{"document":{"slug":"rec-20260325-5233","title":"Reply Brief of Old Dominion Electric Cooperative","issued":"2026-03-25","accession":"20260325-5233","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Old Dominion Electric Cooperative","kind":"brief","file":"sources/filings/text/20260325-5233_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5233","tier":"record","sha256":"3973d1732844c48eca8aa10533f50191154443774ed8e6fedecf5b5f20dd933b","pages":14,"tokens":3731,"emptyPages":[],"textThemes":["colo","flex"]},"pages":[{"page":1,"startToken":0,"endToken":191,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. AEP \nKentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \n  Docket Nos.  EL25-49-000 \n EL25-49-001"},{"page":2,"startToken":191,"endToken":426,"text":"2 \n \nCity of Cleveland, Department of Public Utilities, Division \nof Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \nLarge Loads Co-Located at Generating Facilities  \nConstellation Energy Generation, LLC \nv.  \nPJM Interconnection, L.L.C. \n \n \n \n \n \n \n \n \n \n \n \n AD24-11-000 \n \n EL25-20-000 \n(Consolidated) \n \nREPLY BRIEF OF OLD DOMINION ELECTRIC COOPERATIVE \n \nPursuant to the Order issued in the above-referenced proceeding on December 18, 2025, 1 \nand the Notice of Extension of Time issued on January 23, 2026, Old Dominion Electric \nCooperative (“ODEC”) submits this Reply Brief in response to the Initial Brief and Joint \nResponses of the PJM Transmission Owners to Paper Hearing Questions2 and the Initial Brief of \nPJM Interconnection, L.L.C. (“PJM”).  \nI. \nRELEVANT BACKGROUND AND SUMMARY OF POSITION \nThe detailed background of this proceeding is contained in the Hearing Order. In summary, \nthe Commission determined that PJM’s Tariff is unjust and unreasonable because it lacked \nprovisions that address with sufficient clarity or consistency the rates, terms and conditions of \nservice that apply to generators serving Co-Located Load and Eligible Customers taking \ntransmission service on behalf of Co-Located Load.3 Among other things, the Commission \n \n1 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (“Hearing Order”). \n2 (“Indicated TOs’ Initial Brief”). \n3 Hearing Order  at P 2."},{"page":3,"startToken":426,"endToken":722,"text":"3 \n \ndirected PJM to submit a compliance filing to revise its Tariff to set forth conditions for \ninterconnection regarding Co-Located Location Arrangements. The Commission also directed \nPJM to revise its Tariff to require Eligible Customers taking transmission service on behalf of Co-\nLocated Loads to take one of three transmission services: (1) Network Integration Transmission \nService (“NITS”); (2) a new Firm Contract Demand transmission service; or (3) a new Non-Firm \nContract Demand transmission service.4 The Commission established a paper hearing to determine \nthe just and reasonable rates, terms and conditions for the new transmission services.5  \nOn February 23, 2026, PJM and the Indicated PJM TOs each filed their initial briefs in this \npaper hearing proceeding. PJM’s Initial Brief addressed the non-rate terms and conditions for the \nnew transmission services, in response to questions posed in the Hearing Order. The Indicated TOs \nsubmitted rates for the new services, consistent with their rights under the Consolidated \nTransmission Owners Agreement.  \nODEC is a not-for-profit power supply electric cooperative, organized and operating under \nthe laws of Virginia and subject to FERC jurisdiction. ODEC supplies capacity and energy to its \neleven electric distribution cooperative members, all of which are located within the PJM control \narea. ODEC is a network transmission customer of PJM, as well as a PJM Transmission Owner. \nODEC is a generation-owning utility, dependent upon the use of the transmission facilities of PJM \nunder its Tariff to deliver the output of ODEC’s generation facilities located within PJM and to \ndeliver periodic power purchases from third party sellers to the load of its member systems in \nPJM’s footprint. ODEC takes transmission service under the PJM Tariff. ODEC is also a Market \nSeller of energy and capacity under the PJM Tariff.   \n \n4 Id. \n5 Id. at PP 2, 219-220."