{"document":{"slug":"rec-20260326-5062","title":"Reply Brief of the Independent Market Monitor in response to PJM Interconnection, L.L.C.’s initial brief filed on 02/23/2026","issued":"2026-03-26","accession":"20260326-5062","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Monitoring Analytics, LLC","kind":"brief","file":"sources/filings/text/20260326-5062_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260326-5062","tier":"record","sha256":"b8724074f90d2509feb8524db5b3a750105fe0b1c61387038126cc92b1be1e13","pages":10,"tokens":2494,"emptyPages":[],"textThemes":["flex","colo"]},"pages":[{"page":1,"startToken":0,"endToken":147,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n \nLarge Loads Co-Located at Generating \nFacilities \n \nConstellation Energy Generation, LLC \n \n     v \n \nPJM Interconnection, L.L.C. \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n \nDocket No. EL25-49-000 \n \nDocket No. AD24-11-000 \n \n \nDocket No. EL25-20-000 \n \n \n(Consolidated) \nREPLY BRIEF OF THE INDEPENDENT MARKET MONITOR FOR PJM  \nPursuant to order issued in this proceeding on December 18, 2025 (“December 18th \nOrder”),1 Monitoring Analytics, LLC, acting in its capacity as the Independent Market \nMonitor for PJM2 (“Market Monitor”), submits this reply brief responding to the Initial Brief \nof PJM Interconnection, L.L.C. (“PJM”) filed on February 23, 2026. \n                                                          \n1  \nPJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025).  \n2 \nCapitalized terms used herein and not otherwise defined have the meaning used in the PJM Open \nAccess Transmission Tariff (“OATT”) or the PJM (“OA”) or the PJM Reliability Assurance \nAgreement (“RAA”)."},{"page":2,"startToken":147,"endToken":449,"text":"2 \nI. REPLY BRIEF \nA. PJM Transmission Service \nPJM’s brief includes key statements that should inform thinking about the proposed \ntypes of transmission service that the Commission identified in the December 18th Order. \nPJM states (at 48): “Since at least its establishment as an Independent System Operator \nin 1997, PJM’s processes have been built around the long-held practice and expectation that \nload internal to PJM will receive [Network Integration Transmission Service (“NITS”)]. This \nhas significant implications for PJM’s planning, markets, and operations functions, which are \nfocused on serving Network Load.” \nPJM states (at 14): “A demonstrated and proven ability to limit withdrawals from the \nsystem is crucial to the reliability of the PJM system and to prevent Contract Demand \nTransmission Services from having an adverse impact on the electric system’s reliability and, \nper the [December 18th] Order, a fundamental characteristic of Contract Demand \nTransmission Service.” \nThe Market Monitor appreciates and supports the Commission’s goals in the \nDecember 18th Order. However, it is the Market Monitor’s position that some of the \nCommission’s defined transmission services cannot work given the potentially very large \nload additions that could request service, given the critical importance of maintaining a \nreliable transmission grid, and given the importance of all customers paying their \nappropriate share of the all the costs of the grid, including all ancillary services. While \nrecognizing and supporting the Commission’s goals and the difficult issues facing the PJM \nwholesale power market, the December 18th Order represents a set of dramatic changes in the \nnature of transmission service in PJM, not all of which are workable consistent with \nmaintaining the reliable operation of the PJM system. In particular, non-firm CDS and \nInterim NITS create significant reliability risks for the transmission system. The December \n18th Order addresses transmission service but does not directly address the generation \nreliability issues."},{"page":3,"startToken":449,"endToken":803,"text":"3 \nB. Contract Demand Service (CDS)\nAs PJM states its understanding of CDS: “Contract Demand Transmission Services are \nintended to provide options beyond full NITS to Eligible Customers taking service on behalf \nof Co-Located Loads that are ’willing and able to control their withdrawals from the \ntransmission system.’”3 \nThe December 18th Order assumes that a customer can make a meaningful long term \ncommitment to use transmission service only up to a defined level. That commitment is \nsignificant because it means that a customer would pay for a lower level of transmission \nservice than under NITS because less cost is incurred to serve that load than