{"document":{"slug":"rec-20260325-5239","title":"Response Brief of Vistra Corp","issued":"2026-03-25","accession":"20260325-5239","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Vistra Corp.","kind":"brief","file":"sources/filings/text/20260325-5239_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5239","tier":"record","sha256":"f6b6acdefdb13854d96808bf9ee044379d5b3dbab0120a6e9faa4ba723cbd0e7","pages":56,"tokens":17925,"emptyPages":[],"textThemes":["flex","study","colo","cost"]},"pages":[{"page":1,"startToken":0,"endToken":167,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated\nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC\nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, \nInc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, \nInc. \nAEP Indiana Michigan Transmission \nCompany, Inc. AEP Kentucky Transmission \nCompany, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, \nInc. Appalachian Power Company \nIndiana Michigan Power Company\n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n)\nDocket Nos. EL25-49-000 \nEL25-49-001"},{"page":2,"startToken":167,"endToken":350,"text":"-2- \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public \nUtilities, Division of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic \nIndiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company\nLarge Loads Co-Located at Generating \nFacilities  \nConstellation Energy Generation, LLC \nv.  \nPJM Interconnection, L.L.C. \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \nAD24-11-000 \nEL25-20-000 \n(Consolidated)\nRESPONSE BRIEF OF VISTRA CORP. \nVistra Corp. (“Vistra”) hereby submits this Response Brief pursuant to the Federal Energy \nRegulatory Commission’s (“Commission”) December 18, 2025 Order in Docket No. EL25-49 et \nal. (“Order on Show Cause Proceeding” or “Order”),1 and its Notice of Extension of Time,2 in the \n1 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (“Order on Show Cause Proceeding”). \n2 PJM Interconnection, L.L.C., Notice of Extension of Time, Docket Nos. EL25-49, et al. (Jan. 23, 2026) \n(extending deadlines for response briefs to March 25, 2026)."},{"page":3,"startToken":350,"endToken":842,"text":"-3- \nabove-captioned dockets.  The Commission’s landmark Order articulated a vision for providing \nservice to large loads that are co-located with generation resources in the PJM Interconnection, \nL.L.C. (“PJM”) region in order to fulfill customers’ “right to receive electric service on a timely \nbasis” while ensuring that service is “reliable and affordable for all customers.”3  To do that, the \nCommission required a replacement rate that ensures that large loads are “able to take transmission \nservices that reflect their actual impact on the transmission system.”4  Critically, the Commission \ndirected PJM to create new transmission services to facilitate the expeditious development and \ninterconnection of new loads co-located with generation resources in PJM.5  Such co-location will \nbe critical to powering the next generation of digital infrastructure necessary to develop and \nmaintain the artificial intelligence (“AI”) capability that is increasingly central to our national \nsecurity. \nBut as is often the case, the devil is in the details.  While the Commission set forth the \noverarching framework for the new services, the actual rates, terms, and conditions will be \ndeveloped in this paper hearing.  Those details will determine whether or not these new services \naccomplish the goals the Commission articulated.  Unfortunately, the details proposed by PJM and \n3 See Order on Show Cause Proceeding, 193 FERC ¶ 61,217 (Rosner, Comm’r, concurring at P 3). \n4 Id. P 162. \n5 See, e.g., FERC, Transcript: December 18, 2025 Open Meeting, at 16:11-16 (Dec. 18, 2025), \nhttps://ferc.gov/media/transcript-december-18-2025-open-meeting (Remarks of Comm’r Rosner) (“[C]reating \noptions that only require PJM to plan for the firm service that the large load customers actually want . . . helps get the \nco-located load and generator online faster.”); id. at 18:17-21 (explaining that Interim NITS “leverages speed in the \nnear term and unlocks the benefits of a full grid connection in the long term,” providing “increased speed to connect” \nin exchange for curtailment risk); id. at 24:21-25:16 (Remarks of Comm’r See) (“Co-located arrangements can be an \nimportant mechanism for faster interconnection to the system and have the potential for fewer network upgrade needs \nthan a front-of-the-meter option.  In short, when done right co-location can be both a consumer forward tool and a \ncritical avenue in [meeting] our national imperative of speed to power and winning the AI race . . . . [O]ne of my key \nprinciples as I’ve worked through this order with my colleagues over the past months has been bringing to bear as \nmuch flexibility as responsibly possible to harness the speed and value adds that various co-located configurations \ncan provide.”); id. at 26:4-7 (“FERC is meeting the urgent demand for speed to power by creating flexibility for a \nrapidly evolving industry without sacrificing reliability and affordability.”); id. 28:3-5 (“[T]oday is an important \nmarker propelling us as we provide predictability, stability, and speed to meet this generational moment.”); id. at \n33:20-21 (Remarks of Comm’r LaCerte) (“[T]he status quo has become untenable.”)."},{"page":4,"startToken":842,"endToken":1128,"text":"-4- \nthe PJM Transmission Owners are directly counter to those goals.  The proposal from PJM and \nthe Transmission Owners consists of long delays, unreasonable rates, and undue discrimination.  \nTo adopt a replacement rate that is just, reasonable, and not unduly discriminatory, and to ensure \nthat the new transmission services actually meet the needs they were created to fulfill, the \nCommission must direct PJM and the Transmission Owners to remedy various flaws in the \nproposal.  As discussed further below, although there are numerous flaws in PJM and the \nTransmission Owners’ proposal, they can be grouped into three categories. \nFirst, PJM proposes to delay the effectiveness of the new transmission services until June \n1, 2029.  Under that proposal, customers may have to wait until June 1, 2029 to even submit study \nrequests associated with the new transmission services.  In effect, that proposal creates a three- to \nfive-year moratorium on the co-location of new large loads and generation in PJM—quite the \nopposite of “break[ing] the logjam.”6\nSecond, the proposed rates, terms, and conditions for Non-Firm Contract Demand \nTransmission Service are both unreasonable and unduly discriminatory.  While the Commission \ncompared Non-Firm Contract Demand Transmission Service to Non-Firm Point-to-Point \nTransmission Service,7 PJM and the Transmission Owners propose to make Non-Firm Contract \nDemand Transmission Service both more expensive and less available than its point-to-point \ncounterpart.   \nThird, the proposal reserves unfettered discretion for PJM and the Transmission Owners in \nthe study process.  The proposal appears to allow PJM and the Transmission Owners to determine, \nfor each transmission service request, whether studies are required, which studies to conduct, the \n6 Order on Show Cause Proceeding, 193 FERC ¶ 61,217 (Rosner, Comm’r, concurring at P 4).  \n7 See id. P 215."},{"page":5,"startToken":1128,"endToken":1487,"text":"-5- \ntimeline for doing so, and how to prioritize different requests.  That level of discretion creates \ntextbook opportunities for the type of undue discrimination that the Order was intended to prevent.   \nThe Commission must direct PJM and the Transmission Owners to address each of these \nitems on further compliance to render the PJM Tariff just, reasonable, and not unduly \ndiscriminatory.  The Commission can do so through the below targeted adjustments to PJM and \nthe Transmission Owners’ proposal.  In directing further compliance, Vistra urges the Commission \nto provide as specific and detailed guidance as possible, in addition to setting tight compliance \ndeadlines, to achieve the Commission’s laudable goal of providing the clarity needed to promote \nthe expeditious interconnection of large loads.  \n\nFacilitate speed to power by requiring PJM to implement the new transmission services sooner, \nwith a transition process that reflects the services that can be provided most quickly and \nrespects ongoing or completed necessary studies. \n\nEnsure that the rate structure for Non-Firm Contract Demand Transmission Service is tailored \nto the benefits that the customer draws from the grid and does not create cost shifts.    \no\nThe rates for Non-Firm Contract Demand Transmission Service should recognize that \ncustomers may use the service differently, i.e., some customers may never reserve \ntransmission service, some may reserve a de minimis amount, and some may reserve \nsignificant amounts.  Those customers do not rely on the grid to the same extent and \nshould not be subject to the same grid reliance charge.   \n\nEliminate unfettered discretion in the proposed study process by ensuring that the Tariff clearly \ndefines the studies that must occur and the timeline and order in which those studies will occur.    \n\nRemove unreasonable and unduly discriminatory restrictions on the use of special protective \nschemes and remedial action schemes.  Any restrictions must comply with comparability \nprinciples and be governed by clear and objective standards to prevent undue discrimination. \nI.\nThe Proposed June 1, 2029 Effective Date is Unjust and Unreasonable and Fails to \nProvide Speed to Power \nThis entire proceeding exists because co-located loads need to access the transmission \nsystem quickly in order to satisfy the nation’s time-sensitive demand for the computing and"},{"page":6,"startToken":1487,"endToken":1996,"text":"-6- \nmanufacturing capability necessary to win the global race for AI dominance.8  As Commissioner \nRosner put it, “a business-as-usual approach to load growth . . . will not suffice to timely meet \ngrowing demand while also keeping prices reasonable.”9  Indeed, the new transmission services \ncreated in this proceeding were created specifically “to facilitate more rapid interconnection and \noperation of Co-Located Loads[.]”10\nPJM nevertheless proposes to delay the implementation of the new transmission services \nuntil June 1, 2029—nearly four years after the Commission’s directive to take action.11  And \ncustomers may not even be able to submit study requests until the tariff provisions governing those \napplications are effective.  A June 1, 2029 effective date means, then, that co-located loads will \nnot begin to receive service in PJM until 2030 at the earliest—and potentially even later, depending \non the length of PJM’s studies and the scope of required network upgrades. \n8\nSee, e.g., FERC, Transcript: December 18, 2025 Open Meeting, at 6:13-22 (Dec. 18, 2025), \nhttps://ferc.gov/media/transcript-december-18-2025-open-meeting (Remarks by Chairman Swett) (“[T]oday FERC is \npushing our country forward in the artificial intelligence and manufacturing revolution.  While uncertainty is abounded \nacross our country on how we will facilitate data centers, this morning, my colleagues and I are taking a critical step \nto give investors and consumers more certainty on how FERC believes we can solve the problem of meeting historical \nsurging demand and realize our greatest potential as a country also while safeguarding the prices that we pay for \nelectricity.”); id. at 24:16-25:2 (Remarks by Comm’r See) (“As a nation and an industry, we are grappling with \nunprecedented demand growth.  Today the Commission votes to help assist co-located arrangements quickly and \nflexibly interconnect to meet some of that demand in PJM.  Co-located arrangements can be an important mechanism \nfor faster interconnection to the system and have the potential for fewer network upgrade needs than a front-of-the-\nmeter option.  In short, when done right, co-location can be both a consumer forward tool and a critical avenue in \n[meeting] our national imperative of speed to power and winning the AI race.”);  Order on Show Cause Proceeding, \n193 FERC ¶ 61,217 at P 200 (“Co-Located Loads are concerned with the speed to interconnect to the PJM transmission \nsystem and begin operation.”); id. PP 145-146 (summarizing comments highlighting the importance of data centers \nand AI to national security and the urgent need for clarity and asking the Commission to act quickly); id. (Rosner, \nComm’r, concurring at P 11) (discussing how the new interim transmission service provides speed to power).  \n9 Order on Show Cause Proceeding, 193 FERC ¶ 61,217 (Rosner, Comm’r, concurring at P 3). \n10 Id. P 200; id. PP 200-201 (explaining that Interim NITS would address delays in obtaining service and allow \nEligible Customers to obtain service more quickly in exchange for their willingness to curtail). \n11 PJM Interconnection, L.L.C., Initial Brief of PJM Interconnection, L.L.C., Docket Nos. EL25-49-000, et al., \nat 79 (filed Feb. 23, 2026) (“PJM Initial Brief”)."},{"page":7,"startToken":1996,"endToken":2523,"text":"-7- \nPJM has not shown that its four-year delay is just and reasonable.12  Nor can it.  PJM \npresents two arguments in support of its four-year delay:  (1) the need to procure capacity to serve \nnew load through the three-year forward schedule of the capacity market, and (2) the need for \nsoftware updates to PJM’s market and operations systems to permit the curtailment of Non-Firm \nContract Demand Transmission Service and Interim Network Integration Transmission Service \n(“NITS”) when needed.13  Neither bears scrutiny. \nA. Capacity Market  \nPJM’s capacity market schedule does not justify delaying the provision of new \ntransmission services.  As a threshold matter, resource adequacy considerations are simply outside \nthe scope of a transmission provider’s obligation to serve:  the Commission requires transmission \nproviders to make transmission service decisions based on available transfer capacity.14  Moreover, \ntwo out of the three new transmission services are non-firm.  PJM does not need to procure capacity \n12 Commission regulations and policy must enable timely data center development, which is critical to our \neconomy and our national security.  As President Trump recently observed, the United States is competing with China \nand other nations in a “race to achieve global dominance in artificial intelligence,” which will bring with it the ability \nto “set global AI standards and reap broad economic and military benefits.” Executive Office of the President, Winning \nthe \nRace: \nAmerica’s \nAI \nAction \nPlan, \nat \n1 \n(July \n2025), \nhttps://www.whitehouse.gov/wp-\ncontent/uploads/2025/07/Americas-AI-Action-Plan.pdf.  In that race, “every delay is a dollar lost . . . [w]e need to \nbreak ground faster . . . to build at the speed of national need.” President’s Budget Request for the U.S. Dep’t of Energy \nfor Fiscal Year 2026: Hearing Before the S. Comm. on Energy & Nat. Res., 119th Cong. 5 (2025) (statement of \nChristopher Wright, Secretary, U.S. Dep’t of Energy), https://www.energy.senate.gov/services/files/35D195A3-\n946E-46D0-A5E7-84C06F46B9A4.  