recover from the Co-\nLocated Load the full costs associated with the Co-Located Load’s use of and reliance on the \ntransmission system and do not cause or result in subsidization by existing transmission \ncustomers.  \nSecond, meaningful financial and operational penalties are necessary. Such penalties \nmust discourage gamesmanship, must be enforceable, and should include guard-rails such as the \nanti-toggling measures proposed by PJM. But penalties should also be tailored to ensure that \nthey are not written too broadly. As more fully discussed in Section C.4 of these comments, infra \nat 14-15, the Commission should direct PJM to modify the penalty provisions to clarify that, in \nthe event a single Eligible Customer is serving multiple Co-Located Loads, that the \ndisqualification penalty would only apply to service at the Co-Located Load that disregarded \ncurtailment instructions or whose transmission protection measures misoperated twice.  \nFinally, workable and reliable protections for the transmission system are critical. \nAlthough neither PJM nor the PJM Transmission Owners provided specific criteria yet for the \n“special protection schemes” and other necessary controls, the principles they outlined are \nsound; the Commission should adopt them."},{"page":6,"startToken":1338,"endToken":1637,"text":"6 \n \n \nNotwithstanding the progress that PJM and the PJM Transmission Owners have made in \ntheir proposals, NOVEC respectfully urges the Commission to remain flexible as PJM, the PJM \nTransmission Owners, and other Market Participants gain practical experience serving Co-\nLocated Load. These are entirely new services and may require additional modifications as \nexperience is gained or as unexpected circumstances arise. As this proceeding advances and \nadditional details on the proposals become clear, NOVEC reserves the right to oppose the Co-\nLocation service rates, terms, and conditions if those proposals do not adequately shield existing \ntransmission customers from subsidizing large-load customers or if they endanger the reliability \nof the transmission system. \nB. PJM’s and the PJM Transmission Owners’ proposals to use the NITS rate for \nthe new Firm Contract Demand transmission service, Non-Firm Contract \nDemand transmission service, and Interim NITS, impose PJM administrative \nand ancillary service charges, and institute a Grid Reliance Charge are just and \nreasonable, and the Commission should adopt their proposals. \n \n \nAbove all else, the rates for the new transmission services for the Co-Located Load must \nnot result in existing transmission customers subsidizing large-load customers. NOVEC supports \nthe Commission’s acceptance of the proposals of PJM and the PJM Transmission Owners with \nrespect to rates for Contract Demand transmission service and Interim NITS. NOVEC is \ncommenting specifically to highlight how critical it is that the proposed rates appropriately \nreflect the use of the transmission system by these new services and protect existing transmission \ncustomers from subsidizing Eligible Customers providing transmission service to Co-Located \nLoad.  \n1. Using the NITS rate for Firm Contract Demand transmission service and \nNon-Firm Contract Demand transmission service is appropriate. \n \n \nThe NITS rate is appropriate in light of the characteristics of Firm Contract Demand \ntransmission service. Unlike point-to-point service, Contract Demand transmission service is not"},{"page":7,"startToken":1637,"endToken":1935,"text":"7 \n \nlimited to one source, one sink and one path; an Eligible Customer can draw from the \ntransmission system in a manner comparable to that of a NITS customer. Firm Contract Demand \ntransmission service is NITS-equivalent, just scaled down to be available for less than the Co-\nLocated Customers’ total load. Network upgrades still must be planned and constructed as \nnecessary, with the only difference being that Firm Contract Demand transmission service’s \nnetwork upgrades are planned based on contract demand requests instead of anticipated load \ngrowth.15 Because the service otherwise is fundamentally the same, assessing the same \ntransmission rates as that of NITS makes sense. Because Eligible Customers are receiving a \nservice commensurate with NITS, they should pay a cost commensurate with NITS in \nrecognition of the Commission’s cost-causation principles.  \n \nThe proposal to charge Non-Firm Contract Demand transmission service at the NITS rate \nnet of the Grid Reliance Charge multiplied by their reserved amount of demand also seems \nreasonable. Netting the Grid Reliance Charge prevents double recovery. Like Firm Contract \nDemand transmission service, Non-Firm Contract Demand transmission service bears a \nresemblance to NITS service. Although non-firm, it is a network-type service. In Order No. 888, \nthe Commission capped non-firm rates at the firm rate.16 Because an Eligible Customer need \nonly purchase Non-Firm Contract Demand transmission service when reserved, transmission \ncosts for an Eligible Customer are lower than firm rates. Further, as the PJM Transmission \nOwners point out, it has a superior priority to non-firm point-to-point transmission service.17 And \nbecause these revenues are credited to the applicable transmission owner’s annual transmission \n \n15 PJM TO Initial Brief at 8.  \n16 Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public \nUtilities, Order No. 888, 75 FERC ¶ 61,080 (1996).  \n17 PJM TO Initial Brief at 12."},{"page":8,"startToken":1935,"endToken":2198,"text":"8 \n \nrevenue requirement, this proposal prevents existing load-serving transmission customers from \nsubsidizing Co-Located Load. \n2. PJM’s administrative charges are appropriate. \n \nThe Commission asked whether it would be just and reasonable to include charges for \nPJM’s administrative services.18 NOVEC agrees with PJM’s proposal to assess administrative \nservice charges on Co-Located Load.19 These charges are associated with the use of the \ntransmission system beyond transmission service rates.20 Any entity that uses the transmission \nsystem should contribute to administrative charges associated with the transmission system. The \nCommission found that Co-Located Load would use the transmission system even if it did not \ndraw power from the grid.21 It is thus entirely appropriate for PJM to assess administrative \ncharges on Co-Located Load. Co-Located Load must bear its fair share of administrative costs.  \n \nThe Commission should also accept PJM’s proposal to recover Black Start Service \ncharges and Regulation charges based on the gross demand of the Co-Located Load for Firm \nContract Demand transmission service and for Non-Firm Contract Demand transmission service. \nThe proposal is consistent with the Commission’s finding “that Eligible Customers taking one of \nthe new transmission services on behalf of Co-Located Load must be assessed for regulation \nservice on a gross demand basis at the existing Tariff rate, consistent with the Commission’s \ncost-causation principles.”22  \n \n \n18 Co-Location Order at P 219. \n19 PJM Initial Brief at 27, 36, and 73.  \n20 Id. at 27 (“These are standard charges associated with the use of the Transmission System over and above the \ntransmission service rates.”).  \n21 Co-Location Order at P 183.  \n22 Id. P 184."},{"page":9,"startToken":2198,"endToken":2535,"text":"9 \n \n3. The Commission should accept the Grid Reliance Charge as proposed. \n \n \nIn the Co-Location Order, the Commission asked whether the rate paid by an Eligible \nCustomer on behalf of a Co-Located Load that does not reserve any amount of transmission \nservice should include, besides Regulation and Black Start Services, “an additional charge given \nthat regulation and black start services could not be provided without the transmission system.”23 \nThe answer to that question is an unequivocal yes. The PJM Transmission Owners have \nproposed a Grid Reliance Charge based on the difference between an Eligible Customer’s firm \ncontract demand (or for Non-Firm Contract Demand customers, the amount of reserved service) \nand their gross on-site load.24 \n \nAs a threshold matter, Eligible Customers should pay a charge that reflects the need to \ndeliver these services to their Co-Located Load. Because all other load takes transmission service \nup to their gross load, their transmission rates implicitly reflect such use of the transmission \nsystem. The rates of Black Start Service and Regulation do not include a delivery component. If \na Co-Located Load reserved no Firm or Non-Firm Contract Demand transmission service, its \npayment for those two ancillary services would not include any costs of the transmission system \nthat are necessary to deliver those services to the Co-Located Load. Without such a charge, the \nCo-Located Load would be a free rider on the transmission system, benefiting from the payments \nof existing transmission customers to maintain the transmission system without making any \ncontribution towards it.25 \n \n23 Id. P 219(3).  \n24 PJM TO Initial Brief at 14.  \n25 Id. at 15 (“Even with a zero MW contract demand, a large Co‑Located Load and generation arrangement will still \ndepend on the grid for the delivery of various ancillary services and a suite of synchronization support services, such \nas stable frequency, inertia, stability services (damping, angle stability), fault current capability, and ride-through \nand protection coordination. In short, a Co-Located Load’s net withdrawals do not fully reflect its actual reliance on \nthe grid.”)."