{"document":{"slug":"rec-20260326-5217-2","title":"large_load_customer_concept_report_-_jan_2026","issued":"2026-03-26","accession":"20260326-5217","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"ALLIANCE TO SAVE ENERGY","kind":"attachment","file":"sources/filings/text/20260326-5217_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260326-5217","tier":"record","parent":"rec-20260326-5217","sha256":"eaaf6e028c90add4fbc88b73cf50fcd4751e3fa2ddae627b4cc0a6a8756ecc00","pages":15,"tokens":3770,"emptyPages":[1],"textThemes":["flex"]},"pages":[{"page":1,"startToken":0,"endToken":0,"text":""},{"page":2,"startToken":0,"endToken":335,"text":"2 \nINTRODUCTION \nDemand-side resources remain some of the most affordable, scalable capacity tools \navailable, yet the nation deploys only a fraction of their potential. In 2023, the Alliance \npublished our paper “Demand is the New Supply” which found that in the United States, \ndemand-side solutions can create up to 200 GW of capacity quicker and for billions \nof dollars less than traditional generation and infrastructure.1 Two years later, we need \nthese solutions more than ever. Utilities are confronting unprecedented load growth \ndriven by data centers, electrification, manufacturing, and new housing, while at the \nsame time, customers are struggling with affordability. \nAgainst this backdrop, the Alliance is exploring whether a collaborative model – one \nin \nwhich \na \nlarge \nload \nfunds \nincremental, \nutility-directed \ndemand-side \nmanagement (DSM) investments that include both demand response (DR) and \nenergy efficiency (EE) programs – could unlock new capacity, reduce pressure on \ninfrastructure timelines, and support improved affordability and resilience for \ncustomers. \nTo test the concept, which we have named the Bring Your Own Distributed Capacity \n(BYODC) model, the Alliance met with utilities across a range of regulatory \nenvironments, planning structures, and system conditions. While perspectives \ndiffered, several themes emerged: \n● Location and timing of capacity matter more than systemwide averages. \n● Utilities are actively searching for bridge strategies that offer near-term \ncapacity relief while long-term upgrades are built. \n● Verification and accreditation must be robust for any model to work. \n● Customer protection and fairness are non-negotiable. \nThis paper summarizes what the Alliance has learned so far. It identifies potential \nbenefits for customers, utilities, and large loads, and highlights the operational and \nregulatory questions that deserve continued, collaborative exploration. We do not \npresent a single fully formed model, nor do we assume it will work in every jurisdiction. \nInstead, this paper opens a constructive inquiry – consistent with the Alliance’s role as \n \n1 Alliance to Save Energy. (2023). Demand is the new supply: Affordable grid stability through \ndemand-side solutions [White paper]. \nhttps://www.ase.org/sites/ase.org/files/demand_is_the_new_supply-_white_paper__0.pdf"},{"page":3,"startToken":335,"endToken":661,"text":"3 \na convener – into whether and under what conditions this approach could support \nreliability, affordability, and responsible growth on a rapidly evolving grid. \nCONCEPT OVERVIEW  \nThe BYODC model is a commercial framework that requires collaboration between a \nlarge load, a utility, customers of the utility, and regulators to come to fruition.  \nIn the BYODC model, a large load customer (e.g., a hyperscaler) seeking to add \nadditional load to its existing facility and the local utility collaboratively design a \nportfolio of incremental investments to create capacity headroom. The large load \ncustomer then commits capital either into the utility’s existing suite of commercial and \nresidential distributed energy resource and/or energy efficiency solutions to support \nexpanded reach, or toward the development of new demand-side management \nprograms. The capital to fund this incremental portfolio is then deployed by the utility \nor a third-party implementer to utility customers. In return for this investment, the large \nload receives a capacity credit for the independently verified incremental capacity \nincreases, which may represent the entirety or a portion of the large load’s demand. \nThis could enable an expedited position in the interconnection queue or a greater level \nof load reservation in a quicker timeline at the large load’s existing site.  \nBUILDING THE FRAMEWORK: PROPOSED STEPS IN THE CONCEPT  \n1. Geographically- and Technology-targeted Solution Portfolio \nThe utility and the large customer collaboratively design a portfolio of \nsolutions (e.g. EE, DR, managed EV charging, battery deployment). These \nprograms are not system-wide investments; the utility must be empowered to \nprioritize resources that offer the greatest value to the specific transmission \nor generation constraint associated with expected load growth. \n \n2. Risk Transfer and Capital Commitment \nThe large load customer commits to capital payments to fund the \nincremental deployment of these programs, shifting the early development \nand capital risk away from the general rate base.2 \n \n \n2 Note: The risk associated with capacity accreditation is introduced later in the paper, as part of the \naccreditation section."},{"page":4,"startToken":661,"endToken":912,"text":"4 \n3. Targeted Deployment \nInvestments from large load partners are directed into the portfolio of \ndemand-side solutions according to a defined tariff or contract structure. This \nstructure is publicly filed and available to all large loads to avoid preferential \ntreatment. The tariff or contract provides for the utility to achieve specific \noperational or organizational goals, such as alleviating locational constraints \nnear the large load or prioritizing investments toward hard-to-reach or low- \nand moderate-income (LMI) customers to ensure equitable benefits. \n \n4. Capacity Accreditation \nThe resulting capacity savings would be independently verified to ensure the \nresources are real, effective, and can be formally accredited by the utility, the \nregulator, and, where necessary, the Regional Transmission Organization \n(RTO).  \n \n5. System and Site Benefits \nIn return for investing upfront capital, the large load receives a defined \ncommercial benefit, such as an increased capacity reservation on a shorter \ntimeline, creating the investable certainty they require. The utility benefits from \nimproved distribution system operations and customer satisfaction, as well as \nthe ability to serve more load sooner, due to the quicker availability of \ncapacity. \nThe program creates a triple-win for utilities seeking capacity certainty, large loads \nlooking to decrease interconnection timelines, and customers who are sensitive to \nrising energy costs. \nBACKGROUND \nA growing body of research and policy models support the view of large loads not just \nas consumers, but as critical partners in capacity creation.  \nFoundational analysis from The Brattle Group for a single representative midwestern \nutility system demonstrates the peak reduction potential for demand-side resources,"},{"page":5,"startToken":912,"endToken":1053,"text":"5 \nfinding that a curated portfolio of demand response (DR) and energy efficiency (EE) \nmeasures could meet up to 18% of the utility's 2030 seasonal peak load3.  \n \nCrucially, significant capacity remains available even under stress. When assessed \nagainst the most challenging system conditions of the past decade, the results \nshowed that the portfolio has the capability to reliably reduce system peak demand \nby approximately 1 GW across all necessary hours of the year, representing 14% of the \nutility’s 2030 seasonal peak load. These results confirm that demand-side solutions, \neven when accounting for load building and customer behavior, can function as a \n \n3 Findings from a study by Ryan Hledik, Kate Peters, Sophie Edelman, and Alison Savage \nBrooks (The Brattle Group) on behalf of Google that quantified the cost-effective DR and EE \npotential for a midwestern utility for select measures in 2030."},{"page":6,"startToken":1053,"endToken":1229,"text":"6 \nplanning-grade tool to enhance reliability, serving as a critical bridge strategy while \nlong-term infrastructure projects are developed. \n \nThis approach can also directly address the critical challenge of affordability. The \nanalysis revealed that the average cost of the entire DR and EE portfolio – net of the \nenergy value it provides – for this individual utility is approximately $33/kW-year, \nwhich is less than half the cost of recently observed capacity market prices in the \nMidcontinent Independent System Operator (MISO) territory and a fraction of the cost \nof new thermal generation. \nComplementing this utility-specific analysis, broader market research highlights the \nsignificant potential impact of residential electrification. Rewiring America’s report \nHomegrown Energy4 found that household upgrades like heat pumps, rooftop solar, \nand batteries could collectively provide enough capacity to meet 100% of the \nprojected electricity demand growth from data centers. Rewiring America asserts that \n \n4 Wyent, C., Verma, M., & Kanj, W. (2025, September 18). Homegrown energy: How household \nupgrades can meet 100 percent of data center demand growth [White paper]. Rewiring \nAmerica. https://www.rewiringamerica.org/research/homegrown-energy-report-ai-data-\ncenter-demand"},{"page":7,"startToken":1229,"endToken":1609,"text":"7 \nif hyperscalers commit to paying for a portion of the upfront cost of these residential \nupgrades, they could secure grid capacity at a cost comparable to building new \nfossil-fuel generation.  \nFurther supporting the reframing of large loads as active system participants, a report \nfrom The Rocky Mountain Institute (RMI) report How Virtual Power Plants Can Help the \nUnited States Win the AI Race5 identifies virtual power plants (VPPs) as a solution that \ncould meet up to 20% of US peak demand in 2030, reaching a market size that is on \npar with projected data center growth. RMI’s research details three commercial \nframeworks between utilities/market operators, large loads, and VPPs to help \naccelerate the deployment of VPPs and, as a result, large loads. \nSimilarly, the Piclo \"Clubbing\" Model6 proposes that data centers should move beyond \nconsideration of creating flexibility internally and instead procure resource adequacy \nfrom local VPPs. This \"Flex-as-Firmness\" strategy uses localized DERs to directly relieve \nthe specific feeder or substation constraints that can delay new interconnections, \neffectively meaning that the large load is not simply a utility customer, but is also a \npartner in local reliability. \nIn the regulatory space, numerous states are already exploring the nexus between \nlarge customer investment and energy goals that serve as precedents for channeling \nlarge customer capital into system-wide energy solutions:  \n● In Minnesota, HF167 provides large-scale data centers with sales and use tax \nexemptions in exchange for an annual fee structure dedicated to energy \nconservation and weatherization programs.  \n● In Kansas, Evergy and the Kansas Corporation Commission have signed a \nJoint Settlement Agreement8 for a new large load tariff that creates a Clean \n \n5 Cohen, J., Shwisberg, L., & Dyson, M. (2025, November 6). How virtual power plants can help \nthe United States win the AI race. The Rocky Mountain Institute. https://rmi.org/how-virtual-\npower-plants-can-help-the-united-states-win-the-ai-race  \n6 Johnston, J. (2025, August 20). Everyone’s talking about data center flex, nobody’s talking \nabout clubbing. Piclo blog. https://www.piclo.com/blog/everyones-talking-about-data-\ncenter-flex-nobodys-talking-about-clubbing  \n7 H.F. 16, 94th Minn. Leg. (2025). \nhttps://www.revisor.mn.gov/bills/94/2025/1/HF/16/versions/0/pdf/  \n8 Evergy Kansas Central, Inc. (2025, August 18). Application of Evergy Kansas Central, Inc., \nEvergy Kansas South, Inc. and Evergy Metro, Inc. d/b/a Evergy Kansas Metro for an"},{"page":8,"startToken":1609,"endToken":1915,"text":"8 \nEnergy Choice Rider, which enables customers to directly support the \nprocurement of distributed energy resources, including demand-side \nmanagement, energy efficiency, and battery storage.  \n● In Nevada, the Public Utilities Commission approved a partnership between \nNV Energy and Google9 to bring new, clean capacity under the Clean \nTransition Tariff. In a separate proceeding, Google proposed a Large Customer \nOffsite DSM Program for incorporation in NV Energy’s latest Integrated \nResource Plan docket10. While the Nevada Public Utilities Commission did not \napprove the proposal, it encouraged Google to continue to work with NV \nEnergy to refine its proposal for future consideration, indicating an openness \nto considering this type of program in the future. \nMETHODOLOGY \nTo move beyond theoretical modeling, the Alliance conducted a series of in-depth \ninterviews with utility stakeholders over several months to pressure-test the feasibility \nof large loads funding offsite demand-side solutions. \nWe engaged nine investor-owned and public power utilities, representing a broad \ncross-section of the U.S. energy market. \nThe study cohort included: \n● Geographic Breadth \nParticipants spanned the West/Southwest, Southeast, Midwest, and Northeast. \n \naccounting order to defer and amortize certain costs related to the development of a data \ncenter coalition [Docket No. 24-EKME-551-GIE]. Kansas Corporation Commission. \nhttps://estar.kcc.ks.gov/estar/ViewFile.aspx/S202508181202168915.pdf?Id=9e907841-85a6-\n49d2-8321-59acf777cfd6  \n9 Peterson Corio, A., & Kobor, B. (2024, June 11). How we’re working with utilities to create a new \nmodel for clean energy. Google Blog. https://blog.google/feed/nevada-clean-energy/  \n10 Public Utilities Commission of Nevada. (2025, March 11). Application of Nevada Power \nCompany d/b/a NV Energy, filed under Advice Letter No. 547, to implement Clean Transition \nTariff Schedule No. CTT to allow eligible customers to receive bundled electric service from \nnew clean energy resources [Order, Docket No. 