},{"page":4,"startToken":722,"endToken":1025,"text":"4 \n \nAs discussed herein, ODEC generally agrees with the proposals submitted by PJM and the \nIndicated TOs in their respective Initial Briefs. Subject to the clarifications discussed below, \nODEC believes that both Initial Briefs provide just and reasonable rates, terms and conditions for \nthe new Firm Contract Demand transmission service and Non-Firm Contract Demand transmission \nservice. ODEC is willing to adopt the Indicated TOs’ proposed rates for the new Firm Contract \nDemand and Non-Firm Contract Demand, subject to these clarifications. Therefore, ODEC \nsupports the Commission’s acceptance of both filings, subject to further compliance filings as \nnecessary to address the following issues described in the remainder of this Reply Brief: (1) \nclarification of PJM’s proposed requirement that an Eligible Customer must be designated to take \ntransmission service on behalf of a Co-Located Load and provide PJM with an authorization from \nits Relevant Electric Retail Regulatory Authority (“RERRA”); (2) with respect to the PJM TOs’ \nproposal for PJM to provide billing credits to reflect revenues associated with the new Grid \nReliance Charge as well as revenues for Non-Firm Contract Demand Service, the individual TOs \nwill need to either confirm that their formula or stated rates and metrics reporting enable the direct \ncrediting by PJM, or provide whatever revisions are necessary in order for PJM to do so; (3) PJM \nand the PJM Transmission Owners will need to address how to charge regulation and black start \nservice to an Eligible Customer taking service on behalf of Co-Located Load; and (4) the \nCommission should consider whether any protections are needed for local utilities or TOs should \nthey need to take the extraordinary measure of disconnecting an Eligible Customer taking service \non behalf of Co-Located Loads, if the Eligible Customer’s use of the transmission system exceeds \ncontract demand or they are called upon for Load Shedding and Curtailment."},{"page":5,"startToken":1025,"endToken":1340,"text":"5 \n \nII. \nREPLY TO PJM AND INDICATED TOS’ INITIAL BRIEFS \nODEC is a PJM Transmission Owner but did not participate in the Indicated TOs’ Initial \nBrief. ODEC submits this Reply Brief to state its support for most of the proposals in the Indicated \nTOs’ Initial Brief, as well as identify areas that require further consideration or clarification. \nSubject to the clarifications and issues raised below, ODEC is willing to adopt the Indicated TOs’ \nproposed rates for the new transmission services for Co-Located Loads, as described in the \nIndicated TOs’ Initial Brief. \nOverall, ODEC agrees with the Indicated TOs’ Initial Brief and PJM’s Initial Brief. \nWithout detailing each component of the Indicated TOs’ Initial Brief, ODEC agrees with the \nIndicated TOs’ principles that (1) rates for the new services ordered by the Commission must be \nconsistent with longstanding cost allocation principles, so that existing customers do not unfairly \nsubsidize services for Co-Located Load customers; and (2) the new transmission services must be \nimplemented in a manner that does not compromise system reliability.6 ODEC’s comments below \ncorrespond to the questions posed in the Commission’s Hearing Order. \nQuestions 1 and 2:  \n(1) What are the appropriate rates, terms, and conditions for the new Firm Contract \nDemand transmission service, including whether it would be just and reasonable \nto apply the current zonal firm PTPS charges to this new service and whether it \nwould be just and reasonable and consistent with cost causation to include charges \nfor any of PJM’s administrative services? \n(2) What are the appropriate rates, terms, and conditions for the new Non-Firm \nContract Demand transmission service, including whether it would be just and \nreasonable to apply the current zonal non-firm PTPS charges to this new \ntransmission service and whether it would be just and reasonable and consistent \nwith cost causation to include charges for any of PJM’s administrative services? \n \n6 Indicated TOs’ Initial Brief at 3-5."