},{"page":10,"startToken":2535,"endToken":2857,"text":"10 \n \n \nSo, the question becomes whether the PJM Transmission Owners’ proposed Grid \nReliance Charge is just and reasonable. There are many possible ways to calculate a Grid \nReliance Charge. The approach has a reasonable foundation, and the Commission should accept \nit because the Grid Reliance Charge as proposed is just and reasonable, with an important \ndistinction: it is limited to depreciation and O&M, conservatively excluding a return on rate base \nand associated income taxes. The PJM Transmission Owners only recover their costs and not a \nreturn. Because of the novelty of the Grid Reliance Charge, taking a conservative approach \ninitially is justifiable. Until PJM and the PJM Transmission Owners gain more experience, the \nGrid Reliance Charge is transparent, simple, scales with each utility’s size and cost structure, and \npromotes rate stability.26 In the future, the PJM Transmission Owners should explore revising the \nmethodology to better align the costs of providing access to necessary ancillary services with the \nbenefits of those services to ensure that Co-Located Load makes an adequate contribution to \nthose costs. NOVEC views the current proposal as a minimum rate. In addition, because \nrevenues earned from the Grid Reliance Charge are returned to NITS and Firm Contract Demand \ntransmission service customers as a revenue credit, the structure avoids any risk of double \nrecovery. The Commission should accept it as filed by the PJM Transmission Owners. The \nCommission may wish to consider ordering PJM to hold a stakeholder process to determine \nwhether the rate needs to be changed in the future.  \nC. PJM and the PJM Transmission Owners are correct that both operational and \nfinancial penalties are necessary to ensure compliance with rules for Eligible \nCustomers serving Co-Located Loads.  \n \n \nThe Commission asked what is the “appropriate penalty charge or other remedial action \nthat PJM should take to address any unreserved use of the PJM transmission system for an \n \n26 PJM TO Initial Brief, Ex. PTO-0001 at 24:17-25:14."},{"page":11,"startToken":2857,"endToken":3207,"text":"11 \n \nEligible Customer taking” Firm Contract Demand or Non-Firm Contract Demand transmission \nservice on behalf of a Co-Located Load.27 PJM proposed three different penalties applicable to \nthe three transmission services where Eligible Customers: “(i) fail to follow established Load \nShedding and Curtailment procedures; (ii) rely on necessary control technologies or protection \nsystems in accordance with the PJM Manuals, which may include a RAS, that fail (i.e., \nmisoperate) more than once; and (iii) makes unreserved use of the PJM Transmission System.”28 \nThose penalties are disqualification, a pause in service, and financial penalties. \n1. Disqualification is appropriate in the circumstances proposed by PJM in \norder to protect the reliability of the transmission system. \n \n \nDisqualification means that an Eligible Customer taking Firm Contract Demand or Non-\nFirm Contract Demand transmission service to serve Co-Located Load is disqualified from \ntaking Firm Contract Demand or Non-Firm Contract Demand transmission service for that Co-\nLocated Load.29 An Eligible Customer disqualified from taking such services for the relevant \nCo-Located Load may still take transmission service on behalf of the Co-Located Load by taking \nNITS or qualifying for Interim NITS.30 Also, an Eligible Customer taking Interim NITS may be \ndisqualified from taking service for specific Co-Located Loads, in which case only NITS will be \navailable once any necessary upgrades are complete.31 \n \nThere are two circumstances in which PJM proposes to impose disqualification. First, in \nthe event that there is a failure to follow Load Shedding or Curtailment procedures for the first \ntime, the Co-Located Load will be disqualified from receiving Firm Contract Demand \n \n27 Co-Location Order at P 219(5), (6). \n28 PJM Initial Brief at 40.  \n29 Id., Attachment A, Tariff, Part XI, § 713.7(a).  \n30 Id. at 42. As NOVEC previously commented, supra at 5, and as more fully discussed in Section C.4 of these \ncomments, infra at 14-15, in the event a single Eligible Customer is serving multiple Co-Located Loads, the \ndisqualification penalty should apply only to service at the Co-Located Load which disregarded curtailment \ninstructions or whose transmission protection measures misoperated twice.  \n31 Id. at 42-43."