24-05022]. \nhttps://ob.nv.gov/puc/api/Document/AYLdOvEpSBLA76HTzSdCHUx%C3%81Seb9ivY5bgSFeDhG\nB8Auoygjzgc4WQULdsSKA8mI8fCvDdX93cakTnja60P0%C3%811M%3D/?OverlayMode=View"},{"page":9,"startToken":1915,"endToken":2148,"text":"9 \n● Diverse Regulatory Structures \nThe group included utilities operating in vertically integrated markets as well \nas those in restructured ISO/RTO markets (e.g., PJM, NYISO, MISO, SPP). \n● Senior-Level Expertise \nInterviews were conducted with leadership across Resource Planning, \nTransmission Planning, Customer Solutions, and Regulatory Affairs to reflect \nthe technical, operational, and political realities shaping utility decision-\nmaking. \nTo ensure comparability across perspectives, interviews followed a semi-structured \nformat that explored both operational considerations (e.g., DR saturation levels, winter \nvs. summer peak constraints, effective load carrying capability limitations) and \ninstitutional factors (e.g., regulatory posture, interconnection dynamics, cost-\ncausation concerns). \nAcross utilities, several clear themes consistently emerged around regulatory \nfeasibility, potential implementation pathways, and the limits of data-center flexibility. \nKEY INTERVIEW FINDINGS \nThe Alliance’s engagement with utility stakeholders yielded key themes and essential \nconsiderations for utilities, regulators, and large loads as they collaborate to bring the \nconcept to market.  \n1. THE BYODC MODEL COULD OFFER SIGNIFICANT BENEFITS TO \nCUSTOMERS AND UTILITIES \nThe BYODC model improves affordability for customers by allowing utilities to defer \ncostly capital investments while simultaneously enabling adoption of solutions that \nreduce home energy costs. For utilities, it provides a flexible risk-management tool to \nhandle rapid growth, bridging the gap created by the long lead times of traditional \ninfrastructure projects. Ultimately, this model helps elevate demand-side resources \ninto location-specific, planning-grade assets that contribute to resolving grid \nconstraints and improving overall grid reliability."},{"page":10,"startToken":2148,"endToken":2450,"text":"10 \n2. THE FRAMEWORK MUST ALIGN WITH CORE UTILITY BUSINESS \nGOALS \nGiven that the traditional utility business model relies on generating profits through \ncapital investment and recovering costs through rates, it seems counterintuitive for a \nutility to embrace a model that initially appears to displace capital investment in new \ninfrastructure. However, the proposed concept directly supports crucial utility goals11: \nsecuring high-value large loads within their territory, enhancing grid reliability, \nimproving customer affordability, and in many cases, advancing carbon-free energy \ngoals. \n \nWhen applied strategically across a utility’s territory, the Alliance’s proposed \nframework improves the attractiveness of a utility’s territory to large load customers \nby enabling utilities to quickly integrate major new facilities without the need for \nlengthy, capital-intensive infrastructure build-outs. On the customer side, the concept \ncan also address growing affordability concerns by spreading existing system costs \nacross a significantly larger customer base due to the addition of the new large load \nwithout introducing net new costs that are passed on to customers. Lastly, these \ninvestments have the added benefits of enhancing grid reliability by helping manage \npeak demand and congestion challenges. \n \n3. CATERED PROGRAM DESIGN IS REQUIRED FOR DIVERSE UTILITY \nSYSTEMS AND MARKETS \nA clear theme that emerged from the Alliance’s research is that a singular, prescriptive \ndemand-side portfolio mix cannot work across diverse regulatory environments, utility \nstructures, and climatic needs.  \n \nThe Alliance proposes a framework over a fixed blueprint. The framework establishes \nthe foundational principles—like the requirement for incremental funding and \ncapacity \naccreditation—but \nempowers \nthe \nutility \nand \nlarge \ncustomer \nto \ncollaboratively design the program portfolio. This design freedom allows them to \nprioritize high-value resources and to identify and pursue the right mix of energy \n \n11Allsup, M. (2025, September 30). Inside the first 'bring your own' VPP program for data \ncenters. Latitude Media. https://www.latitudemedia.com/news/inside-the-first-bring-your-\nown-vpp-program-for-data-centers/"},{"page":11,"startToken":2450,"endToken":2812,"text":"11 \nefficiency, managed EV charging, battery storage, or other demand-side solutions \nthat best meet their specific system and locational needs. Beyond investing in the \ntechnology solutions themselves, the Alliance’s research indicated utility interest in \nbuilding a framework that allows for investment specifically targeted at driving \ncustomer enrollment through program marketing and customer education, ultimately \nhelping to shorten the adoption cycle. \n \n4. TIMELINES MUST DELIVER SUFFICIENT NEAR-TERM CAPACITY \nUtility stakeholders identified two key timing considerations that utilities and large \nloads will need to consider when pursuing this framework.  \n \nFirst, in order for the concept to have a measurable impact on speed to power and \nhelp ensure that generation sources for new large loads are aligned with hyperscaler \nand/or state goals, there must be sufficient adoption of demand-side solutions on a \nrelevant time scale, relative to alternative capacity resources.  \n \nWhile there may be a broad suite of demand-side solutions available to implement in \na way that is tailored to individual utility territories, it can take significant time for utility \ncustomers to adopt these solutions at a meaningful scale. A 2022 study12 from the \nNational Renewable Energy Lab found that the overall adoption process for residential \nsolar typically takes 10-16 weeks from contract signing to receiving permission to \noperate. This estimate does not include the customer acquisition process, which can \nadd additional weeks or months to the process. While other DSM solutions may have \nshorter adoption cycles, speed-to-adoption is still a significant factor that must be \nweighed by both planning and commercial teams to deeply understand the timeline \nby which supplemental capacity may become available. \n \nAdding complexity to this consideration, the Alliance’s research revealed that in \ncertain utility territories, the residential housing stock requires significant investment \nin pre-weatherization activities (roof or foundation repair, mold/asbestos abatement, \netc.) to prepare homes for even basic weatherization improvements. This reduces the \nnumber of homes that can participate in the BYODC model in a given time frame, \n \n12 Cruce, J. R., O’Shaughnessy, E., Harmon, J., Geiger, J., & Cook, J. J. (2022, September). \nResidential solar adoption timelines and impacts from the COVID-19 pandemic (Report No. \nNREL/TP-6A20-83529). National Renewable Energy Laboratory. \nhttps://docs.nrel.gov/docs/fy22osti/83529.pdf"},{"page":12,"startToken":2812,"endToken":3152,"text":"12 \nultimately lengthening the time required to aggregate meaningful capacity from this \napproach. \n \nSecond, the Alliance heard from some utilities that this model could act as a “bridge \nto capacity” during the ramp up periods for new large loads. In this scenario, large \nloads could potentially align build-out with best estimates of adoption cycles for DERs, \nusing DERs as a proportionally larger amount of demand while they add incremental \non-site resources or utility-scale generation, which take longer to bring online.  \n \nThis creates a question of what the appropriate length is for an agreement between \nthe large load and utility, as well as what the implications are for customers once the \nagreement ends. For example, customers that enroll in demand response programs \nas a result of incremental investments from large loads may wish to continue \nparticipating after the incremental bridge capacity is no longer needed. Depending \non the investment framework agreed to with the large load, utilities may need to plan \nfor ongoing funding of those incentives after agreements with large loads expire. \n  \n5. UTILITIES WILL REQUIRE TIGHT COORDINATION, BOTH \nINTERNALLY AND EXTERNALLY \nSuccess requires broad internal and external alignment, starting with getting buy-in \nfrom the right utility teams. Through conversations with a wide range of utilities, the \nAlliance  identified at least five groups within a utility that will require buy-in, including: \ngeneration, transmission, and distribution planning; customer teams; commercial \noperations; and regulatory teams. Coordination between transmission and \ndistribution planning will be of particular importance, given that the portfolio of DSM \nsolutions will be applied at distribution level while large loads receive transmission \nlevel service. \n \nAdditionally, utilities will rely on a network of implementers and service providers that \ncan efficiently and effectively shepherd customers through the adoption cycle, from \ninitial interest and customer education to technology installation and completion of \nany closeout documentation with the utility. Utilities in some jurisdictions are already \nleveraging specific “energy navigator” roles focused on educating customers on the \navailable portfolio of solutions, helping them weigh the benefits of each and create a \ntailored approach to adoption."