},{"page":6,"startToken":1340,"endToken":1672,"text":"6 \n \nA. PJM’s Proposed Conditions Precedent and Technical Requirements for Contract \nDemand Transmission Services \nODEC generally supports PJM’s conditions precedent to ensure that Eligible Customers \ntaking service on behalf of Co-Located Loads preserve the reliability of the Transmission System. \nHowever, there is one aspect of PJM’s proposed conditions precedent that may need further \nconsideration or clarification. PJM’s Initial Brief and Illustrative Tariff propose a condition \nprecedent that the “Eligible Customer must have been designated to take transmission service on \nbehalf of a Co-Located Load in the relevant Application, Service Agreement, or GIA for the Co-\nLocated Generating Facility, and provide PJM with ‘an authorization or certification from its \nRelevant Electric Retail Regulatory Authority which affirms that the Eligible Customer is \nauthorized to provide energy to the Co-Located Load.”7 Based on the existing PJM Tariff \ndefinitions, it appears that ODEC would be the Eligible Customer8 for at least its distribution \ncooperative members, as well as the RERRA. \nThe PJM Tariff defines and Eligible Customer as follows: \n . . .any electric utility or any person generating electric energy for sale for resale, \nbut with respect to transmission service that the Commission is prohibited from \nordering by section 212(h) of the Federal Power Act, such entity is eligible only if \nthe service is provided pursuant to a state requirement that the Transmission \nProvider or Transmission Owner offer the unbundled transmission service, or \npursuant to a voluntary offer of such service by a Transmission Owner or (2) any \nretail customer taking unbundled transmission service pursuant to a state \nrequirement that the Transmission Provider or a Transmission Owner offer the \ntransmission service, or pursuant to a voluntary offer of such service by a \nTransmission Owner.   \n \nODEC is a generation and transmission electric cooperative. To meet the requirements of \nits eleven distribution cooperatives under the Third Amended and Restated Wholesale Power \n \n7 PJM Initial Brief at 19; Illustrative Tariff. Part XI, Subpart B, section 710.1. \n8 PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – E-F (41.0.0)."},{"page":7,"startToken":1672,"endToken":1969,"text":"7 \n \nContracts between ODEC and each of its eleven distribution electric cooperatives, ODEC owns \ngenerating facilities and purchases Network Integration Transmission Service (“NITS”) under the \nPJM Open Access Transmission Tariff (“Tariff”). Thus, with respect to the definition of Eligible \nCustomer, ODEC is the “electric utility . . . generating electric energy for resale” and ODEC takes \ntransmission service to serve its members. As such, ODEC is the entity that would be the Eligible \nCustomer for Co-Located Loads, at least with respect to existing generating facilities and any \nPlanned Facilities owned by ODEC that would be used to serve the Co-Located Loads of ODEC’s \nmembers. \nThe PJM Tariff defines the RERRA as “an entity that has jurisdiction over and establishes \nprices and policies for competition for providers of retail electric service to end-customers, such \nas the city council for a municipal utility, the governing board of a cooperative utility, the state \npublic utility commission or any other such entity.”9 ODEC’s members are located in Virginia, \nMaryland and Delaware. While the Virginia State Corporation Commission (“VSCC”) is currently \nthe RERRA for ODEC’s member distribution cooperatives in Virginia, the individual member \ndistribution cooperatives are the RERRA in Maryland and Delaware. It is unclear whether PJM \nintends that ODEC, as the Eligible Customer for Co-Located Loads located in its members’ service \nterritories, would need to provide certification that the member has authorized ODEC to provide \nenergy to the Co-Located Load. Alternatively, where the state regulatory agency is the RERRA, \nODEC is unaware of a procedure whereby it would obtain authorization from the VSCC in order \nto provide energy to Co-Located Loads. ODEC requests that PJM provide clarification on this \nproposed requirement, as it would apply to a generation and transmission electric cooperative like \nODEC.  \n \n9 PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – R-S."