{"document":{"slug":"rec-20260325-5235","title":"Response Brief of Geronimo Power, LLC","issued":"2026-03-25","accession":"20260325-5235","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"GERONIMO POWER, LLC","kind":"brief","file":"sources/filings/text/20260325-5235_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5235","tier":"record","sha256":"51da403addc048ce505b58920cc6aeaa800afad79b6c908c3cd29c7334b31662","pages":16,"tokens":5101,"emptyPages":[],"textThemes":["flex","colo"]},"pages":[{"page":1,"startToken":0,"endToken":306,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C. \nInterconnection of Large Loads to the  \nInterstate Transmission System  \nConstellation Energy Generation, LLC \nv. \nPJM Interconnection, L.L.C. \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \nDocket Nos. EL25-49-000 \nEL25-49-001  \n \nDocket No. AD24-11-000 \n \n \nDocket No. EL25-20-000 \n \n \n(Consolidated) \n \n \nRESPONSE BRIEF OF GERONIMO POWER, LLC \n \nPursuant to the Federal Energy Regulatory Commission’s (“FERC” or “Commission”) \nDecember 18, 2025 order1 and the Commission’s January 23, 2026 Notice of Extension of Time,2 \nGeronimo Power, LLC (“Geronimo Power”) hereby submits this response brief.3   \nI. \nINTRODUCTION \nThe current paradigm for serving large loads in PJM Interconnection, L.L.C. (“PJM”) is \nnot sufficiently flexible to accommodate the growth of hyperscale data centers and other large load \ncustomers that have the capability to meet their demand—in whole or in part—using co-located \ngeneration resources.  At the same time, growing resource adequacy concerns within the PJM \n \n1 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (“Order”).  \n2 PJM Interconnection, L.L.C., et al., Docket Nos. EL25-49-000, et al., Notice of Extension of Time (Jan. \n23, 2026).  \n3 On January 17, 2025, National Grid Renewables Development, LLC (“NG Renewables”) filed Post-\nTechnical Conference Comments in Docket No. AD24-11-000 and on February 25, 2025 NG Renewables filed a \ntimely Motion to Intervene in Docket No. EL25-49-000.  Large Loads Co-Located At Generating Facilities, Docket \nNo. AD24-11-000, Post-Technical Conference Comments of National Grid Renewables Development, LLC (Jan. 17, \n2025); PJM Interconnection, L.L.C., Docket No. EL25-49-000, (doc-less) Motion to Intervene of National Grid \nRenewables Development, LLC under EL25-49-000 (Feb. 25, 2025).  On May 29, 2025, NG Renewables was acquired \nby Brookfield Asset Management LLC and subsequently changed its name to Geronimo Power, LLC on June 5, 2025.  \nSee NGV NGR Acquisition Co, LLC, Docket No. EC25-64-000, Notice of Consummation (June 9, 2025)."},{"page":2,"startToken":306,"endToken":606,"text":"2 \n \nregion have increased the importance of ensuring that market rules provide an incentive for large \nloads to pursue supply arrangements that mitigate their impact on the grid and other customers.  \nMaintaining existing barriers to co-location and other “bring your own generation” solutions has \nthe potential to lead to higher prices for ratepayers, a less reliable grid, and put at risk America’s \nplace at the forefront of the global economy.  \nGeronimo Power applauds the Commission for recognizing that this outcome is \nunacceptable and ordering PJM to reform existing market rules to provide large loads with the \nflexibility necessary to pursue arrangements that allow these customers to receive service on a \ntimely basis, minimize their reliance on the transmission system, and, ultimately, reduce costs for \nother ratepayers within the PJM region.  The Commission’s recognition that the PJM tariff must \ninclude transmission service offerings that reflect the use of the grid by co-located loads will, if \nproperly implemented, ensure that co-located loads can come online more quickly and avoid \ntriggering unnecessary transmission infrastructure upgrades.4  The Commission’s requirement that \nPJM allow co-located load to select from two new types of transmission service—a Firm Contract \nDemand transmission service and a Non-Firm Contract Demand transmission service—is a key \npart of this framework and represents an important first step in ensuring that co-located loads have \nthe option of taking transmission service that is consistent with their actual impact on the grid.  \nGeronimo Power believes that certain proposals outlined in the initial brief filed by the \nPJM Transmission Owners run counter to the objectives outlined in the Commission’s order in \nthis proceeding and will result in charges that do not reflect co-located loads’ actual impact on the \ngrid, disincentivize large loads from co-locating with new generation resources, and ultimately \n \n4 Order at P 162."},{"page":3,"startToken":606,"endToken":923,"text":"3 \n \nextend the status quo in PJM that the Commission has found to be unjust and unreasonable.5  \nSpecifically, the PJM Transmission Owners have proposed to use the same Firm Contract Demand \ntransmission service rate—which will be the same rate as Network Integration Transmission \nService (“NITS”)6—for purposes of establishing the rate for Non-Firm Contract Demand \ntransmission service despite the fact that Non-Firm Contract Demand transmission service is a \nlesser service with lower curtailment priority.7  The PJM Transmission Owners have also proposed \nto apply a significant, but vaguely defined “Grid Reliance Charge” that would apply to load being \nserved by co-located generation based on nebulous benefits that the PJM Transmission Owners \nclaim that all loads derive from the grid.8  \nThe Commission should reject the PJM Transmission Owners’ proposal to set the Non-\nFirm Contract Demand transmission service rate equal to the rates for firm service and establish \nthe proposed Grid Reliance Charge.  While Geronimo Power acknowledges that co-located load \nshould pay for the transmission service it uses and the actual benefits it receives from the grid, the \nPJM Transmission Owners’ proposed rates and charges have not been tailored to reflect the nature \nof the service being provided.  If approved, the PJM Transmission Owners’ proposed rate for Non-\nFirm Contract Demand transmission service and the Grid Reliance Charge will result in co-located \nload paying rates that do not accurately reflect the services being provided and will create a \ndisincentive for large loads to pursue efficient co-location arrangements that have the potential to \nsupport the reliability of the grid, avoid unnecessary transmission investments, and drive costs \ndown for ratepayers.   \n \n5 PJM Interconnection, L.L.C., et al., Docket Nos. EL25-49-000, et al., Initial Brief and Responses of the \nIndicated PJM Transmission Owners to Paper Hearing Questions (Feb. 23, 2026) (“PJM TO Brief”).  \n6 Id. at 4-5, 6.   \n7 Id. at 10-13. \n8 Id. at 14."},{"page":4,"startToken":923,"endToken":1264,"text":"4 \n \nII. \nTHE RATES PROPOSED BY THE PJM TRANSMISSION OWNERS ARE NOT \nJUST AND REASONABLE \n \nA. \nThe PJM Transmission Owners Have Not Demonstrated That It Is Just And \nReasonable To Apply The Same NITS And Firm Contract Demand Rates To \nNon-Firm Contract Demand Transmission Service \n \nIn its Order, the Commission required PJM to revise its tariff to offer co-located loads the \nability to take Firm and Non-Firm Contract Demand transmission services.9  The Commission \nexplained that the Non-Firm Contract Demand transmission service would be a lesser service than \nNITS or Firm Contract Demand transmission service since customers taking this service may only \ndo so “if transmission capacity is available” and this service is “curtailed during emergency \noperations (i.e., it will be curtailed before existing firm transmission services and the new Firm \nContract Demand Transmission Service).”10  The Commission explained that this Non-Firm \nContract Demand transmission service may, for example, be used by a co-located load when the \nresource that normally supplies it is expected to be offline for maintenance and the service is \nreserved in advance.11   \nDespite the fact that Non-Firm Contract Demand transmission service is a lesser service \nthan NITS or Firm Contract Demand transmission service and will have a lower curtailment \npriority, the PJM Transmission Owners propose to charge co-located load for Non-Firm Contract \nDemand transmission service at the same rate used for NITS and Firm Contract Demand \ntransmission service.12  There are numerous aspects of the PJM Transmission Owners’ proposal \n \n9 Order at P 2. \n10 Id. at P 214.  PJM has proposed that Non-Firm Contract Demand transmission service may only be taken \nup to the MW level that a co-located generation resource is able to supply a co-located load; the portion of load that \nis not supplied by co-located generation must take Firm Contract Demand transmission service.  