See also Sw. Power Pool, Inc., 192 FERC ¶ 61,131 (2025) (Rosner, Comm’r, \nconcurring at P 3) (“It is critically important that grid operators continually look for ways to refine the efficiency and \nspeed with which new generation can connect to the grid, especially as our country faces growing power needs to win \nthe global AI race, re-shore manufacturing, and keep electricity affordable for everyday consumers.” (emphasis \nadded)); Press Release, Dep’t of Energy, Energy Department Announces $1.9B Investment in Critical Grid \nInfrastructure to Reduce Electricity Costs (Mar. 12, 2026), https://www.energy.gov/articles/energy-department-\nannounces-19b-investment-critical-grid-infrastructure-reduce-electricity (emphasizing the need to “accelerate \nurgently needed upgrades to the nation’s power grid”).  \n13 PJM Initial Brief at 79. \n14 See Preventing Undue Discrimination & Preference in Transmission Serv., Order No. 890, 118 FERC ¶ 61,119, \nat P 2, order on reh'g, Order No. 890-A, 121 FERC ¶ 61,297 (2007), order on reh'g, Order No. 890-B, 123 FERC ¶ \n61,299 (2008), order on reh'g, Order No. 890-C, 126 FERC ¶ 61,228, order on clarification, Order No. 890-D, 129 \nFERC ¶ 61,126 (2009); Implementation of Dynamic Line Ratings, Advance Notice of Proposed Rulemaking, 187 \nFERC ¶ 61,201, at P 40 (2024); FERC, Pro Forma Open Access Transmission Tariff, §§ 14.2, 15.4, 18.4 (rev. Dec. \n16, 2021)."},{"page":8,"startToken":2523,"endToken":3007,"text":"-8- \nto meet demand from customers that take Non-Firm Contract Demand Transmission Service and \nInterim NITS (before it is converted to regular NITS).15  The capacity market schedule cannot be \na reason to delay the implementation of services that are not capacity-backed. \nThe capacity market schedule is not a reason to delay the implementation of Firm Contract \nDemand Transmission Service either.16  PJM argues that it must ensure that it procures enough \ncapacity to meet demand, and that the 2029/2030 Base Residual Auction (“BRA”) is the first \nauction in which it can do so because the 2027/2028 BRA has already occurred, and the parameters \nare already set for the 2028/2029 BRA.17  But that argument assumes that the loads that will take \nFirm Contract Demand Transmission Service were not already included in the load forecast for \nthe 2027/2028 and 2028/2029 BRAs.  That assumption is false. \nTo the contrary, the new large loads that could come online between now and June 2029 \nwere already included in the load forecasts used for the 2027/2028 BRA and the 2028/2029 BRA.18\nBy definition, PJM’s load forecast is just that:  a forecast of a future demand.  That forecast \n15 Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at P 218 (“[U]nlike Network Load, Co-Located Loads \non whose behalf Eligible Customers are taking Non-Firm Contract Demand transmission service would not be \nconsidered for resource adequacy planning purposes.”). \n16 Further undermining the justification for this delay is that fact that the PJM Board of Managers has committed \nto developing a connect-and-manage framework whereby, if a shortfall exists between forecasted load additions and \nnew incremental generation, that load growth would be subject to curtailment until additional resources are deployed \non the system.  See PJM, Board Decisional Letter on Critical Issue Fast Path - Large Load Additions, at 4-5 (Jan. 16, \n2026), \nhttps://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-disclosures/2026/20260116-pjm-\nboard-letter-re-results-of-the-cifp-process-large-load-additions.pdf.  \n17 PJM Initial Brief at 80. \n18 PJM has been closely monitoring and planning for large load growth for several years.  See 2023 Long-Term \nLoad Forecast Predicts Growth Fueled by \nData Centers, PJM Inside Lines (Jan. 23, 2023), \nhttps://insidelines.pjm.com/2023-long-term-load-forecast-predicts-growth-fueled-by-data-centers/ (explaining that \nthe 2023 load forecast showed increasing energy demand driven by data centers in Virginia and Maryland); Ethan \nHowland, Data centers were 40% of PJM capacity costs in last auction: market monitor, Utility Dive (Jan. 7, \n2026), https://www.utilitydive.com/news/data-centers-pjm-capacity-auction/808951/ (explaining that in PJM’s last \nthree capacity auctions, data center-driven costs constituted 45 percent of total cleared capacity); PJM Interconnection, \nL.L.C., 188 FERC ¶ 61,200, at P 5 (2024) (describing that in PJM’s proposal to revise its Reliability Assurance \nAgreement to better allocate localized load adjustments, it noted that its proposal was “spurred by the recent \nproliferation of data centers that are contributing to large additions of forecasted load”)."},{"page":9,"startToken":3007,"endToken":3483,"text":"-9- \nincludes an adjustment that specifically accounts for new large loads like data centers.19  Indeed, \nthe load forecast that was released in 2025 and used for the 2027/2028 auction included \napproximately 18 GW of new large loads in 2027 and 23 GW of new large loads in 2028.20  That \nforecast appeared to have been over-inclusive of new large loads such that PJM applied more \nconservative assumptions in the next load forecast.21  As a result, the forecast that was released in \n2026 and will be used in the 2028/2029 BRA includes approximately 21 GW of new large loads \nin 2028 and 27 GW of new large loads in 2029.22  And given the new transmission services created \nin this proceeding, it is likely that some of the large loads included in the forecasts used in the \n2027/2028 and 2028/2029 BRA may choose to take non-firm service, for which capacity is not \nrequired.  Therefore, those forecasts necessarily must include the new loads that may come online \nbefore 2029 and take firm service.    \n PJM also argues that it does not expect any customers to take the new transmission services \nbefore June 1, 2029 because of the time it takes to de-list an existing generator from the capacity \n19 PJM Manual 19: Load Forecasting & Analysis, Rev. 38 (eff. Dec. 17, 2025), attach. B. \n20 More precisely, the load adjustments in the 2025 forecast totaled 17,721 MW for 2027 and 23,418 MW for \n2028.  PJM, Load Forecast Development Process, Forecast & Reports, Long-Term Load Forecast, Previous Reports \n(Jan. 14, 2026), https://www.pjm.com/-/media/DotCom/planning/res-adeq/load-forecast/previous-load-forecast-\nreports.zip (zip file containing 2025 load report tables with 2025 load adjustment figures at tab B-9b). \n21 In the 2026 forecast, PJM revised the load adjustment figures for 2027 and 2028 down to 15,856 MW and \n21,280 MW, respectively.  PJM, Load Forecast Development Process, Forecast & Reports, Long-Term Load Forecast \nTables, at B-9b (Feb. 6, 2026), https://www.pjm.com/-/media/DotCom/planning/res-adeq/load-forecast/2026-load-\nreport-tables.xlsx (“2026 Load Forecast Table”); see also PJM, 2026 PJM Load  Forecast Report, at 4 (Jan. 14, 2026), \nhttps://www.pjm.com/-/media/DotCom/library/reports-notices/load-forecast/2026-load-report.pdf \n(“2026 \nLoad \nForecast Report”) (explaining that the changes to large load adjustment request brought down the near-term forecast \ncompared to the forecast published in 2025); PJM, Load Adjustment Request Implementation, at 3-5 (July 1, \n2025), https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/postings/load-adjustment-\nrequest-implementation.pdf (explaining PJM’s approach to implementing the large load adjustment). \n22 The load adjustments in the 2026 forecast totaled 21,280 MW for 2028 and 27,361 MW for 2029.  2026 Load \nForecast Table at B-9b; see also 2026 Load Forecast Report at 5 (explaining load adjustments for 2026 are primarily \nattributable to growth in data center load)."},{"page":10,"startToken":3483,"endToken":3860,"text":"-10- \nmarket.23  There are multiple flaws with that rationale.  First, there may be some generators that \nseek to serve co-located load that are not currently capacity resources.  Second, there may be other \ngenerators that seek to serve co-located load that are already in the process of de-listing.  Third, \nexisting capacity resources that have not started the process to de-list still have the option to enter \ninto a bilateral agreement with another generator to cover their capacity obligations.24  Finally, \nexisting capacity resources can also buy out of their capacity positions in intervening Incremental \nAuctions if necessary.25\nAt bottom, the three-year forward capacity market schedule is no excuse to delay the \nintegration of co-located loads by several years when all of the load that could otherwise \ninterconnect during that time is either not capacity-backed or already included in the capacity \nmarket forecast.   \nB. Software and System Changes \nSeparate from its capacity market argument, PJM asserts that delaying its reforms to mid-\n2029 is necessary because it needs to implement software changes that depend on vendor \navailability, speed of design, costs, managing competing priorities, and the resolution of rates, \nterms, and conditions for the new services.26  PJM also notes that “automation will be necessary” \nto avoid “non-optimal, untimely, and inefficient outcomes” in implementing the curtailable Interim \n23 PJM Initial Brief at 82.  PJM also points to the inability of new generation to come online within the next three \nyears.  Id.  But at the same time, PJM just filed an Expedited Interconnection Track proposal that requires generators \nto interconnect within three years.  See PJM, Open Access Transmission Tariff, pt. X, subpt. A, § 601(C)(3) (0.0.0) \n(proposed tariff provisions establishing Expedited Interconnection Track, pending in Docket No. ER26-1563) (“PJM \nTariff”). \n24 PJM Tariff, attach. DD.4 (8.1.0), § 4.6(a) (Bilateral Capacity Transactions). \n25 PJM asserts that this pathway would be “inappropriate” because “Incremental Auctions are conducted to allow \nfor replacement resource procurement . . . [.]”  PJM Initial Brief at 80 (emphasis in original) (citing PJM Initial Brief, \nAttach. D, Affidavit of Timothy Horger, Senior Director, Forward Market Operations, at ¶ 15 (“Horger Affidavit”)).  \nBut PJM does not actually explain why customers could not use the Incremental Auction in this instance.  \n26 See Horger Affidavit at ¶ 16."},{"page":11,"startToken":3860,"endToken":4246,"text":"-11- \nNITS and Non-Firm Contract Demand Transmission Service. 27  PJM does not plead with any \ndegree of specificity why these factors, separately or together, require it to delay service until mid-\n2029.  Nor does PJM address the fact that its systems should already be capable of curtailing based \non type of transmission service because its Tariff already provides Non-Firm Point-to-Point \nTransmission Service.28  Given PJM’s lack of evidence supporting its proposed delay, the \nCommission should give no probative value to PJM’s assertion that it needs over three years to \nimplement software changes for the new transmission services.   \nFurther, past precedent indicates that PJM should be able to implement software changes \nmuch more quickly than it has proposed here.  For example, when PJM integrated energy storage \nresources into its markets pursuant to Order No. 841, PJM required only one year to develop \nsoftware to accommodate an operationally distinct asset class.29  PJM has provided no explanation \nfor why it needs three years to create new flavors of transmission service using the existing system, \nwhile it needed only one year to develop the software to implement a new participation model for \nan entire resource class.  As it has in the past, the Commission should demand more support than \na cursory gesture at complexity to justify delaying implementation of its directives.30\nPJM does not offer the type of evidence the Commission has relied upon to support a \nfinding that such a delay is necessary.  For example, in its 2025 order approving the Midcontinent \nIndependent System Operator’s (“MISO”) Order No. 2222 compliance timeline, the Commission \n27 Id.\n28 See PJM Tariff, pt. II, § 14.7 (0.0.0) (reserving the right to interrupt non-firm point-to-point transmission service \nfor economic reasons and to curtail it for reliability reasons).  \n29 See PJM Interconnection, L.L.C., Order No. 841 Compliance Filing ESR Markets and Operations Proposal, \nDocket No. ER19-469-000, at 61 (filed Dec. 3, 2018). \n30 See, e.g., Midcontinent Indep. Sys. Operator, Inc., 185 FERC ¶ 61,011, at P 411 (2023) (“[W]e find that MISO’s \nproposed effective date of October 1, 2029 is not timely because, once MISO implements the [market system \nenhancement] project, MISO proposes to defer Order No. 2222 implementation for several years.”); Midcontinent \nIndep. Sys. Operator, Inc., 175 FERC ¶ 61,120, at PP 6, 27 (2021)."},{"page":12,"startToken":4246,"endToken":4576,"text":"-12- \nrelied on testimony from MISO staff detailing specific software and system changes that needed \nto occur and the timeline for each of those changes.31  PJM asks for a similarly lengthy timeline \nwith nowhere near the same level of support.  \nWithout further evidence, the Commission should not rely on PJM’s assertion about the \ncomplexity of implementation to delay implementation of its co-location reforms to mid-2029.  \nGiven the stakes of such a delay, the Commission should ensure that it is absolutely unavoidable. \nC. The Commission Should Require a Transition Process that Accommodates Co-\nLocation Configurations that Commit to Not Take Electrons from the Grid \nEven if the Commission accepts PJM’s unsupported assertion that it will take a third of a \ndecade to update its software, the Commission should require PJM to immediately accommodate \nco-location arrangements for which those software changes are, as a practical matter, irrelevant.   \nThe Order explained that, under Non-Firm Contract Demand Transmission Service, “an \nEligible Customer on behalf of a Co-Located Load may elect to not reserve any amount of \ntransmission service to the extent that the Eligible Customer will not withdraw any electricity from \nthe transmission system.”32  In that case, the customer will simply be charged for regulation and \nblack start services.33\nIf a customer elects that option, the Non-Firm Contract Demand Transmission Service \nassociated with that co-location arrangement consists of ex post invoicing of charges for regulation \nand black start services (and, if the Commission determines it is appropriate, a grid reliance \ncharge—which we separately address below).  That should not be difficult to implement, \n31 See Midcontinent Indep. Sys. Operator, Inc., 190 FERC ¶ 61,031, at P 163 (2025) (citing Midcontinent Indep. \nSys. Operator, Inc., Prepared Direct Testimony of Zakaria Joundi, Docket No. ER22-1640-003, at 13:13-19; \nMidcontinent Indep. Sys. Operator, Inc., Prepared Direct Testimony of Todd Ramey, Docket No. ER22-1640-003, at \n11:5-13:18).   \n32 Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at P 178 n.380. \n33 Id."},{"page":13,"startToken":4576,"endToken":4954,"text":"-13- \nparticularly given that the black start and regulation services will be based on gross load, which \ncustomers will be required to report (as opposed to Non-Firm Point-to-Point Transmission Service \ncustomers, which only pay for black start and regulation when actually using the system).34\nIndeed, PJM has explained that the purpose of its software upgrade enabling Non-Firm Contract \nDemand Transmission Service is to ensure that it applies the appropriate curtailment priority to \nvarious customers.35  But curtailment priority is only relevant when customers are actually taking \na service that can be curtailed.  