},{"page":8,"startToken":1969,"endToken":2299,"text":"8 \n \nB. The Indicated TOs’ Proposed Rates for Firm and Non-Firm Contract Demand \nTransmission Services \nWith respect to Indicated TOs’ proposed rates for the new transmission services ordered \nby the Commission, ODEC generally agrees with the Indicated TOs’ proposed rate design as well \nas the terms and conditions for each service. More specifically, ODEC agrees that it is reasonable \nto charge the same rate for Firm Contract Demand Service and NITS, as well as the Indicated TOs’ \nproposal to use the same Firm Contract Demand Service rate for purposes of establishing the \nmaximum rate for Non-Firm Contract Demand Service. ODEC also agrees that it is reasonable for \nPJM to charge Firm Contract Demand Service customers and Non-Firm Contract Demand Service \ncustomers for applicable PJM administrative charges consistent with PJM’s charges to existing \ntransmission customers.  \nOne component of the Indicated TOs’ Initial Brief that may require further compliance \nfilings is the issue of bill credits for NITS and Firm Contract Demand Service customers. ODEC \nsupports the Indicated TOs’ expectation that PJM will provide bill credits to NITS and Firm \nContract Demand Service customers directly in their monthly invoices, to reflect credits for \nrevenues associated with the new Grid Reliance Charge as well as revenues for Non-Firm Contract \nDemand Service.10 In addition to its status as a Transmission Owner, ODEC is a transmission \ncustomer under the PJM OATT, as ODEC takes NITS service and pays the NITS rates for several \nTransmission Owners in order to meet ODEC’s obligations to provide service to its eleven member \ndistribution cooperatives.11 It is important that the Commission have assurance from PJM that it \n \n10 Id. at 7, 9. \n11 ODEC takes transmission service and pays the transmission revenue requirement for the following \nTOs: Virginia Electric and Power Company d/b/a Dominion Energy Virginia; American Electric Power \nService Corporation (Appalachian Power Company); Exelon Corporation (Delmarva Power & Light \nCompany); and FirstEnergy Service Company (The Potomac Edison Company, Monongahela Power \nCompany, and Keystone Appalachian Transmission Company)."},{"page":9,"startToken":2299,"endToken":2668,"text":"9 \n \nwill provide the bill credits as envisioned by the Indicated TOs, so that ODEC and other NITS \ncustomers are not subject to paying duplicative charges for the same revenue requirement amount. \nThe assurance from PJM is also important because the Indicated TOs’ statement that load-serving \nentities will perform their current roles of submitting the metrics that PJM uses to calculate \ntransmission, capacity, and energy charges that as a transmission customer taking NITS service, \nmay not be consistent among the Indicated TOs. For example, although ODEC is a load-serving \nentity, as a transmission customer ODEC does not submit metrics to PJM for calculation of \nODEC’s charges for transmission, capacity, and energy. Instead, those metrics are provided to \nPJM by the Transmission Owner(s) for the zones where ODEC takes transmission service.12 \nFurther, ODEC is a customer of AEP affiliate Appalachian Power Company (“APCo”) under a \nfull-requirements agreement dated August 1, 2017. Such stated rate agreements should ensure that \ncustomers such as ODEC receive credits for revenues received by  APCo for the Grid Reliance \nCharge and Non-Firm Contract Demand transmission service, so that ODEC is not paying costs \nthat are already recovered by APCo through these new charges. In order to ensure that rates for \nthe new Firm Contract Demand Service are just and reasonable, the individual TOs will need to \neither confirm that their formula or stated rates and metrics reporting enable direct crediting by \nPJM, or provide whatever revisions are necessary in order to do so. Therefore, ODEC requests that \nthe Commission’s order on the Indicated TOs’ filing require such further compliance filings. \nQuestions 3 and 4:  \n(3) As noted above, a Co-Location Arrangement is synchronized to the transmission \nsystem.13  Should the rate paid by an Eligible Customer on behalf of a Co-Located \n \n12 See, e.g., Attachments M-1 and M-2 to the PJM Tariff; see also, the Settlements Agreement between \nThe Potomac Edison Company (“Potomac Edison”) and ODEC, Service Agreement No. 4453, providing \nthat Potomac Edison calculates and reports to PJM the Total Hourly Energy Obligation (energy), Peak \nLoad Contribution (capacity) and Network Service Peak Load (transmission) on behalf of LSEs in the \nPJM APS Zone. \n13 See also PJM March 24 Response at 42-43."