PJM Interconnection, \nL.L.C., et al., Docket Nos. EL25-49-000, et al., Initial Brief of PJM Interconnection, L.L.C. at 9 (Feb. 23, 2026) (“PJM \nBrief”). \n11 Order at P 214.  \n12 PJM TO Brief at 10."},{"page":5,"startToken":1264,"endToken":1790,"text":"5 \n \nthat are unclear.13  But when combined with PJM’s proposed requirement that an eligible customer \ntake Non-Firm Contract Demand transmission service for the portion of its load served by co-\nlocated generation,14 the implication of PJM Transmission Owners’ proposal appears to be that a \ncustomer taking Non-Firm Contract Demand transmission service would be required to pay a \ntransmission charge equivalent to the rate paid by customers taking firm service.  Take the example \nof 100 MW load co-located with a 100 MW generator located within a zone with a NITS and Firm \nContract Demand transmission service rate of $10,000/MW/year and a Grid Reliance Charge of \n$2,580/MW/Year.15  Under the PJM Transmission Owners’ proposal, the load would pay the same \namount if it reserved 100 MW of Firm Contract Demand transmission service or 100 MW of Non-\nFirm Contract Demand transmission service.  The only difference is that a portion of the rate paid \nby the load electing Non-Firm Contract Demand transmission service would be in the form of a \nGrid Reliance Charge.  This is illustrated in the table below, which builds on the examples included \nin the PJM Transmission Owners’ brief.  \n \n13 For example, the PJM Transmission Owners indicate that the Grid Reliance Charge will be subtracted from \nthe Non-Firm Contract Demand service charge on a MWh basis for each MWh of Non-Firm Contract Demand \ntransmission service included in a transmission service reservation request.  Id. at 10.  This proposal appears to suggest \nthat the PJM Transmission Owners will charge for Non-Firm Contract Demand transmission service on a MWh basis.  \nSuch a proposal would to be at odds with how transmission reservation charges are historically structured and the PJM \ntariff.  See PJM Tariff § 1 (Definitions – Reserved Capacity) (“‘Reserved Capacity’ shall mean the maximum amount \nof capacity and energy that the Transmission Provider agrees to transmit for the Transmission Customer over the \nTransmission Provider’s Transmission System between the Point(s) of Receipt and the Point(s) of Delivery under \nTariff, Part II.  Reserved Capacity shall be expressed in terms of whole megawatts on a sixty (60) minute interval \n(commencing on the clock hour) basis.”).  The PJM Transmission Owners’ reference to charging on a per MWh basis \nalso appears inconsistent with other statements in their brief that contemplate assessing charges for Non-Firm Contract \nDemand transmission service based on a customer’s reserved contract demand.  See PJM TO Brief at 11 (discussing \nthe Non-Firm Contract Demand rate as applied on a MW/Year basis).  If the Commission does not reject the PJM \nTransmission Owners’ proposal outright, the Commission should, at minimum, require the PJM Transmission Owners \nto clarify the nature of the rates and billing determinants that they are proposing.   \n14 PJM Brief at 9 (“To the extent that the gross demand of a Co-Located Load is not covered by the Eligible \nCustomer’s Firm Contract Demand Transmission Service, the Eligible Customer must cover the remaining gross \ndemand by applying for Non-Firm Contract Demand Transmission Service.”). \n15 These are the same rates used by the PJM Transmission Owners in their brief to illustrate the application \nof the new transmission services.  PJM TO Brief at 7, 11."},{"page":6,"startToken":1790,"endToken":2062,"text":"6 \n \nTable 1: Illustration of Customer Payments \nCharge Component \nScenario 1: Firm \nContract Demand (100 \nMW) \nScenario 2: Non-Firm \nContract Demand (100 \nMW) \nContract Demand Reserved \n(MW) \n100 MW \n100 MW \nApplicable Contract \nDemand Rate ($/MW-year) \n$10,000 \n$7,42016 \nContract Demand Charge \n($/year) \n$1,000,000 \n$742,000 \nGrid Reliance Charge Rate \n($/MW-year) \nN/A \n$2,580 \nGrid Reliance Charge Paid \n($/year) \n$0 \n$258,000 \nTotal Amount Paid by \nCustomer ($/year) \n$1,000,000 \n$1,000,000 \n \nCharging a customer taking Non-Firm Contract Demand transmission service the same \namount as a customer taking Firm Contract Demand transmission service is inconsistent with cost \ncausation principles and unjust and unreasonable.  