under NITS. The \nimplication of that commitment is that PJM will build the transmission system in a different \nand less costly way than it would without that commitment. There is no evidence to support \nthis assumption. In fact, this strong assumption appears to be implausible and not consistent \nwith the way in which the transmission system is actually planned. For the assumption to be \ncorrect, it would need to be demonstrated that the sizing of elements of the transmission \nsystem would change with the characteristics of individual customers years in advance of the \ncustomers coming on line. Given the lumpiness of transmission investment, given the \nuncertainties inherent in transmission planning, given the uncertainty in actual customer \ndemand, given the fact that customers can and will change and given the fundamentally \ninteractive nature of the transmission system, it appears impossible to actually calculate a \ncost savings associated with a specific customer limiting their demand to a specific level, \ndefined years in advance of taking service. In the absence of a cost saving, there is no basis \nfor charging less for contract demand service than for NITS. If the billing determinants for \nNITS are correct and the customer actually limits its demand, the charges for NITS will reflect \nthe customer’s actual use of the transmission system. There is a logical reason that average \ncost ratemaking has been the general practice in setting transmission rates. It is not possible \n3\nPJM at 8, citing the order to the December 18th Order."},{"page":4,"startToken":803,"endToken":1149,"text":"4 \nto do accurate cost allocation or cost assignment to individual customers given the \nfundamental network nature of transmission service. The grid works as an integrated whole. \nAll transmission customers use the grid. It is not possible to meaningfully parse out exactly \nwhich grid services are used by a specific customer or exactly what parts of the grid are used \nby a specific customer. These issues are exacerbated by the option to convert firm CDS service \nto NITS. Given the long time lines in transmission planning and the extreme lumpiness of \ntransmission investments, if PJM is required to permit conversion to full NITS at a future \ndate, it would be rational for PJM to plan the transmission system as if the customer is a NITS \ncustomer. \nThe firm CDS is a logical transmission service that could work to maintain a reliable \ngrid if implemented as defined by the Commission. However, the firm CDS service provides \nno assurance that transmission costs associated with providing firm CDS service will not be \npaid by NITS transmission customers. \nCDS is intended for co-located load. In the December 18th Order, the Commission \nadopted (at P 3) PJM’s definition of co-located load: “PJM defined co-located load as a \nconfiguration through which end-use customer load is physically connected to the facilities \nof an existing or planned generation unit on the interconnection customer’s side of the point \nof interconnection to the PJM transmission system.”4 This definition does not address any of \nthe basic reliability issues raised by co-located loads. \nThe Commission separates two types of CDS: firm and non-firm CDS.5 The portion of \nthe Co-Located Load for which the Co-Located Generating Facility will dedicate its output \n(in whole or in part) may be covered by non-firm contract demand transmission service, but \n4\nThis does not address PJM’s proposal to change the distinction between the point of interconnection \nand the point of ownership change. See Answer and Motion for Leave to Answer of the Independent \nMarket Monitor for PJM, Docket No. ER26-1088-000 (February 25, 2026). \n5\nSee December 18th Order at P 160."},{"page":5,"startToken":1149,"endToken":1482,"text":"5 \nany portion of the gross demand of the Co-Located Load not served by the Co-Located \nGenerating Facility must be covered by firm contract demand transmission service. \nThe assumption underlying non-firm CDS is that the load has to pay for transmission \nservice only when the load needs transmission service. That assumption is untenable. As PJM \npoints out in its Brief and in the Dr. Abdulsalam Affidavit, such non-firm service can be only \na standby service and can only be provided “under limited circumstances.” The Affidavit \nshould be reviewed carefully as it includes a range of carefully stated concerns about the \nnature of this non-firm CDS option. The conditions for taking non-firm CDS identified by \nPJM are well defined and well supported but are not consistent with the Commission’s \ndefinition of non-firm CDS. According to the Commission, non-firm CDS is for customers \nthat want a “transmission reservation for a Co-Located Load in advance for the duration of \nan expected outage of the associated generator.”  \nAs PJM states (at 32). “Per the requirements of the [December 18th ] Order, Eligible \nCustomers seeking Non-Firm Contract Demand Transmission Service ‘will be charged for \ntransmission and ancillary services on an as-reserved contract demand [i.e., usage only] basis’ \nand will be charged ‘regulation and black start services based on a gross demand basis.’” \nAs PJM states (at 54). “That is, because PJM will plan the Transmission System to \nensure the Firm Contract Demand Transmission Service MW quantity and PJM will consider \nsuch amount in resource adequacy planning, the system will be designed to serve the Firm \nContract Demand Transmission Service, minimizing much of the system reliability risks \npresented by Non-Firm Contract Demand Transmission Service.” \nPer PJM, the transmission reservation cannot be made in advance and cannot be \nguaranteed for the duration of the expected outage. The non-firm CDS cannot be reserved in \nadvance of an unplanned outage, whether forced or maintenance. The equivalent availability \ndata (EAF is the equivalent availability factor) for all types of generators in PJM demonstrate"},{"page":6,"startToken":1482,"endToken":1837,"text":"6 \nthat the non-firm service would have to be used on a regular basis.6 Generators providing co-\nlocated service will not be available for 8,760 hours per year. The available factor (EAF) for \nPJM resources was 83.2 percent (1 – EAF is 16.8 percent) in 2025. Given the scale of potential \ndata center users of non-firm CDS, the system would become unmanageable if all or a \nsignificant part of the data center users wanted to use non-firm CDS, and the service would \nnot be available on a consistent basis and would therefore be meaningless. \nThis illustrates that there can be no such service as non-firm CDS that is fully \nconsistent with maintaining a reliable PJM transmission system. Non-firm CDS would \neffectively provide co-located generators a subsidized low cost option to use the system \nwhenever they need backup. That is precisely the point of the grid. The grid is available when \nneeded by all transmission customers. That is why all transmission customers should pay for \nfull NITS service. All customers should share the costs of the transmission system. There is \nno free or low cost part of the system. It is all paid for by other NITS customers. \nC. Interim NITS \nInterim NITS was created by the Commission in response to requests by large data \ncenter loads to interconnect more quickly than could occur for full NITS. Interim NITS is a \nnon-firm, interruptible network transmission service energy to serve co-located load that \nwould be provided because the transmission system cannot support full NITS for those \ncustomers. Once the necessary transmission system investments are final, Interim NITS \ncustomers would automatically convert to NITS customers. \nIt is clear from PJM’s filing that Interim NITS is not a preferred path forward because \nit is not consistent with PJM’s normal transmission planning process and imposes potentially \nsignificant risks on the PJM system.  PJM states (at 50) that “permitting Eligible Customers to \ntake non-NITS transmission services on behalf of Co-Located Load may pose additional \n                                                          \n6  \nSee Monitoring Analytics, LLC, 2025 Annual State of the Market Report for PJM, Volume 2: Section 5 \nCapacity Market, Table 5-39, page 366."},{"page":7,"startToken":1837,"endToken":2163,"text":"7 \nreliability and operational risks to the PJM Region.” PJM states (at 60) that “the complexity \nintroduced by the necessary control technology and protection systems (e.g. RAS) introduces \nsignificant risks.” \nGiven the risks, there is not an unlimited amount of Interim NITS that can be \nprovided. PJM and the affected TOs would have to perform required studies to define the \namount of Interim NITS that can be reliably provided. This raises questions about which \ncustomers would be allowed to take Interim NITS if demand exceeds supply, which seems \nlikely given the level of forecast large data center load. \nTo attempt to address the risks that result from Interim NITS, PJM will require the co-\nlocated load customers to work with PJM and affected Transmission