{"document":{"slug":"rec-20260325-5236","title":"Reply Brief of Joint Co-Location Developers and Motion to Intervene Out-of-Time of Calibrant, Convergent, U.S. Energy Storage Coalition, and Versus","issued":"2026-03-25","accession":"20260325-5236","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Eolian, L.P.Antora Energy LLCCalibrant Energy ,Convergent Energy and Power LP ,Mainspring Energy ,U.S. Energy Storage Coalition ,Verrus LLC ,","kind":"motion","file":"sources/filings/text/20260325-5236_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5236","tier":"record","sha256":"d312c35f5b6f624d8b512fa74648ceedc937715be9729345aecfec29ce28fc2b","pages":59,"tokens":20102,"emptyPages":[],"textThemes":["flex","colo","study","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":267,"text":"1 \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n) \nDocket Nos. EL25-49-000 \n) \n \n \n         EL25-49-001 \n) \nLarge Loads Co-Located at Generating Facilities  \n)  \n \n \n         AD24-11-000 \n) \nConstellation Energy Generation, LLC  \n \n)  \n \n \n         EL25-20-000 \nv.  \n \n \n \n \n \n \n) \n \n \n         (Consolidated) \nPJM Interconnection, L.L.C.   \n \n \n)  \n \n \n \n \nREPLY BRIEF OF JOINT CO-LOCATION DEVELOPERS AND MOTION TO \nINTERVENE OUT-OF-TIME OF CALIBRANT, CONVERGENT, U.S. ENERGY \nSTORAGE COALITION, AND VERRUS \n \n \nPursuant to the Federal Energy Regulatory Commission’s (Commission) December 18, \n2025 order (Co-Location Order),1 Eolian, L.P. (Eolian), Antora Energy, Inc., Calibrant Energy \n(Calibrant), Convergent Energy and Power (Convergent), Mainspring Energy, Inc. (Mainspring), \nU.S. Energy Storage Coalition, and Verrus, LLC (Verrus) (collectively, the Joint Co-Location \nDevelopers) submit this response to the Initial Briefs filed by PJM Interconnection, L.L.C. (PJM) \nand the Indicated PJM Transmission Owners (PJM TOs) on February 23, 2026. Pursuant to Rule \n214 of the Commission Rules of Practice and Procedure,2 Calibrant, Convergent, U.S. Energy \nStorage Coalition, and Verrus also submit a motion to intervene out-of-time. The brief is \nsupported by the affidavit of Andrew Levitt and Aniruddh Mohan of the Brattle Group on behalf \nof Eolian, at Attachment A.3 \nThe Joint Co-location Developers believe in the promise of the Co-Location Order and \nwould like to pursue business models based on the new services offered. We are deeply \nconcerned, however, that PJM’s proposed transmission service provisions will render the new \n \n1 PJM Interconnection, LLC, 193 FERC ¶ 61,217 (2025) (Co-Location Order). \n2 18 C.F.R. § 385.214. \n3 Attach. A, Affidavit if Andrew Levitt & Aniruddh Mohan on Behalf of Eolian, L.P. (Levitt & Mohan Aff.)."},{"page":2,"startToken":267,"endToken":552,"text":"2 \ntransmission services commercially unworkable. We urge the Commission to require PJM to \nadopt transmission service terms that deliver on the promise of the Co-Location Order and \nenable customers to meet their commercial needs through co-location arrangements.  \n \nThe Commission issued the Co-Location Order within the context of a broader national \neffort to confront the affordability, reliability, and speed-to-power challenges that rapid large load \ngrowth poses for the electricity system. The Co-Location Order promises to cut through those \nchallenges by requiring PJM to make common-sense reforms, allowing Eligible Customers to \ntake new “transmission services that reflect their actual impact on the transmission system” and \nthereby “avoid costly and inefficient transmission system buildout that may not be necessary.”4 \nAs Commissioner Rosner summarized, the Commission’s goal was “to meet surging demand \nwhile upholding two fundamental values that underpin the electric industry in our country: first, \nthat all customers have a right to receive electric service on a timely basis, and second, that \nelectric service should be reliable and affordable for all customers.”5  \n \nThe proposals in PJM’s Initial Brief fall short of fulfilling that promise. PJM departs from \nthe requirements and spirit of the Co-Location Order again and again, rendering the new \ntransmission services commercially unworkable. PJM’s response to the Commission’s demand \nfor bold leadership largely amounts to a continuation of the “business-as-usual approach to load \ngrowth—planning for generation and load separately.”6 This “will not suffice to timely meet \ngrowing demand while also keeping prices reasonable.”7 PJM’s proposal would do little to \nimprove reliability, avoid unnecessary infrastructure, and enable timely interconnection.  \n \n4 Co-Location Order, 193 FERC ¶ 61,217 at PP 160, 162. \n5 Id. (Comm’r Rosner, concurring, at P 3).  \n6 Id. \n7 Id."},{"page":3,"startToken":552,"endToken":803,"text":"3 \nThe Commission should reject PJM’s proposal and direct a replacement rate that delivers \non the Co-Location Order’s promise. Most importantly, the Commission should direct PJM and \nthe PJM TOs, as applicable, to make the following changes:  \n• Make Non-Firm Contract Demand Transmission Service (CDS) available as \nneeded during normal operations, as the Co-Location Order required, rather than \nonly during a generator outage, as PJM has proposed.  \n• Clarify that a Co-Located Load receiving Interim Network Integration \nTransmission Service (NITS) can take energy from its co-located generator during \ncurtailment conditions.  \n• Clarify when and how Non-Firm CDS and Interim NITS will be curtailed. \n• Clarify that charging of energy storage resources does not require transmission \nservice, whether or not such resources are stand-alone resources or are part of a \nco-location configuration together with Co-Located Load, and as such charging of \nco-located storage does not apply toward customers a Non-Firm CDS customer’s \nMaximum Facility Output limitation.  \n• Offer a rate for Non-Firm CDS that reflects cost causation principles.  \n• Modify PJM’s draconian penalty proposal. Penalties are appropriate where a \ncustomer fails to respond to PJM’s curtailment instructions in a manner consistent \nwith its service obligations. But penalties must balance the need to deter conduct \nthat is harmful to the system with the need to limit excessive and unnecessary \ncosts.  \n• Given the urgent need to address the impacts of load growth on the PJM system \ntoday, the Commission should require PJM to make the new tariff provisions \nrelated to the new transmission services effective sooner than June 1, 2029."},{"page":4,"startToken":803,"endToken":1073,"text":"4 \nI. \nJOINT CO-LOCATION DEVELOPERS’ INTEREST IN THE PROCEEDING \nAND MOTION TO INTERVENE OUT-OF-TIME OF CALIBRANT, CONVERGENT, \nU.S. STORAGE COALITION, AND VERRUS \n \nEolian develops energy generation and storage assets throughout the United States and \nhas originated 27 GW of operating capacity to date. Eolian and its partners have developed \nprojects supporting large loads in multiple regions across the United States, including PJM. \nEolian expects to develop storage or generation assets co-located with loads. \nAntora is a U.S. manufacturer of thermal batteries, which are domestically built in San \nJose, California, and developer of thermal storage projects for industrial facilities in the U.S. and \nabroad. \nCalibrant develops energy generation and storage assets throughout the United States. \nCalibrant and its partners have developed and expect to continue to develop projects in PJM \nthrough a range of configurations, including behind-the-meter generation (BTMG) and co-\nlocated projects supporting large loads. Specifically, Calibrant has several existing BTMG \nprojects and projects that are currently being developed worth millions of dollars that could be \nimpacted by PJM’s proposed transmission service framework. \nConvergent develops, owns, and operates distributed energy storage and storage plus \nsolar resources for large commercial, industrial, and utility customers across North American \nmarkets, including PJM. Convergent has resources in operation and in development in PJM \nincluding behind-the-meter distribution and transmission connected battery energy storage \nsystems, front-of-the-meter distribution connected battery energy storage systems, both with and \nwithout attached solar systems, and a 20 MW flywheel resource in Hazleton, Pennsylvania. \nMainspring is a U.S.-headquartered manufacturer of modular, fuel-flexible, and \ndispatchable linear generators, a new type of power generator. Mainspring was founded in 2010"},{"page":5,"startToken":1073,"endToken":1331,"text":"5 \nand its first commercial units were deployed in 2020. The company has been rapidly scaling \nsince 2023, deploying its innovative technology across a wide spectrum of customer types and \nuse cases. The company’s customers include investor-owned utilities, public power utilities, \nmunicipal water treatment facilities, biogas facilities, data centers, grocery store chains, cold \nfood storage, and hospital systems. Mainspring’s linear generators can be installed behind a \ncustomer’s utility meter or as a front of the meter grid asset. Mainspring linear generators are \ncurrently operating across multiple sites in PJM territory and are in development across \nadditional sites.  \nThe U.S. Energy Storage Coalition unites America’s leading grid battery manufacturers, \nenergy storage developers, owners, and operators. The U.S. Energy Storage Coalition advances \npolicies and solutions to ensure grid reliability amidst historic demand for power, lower energy \ncosts for all Americans, strengthen grid capacity to support new industrial and AI infrastructure, \nand rapidly scale American manufacturing and minerals production. \nVerrus is a developer, owner, and operator of a first-of-its-kind fleet of purpose-built, \nload-flexible hyperscale data centers. Verrus designs facilities from the ground up to function not \nonly as digital infrastructure but also as grid assets—a new class of large customer capable of \ndynamically adjusting electricity consumption to support reliability, efficiency, and affordability. \nVerrus’ facilities can provide these system benefits without disrupting the critical computing \nworkloads that increasingly underpin the modern economy. Each Verrus campus integrates on-\nsite utility-scale battery energy storage, advanced load-management controls, and grid-aware \nautomation that collectively enable real-time coordination with utilities and regional transmission \noperators."},{"page":6,"startToken":1331,"endToken":1638,"text":"6 \nJoint Co-Location Developers therefore have a substantial interest in this proceeding that \ncannot be adequately represented by another party. The concerns that Joint Co-Location \nDevelopers raise will critically support development of Co-Located Loads and storage assets that \navoid “costly and inefficient transmission system buildout.”8 Their participation is therefore in \nthe public interest. \nThe Commission granted Eolian’s, Antora’s, and Mainspring’s motions to intervene at the \nshow cause stage of this proceeding.9 Calibrant, Convergent, U.S. Energy Storage Coalition, and \nVerrus, however, move to intervene out-of-time for the first time here. These parties respectfully \nrequest that the Commission grant this request to intervene out-of-time.10 The posture of this \nproceeding has changed significantly with the Commission’s initiation of the paper hearing \nproceeding in a way that has crystalized these parties’ interest. These parties accept the record as \nit stands, and this intervention will not place any additional burden on any other party, nor will it \ndisrupt or delay Commission proceedings in this matter, because the same brief is submitted by \nEolian, Antora, and Mainspring, even absent these additional parties’ intervention. \nII. \nARGUMENT \nA. \nThe Co-Location Order requires that Non-Firm CDS be available as needed \nduring normal operations, not solely when a generator is on outage, as PJM has \nproposed. \n \nPJM proposes to limit the availability of Non-Firm CDS to “the event the Co-Located \nGenerating Facility is on outage and unable to provide any of the dedicated level of energy.”11 \nBut the Co-Location Order made clear that Non-Firm CDS is to be available for reservation by \n \n8 Id. P 177. \n9 Id. P 157 & Appendix. \n10 To the extent that the Commission denies these additional parties’ motion to intervene out-of-time, the remaining \nparties that are already parties submit this filing without the movants. \n11 PJM Initial Brief, Illustrative Tariff, Part XI, Subpart B, § 709.2(b)."},{"page":7,"startToken":1638,"endToken":1994,"text":"7 \nan Eligible Customer “as needed during normal, non-emergency system operating conditions.”12 \nThe Commission offered the scenario of a generator outage as an example of when an Eligible \nCustomer might use Non-Firm CDS.13 But this was clearly just an example, not a limitation on \nthe availability of the service. The Commission intended the service to function in a manner \n“similar to existing non-firm transmission service options in the Tariff,”14 which contain no such \nlimitation. \nEven if the Co-Location Order were unclear (which it is not), PJM has not offered an \nadequate rationale for limiting the availability of Non-Firm CDS to periods of generator \noutages.15 References to the “complexity” of providing Non-Firm CDS cannot overcome the \nbenefits that Non-Firm CDS will create for PJM ratepayers and large load customers seeking \ntimely interconnection.  \n1. \nPJM’s proposal is commercially unworkable. \nAs the Commission explained, the availability of Non-Firm CDS allows co-located \nresources that can control their withdrawals from the grid to interconnect in a manner that avoids \nunnecessary network upgrades and unnecessary procurement of capacity.16 Were PJM to follow \nthrough on the Commission’s order as drafted, it would enable a business model that has the \npotential to benefit ratepayers by increasing grid utilization while reducing or avoiding the cost \nof new infrastructure. Ensuring that Non-Firm CDS is available during non-emergency operating \n \n12 Co-Location Order, 193 FERC ¶ 61,217 at P 215. \n13 Id. P 214; see also id. (Comm’r Rosner, concurring, at P 6) (“The data center may instead elect to purchase Non-\nFirm Contract Demand Transmission Service if, for example, it only plans to pull energy from the grid temporarily \nwhile its co-located generator is undergoing scheduled maintenance.”).  \n14 Id. P 215.  \n15 In addition, PJM has not provided sufficient clarity on how outages are defined and whether they cover both \nplanned and unexpected outages. If Non-Firm CDS must be reserved ahead of time, in practice Non-Firm CDS will \nonly be useful in the event of planned outages or extended forced outages. See Attach. A, Levitt & Mohan Aff. at 6 \nn.4. \n16 Co-Location Order, 193 FERC ¶ 61,217 at PP 162, 218."},{"page":8,"startToken":1994,"endToken":2349,"text":"8 \nconditions would allow large loads to rely on generation and storage assets at the same point of \ninterconnection to meet the loads’ needs based on grid economics, including the relative scarcity \nof energy during peak conditions as well as transmission congestion. While the large load \ncustomers would be responsible for ensuring that they have ample assets and load flexibility to \ncurtail as necessary given potential constraints, the ability to rely on the system for significant \nperiods of time would provide critical service necessary to reliably meet the load’s demand at \nreasonable cost while promoting the efficient utilization of existing transmission infrastructure \nconsistent with economic dispatch and real-time system conditions.  \nPJM’s approach would instead require inefficient system operations. Limiting the \navailability of Non-Firm CDS will undermine economic efficiency by preventing Co-Located \nLoads from using grid power at times when wholesale energy prices are lower than the marginal \ncost of the co-located generator. Under PJM’s approach, a customer taking Non-Firm CDS \nwould be required to dispatch on-site generation even during periods when LMP is negative.  \nUse of as-available Non-Firm CDS would also allow a load relying on thermal resources \nto significantly decrease the number of starts required, considerably reducing reliability risks, as \nwell as operations and maintenance needs.17 Ability to take non-firm service during non-\nemergency conditions is particularly critical to cost-effectively leveraging energy storage \nresources to serve the load, as Non-Firm CDS must be able to support load while storage is held \nin reserve for peak periods, is depleted, or is charging.18  \n \n17 See, e.g., Kumar et al., NREL, Power Plant Cycling Costs, at 45-46 (2012) (finding that more frequent cycling and \nhigher ramp rates damages generation units, increasing the costs of operation). \n18 See Attach. A, Levitt & Mohan Aff. at 7 (While “[b]attery storage provides particular value for co-locating with \nartificial intelligence data centers, given their ability to ramp instantaneously to match rapid changes in power \ndemand for compute,” “PJM’s proposal to only allow load to reserve NFCDS during outages appears to be \nincompatible with co-located storage use cases, since storage is physically incapable of producing power at all \ntimes.”)