If a customer has reserved zero MW of transmission service, as the \nOrder explained it has the right to do, there will be no transmission service scheduled and no \ntransmission service to curtail.  As a result, the software PJM develops to provide Non-Firm \nContract Demand Transmission Service will have no material relevance to such a configuration. \nEven assuming that PJM will use its software upgrade to track customers reserving zero \nMW of Non-Firm Contract Demand Transmission Service to track which customers need to be \ninvoiced for regulation and black start services based on gross load, PJM has provided no \nexplanation for why it is lawful and consistent with the Order to prohibit service to such customers \non that basis in the interim.  Nor can it.  Preventing service on the basis of a software upgrade that \nis, at best, only nominally relevant to that service is not just and reasonable.36  Further, customers \nthat commit to taking no electricity from the grid and, therefore, take Non-Firm Contract Demand \nTransmission Service as an administrative formality to enable PJM to charge for regulation and \nblack start services are not similarly situated to other co-located loads (and Eligible Customers) \n34 See PJM Initial Brief, Attach, A, pt. XI, subpt. A, §§ 714.5, 715.4 (“Proposed Tariff”); PJM Manual 27: Open \nAccess Transmission Tariff Accounting, Rev. 103 (eff. July 23, 2025), § 7.1; PJM Manual 28: Operating Agreement \nAccounting, Rev. 104 (eff. Mar. 1, 2026), §§ 4.1-3. \n35 PJM Initial Brief at 65-66. \n36 Cf. Midcontinent Indep. Sys. Operator, Inc., 175 FERC ¶ 61,120 at PP 6, 27 (denying MISO’s request to defer \nimplementation of Order No. 841 in order to prioritize a broader overhaul of its market software platform)."},{"page":14,"startToken":4954,"endToken":5392,"text":"-14- \nthat will use Non-Firm Contract Demand Transmission Service to pull electricity from the grid.  \nAs a result, PJM’s attempt to impose a moratorium on the former while it upgrades its software to \naccommodate the latter is unduly discriminatory.37\nMoreover, delaying service to co-located loads that commit to pulling no electricity from \nthe grid is fundamentally inconsistent with the Order’s goals of remedying PJM’s failure to provide \ntransmission service that reflects a co-located load’s “willing[ness] and ab[ility] to limit its energy \nwithdrawals from the transmission system under certain conditions.”38  The Commission was \nfastidious in distinguishing between co-located loads that will not withdraw energy from the \ntransmission system and those that will.39  PJM’s failure to recognize that distinction and propose \nrules—and an implementation timeline—that respect that critical consideration exacerbates, rather \nthan remedies, the flaws that the Commission identified.   \nThe net result is that PJM’s proposal will impede the nation’s ability to win the AI race.40\nFurther cementing that counterproductive outcome is the fact that, as Vistra previously explained, \nPJM’s proposed delay fails to acknowledge that some entities have already executed necessary \nstudy agreements or received study results for these types of co-location configurations.41\nRequiring those entities to restart the necessary study process, and delaying service even for those \n37 See Calpine Corp. v. PJM Interconnection, L.L.C., 163 FERC ¶ 61,236, at P 68 n.112 (2018) (“Typically, undue \ndiscrimination cases involve a seller charging a different rate to similarly-situated customers; but undue discrimination \ncan also occur when a seller charges the same rate to differently-situated customers.”), order on reh’g & clarification, \n171 FERC ¶ 61,034 (2020); Ala. Elec. Coop., Inc. v. FERC, 684 F.2d 20, 27-28 (D.C. Cir. 1982) (“[A] single rate \ndesign may also be unlawfully discriminatory. . . . It matters little that the affected customer groups may be in most \nrespects similarly situated—that is, that they may require similar types of service . . . . If the costs of providing service \nto one group are different from the costs of serving the other, the two groups are in one important respect quite \ndissimilar.”). \n38 Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at P 159. \n39 See id. \n40 See supra n.12. \n41 As Vistra explained further in its protest to PJM’s compliance filing in Docket No. ER26-1479-000, this aspect \nof PJM’s proposal is incompatible with the Commission’s Order, violates the filed rate doctrine, and represents an \nunexplained and unjustified departure from the Commission’s customary approach to interconnection reform.  PJM \nInterconnection, L.L.C., Protest of Vistra Corp., Docket No. ER26-1479-000, at 4-6 (filed Mar. 16, 2026)."},{"page":15,"startToken":5392,"endToken":5708,"text":"-15- \nthat commit to not withdraw electricity from the grid, virtually ensures that PJM will fail to \nexpedite co-location and meet the nation’s urgent need for expanded computing power. \nAccordingly, if the Commission accepts PJM’s twentieth century software upgrade \ntimeline (which it should not, as discussed above), the Commission should direct PJM to \nimplement rules under which (1) Eligible Customers procuring Non-Firm Contract Demand \nTransmission Service for co-located loads that commit to not withdraw energy from the grid can \ncommence service to co-located load prior to the 2029 effective date, (2) generation owners and \ninterconnection customers can pursue facility configurations to facilitate such service on the same \ntimeline, and (3) those Eligible Customers that have already reached advanced stages of the \nnecessary study process have a clear transition mechanism that respects executed necessary study \nagreements on file with the Commission.   \nII. The Structure of Non-Firm Contract Demand Transmission Service is Unjust and \nUnreasonable and Unduly Discriminatory \nPJM and its Transmission Owners propose to implement Non-Firm Contract Demand \nTransmission Service in a manner that blatantly impedes co-location.  Virtually every aspect of \nthe proposed rates, terms, and conditions of the Non-Firm Contract Demand Transmission Service \nare unjust, unreasonable, and unduly discriminatory.  While the Commission analogized Non-Firm \nContract Demand Transmission Service to existing Non-Firm Point-to-Point Transmission Service \nboth in terms of rates and the availability of reservations,42 PJM and the Transmission Owners \nhave proposed to implement Non-Firm Contract Demand Transmission Service in a manner that \nis simultaneously more expensive and subject to more restrictions than its Non-Firm Point-to-Point \n42 See Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at PP 215-216 (discussing how reservations for \nNon-Firm Contract Demand Transmission Service would be available in a similar manner to non-firm point to point \nservice and suggesting that it may be just and reasonable to apply the zonal non-firm point-to-point rate to the new \nNon-Firm Contract Demand Transmission Service)."},{"page":16,"startToken":5708,"endToken":6013,"text":"-16- \ncounterpart.  The Commission must direct PJM and the Transmission Owners to correct these \nerrors. \nA. The Proposed Rate for Non-Firm Contract Demand Transmission Service is Unjust \nand Unreasonable and Unduly Discriminatory  \nThe proposed rates for Non-Firm Contract Demand Transmission Service—including both \nthe zonal rate for service and the grid reliance charge—are unjust, unreasonable, and unduly \ndiscriminatory.  This conclusion is all the more apparent when Non-Firm Contract Demand \nTransmission Service is compared to other, existing non-firm transmission service.  Moreover, as \ndiscussed in the Affidavit of Rebecca Stadelmeyer (“Stadelmeyer Affidavit”), the proposal to use \nthe revenues from the grid reliance charge to credit NITS customers will create large cost shifts.43\nEach of these flaws, as discussed below, represents an independent, sufficient basis to reject PJM \nand the Transmission Owners’ proposed Non-Firm Contract Demand Transmission Service. \n1. Use of Zonal NITS Rates \nThe PJM Transmission Owners’ proposal to charge the NITS zonal rate for Non-Firm \nContract Demand Transmission Service does not respond to the Commission’s directive to explain \n“whether it would be just and reasonable to apply the current zonal non-firm PTPS rates to [Non-\nFirm Contract Demand Transmission Service].”44  Instead of grappling with the question, the \nTransmission Owners acknowledge in a footnote that “non-firm PTPS customers in PJM are \ncurrently subject to a discounted rate of $0.67/kWh,”45 but defer consideration of whether to offer \nsuch a discount for Non-Firm Contract Demand Transmission Service.46  Notably, they do not \n43 Attach. A, Affidavit of Rebecca Stadelmeyer, at 6:3-8:11 (“Stadelmeyer Affidavit”). \n44 Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at P 216. \n45 PJM Interconnection, L.L.C., Initial Brief of Indicated PJM Transmission Owners, Docket Nos. EL25-49-000, \net al., at 11 n.30 (filed Feb.23, 2026) (“PJM TOs Initial Brief”). \n46 Id.; id. at 12-13."},{"page":17,"startToken":6013,"endToken":6380,"text":"-17- \nexplain the timeline on which they will consider a discounted rate or the conditions that would \nneed to be met to offer it.47\nMost critically, the Transmission Owners have not explained why it is just and reasonable \nand not unduly discriminatory to offer a discounted rate to Non-Firm Point-to-Point Transmission \nService customers but not to Non-Firm Contract Demand Transmission Service customers.  \nInstead, the Transmission Owners suggest that Non-Firm Contract Demand Transmission Service \nwill represent a “superior level of service” compared to Non-Firm Point-to-Point Transmission \nService because PJM will re-dispatch generation prior to curtailing Non-Firm Contract Demand \nTransmission Service.48\nEven if that were true, given that PJM proposed major (and unreasonable) limitations on \nwhen Non-Firm Contract Demand Transmission Service can reserve service—i.e., only when the \nco-located generator is on outage —the benefit of re-dispatching generation prior to curtailment \nwould be a fleeting benefit during rare occurrences.  It is not clear why a rare, theoretical benefit \njustifies paying a substantially higher rate for a service that is otherwise inferior because it is \nsubject to significantly more restrictions.49\nFurther, it is unclear whether Non-Firm Contract Demand Transmission Service is, in fact, \nsuperior in the manner the Transmission Owners suggest.  PJM proposes to require Non-Firm \n47 Id. at 12-13. \n48 Id. at 11-12. \n49 See Inquiry Concerning the Comm’n’s Pricing Pol’y for Transmission Servs. Provided by Pub. Utils. Under \nthe Fed. Power Act, 59 Fed. Reg. 55,031, at 55,034 (Nov. 3, 1994) (“Transmission Pricing Policy Statement”) (“There \nis a relationship between price and quality of service (i.e., in general, higher quality service costs more).”); El Paso \nNat. Gas Go., 112 FERC ¶ 61,150, at PP 56-57 (2005) (“The Commission has consistently held that [interruptible] \nservice should be at a lower rate than [firm] service because it is of a lower quality . . . . It is not the Commission's \npolicy that [interruptible] service should be priced in a manner that discourages its use.”); Bldg. for the Future Through \nElec. Reg’l Transmission Planning & Cost Allocation & Generator Interconnection, Notice of Proposed Rulemaking, \n179 FERC ¶ 61,028, at P 33 (2022) (finding reforms to the regional transmission planning process necessary where \ncustomers would otherwise “pay[] more for less”)."},{"page":18,"startToken":6380,"endToken":6766,"text":"-18- \nContract Demand Transmission Service customers to pay redispatch costs set forth in Attachment \nK of the PJM Tariff.50  The Tariff allows Non-Firm Point-to-Point Transmission Service customers \nto voluntarily agree to pay Attachment K redispatch costs in exchange for redispatch of generation \nprior to curtailment,51 indicating that Non-Firm Point-to-Point Transmission Service Customers \nmay enjoy the same benefit as Non-Firm Contract Demand Transmission Service customers.    \nEither way, the re-dispatch of generation prior to curtailment Non-Firm Contract Demand \nTransmission Service does not justify the substantially higher rate compared to Non-Firm Point-\nto-Point Transmission Service. \n2. Grid Reliance Charge \nThe proposed grid reliance charge is likewise unresponsive to the Commission’s directives, \nunjust and unreasonable, and unduly discriminatory.  The Order sought briefing on two related \nquestions:  (1) whether to impose a charge for Non-Firm Contract Demand Transmission Service \ncustomers that do not reserve service in a given period of time, and if so, how that charge should \nbe determined,52 and (2) whether to impose a charge on Firm or Non-Firm Contract Demand \nTransmission Service customers reserving only a de minimis amount of service,53 and if so, “how \nthat additional charge, including a de minimis threshold, should be determined.”54  The PJM \n50 See Proposed Tariff, pt. XI, subpt. B, § 715.2. \n51 See PJM Tariff, pt. II, § 27.2 (1.0.0) (“Whenever in the operation of the PJM Region the Transmission Provider \nidentifies transmission constraints, the provisions of Tariff, Attachment K shall apply to all Transmission Customers \n(including Native Load Customers and a Transmission Owner making a Third-Party Sale); provided, however, that a \nTransmission Customer receiving Non-Firm Point-To-Point Transmission Service may elect not to pay the costs of \nredispatch determined pursuant to Tariff, Attachment K when those costs would be imposed consistent with \nCommission policy and Transmission Service to such Transmission Customer may be interrupted.”); see also PJM \nTariff, attach. K App., § 5.1 (8.0.0), § 5.1.4 (calculation of transmission congestion charges for Network Customers, \nFirm Point-to-Point Transmission Service customers, and Non-Firm Point-to-Point Transmission Service customers \nthat have elected to pay transmission congestion charges); see also Penn.-N.J.-Md. Interconnection, 94 FERC ¶ \n61,072, at 61,339 (2001).  \n52 Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at P 219(3).  \n53 Id. P 219(4). \n54 Id. P 207."},{"page":19,"startToken":6766,"endToken":7125,"text":"-19- \nTransmission Owners assume that the answer is “yes,” without addressing the nuances in the \nCommission’s questions or the actual ways that Non-Firm Contract Demand Transmission Service \ncustomers might rely—or not rely—on the grid.   \nThe Commission’s questions illustrate that customers could use Non-Firm Contract \nDemand Transmission Service in different ways.  A customer might (a) never reserve service (in \nfact, it might actually commit to never reserving service),55 or (b) occasionally reserve a de minimis \namount of service, or (c) frequently reserve significant amounts of service.  The first customer in \nthat example clearly does not rely on the grid to the same extent as the second or third, and the \nsecond customer clearly does not rely on the grid to the same extent as the third.  A customer that \nnever reserves transmission service relies on the PJM grid only to transport black start and \nregulation services, while other customers may rely on the PJM grid for energy withdrawals, either \nfor primary or back-up service, in significantly varying amounts.  