The Commission directed PJM to establish \nNon-Firm Contract Demand transmission service because it recognized that co-located loads may \nnot plan to withdraw energy on a regular basis and that these customers should have the ability to \n“reserve transmission service . . . as needed during normal, non-emergency system operating \nconditions.”17  Yet, under the PJM Transmission Owners’ proposal, these loads will be required to \npay a rate equivalent to customers receiving a higher level of service that rely entirely on the grid \nto serve their needs.  \nThe PJM Transmission Owners offer several rationales for charging co-located load taking \nNon-Firm Contract Demand transmission service the same rate for a lesser service, but none are \nconvincing.  The PJM Transmission Owners start by asserting that charging customers taking Non-\n \n16 This equals the Non-Firm Contract Demand Rate minus the Grid Reliance Charge.  Although, as noted \nabove, it is not clear whether PJM will charge for Non-Firm Contract Demand transmission service on a MW basis. \n17 Order at PP 214-215."},{"page":7,"startToken":2062,"endToken":2415,"text":"7 \n \nFirm Contract Demand transmission service the same as they charge for NITS and Firm Contract \nDemand transmission service is just and reasonable because the Commission has permitted non-\nfirm point-to-point (“PTP”) transmission service to be charged a rate no higher than the rate \ncharged for firm PTP transmission service.18  But just because the Commission has said that a rate \nmay not exceed a certain threshold, does not mean that setting the rate at that threshold is just and \nreasonable.  Indeed, when FERC adopted the principle that a non-firm rate may not exceed a firm \nrate, it explained that “[i]n most cases, FERC expects that non-firm transmission rates will be \npriced below the firm rate.”19  This is in fact the case in PJM where, as the PJM Transmission \nOwners acknowledge, non-firm PTP customers receive a discounted rate as compared to firm PTP \ncustomers.20   \nThe PJM Transmission Owners attempt to dismiss this evidence that non-firm service \nshould be, and often is, priced lower than firm service as something that is limited to customers \ntaking service at the PJM border and that should not be extended to a broader class of customers.21  \nThe PJM Transmission Owners also assert that Non-Firm Contract Demand transmission service \nis a superior service to non-firm PTP.22  But the PJM Transmission Owners are focusing on the \nwrong issue.  The issue is not whether co-located load should pay the same rate as non-firm PTP \ncustomers in PJM.  It is whether co-located load taking Non-Firm Contract Demand transmission \nservice should pay the same rate for this lesser service as NITS and Firm Contract Demand \ncustomers pay.  On this critical question the PJM Transmission Owners have provided no basis for \n \n18 PJM TO Brief at 11.  \n19 Transmission Access Policy Study Group v. FERC, 225 F.3d 667, 731 (D.C. Cir. 2000).  See also Northeast \nUtils. Serv. Co., 57 FERC ¶ 61,340, 62103 (1991) (“A non-firm rate is generally lower than a firm rate to reflect the \nnature of the interruptible wheeling service.”). \n20 PJM TO Brief at 11, n.30.   \n21 Id.   \n22 Id. at 12."},{"page":8,"startToken":2415,"endToken":2726,"text":"8 \n \nthe Commission to conclude that requiring Non-Firm Contract Demand customers to pay more for \nless is just and reasonable. \nThe PJM Transmission Owners also argue that before they are required to “discount” the \nrate charged for Non-Firm Contract Demand transmission service they must first “gather data” on \nhow Non-Firm Contract Demand transmission service customers “are utilizing the service, taking \ninto account the intended purpose of the service, and the effect of that utilization on the system.”23  \nBut there is no need for the PJM Transmission Owners to “gather data” to come to the conclusion \nthat charging the same rate for inferior service is not just and reasonable.  And there is no exception \nto the Federal Power Act’s (“FPA”) requirement that rates be just and reasonable while the PJM \nTransmission Owners “gather data” to determine if a rate they have implemented is in fact a just \nand reasonable rate.  The PJM Transmission Owners must adopt a just and reasonable rate \nbeginning on the date they first offer Non-Firm Contract Demand transmission service.  