."},{"page":9,"startToken":2349,"endToken":2667,"text":"9 \nThis same dynamic holds true for other strategies a load customer may use to reduce \nreliance on the grid during critical periods, such as by modulating load. PJM’s proposed \napproach allows for no market-based response based on customers’ willingness to hold risk. In \nthe Commission’s approach, by combining Non-Firm CDS with Firm CDS, customers may seek \nfull redundancy with generation at the point of interconnection, no redundancy, or anywhere in \nbetween and tolerate curtailment risk up to the individual customer’s appetite. In PJM’s proposed \napproach, customers are bound to a specific level of redundancy, which will restrict competition \nand innovation.  \nIn addition, PJM’s approach may inadvertently threaten reliability for other customers. \nPJM’s proposal to restrict Non-firm CDS to times when the co-located generator is on outage \nappears to be tailored to baseload resources. Given that it takes many years to develop new \nbaseload resources, PJM’s proposal, to the extent it is workable at all, is most likely to be used \nby existing baseload resources (such as nuclear plants and gas-fired combined cycles), who may \nexit the market and enter into co-located arrangements with loads taking Non-Firm CDS.19 \nFinally, PJM’s filing is unclear whether customers may take Non-Firm CDS during \npartial outages.20 PJM’s brief states that a customer could take service “up to the MW level that \nthe Co-Located Generating Facility is on outage,” suggesting that perhaps a partial outage is \npermissible.21 However, the illustrative tariff appears to require an all-or-nothing approach. The \nillustrative tariff indicates that Non-Firm CDS is available when the co-located generator is \n \n19 Id. at 7-8. \n20 Id. at 7 (noting that “generation facilities typically feature multiple units for economies of scale or other purposes” \nand that, accordingly, “physical outages would not typically cover all generation at the site, thus potentially \nprecluding utilization of NFCDS entirely, despite potential efficiency benefits of broad availability of NFCDS”). \n21 PJM Initial Brief at 32."},{"page":10,"startToken":2667,"endToken":3003,"text":"10 \n“unable to provide any of the dedicated level of energy.”22 PJM should clarify this point. If PJM \nintends the illustrative tariff language to control, it should address the perverse incentives created \nby that rule, including the fact that this structure would encourage co-located generators to \ndeclare complete outages even when only a partial outage is necessary. \n2. \nPJM’s approach is not necessary to maintain system reliability. \nRestricting Non-Firm CDS to periods of generator outage is also unnecessary to maintain \nsystem reliability. To the contrary, PJM’s Interim NITS proposal demonstrates PJM’s ability to \noffer interruptible, non-firm service during normal conditions without the need to request \nreservation.23 Instead, rendering this service commercially unworkable will make it harder for \nnew customers to connect to the system without overwhelming the grid. By stymying a Non-\nFirm CDS model that would encourage loads to bring their own capacity and reduce reliance on \nPJM system capacity, PJM’s approach would result in more loads following the status quo model \nthat has strained PJM’s capacity market. Further, PJM’s approach could even prevent such loads \nfrom dispatching up when doing so would help to address a reliability challenge, such as when \nincreasing consumption could mitigate a potential thermal overload on a transmission facility, or \nabsorb excess reactive power to address high voltage conditions. In providing a service \nframework for dispatchable loads, PJM should leverage the capabilities of these loads to ensure \nsystem reliability. Given the fact that grid operators across the globe reliably count on energy \nstorage resources to follow dispatch instructions, PJM does not adequately explain its reticence \nto rely on similarly-dispatchable loads.  \n \n22 Id., Illustrative Tariff, Part XI, Subpart B, § 709.2(b) (emphasis added). While PJM’s brief suggests that a \ncustomer could take service “up to the MW level that the Co-Located Generating Facility is on outage,” suggesting \nthat perhaps a partial outage is permissible, the illustrative tariff language appears to require an all-or-nothing \napproach. PJM Initial Brief at 32. \n23 See Attach. A, Levitt & Mohan Aff. at 8."},{"page":11,"startToken":3003,"endToken":3353,"text":"11 \nWe recommend that, in studying a request for Non-Firm CDS, PJM model the precise \ncharacteristics of the load and co-located generation, accounting for their proximity to one \nanother, and appropriately accounting for generator outage and RAS or SPS contingencies.24 \nSuch studies should model the load as dispatchable, examining transmission system limits and \nidentifying transmission system conditions when Non-Firm CDS will not be made available.25 \nThose studies would impose limits on the use of Non-Firm CDS, but those limits need not be \nnearly so restrictive as the proposed limit to periods when the co-located generator is on outage. \nRather, any operation restrictions would flow from system constraints. As discussed further \nbelow, similar to the study process it uses in providing for provisional interconnection service to \ngenerators, PJM can and should update such studies periodically, so as to ensure that such \noperating limits remain up to date.26  \nPJM’s position on Non-Firm CDS also does not square with its other service offerings. \nPJM already offers non-firm point-to-point service that is reservable whether or not the load has \nco-located generation, and whether or not any such generation is on outage. Like non-firm \ntransmission service, Non-Firm CDS should be offered on an as-available basis, to be reserved \non an hourly, daily, or (rolling) monthly basis. Further, PJM plans to offer non-firm Interim NITS \non an as-available basis, demonstrating that it can provide for a reliable service framework that \nprovides non-firm service during normal operating conditions.27  \n \n24 See id. § V.D (providing recommendations regarding PJM’s study processes for co-located load and generation). \n25 Id. at 19. \n26 See infra n.33.The Commission should encourage PJM, in carrying out such studies, to publish analysis of \nanticipated curtailment, based on historical data and projections accounting for system resources and infrastructure. \nSuch analysis, if made available to prospective CDS customers when they apply for service, will inform their choice \nin CDS service and enhance the commercial workability of the services framework the Commission has required to \nfacilitate speed to power while protecting existing customers. \n27 See Attach. A, Levitt & Mohan Aff. at 8."},{"page":12,"startToken":3353,"endToken":3650,"text":"12 \nIf anything, Non-Firm CDS can more readily be offered during normal conditions than \nInterim NITS, because the service structure behind Non-Firm CDS allows for day-ahead \nreservation. As discussed in the affidavit of Levitt et al., Non-Firm CDS is granted based on both \nstudies for interconnection, and day-ahead reservation review by PJM.28 Under this structure, \nPJM could provide for Non-Firm CDS to be available during normal operating conditions \nsubject to any reservation limits identified in the interconnection study, while denying \nreservations to the extent that its day-ahead predictions demonstrate a particular hour (or day) to \napproach transmission system limits.29  \nAny SPS or RAS would operate only after these mechanisms are put in place, to ensure \nthat the load does not show up on the grid unexpectedly. For example, PJM’s Matthew Wharton \nprovides that “PJM would expect the RAS to actuate on the loss of the Co-Located Generating \nFacility” such that “the load served by Non-Firm Contract Demand Transmission Service or \nInterim NITS will automatically be removed from the system by the RAS scheme.”30 Thus, \nwhile SPS and RAS “should not be installed as a substitute for good system design or operating \npractices,”31 that would not be the case here were PJM to enable Non-Firm CDS across a broader \nrange of circumstances. As with other services, RAS or SPS would operate only as a fail-safe \nbackup after PJM’s planning measures and dispatch process provide for curtailment to the extent \nthe transmission system is constrained.  \nDr. Abdulsalam draws a distinction between Interim NITS and Non-Firm CDS in \nhighlighting the temporary nature of Interim NITS service, and explaining that system conditions \n \n28 Id. at 8. \n29 Id. at 8-9. \n30 PJM Initial Brief, Attachment C (Affidavit of Matthew Wharton), at P 25. \n31 Id. P 16."},{"page":13,"startToken":3650,"endToken":3965,"text":"13 \nmay change over time.32 But that distinction does not justify restrictions on Non-Firm CDS. \nInstead, PJM should update the operating conditions framework for Non-Firm CDS periodically \nas part of its transmission system planning process.33 Much as provisional service provides a \ngenerator with operating conditions under which it is allowed to discharge into the system, these \nstudies will provide the baseline operating conditions pursuant to which a load taking Non-Firm \nCDS can expect to withdraw from the system.34 Those conditions should be built into the PJM \noperations framework, with the applicable RAS and/or SPS provided by such resource layering \nonto this service framework as a fail-safe to ensure reliability. While any SPS or RAS would not \nbe the first line of defense in ensuring PJM’s reliability, we note that RASs can operate reliably \nand are used far more extensively by some grid operators.35 Under PJM’s tariff proposal “each \nand every Service Agreement for” Non-Firm CDS will “include the necessary control \ntechnologies and protection systems to ensure the reliability and stability of PJM’s Transmission \nSystem.”36  \nB. \nPJM should clarify that its transmission service requirements for energy \nstorage charging apply equally to storage co-located with load, and exempt \ncustomers from the Maximum Facility Output where the customer’s load shape and \ncharacteristics are inherently flexible.  \nPJM studies the charging of energy storage resources through its generator \ninterconnection process.37 It does not require energy storage resources to take transmission \nservice for charging, except where the storage charges during the zonal peak hour without being \ndispatched.38 As applied here in conjunction with the Maximum Facility Output (MFO) \n \n32 PJM Initial Brief, Attachment B (Affidavit of Dr. Sami Abdulsalam), at P 10. \n33 Attach. A, Levitt & Mohan Aff. at 19. \n34 Id. \n35 See id. § V.F. \n36 PJM Initial Brief at 35. \n37 Attach. A, Levitt & Mohan Aff. at 19. \n38 Id."},{"page":14,"startToken":3965,"endToken":4343,"text":"14 \nrequirement for Non-Firm CDS to Co-Located Loads,39 and consistent with the position that \nPJM has taken in response to stakeholder questions,40 this service framework appears to allow \nthe relevant Co-Located Load to take service while the co-located energy storage resource \ncharges. However, PJM should clarify this point in its tariff, to avoid any implication that the \nMFO requirement prohibits such activity, which necessarily entails total combined withdrawals \nat the Point of Interconnection from the relevant storage resource and Co-Located Load in excess \nof the MFO. PJM should clarify that co-located charging loads, like standalone energy storage \nresources, do not require transmission service unless they charge during the zonal peak hour \nwithout being dispatched,41 and that any withdrawals for energy storage charging at the Point of \nInterconnection for which transmission service is not required do not count toward the MFO. In \nthe alternative, the Commission should direct PJM to remove the MFO limit for loads co-located \nwith energy storage resources.  \nPJM proposes to include a 100% MFO limit because “foreseeable conditions where the \nCo-Located Load is expected to withdraw power from the PJM network” will “only materialize \nif the generator is planned to go out of service or face operating conditions requiring its output to \nbe derated for a relatively short timeframe,” and “[s]uch flexibility and conditions in operation \ncan only exist if the non-firm load size can be served fully through the co-located generator (i.e., \nthe generator is at least 100% of the non-firm load size).”42  \n \n39 PJM proposes to limit Non-Firm CDS to 100% of Maximum Facility Output (MFO) of the co-located generator. \nSee PJM Initial Brief, Illustrative Tariff, Part XI, Subpart B, § 709.2(b) (“An Eligible Customer taking service on \nbehalf of a Co-Located Load must apply for Non-Firm Contract Demand Transmission Service equivalent to the \nmegawatt level of the Co-Located Generating Facility dedicated to serving the Co-Located Load.”); see also PJM \nInitial Brief, Attachment B (Affidavit of Dr. Sami Abdulsalam), at PP 13-17. \n40 PJM indicated in response to a stakeholder question that charging energy would not count against a load \ncustomer’s Firm CDS. \n41 See Attach. A, Levitt & Mohan Aff. at 19. \n42 PJM Initial Brief, Attachment B (Affidavit of Dr. Sami Abdulsalam), at P 15."},{"page":15,"startToken":4343,"endToken":4833,"text":"15 \nAs applied to co-location configurations involving energy storage resources, this rationale \nonly holds true to the extent that PJM clarifies (1) that charging of the co-located energy storage \nresource can take place without taking transmission service,43 and (2) that the limit is measured \nby the resource’s nameplate capacity.44 As Andrew Levitt and Anirrudh Mohan explain, PJM \nshould clarify that “even if a co-located facility has 0 MW of Firm CDS and 0 MW of Non-Firm \nCDS, a co-located storage component that has been granted an Interconnection Service \nAgreement recognizing its ability to withdraw from the grid for charging may still do so as \ndispatched by PJM, consistent with a standalone storage facility.”45 \nFurther, even with this clarification, PJM’s MFO limit should also not apply to inherently \nflexible loads that operate at low load factors, such as thermal energy storage. Such loads would \nnot anticipate taking transmission service on an 8760 basis like many other large loads (thermal \nenergy storage can provide 24/7 thermal output with a load factor of only 33%) and instead \nwould plan to charge only when prices are very low at the point of delivery, because generation \nfrom low or zero marginal cost generators exceeds local demand.46 To the extent PJM is \nconcerned that variable transmission usage above MFO would create unmanageable scheduling \n \n43 As Andrew Levitt and Aniruddh Mohan explain, “Storage charging in PJM does not take transmission service \nunless it charges during the zonal peak hour without being dispatched, in which case it is a Network Load taking \nNITS.” Attach. A, Levitt & Mohan Aff. at 19. However, clarification is necessary to confirm that this holds true in \nthe context of energy storage resources that are co-located with load. PJM stated in response to a stakeholder inquiry \nthat energy storage charging shall not count against a customer’s Firm CDS, suggesting that the same holds true with \nregard to Non-Firm CDS; however, the tariff should clarify that energy storage charging in a co-located \nconfiguration does not require transmission service. \n44 PJM defines Maximum Facility Output as “the maximum (not nominal) net electrical power output in megawatts, \nspecified in the Interconnection Service Agreement, after supply of any parasitic or host facility loads, that a \nGeneration Interconnection Customer’s Customer Facility is expected to produce, provided that the specified \nMaximum Facility Output shall not exceed the output of the proposed Customer Facility that Transmission Provider \nutilized in the System Impact Study.” PJM, Intra-PJM Tariffs, L-M-N, OATT Definitions - L - M - N (41.1.1). While \nmeasuring the net electrical power output in megawatts makes sense, that amount may not correspond to the \nresource’s injection rights enshrined in the interconnection agreement. PJM should clarify that they refer to the \ntechnical output capability and not injection rights. \n45 Attach. A, Levitt & Mohan Aff. at 20. \n46 See Antora Energy LLC, Motion to Intervene and Comments, Docket Nos. EL25-49-000, EL25-20-000, & AD24-\n11-000, at 4 (filed Apr. 23, 2025)."