Yet the PJM Transmission \nOwners’ proposal would impose the same grid reliance charge on these very different customers.56\nInstead of grappling with the differences in how those customers rely on the grid, the PJM \nTransmission Owners simply assert that they are all “synchronized” to the grid.57  But \n“synchronization” is “simply an operational reality of the system and a prerequisite to taking any \ntransmission or ancillary service.”58  Synchronization is not, itself, a service.59  Indeed, when the \nCommission required transmission providers to unbundle ancillary services from transmission \nservice in Order No. 888, it explained that customers that take similar amounts of transmission \n55 See id. P 178 n.380. \n56 See Old Dominion Elec. Coop. v. FERC, 898 F.3d 1254, 1263 (D.C. Cir. 2018) (“FERC must make some \nreasonable effort to match costs to benefits.”); BNP Paribas Energy Trading GP v. FERC, 743 F.3d 264, 268 (D.C. \nCir. 2014) (the cost causation principle is a “matter of making sure that burden is matched with benefit”). \n57 PJM TOs Brief at 4, 14-15. \n58 Stadelmeyer Affidavit at 9:8-9. \n59 Id. at 9:8-16."},{"page":20,"startToken":7125,"endToken":7536,"text":"-20- \nservice may require different amounts of ancillary services, so “bundling these services with basic \ntransmission service would result in some customers having to take and pay for more or less of an \nancillary service than they use.”60  The Commission therefore required transmission providers to \n“offer and price the individual ancillary services separately,” and it stated that transmission \nproviders “may not tie the purchase of one to the purchase of another.”61  The Transmission \nOwners’ proposal stands in stark contrast to this long-standing policy by creating a new service \ncharge for what appears to be an undefined ancillary service (i.e., grid reliance), which they assert \ncovers a “suite of synchronization support services.”62  Not only do the Transmission Owners not \nexplain how customers benefit from that “suite” of purported services, they propose to “tie the \npurchase” of that suite together instead of “pric[ing] the individual [services] separately.”  Even \nmore concerningly, the Transmission Owners then propose to impose that cost on customers \nwithout regard to the extent to which customers actually rely on the grid. \nThe Transmission Owners do not justify how it is consistent with cost causation principles \nto impose the same grid reliance charge for those very different types of grid reliance.63  While the \nthree permutations of Non-Firm Contract Demand Transmission Service customers discussed \nabove exist on a spectrum—and the PJM Transmission Owners failed to respond to the \nCommission’s directive to identify a “de minimis threshold”64—there is at the very least a clear \ndistinction between Non-Firm Contract Demand Transmission Service customers that never \n60 Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Serv. by Pub. \nUtil.; Recovery of Stranded Costs by Pub. Util. and Transmitting Util., Order No. 888, 61 Fed. Reg. 21,540, at 21,588 \n(May 10, 1996), FERC Stats. & Regs. ¶ 31,036 (1996), order on reh'g, Order No. 888-A, 62 Fed. Reg. 12,274 (Mar. \n14, 1997), FERC Stats. & Regs., ¶ 31,048, order on reh'g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), order on \nreh'g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff'd in relevant part sub nom. Transmission Access Pol’y Stud. \nGroup, et al. v. FERC, 225 F.3d 667 (D.C. Cir. 2000), aff'd sub nom. New York v. FERC, 535 U.S. 1 (2002); \n61 Id. at 21,589. \n62 See PJM TOs Brief at 15. \n63 See supra n.37. \n64 See Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at P 207."},{"page":21,"startToken":7536,"endToken":7821,"text":"-21- \nreserve transmission service and those that do.  It is not clear why a Non-Firm Contract Demand \nTransmission Service customer who never reserves transmission service to pull energy from the \ngrid and only relies on the grid for black start and regulation service should pay for something \nother than black start and regulation service.   \nContrary to PJM’s and the Transmission Owners’ assumption, the Commission did not \nprejudge, as a legal or policy matter, whether or under what circumstances a grid reliance charge \nis necessary.  The Commission merely called for briefing on the issue.  As discussed herein, a \ncustomer that is relying on the grid solely for regulation and black start service is demonstrably \nrelying very little on the grid.  Accordingly, Vistra contends that the Commission could reasonably \nconclude that no grid reliance charge is necessary for a customer that commits to making zero \ntransmission service reservations or that only reserves a de minimis amount of transmission \nservice. \nEven if it were just and reasonable and not unduly discriminatory to impose some form of \na grid reliance charge on Non-Firm Contract Demand Transmission Service customers that will \nnever pull energy from the grid, the Transmission Owners have not adequately justified the \nparticular rate they propose.  It defies belief that a customer that never takes transmission service \nreceives benefits approximating 25.8% of the Transmission Owner’s transmission revenue \nrequirement.  The adjustment to account for the ratio between firm load and gross load does not \nsolve the fundamental problem that the proposed charge is not tied to the share of transmission \nand operations and maintenance (“O&M”) costs that are associated with the ways in which these \nNon-Firm Contract Demand Transmission Service Customers actually rely on the grid."},{"page":22,"startToken":7821,"endToken":8191,"text":"-22- \nThe Transmission Owners’ proposal is therefore inconsistent with cost causation \nprinciples.65  To the extent that a Non-Firm Contract Demand Transmission Service customer that \nnever reserves transmission services relies on the grid, its reliance is for the sole purpose of \nreceiving black start and regulation service.  And as the Stadelmeyer Affidavit illustrates, black \nstart and regulation services represent a miniscule amount of the use of the PJM system.66  Indeed, \nonly 0.5% of PJM’s monthly total billings are related to black start and regulation charges.67  Yet \nthe Transmission Owners suggest that services that represent only 0.5% of PJM’s monthly billings \nuse the transmission system to such an extent that the cost of the transportation of those services \nshould be predicated on 25.8% of the total revenue requirement.   \nThe proposal also stands in direct conflict with the Commission’s transmission pricing \npolicy, which indicates that “[t]he major purpose of transmission pricing reform should be to \nprovide more efficient price signals, particularly for new transmission uses, and not simply to \nreallocate sunk costs.”68  A Non-Firm Contract Demand Transmission Service customer that does \nnot actually reserve transmission service promotes the most efficient use of the transmission \nsystem,69 yet the Transmission Owners’ proposal disincentivizes that efficiency and instead \nfocuses on re-allocating a large share of sunk costs.   \nIf the Commission finds it necessary to impose a grid reliance charge on customers that \nnever reserve transmission service, it should do so in a manner that is appropriately tailored to the \nspecific benefits those customers receive, in accordance with the cost causation principle.  As the \n65 KN Energy, Inc. v. FERC, 968 F.2d 1295, 1300 (D.C. Cir. 1992) (“[A]ll approved rates [must] reflect to some \ndegree the costs actually caused by the customer who must pay them.”). \n66 Stadelmeyer Affidavit at 11:12-13. \n67 Id. at 11:12-14. \n68 Transmission Pricing Policy Statement, 59 Fed. Reg. at 55,035. \n69 Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at P 160 (explaining that Non-Firm Contract Demand \nTransmission Service “reflect[s] a Co-Located Load’s ability to limit withdrawals from the transmission system and \npotentially avoid costly and inefficient transmission system buildout that may not be necessary”)."},{"page":23,"startToken":8191,"endToken":8499,"text":"-23- \nStadelmeyer Affidavit explains, the percentage of PJM’s total monthly billings that relates to black \nstart and regulation charges is a reasonable proxy for the amount of transmission system costs that \nare associated with use of the grid to deliver black start and regulation service.70  That is because \nthe vast majority of the costs of PJM’s total monthly billing are based on the provision of actual \ntransmission service, not the transportation of black start and regulation service over the grid.  This \ntype of connection to the share of the transmission system associated with the transportation of \nblack start and regulation service would be necessary to justify a grid reliance charge for customers \nthat never reserve transmission service. \n3. Distribution of Revenues \nIn addition to imposing costs that are not roughly commensurate with the benefits that Non-\nFirm Contract Demand Transmission Service customers that do not reserve service would receive, \nthe PJM Transmission Owners’ proposal is also unjust and unreasonable and unduly \ndiscriminatory because it would create significant and unjustified cost shifts between classes of \ncustomers.  Figure 1 from the Stadelmeyer Affidavit provides a simple example of a zone with the \nfollowing three customers to demonstrate the extent of these cost shifts:71\n\nCustomer A takes 250 MW of NITS \n\nCustomer B takes a combination of Contract Demand Transmission Services: \no\n150 MW of Firm Contract Demand Transmission Service  \no\n100 MW of Non-Firm Contract Demand Transmission Service (which it \nuses during two months of the year when the co-located generator is on \noutage)  \n\nCustomer C contracts for—but does not actually use—250 MW of Non-Firm \nContract Demand Service.   \nCustomer A will pay significantly less for transmission service than it otherwise would \nbased on the existence and contributions of the Contract Demand Transmission Service \n70 Stadelmeyer Affidavit at 11:4-12:4. \n71 Id. at 7, fig. 1."},{"page":24,"startToken":8499,"endToken":8922,"text":"-24- \ncustomers.72  Specifically, Customer A will only pay 84% of the transmission charges it incurred \nand otherwise would have been required to pay.73  The magnitude of that cost shift cannot possibly \nbe considered just and reasonable and not unduly discriminatory.  And while Customer B will only \ntake 40% of the amount of firm transmission service that Customer A takes, it will pay 73% of the \ncosts.  The charge Customer B will pay cannot be said to be “roughly commensurate” with the \nlevel of service that Customer B receives.  \nWhile PJM and the Transmission Owners focus on preventing NITS customers from cross-\nsubsidizing Non-Firm Contract Demand Transmission Service customers,74 they do not \nacknowledge that under their proposal, it is structurally certain that Non-Firm Contract Demand \nTransmission Service customers will cross-subsidize NITS customers or propose safeguards to \nprevent such cross-subsidization.75\nMoreover, while the Transmission Owners assert that the distribution of revenues will \n“ensure against double recovery,”76 it is not clear that is the case.  The revenues from the grid \nreliance charge will be credited to NITS and Firm Contract Demand Transmission Service \n72 The only way these cost shifts would not occur under this proposal is if the existence of Non-Firm Contract \nDemand Transmission Service Customers increased the Transmission Owner’s transmission revenue requirement.  \nBut that circumstance should not occur because the Transmission Owners will not plan the transmission system to \nserve non-firm customers, and to the extent any upgrades are necessary to accommodate the change in power flows \nfrom an existing generator, those upgrades will be directly assigned to the generator.  The costs of any special \nprotection schemes or remedial action schemes should likewise be borne directly by the parties instead of increasing \nthe Transmission Owner’s rate base. \n73 Stadelmeyer Affidavit at 7:3. \n74 PJM TOs Initial Brief at 8-9.  \n75 Transmission Pricing Policy Statement, 59 Fed. Reg. at 55,035 (“[W]e do not believe that third-party \ntransmission customers should subsidize existing customers.”); see Order No. 888, 61 Fed. Reg. at 21,635 (explaining \nthat shifting costs to customers that did not cause costs to be incurred violates the cost causation principle); \nTransmission Plan. & Cost Allocation by Transmission Owning & Operating Pub. Utils., Order No. 1000-A, 139 \nFERC ¶ 61,132, at P 578 (“The principle of cost causation is intended to prevent subsidization.”), order on reh’g, \nOrder No. 1000-B, 141 FERC ¶ 61,044 (2012), aff’d sub nom. S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41 (D.C. Cir. \n2014). \n76 PJM TOs Initial Brief at 11."},{"page":25,"startToken":8922,"endToken":9319,"text":"-25- \ncustomers.  But the PJM Transmission Owners are major NITS customers in PJM.77  It is not clear \nwhat the Transmission Owners will do with those bill credits.  Whether the Transmission Owners \npass the savings onto retail customers is a question for state regulators and is not a foregone \nconclusion based on their current proposal.   \nB. The Proposed Restrictions on Non-Firm Contract Demand Transmission Service are \nUnreasonable and Unduly Discriminatory  \nThe proposed rates are all the more unreasonable in light of the restrictions that PJM and \nthe Transmission Owners propose to impose on customers that take Non-Firm Contract Demand \nTransmission Service.  Specifically, PJM and the Transmission Owners propose significant \nlimitations on when Non-Firm Contract Demand Transmission Service customers can make \ntransmission reservations—i.e., only when the co-located generator is on outage.  They also \npropose overly strict and unduly discriminatory rules governing the use of special protection \nsystems and remedial action schemes for Contract Demand Transmission Service customers.  Both \nsets of restrictions are unreasonable and unduly discriminatory.    \n1. Restrictions on Making Transmission Service Reservations  \nPJM’s proposed restrictions on Non-Firm Contract Demand Transmission Service directly \ncontradict the Commission’s directives.  The Commission established Non-Firm Contract Demand \nTransmission Service as an option for “Eligible Customers taking service on behalf of Co-Located \n77 For example, Dominion, AEP, and FirstEnergy and their affiliates together appear to take approximately 70,121 \nMW of NITS service in PJM.  See, e.g., PJM Service Agreement No. 6425, Network Integration Transmission Service \nAgreement among PJM and Virginia Elec. & Power Co. (Apr. 12, 2022) (providing for approximately 17,373 MW of \nNITS); PJM Service Agreement No. 4956, Network Integration Service Agreement among PJM and AEP Service \nCorp. (Jan. 10, 2018) (providing for approximately 20,219.6 MW of NITS); PJM, Electric Quarterly Reports (Q4 \n2025) (listing contracts for 3,442 MW of network service with The Potomac Edison Co.; 5,024 MW with Ohio Edison \nCo.; 10,211 MW with FirstEnergy Pennsylvania Electric Co.; 5,731 MW with Jersey Central Power & Light Co.; \n1,914 MW with The Toledo Edison Co.; 2,140 MW with Monongahela Power Co.; and 4,067 MW with The Cleveland \nElectric Illuminating Co.).  