They \ncannot set an unjust and unreasonable rate based on superior services while they wait until they \ngather more data to determine the extent to which such unjust and unreasonable rate should be \nreduced when charging for an inferior service.  \nIf anything, the PJM Transmission Owners’ brief provides support for charging Non-Firm \nContract Demand customers a lower rate than is charged NITS and Firm Contract Demand \ncustomers.  The PJM Transmission Owners observe that the “historical purpose” of non-firm rates \nbeing less than firm rates “is to encourage the efficient use of the transmission system – i.e., to \nensure that the system is being utilized optimally.”24  This makes sense.  Allowing customers that \ncan limit their use of the grid to time periods when capacity is available to pay a lower rate for \n \n23 Id. at 13.  \n24 Id."},{"page":9,"startToken":2726,"endToken":2997,"text":"9 \n \nsuch non-firm service creates an incentive for customers to reduce their reliance on the \ntransmission system.   \nYet, the PJM Transmission Owners’ proposal will undermine the incentive for large load \ncustomers to reduce their reliance on the grid by applying the same rate to Non-Firm Contract \nDemand transmission service as Firm Contract Demand transmission service.  The PJM \nTransmission Owners’ failure to offer a Non-Firm Contract Demand rate that will not \ndisincentivize co-location arrangements and will encourage the efficient use of the transmission \nsystem is contrary to a primary reason the Commission required PJM to adopt these new Contract \nDemand transmission services: to avoid costly and inefficient transmission system buildout that \nmay not be necessary.25  To achieve this goal, the PJM Transmission Owners must adopt rates that \nreflect the nature of the service being provided and encourage the efficient use of the transmission \nsystem.  The PJM Transmission Owners’ proposed Non-Firm Contract Demand transmission \nservice rate does neither.   \nThe Commission should find that the PJM Transmission Owners’ proposed Non-Firm \nContract Demand transmission service rate is unjust and unreasonable.  Rather than starting from \nthe position that customers taking non-firm transmission service should pay the same rate as firm \ncustomers, the PJM Transmission Owners should propose a Non-Firm Contract Demand \ntransmission service rate that includes a discount which reflects the non-firm nature of the service \nthey are providing.   \nB. \nAny Grid Reliance Charge Must Be Based On Demonstrated System Benefits  \nAny charges imposed on co-located loads must be based on co-located load’s actual impact \non the grid and the transmission services they receive.  The FPA requires as much.  Specifically, \n \n25 Order at P 160."},{"page":10,"startToken":2997,"endToken":3412,"text":"10 \n \nthe FPA’s just and reasonable standard incorporates a cost causation principle which requires that \nthe costs of providing a service be allocated to “those who cause the costs to be incurred and reap \nthe resulting benefits.”26  The cost causation principle prohibits the Commission from approving \na rate scheme that will result in one group of customers being required to pay for a service from \nwhich they do not benefit.27  No amount of “emphasizing other competing interests permits FERC \nto sacrifice the foundational principle of cost-causation by refusing to allocate costs ‘to those who \ncause the costs to be incurred and who reap the resulting benefits.’”28   \nThe PJM Transmission Owners have not demonstrated that their proposed Grid Reliance \nCharge reflects co-located loads’ actual impact on the grid and is consistent with the cost causation \nprinciple.  The PJM Transmission Owners explain that their proposed Grid Reliance Charge will \nbe applied to co-located loads based on “the difference between the amount of their firm contract \ndemand for Firm Contract Demand transmission service or, in the case of Non-Firm Contract \nDemand Service customers, the amount of their reserved service, and their total (gross) on-site \nload.”29  This means that, if this Grid Reliance Charge were to be implemented consistent with the \nreforms proposed by PJM in this proceeding,30 it would effectively apply to any portion of co-\nlocated load that was being supplied by a co-located generator.  