},{"page":16,"startToken":4833,"endToken":5156,"text":"16 \nor dispatch complexity, that concern can be addressed through tariff design rather than a blanket \ncapacity cap. Specifically, PJM could require Co-Located Loads seeking Non-Firm CDS above \nMFO to submit day-ahead or hour-ahead transmission schedules for the incremental withdrawal, \nsubject to curtailment that reduces withdrawals to MFO. This approach gives PJM advanced \nvisibility into expected transmission usage, preserves its ability to curtail in real time, and avoids \nthe need to plan or construct any incremental infrastructure. It is also workable in practice as \nexpected withdrawals above MFO would occur predominantly during off-peak hours—precisely \nthe conditions under which non-firm transmission capacity is most likely to be available. \nSimilarly, if an inherently flexible large load such as a thermal energy storage resource is \nco-located with a generator with an MFO less than its full system draw, such a load would not \nplan to use the transmission system 100% of the time for the load above the generator MFO. \nRather, both of these Co-Located Loads could demonstrate that they are “willing and able” to \n“reduce their withdrawal from the system . . . without (i) compromising the level of reliability to \nfirm loads, or (ii) over utilizing their non-firm contract arrangements at the cost of firm service \nratepayers.”47 In both cases, the customers could reliably curtail as necessary. Because firm \ncustomers would retain priority and because PJM would not plan any additional infrastructure to \naccommodate such customers, they would not impose costs on firm customers. In fact, such \ncustomers would be expected to reduce total system costs for firm customers because PJM TOs \nwould collect new revenues for the non-firm service customers without building any new \ninfrastructure to accommodate them. Flexible loads can also reduce curtailment and generator \nramping and relieve transmission congestion by increasing consumption to absorb low value \nhours of generation when local generation exceeds local demand. Accordingly, PJM should \n \n47 PJM Initial Brief, Attachment B (Affidavit of Dr. Sami Abdulsalam), at P 17."},{"page":17,"startToken":5156,"endToken":5467,"text":"17 \nremove the MFO limit for loads co-located with energy storage resources, or, in the alternative, \nclarify that charging loads will not count toward the MFO limits. \nC. \nPJM’s tariff should clarify when and how Non-Firm CDS and Interim NITS \nwill be curtailed. \n \nPJM’s proposed tariff does not provide adequate clarity regarding when and how Non-\nFirm CDS and Interim NITS shall be curtailed. With regard to both services, the proposed tariff \nlanguage specifies only that PJM “may curtail [such service] prior to dispatching the Pre-\nEmergency Load Response Program as further set forth in the PJM Manuals, or in response to a \ntransfer capability shortage as a result of system reliability conditions.”48 While this language \nprovides that the service will be curtailed before other procedures are drawn upon, it does not \naffirmatively state what the curtailment trigger shall be. This open-ended process, which \ntheoretically allows PJM to curtail such services at any time, does not provide resource \ndevelopers with sufficient certainty to understand their obligations and enter into commercial \narrangements based on those obligations. At minimum, PJM must provide a book-end that allows \ncustomers taking Non-Firm CDS or Interim NITS to understand the earliest point at which they \nmight be curtailed. Further, PJM does not clarify whether and how it will determine curtailment \npriority among its different classes of non-firm service: Non-Firm Point-to-Point, Non-Firm \nCDS, and Interim NITS, or whether such customers are accorded equal curtailment priority. \nBecause the curtailment trigger for Non-Firm CDS and Interim NITS and curtailment priority \norder of those services “affect rates and service significantly,” and “are realistically susceptible \nof specification,” they must be included in the tariff.49 \n \n48 PJM Initial Brief, Illustrative Tariff, Part XI, Subpart B, § 705.2 & Subpart C, § 713.4 \n49 City and County of San Francisco v. FERC, 24 F. 4th 652, 661 (D.C. Cir. 2022) (citations omitted)."},{"page":18,"startToken":5467,"endToken":5766,"text":"18 \nD. \nPJM’s tariff should clarify that a Co-Located Load receiving Interim NITS \ncan take energy from its co-located generator during curtailment conditions. \n \nWhile the illustrative tariff is not explicit on this point, PJM stated in stakeholder meeting \nmaterials that it may prohibit Co-Located Loads taking Interim NITS from being served by co-\nlocated generators during curtailment periods. Such a requirement, if implemented, would be \nexpressly contrary to the Co-Location Order, would serve no clear purpose, and would \nsignificantly degrade the value of Interim NITS. The Joint Co-Location Developers ask PJM to \nclarify that it does not plan to limit Co-Located Loads taking Interim NITS in this way, and \ninstead intends to allow them to be served by co-located generators during curtailment \nconditions.  \nTo the extent that PJM does intend to limit Co-Located Loads taking Interim NITS’ \nabilities to be served by co-located generators, the Commission must not adopt it. The \nCommission in the Co-Location Order expressly stated that “when curtailed, Eligible Customers \ntaking [Interim NITS] on behalf of Co-Located Loads may be able to continue to take energy \nfrom the Interconnection Customer with which they are co-located if PJM’s Tariff otherwise \nallows.”50  \nIn addition, such a limitation threatens to render Interim NITS commercially unusable.51 \nLimiting service from co-located generators would require Co-Located Loads to curtail even \nwhen the co-located generation facility is physically available, thereby preventing the large load \nfrom relying on Interim NITS as a flexible bridge between reliance on co-located resources and \neventual permanent NITS service and denying loads the benefit of any resource adequacy value \nfrom their co-located generation.52 As a result, under PJM’s potential proposal, utilizing Interim \n \n50 Co-Location Order, 193 FERC ¶ 61,217 at P 201. \n51 See Attach. A, Levitt & Mohan Aff. at 10-12. \n52 See id. at 11."},{"page":19,"startToken":5766,"endToken":6080,"text":"19 \nNITS would fail to support the operational flexibility that forms a central premise of the Co-\nLocation Order. Instead, customers would be required to procure additional transmissions \nservices in conjunction with Interim NITS to maintain continuity of operations, undermining the \ncommercial viability of Interim NITS as a stand-alone service. Such an outcome would be \ninconsistent with both the letter and the spirit of the Commission’s Co-Location Order. \nAllowing co-located generation to serve Co-Located Load during curtailment also \nreflects sound operational principles. During curtailment conditions, reliance on co-located \nresources reduces dependence on constrained transmission facilities by allowing energy to serve \nload locally rather than requiring it to be delivered across constrained portions of the grid. While \nPJM may seek to preserve access to co-located generation as a potential system resource during \ntight conditions, doing so does not justify requiring curtailment of load that can instead be served \nlocally without increasing reliance on the transmission system.53 To the contrary, permitting co-\nlocated generation to continue serving its associated load during curtailment conditions supports \nmore efficient use of the transmission system while preserving reliability. Prohibiting such \nbehavior would instead force unnecessary curtailment of load even when local generation is \nphysically available and capable of serving it, producing outcomes that are inconsistent with the \npurpose of Interim NITS. \nPJM offers no rationale to justify the potential limitation. As long as co-located \ngenerators are not capacity resources, they should be free to serve Co-Located Loads during \ncurtailment conditions.54  \n \n53 PJM’s proposal could even create the perverse result of encouraging co-located generation to forego \ninterconnection entirely, such that it would be available to a Co-Located Load taking Interim NITS in the event of a \nPJM imposed curtailment. This would deprive the PJM system of the resource’s value at times when it is not needed \nto serve the Co-Located Load. \n54 Attach. A, Levitt & Mohan Aff. at 13-14."},{"page":20,"startToken":6080,"endToken":6387,"text":"20 \nE. \nPJM TOs have not justified charging the same rate for Non-Firm CDS and \nFirm CDS. \n \nThe PJM TOs propose that “the Non-Firm Contract Demand Service rate will be \ncomputed in the same manner as the Firm Contract Demand Service rate.”55 Pricing Non-Firm \nCDS at the same rate as Firm CDS is neither consistent with the cost causation principle nor the \nCommission’s purpose, in establishing Non-Firm CDS, of creating a pathway to market that \nwould avoid “costly and inefficient transmission system buildout that may not be necessary if \nsuch Eligible Customers are willing and able to take a transmission service that requires fewer \nNetwork Upgrades to provide.”56 The Commission should instead require the PJM TOs to set \nNon-Firm CDS rates that reflect the lesser costs that customers taking Non-Firm CDS impose on \nthe grid. \nPJM TOs’ proposed Non-Firm CDS rate is inconsistent with cost causation because it \ndoes not reflect the lesser costs caused by customers taking Non-Firm CDS nor the lesser \nbenefits that such customers receive.57 PJM TOs’ justification for charging the NITS rate for \nFirm CDS implicitly demonstrates the need to charge a lower rate for Non-Firm CDS than Firm \nCDS. The PJM TOs explain that “[b]oth NITS and Firm Contract Demand Service are firm \nservices for which network upgrades will be planned and constructed as necessary, with the only \ndifference being that upgrades for NITS customers are identified based on existing and \nanticipated load growth while upgrades for Firm Contract Demand Service customers will be \nidentified based on their contracted demand level.”58 PJM TOs note that “[b]ecause NITS and \n \n55 PJM TOs Initial Brief at 10-11. \n56 Co-Location Order, 193 FERC ¶ 61,217 at P 177. \n57 Illinois Com. Comm’n v. FERC, 576 F.3d 470, 477 (7th Cir. 2009). \n58 PJM TOs Initial Brief at 8."},{"page":21,"startToken":6387,"endToken":6687,"text":"21 \nFirm Contract Demand customers receive comparable benefits, using the same rate for NITS and \nFirm Contract Demand Service is consistent with the Commission’s cost allocation principles.”59  \nApplying this logic to Non-Firm CDS should result in a different, lower rate. Non-Firm \nCDS is not a firm service, Non-Firm CDS customers do not receive comparable benefits to \nNITS/Firm CDS customers, and the Transmission Provider will not plan and construct network \nupgrades to ensure the ability to provide firm service to Non-Firm CDS customers. Using the \nsame NITS/Firm CDS rate for Non-Firm CDS is therefore not consistent with the Commission’s \ncost allocation principles. Rather, the cost causation principle requires discounting Non-Firm \nCDS relative to Firm CDS to reflect the lower transmission system costs that Non-Firm CDS \ncustomers cause, and the lesser benefit that Non-Firm CDS customers receive from a \ntransmission system built to ensure that firm but not non-firm customers receive firm service. \nThe PJM TOs argue that they cannot commit to offer discounts at this time because they \nassert that, “[b]efore determining whether a discount is appropriate for Non-Firm Contract \nDemand Service, and if so what level it should be set at, it is necessary for the PJM TOs to \ngather data on how Non-Firm Contract Demand Service customers are utilizing the service, \ntaking into account the intended purpose of the service, and the effect of that utilization on the \nsystem.”60 But while this may be reasonable with respect to customers who schedule Non-Firm \nCDS but do not commit to limit its use to a certain level and who maintain the ability to draw \nFirm CDS or to switch to NITs, PJM TOs can have confidence today that customers who commit \nto using Non-Firm CDS will require fewer network upgrades.  \n \n59 Id. \n60 Id. at 13."},{"page":22,"startToken":6687,"endToken":7082,"text":"22 \nPJM TOs are correct that, under Order No. 888, transmission providers may charge up to \nthe firm transmission rate for non-firm transmission service.61 In Order No. 888-A, however, the \nCommission clarified that “non-firm transmission prices should reflect the interruptibility of the \nservice and should promote efficient use of the transmission system.”62 Accordingly, the \nCommission explained that, “while in some circumstances non-firm transmission rates may be \nset at the firm transmission rate level, the Commission expects that non-firm transmission rates \nwould, in most instances, be priced below the price cap.”63 PJM TOs have not demonstrated that \nits proposed rates for Non-Firm CDS reflect the interruptibility of the service and promote \nefficient use of the transmission system—which they do not.  \nThe PJM TOs’ proposed rate would also discourage productive industrial development, if \nadopted. Certain use cases for Non-Firm CDS rely on pricing that reflects the Commission’s cost \ncausation principles. For example, to be cost competitive in serving the thermal demands of \nindustrial customers, thermal energy storage resources must be able to take power when low-cost \nsupply is available because low and zero marginal cost generation availability exceeds local \ndemand (often because the generation faces congestion to reach other loads), at prices that reflect \nthe lower cost of electricity and transmission service during such conditions. Thermal energy \nstorage penetration can be expected to grow significantly where grid operators offer such service, \nsupporting economic development from industrial uses that have significant thermal energy \n \n61 Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by Public \nUtilities; Recovery of Stranded Costs by Pub. Utils. and Transmitting Utils., Order No. 888, FERC Stats. & Regs. ¶ \n31,036, 31,780 (1996) (cross-referenced at 75 FERC ¶ 61,080), order on reh’g, Order No. 888-A, FERC Stats. & \nRegs. ¶ 31,048 (cross-referenced at 78 FERC ¶ 61,220), order on reh’g, Order No. 888-B, 81 FERC ¶ 61,248 \n(1997), order on reh’g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff’d in relevant part sub nom. Transmission \nAccess Pol’y Study Grp. v. FERC, 225 F.3d 667 (D.C. Cir. 2000), aff’d sub nom. New York v. FERC, 535 U.S. 1 \n(2002). \n62 Order No. 881-A, at 30,272.  \n63 Id.; see also Transmission Access Policy Study Group v. FERC, 225 F.3d at 731 (“In most cases, FERC expects \nthat non-firm transmission rates will be priced below the firm rate.”)."},{"page":23,"startToken":7082,"endToken":7377,"text":"23 \nneeds. Where non-firm service costs are higher than true system costs, such development will be \nstymied, inhibiting economic growth.   \nF. \nPJM’s proposed penalty provisions are unjust and unreasonable. \nPJM proposes a draconian penalty structure that threatens to effectively deny customers \nservice after a single failure to curtail or shed load, regardless of the cause. This penalty scheme \nis not “narrowly designed to balance the need to deter conduct that is harmful to the system with \nthe need to limit excessive and unnecessary costs.”64 Instead, the Commission should adopt \nfinancial penalties as a replacement rate. In addition to relying on penalties in order to ensure \nthat customers follow its dispatch instructions, transmission owners can manually disconnect a \nfacility in case of potential severe reliability risk.65  \nPJM proposes to (1) disqualify customers who take more transmission service than they \nhave contracted for from taking Contract Demand Transmission Service and/or Interim NITS \naccording to “a strict liability rule that automatically applies after being triggered by one \ninstance” of failure to curtail;66 (2) pause new transmission service availability for up to 120 days \nupon the first misoperation of a control technology or protection system scheme and disqualify \nEligible Customers after a second misoperation;67 and (3) levy additional financial penalties for \nunreserved use to be explored with the PJM TOs in the future.68 \nLike many of the proposals discussed above, requiring an Eligible Customer to take NITS \nin order to continue to be served after a single unauthorized withdrawal regardless of fault \n \n64 Mirant Kendall, LLC & Mirant Americas Energy Mktg., L.P., 110 FERC ¶ 61,272, at P 17 (2005). \n65 See Attach. A, Levitt & Mohan Aff. at 16. \n66 PJM Initial Brief at 41-43. \n67 Id. at 43-46. \n68 Id. at 50."},{"page":24,"startToken":7377,"endToken":7791,"text":"24 \nthreatens the commercial workability of the new transmission services.69 For customers taking \nInterim NITS, PJM’s proposed disqualification rules would require the Co-Located Load to \ncease operations while it awaits the completion of network upgrades. Ceasing operations would \nexpose such a customer to breach of its contractual obligations while stranding hardware \ninvestments that may quickly become obsolete while the customer waits for network upgrades to \nbe completed. And for customers taking CDS, being forced onto NITS (or Interim NITS, as \napplicable) could permanently undermine the commercial case behind investments made for \npurposes of enabling CDS (and reduced transmission reservations). The risk of such a result, \nespecially to the extent that it could occur without fault or an ability to prevent the triggering \nfailure, will dissuade Eligible Customers that otherwise would take the new transmission \nservices from doing so.  \nAs an initial matter, it is not clear that PJM’s disqualification-based penalty scheme is \nnecessary at all, let alone “narrowly designed to balance the need to deter conduct that is harmful \nto the system with the need to limit excessive and unnecessary costs.”70 Transmission owners \nalways have the ability to manually disconnect a facility in case of potential severe reliability \nrisk.71 The threat of an extreme penalty like disqualification, especially on a strict liability basis, \nis therefore not needed to protect system reliability. It is also not commensurate with the penalty \nlevied on generators that fail to curtail when ordered under similar circumstances.72 Instead, PJM \n \n69 While PJM proposes to allow customers taking CDS to take Interim NITS in addition to NITS after a single \nunauthorized withdrawal, Interim NITS is only available on a temporary basis “until such time as the Network \nUpgrades necessary to provide NITS are complete.” PJM Initial Brief at 67-68. Many customers taking CDS will \ntherefore be ineligible to take Interim NITS and be forced to take NITS to the extent that they are waiting for \nNetwork Upgrades to be completed. Those customers that are eligible to take Interim NITS will be required to take \nNITS upon completion of the relevant Network Upgrades. Those customers would also become ineligible to \ncontinue to take Interim NITS upon a subsequent unauthorized withdrawal. \n70 Mirant Kendall, LLC & Mirant Americas Energy Mktg., L.P., 110 FERC ¶ 61,272 at P 17. \n71 See Attach. A, Levitt & Mohan Aff. at 16. \n72 Id. at 16-17 (noting also that “there appears to be no such systematic penalty on generators, although arguably \nthere should be”)."},{"page":25,"startToken":7791,"endToken":8133,"text":"25 \nshould adopt financial penalties sufficient to deter intentional gaming of transmission service \nsubscription. \nMeanwhile, disqualification is wildly disproportionate to the harm caused by \nunauthorized withdrawal during resource adequacy-related curtailment events. From a resource \nadequacy perspective, failure to respond to a Load Shedding or Curtailment procedure would \nhave a similar impact to a capacity resource failing to perform during emergency events. PJM \nalready has a Commission-approved penalty in place to deter such an outcome: the Non-\nPerformance Charge rate assessed to Capacity Resources that underperform during \na Performance Assessment Interval (PAI). A similar or equivalent financial penalty would be \nappropriate and sufficient in this context too.73 As Levitt & Mohan explain, the lost opportunity \ncost of shutting down a 1,000 MW data center could be three orders of magnitude higher than the \nequivalent Non-Performance Charge penalty for failure to curtail.74  \nIf the Commission decides to adopt PJM’s proposal to penalize unauthorized withdrawals \nwith disqualification, it should adopt intent (or at least fault), materiality, and repetition elements \nprior to disqualification. As proposed, and because PJM’s curtailment protocols allow PJM \ncomplete discretion to call curtailment events across an unpredictable range of circumstances and \nwith as little notice as PJM deems “practicable,”75 PJM’s strict liability rule could cause an \nEligible Customer to be denied future service for responding 30 seconds late to an instantaneous \ninstruction, regardless of the cause or whether another party is at fault. And, as discussed above, \n \n73 Id. at 15. \n74 Id. at 16 (explaining that a 1,000 MW data center might cost $40 billion and provide a gross revenue of several \nbillion dollars per year, while the PAI penalty for a 1,000 MW failure to curtail for one hour would be roughly $3 \nmillion.). \n75 See PJM Initial Brief, Illustrative Tariff, Part XI, Subpart A, § 705.4 & Subpart B, § 713.5 (e.g., in relation to \n“making necessary adjustments to, changes in, or repairs on its lines, substations, and facilities, and in cases where \nthe continuance of . . . [the transmission service] . . . would endanger persons or property”)."},{"page":26,"startToken":8133,"endToken":8440,"text":"26 \ntransmission owners’ abilities to manually disconnect a facility in case of severe reliability risk76 \ndefangs any possible justification for PJM’s proposed strict liability regime falling entirely on the \nEligible Customer. Absent fault or materiality, and given the breadth of circumstances under \nwhich PJM could direct curtailment, it is not clear that the disqualification penalty sends a \n“signal[]” that is “actionable,” and therefore may “only result in higher costs to ratepayers”—\nwho will share in the cost of transmission infrastructure that will need to be built to provide \nNITS—“without a commensurate benefit.”77 Especially when coupled with whatever financial \npenalties PJM and the PJM TOs ultimately adopt, which themselves could be sufficient to deter \nharmful conduct,78 this penalty scheme is excessive, draconian, expensive, and not just and \nreasonable. \nThese arguments apply with equal force to PJM’s proposal to disqualify Eligible \nCustomers whose control technologies or protection system schemes misoperate for a second \ntime.79 Disqualification is not needed to deter harmful conduct, is disproportionate given absence \nof fault or materiality elements and availability of financial penalties, and threatens the ability of \nprivate developers to finance projects that rely on the new transmission services the Commission \nrequired in the Co-Location Order. Disqualification for misoperation of control technologies or \nprotection system schemes absent unauthorized withdrawal is arguably even more excessive, \ndespite the two strikes policy PJM proposes, because misoperation without withdrawal does not \nin and of itself risk system harm. This proposal is unjust and unreasonable because it is “not \n \n76 Attach. A, Levitt & Mohan Aff. at 16. \n77 PJM Interconnection, L.L.C., 178 FERC ¶ 61,104, at PP 60-61 (2022).  \n78 Notably, the Commission and NERC regularly rely on the deterrent effect of financial penalties across a range of \nviolations, including violations of the reliability standards involving severe risks. \n79 PJM Initial Brief at 43-46."},{"page":27,"startToken":8440,"endToken":8805,"text":"27 \ncommensurate with any potential damage caused by the inadvertent errors which [are] de \nminimus,” especially if “properly reported upon discovery, and promptly fixed.”80  \nPJM’s proposed disqualification-based penalties are therefore not just and reasonable and \nshould not be adopted by the Commission. Instead, the Commission should direct PJM to adopt a \npenalty scheme that: (1) penalizes failure to respond to resource adequacy-related curtailment \ninstructions at the Non-Performance Charge rate assessed to Capacity Resources that \nunderperform during a  PAI; (2) penalizes failure to respond to transmission security-related \ncurtailment instructions with financial penalties sufficient to deter intentional gaming of \ntransmission service subscription, or, in the alternative, with disqualification only when \nintentional (or at least negligent), material, and/or repeated;81 and (3) suspends service where \nunauthorized withdrawals reveal control technology or protection system deficiencies until those \nsystems can be re-tested and re-certified up to 120 days. \nG. \nPJM’s proposed effective date of June 2029 is unjust and unreasonable. \nThe Commission in the Co-Location Order reflected the urgent need to address resource \nadequacy challenges in PJM.82 In light of that urgency, the Commission should not leave the \nrates that it found unjust and unreasonable in the Co-Location Order in place for more than three \nmore years. Instead, the Commission should require that (1) the Firm CDS be available within \nsix months of an order accepting PJM’s transmission service compliance filing, and (2) the Non-\n \n80 Direct Energy Bus., LLC, 186 FERC ¶ 61,228, at P 15 (2024); see also Idaho Power Co., 186 FERC ¶ 61,231, at \nP 26 (2024); Bp Energy Retail Co. California LLC, 190 FERC ¶ 61,127, at P 16 (2025); Tucson Elec. Power Co., \n188 FERC ¶ 61,207, at P 22 (2024). \n81 The Commission could also consider time-limiting disqualification to a specified term rather than making it \npermanent, if it chooses to adopt a disqualification-based penalty scheme.  \n82 See Co-Location Order, 193 FERC ¶ 61,217 (Comm’r Rosner, concurring, at PP 3 ( “a business-as-usual approach \nto load growth . . . will not suffice to timely meet growing demand while keeping prices reasonable.”) & 12 (“the \nsolutions enabled by both [the Co-Location Order] and PJM’s ongoing initiatives to accelerate new generation are \nimmensely important and urgent.”)."},{"page":28,"startToken":8805,"endToken":9165,"text":"28 \nFirm CDS and Interim NITS services be available at the earliest date technically feasible, \naccounting for the urgency and importance of their availability. \nPJM principally justifies its proposed June 1, 2029 effective date on the assertion that \nthree years of lead time is necessary to “integrate these transmission services into PJM’s capacity \nmarket . . . so that PJM can procure capacity for those that are capacity-backed (e.g., Firm \nContract Demand Transmission Service).”83 This explanation provides no reason to delay the \navailability of Non-Firm CDS or Interim NITS, which are not capacity-backed.84 Nor does it \noffer a compelling reason to delay Firm CDS—which is likely to present nearly identical \ncapacity requirements as NITS. PJM does not explain why a customer taking NITS would be \nreflected in its capacity market demand forecast but a customer taking Firm CDS would not. Nor \ndoes PJM explain why an Eligible Customer should not be allowed to transition in the immediate \nterm from NITS to Firm CDS, which would, if anything, have a lesser resource adequacy impact. \nIn fact, because Firm CDS enables customers to reduce their impact on resource adequacy, and \nco-located generation to potentially offer capacity into the market, making Firm CDS available \nmore immediately can serve to help address PJM’s immediate capacity shortage.85 To the extent \nthat PJM’s concern stems from a potential planning need associated with existing capacity \nresources de-registering to provide service to Co-Located Loads that take Non-Firm CDS or a \nlesser amount of Firm CDS, then PJM should propose a delayed implementation limited to those \nparticular use cases, while allowing faster implementation for customers using new generation or \nresources not currently participating in the capacity market.86 \n \n83 PJM Initial Brief at 79. \n84 See Attach. A, Levitt & Mohan Aff. at 20. \n85 See id.; see also PJM, 2027/2028 Base Residual Auction Reserve Target Shortfall Report, at 1-2 (Feb. 9, 2026), \nhttps://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2027-2028/2027-2028-bra-reserve-\ntarget-shortfall-report.pdf (explaining that PJM’s Base Residual Auction for the 2027/2028 Delivery Year cleared \n6,517 MW short of the Installed Reserve Margin). \n86 See Attach. A, Levitt & Mohan Aff. at 21."},{"page":29,"startToken":9165,"endToken":9494,"text":"29 \nPJM also argues that it needs until June 2029 to “make the necessary modifications to the \nPJM core Markets and Operations systems.”87 PJM claims that “implementing the proposed \nCurtailment priorities applicable to Interim NITS and Non-Firm Contract Demand Transmission \nServices,” “[i]n particular,” “will require PJM to work with vendors to develop system \nautomation that will avoid non-optimal, untimely, and inefficient outcomes.”88 Again, this \nexplanation is incomplete on its own terms, and does not address at all why additional software \nmust be developed to provide Firm CDS to customers in a manner that is similar to providing \nNITS to a smaller customer. In addition, neither PJM’s brief nor the supporting testimony \nspecifically support its claim that the software changes will require three years specifically to \nimplement.  \nThis silence is notable given evidence that curtailable products can be implemented in \nother context on much faster timelines. PJM has announced, for example, that it plans to adopt \nand implement by the end of 2026 a “Connect and Manage” proposal under which certain new \nloads in regions experiencing shortfalls would be curtailed prior to the deployment of pre-\nemergency Demand Response89—i.e., in a manner similar to resource adequacy-related \ncurtailment instructions for Non-Firm CDS or Interim NITS. Similarly, just two weeks before \nPJM filed its Initial Brief, SPP proposed to offer Conditional High Impact Large Load Service \nsimilar in critical components (including curtailment requirements) to the non-firm conditional \ntransmission services at issue here effective on July 1, 2026—nearly three full years before the \neffective date proposed by PJM.90 It is not clear why PJM will be able to implement its Connect \n \n87 PJM Initial Brief at 79. \n88 Id. at 81. \n89 See PJM, Board Decisional Letter on Critical Issue Fast Path – Large Load Additions, at 4, 8 (Jan. 16, 2026), \nhttps://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-disclosures/2026/20260116-pjm-board-letter-\nre-results-of-the-cifp-process-large-load-additions.pdf.   \n90 SPP, Filing, Docket No. ER26-1323-000, at 1-2 (filed Feb. 10, 2026)."},{"page":30,"startToken":9494,"endToken":9785,"text":"30 \nand Manage proposal and SPP will be able to make non-firm conditional transmission service \navailable this year while PJM claims to need 40 months to implement the new transmission \nservices at issue in this proceeding. In addition, Mr. Levitt and Dr. Mohan note in the attached \ntestimony that leveraging price responsive demand modifications to security constrained \neconomic dispatch (SCED) could allow PJM to faster implement any SCED changes for non-\nfirm loads.91  \nFinally, PJM posits that, because generation intended to serve Co-Located Loads is \nunlikely to be operational before June 1, 2029, its proposed effective date “will not be a limiting \nfactor.”92 To the contrary, there are likely to be projects in development in a position to avail \nthemselves of these new services—particularly those using energy storage systems.  \nThe Commission should therefore reject PJM’s proposed effective date, and direct PJM \nto propose an effective date that is as early as technically feasible for each individual \ntransmission service offered. For Firm CDS, which is unlikely to require software updates, the \nCommission should direct an effective date within six months of an order accepting PJM’s \ncompliance filing to establish the service. For Non-Firm CDS and Interim NITS, the \nCommission should direct PJM to adopt an effective date as soon as practicable, based on a \ndetailed projection of project schedule components, moving with urgency. \nIII. \nCONCLUSION \nThe PJM region faces significant challenges. Addressing those challenges will require \nleadership. The Commission demonstrated that leadership in issuing the Co-Location Order, \nbreaking from a “business-as-usual approach” to “help[] break the logjam.”93 PJM’s and the PJM \n \n91 Attach. A, Levitt & Mohan Aff. at 21-22. \n92 PJM Initial Brief at 82. \n93 Co-Location Order, 193 FERC ¶ 61,217 (Comm’r Rosner, concurring, at P 4)."},{"page":31,"startToken":9785,"endToken":9954,"text":"31 \nTOs’ initial briefs, however, do not match the Commission’s leadership in the Co-Location \nOrder. Rather, they propose the minimum possible ambition to offer non-firm and contract \ntransmission services after letting the problems plaguing the PJM system worsen for several \nyears. The Commission should not allow this attempt to water down the Co-Location Order, \nwhich would prevent it from realizing its goals. Rather, the Commission should direct PJM to \ntimely implement commercially workable Firm CDS, Non-Firm CDS, and Interim NITS as \ncontemplated in the Co-Location Order. Anything less will fail to meet this critical moment. \n \n \n \nRespectfully submitted, \n/s/ Eric Stoutenburg  \nEric Stoutenburg \n \nChief Development Officer \n \nEolian L.P. \n \n988 Howard Ave. Suite 200   \nBurlingame, CA 94010 \n \neric.stoutenburg@eolianenergy.com  \n/s/ Noah Long  \nNoah Long  \nDirector, State and Regulatory Affairs  \nAntora Energy, Inc.  \n200 West De Vargas St  \nSanta Fe, NM 87501  \nnoah.long@antora.com   \n \n/s/ Matt Barnes \nMatt Barnes \nChief Commercial Officer \nCalibrant Energy \n4830 W. Kennedy Blvd, Suite 600 \nTampa, Florida 33609 \nmatthew.barnes@calibrantenergy.com"},{"page":32,"startToken":9954,"endToken":10047,"text":"32 \n/s/ Katie Guerry  \nKatie Guerry \nSVP Regulatory and Government Affairs \nConvergent Energy and Power \n7 Time Square, Suite 3504 \nNY, NY 10036 \nkguerry@convergentep.com \n \n/s/ Brian Kauffman \nBrian Kauffman \nDirector, Wholesale Market Development \nMainspring Energy, Inc. \n3601 Haven Ave. \nMenlo Park, CA 94025 \nbrian.kauffman@mainspringenergy.com \n \n/s/ Noah Roberts \nNoah Roberts \nExecutive Director \nU.S. Energy Storage Coalition \n1299 Pennsylvania Ave NW \nWashington, D.C. 20004 \nnoah@energystorage.org \n \n/s/ Jeff Bladen \nJeff Bladen  \nHead of Energy  \nVerrus, LLC  \n918 N Rengstorff Ave.  \n \n  \nMountain View, CA 94043 \n \n \nbladen@verrusdata.com"},{"page":33,"startToken":10047,"endToken":10109,"text":"33 \nCERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary of the Commission in this \nproceeding. \n \nDated: March 25, 2026 \n/s/ Eric Stoutenburg  \nEric Stoutenburg \n \nChief Development Officer \n \nEolian L.P. \n \n988 Howard Ave. Suite 200   \nBurlingame, CA 94010 \n \neric.stoutenburg@eolianenergy.com"},{"page":34,"startToken":10109,"endToken":10111,"text":"Attachment A"},{"page":35,"startToken":10111,"endToken":10164,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 1 of 25 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nLarge Loads Co-Located at Generating \nFacilities \nDocket No. EL25-49-000 et al. \nAFFIDAVIT OF \nANDREW LEVITT AND ANIRUDDH MOHAN \nON BEHALF OF \nEOLIAN, L.P. \nMarch 25, 2026"},{"page":36,"startToken":10164,"endToken":10586,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 2 of 25 \nI. \nQUALIFICATIONS \n1 \nOur names are Andrew Levitt and Aniruddh Mohan. Mr. Levitt is a Senior Consultant and Dr. \n2 \nMohan is an Energy Associate at The Brattle Group (Brattle).  \n3 \nMr. Levitt is an expert on wholesale market design and reliability implications of changes in the \n4 \npower system. He has consulted to Independent System Operators and Regional Transmission \n5 \nOrganizations (ISO/RTOs) such as the Midcontinent Independent System Operator (MISO), the \n6 \nNew York Independent System Operator (NYISO), the Alberta Electric System Operator \n7 \n(AESO), and the Independent Electricity System Operator (IESO) of Ontario, and helped other \n8 \nclients navigate ISO/RTO changes nationwide. Prior to joining Brattle in 2022, Mr. Levitt was \n9 \non staff at PJM for seven years (most recently as Lead Market Designer), where he developed \n10 \nreforms to reliably integrate new resource types. Mr. Levitt holds an MMP from the University \n11 \nof Delaware and a BSc in physics from the University of Toronto. \n12 \nDr. Mohan specializes in the evaluation of energy technologies at a systems level, with expertise \n13 \nin electricity markets, techno-economic analysis, and energy policy. He has expertise in \n14 \noptimization models that support both resource and transmission planning and has published \n15 \npeer-reviewed research in leading academic journals on energy systems. He holds a PhD in \n16 \nEngineering & Public Policy from Carnegie Mellon University. \n17 \nWe have worked extensively on the benefits of co-located (“hybrid”) loads and generation and \n18 \nhow that option should be facilitated to reduce costs, achieve faster connection of new loads and \n19 \ngeneration, and ensure reliability. This includes co-authored affidavits and reports in prior filings \n20 \nbefore the Federal Energy Regulatory Commission (“FERC” or “Commission”) on co-location \n21 \nincluding an affidavit on behalf of Eolian in FERC Docket No. RM26-4-000 on Interconnection \n22 \nof Large Loads to the Interstate Transmission System and a report on behalf of Bloom Energy in \n23 \nthis Docket EL25-49-000 on Accelerating the Integration of New Co-located Generation and \n24 \nLoads.1 \n25 \n \n1  \nAffidavit of Andrew Levitt, Aniruddh Mohan, Ryan Quint, and Sirisha Tanneeru on Behalf of Eolian Energy, \nInc., before the Federal Energy Regulatory Commission in the matter of Interconnection of Large Loads to the \nInterstate Transmission System, Docket No. RM26-4-000, November 21, 2025; A. Levitt, J. Pfeifenberger, and \nA. Mohan, Accelerating the Integration of New Co-located Generation and Loads, prepared for Bloom Energy \nas part of Docket No. EL25-49-000, April 23, 2025."},{"page":37,"startToken":10586,"endToken":10958,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 3 of 25 \nII. \nASSIGNMENT \n1 \nWe were asked by Eolian, L.P. to assess the efficiency and reliability effects of PJM’s \n2 \ncompliance filing in Dockets EL25-49-000 et al. on new transmission services for loads co-\n3 \nlocating with generation resources, and to identify potential enhancements. We assessed: the \n4 \nproposed eligibility for Non-Firm Contract Demand Transmission Service (“Non-Firm CDS” or \n5 \n“NFCDS”); operational requirements for NFCDS and Interim Network Integration Transmission \n6 \nService (“Interim NITS”); PJM interconnection study procedures for co-located load and supply \n7 \nresources; and PJM’s proposed timeline for implementation of the proposed reforms. \n8 \nIII. \nBACKGROUND \n9 \nIn February 2025, the Federal Energy Regulatory Commission (FERC) initiated a show cause \n10 \nproceeding into whether sections of PJM’s tariff on co-location of generation with loads are just, \n11 \nreasonable, and not unduly discriminatory or preferential. FERC’s subsequent Order in Docket \n12 \nEL25-49-000 on December 18, 2025 found that PJM’s Tariff did not address with sufficient \n13 \nclarity and consistency the rates, terms, and conditions applicable to generators serving co-\n14 \nlocated load and to eligible customers taking transmission service on behalf of such load.2 FERC \n15 \ntherefore directed PJM to revise its Tariff, required PJM to establish three new transmission \n16 \nservice options for co-located load arrangements, and set the matter for further paper-hearing \n17 \nproceedings on the appropriate rates, terms, and conditions.  \n18 \nPJM’s filings are its response to those directives. In its compliance filing, PJM proposes \n19 \nrevisions to its Open Access Transmission Tariff addressing, among other things, behind-the-\n20 \nmeter generation, necessary study procedures, and the framework for new transmission services \n21 \napplicable to co-located load. In its accompanying Initial Brief, which is the subject of this \n22 \naffidavit, PJM sets out illustrative tariff language and supporting positions for three new service \n23 \ncategories: Interim NITS, Firm CDS, and Non-Firm CDS. PJM also submitted supporting \n24 \naffidavits addressing planning, operations, market design, and implementation timing. We \n25 \nsubmit this affidavit in response to this Initial Brief and its accompanying affidavits, and the \n26 \nissues they place before the Commission. \n27 \n \n2  \nPJM Interconnection, LLC, 193 FERC ¶ 61,217 (2025) (Co-Location Order)."},{"page":38,"startToken":10958,"endToken":11329,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 4 of 25 \nIV. \nSUMMARY \n1 \nWe appreciate the steps PJM has taken in its Initial Brief and compliance filing to create new \n2 \ntransmission services for co-located loads that can reduce their withdrawals from the grid when \n3 \nneeded. PJM has undertaken considerable work to outline a number of pathways that we believe \n4 \nwill help facilitate faster entry of new large loads, new generation resources, and more flexible \n5 \ncontractual arrangements. These reforms are well positioned to be fully realized, and the benefits \n6 \nfully unlocked, with relatively minor enhancements. \n7 \nIn this affidavit, we assess the proposal PJM has made in its Initial Brief in Docket EL25-49-000 \n8 \nand identify enhancements that will enable it to achieve the full scope and ambition indicated in \n9 \nthe Co-Location Order. To summarize, we identify these enhancements as:  \n10 \nProvide NFCDS when needed and available (i.e., not limited only to periods when the co-located \n11 \ngenerator is on outage), improving efficiency and speed to power;  \n12 \nFor loads that take Interim NITS, obligate curtailment to the level of net zero withdrawals from \n13 \nthe transmission system to avoid additional unnecessary curtailment of load supplied by local \n14 \ngeneration (with narrow exceptions discussed below) while ensuring no or minimal impact \n15 \non the transmission system;  \n16 \nUse penalties that are proportional to the system impact and commensurate with similar penalties \n17 \nfaced by generators today; apply penalties that distinguish between failing to curtail during \n18 \nresource adequacy events versus transmission security events;  \n19 \nProvide more detail on the interconnection studies required for co-located load and supply \n20 \nresources, including how each component will be modeled in the studies of the other \n21 \ncomponent(s); study non-firm load as dispatchable in order to achieve maximum speed to \n22 \npower benefits; and clarify treatment of the co-location of load with storage resources, \n23 \nincluding allowing co-located load and energy storage resources to nominate joint \n24 \nwithdrawal limits in order to enable flexible and technology-neutral co-location \n25 \narrangements;  \n26 \nAccelerate the target implementation of significant portions of the new transmission services to \n27 \nenable energization of new large loads; and  \n28"},{"page":39,"startToken":11329,"endToken":11608,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 5 of 25 \nDeploy remedial action schemes (RAS) more extensively to increase the utilization of the \n1 \nexisting transmission grid. \n2 \nTaken together, we believe these modifications to PJM’s proposal will significantly expand the \n3 \ncommercial opportunities for co-located load and generation resources in PJM, consistent with \n4 \nthe outlined priorities of the US Department of Energy and FERC to accelerate energization of \n5 \nnew large loads, while improving and expanding the efficiency benefits of the PJM energy \n6 \nmarket, making it more attractive for new loads to bring new generation, and reducing the \n7 \ntransmission upgrades and interconnection timelines necessary to integrate new loads.  \n8 \nWe note that the scope of our affidavit is restricted to the items described above. We do not \n9 \naddress the proposed prices for the new non-firm transmission services, while acknowledging \n10 \nthat such pricing should be consistent with other non-firm transmission services already provided \n11 \nby PJM to ensure that customers pay for a fair share of the transmission system they are using. \n12 \nV. \nASSESSMENT OF THE PJM PROPOSAL AND POTENTIAL ENHANCEMENTS \n13 \nV.A. \nMaking Non-Firm CDS Available as Needed Improves \n14 \nEfficiency and Speed to Power  \n15 \nV.A.1. \nThe benefit of Non-Firm Contract Demand Service is \n16 \nunnecessarily limited as it only contemplates load \n17 \nwithdrawals when co-located generation is on outage  \n18 \nPJM has proposed to limit the availability of Non-Firm CDS to “the event the Co-Located \n19 \nGenerating Facility is on outage and unable to provide any of the dedicated level of energy.”3 \n20 \n \n3  \nPJM Illustrative Tariff § 709.2(b)."},{"page":40,"startToken":11608,"endToken":12257,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 6 of 25 \nPJM’s implementation therefore seems to envisage a load that is 100% self-supplied by its co-\n1 \nlocated generation unit for almost the entire year, except for periods of generator outages.4 \n2 \nPJM’s proposed implementation is unreasonable and inefficient as it is far narrower than \n3 \nnecessary. If implemented as proposed, it would introduce potentially significant economic \n4 \ninefficiencies by precluding the load from accessing the PJM energy market when doing so \n5 \nwould be lower cost than dispatching the co-located generation, assuming of course that such \n6 \nwithdrawals would be limited to when the transmission network could reliably deliver that \n7 \nenergy. For example, consider the case of a load taking NFCDS that is co-located with a natural \n8 \ngas peaker plant. Under PJM’s proposed implementation, the load would have to rely on its \n9 \npeaker plant for all the hours of the year in which the plant is physically available (i.e., not on \n10 \noutage). This would be necessary (and reasonable) only if the transmission network were unable \n11 \nto deliver market energy for the entire year. As proposed, loads would not be able to request non-\n12 \nfirm CDS and PJM would not even check for the availability of non-firm transmission unless the \n13 \nco-located generator is on outage. Assuming non-firm transmission capability would indeed be \n14 \navailable in many hours of the year, PJM’s proposal would result in unnecessarily high costs \n15 \n(and unnecessarily high fuel consumption and emissions) for supplying the load compared to \n16 \nallowing access to PJM’s market resources whenever non-firm transmission is available. This is \n17 \nbecause a co-located peaking unit would only be cost competitive during a portion of all hours \n18 \nwhen the unit is available (i.e., not on outage).  \n19 \n \n4  \nWe note that even if PJM’s proposed restriction of NFCDS to periods where co-located Generation is on outage \nwere necessary and beneficial, which it is not, PJM has not provided sufficient clarity on how outages are \ndefined and whether this covers both planned and unexpected outages or both. Given the need for reserving \nNFCDS ahead of time, it is likely in practice that this would only be used for planned outages or extended \nforced outages. By definition, unexpected outages cannot be anticipated and fully reserved for in advance \n \nPJM’s implementation also does not specify how multiple units are to be treated for outages. For example, in \nthe Illustrative Tariff § 709.2(b) it says NFCDS would be allowed in “the event the Co-Located Generating \nFacility is on outage and unable to provide any of the dedicated level of energy.” Take the case of a 500 MW \nload co-located with 2 × 250 MW generators that takes NFCDS. The use of the word “any” suggests that PJM \nwould not allow the 500 MW load to take NFCDS unless all 500 MW of the generation, i.e. both units, were \nfully on outage. Load must request reservation of 500 MW or nothing. However, in its Initial Brief, p. 32, PJM \nsays “The Eligible Customer may then, on any given day, reserve Non-Firm Contract Demand Transmission \nService up to the amount specified in the Service Agreement (but only up to the MW level that the Co-Located \nGenerating Facility is on outage).” The phrase “only up to the MW level” would suggest that in the example, \nload may take NFCDS up to 250 MW if one of its generation units were offline. This is clearly inconsistent. In \nAttachment B (Affidavit of Dr. Sami Abdulsalam), p.6 it also says that “An Eligible Customer would only need \nto take non-firm transmission service under limited circumstances—e.g., if the co-located generator is \nunavailable or operating at a reduced capacity.” The phrase “reduced capacity” contradicts the use of the word \n“any” in PJM’s Illustrative Tariff provision."},{"page":41,"startToken":12257,"endToken":12729,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 7 of 25 \nAs a second example, consider a co-located battery storage facility. Battery storage provides \n1 \nparticular value for co-locating with artificial intelligence data centers, given the batteries’ ability \n2 \nto ramp instantaneously to match rapid changes in computing load. PJM’s proposal to only allow \n3 \nloads to reserve NFCDS during outages appears to be incompatible with co-located storage use \n4 \ncases, since storage is physically incapable of producing power at all times. Given that storage is \n5 \ncapable of working in concert with load curtailment to accelerate grid connection of a co-located \n6 \nfacility via non-firm transmission service, PJM’s proposal would unnecessarily shut out this use \n7 \ncase.5 This precludes taking advantage of the benefits of battery storage for addressing the \n8 \ninfrastructure challenge that is the subject of FERC and PJM’s policy effort in this docket. Those \n9 \nbenefits include the fast-ramping loads mentioned above, as well as rapid deployment, a robust \n10 \nsupply chain, lower permitting requirements, and lower emissions. \n11 \nIn addition, generation facilities typically feature multiple units for economies of scale, local \n12 \nredundancy, or other purposes. PJM would benefit if new co-located facilities are designed with \n13 \nredundancy offered by multiple units, which in some cases could be dozens or more units at a \n14 \nsingle site able to offer extremely high availability and commensurate reliability benefits.6 In \n15 \nsuch cases, physical generation outages would not typically cover all generation at the site, thus \n16 \npotentially precluding utilization of NFCDS entirely, despite the efficiency benefits that broad \n17 \navailability of Non-Firm CDS would offer. As long as non-firm capacity is available on the PJM \n18 \ngrid, customers should be able to reserve the service. \n19 \nPJM’s proposed implementation would create economic and technical barriers to loads that wish \n20 \nto take NFCDS to contract with any resources other than low-energy-cost baseload resources. \n21 \nPJM’s proposed implementation of NFCDS would thus not be technology neutral, and PJM \n22 \noffers no explanation for why such a restrictive operational envelope for Non-Firm CDS is \n23 \nnecessary. Finally, by creating conditions in which co-location is limited to baseload resources \n24 \n(that may require many years to develop), PJM’s proposal would create the unintended outcome \n25 \nof providing a strong incentive to existing baseload resources (such as nuclear plants and gas-\n26 \n \n5  \nAffidavit of Andrew Levitt, Aniruddh Mohan, Ryan Quint, and Sirisha Tanneeru on Behalf of Eolian Energy, \nInc., before the Federal Energy Regulatory Commission in the matter of Interconnection of Large Loads to the \nInterstate Transmission System, Docket No. RM26-4-000, November 21, 2025. \n6  \nA. Levitt, J. Pfeifenberger, and A. Mohan, Accelerating the Integration of New Co-located Generation and \nLoads, prepared for Bloom Energy as part of Docket No. EL25-49-000, April 23, 2025."