As a point of comparison, PJM’s peak demand in 2024 was approximately 162,400 MW.  \nSee 2025 in Review: Operations Improvements See PJM Through Record Peaks, Growing Demand, PJM Inside Lines \n(Dec. 30, 2025), https://insidelines.pjm.com/209696-2/."},{"page":26,"startToken":9319,"endToken":9631,"text":"-26- \nLoads,” in recognition of the fact that “not all Co-Located Loads will necessarily plan to withdraw \nenergy from the transmission system on a regular basis,” but may seek to do so “from time to time \nwhen transmission capacity is available.”78  The Commission specifically noted that “the new Non-\nFirm Contract Demand transmission service must be available during normal operations and \ncurtailed during emergency operations[.]”79  The Commission used the possibility of a co-located \ngenerator being on outage as an example of when the non-firm transmission service would be \nparticularly helpful, but nothing in the Order suggested that a transmission reservation should only\nbe available during the generator’s outages.   \nYet that is exactly what PJM proposed.80  They reframe Non-Firm Contract Demand \nTransmission Service as “a limited supplemental service that may be needed for the benefit of \nFirm Contract Demand Service customers,”81 that can be used only when the co-located generator \nis on outage.82  Nothing in the Commission’s Order suggested that Non-Firm Contract Demand \nTransmission Service should be so limited.  And PJM and the Transmission Owners have provided \nno justification for this limitation.   \n2. Restrictions on Remedial Action Schemes  \nSeveral of PJM and the PJM Transmission Owners’ proposals regarding special protection \nschemes and remedial action schemes are excessively punitive, violate Order No. 888’s \ncomparability principle, and create opportunities for undue discrimination.  The Commission \n78 Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at P 214. \n79 Id. P 215. \n80 See PJM Initial Brief at 16 (“[A]n Eligible Customer . . . will be [able] to obtain Non-Firm Contract Demand \nTransmission Service on a given Operating Day only to the extent the portion of the Co-Located Generating Facility \ndedicated to serving the Co-Located Load is on outage.”); Proposed Tariff, pt XI, subpt. B, § 709.2(b) (same).\n81 PJM TOs Initial Brief at 12.   \n82 PJM Initial Brief at 16."},{"page":27,"startToken":9631,"endToken":9958,"text":"-27- \nshould direct PJM and the Transmission Owners to take a fundamentally different approach to \nspecial protection schemes and remedial action schemes in the replacement rate. \nFirst, the Commission should reject PJM Transmission Owners’ request that the \nCommission permit PJM and the PJM Transmission Owners to “implement and enforce reasonable \nlimits on the total amount of load that can be covered by [special protection schemes] or [remedial \naction schemes], particularly for customers in relatively close proximity to one another or in a \ntransmission-constrained area.”83  PJM’s proposal does not clarify how it and/or the PJM \nTransmission Owners would develop and implement these limits, including how they would \ndesignate relevant areas and decide which customers in each area may use special protection \nschemes/remedial action schemes (i.e., may access transmission service) and which may not.  \nRather, PJM states that requests and the need for control technologies and protection systems \n(including remedial action schemes) will be evaluated on a request-specific basis,84 and that PJM \nwill be the “ultimate decider for any necessary control technology or protective system.”85\nAs an initial matter, it is not clear where decision-making authority over access to service \nwould lie: while PJM states that it will have ultimate authority over the necessity of control \ntechnologies and systems, the PJM Transmission Owners ask for their own right to implement \nthese limits.  But regardless of where that authority lies, it creates textbook conditions for the \nexercise of undue discrimination: the ability to pick and choose, with no apparent parameters or \nconstraints, customers that may receive transmission service and customers that may not.  If the \nCommission permits PJM or the PJM Transmission Owners to limit the special protection \n83 PJM TOs Initial Brief at 24.  \n84 PJM Initial Brief at 35 (citing id., Attach. B, Affidavit of Dr. Sami Abdulsalam, Director of Transmission \nPlanning, at ¶ 9). \n85 Id. at 44 (citing Proposed Tariff, pt. XI, subpt. A, § 705.5; id. subpt. B, § 713.6)."},{"page":28,"startToken":9958,"endToken":10250,"text":"-28- \nschemes/remedial action schemes in a particular area, the Commission must ensure that \nstandardized and transparent guidelines are in place to cabin PJM and/or Transmission Owners’ \ndiscretion to define affected areas and to determine which customers in those areas may access \ntransmission service and which may not.    \nFurther, the PJM Transmission Owners’ proposal subjects Eligible Customers serving co-\nlocated load to different requirements than the Transmission Owners subject themselves, violating \nthe comparability requirement.  The Federal Power Act’s (“FPA”) prohibition on undue \ndiscrimination requires that transmission owners and providers “offer third parties access on the \nsame or comparable basis, and under the same or comparable terms and conditions, as the \ntransmission provider’s uses of its system.”86  PJM’s existing procedures for approval of remedial \naction schemes include no location-based restrictions.  Rather, PJM evaluates whether a proposed \nremedial action scheme meets the North American Electric Reliability Corporation (“NERC”) \ndefinition and whether the remedial action scheme is needed for reliability purposes, including \noperational performance.  The remedial action scheme is then subjected to technical feedback by \na sequence of PJM Committees before it is implemented.87  There is no evidence that PJM applies \na categorical, area-based limitation on use of remedial action schemes for existing customers.  Nor \nis there a basis for applying such a categorical limitation only to Eligible Customers taking service \non behalf of co-located load but not to other entities with remedial action schemes (and neither \nPJM nor PJM Transmission Owners proffer one).  Applying such a limitation only to Eligible \nCustomers taking service on behalf of a co-located load would therefore violate the comparability \nrequirement.  \n86 See Order No. 888, 61 Fed. Reg. at 21,548. \n87 See PJM Manual 03: Transmission Operations, Rev. 70 (eff. Mar. 4, 2026), § 1.7."},{"page":29,"startToken":10250,"endToken":10668,"text":"-29- \nSecond, PJM proposes a two-strikes policy for special protection scheme/remedial action \nscheme misoperation that diverges from the Commission’s directives and violates the \ncomparability principle.  PJM proposes that, after one misoperation, PJM will prohibit an Eligible \nCustomer from taking transmission service from the PJM transmission system for up to 120 days \npending analysis of the special protection scheme/remedial action scheme operational \nperformance, a requirement PJM alleges is consistent with NERC Standards PRC-012-02 and \nPRC-004-6.88  After two misoperations, PJM proposes that an Eligible Customer taking either \nform of Contract Demand Transmission Service will be disqualified from taking any Contract \nDemand Transmission Service, and an Eligible Customer taking Interim NITS will be disqualified \nfrom taking any service other than regular NITS.89\nPJM’s proposal goes far beyond the penalties the Commission envisioned in the Order, \nwhich did not contemplate a two-strikes policy disqualifying co-located facilities from accessing \nthe new services the Commission mandated.90  In fact, PJM’s proposal goes far beyond the \npenalties the Commission has permitted for unreserved use of the transmission system in general—\nthe Commission has addressed this issue in many contexts and has repeatedly held that tailored \nfinancial penalties are appropriate for penalizing unreserved use.91  Against that backdrop, PJM’s \n88 See PJM Initial Brief at 44-45; Proposed Tariff, pt. XI, subpt. A, § 705.6(b) (Interim NITS); id. subpt. B, § \n713.7(b) (Firm and Non-Firm Contract Demand Transmission Service). \n89 See PJM Initial Brief at 45; Proposed Tariff, pt. XI, subpt. A, § 705.6(b) (Interim NITS); id. subpt. B, § 713.7(b) \n(Firm and Non-Firm Contract Demand Transmission Service). \n90 See Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at P 212. \n91 See Integration of Variable Energy Res., Order No. 764, 139 FERC ¶ 61,246, at P 108 (holding that “the ability \nto avoid penalties in the first two tiers of generator imbalance charges will provide a sufficient incentive for [variable \nenergy resources] to adjust transmission schedules” and noting that a transmission provider could propose additional \npenalties if it could “demonstrate that [variable energy resources] are not adjusting their transmission schedules despite \ntheir reasonable ability to foresee that output will deviate significantly from existing transmission schedules”), order \non reh’g, Order No. 764-A, 141 FERC ¶ 61,232, at PP 89, 95 (2012) (denying commenter’s request to clarify that \ncustomers that intentionally overstate firm schedules may be subject to substantial fines or penalties, explaining that \n“rather than impose a novel and generic restriction on transmission customers' discretion to schedule transmission"},{"page":30,"startToken":10668,"endToken":11129,"text":"-30- \nproposal is “excessively punitive.”92  PJM’s proposal may also be unduly discriminatory insofar \nas it treats unreserved use of the transmission system by point-to-point customers differently from \nunreserved use by customers taking these new transmission services. \nMoreover, this policy is significantly more stringent than penalties imposed on market \nparticipants under existing rules, yet again violating the comparability requirement.  PJM’s \nproposal treats co-location arrangements utilizing special protection schemes/remedial action \nschemes differently from any other entities using special protection schemes/remedial action \nschemes, including the PJM Transmission Owners.  Neither the relevant NERC standards nor \nPJM’s own rules require special protection scheme/remedial action scheme owners to pause all \nservice for 120 days after a single misoperation.93  Nor do relevant NERC standards or PJM rules \nsubject special protection scheme/remedial action scheme owners to a two-strikes standard.  PJM \ndoes not explain why Eligible Customers serving co-located load with a special protection \nscheme/remedial action scheme are dissimilarly situated from other special protection \nscheme/remedial action scheme owners such that this discrimination is due. \nservice here . . . we will allow the mechanisms discussed in Order No. 764 to work and revisit them when and if \nnecessary”); Order No. 890, 118 FERC ¶ 61,119 at PP 834-835 (adopting unreserved use penalties for use of the \ntransmission system without a reservation, including lesser penalties for instances of inadvertent unreserved use); id. \nP 849 (requiring transmission providers proposing penalty rates greater than twice the applicable transmission rate to \naddress why that rate is required to combat pervasive unreserved use of transmission and why the standard rate is \ninadequate to discourage repeated violations), order on reh’g, Order No. 890-A, 121 FERC ¶ 61,297 at P 447 \n(explaining that the unreserved use penalty would “more closely approximate[] the penalty charge with the impact on \nthe transmission system while maintaining the correct incentive for transmission customers to take the necessary steps \nto ensure that they reserve appropriate service”). \n92 See Order No. 890, 118 FERC ¶ 61,119 at P 849.   \n93 See NERC Standard PRC-012-2, R5 (providing that a remedial action scheme owner shall participate in analysis \nof a remedial action scheme’s operational performance within 120 days of its operation or its failure and provide \nresults of that analysis to its reliability coordinator(s)); id. R6 (requiring development of a corrective action plan within \nsix months of notification of a remedial action scheme deficiency); NERC Standard PRC-004-6, R1-R3 (providing \nthat the owner of a bulk electric system interrupting device shall identify whether its protection system component \ncaused a misoperation within the later of 120 days of an event involving the device or 60 days of notification by other \nowners); id. R5 (requiring development of a corrective action plan within 60 days of identification of a cause of the \nmisoperation)."},{"page":31,"startToken":11129,"endToken":11454,"text":"-31- \nFinally, PJM’s two-strikes proposal conflicts with the PJM Transmission Owners’ proposal \nto own special protection schemes/remedial action schemes.  The Transmission Owners ask the \nCommission to allow them to unilaterally exercise an option to own and operate special protection \nschemes/remedial action schemes on the transmission owner side of the point of interconnection \nand the customer side of the point of interconnection.94  The Commission should reject this \nproposal, which would needlessly raise the cost of transmission service simply to generate extra \nrevenue for the PJM Transmission Owners.  Nevertheless, if the Transmission Owners are to own \nand operate the special protection schemes/remedial action schemes for an Eligible Customer’s \nfacility, the consequences of that special protection scheme/remedial action scheme’s misoperation \nmust attach to the PJM Transmission Owner, not the Eligible Customer.95\nIn sum, PJM’s two-strikes proposal is excessively punitive, unduly discriminatory, and \nerodes Eligible Customers’ ability to reliably utilize the transmission services the Commission \nmandated that PJM develop in the Order.96\nIII.Study Process \nThe study process in PJM’s proposal is flawed because it reserves for PJM and the \nTransmission Owners too much discretion to determine whether studies are required for a \nparticular customer, which studies to conduct, the timeline for doing so, and how to prioritize \ndifferent requests.  Further, the Commission should require PJM to clarify how it will assess \nwhether non-firm service can occur “reliably” and ensure that PJM does not intend to study non-\n94 See PJM TOs Initial Brief at 24. \n95 See NERC Standard PRC-012-2 (applying requirements to the “RAS-entity,” defined as the transmission \nowner, generator owner, or distribution provider that owns all or part of a remedial action scheme).\n96 See PJM Initial Brief at 47-50 (noting that Eligible Customers disqualified from the Commission-mandated \nnew services can still take NITS, then discussing at length PJM’s views of the merits of NITS and its long history as \nthe only transmission service offered internal to PJM’s borders)."},{"page":32,"startToken":11454,"endToken":11754,"text":"-32- \nfirm customers as though they will take transmission service during system conditions in which \nthey will, in fact, be curtailed.