},{"page":13,"startToken":3152,"endToken":3458,"text":"13 \n6. ACCURATE CAPACITY ACCREDITATION IS REQUIRED TO JUSTIFY \nDEFERRED INFRASTRUCTURE INVESTMENTS  \nAnother critical consideration is accurate capacity accreditation of demand-side \ninvestments so that any contribution can legitimately offset the incremental peak \ndemand driven by a large load. Utilities must demonstrate to regulators that these \nresources are incremental, verifiable, and reliable, and that the resulting capacity \nreductions are sufficient to justify avoided or deferred infrastructure investments. \n \nCapacity accreditation is not a new problem. Energy efficiency evaluators and \ninnovative companies such as WattCarbon, Recurve, EnergyHub, Piclo, and Voltus \nalready provide specialized components of the capacity accreditation toolkit, \nincluding \nmeter-based \nM&V, \nfleet \nperformance \nanalytics, \nand \nflexibility \nprocurement/dispatch tools. With these options, utilities must select the approach \nthat aligns with their planning standards, operational constraints, and regulatory \nrequirements, ensuring that the methodology is technically defensible and can be \nintegrated into existing workflows. \n \n7. THE MECHANISM FOR TRANSFERRING CAPACITY MUST \nDEMONSTRATE COMMERCIAL VALUE AND EQUITY \nOnce capacity is verified through an established accreditation framework, there must \nbe a mechanism for large load customers to claim a defined commercial benefit, such \nas an expedited interconnection position, for the headroom created through their \noffsite investments. Regulators will need to be comfortable with the structure, ensuring \nthat any implications on customers are understood, that costs are not shifted from \nlarge loads to other customers, and that all participating large loads are treated \nequitably, preventing any participant from gaining disproportionate advantage (such \nas the ability to move farther ahead in the interconnection process than another). \n \nThese mechanisms could take the form of bilateral contracts between utilities and \nlarge loads, and could potentially also involve third-party aggregators, as outlined by \nRMI13.  \n \n13  Cohen, J., Shwisberg, L., & Dyson, M. (2025, November 6). How virtual power plants can help \nthe United States win the AI race. The Rocky Mountain Institute. https://rmi.org/how-virtual-\npower-plants-can-help-the-united-states-win-the-ai-race"},{"page":14,"startToken":3458,"endToken":3623,"text":"14 \nWHAT’S NEXT \nPairing large load utility customers with demand-side solutions represents one of the \ngreatest capacity-building opportunities of this decade. However, putting the BYODC \nmodel into practice requires extensive collaboration between utilities, large loads, and \nregulators to identify the policy and regulatory details that can enable the concept to \nachieve maximum impact. Key questions still remain, such as: \n● What does an inclusive participation model that addresses the potential for any \nunfair preferential treatment look like? \n● What are the appropriate funding and capacity credit mechanisms? \n● How should the BYODC program be incorporated into capacity planning? \n● In what markets or jurisdictions will the BYODC concept work best? \nThe Alliance is committed to working as a convener and thought leader to bring \ntogether utilities, regulators, grid operators, large customers, and other stakeholders \nto ensure the opportunity is realized in ways that balance customer needs, utility \nresponsibilities, and system benefits. This is not just about efficiency — it is about \nbuilding a more affordable, reliable, and resilient energy future."},{"page":15,"startToken":3623,"endToken":3770,"text":"15 \nABOUT ALLIANCE TO SAVE ENERGY \nFounded in 1977 by Sens. Charles H. Percy (R-Ill.) and Hubert Humphrey (D-Minn.), the \nAlliance to Save Energy was launched following the oil embargo of the 1970s – a pivotal \ntime in our nation’s history that exposed fundamental weaknesses in our nation’s \neconomic security and challenged us to develop innovative energy solutions. \nDecades later, it continues its mission to create a more energy-productive world. \n \nABOUT THE AD HOC GROUP \nThe Ad Hoc Group (AHG) is a specialized consulting firm that accelerates growth for \nstart-ups and innovative companies operating in a complex and highly-regulated \nenergy sector. We source opportunities, advance deals, and shape regulations to \nensure that our clients scale with the urgency that today's energy and climate \nchallenges demand. AHG supported the Alliance to Save Energy in researching, \nsynthesizing findings, and producing this report. \n \n \nACKNOWLEDGMENTS \nThis research was sponsored by Google LLC."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":3,"startToken":0,"endToken":1},{"p":2,"at":3,"title":"INTRODUCTION","method":"printed heading","endPage":4,"endAt":1469,"startToken":1,"endToken":865},{"p":4,"at":1469,"title":"BACKGROUND","method":"printed heading","endPage":15,"endAt":997,"startToken":865,"endToken":3770}]}