},{"page":42,"startToken":12729,"endToken":13229,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 8 of 25 \nfired combined cycles) to exit the PJM market so they can enter into co-location arrangements \n1 \nwith loads taking NFCDS. These are also the resources with the highest capacity market \n2 \naccreditation, whose exit would have the highest adverse impact on the PJM capacity market. \n3 \nCreating such incentives is undesirable at a time in which the PJM capacity market is falling \n4 \nshort of its reliability requirement and capacity prices are at the cap. \n5 \nV.A.2. \nPJM can leverage the same tools for Interim NITS and \n6 \nfor Non-Firm CDS to ensure reliability \n7 \nConsistent with FERC’s Order, PJM has structured NFCDS such that it has the authority and \n8 \ncapability to evaluate and deny requested reservations based on expected operational \n9 \nconsiderations ahead of time.7 Further, in real time operations, even after granting reservation of \n10 \nNFCDS, PJM has the ability to curtail withdrawals consistent with the nature of non-firm \n11 \nservice. We find merit with PJM’s proposed structure for reservations and operational \n12 \nevaluations. Given that PJM proposes to evaluate operations when it receives a reservation \n13 \nrequest, it stands to reason that PJM could also evaluate conditions for NFCDS requests when \n14 \nthe co-located generation is not on outage. PJM has not provided a justification for why the \n15 \nNFCDS reservation process should be limited to when the co-located generator is on outage. \n16 \nFurther, PJM has already proposed to offer interruptible non-firm access to withdrawals at all \n17 \nhours to load taking Interim NITS, even without the need to request reservation. PJM should \n18 \ntherefore be able to offer non-firm, as-available service to Non-Firm CDS customers whenever \n19 \nthe request can be served reliably (understanding that the service can be curtailed in real time). \n20 \nWe conclude that NFCDS should be offered upon request whenever non-firm transmission \n21 \ncapability is available. Since PJM can deny a service request based on PJM’s operational \n22 \nevaluation and curtail the service in real time if needed, doing so would be at least as reliable and \n23 \n \n7  \nFor example, PJM in its Initial Brief, pp. 32–33 notes that “requests for Non-Firm service shall only be granted \nwhen PJM has determined there is available transmission capacity.” PJM also notes that studies for NFCDS \n“relate only to the maximum amount of Non-Firm Contract Demand Transmission Service that would be \nallowed under a specific Service Agreement. PJM expects to perform different evaluations to actually use such \nservice on the Transmission System on any given day.” Further, in PJM Initial Brief, Attachment B (Affidavit of \nDr. Sami Abdulsalam, p. 6) Dr. Abdulsalam notes that “The order also requires Non-Firm Contract Demand \nTransmission Service to be requested ahead of time and on a relatively short duration basis (one hour to one \nmonth). This forward request for service implies foreseeable conditions where the Co-Located Load is expected \nto withdraw power from the PJM network.”"},{"page":43,"startToken":13229,"endToken":13708,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 9 of 25 \npractical to operationalize as Interim NITS.8 Limiting Non-Firm CDS to periods during which \n1 \nthe co-located generator is on outage would be unnecessary, unreasonable, inefficient, and create \n2 \na significant or unworkable barrier for co-locating loads with many types of the generation \n3 \nresources, including batteries and gas-fired peaking units. \n4 \nV.A.3. \nPJM’s implementation would be more efficient and \n5 \naccelerate speed to power if NFCDS were broadly \n6 \navailable when requested  \n7 \nExpanding availability of Non-Firm CDS reservations to whenever it is requested and non-firm \n8 \ngrid capacity is available removes barriers to use of the NFCDS construct for generators that are \n9 \nnot baseload. This would significantly improve the economic efficiency offered by the service \n10 \nand accelerate speed to power. Allowing customers with NFCDS to apply for reservations for \n11 \nnon-firm service in all hours of the year at their nominated levels would maximize economic \n12 \nefficiency and allow loads to co-locate with a wide variety of technologies depending on their \n13 \nneeds and technology availability. In this expanded implementation, PJM would still have the \n14 \nability to deny reservations for non-firm service if expected grid conditions do not permit \n15 \nreliably serving the load on a non-firm basis. And, if unforeseen conditions occur in real time, a \n16 \ncurtailment order could be issued, and the load would follow instructions to curtail its net \n17 \nwithdrawals from the grid to the level ordered by PJM.  \n18 \nExpanding NFCDS would enable large loads to make commercial investments with this service, \n19 \navoiding major transmission upgrades (and reducing the associated cost) and achieving the speed \n20 \n \n8  \nPJM Initial Brief, Attachment B (Affidavit of Dr. Sami Abdulsalam) distinguishes between the reliability \nimplications of Interim NITS and NFCDS by noting that Interim NITS is temporary (see p. 4). However, PJM \nhas not provided any time frame to limit the expected period of Interim service. Transmission upgrades required \nto enable full NITS for load may take many years to be completed. Further, the transmission system is changing \ncontinuously due to new generation, load, and transmission upgrades, making it unclear why temporary Interim \nNITS is reliable for its entire duration while NFCDS, which allows for continuous operational evaluations, is \nnot. \n \nFurther, the Affidavit, p. 5 also acknowledges that operational screening by PJM for NFCDS will reduce the \nnumber of protection schemes necessary: “For Non-Firm Contract Demand Transmission Service, PJM will be \noffering and managing these pre-scheduled services “operationally” and ensure that permanent monitoring \nand aggressive, fast-acting protections are in place if conditions arise that may compromise reliable system \noperations. This approach allows for more reliable system operation, reduces the number of permanent \nprotection systems on the system, thereby reducing the likelihood of unintended protection system misoperation \nthat could lead to cascading events.”"},{"page":44,"startToken":13708,"endToken":14106,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 10 of 25 \nto power priorities of FERC and the US administration. It would also increase the attractiveness \n1 \nof co-located arrangements under which large new loads voluntarily bring their own new \n2 \ngeneration, reducing PJM’s reliance on other efforts (i.e., the Reliability Backstop Auction) to \n3 \nassure generation adequacy through administrative mandates or cost allocations. Finally, by \n4 \nincentivizing transmission customers to develop load curtailment as a backstop to generator \n5 \navailability, it increases the operational reliability tools available to PJM.  \n6 \nWhile the immediate benefits of speed to power and avoided transmission upgrades for Non-\n7 \nFirm CDS match those benefits for Interim NITS, Non-Firm CDS has the added benefit of: (1) \n8 \nbeing a permanent service (as opposed to Interim NITS); (2) indicating to PJM exactly how \n9 \nmuch load the customer is willing to curtail as a backstop for its co-located generator, and (3) \n10 \nexplicitly indicating to PJM and the transmission owner that the customer intends to primarily \n11 \nrely on its own generator for a specified portion of its firm supply, setting a clear benchmark for \n12 \nPJM to plan towards. \n13 \nV.B. \nPJM’s Proposal to Curtail Interim NITS Loads to Zero \n14 \nGross Consumption Results in Unnecessary Curtailment  \n15 \nV.B.1. \nPJM’s proposal to fully curtail all load of Interim \n16 \nNITS customers results in unnecessary curtailment \n17 \nand renders Interim NITS commercially unworkable \n18 \nfor many applications \n19 \nPJM has stated in its stakeholder meetings that load customers taking Interim NITS service \n20 \n(which is appropriately interruptible and non-firm until the customer transitions to firm NITS) \n21 \nwould be required to curtail their entire load to zero MW when ordered to do so by PJM.9 During \n22 \nsystem conditions demanding curtailment, PJM would not allow load to net its consumption \n23 \nagainst its co-located generation resource. Instead, PJM would curtail the entire load even when \n24 \nits co-located generator is producing. Curtailing customer load to levels beyond what is needed \n25 \n \n9  \nWhile not explicit in its tariff filing, PJM in stakeholder materials has said that load would not be allowed to net \nits load with its co-located generation resource during system conditions that require curtailment. “If curtailed, \nEC cannot take energy from co-located generator (no netting under system conditions that required \ncurtailment).”"},{"page":45,"startToken":14106,"endToken":14521,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 11 of 25 \nto achieve zero withdrawals from the grid (i.e., to less than the generation output of the co-\n1 \nlocated generation) is unreasonable and inefficient in most use cases.  \n2 \nPJM does not explain why the load would need to curtail beyond the level at which zero MW are \n3 \nwithdrawn from the transmission system to the co-located facility (i.e., when some or all of the \n4 \nload is consuming but is physically taking power entirely from the co-located generation). In \n5 \nother words, PJM does not explain why the load could not take power from its co-located \n6 \ngenerator without physically flowing power over the transmission network.  \n7 \nSince PJM proposes that co-located loads taking Interim NITS curtail not only when needed for \n8 \ntransmission security, but also for resource adequacy reasons (prior to deployment of Pre-\n9 \nEmergency Demand Response), PJM’s proposal denies the load the benefit of any resource \n10 \nadequacy value from its co-located generation.10 This would result in unnecessary curtailments \n11 \nand render the Interim NITS proposal commercially unworkable for loads that develop their own \n12 \nnew generation, since the purpose of the co-location arrangement is to increase the firmness of \n13 \npower availability to the load by way of the co-located generator.  \n14 \nFor example, consider a 300 MW generator with full injection rights and a 300 MW load with \n15 \ninterim NITS, with the generator running at maximum output. If system conditions require \n16 \ncurtailment from the grid, PJM proposes to curtail the load to 0 MW while the 300 MW \n17 \ngeneration resource would still be injecting into the grid. This would mean the co-located facility \n18 \nwould now be injecting 300 MW into the grid, instead of simply obligating co-located generation \n19 \nand load to limit their net withdrawals to 0 MW. Doing so would be reasonable only if the co-\n20 \nlocation involves (1) existing generators with PJM capacity market obligations prior to taking \n21 \nadvantage of the co-location opportunity and (2) the generator had no intention to retire the \n22 \nfacility absent the co-location opportunity. In any other cases, such as when new load is co-\n23 \nlocated with owned or contracted new generation, curtailments should be limited to zero net \n24 \nwithdrawals from the grid. \n25 \n \n10  We refer to the proposed provision to curtail prior to pre-emergency Demand Response as a resource-adequacy \nrelated curtailment."},{"page":46,"startToken":14521,"endToken":14937,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 12 of 25 \nConsider another case in which a 300 MW generator has minimal net injection rights (i.e., it is \n1 \nlimited in its interconnection agreement to almost exclusively provide power for the co-located \n2 \nload, consistent with the Co-Location Order, with only e.g. 20 MW of allowed injections) and is \n3 \nsited with a 300 MW load. With the load at 280 MW and the generation at 300 MW, PJM’s \n4 \nproposal would be to curtail the load to 0 MW prior to a Pre-Emergency Demand Response \n5 \nevent. This would result in the generator also curtailing such that it injected at its maximum of 20 \n6 \nMW. The result would be to incur great opportunity cost through the curtailment yet yielding no \n7 \nnet gain in power balance during the scarcity condition. This is inefficient and unnecessary and \n8 \nmay also reduce reliability as the reactive power and stability benefits of the generator would no \n9 \nlonger be available due to its curtailment.  \n10 \nV.B.2. \nPJM can offer Interim NITS without unnecessary \n11 \ncurtailments by obligating curtailment to net zero \n12 \nwithdrawals and clarifying resource adequacy \n13 \ncurtailment obligations \n14 \nPJM proposes curtailment of load taking Interim NITS not only for transmission security reasons \n15 \nbut also for resource adequacy purposes (as evidenced by the requirement of Interim NITS \n16 \ncustomers to curtail before Demand Response customers are curtailed). Curtailment for \n17 \ntransmission security is natural given the interruptible, non-firm nature of the Interim NITS \n18 \ntransmission service. However, the extent of obligatory curtailment is greater than necessary, and \n19 \nthe application to resource adequacy is insufficiently specified with respect to capacity \n20 \narrangements for the load and generation, leading to inefficient, unnecessary curtailments of \n21 \nloads. Reliability would be maintained while minimizing unnecessary curtailment and offering a \n22 \nworkable Interim NITS construct if PJM limited the curtailment of net grid withdrawals only to \n23 \n(a) the level necessary for transmission security, and (b) the level appropriate to the resource \n24 \nadequacy circumstance the customer is in (as explained below).  \n25 \nPutting aside transmission security considerations related to existing generators (where addition \n26 \nof new load without new generation can adversely impact transmission security for existing \n27 \ncustomers), it is evident that load co-located with new generation does not generally impact \n28 \ntransmission security for existing customers once net withdrawals have been reduced to zero and \n29"},{"page":47,"startToken":14937,"endToken":15432,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 13 of 25 \nthe customer is no longer taking any power from the transmission system. In some cases, even \n1 \ncurtailing to net zero withdrawals is more than necessary, especially when multiple customers \n2 \ntaking non-firm transmission service can respond to mitigate the same issue.  \n3 \nThe exception to limiting load curtailments to net zero grid withdrawals is for facilities with \n4 \nlarge generation unit or load module components for which a trip of the large component could \n5 \ncause inadvertent inflows or outflows, which would need to be addressed by reducing the output \n6 \nor consumption of the component.11 This can be remedied with a relay or simple RAS \n7 \nmonitoring flows at the point of connection to the grid. Indeed, PJM recognizes the value of RAS \n8 \nfor the Interim NITS case in preventing accidental load withdrawals from the grid.12 In case no \n9 \nRAS is available and post-contingency flows are insecure, curtailment obligations for Interim \n10 \nNITS customer loads can be made by exception, rather than setting a standing obligation to \n11 \ncurtail the entire load to zero even if co-located generation supplies all or some of the load. This \n12 \nwould clarify that unnecessary curtailments are not expected. \n13 \nCurtailments of load to ensure resource adequacy for co-location arrangements with new \n14 \ngenerators should also be limited to net zero grid withdrawals (putting aside the use case \n15 \ninvolving existing generator arrangements with capacity market obligations). When the \n16 \nco-located new generator is not selling capacity to PJM and, instead, provides capacity to the co-\n17 \nlocated load customer, it would be unreasonable and unnecessary to curtail load below net zero \n18 \ngrid withdrawals from the co-located facilities. In other words, even under Interim NITS, loads \n19 \nco-located with dedicated new generation should not be curtailed for resource adequacy events if \n20 \nthere are no net withdrawals from the grid.  \n21 \n \n11  We note that the simplest solution to this issue is to avoid large units/modules in the design of such facilities, \nwhich is not uncommon for new large load co-location arrangements. \n12  PJM Initial Brief, Attachment C (Affidavit of Matthew Wharton), at p. 9. “There is one scenario where a RAS \nwould be overwhelmingly beneficial and would have a minimal impact on the overall grid. A RAS will be \nrequired for the loss of the Co-Located Generating Facility. In this instance, PJM would expect the RAS to \nactuate on the loss of the Co-Located Generating Facility and the load served by Non-Firm Contract Demand \nTransmission Service or Interim NITS will automatically be removed from the system by the RAS scheme. In \nother words, after the co-located generator is offline, only the NITS or Firm Contract Demand Transmission \nService will remain connected and served by PJM. At that point, PJM could evaluate if additional non-firm load \ncould be supported after the loss of generation occurs.”"},{"page":48,"startToken":15432,"endToken":15795,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 14 of 25 \nOnly if the co-located load is not buying capacity from PJM but the co-located generator is \n1 \nselling capacity to PJM (and is therefore not available to serve the co-located load) is it logical \n2 \nand necessary to curtail the load for resource adequacy events (e.g., prior to Demand Response \n3 \ndeployment, or otherwise as appropriate).  \n4 \nV.B.3. \nThe benefits of limiting curtailments only to net zero \n5 \nwithdrawals under Interim NITS are significant  \n6 \nFor all cases in which generation does not have a PJM capacity market obligation, significant \n7 \nbenefits would accrue by allowing the co-located generation to provide capacity to Interim NITS \n8 \nload and power that load during resource adequacy and transmission security events. PJM has \n9 \nindicated that the highest level of reliability for loads seeking transmission service is to take \n10 \nNITS, a service which will be provided to all Interim NITS customers once the necessary grid \n11 \nupgrades have been completed. Enabling energization of new loads on an expedited basis \n12 \nthrough co-location supports national economic competitiveness and national security priorities \n13 \nfor artificial intelligence. The Interim NITS framework established by FERC was directed at \n14 \naddressing both the need for reliability (via eventual NITS) as well as energization of load on an \n15 \naccelerated basis while upgrades required to provide full NITS were built out. Allowing the co-\n16 \nlocated generation to provide resource adequacy benefits to its co-located load while avoiding \n17 \nunnecessary curtailments for transmission security events increases reliability for loads that elect \n18 \nto come online faster under Interim NITS. This speed to market advantage is particularly \n19 \nimportant if the load served by Interim NITS is co-located with new generation that is able to \n20 \nserve the load with lower (or no) net grid injections. In that case, the generation could be \n21 \ndeveloped more quickly with fewer delays in PJM’s generator interconnection process. Enabling \n22 \nthat use case would make the Interim NITS framework significantly more attractive for major \n23 \ncapital investments and help achieve FERC’s and DOE’s policy objectives. \n24"},{"page":49,"startToken":15795,"endToken":16195,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 15 of 25 \nV.C. \nThe Proposed Penalty for Failure to Curtail Is \n1 \nDisproportionate to the Impact and Should Distinguish \n2 \nTypes of Events \n3 \nPJM has proposed a strict liability rule for a customer taking NFCDS or Interim NITS that “fails \n4 \nto respond to established Load Shedding and Curtailment procedures.”13 Such a customer would \n5 \nbe disqualified from taking the service after a single failure to respond. For customers that have \n6 \nan equipment malfunction, i.e. a protection scheme not operating as intended, PJM proposes a \n7 \nsuspension of service for up to 120 days on the first failure, to analyze the operation of the \n8 \nprotection scheme.14 On the second failure, PJM proposes a disqualification of service.15 \n9 \nLoads taking Non-Firm CDS or Interim NITS do not have firm transmission service nor benefit \n10 \nfrom a resource adequacy obligation from PJM. These two attributes (transmission security and \n11 \nresource adequacy) have distinct functions and values, and PJM’s curtailment of loads has \n12 \ndifferent implications for resource inadequacy or transmission related events. Penalties for \n13 \nfailure to comply with these two types of curtailments are most effectively applied when they are \n14 \ncommensurate with the reliability and cost implications of that failure. Importantly, these \n15 \npenalties should be equivalent to the penalties paid by generators that cannot meet their capacity \n16 \nobligations, or that cause transmission reliability impacts due to their failure to comply with PJM \n17 \ndispatch orders.  \n18 \nGenerators and demand response resources with a capacity market obligation that fail to perform \n19 \nduring a resource adequacy event are assessed as a Non-Performance Charge during every \n20 \nPerformance Assessment Interval (PAI) in which they cannot perform as committed. This charge \n21 \nreflects the cost of the failure to perform during resource adequacy events. A similar or \n22 \nequivalent financial penalty would appropriately be applied for load under NFCDS or Interim \n23 \nNITS that fails to curtail for resource adequacy events. In contrast, the penalty proposed by PJM \n24 \n(permanently discontinuing non-firm transmission service and effectively shutting down the \n25 \ncustomer facility not for hours, but for many months or years) is many thousands of times more \n26 \n \n13  PJM Initial Brief pp. 41–42 \n14  PJM Initial Brief, pp. 43–45 \n15  PJM Initial Brief, pp. 45–46"},{"page":50,"startToken":16195,"endToken":16705,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 16 of 25 \ncostly than the system cost for resource adequacy failures implied by the PAI performance \n1 \npenalties imposed on generators. For example, the PAI penalty for a 1,000 MW failure to curtail \n2 \nfor one hour might be roughly $2-3 million based on PJM’s formula.16 PJM’s Interim NITS and \n3 \nNFCDS penalty proposal to shut down a load customer until transmission upgrades are \n4 \ncompleted would have a far higher cost. A 1,000 MW data center might provide a gross revenue \n5 \nof several billion dollars per year, much or most of it profit, in addition to contributing to \n6 \nnational priorities for deployment of artificial intelligence.17 Shutting it down for several years \n7 \nuntil firm NITS can be provided due to a failure to curtail its grid withdrawals to net zero during \n8 \na resource adequacy event likely represents a lost opportunity cost on the order of many billion \n9 \ndollars, or three orders of magnitude higher than the equivalent PAI penalty. PJM’s proposed \n10 \npenalty is therefore unnecessarily high, not commensurate with the system impact of the failure \n11 \nto curtail during resource adequacy events, and discriminatory relative to the treatment of PJM \n12 \ngenerators for non-performance during resource adequacy events. \n13 \nFailure to curtail for a transmission-security-related event could in principle result in severe, \n14 \npotentially catastrophic reliability problems. A more substantial penalty may therefore be \n15 \nappropriate to the scale of the risk. A similar circumstance holds for generators that fail to curtail \n16 \nwhen transmission system overloads are at risk. Because the consequence of continued \n17 \nwithdrawals (or, for generators, injections) can be so high, in the case of both load and generator \n18 \nfailures to curtail as instructed, transmission owners often retain the ability to manually \n19 \ndisconnect a facility if needed to avoid potential severe reliability risk. It therefore stands to \n20 \nreason that such overriding “forced curtailment” action would be available as a backstop in case \n21 \nof failed load curtailment to limit the extent of actual reliability impact. Therefore, the severe \n22 \npenalty proposed by PJM (discontinuing non-firm transmission service) is unnecessarily high for \n23 \ntransmission-related curtailment failure. It is also not commensurate with the penalty levied on \n24 \n \n16  PJM, Manual 18, Section 3A.6.2, Revision 65, effective December 17, 2025 specifies the PAI charge for an \ninterval = Performance Shortfall (MW)×Non-Performance Charge Rate. The Non-Performance Charge Rate is \nestimated based on Net CONE. \n17  CoreWeave, CoreWeave Reports Strong Fourth Quarter and Fiscal Year 2025 Results, February 26, 2026 \n(stating that the company “became the fastest cloud in history to reach $5 billion in annual revenue”); \nCoreWeave, Annual Report on Form 10-K for the year ended December 31, 2025 (filed February 26, 2026) \n(stating that, as of December 31, 2025, CoreWeave operated “43 data centers with over 850 MW of active \npower”). Scaling those figures proportionally implies approximately $5.9 billion of annual revenue per 1 GW of \nactive power."},{"page":51,"startToken":16705,"endToken":17128,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 17 of 25 \ngenerators that fail to curtail when ordered under similar circumstances (there appears to be no \n1 \nsuch systematic penalty on generators, although arguably there should be). \n2 \nV.D. \nPJM should study co-located resources independently but in \n3 \nthe presence of one another and consider load as \n4 \ndispatchable to maximize speed to power benefits \n5 \nV.D.1. \nPJM has not provided sufficient detail on study design \n6 \nfor co-located resources \n7 \nPJM has provided limited details in its filing on how studies for transmission service for loads \n8 \nco-located with supply resources will proceed. For example, in its section on Study Procedures \n9 \nfor load taking NFCDS, PJM says only that it will coordinate with the Transmission Owners to \n10 \nidentify appropriate studies.18 Similarly, for Interim NITS, PJM says that it will determine \n11 \nwhether additional studies beyond what is required to evaluate the Customer’s request for NITS \n12 \nare needed. \n13 \nThe design of studies for large load interconnection is the critical factor in determining the scale \n14 \nof upgrades required for energization of new large loads under all scenarios including co-located \n15 \nNITS, Interim NITS, NFCDS, and firm CDS. As explained in detail in a prior filing in the same \n16 \ndocket, it is important for study processes to capture both the co-located load and generation \n17 \n(rather than netting them against one another prior to implementing the components in the study \n18 \nmodel), but the study process for load must account for the presence of the generation \n19 \nresource(s) and vice versa.19 This ensures that co-located load and generation are both present in \n20 \n \n18  On p.33 of its Initial Brief PJM says “As discussed, PJM will not study transmission service requests alone, but \nrather will coordinate and consult with any affected Transmission Owners to determine whether and how the \nrequested transmission service may be provided. Thus, upon receipt of a request for Non-Firm Contract \nDemand Transmission Service, PJM will notify the affected Transmission Owner(s) of such request.108 PJM \nand the affected Transmission Owner(s) will determine whether additional studies are required ‘to assess \nwhether the Transmission System has sufficient available capacity to provide Non-Firm Contract Demand \nTransmission Service, and if so, which studies are appropriate.’” \n19  A. Levitt, J. Pfeifenberger, and A. Mohan, Accelerating the Integration of New Co-located Generation and \nLoads, prepared for Bloom Energy as part of Docket No. EL25-49-000, April 23, 2025."},{"page":52,"startToken":17128,"endToken":17582,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 18 of 25 \nthe study model, therefore offering the option to effectively self-supply and impose zero or de \n1 \nminimis impacts on the transmission system.  \n2 \nV.D.2. \nStudying co-located load and generation in the \n3 \npresence of each other achieves speed to power  \n4 \nFor example, take the case of a 500 MW load and a 500 MW co-located generator. If in the study \n5 \nmodel, the presence of the co-located generator is ignored (e.g., because it does not yet have an \n6 \nInterconnection Service Agreement), the 500 MW load is withdrawing from the system in the \n7 \nsteady state case, and the transmission service must be firm enough to support it, including after \n8 \nremoving any two components in the N-1-1 study cases. However, if both generation and load \n9 \nare present, the 500 MW generator can support the load, ensuring that net withdrawals from the \n10 \ntransmission system are effectively zero in the base case. We recognize that contingency analysis \n11 \nwould still require stress testing one component to be tripped offline while the other is online, as \n12 \nis the case with all elements on the transmission system. However, the addition of the new \n13 \ngeneration still reduces the need for system upgrades identified in the transmission network \n14 \nplanning studies, because only so many network facilities are removed from service in \n15 \ncontingency planning cases. Further, for cases that utilize a RAS, it would ensure that the co-\n16 \nlocated load never shows up on the transmission system if the generation unit were to trip offline \n17 \ndue to an unexpected outage, therefore further mitigating any impact of contingency events.20 \n18 \nSuch a study model would generally identify significantly lower upgrades relative to studies that \n19 \ndo not consider both generation and load in the presence of each other.  \n20 \n \n20  PJM Initial Brief, Attachment C (Affidavit of Matthew Wharton), at p.9. “There is one scenario where a RAS \nwould be overwhelmingly beneficial and would have a minimal impact on the overall grid. A RAS will be \nrequired for the loss of the Co-Located Generating Facility. In this instance, PJM would expect the RAS to \nactuate on the loss of the Co-Located Generating Facility and the load served by Non-Firm Contract Demand \nTransmission Service or Interim NITS will automatically be removed from the system by the RAS scheme. In \nother words, after the co-located generator is offline, only the NITS or Firm Contract Demand Transmission \nService will remain connected and served by PJM. At that point, PJM could evaluate if additional non-firm load \ncould be supported after the loss of generation occurs.”"},{"page":53,"startToken":17582,"endToken":18050,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 19 of 25 \nV.D.3. \nStudying load under NFCDS and Interim NITS as \n1 \ndispatchable will improve system accuracy  \n2 \nWhile studying and evaluating the load for NFCDS and Interim NITS, PJM’s models would \n3 \nneed to consider the load to be curtailable in order to reflect its non-firm nature. This is \n4 \ncomparable to the way in which generators are modeled as dispatchable. Dispatchable load will \n5 \nbe incorporated into real-time operations (for example using security constrained economic \n6 \ndispatch or SCED to curtail when needed for reliability), and modeling details are most accurate \n7 \nwhen they reflect these operational capabilities. The studies can identify operating limits for \n8 \nNFCDS and Interim NITS and provide customers with guidance on expected curtailment levels. \n9 \nThese can be updated on a periodic basis based on changes to the transmission system, consistent \n10 \nwith provisional interconnection service to generators. Just as provisional service can provide \n11 \ngenerators with a view on operating conditions under which it may be allowed to inject into the \n12 \nPJM grid, studies for NFCDS and Interim NITS can provide customers with a view on the \n13 \nconditions in which withdrawals would be permitted.  \n14 \nV.D.4. \nPJM should clarify that storage charging is studied \n15 \ndistinctly from load, and allow co-located load and \n16 \nenergy storage resources to nominate joint withdrawal \n17 \nlimits \n18 \nStorage charging in PJM does not take transmission service unless it charges during the zonal \n19 \npeak hour without being dispatched, in which case it is a Network Load taking NITS.21 Storage \n20 \ncharging is therefore not studied as a new NITS customer, but rather using its own distinctive \n21 \nstudy process that is incorporated into the interconnection queue.22 Because storage can be co-\n22 \nlocated generation, it will be helpful and possibly necessary for regulatory certainty for PJM to \n23 \n \n21  PJM Manual 28, Operating Agreement Accounting, Sections 22.1 and 22.2, Revision 104, effective March 1, \n2026, pp. 154-156 \n22  PJM, Manual 14B, Attachment C, Section C.3.1.3, Revision 58, effective December 17, 2025, p. 95. (“For each \nflowgate, group the Generation Capacity Resources based on whether the distribution factor is positive, in \nwhich case increases in the generator’s output contribute to the loading on the flowgate and the generator is \nconsidered a “Harmer” or negative, in which case increases in the generator’s output reduce the loading on \nthe flowgate and the generator is considered a “Helper”. Note that the light load test considers pumped storage \nunits in the pumping mode and batteries in both the discharging and charging mode and the appropriate mode \nto ramp will be based on whether the distribution factor is positive for that mode.”) ."