\nA. PJM Has Granted Itself Unfettered Discretion to Determine Whether to Conduct \nStudies, What Studies to Conduct, and the Timeline for Doing So. \nPJM’s proposed procedures for evaluating transmission service requests are “too broad and \nnot sufficiently detailed to direct as a replacement rate.”97  Indeed, PJM’s proposal perpetuates the \nvery problem the Commission sought to address in the Order:  it reserves to PJM and the \nTransmission Owners unfettered discretion with respect to “the necessary steps that apply to \nInterconnection Customers seeking to serve Co-Located Load through a Co-Location \nArrangement.”98  This discretion creates the risk of undue discrimination in the transmission \nservice request process and violates the rule of reason.   \nThere are at least five ways in which PJM’s proposal affords it and the Transmission \nOwners too much discretion with respect to the process for studying transmission service requests \nfor co-located arrangements.  The degree of that discretion is particularly clear when comparing \nthe proposed procedures to PJM’s existing procedures for generator interconnection requests.\nFirst, the proposed tariff does not contain a mechanism for assigning customers a queue \nposition in chronological order based on submission of a complete application.  By contrast, \ngenerator interconnection requests are assigned to a study cycle if they submit a completed \napplication prior to the cycle’s application deadline, then are allocated costs of network upgrades \nidentified in the cycle’s system impact study based on their contribution to the reliability violation \nnecessitating the upgrade.99\n97 See Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at P 202.  \n98 Id. P 175. \n99 See PJM Tariff, pt. VIII, subpt. B, § 403(A) (0.1.0); id. subpt. C, § 404(A)(5)(c) (1.0.0)."},{"page":33,"startToken":11754,"endToken":12125,"text":"-33- \nSecond, PJM has reserved to itself full discretion to determine whether studies must be \nconducted and what analyses those studies will involve.  PJM has no discretion to determine \nwhether or not to conduct a study of a generator interconnection request100—and the procedures \nfor that study, including analyses within the scope of the study, are set out in the Tariff.101  By \ncontrast, for Interim NITS, PJM proposes that it shall determine “whether additional studies are \nneeded beyond what was required to evaluate the Eligible Customer’s request for [NITS],” without \nspecifying in any detail how PJM will make that determination or what those additional studies \nmay be.102  For Firm Contract Demand Transmission Service, the proposed tariff provides only \nthat PJM and the Transmission Owner “shall coordinate to study the effects” of providing service \n“pursuant to the applicable affected Transmission Owner requirements” and that PJM “shall \ndetermine, in accordance with the PJM Manuals, any necessary studies for reliably providing the \nrequested Firm Contract Demand Transmission Service.”103  It is not clear what the “applicable \naffected Transmission Owner requirements” are or where they are housed.  It is likewise unclear \nhow PJM will determine if there are other necessary studies, and if so, what those additional studies \nmay be.  The tariff also contemplates that PJM will “consider the results of any studies conducted \nby the affected Transmission Owner,” alluding to studies conducted at the Transmission Owner’s \ndiscretion mentioned nowhere else in the Tariff.104  And for Non-Firm Contract Demand \nTransmission Service, PJM again determines whether and “which studies” are appropriate.105\n100 See id. subpt. C, § 405(A)(1) (0.1.0) (“After the Application Phase of a Cycle is completed and a group of \nvalid New Service Requests is established therein, Phase I of a Cycle will commence.  During Phase I of a Cycle, the \nTransmission Provider shall conduct a Phase I System Impact Study.”). \n101 See id. pt. III, § 32.3 (3.0.0); id. pt. VIII, subpt. C, § 404(A)(2)-(4) (1.0.0); id. pt. VII, subpt. D, § 307(A)(2)-\n(4) (1.0.0). \n102 Proposed Tariff, pt. XI, subpt. A, § 704.1. \n103 Id. subpt. B, § 712.1. \n104 See id. \n105 Id. § 712.2."},{"page":34,"startToken":12125,"endToken":12401,"text":"-34- \nThird, it is not clear that the proposed tariff limits the results of PJM’s analysis of \ntransmission service requests to the results of duly conducted studies.  With respect to Interim \nNITS, PJM proposes that it, in consultation with the affected transmission owner, will determine \nthe amount of Interim NITS that can reliably be provided, a determination that “will consider the \nresults of the study procedures set forth in Tariff, Part XI, Subpart A, section 704.”106  It is not \nclear what else PJM may consider in making that determination.  Similarly, with respect to Firm \nand Non-Firm Contract Demand Transmission Service, the proposed tariff provides that PJM and \nthe transmission owners’ studies “will provide data relevant to the determination of whether (and \nto what level as applicable)” service can be “reliably provided.”107  As discussed further below, it \nis also unclear what it means to provide Interim NITS or Non-Firm Contract Demand Transmission \nService “reliably.” \nFourth, PJM’s proposal contains no timeline or deadlines for processing Interim NITS, \nFirm Contract Demand Transmission Service, or Non-Firm Contract Demand Transmission \nService requests.  For generator interconnection requests, by contrast, PJM must complete the \nPhase I System Impact Study within deadlines set out in the Tariff: 120 days for the Phase I \nstudy,108 180 days for the Phase II study,109 and 180 days for the Phase III study.110\n106 Id. subpt. A, § 702.3 (emphasis added). \n107 Id. subpt. B, § 710.3. \n108 PJM Tariff, pt. VIII, subpt. C, § 405(A)(1)(b)(i) (0.1.0). \n109 Id. § 407(A)(1)(e)(ii) (0.1.0). \n110 See id. § 409(A)(1)(e)(ii) (0.1.0)."},{"page":35,"startToken":12401,"endToken":12866,"text":"-35- \nFifth, the proposed tariff provides PJM total discretion to set study fees for Interim NITS111\nand for Contract Demand Transmission Service requests,112 with zero parameters or guardrails in \nplace for setting those fees.  For generator interconnection requests, by contrast, the study fee is \ndetermined based upon the amount of service requested (in MW), and is up to 90% refundable, or \nsubject to increase, based on actual study costs.113\nThis unfettered discretion creates profound risk of undue discrimination.  The FPA \nprohibits public utilities from exercising undue discrimination or preference both between \nsimilarly situated customers and against potential competitors.114  “[W]ide discretion” in the study \nof transmission service requests, “when coupled with a transmission provider’s incentive to \ndiscriminate, creates opportunities for discrimination” cognizable under the FPA.115  For example, \nin Order No. 890, the Commission found that wide discretion in calculating Available Transfer \nCapability—the gatekeeper for transmission service—coupled with Transmission Owners’ \nincentives to discriminate against competitors led to undue discrimination, which the Commission \nwas required to remedy under section 206.116  As illustrated above, the discretion in the proposed \n111 See Proposed Tariff, pt. XI, subpt. A, §§ 702.2, 704.1 (providing that, to apply for Interim NITS, the Eligible \nCustomer must pay a study fee set out in section 704.2); id. § 704.2 (“Eligible Customer shall pay a study fee, as \ndetermined by the Transmission Provider, to apply for Interim Network Integration Transmission Service.”). \n112 See id. subpt. B, § 712.3 (providing that, to apply for Contract Demand Transmission Service, the Eligible \nCustomer must pay a study fee set out in section 712.4); id. § 712.4 (“Eligible Customer shall pay a study fee, as \ndetermined by the Transmission Provider, to apply for Firm Contract Demand Transmission Service or Non-Firm \nContract Demand Transmission Service.”). \n113 See PJM Tariff, pt. VIII, subpt. A, § 401(D)(1) (2.0.0); id. subpt. B, § 403(A)(5)(a)(iv) (0.1.0). \n114 16 U.S.C. § 824d(b). \n115 Order No. 890, 118 FERC ¶ 61,119 at P 41.  Indeed, across contexts, the Commission has acknowledged that \nexcess discretion in the provision of transmission service is impermissible.  See, e.g., Sw. Power Pool, Inc., 175 FERC \n¶ 61,198, at PP 38-39 (2021) (cost allocation context). \n116 Order No. 890, 118 FERC ¶ 61,119 at P 68 (“[T]he lack of a consistent and transparent methodology for \ncalculating ATC gives transmission providers the ability and opportunity to unduly discriminate in the provision of \nopen access transmission service.  There are few clear rules respecting ATC calculation, and transmission providers \nretain unnecessarily broad discretion in this area.  This resulting discretion is a significant problem because calculation \nof ATC, which varies greatly depending on the criteria and assumptions used, may allow the transmission provider to"},{"page":36,"startToken":12866,"endToken":13387,"text":"-36- \nstudy process for the new transmission services creates the opportunity for PJM and Transmission \nOwners to treat customers disparately with respect to queue position, the timeline for processing \nrequests, the studies conducted,117 whether and how the results of those studies inform the quantity \nof service is granted and upgrades identified, and the fees assessed for those studies.  And \ntransmission owners have the incentive to exercise that opportunity and discriminate among \nsimilarly situated transmission service customers, particularly against those taking a type of \ntransmission service that may be less profitable to the transmission owner than other types of \nservice.  To mitigate these conditions for undue discrimination, the Commission should direct PJM \nto cabin the discretion it has reserved for itself and the Transmission Owners by filling in the \nmissing details described above. \nPJM’s proposal also violates the Commission’s rule of reason.  The FPA requires that all \nrates and charges for services within the Commission’s jurisdiction, as well as practices affecting \nsuch rates and charges, be on file with the Commission.118  As part of its implementation of this \ndiscriminate in subtle ways against its competitors.  On systems where transmission capacity is congested, this lack \nof consistency, coupled with a lack of transparency, is of heightened importance and has led to recurring disputes over \nwhether the transmission provider is exercising its discretion to discriminate against its competitors.  This discretion \nalso hampers the detection of undue discrimination and, thereby, undermines the Commission's ability to enforce the \ngeneral requirement in Order No. 888 that transmission service be provided on a not unduly discriminatory basis.”). \n117 See Standardization of Generator Interconnection Agreements & Procs., Order No. 2003, 104 FERC ¶ 61,103, \nat P 785 (2003) (explaining that article 4.1.2.2 of the pro forma LGIA, describing interconnection study procedures \nfor Network Resource Interconnection Service, “establishes the standards for conducting necessary studies to provide \nthe requested service while ensuring that the reliability of the system is maintained” and “deters a Transmission \nProvider from delaying an interconnection by imposing on competing Interconnection Customers, in the name of \nreliability, more stringent Interconnection Study requirements than it would require of its own interconnections or \nthose of its Affiliates”), order on reh’g, Order No. 2003-A, 106 FERC ¶ 61,220, order on reh’g, Order No. 2003-B, \n109 FERC ¶ 61, 287 (2004), order on reh’g, Order No. 2003-C, 111 FERC ¶ 61,401 (2005), aff’d sub nom. Nat’l \nAss’n of Regul. Util. Comm’rs v. FERC, 475 F.3d 1277 (D.C. Cir. 2007); Reform of Generator Interconnection Procs. \n& Agreements, Order No. 845, 163 FERC ¶ 61,043, at P 237 (2018) (explaining that requiring transmission providers \nto make available network models and underlying assumptions for interconnection studies would “reduce the \npossibility that some interconnection customers will have unduly discriminatory access to relevant information,” \n“generally increase transparency,” “allow interconnection customers to make more informed interconnection \ndecisions,” and “hold[] transmission providers accountable as to which network models and assumptions they use to \nassess interconnection requests”), order on reh’g & clarification, Order No. 845-A, 166 FERC ¶ 61,137, order on \nreh’g, Order No. 845-B, 168 FERC ¶ 61,092 (2019). \n118 16 U.S.C. § 824d(c)."},{"page":37,"startToken":13387,"endToken":13770,"text":"-37- \nrequirement, the Commission applies a “rule of reason” pursuant to which a utility must file with \nthe Commission those practices that (1) significantly affect rates, terms, and conditions of service, \n(2) are realistically susceptible of specification, and (3) are not so generally understood in a \ncontractual arrangement as to render recitation superfluous.119  The missing information from \nPJM’s proposal satisfy each criterion. \nFirst, the missing information significantly affects rates, terms, and conditions of service.  \nA customer’s queue position, the analyses that PJM and the Transmission Owners conduct, and \nthe timeline for conducting those analyses all directly and significantly affect how much service a \ncustomer can receive and the cost of the upgrades required to receive that service.  Similarly, study \nfees and discretion as to the evaluation timeline can be used to interfere with a customer’s ability \nto receive service at all.  These are no “mere implementation details”;120 they go to the heart of \naccess to transmission service. \nSecond, the missing information is readily susceptible of specification:  as shown above, \neach missing item has a counterpart that is specified for generator interconnection requests in the \nPJM Tariff.    \nThird, the missing information is not so readily understood as to render recitation \nsuperfluous.  Each practice can diverge widely: customers can be queued and studies can be \nperformed serially or in clusters;121 transmission providers conduct various types of analyses in \nthe course of their studies, and the proposed tariff contemplates that PJM will conduct studies \n119 City of Cleveland v. FERC, 773 F.2d 1368, 1376 (D.C. Cir. 1985); Hecate Energy Greene Cty. 3 LLC v. FERC, \n72 F.4th 1307, 1312 (D.C. Cir. 2023) (citing id.); see also Cal. Indep. Sys. Operator, Inc., 116 FERC ¶ 61,274, at PP \n54, 64, 618 (2006) (requiring CAISO to provide details in tariff on its parameters for treatment of ancillary service \nbids in the forward market because such parameters could significantly affect rates), order on reh’g, 119 FERC ¶ \n61,076, order on reh’g, 120 FERC ¶ 61,271 (2007). \n120 Hecate Energy Greene Cty. 3, 72 F.4th at 1312. \n121 Compare, e.g., PJM Tariff, pt. VIII, subpt. J, § 437 (1.1.0) (serial study for replacement generating facilities), \nwith id. subpt. A, § 401(A) (2.0.0) (cluster study for new generating facilities)."},{"page":38,"startToken":13770,"endToken":14157,"text":"-38- \nabove and beyond those ordinarily performed in the system impact study process, raising the \nquestion of what those will be;122 and timelines for studies vary across transmission providers and \nprocesses,123 as do study fees.124\nThe missing information therefore cannot be left to PJM and the Transmission Owners’ \ndiscretion.  The FPA and the rule of reason require that it be articulated and filed with the \nCommission.  \nB. PJM Has Not Explained the Standard for Assessing Whether PJM can “Reliably” \nServe Curtailable Customers \nPJM proposes that it will consult with Transmission Owners to determine “the amount of \nInterim [NITS] that can be provided to an Eligible Customer . . . while maintaining the reliability \nof the Transmission System.”125  Similarly, PJM proposes to consult with Transmission Owners \nto determine “whether (and to what level as applicable) Firm Contract Demand Transmission \nService or Non-Firm Contract Demand Transmission Services can be reliably provided for an \nApplication, and if so, what level of service may be provided.”126  The proposal contemplates the \npossibility that PJM will determine that “only a portion of the Non-Firm Contract Demand \nTransmission Service requested by Eligible Customer can be provided reliably” and the possibility \nthat PJM will determine that “no level of Non-Firm Contract Demand Transmission Service \nrequested by Eligible Customer can be provided reliably.”127\n122 Compare, e.g., id. subpt. C, § 404(2)(a) (1.0.0) (procedures for studying New Service Requests in PJM), with \nSPP, Open Access Transmission Tariff, attach. Z1, § III(C) (4.0.0) (procedures for studying long-term NITS requests \nin SPP) (“SPP Tariff”). \n123 Compare, e.g., PJM Tariff, pt. VIII, subpt. C §§ 409(A)(1)(d), (e)(ii) (0.1.0) (180-day Phase III study, including \nFacilities Study), with MISO, FERC Electric Tariff, attach. X (184.0.0), § 3.3.1.2(2) (90-day Facilities Study). \n124 Compare, e.g., PJM Tariff, pt. VIII, subpt. B, § 403(A)(5)(a)(iv) (0.1.0) (new service request study deposit \nschedule starting at $75,000 for requests up to 20 MW), with SPP Tariff, attach. V, § 8.2(b) (27.0.0) (generator \ninterconnection study deposit schedule starting at $35,000 plus $1,000 per MW for requests up to 80 MW). \n125 Proposed Tariff, pt. XI, subpt. A, § 702.3. \n126 Id. subpt. B, § 710.3. \n127 Id."},{"page":39,"startToken":14157,"endToken":14550,"text":"-39- \nCustomers electing to take Interim NITS and Non-Firm Contract Demand Transmission \nService have agreed to be curtailable.128  Indeed, the purpose of non-firm transmission service is \nto use the capacity of the transmission system as it exists at any given point in time, subject to use \nby transmission customers of higher priority.  It is therefore unclear what it means to ensure that \nnon-firm transmission service can be provided “reliably.” And it is critical that the PJM and \nTransmission Owners’ determination of whether non-firm service can be provided “reliably” not \nhold the non-firm request to some higher standard.  Study standards must be appropriate for the \nlevel of service and must be transparent to avoid undue discrimination.  Studying non-firm \ncustomers as if they are firm customers, or as if they will take transmission service during system \nconditions in which they will in fact be curtailed, will needlessly inhibit access to, and efficient \nutilization of, available transmission system capacity.129\nThe Commission should require PJM to articulate the standard of “reliability” for \ncustomers that have expressly agreed to be curtailable, and the Commission should ensure that this \nstandard does not unnecessarily restrict access to non-firm transmission system capacity. \nIV.Payment Guarantees \nThe Transmission Owners expressed concerns about potential cost shifting if a customer \ntaking Firm Contract Demand Transmission Service exits the transmission system before the costs \nof needed network upgrades to accommodate its load are fully paid.130  The Transmission Owners \n128 See Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at P 200 (“This new interim, non-firm transmission \nservice must allow an Eligible Customer that has requested NITS on behalf of a Co-Located Load to take non-firm \ntransmission service that can be interrupted until the Network Upgrades necessary to provide NITS are complete and \nthe Co-Located Load can be designated as Network Load.”); id. P 215 (“Reservations under this service would be \navailable only when there is available transmission capacity, similar to existing non-firm transmission service options \nin the Tariff.”). \n129 See Order No. 890, 118 FERC ¶ 61,119 at P 925 (finding that it was unjust and unreasonable for transmission \nproviders to deny firm long-term transmission service request on the basis that firm service is unavailable in a very \nfew hours of the year, and requiring transmission providers to offer conditional firm service as remedy). \n130 PJM TOs Initial Brief at 21."},{"page":40,"startToken":14550,"endToken":14912,"text":"-40- \nsuggested in a footnote that they may “require separate payment guarantees” to collateralize \nnetwork upgrades to mitigate that risk.131  Some of the Transmission Owners, such as ComEd, \nhave filed Transmission Security Agreements to establish firm financial commitments to mitigate \nthat risk.132\nThe risk of network upgrade cost shifts simply does not apply to co-location arrangements \nwhere the generator bears the cost of any necessary network upgrades.  Vistra has previously \nexplained that it is willing and able to bear those costs,133 and the Commission’s Order confirmed \nthat the necessary study process requires generators to bear any network upgrade costs.134  The \nTransmission Security Agreements that the Commission has accepted are therefore not necessary \nin this context.       \nV. Conclusion \nTo establish a lawful replacement rate, the Commission must require PJM and the \nTransmission Owners to modify the proposed rates, terms, and conditions of the  new transmission \nservices to ensure that they are implemented expeditiously and in a manner that is both consistent \nwith the FPA and fulfills the purpose they were designed to serve.  Specifically, the Commission \nshould: \n\nRequire PJM to implement the new transmission services quickly, and provide a pathway for \ncustomers who commit to pulling zero energy from the grid to take service as soon as possible; \n131 Id. n.50 \n132 See, e.g., PECO Energy Co., Transmission Security Agreement between PECO Energy Co. & Amazon Data \nServices, Inc., Docket No. ER25-3492-000 (filed Sep. 23, 2025); Commonwealth Edison Co., Transmission Security \nAgreement between Commonwealth Edison Co. & Aligned Data Centers (Acquisition) PropCo, LLC, Docket No. \nER26-838-000 (filed Dec. 19, 2025); Commonwealth Edison Co., Transmission Security Agreement between \nCommonwealth Edison Co. & Equinix, Inc., Docket No. ER26-989-000 (filed Jan. 9, 2026).  \n133 See, e.g., Interconnection of Large Loads to the Transmission Sys., Comments of Vistra Corp., Docket No. \nRM26-4-000, at 4 (filed Nov. 21, 2025); Interconnection of Large Loads to the Transmission Sys., Reply Comments \nof Vistra Corp., Docket No. RM26-4-000, at 2-3 (filed Dec. 5, 2025); PJM Interconnection, L.L.C., Comments of \nVistra Corp., Docket Nos. EL25-49-000, et al., at 24-25 (filed Apr. 23, 2025). \n134 Order on Show Cause Proceeding, 193 FERC ¶ 61,217 at P 176."},{"page":41,"startToken":14912,"endToken":15086,"text":"-41- \n\nAdopt a common-sense transition process for co-location arrangements that have already taken \nsteps under the existing tariff; \n\nEnsure that the rate structure for Non-Firm Contract Demand Transmission Service is tailored \nto the benefits that the customers draw from the grid and does not create cost shifts;  \n\nEliminate unfettered discretion in the study process; and  \n\nRemove unreasonable and unduly discriminatory restrictions on the use of the new services.   \nThose adjustments are necessary to render the PJM Tariff just, reasonable, and not unduly \ndiscriminatory—and it will ensure that this proceeding lives up to its transformative potential.  \nRespectfully submitted, \n/s/ J. Arnold Quinn\nJ. Arnold Quinn\nSVP of Regulatory Policy \nAndrew Weinstein\nVice President, FERC Market Policy\nVistra Corp.\n325 7th Street NW\nSuite 520\nWashington, DC 20004\narnie.quinn@vistracorp.com\nandrew.weinstein@vistracorp.com\n__________________\nNicholas M. Gladd\nSarah Greenberg\nRachel Neuburger\nWilson Sonsini Goodrich & Rosati\n1700 K Street NW\nFifth Floor\nWashington, DC 20006\n(617) 598-7871\nngladd@wsgr.com\nsgreenberg@wsgr.com\nrneuburger@wsgr.com\nCounsel for Vistra Corp.\nDated: March 25, 2026"},{"page":42,"startToken":15086,"endToken":15145,"text":"CERTIFICATE OF SERVICE\nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service lists compiled by the Secretary of the Commission in these \nproceedings. \nDated: March 25, 2026 \nWashington, D.C. \n/s/ Rachel Neuburger\nRachel Neuburger \nWilson Sonsini Goodrich & Rosati \n1700 K Street NW \nFifth Floor \nWashington, DC 20006"},{"page":43,"startToken":15145,"endToken":15151,"text":"Attachment A \nAffidavit of Rebecca Stadelmeyer"},{"page":44,"startToken":15151,"endToken":15401,"text":"Page 2 \nQ. \nPLEASE STATE YOUR NAME AND BUSINESS ADDRESS. \n1 \nA.\nMy name is Rebecca Stadelmeyer. My business address is 2001 Market Street, Suite 2500, \n2 \nPhiladelphia, Pennsylvania 19103.\n3 \nQ. \nBY WHOM ARE YOU EMPLOYED AND IN WHAT CAPACITY?   \n4 \nA.\nI am employed by Gabel Associates, Inc., where I serve as the Vice President of RTO \n5 \nWholesale Power and Market Services.  I first joined Gabel Associates in 2022 as a \n6 \nDirector and was promoted to Vice President in 2025. In this role, I manage our firm’s \n7 \nengagements on wholesale power market matters throughout the United States, including \n8 \nissues in the PJM Interconnection (“PJM”).  I advise clients on state and federal electric \n9 \nmarket design matters, support mergers and acquisitions, perform diligence on wholesale \n10 \npower market transactions, monitor ongoing policy issues in PJM and abroad, and evaluate \n11 \nPJM’s capacity, energy, and ancillary service markets.  \n12 \nI frequently engage with PJM staff and industry stakeholders on all matters impacting our \n13 \nclients directly or indirectly, including but not limited to capacity market design issues, \n14 \ncapacity accreditation, reserve market reforms, regulation Phase 1 and Phase 2 changes, \n15 \nmarket offering rules, operational regulations, and ultimately how money changes hand in \n16 \nsettlements.  \n17 \nQ. \nPLEASE \nDESCRIBE \nYOUR \nEDUCATIONAL \nAND \nPROFESSIONAL \n18 \nEXPERIENCE. \n19 \nA.\nI graduated from Moravian College, renamed to Moravian University in 2021, with a \n20 \nbachelor’s degree in management.  I have over 20 years of experience in wholesale power \n21"},{"page":45,"startToken":15401,"endToken":15626,"text":"Page 3 \nmarkets in various positions at Mirant, Exelon Power Team, and PJM.  At PJM, I held \n1 \nleadership and technical roles, including Manager of Market Settlement Development, \n2 \nManager of Client Management, and Senior Consultant, overseeing billing system \n3 \noperations and streamlining complex client requests.  I contributed to major market rule \n4 \nchanges, including Capacity Performance, 5-minute Settlement, and facilitated Market \n5 \nSettlement Subcommittee and member interactions.  My roles prior to PJM, from trade \n6 \nfloor portfolio analyst to regulatory affairs manager, honed my analytical skills and applied \n7 \nthem to the regulatory arena.  My roles supporting capacity performance, 5-minute \n8 \nsettlements, and various NOPRs at PJM contributed to my overall understanding of the \n9 \ntechnical underpinnings of market rules, and how those rules are properly implemented in \n10 \nPJM.    \n11 \nQ. \nWHAT IS THE PURPOSE OF YOUR AFFIDAVIT? \n12 \nA.\nI was retained by Vistra Corp. to evaluate the PJM Transmission Owners’ proposed rates \n13 \nfor Firm and Non-Firm Contract Demand Transmission Services and determine if cost \n14 \nshifts occur between the different transmission service classes, especially when Non-Firm \n15 \nContract Demand Transmission Service customers take no transmission service (or a de \n16 \nminimis amount of service) from the grid.  \n17 \nQ.\nCAN YOU BRIEFLY SUMMARIZE HOW PJM PROPOSES TO IMPLEMENT \n18 \nTHE NEW FIRM AND NON-FIRM CONTRACT DEMAND TRANSMISSION \n19 \nSERVICES? \n20"},{"page":46,"startToken":15626,"endToken":15892,"text":"Page 4 \nA. \nPJM will require Eligible Customers taking one of the Contract Demand services on behalf \n1 \nof a co-located load to sign a Transmission Service Agreement that covers the entire gross \n2 \nload.  PJM will allow customers to obtain a combination of Firm Contract Demand \n3 \nTransmission Service and Non-Firm Contract Demand Transmission Service, as long as \n4 \nthat combination equals the full gross load.1  If the customer does not take any Firm \n5 \nContract Demand Transmission Service, then it “must request Non-Firm Contract Demand \n6 \nTransmission Service equivalent to the MW level of the Co-Located Load’s gross \n7 \ndemand.”2\n8 \nFor example, an Eligible Customer procuring service on behalf of a 200 MW gross load \n9 \nmay sign a Transmission Service Agreement for either (a) 200 MW of Firm Contract \n10 \nDemand Transmission Service, (b) 200 MW of Non-Firm Contract Demand Transmission \n11 \nService, or (c) a combination of both Firm and Non-Firm Contract Demand Transmission \n12 \nService that, together, equals 200 MW.  \n13 \nQ.\nCAN YOU BRIEFLY SUMMARIZE THE PJM TRANSMISSION OWNERS’ GRID \n14 \nRELIANCE CHARGE METHODOLOGY? \n15 \nA. \nPJM Transmission Owners propose to create a new charge, called the Grid Reliance \n16 \nCharge, which will apply to Contract Demand customers based on “the difference between \n17 \n1 PJM Interconnection, L.L.C., Initial Brief of PJM Interconnection, L.L.C., Docket Nos. EL25-49-000, et al., at 9 \n(filed Feb. 23, 2026) (“PJM Initial Brief”); id. at 11 (“ . . . so long as the combination of the two services covers the \nentire gross demand of the Co-Located Load”). \n2 Id. at 31."},{"page":47,"startToken":15892,"endToken":16178,"text":"Page 5 \ntheir gross load and their Firm Contract Demand.”3  Customers that “only [take] Non-Firm \n1 \nContract Demand Service would pay the Grid Reliance Charge on their entire load.”4  The \n2 \nPJM Transmission Owners propose to use a calculated uniform percentage rate across all \n3 \nzones, which they assert represents an “average fixed percentage of the portion of \n4 \ntransmission depreciation and operations and maintenance (“O&M”) expense associated \n5 \nwith providing grid reliance services.”5  The average fixed percentage, 25.8%, will be \n6 \nmultiplied by the applicable zonal NITS rate to produce an “unadjusted” Grid Reliance \n7 \nCharge.6  That unadjusted Grid Reliance Charge will then be “multiplied by a ratio that \n8 \naccounts for the difference between the demand used to account for the NITS and Firm \n9 \nContract Demand Service rate (NITS customer load plus Firm Contract Demand Service \n10 \nload) and Co-Located Load customers’ gross load, to arrive at the final Grid Reliance \n11 \nCharge for each Zone.”7  The Transmission Owners will allocate the monies collected from \n12 \nthe Grid Reliance Charge “as a dollar-for-dollar credit to NITS and Firm Contract Demand \n13 \nService customers located in the relevant Zone based on their share of the coincident peak \n14 \nload.”8  The Transmission Owners will similarly credit revenues from any transmission \n15 \n3 PJM Interconnection, L.L.C., Initial Brief of Indicated PJM Transmission Owners, Docket Nos. EL25-49-000, et \nal., (filed Feb. 23, 2026) (“PJM TOs Initial Brief”), Attach. A, Affidavit of Peter Blazunas, Lance Schafer and \nHanhan Hammer, at 18:18-19 (“Blazunas, Schafer, and Hammer Affidavit”). \n4 PJM TOs Initial Brief at 14. \n5 Id. at 15. \n6 Id. \n7 Id. at 17. \n8 Id. at 17-18."