The PJM Transmission Owners \nhave proposed to apply this Grid Reliance Charge to co-located load being served by onsite \ngeneration resources as a zonal charge based on the percentage of transmission depreciation and \n \n26 El Paso Elec. Co. v. FERC, 76 F.4th 352, 362 (5th Cir. 2023) (quoting Nat'l Ass'n of Reg. Util. Comm’rs \nv. FERC, 475 F.3d 1277, 1285 (D.C. Cir. 2007)).  See also Sithe/Independence Power Partners, L.P. v. FERC, 285 \nF.3d 1, 5 (D.C. Cir. 2002) (citing Alabama Elec. Cooperative, Inc. v. FERC, 684 F.2d 20, 27 (D.C. Cir. 1982)). \n27 Constellation Mystic Power, LLC v. FERC, 45 F.4th 1028, 1050 (D.C. Cir. 2022) (citing Black Oak Energy, \nLLC v. FERC, 725 F.3d 230 (D.C. Cir. 2013)).  \n28 El Paso Elec. Co. v. FERC, 76 F.4th 352, 363 (5th Cir. 2023) (quoting Nat'l Ass'n of Reg. Util. Comm’rs \nv. FERC, 475 F.3d 1277, 1285 (D.C. Cir. 2007)).  \n29 PJM TO Brief at 14.   \n30 See PJM Brief at 9."},{"page":11,"startToken":3412,"endToken":3717,"text":"11 \n \noperations and maintenance expense of a transmission owner’s annual transmission revenue \nrequirement—which is currently 25.8 percent.31 \nGiven the significance of the Grid Reliance Charge—over a quarter of a PJM transmission \nowner’s annual transmission revenue requirement—one would expect that the charge would be \ntied to clearly defined benefits associated with the grid impact of a co-located load that is being \nserved by an onsite generator.  But the PJM Transmission Owners have provided no such evidence.  \nRather the primary basis for the Grid Reliance Charge appears to be “the inherent benefits that all \ncustomers, including Contract Demand customers, receive as a result of their synchronization to \nand reliance on the grid.”32   \nGeronimo Power does not dispute that the grid may provide a benefit to co-located load \nthat generally does not rely on the transmission system for service and that it may be appropriate \nto impose certain charges on co-located load for demonstrated costs they cause and benefits that \naccrue to them.  But the PJM Transmission Owners have not demonstrated that their proposed \nGrid Reliance Charge bears any relationship to the service that will be provided to, or the benefits \nreceived by, these co-located loads.   \nAs a starting point, the PJM Transmission Owners provide no detail on what sort of \n“inherent benefits” will be provided to co-located load relying on an onsite generator to serve it.  \nThe PJM Transmission Owners say that “Co-Located Loads are electrically connected to the \ntransmission system (not islanded) and therefore benefit from the system and should contribute to \nthe ongoing operation and maintenance of the transmission system, consistent with foundational \ncost causation principles.”33  But not being islanded from the grid is not a benefit in and of itself.  \n \n31 PJM TO Brief at 14-15.  \n32 Id. at 14. \n33 Id., Exh. PTO-0001 at 17:19-22."},{"page":12,"startToken":3717,"endToken":4028,"text":"12 \n \nThe PJM Transmission Owners have not articulated what the inherent benefit—that is separate \nfrom the benefit co-located load will pay for as part of its Non-Firm Contract Demand transmission \nservice—that being connected to the grid provides. \nBesides unspecified and unidentified inherent benefits, the PJM Transmission Owners say \nthat the Grid Reliance Charge is “designed to reflect the costs of using the transmission system to \ndeliver black start and regulation services…”34  Geronimo Power does not disagree that co-located \nload depends on and uses black start and regulation services.  The Commission reached the same \nconclusion in its Order.35  And PJM has proposed, as required by the Order, that it will assess \ncharges to co-located load on a gross basis for black start and regulation services.36  The PJM \nTransmission Owners fail to adequately explain why the Grid Reliance Charge is appropriate given \nthat co-located load already will be paying separate charges for black start and regulation service.   \nWhile the PJM Transmission Owners attempt to portray the Grid Reliance Charge as \nnecessary to account, in part, for the delivery of black start and regulation services, that is a \ndistinction without a difference.  As the Commission observed in its Order, black start service is a \nservice that is provided by generators that have the ability to start without an outside electric \nsupply.37  All customers rely on black start generators to restart the grid following a blackout.  