},{"page":10,"startToken":2668,"endToken":3033,"text":"10 \n \nLoad taking only the new Non-Firm Contract Demand transmission service that \nelects to not reserve any amount of that service for a period of time (e.g., one \nmonth) reflect not only charges for regulation and black start services, but also an \nadditional charge given that regulation and black start services could not be \nprovided without the transmission system?  If so, how should that additional \ncharge be determined? \n(4) As noted above, a Co-Location Arrangement is synchronized to the transmission \nsystem.14  Should the rate paid by an Eligible Customer on behalf of a Co-Located \nLoad taking only a de minimis amount of the new Firm or Non-Firm Contract \nDemand transmission services reflect not only (i) charges for regulation and black \nstart service and (ii) the transmission service charges for that de minimis amount \nof service, but also an additional charge reflecting that the Co-Location \nArrangement is physically connected and synchronized to the PJM transmission \nsystem?  If so, how should that additional charge be determined? \nODEC supports the Indicated TOs’ proposal for a Grid Reliance Charge to be applied to \ncustomers taking Firm Contract Demand Service and Non-Firm Contract Demand Service.15 As \ndescribed by the Indicated TOs, the Grid Reliance Charge appropriately reflects the fact that Co-\nLocated Load are synchronized with the transmission grid and rely on the transmission grid. \nConsistent with the Commission’s determination that transmission customers should be protected \nagainst cost-shifts under the new transmission service framework for Co-Located Loads, the Grid \nReliance Charge ensures that Co-Located Loads pay their “fair share” of costs that are \ncommensurate with the benefits Co-Located Loads receive from the transmission system including \nthe costs associated with delivery of black start and regulation services.16 \nIn its Initial Brief, PJM did not address these questions but indicated that it may provide \nadditional perspectives in its reply brief, based on review of the PJM Transmission Owners’ \nbrief.17 ODEC believes that in addition to the rates for the cost of regulation and black start \nservices, the charges for individual Co-Located Loads will need to be determined on some basis \n \n14 Id. \n15 Indicated TO’s Initial Brief at 14-18. \n16 Id.  \n17 PJM Initial Brief at 38."},{"page":11,"startToken":3033,"endToken":3371,"text":"11 \n \nof the Eligible Customer’s actual or proxy usage on behalf of Co-Located Loads. ODEC expects \nthat in order to assess charges for black start and regulation service, there must be individual meters \non the Co-Located Loads. PJM and the PJM Transmission Owners will need to address how to \ncharge regulation and black start service to an Eligible Customer taking service on behalf of Co-\nLocated Load.  \nQuestions 5 and 6:  \n(5) What is the appropriate remedy or other remedial action that PJM should take to \naddress unreserved use of the PJM transmission system for an Eligible Customer \ntaking Firm Contract Demand transmission service on behalf of a Co-Located \nLoad? What is the appropriate penalty charge or other remedial action that PJM \nshould take to address any unreserved use of the PJM transmission system for an \nEligible Customer taking Non-Firm Contract Demand transmission service on \nbehalf of a Co-Located Load? \n(6) What is the appropriate penalty charge or other remedial action that PJM should \ntake to address any unreserved use of the PJM transmission system for an Eligible \nCustomer taking Non-Firm Contract Demand transmission service on behalf of \nCo-Located Load? \n \nODEC agrees with PJM’s proposal for escalating penalties in the form of disqualification \nand pauses in service for Eligible Customers failing to shed load or curtail, as well as for failures \nin control technology, and/or protection system misoperation.18 ODEC agrees with PJM that \nfinancial penalties alone will be insufficient to address and/or prevent the threats to system \nreliability posed by Eligible Customers who fail to control their withdrawals from the transmission \nsystem. ODEC will review the financial penalties being considered by PJM and the Indicated TOs \nwhen they are submitted to the Commission and may offer further comments at that time.  \nAdditionally, ODEC suggests that the Commission consider whether any protections are \nneeded for local utilities or TOs should they need to take the extraordinary measure of \ndisconnecting an Eligible Customer taking service on behalf of Co-Located Loads, if the Eligible \n \n18 Id. at 40-50."},{"page":12,"startToken":3371,"endToken":3642,"text":"12 \n \nCustomer’s use of the transmission system exceeds contract demand or are called upon for Load \nShedding and Curtailment. In such instances, the local utility or TO should not be liable for legal, \nfinancial or other damages that might be experienced by an Eligible Customer. \nIII. \nCONCLUSION \nWHEREFORE, for the foregoing reasons, ODEC requests that the Commission consider \nthis Reply Brief and condition acceptance of the PJM and Indicated TOs’ proposals for \ntransmission service to Co-Located Loads on further compliance filings as necessary to address \nthe following (1) clarification of PJM’s proposed requirement that an Eligible Customer must be \ndesignated to take transmission service on behalf of a Co-Located Load and provide PJM with an \nauthorization from its RERRA; (2) with respect to the PJM TOs’ proposal for PJM to provide \nbilling credits to reflect revenues associated with the new Grid Reliance Charge as well as revenues \nfor Non-Firm Contract Demand Service, the individual TOs will need to either confirm that their \nformula or stated rates and metrics reporting enable the direct crediting by PJM, or provide \nwhatever revisions are necessary in order to do so; (3) PJM and the PJM TOs will need to address \nhow to charge regulation and black start service to an Eligible Customer taking service on behalf \nof Co-Located Load; and (4) the Commission consider whether any protections are needed for \nlocal utilities or TOs should they need to take the extraordinary measure of disconnecting an \nEligible Customer taking service on behalf of Co-Located Loads, if the Eligible Customer’s use \nof the transmission system exceeds contract demand or are called upon for Load Shedding and \nCurtailment."},{"page":13,"startToken":3642,"endToken":3689,"text":"13 \n \nRespectfully submitted, \n \n /s/ Adrienne E. Clair \nAdrienne E. Clair \nJenna Cliatt \nThompson Coburn LLP \n1909 K Street, N.W., Suite 600 \nWashington, D.C.  20006-1167 \n(202) 585-6900 \n(202) 585-6969 (fax) \naclair@thompsoncoburn.com  \njcliatt@thompsoncoburn.com \n \nAttorneys for Old Dominion Electric \nCooperative \n \nDated: March 25, 2026"},{"page":14,"startToken":3689,"endToken":3731,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that on this 25th day of March 2026, I have caused a copy of the foregoing \nto be served upon each party designated on the Commission’s Official Service List for this \nproceeding. \n \n /s/Adrienne E. Clair"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":1025,"startToken":0,"endToken":329},{"p":2,"at":1025,"title":"I. RELEVANT BACKGROUND AND SUMMARY OF POSITION","method":"printed heading","endPage":5,"endAt":5,"startToken":329,"endToken":1026},{"p":5,"at":5,"title":"II. REPLY TO PJM AND INDICATED TOS’ INITIAL BRIEFS","method":"printed heading","endPage":6,"endAt":5,"startToken":1026,"endToken":1341},{"p":6,"at":5,"title":"A. PJM’s Proposed Conditions Precedent and Technical Requirements for Contract","method":"printed heading","endPage":8,"endAt":5,"startToken":1341,"endToken":1970},{"p":8,"at":5,"title":"B. The Indicated TOs’ Proposed Rates for Firm and Non-Firm Contract Demand","method":"printed heading","endPage":12,"endAt":282,"startToken":1970,"endToken":3416},{"p":12,"at":282,"title":"III. CONCLUSION","method":"printed heading","endPage":14,"endAt":0,"startToken":3416,"endToken":3689},{"p":14,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":14,"endAt":247,"startToken":3689,"endToken":3731}]}