},{"page":48,"startToken":16178,"endToken":16429,"text":"Page 6 \nservice that Non-Firm Contract Demand Transmission Service customers take back to \n1 \nNITS and Firm Contract Demand Transmission Service customers.9\n2 \nQ. \nWILL THE GRID RELIANCE CHARGE SHIFT COSTS INAPPROPRIATELY \n3 \nBETWEEN CUSTOMER CLASSES? \n4 \nA.\nYes.  The new Grid Reliance Charge will result in Contract Demand Transmission Service \n5 \ncustomers subsidizing NITS customers.  The proposal would allow NITS customers to pay \n6 \nless than they currently do, for a superior product compared to either the Firm or Non-Firm \n7 \nContract Demand Transmission Service.  \n8 \nFigure 1 below illustrates this result, using a simple example based on the Transmission \n9 \nOwners’ proposal.  This example includes three customers, each with 250 MW of gross \n10 \nload, in a zone with a $1,000,000 transmission revenue requirement.  Customer A takes \n11 \n250 MW of NITS.  Customer B takes 150 MW of Firm Contract Demand Transmission \n12 \nService and 100 MW of Non-Firm Contract Demand Transmission Service, but only uses \n13 \nits Non-Firm service during two months of the year when the co-located generator is on \n14 \noutage.  Customer C takes 250 MW of Non-Firm Contract Demand Transmission Service, \n15 \nbut does not use the Non-Firm service.  The chart below provides a step-by-step calculation \n16 \nof the transmission service charges and Grid Reliance Charges that each customer would \n17 \nincur under the Transmission Owners’ proposal, as well as the allocation of bill credits \n18 \nfrom revenues received from Non-Firm Contract Demand Transmission Service \n19 \ncustomers.   \n20 \n9 Id. at 7."},{"page":49,"startToken":16429,"endToken":16510,"text":"Page 7 \nFigure 1: Illustration of Cost Shifts Caused by the Grid Reliance Charge \nThe key focus is reference line numbers 33, 37, and 41, which represent the “Percentage \n1 \nof Charges paid” by each customer.  Customer A, taking 250 MW of NITS, will pay only \n2 \n84% of its transmission charges because the rest will be offset by bill credits.  Customer B \n3 \nwill pay 87% of its transmission charges, and Customer C will pay 100% of its transmission \n4"},{"page":50,"startToken":16510,"endToken":16791,"text":"Page 8 \ncharges.  Customer A therefore receives a substantial discount from the transmission \n1 \ncharges it incurs and would have otherwise been required to pay. \n2 \nAdditionally, even though Customer B only takes 40% of the firm service that Customer \n3 \nA takes (i.e., 100 MW compared to 250 MW), Customer B is required to pay over 73% of \n4 \nthe transmission charges that Customer A pays (i.e., $386,708 compared to $527,292).  \n5 \nAnd Customer C, who did not actually take any transmission service from the grid, pays \n6 \n16% of what Customer A pays for the highest level of around-the-clock, firm service.   \n7 \nThe proposed Grid Reliance Charge calculation and credit allocation therefore causes \n8 \nsignificant cost shifts, resulting in the Non-Firm Contract Demand Transmission Service \n9 \ncustomers subsidizing the NITS customer.  It also results in charges that are not \n10 \ncommensurate with the benefits that the different customers receive. \n11 \nQ.\nIS A GRID RELIANCE CHARGE NECESSARY AND SHOULD NON-FIRM \n12 \nCONTRACT DEMAND SERICE CUSTOMERS PAY THIS CHARGE WHEN NO \n13 \nSERVICE IS TAKEN OR WHEN ONLY DE MINIMIS SERVICE IS TAKEN? \n14 \nA. \nNo.  The Commission’s December 18, 2025 Order requested briefing on whether a grid \n15 \nreliance charge was appropriate.10  The Order did not make any findings on that question.  \n16 \nIn fact, the Commission’s questions recognized that customers can use Non-Firm Contract \n17 \nDemand Transmission Service in different ways and to varying degrees, including by \n18 \nexplaining that a customer may elect to reserve no transmission service ‘to the extent that \n19 \n10 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at P 219 (2025) (“Order on Show Cause Proceeding”)."},{"page":51,"startToken":16791,"endToken":17050,"text":"Page 9 \nthe [customer] will not withdraw any electricity from the transmission system.’”11\n1 \nApplying the Grid Reliance Charge to Non-Firm Contract Demand Transmission Service \n2 \nwhen no service or when only de minimis service is taken is unnecessary, undermines the \n3 \npurpose of the service, and creates a charge that is not commensurate with the benefits the \n4 \ncustomer receives. \n5 \nQ.\nIS SYNCHRONIZATION WITH THE GRID A STANDALONE BASIS FOR \n6 \nIMPOSING A GRID RELIANCE CHARGE? \n7 \nA.\nNo.  Synchronization is simply an operational reality of the system, and a prerequisite to \n8 \ntaking transmission and ancillary services.  There is no standalone benefit from \n9 \nsynchronization when a customer is not taking service from the grid.  While the \n10 \nCommission recognized that certain specific services enabled by synchronization to the \n11 \ngrid—namely, black start and regulation—benefit co-located loads,12 and asked whether \n12 \nan additional charge might be appropriate to reflect that regulation and black start could \n13 \nnot be provided without the transmission system,13 the Commission did not make a finding \n14 \nthat synchronization is itself a service or otherwise provides a standalone compensable \n15 \nbenefit.  The PJM Transmission Owners assert that customers taking transmission service \n16 \non behalf of a co-located load will benefit from “various ancillary services and a suite of” \n17 \nadditional “synchronization support services,”14 but do not list the full set of services such \n18 \n11 Id. P 178 n.380. \n12 Id. PP 177, 183-185. \n13 Id. P 219. \n14 PJM TOs Initial Brief at 15."},{"page":52,"startToken":17050,"endToken":17320,"text":"Page 10 \nloads allegedly benefit from nor explain how such customers taking no transmission \n1 \nservice or de minimis transmission service benefit from them.   \n2 \nQ.\nIF THE COMMISSION DETERMINES THAT A GRID RELIANCE CHARGE IS \n3 \nNECESSARY, IS THERE A METHODOLOGY THAT WOULD RESOLVE \n4 \nTHOSE COST SHIFTS?  \n5 \nA.\nIf there is a Grid Reliance Charge for Non-Firm Contract Demand Transmission Service \n6 \ncustomers that reserve no transmission service (or a de minimis amount of service), that \n7 \ncharge should be based on the benefits those customers receive from the grid in supporting \n8 \nblack start and regulation services only.  Since no electricity (or a de minimis amount of \n9 \nelectricity) is taken from the grid, the customer is not relying on the grid, i.e., taking \n10 \ntransmission service, for electricity. Only a sub-part of the costs of transmission \n11 \ndepreciation and O&M are associated with the use of the grid to support black start and \n12 \nregulation, so only that sub-part of the costs should be assessed.  To identify that portion \n13 \nof costs, PJM could calculate an annual ratio share that represents the value of these \n14 \nservices in relation to PJM’s monthly total billings.  Figure 2 below provides a monthly \n15 \nbreakdown of PJM’s monthly total billings, monthly total black start billings, and monthly \n16 \ntotal regulation billings in 2025,15 along with black start and regulation revenue as a \n17 \npercentage of PJM’s monthly total billings. \n18 \n15 Monitoring Analytics, Components of the Total Cost of PJM Wholesale Power, \nhttps://www.monitoringanalytics.com/data/pjm_cost.shtml (last visited Mar. 24, 2026)."},{"page":53,"startToken":17320,"endToken":17543,"text":"Page 11 \nFigure 2: Black Start and Regulation Billing as Percentage of PJM Monthly Total Billings in 2025\nTo produce a Grid Reliance Charge that represents the benefits associated with black start \n1 \nand regulation services only, PJM could apply the sum of the percentage of total billings \n2 \nassociated with black start and the percentage of total billings associated with regulation to \n3 \nthe proposed PJM Transmission Owner Grid Reliance Charge rate.  Since the proposed \n4 \nPJM Transmission Owner Grid Reliance Charge rate captures all of the costs of the FERC \n5 \nAccounts that they assert are relevant to grid reliance, a ratio share of that proposed rate to \n6 \nrepresent the portion of those costs that are attributable to supporting black start and \n7 \nregulation (rather than supporting transmission service itself) appropriately captures the \n8 \nbenefits obtained and removes the cost shift between customer classes.   \n9 \nThere are minimal monthly variations in the monthly total billings, so PJM could use an \n10 \nannual percentage, updated annually to reflect market conditions, to reduce the \n11 \nadministrative burden.  In 2025, the percentage of total billings related to black start is \n12 \n0.08%, and the percentage of total billings related to regulation is 0.46%.  Together, those \n13 \nvalues produce a total annual grid reliance benefit percentage of 0.54%.  That percentage, \n14"},{"page":54,"startToken":17543,"endToken":17770,"text":"Page 12 \napplied to the proposed PJM Transmission Owner’s Grid Reliance Charge rate, creates an \n1 \nalternative rate that can be applied to Non-Firm Contract Demand Transmission Service \n2 \ncustomers in a billing month when no service or when a de minimis amount of service is \n3 \ntaken. \n4 \nQ. \nHOW WILL APPLYING A BENEFIT PERCENTAGE TO THE GRID RELIANCE \n5 \nCHARGE RATE PREVENT COST SHIFTS AND MORE APPRORIATELY \n6 \nBALANCE COST CAUSATION WHEN NO SERVICE IS USED?  \n7 \nA.\nIf there is a Grid Reliance Charge for Non-Firm Contract Demand Transmission Service \n8 \ncustomers that reserve no transmission service (or a de minimis amount of service), then \n9 \nthe charge should reflect only the benefits provided from the grid, black start and \n10 \nregulation, and should not subsidize NITS customers.  The alternative rate captures these \n11 \nbenefits.  \n12 \nFigure 3 below shows a comparison of rates, charges and credits applied to two customers \n13 \nin one zone, both with the same gross load of 250 MWs.  Customer A is a NITS customer \n14 \nand Customer B is a Non-Firm Contract Demand Transmission Service customer that does \n15 \nnot reserve service from the grid in either Scenario A or Scenario B.  Scenario A applies \n16 \nthe proposed methodology described in the PJM Transmission Owner’s Initial Brief. \n17 \nScenario B applies the alternative rate I describe above.   \n18"},{"page":55,"startToken":17770,"endToken":17909,"text":"Page 13 \nFigure 3: Illustrative Comparison of Alternative Rate Structure to Minimize Cost Shifts   \nThe PJM Transmission Owner’s proposal, represented in Scenario A, results in an \n1 \ninappropriate cost shift and a 12.9% reduction of cost for the NITS customers based on the \n2 \ncontributions of Customer B, who never takes service from the grid.  Scenario B more \n3 \nappropriately allocates to Customer B the costs of receiving black start and regulation from \n4 \nthe grid and allocates costs appropriately among customer classes.  \n5 \nScenario B continues to allocate credits from the Grid Reliance Charge to the NITS and \n6 \nFirm Contract Demand Transmission Service customers based on ratio share of the \n7 \ncoincident peak, without creating significant cost shifts.  This alternative compensates the \n8 \ntransmission owner for the provision of ancillary services while avoiding cost shifting.  \n9"},{"page":56,"startToken":17909,"endToken":17925,"text":"Page 14 \nQ.\nDOES THIS CONCLUDE YOUR AFFIDAVIT?\n1 \nA.\nYes.  This concludes my affidavit.  \n2"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":5,"endAt":2117,"startToken":0,"endToken":1442},{"p":5,"at":2117,"title":"I. The Proposed June 1, 2029 Effective Date is Unjust and Unreasonable and Fails to","method":"printed heading","endPage":7,"endAt":526,"startToken":1442,"endToken":2078},{"p":7,"at":526,"title":"A. Capacity Market","method":"printed heading","endPage":10,"endAt":936,"startToken":2078,"endToken":3626},{"p":10,"at":936,"title":"B. Software and System Changes","method":"printed heading","endPage":12,"endAt":529,"startToken":3626,"endToken":4328},{"p":12,"at":529,"title":"C. The Commission Should Require a Transition Process that Accommodates Co-","method":"printed heading","endPage":15,"endAt":973,"startToken":4328,"endToken":5532},{"p":15,"at":973,"title":"II. The Structure of Non-Firm Contract Demand Transmission Service is Unjust and","method":"printed heading","endPage":16,"endAt":106,"startToken":5532,"endToken":5723},{"p":16,"at":106,"title":"A. The Proposed Rate for Non-Firm Contract Demand Transmission Service is Unjust","method":"printed heading","endPage":25,"endAt":343,"startToken":5723,"endToken":8977},{"p":25,"at":343,"title":"B. The Proposed Restrictions on Non-Firm Contract Demand Transmission Service are","method":"printed heading","endPage":32,"endAt":136,"startToken":8977,"endToken":11475},{"p":32,"at":136,"title":"A. PJM Has Granted Itself Unfettered Discretion to Determine Whether to Conduct","method":"printed heading","endPage":38,"endAt":430,"startToken":11475,"endToken":13839},{"p":38,"at":430,"title":"B. PJM Has Not Explained the Standard for Assessing Whether PJM can “Reliably”","method":"printed heading","endPage":40,"endAt":805,"startToken":13839,"endToken":14669},{"p":40,"at":805,"title":"V. Conclusion","method":"printed heading","endPage":42,"endAt":0,"startToken":14669,"endToken":15086},{"p":42,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":43,"endAt":0,"startToken":15086,"endToken":15145},{"p":43,"at":0,"title":"Attachment A","method":"printed heading","endPage":44,"endAt":61,"startToken":15145,"endToken":15162},{"p":44,"at":61,"title":"A. My name is Rebecca Stadelmeyer. My business address is 2001 Market Street, Suite 2500,","method":"printed heading","endPage":46,"endAt":8,"startToken":15162,"endToken":15628},{"p":46,"at":8,"title":"A. PJM will require Eligible Customers taking one of the Contract Demand services on behalf","method":"printed heading","endPage":46,"endAt":1144,"startToken":15628,"endToken":15810},{"p":46,"at":1144,"title":"A. PJM Transmission Owners propose to create a new charge, called the Grid Reliance","method":"printed heading","endPage":48,"endAt":256,"startToken":15810,"endToken":16216},{"p":48,"at":256,"title":"A. Yes. The new Grid Reliance Charge will result in Contract Demand Transmission Service","method":"printed heading","endPage":50,"endAt":1149,"startToken":16216,"endToken":16699},{"p":50,"at":1149,"title":"A. No. The Commission’s December 18, 2025 Order requested briefing on whether a grid","method":"printed heading","endPage":51,"endAt":492,"startToken":16699,"endToken":16871},{"p":51,"at":492,"title":"A. No. Synchronization is simply an operational reality of the system, and a prerequisite to","method":"printed heading","endPage":52,"endAt":312,"startToken":16871,"endToken":17100},{"p":52,"at":312,"title":"A. If there is a Grid Reliance Charge for Non-Firm Contract Demand Transmission Service","method":"printed heading","endPage":54,"endAt":471,"startToken":17100,"endToken":17622},{"p":54,"at":471,"title":"A. If there is a Grid Reliance Charge for Non-Firm Contract Demand Transmission Service","method":"printed heading","endPage":56,"endAt":50,"startToken":17622,"endToken":17918},{"p":56,"at":50,"title":"A. Yes. This concludes my affidavit.","method":"printed heading","endPage":56,"endAt":91,"startToken":17918,"endToken":17925}]}