But \nblack start service is not delivered like transmission service.  Rather if the grid goes down, black \nstart generators are called upon to provide power to the grid to get it restarted.  In fact, the PJM \ntariff contemplates that black start units be located in certain locations and that they will “provid[e] \n \n34 Id. at 14. \n35 Order at P 209.  \n36 See PJM Brief at 27.  \n37 Order at P 185."},{"page":13,"startToken":4028,"endToken":4405,"text":"13 \n \nBlack Start Service at the identified locations.”38  Black start generators are not, as the PJM \nTransmission Owners seem to imply, delivering black start service to discrete points on the grid. \nThere also is no basis to conclude that there is a separate delivery cost associated with \nregulation service.  As with black start service, Geronimo Power agrees with the Commission that \nit is appropriate to assess co-located loads on a gross basis for the costs of regulation service.39  \nRegulation service is essential for balancing the grid and even if co-located load never draws \nenergy from the grid regulation service may be necessary to balance changes in all load’s power \nfactor.40  But there is no basis to conclude that customers should be subject to a separate charge \nassociated with the delivery—to the extent regulation service can even be considered deliverable—\nof regulation service.  PJM measures the supply of regulation service on a zonal basis41 and \nresources participating in PJM’s regulation market have no obligation to deliver this service to a \nparticular point on the grid.42   \nEven if the PJM Transmission Owners were to demonstrate that there was a separate \ndelivery component to black start and regulation services—which, to be clear, they have failed to \ndo—they have not demonstrated that the rates proposed are not commensurate with the costs being \ncaused or the benefits received.  Indeed, if there were costs associated with these services the PJM \nTransmission Owners would be able to identify how charges for the delivery of black start and \nregulation services are imposed on other transmission customers.  Of course neither the PJM \nTransmission Owners nor PJM point to such a charge.  And they have provided no basis for the \n \n38 PJM Tariff, Schedule 6A § 4 (“The Transmission Provider is responsible for developing a coordinated and \nefficient system restoration plan that identifies all of the locations where Black Start Units are needed.  The PJM \nManuals shall set forth the criteria and process for selecting or identifying the Black Start Units necessary to commit \nto providing Black Start Service at the identified locations.”).  \n39 Order at P 184.  \n40 Id. \n41 PJM Tariff, Schedule 3, subsection (a).  \n42 See PJM Manual 11: Energy & Ancillary Services Market Operations § 3 (effective Oct. 2025)."},{"page":14,"startToken":4405,"endToken":4828,"text":"14 \n \nCommission to conclude it is just, reasonable, and not unduly discriminatory to only impose a \nblack start and regulation-based delivery charge on co-located loads.   \nThe only other basis that the PJM Transmission Owners put forward for assessing co-\nlocated loads that rely on their own generation a Grid Reliance Charge is that the PJM \nTransmission Owners will incur “costs associated with the operations, maintenance, and other \nactivities” associated with the “increased number of protection schemes that will be required for \nCo-Located Load customers.”43  Setting aside the fact that any costs associated with operating, \nmaintaining, and whatever other activities protection schemes require have not been shown to be \nsignificant, the PJM Transmission Owners concede that such protection schemes will primarily be \nthe responsibility of co-located load themselves.44  Moreover, there is no reason to believe that any \ncosts that transmission owners will bear that are associated with these protection schemes could \nnot be addressed in interconnection agreements just as the costs for such facilities are currently \naddressed in the interconnection agreement for generators.45   \nThe PJM Transmission Owners have failed to identify a single cost that provides a benefit \nto co-located load that is not accounted for through other charges that will already apply to co-\nlocated load or that may be addressed through an interconnection agreement.  