},{"page":54,"startToken":18050,"endToken":18483,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 20 of 25 \nclarify that the treatment for studying storage charging at such a co-located facility is distinct \n1 \nfrom the studies for the load taking Interim NITS or Contract Demand Service. It will be \n2 \nsimilarly helpful or necessary to clarify that, even if a co-located facility has 0 MW of Firm CDS \n3 \nand has reserved 0 MW of Non-Firm CDS, a co-located storage component that has been granted \n4 \nan Interconnection Service Agreement recognizing its ability to withdraw from the grid for \n5 \ncharging may still do so as dispatched by PJM, consistent with a standalone storage facility. Any \n6 \nRAS at the facility would need to be developed with such use cases in mind, including \n7 \npotentially interrupting storage charging withdrawals prior to a PJM dispatch to reduce storage \n8 \ncharging under certain contingencies. \n9 \nFurther, the use case of co-located storage would feature enhanced efficiency and speed to power \n10 \nif PJM allows loads in such arrangements taking NFCDS or Interim NITS to nominate a joint \n11 \nwithdrawal limit. This would allow for maximum flexibility and innovation for the pair of \n12 \nresources which can decide how to use their joint withdrawal limits for serving load or charging \n13 \nstorage, or both, as appropriate. This joint limit would then be respected in the storage \n14 \nwithdrawal studies as well as in the load integration studies and NFCDS reservation evaluations. \n15 \nV.E. \nPJM can achieve implementation of all three services faster \n16 \nthan proposed \n17 \nV.E.1. \nTimeline for implementation of the new tariff services \n18 \ndoes not need to be fully linked to the capacity market  \n19 \nPJM cites capacity market timing in justifying its proposed implementation date of June 1, 2029. \n20 \nUnder two of the three transmission services, PJM appears to contemplate loads that do not buy \n21 \ncapacity from the market. This includes Interim NITS and NFCDS. Therefore, they cannot have \n22 \nan impact on the load forecast for use in the capacity market. New generators serving Interim \n23 \nNITS and NFCDS customers may choose to not offer capacity into the market but instead \n24 \ncontract for capacity directly with co-located load. In that case, the new load and new generation \n25 \nboth would result in no changes to the Base Residual Auction in the capacity market. If the new \n26 \nco-located generation sells capacity to the market, this would presumably be a helpful outcome \n27 \nin today’s environment that would be desirable as soon as possible. Therefore, PJM’s \n28"},{"page":55,"startToken":18483,"endToken":18887,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 21 of 25 \njustifications for delaying implementation until 2029 appear not to apply to co-location cases \n1 \nwith new generation. \n2 \nImpacts on the BRA could occur in the case of existing generators leaving the capacity market to \n3 \nprovide dedicated output to co-located loads. But these reconciliations would be necessary \n4 \nwhether PJM implemented the proposal sooner or later, making it unclear why PJM proposes to \n5 \nwait until June 1, 2029 to implement the proposal. Any such impacts would need to be and can \n6 \nbe reconciled in incremental auctions regardless of the implementation date. \n7 \nIf PJM’s concern regarding a capacity market shock that cannot be covered through an \n8 \nincremental auction is focused on existing co-located generation withdrawing from the capacity \n9 \nmarket, it should delay only that use case, while accelerating other use cases (i.e., co-location \n10 \nwith new generation facilities). We observe that accelerating new generation and co-located load \n11 \noptions eases concerns with reliability and affordability or at least reduces burden on PJM’s \n12 \nother efforts to address those concerns, and should be implemented as quickly as possible. \n13 \nV.E.2. \nPJM can build on existing SCED capabilities for Price \n14 \nResponsive Demand to achieve a faster timeline \n15 \nWe are encouraged that PJM expects to modify Intermediate and Real-Time SCED tools for \n16 \noperationalizing the three new transmission services. This important function warrants deliberate \n17 \nand careful design and thorough testing, which will take time. However, PJM can build on the \n18 \nexisting capability of its nodal Price Responsive Demand (PRD) implementation in SCED for \n19 \ntransmission-driven curtailments when needed for local exigencies such as avoiding post-\n20 \ncontingency transmission overloads or cascading failures. Because PRD is nodal, real-time, and \n21 \nuses SCED’s real-time capabilities via Contingency Analysis and the other parts of the Energy \n22 \nManagement System, it can provide the functionality needed for executing needed reliability \n23 \ncurtailments for the non-firm transmission services in order to maintain transmission security as \n24 \nconditions change in real-time. Since PRD has already been developed and tested, and has been \n25 \ndeployed in operations for several years, PJM could implement this particularly challenging \n26 \naspect of the non-firm transmission services in less time. Southwest Power Pool’s recent \n27 \nproposal to implement non-firm transmission service for load (CHILLS) by July 1, 2026 offers \n28"},{"page":56,"startToken":18887,"endToken":19230,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 22 of 25 \nfurther evidence that such changes to dispatch can be implemented faster than envisaged by \n1 \nPJM.23 \n2 \nV.F. \nPJM Could Rely on Remedial Action Schemes (RAS) More \n3 \nExtensively  \n4 \nA Remedial Action Scheme (RAS) allows grid operators to ensure reliable system security while \n5 \nutilizing the capability of transmission lines more fully. A RAS monitors for certain failures and \n6 \nresponds immediately with a remedial change to ensure the failure does not cause problems. \n7 \nRASs must be carefully designed to avoid introducing unmanaged complexities and are not \n8 \nappropriate in all circumstances. \n9 \nMr. Wharton in his affidavit states that  \n10 \nA RAS should not be installed as a substitute for good system design or operating \n11 \npractices. PJM Manuals reflect this caution of relying on such schemes on a permanent \n12 \nbasis. The implementation of a RAS is generally limited to temporary conditions \n13 \ninvolving the outage of critical equipment.24  \n14 \nWe were not able to identify a North American Electric Reliability Corporation (NERC) \n15 \nrequirement or guideline that RAS be limited to temporary conditions related to outages. We \n16 \nobserve that other grid operators utilize RAS as an alternative to new transmission, rather than as \n17 \na temporary solution. For example, the California Independent System Operator (CAISO) states \n18 \nthat:  \n19 \nThe primary reasons why RAS might be selected over building new transmission \n20 \nfacilities are that RAS can normally be implemented much more quickly and at a much \n21 \nlower cost than constructing new infrastructure. In addition, RAS can increase the \n22 \nutilization of the existing transmission facilities, make better use of scarce transmission \n23 \nresources and maintain system reliability. Due to these advantages, use of a RAS is a \n24 \ncommonly considered alternative to building new infrastructure in an effort to keep costs \n25 \n \n23  SPP, Filing, Docket No. ER26-1323-000, at 1-2 (filed Feb. 10, 2026). \n24  PJM Initial Brief, Attachment C (Affidavit of Matthew Wharton), p.6."},{"page":57,"startToken":19230,"endToken":19759,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 23 of 25 \ndown when integrating new generation into the grid and/or addressing reliability \n1 \nconcerns under multiple contingency conditions.25  \n2 \nCAISO acknowledges the potential complexity of RASs and reliability concerns if not properly \n3 \nmanaged and therefore has issued a RAS Planning Standard guideline to ensure their reliable \n4 \nutilization.26 CAISO states that:  \n5 \nThese reliability concerns necessarily dictate that guidelines and standards be established \n6 \nto ensure that performance of all RASs are consistent across the ISO controlled grid. It is \n7 \nthe intent of these guidelines and standards to allow the use of RASs to maximize the \n8 \ncapability of existing transmission facilities while maintaining system reliability and \n9 \noptimizing operability of the ISO controlled grid. Needless to say, with the large number \n10 \nof generator interconnections that are occurring on the ISO controlled grid, the need for \n11 \nthese guidelines and standards has become more critical.27  \n12 \nWe observe that other grid operators also have extensive standalone RAS planning guides, but \n13 \nPJM does not.28 If PJM utilized RAS more extensively, putting into place the necessary protocols \n14 \nto ensure reliable development and operations, it could more effectively accomplish speed to \n15 \npower for large loads in appropriate areas while lowering the cost of new transmission.  \n16 \nMore extensive use of RAS would require administrative and engineering effort by PJM to \n17 \nensure RAS are properly designed and only deployed where appropriate. Mr. Wharton states \n18 \nthat, given that PJM has areas in which it is a tightly coupled network, “…having multiple RASs \n19 \nwithin a single area increases the likelihood of a misoperation.”29 Avoiding multiple RASs in a \n20 \nsingle area does not preclude use of RAS as a permanent solution across appropriate parts of the \n21 \n \n25  California ISO, California ISO Planning Standards, effective February 2, 2023. \n26  California ISO cites the following potential reliability considerations associated with RAS: “With the increased \ntransmission system utilization that comes with application of RAS, there can be increased exposure to not \nmeeting system performance criteria if the RAS fails or inadvertently operates. Transmission outages can \nbecome more difficult to schedule due to increased flows across a larger portion of the year; and/or the system \ncan become more difficult to operate because of the independent nature of the RAS. If there are a large number \nof RAS, it may become difficult to assess the interdependency of these various schemes on system reliability. In \naddition, as RAS has become progressively increasing in complexity, it is necessary to consider the level of \nlogic complexity through combining multiple features that were acceptable individually but that could \ncompound to a level that cannot be integrated into market operation.”  California ISO, California ISO Planning \nStandards, effective February 2, 2023, p. 11. \n27  California ISO, California ISO Planning Standards, effective February 2, 2023, p. 11. \n28  AEMO, Remedial Action Scheme Guidelines; Western Electricity Coordinating Council (WECC) Relay Work \nGroup, Remedial Action Scheme Review Subcommittee, Remedial Action Scheme Design Guide, July 2022. \n29  PJM Initial Brief, Attachment C (Affidavit of Matthew Wharton), p.7."},{"page":58,"startToken":19759,"endToken":19996,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 24 of 25 \nPJM footprint (much of which is less dense than the Northern Virginia example that Mr. \n1 \nWharton cites). PJM could implement this principle in a RAS guideline, similar to CAISO’s \n2 \nguideline that “[o]verlapping RAS (i.e., two different RAS monitoring one or more of the same \n3 \nelements or contingencies) is not allowed.”30 Further, a given RAS can only monitor a limited \n4 \nnumber of conditions (e.g., contingencies on specified elements). As Mr. Wharton points out, \n5 \n“Since the PJM network is tightly coupled with multiple transmission lines, the RAS or multiple \n6 \nRASs will need to monitor and activate for a multitude of conditions. Typically, a RAS monitors \n7 \none specific condition and is armed to respond to one condition.” PJM could implement such a \n8 \nlimit in a RAS standard, similar to CAISO’s provision that “There should be no more than 6 \n9 \ncontingencies (P1–P7) that would trigger the operation of a RAS” and “The RAS should not be \n10 \nmonitoring more than 4 system elements or variables.”31 (We note that CAISO appears to allow \n11 \nbroader monitoring than Mr. Wharton suggests is typical in PJM).  \n \n12 \n \n30  California ISO, California ISO Planning Standards, effective February 2, 2023, p. 13. \n31  California ISO, California ISO Planning Standards, effective February 2, 2023, p. 12."},{"page":59,"startToken":19996,"endToken":20102,"text":"Affidavit of Andrew Levitt and Aniruddh Mohan \nDocket No. EL25-49-000 et al. | Page 25 of 25 \nAffidavit of Andrew Levitt  \n \nI, Andrew Levitt, do hereby swear that I have co-authored the Affidavit of Andrew Levitt \nand Aniruddh Mohan and the statements contained therein are true and accurate to the best of my \nknowledge and belief.  \nAndrew Levitt  \n \n \nDate: March 25, 2026 \nAffidavit of Aniruddh Mohan \n \nI, Aniruddh Mohan, do hereby swear that I have co-authored the Affidavit of Andrew \nLevitt and Aniruddh Mohan and the statements contained therein are true and accurate to the best \nof my knowledge and belief.  \nAniruddh Mohan \n \n \nDate: March 25, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":4,"endAt":3,"startToken":0,"endToken":804},{"p":4,"at":3,"title":"I. JOINT CO-LOCATION DEVELOPERS’ INTEREST IN THE PROCEEDING","method":"printed heading","endPage":6,"endAt":1262,"startToken":804,"endToken":1512},{"p":6,"at":1262,"title":"II. ARGUMENT","method":"printed heading","endPage":6,"endAt":1277,"startToken":1512,"endToken":1514},{"p":6,"at":1277,"title":"A. The Co-Location Order requires that Non-Firm CDS be available as needed","method":"printed heading","endPage":13,"endAt":1155,"startToken":1514,"endToken":3830},{"p":13,"at":1155,"title":"B. PJM should clarify that its transmission service requirements for energy","method":"printed heading","endPage":17,"endAt":169,"startToken":3830,"endToken":5183},{"p":17,"at":169,"title":"C. PJM’s tariff should clarify when and how Non-Firm CDS and Interim NITS","method":"printed heading","endPage":18,"endAt":4,"startToken":5183,"endToken":5468},{"p":18,"at":4,"title":"D. PJM’s tariff should clarify that a Co-Located Load receiving Interim NITS","method":"printed heading","endPage":20,"endAt":4,"startToken":5468,"endToken":6081},{"p":20,"at":4,"title":"E. PJM TOs have not justified charging the same rate for Non-Firm CDS and","method":"printed heading","endPage":23,"endAt":141,"startToken":6081,"endToken":7102},{"p":23,"at":141,"title":"F. PJM’s proposed penalty provisions are unjust and unreasonable.","method":"printed heading","endPage":27,"endAt":1078,"startToken":7102,"endToken":8585},{"p":27,"at":1078,"title":"G. PJM’s proposed effective date of June 2029 is unjust and unreasonable.","method":"printed heading","endPage":30,"endAt":1457,"startToken":8585,"endToken":9719},{"p":30,"at":1457,"title":"III. CONCLUSION","method":"printed heading","endPage":33,"endAt":4,"startToken":9719,"endToken":10048},{"p":33,"at":4,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":34,"endAt":0,"startToken":10048,"endToken":10109},{"p":34,"at":0,"title":"Attachment A","method":"printed heading","endPage":36,"endAt":93,"startToken":10109,"endToken":10180},{"p":36,"at":93,"title":"I. QUALIFICATIONS","method":"printed heading","endPage":36,"endAt":2600,"startToken":10180,"endToken":10562},{"p":36,"at":2600,"title":"A. Mohan, Accelerating the Integration of New Co-located Generation and Loads, prepared for Bloom Energy","method":"printed heading","endPage":37,"endAt":93,"startToken":10562,"endToken":10602},{"p":37,"at":93,"title":"II. ASSIGNMENT","method":"printed heading","endPage":37,"endAt":769,"startToken":10602,"endToken":10698},{"p":37,"at":769,"title":"III. BACKGROUND","method":"printed heading","endPage":38,"endAt":93,"startToken":10698,"endToken":10974},{"p":38,"at":93,"title":"IV. SUMMARY","method":"printed heading","endPage":39,"endAt":1190,"startToken":10974,"endToken":11513},{"p":39,"at":1190,"title":"V. ASSESSMENT OF THE PJM PROPOSAL AND POTENTIAL ENHANCEMENTS","method":"printed heading","endPage":41,"endAt":2926,"startToken":11513,"endToken":12700},{"p":41,"at":2926,"title":"A. Levitt, J. Pfeifenberger, and A. Mohan, Accelerating the Integration of New Co-located Generation and","method":"printed heading","endPage":59,"endAt":661,"startToken":12700,"endToken":20102}]}