Owners to “establish \nnecessary control technologies and protection systems, which may include a Remedial Action \nScheme, for each Service Agreement for Interim [NITS].”7 Remedial Action Schemes (RAS) \nare also referred to as Special Protection Schemes (SPS) by PJM and NERC. Per the Wharton \nAffidavit (at para. 15), a RAS “is designed to detect abnormal system conditions and to \nautomatically take appropriate corrective action to maintain system stability, acceptable \nsystem voltages, and acceptable facility loading.” The Wharton Affidavit makes a critical \npoint, when Mr. Wharton states (at para. 16) that RAS “should not be installed as a substitute \nfor good system design or operating practices.” Mr. Wharton states (id.) that the \nimplementation of RAS “is generally limited to temporary conditions involving the outage \nof critical equipment.” \nAddressing the risks of RAS, the Wharton Affidavit states (id.), “the consequences of \nan RAS misoperation are often more severe than those of fault protection schemes. While an \nRAS may be a temporary solution until the transmission system is reinforced, PJM Manuals \nindicate that PJM’s systems and operating procedures were designed to be served by NITS \neliminating the need for RAS while ensuring generation can be dispatched to serve load.” \n                                                          \n7  \nSee PJM at 72."},{"page":8,"startToken":2163,"endToken":2343,"text":"8 \nD. Implementation Date\nThe Market Monitor supports PJM’s proposed implementation date. Mr. Horger’s \nAffidavit states that PJM believes an effective date of June 1, 2029, is necessary for the three \nnew transmission services, interim NITS, non-firm contract demand transmission service, \nand firm contract demand transmission service. As PJM points out (at 66) The PJM system \ndoes not differentiate between different types of transmission service being used to serve \nload within PJM, because all load within PJM is currently served by NITS. The Horger \nAffidavit explains that PJM will be required to significantly modify core systems, including \nsoftware changes, to address, among other things, curtailing the load of a customer’s co-\nlocated Load being served by two different levels of transmission service.  The Horger \nAffidavit covers the level, significance and pervasiveness of the design changes that would \nbe required. For example, PJM points out (at 66) that “Eligible Customers taking transmission \nservice on behalf of Co-Located Load, would need to take these different forms of \ntransmission service on different feeders, or cables leaving substations, to ultimately serve \nthe Co-Located Load.”"},{"page":9,"startToken":2343,"endToken":2429,"text":"9 \nII. CONCLUSION\nThe Market Monitor respectfully requests that the Commission afford due \nconsideration to this reply brief as the Commission resolves the issues raised in this \nproceeding. \nJoseph E. Bowring \nIndependent Market Monitor for PJM \nPresident \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610) 271‐8051\njoseph.bowring@monitoringanalytics.com\nRespectfully submitted, \nJeffrey W. Mayes \nGeneral Counsel \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610) 271‐8053\njeffrey.mayes@monitoringanalytics.com\nDated:  March 25, 2026"},{"page":10,"startToken":2429,"endToken":2494,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. \nDated at Eagleville, Pennsylvania, \nthis 25th day of March, 2026. \nJeffrey W. Mayes \nGeneral Counsel \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610)271‐8053\njeffrey.mayes@monitoringanalytics.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":3,"startToken":0,"endToken":148},{"p":2,"at":3,"title":"I. REPLY BRIEF","method":"printed heading","endPage":2,"endAt":19,"startToken":148,"endToken":151},{"p":2,"at":19,"title":"A. PJM Transmission Service","method":"printed heading","endPage":3,"endAt":3,"startToken":151,"endToken":450},{"p":3,"at":3,"title":"B. Contract Demand Service (CDS)","method":"printed heading","endPage":6,"endAt":1167,"startToken":450,"endToken":1682},{"p":6,"at":1167,"title":"C. Interim NITS","method":"printed heading","endPage":8,"endAt":3,"startToken":1682,"endToken":2164},{"p":8,"at":3,"title":"D. Implementation Date","method":"printed heading","endPage":9,"endAt":3,"startToken":2164,"endToken":2344},{"p":9,"at":3,"title":"II. CONCLUSION","method":"printed heading","endPage":10,"endAt":0,"startToken":2344,"endToken":2429},{"p":10,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":10,"endAt":443,"startToken":2429,"endToken":2494}]}