Aside from vague \n \n43 PJM TO Brief at 14. \n44 Id., Exh. PTO-0001 at 36:19-22 (“[T]he primary responsibility for limiting withdrawals from the \ntransmission system remains with the interconnection customer or Co‑Located Load, typically through customer-\nowned SPS/RAS that are designed, operated, and maintained in accordance with applicable NERC standards and \nreviewed by PJM.”).  \n45 PJM Tariff, Part IX.B, App. 2 § 4.8.1 (PJM pro forma GIA Combined with CSA – Standard Terms and \nConditions) (“Project Developer shall, at its expense, install, operate and maintain such System Protection Facilities as \nmay be required in connection with operation of the Generating Facility or Merchant Transmission Facility and the \nProject \nDeveloper Interconnection \nFacilities consistent \nwith Applicable \nTechnical \nRequirements \nand \nStandards.  Transmission Owner shall install any System Protection Facilities that may be required, as determined \nby Transmission Provider, on the Transmission Owner Interconnection Facilities and Transmission Owner \nUpgrades or the Transmission System in connection with the operation of the Generating Facility or \nMerchant Transmission Facility and the Project Developer Interconnection Facilities.  Responsibility for the cost of \nany System Protection Facilities required on the Transmission Owner Interconnection Facilities and Transmission \nOwner Upgrades or the Transmission System shall be allocated as provided in the GIP.”)."},{"page":15,"startToken":4828,"endToken":5037,"text":"15 \n \nassertions of the inherent benefits the grid provides to co-located loads that rely on onsite \ngeneration resources, there is no basis for the Commission to conclude that the PJM Transmission \nOwners’ proposed Grid Reliance Charge is even “roughly commensurate”46 with the “burdens \nimposed or benefits received” for the service provided to such co-located load.47  The Commission \nshould thus reject the PJM Transmission Owners’ proposed Grid Reliance Charge as inconsistent \nwith the cost causation principle and unjust and unreasonable.  \nIII. \nCONCLUSION \nGeronimo Power respectfully requests that the Commission issue an order in this \nproceeding consistent with this brief.  \nRespectfully submitted, \n \n/s/ Stephen J. Hug \nMatthew Morais \nSenior Director, Policy \nKurt Rempe \nAssistant General Counsel \nGERONIMO POWER, LLC \n8400 Normandale Lake Blvd., Ste. 1200 \nBloomington, MN 55437 \nmmorais@geronimopower.com  \nkrempe@geronimopowre.com  \n  \nStephen J. Hug \nBen N. Reiter \nAKIN GUMP STRAUSS HAUER & FELD LLP \n2001 K Street, N.W. \nWashington, D.C.  20006 \nTel: (202) 887-4084 \nshug@akingump.com \nbreiter@akingump.com   \nOn behalf of Geronimo Power \nDated: March 25, 2026 \n \n46 S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41, 83 (D.C. Cir. 2014).  \n47 Midwest ISO Transmission Owners v. FERC, 373 F.3d 1361, 1368–69 (D.C. Cir. 2004) (cleaned up)."},{"page":16,"startToken":5037,"endToken":5101,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have caused the foregoing document to be served upon the individuals \ndesignated on the Commission’s official service list for this proceeding. \nDated at Washington, D.C., this 25th day of March 2026. \n \n \n/s/ Stephen J. Hug \n \nStephen J. Hug \nAKIN GUMP STRAUSS HAUER & FELD LLP \n2001 K Street, N.W. \nWashington, D.C.  20006 \n(202) 887-4084"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":701,"startToken":0,"endToken":89},{"p":1,"at":701,"title":"I. INTRODUCTION","method":"printed heading","endPage":4,"endAt":5,"startToken":89,"endToken":924},{"p":4,"at":5,"title":"II. THE RATES PROPOSED BY THE PJM TRANSMISSION OWNERS ARE NOT","method":"printed heading","endPage":4,"endAt":92,"startToken":924,"endToken":938},{"p":4,"at":92,"title":"A. The PJM Transmission Owners Have Not Demonstrated That It Is Just And","method":"printed heading","endPage":9,"endAt":1562,"startToken":938,"endToken":2951},{"p":9,"at":1562,"title":"B. Any Grid Reliance Charge Must Be Based On Demonstrated System Benefits","method":"printed heading","endPage":15,"endAt":548,"startToken":2951,"endToken":4909},{"p":15,"at":548,"title":"III. CONCLUSION","method":"printed heading","endPage":16,"endAt":0,"startToken":4909,"endToken":5037},{"p":16,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":16,"endAt":390,"startToken":5037,"endToken":5101}]}