},{"page":12,"startToken":3207,"endToken":3473,"text":"12 \n \ntransmission service, Non-Firm Contract Demand transmission Service, or Interim NITS.32 \nSecond, Eligible Customers will be disqualified from taking the contract demand services for the \nrelevant Co-Located Load upon the second misoperation of necessary control technology and \nprotection schemes.33  \n \nPJM is responsible for ensuring the provision of reliable electric service to 67 million \npeople. Not following Load Shedding or Curtailment procedures compromises PJM’s ability to \nfulfill its responsibilities. Although PJM has proposed as a compromise allowing one \nmisoperation of a “special protection scheme” before disqualification, the proposal to disqualify \nafter repeated misoperations is also necessary to protect the integrity of the transmission system. \nFurther, NITS remains available to any Co-Located Load that is disqualified from taking the new \nservices. As PJM explained, the “choice to take NITS, in and of itself, decreases the likelihood of \nsignificant issues arising from failure to curtail, load shed, or misoperation of a necessary control \ntechnology or protection system.”34 Because PJM’s disqualification proposal deters conduct that \nthreatens the integrity of the transmission system and provides a safe alternative, the \nCommission should find it is just and reasonable and adopt it.  \n2. A pause in service is an appropriate compromise for the first \nmisoperation of a necessary control technology or protection system. \n \n \nNOVEC supports PJM’s proposal to implement a pause of 120 days from taking \ntransmission service or withdrawing energy from the transmission system after the first \nmisoperation of the necessary control technology or protection system.35 Allowing a pause to \n \n32 Id. at 41, Table 1.  \n33 Id. at 45. \n34 Id. at 48-49.  \n35 Id. at 44-45."},{"page":13,"startToken":3473,"endToken":3756,"text":"13 \n \nevaluate, investigate, and remedy failures of the necessary control technology is appropriate and \nwill help develop new procedures and experience to more reliably manage Co-Location.   \n3. Additional financial penalties are warranted. \n \nNOVEC agrees with PJM and the PJM Transmission Owners that a penalty for \nunreserved use in addition to disqualification and pause-in-service rules is appropriate.36 In the \ncurrent environment, PJM is correct that “many, if not most, Eligible Customers taking service \non behalf of a Co-Located Load could foreseeably elect to absorb financial penalties for \nunreserved use rather than follow Curtailment or Load Shed procedures or avoid misoperation of \nthe protective technology or system.”37 Financial penalties alone would not be sufficient to \nensure that Co-located Loads and co-located generating facilities comply, through the relevant \nEligible Customers, with their obligations. But that is not sufficient reason to dispense with a \nfinancial penalty. \n \nA complementary financial penalty should be an additional deterrent that would help \nmake sure that “the market and other ratepayers are made whole if a Co-Located Load customer \nexceeds its contract demand.”38 At this time, neither PJM nor the PJM Transmission Owners \nhave a specific concept for the Commission to consider, but have committed to working together \nto explore penalty options. NOVEC supports those efforts and supports the principle that a \nfinancial penalty should compensate other customers for any harm caused by the Eligible \nCustomer’s departure from Co-Location requirements or, if there is no harm, that the financial \npenalty should be set at a level sufficient to encourage compliance with the PJM Tariff’s \nscheduling requirements.   \n \n36 Id. at 50; PJM TO Initial Brief at 20.  \n37 PJM Initial Brief at 50.  \n38 PJM TO Initial Brief at 20."},{"page":14,"startToken":3756,"endToken":4079,"text":"14 \n \n4. PJM’s penalty language should be revised to account for conditions \nwhere an Eligible Customer serves multiple Co-Located Loads. \n \n \nAt present, the Illustrative Tariff provides that, when one of the disqualifying events \nhappens, the Eligible Customer “shall be disqualified from taking Firm Contract Demand \nTransmission Service and Non-Firm Contract Demand Transmission Service.”39 PJM has crafted \nthis language with the assumption that either the generator serving the Co-Located Load or the \nCo-Located Load itself would be the Eligible Customer. But the Co-Location Order \ncontemplates that “any electric utility” could be an Eligible Customer.40 That leaves open the \npossibility that the generator, the Co-Located Load, and the Eligible Customer could each be \nseparate entities. Under those circumstances, the Eligible Customer could reasonably have to rely \nupon the Co-Located Load and the co-located generating facility for compliance with curtailment \ninstructions from PJM and maintenance of equipment to implement the “special protection \nschemes.” A third-party Eligible Customer would have limited operational control over the site. \n \nAs drafted, the Illustrative Tariff could result in a third-party Eligible Customer being \ndisqualified from serving Co-Located Load entirely because of the actions of the Co-Located \nLoad or the co-located generating facility. This would unreasonably harm the Eligible Customer. \nIf the Eligible Customer were a Load Serving Entity acting as an Eligible Customer for multiple \nCo-Located Loads, it would unreasonably harm those other Co-Located Loads as well. \nAccordingly, the Illustrative Tariff should be revised to specify that when a third-party Eligible \nCustomer is not responsible for a disqualifying event, only the culpable Co-Located Load (and \n \n39 See PJM Initial Brief, Attachment A, Tariff, Part XI, § 713.7(b).  \n40 Co-Location Order at P 10; see also Co-Location Order at n.404 (“An Eligible Customer could be, for example, \nany person generating electric energy for resale or any retail customer taking unbundled transmission service under \ncertain conditions.  For the full definition of Eligible Customer, see Part I.C.”) (italics added)."},{"page":15,"startToken":4079,"endToken":4376,"text":"15 \n \nnot the Eligible Customer) will be disqualified from Firm and Non-Firm Contract Demand \ntransmission service. \nD. PJM’s two-pronged approach to implementing an anti-toggling feature for Firm \nContract Demand transmission service is reasonable and should be accepted. \n \n \nThe Commission sought comment on the appropriate mechanisms for an anti-toggling \nfeature for Firm Contract Demand transmission service, including a minimum service period and \nminimum notice period.41 The Commission explained that without an anti-toggling feature, \nEligible Customers taking transmission service on behalf of Co-Located Loads “may attempt to \nswitch between the two new transmission services based on expected capacity market \nconditions.”42 \n \nPJM proposed a two-pronged approach. First, Section 709.4 of its Illustrative Tariff \nprovides that the portion of Co-Located Load served by Firm Contract Demand transmission \nservice is not eligible to be served by Non-Firm Contract Demand transmission service for “five \nyears following the effective date of the Service Agreement for Contract Demand Transmission \nService.”43 There is an exception for physical changes to the Co-Located generating facility or \nthe Co-Located Load that would materially alter the MW-level of power or MW-level of gross \ndemand.44 The second anti-toggling feature is PJM’s proposed 42-month notice of termination.45 \n \nBoth of these proposals are just and reasonable and should be accepted. PJM will have to \nprocure capacity resources for Firm Contract Demand, and there may be network upgrades \nnecessary to serve a request for Firm Contract Demand transmission service.46 Setting a \nminimum service commitment of five years ensures that timely price signals are sent to the \n \n41 Id. P 219(7).  \n42 Id. P 213.  \n43 PJM Initial Brief at 53 (quoting PJM Initial Brief, Attachment A, Tariff, Part XI, § 709.4).  \n44 Id. at 54.  \n45 Id. at 54-55. \n46 PJM TO Initial Brief at 21."},{"page":16,"startToken":4376,"endToken":4649,"text":"16 \n \ncapacity market and enhances market stability. The five-year period also minimizes the risk of \nCo-Located Load causing network upgrades and then withdrawing, leaving other load with the \nobligation to fund those upgrades. With respect to the notice-of-termination period, as the PJM \nTransmission Owners point out, it is identical to the requirements for termination of NITS.47 The \nnotice period will help address any cost-shifting concerns by preventing Co-Located Loads from \navoiding capacity charges incurred on their behalf by prematurely terminating their agreement.48 \nE. The Commission should ensure that any “special protection schemes” are robust \nenough to ensure system reliability. \n \n \nThe Commission asked what interconnection requirements and operational practices are \nnecessary for “special protection schemes” to maintain system reliability.49 In response, PJM \nstated that “[t]he interconnection requirements and operational practices necessary for necessary \ncontrol technologies and protection systems to maintain system reliability in the event that a Co-\nLocated Load or associated generator trips offline will be set forth in the PJM Manuals and, as \napplicable, [North American Electric Reliability Corporation] reliability standards.”50 At a \nminimum, PJM’s proposal to incorporate North American Electric Reliability Corporation \n(“NERC”) reliability standards is just and reasonable.  \n \nThe Commission should ensure that there are high reliability standards so that no retail \ncustomers are harmed by the failure of “special protection schemes” of large-load customers. \nRetail customers do not have the option to take a lower-quality service to economize. Under no \ncircumstances should large-load customers choosing a lower-quality service be permitted to \n \n47 Id. at 21-22.  \n48 PJM Initial Brief at 55. \n49 Co-Location Order at P 219(8).  \n50 PJM Initial Brief at 57."},{"page":17,"startToken":4649,"endToken":4945,"text":"17 \n \nreduce the reliability of retail customers’ services. The PJM Transmission Owners elucidated \nseveral possible guideposts to consider that would help meet this goal.51  \n \nNOVEC supports those principles. In particular, NOVEC agrees that the “special \nprotection schemes” should be fully redundant and that the applicable PJM Transmission Owner \nshould be able to establish technical criteria for the interconnection of Co-Located Load. \nTransmission Owners are familiar with the operating characteristics of their own systems, and \nany criteria should be flexible enough to include reasonable requirements the Transmission \nOwners believe are necessary to protect the transmission system. NOVEC also agrees with the \nPJM Transmission Owners that the Commission should direct NERC to establish registration \nrequirements for Co-Located Loads so that they can be responsible for meeting NERC reliability \nstandards.  \nF. The Commission should approve PJM’s proposed effective date. \n \nNOVEC agrees with PJM that a reasonable effective date is June 1, 2029. Mr. Horger’s \nexplanation that it is no longer possible to implement necessary changes to the 2028/2029 \nReliability Pricing Model to account for the new transmission services is well-founded.52 The \nfurther explanations that there are necessary software modifications that must be designed and \nimplemented and that no customers would likely be able to interconnect before then because of \nPJM’s interconnection queue further support the June 1, 2029 effective date.  \n \nBesides the impact on PJM, other affected entities must prepare for these new \ntransmission services to accommodate Co-Located Loads. Any electric utility that may have to \nserve a Co-Located Load as an Eligible Customer, or even simply have one in its service \nterritory, will have to prepare both as an operational matter and consider appropriate regulatory \n \n51 PJM TO Initial Brief at 23-24.  \n52 PJM Initial Brief, Attachment D, Affidavit of Timothy Horger at PP 6-14."},{"page":18,"startToken":4945,"endToken":5079,"text":"18 \n \nand billing changes to ensure that costs reflect cost-causation principles. That takes time and \nPJM’s proposed date provides an opportunity to make these changes systematically and \nefficiently. \nII. \nCONCLUSION \nWHEREFORE, for the foregoing reasons, NOVEC respectfully requests that the \nCommission accept this response to the initial briefs of PJM and the PJM Transmission Owners \nand adopt a replacement rate consistent with the PJM and PJM Transmission Owners’ proposals \nand NOVEC’s comments on those proposals as set forth herein. \n \nRespectfully submitted, \n \n  //s// Alan I. Robbins \n \nAlan I. Robbins \nDebra D. Roby \nThomas B. Steiger III \nWashington Energy Law LLP \n900 17th Street. N.W., Suite 500-A  \nWashington, D.C. 20006 \nTel: (202) 326-9313 \nEmail: arobbins@washingtonenergylaw.com \ndroby@washingtonenergylaw.com \ntsteiger@washingtonenergylaw.com \n \nCounsel to Northern Virginia Electric Cooperative, Inc. \n \n \n \n \nDated: March 25, 2026."},{"page":19,"startToken":5079,"endToken":5157,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary of the Federal Energy \nRegulatory Commission in this proceeding. \nDated at Washington, D.C. this 25th day of March, 2026.  \n \n  //s// Jessika Dziechciowska  \n \nJessika Dziechciowska \nEnergy Practice Analyst \nWashington Energy Law LLP \n900 17th Street, N.W., Suite 500-A \nWashington, D.C. 20006 \nTel: (202) 326-9308 \nEmail: jdziechciowska@washingtonenergylaw.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":5,"startToken":0,"endToken":460},{"p":3,"at":5,"title":"I. RESPONSE","method":"printed heading","endPage":3,"endAt":19,"startToken":460,"endToken":462},{"p":3,"at":19,"title":"A. Introduction and Background","method":"printed heading","endPage":6,"endAt":776,"startToken":462,"endToken":1448},{"p":6,"at":776,"title":"B. PJM’s and the PJM Transmission Owners’ proposals to use the NITS rate for","method":"printed heading","endPage":10,"endAt":1637,"startToken":1448,"endToken":2789},{"p":10,"at":1637,"title":"C. PJM and the PJM Transmission Owners are correct that both operational and","method":"printed heading","endPage":15,"endAt":117,"startToken":2789,"endToken":4095},{"p":15,"at":117,"title":"D. PJM’s two-pronged approach to implementing an anti-toggling feature for Firm","method":"printed heading","endPage":16,"endAt":584,"startToken":4095,"endToken":4460},{"p":16,"at":584,"title":"E. The Commission should ensure that any “special protection schemes” are robust","method":"printed heading","endPage":17,"endAt":923,"startToken":4460,"endToken":4777},{"p":17,"at":923,"title":"F. The Commission should approve PJM’s proposed effective date.","method":"printed heading","endPage":18,"endAt":203,"startToken":4777,"endToken":4973},{"p":18,"at":203,"title":"II. CONCLUSION","method":"printed heading","endPage":19,"endAt":0,"startToken":4973,"endToken":5079},{"p":19,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":19,"endAt":537,"startToken":5079,"endToken":5157}]}