{"document":{"slug":"rec-20260326-5217","title":"Comments of the Alliance to Save Energy in support of clear, durable rules that enable responsible large-load integration while preserving reliability, cost…","issued":"2026-03-26","accession":"20260326-5217","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"ALLIANCE TO SAVE ENERGY","kind":"comments","file":"sources/filings/text/20260326-5217_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260326-5217","tier":"record","sha256":"ca0b63be68c426abd614304ee38470f5222c6547b95ec9c56daa792316bc7f7f","pages":8,"tokens":2819,"emptyPages":[],"textThemes":["flex","colo","cost","registry"]},"pages":[{"page":1,"startToken":0,"endToken":403,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C., et al. \nDocket Nos. EL25-49-000, AD24-11-000, EL25-20-000 (Consolidated) \nRelated Compliance Docket No. ER26-1479-000 \nCOMMENTS OF THE ALLIANCE TO SAVE ENERGY \nThe Alliance to Save Energy (“ASE”) appreciates the opportunity to comment in this proceeding \nfollowing the Commission’s December 18, 2025 order on the PJM co-located load show cause \nproceeding, the related compliance process, and the paper hearing now underway. In that order, \nthe Commission found PJM’s Tariff unjust and unreasonable in part, directed PJM to submit \ncompliance filings, required PJM to establish clearer transmission service options for Co-\nLocated Load, and directed PJM to report on enhanced load forecasting and demand flexibility \nmeasures.  \nThe Alliance to Save Energy has carefully reviewed the full record developed to date, including \nthe positions advanced by PJM, the Indicated PJM Transmission Owners, PJM transmission \nowners filing separately, developers and technology providers such as Bloom Energy \nCorporation, Invenergy Renewables LLC and Invenergy Thermal LLC, and Constellation Energy \nGeneration, LLC, as well as trade groups including the Business Council for Sustainable Energy \nand the American Council on Renewable Energy, and industrial coalitions such as the PJM \nIndustrial Customer Coalition and Industrial Energy Consumers of America. The record \ndemonstrates both the urgency of large-load growth and the sharp disagreement over how \nfavorable treatment should be structured.  \nThe Alliance to Save Energy is a leading nonprofit, bipartisan coalition of manufacturers, \nutilities, technology companies, environmental advocates, and governmental leaders committed \nto advancing the role of fuel-neutral energy efficiency as a cornerstone of U.S. energy policy and \nvaluing its contribution to affordability, grid reliability, economic growth, and energy security. \nASE’s recent filings have consistently emphasized that efficiency-first approaches and demand-\nside management are among the most cost-effective tools available to improve affordability and \nreliability, and ASE has separately urged the Commission to more fully evaluate the role of \nenergy efficiency in wholesale markets as a resource that should be treated comparably to other \nreliability solutions.  \nThe Alliance to Save Energy’s contribution here is narrower than the full tariff architecture \ndebate. ASE does not purport to resolve every dispute in the record over service tiers, upgrade \nallocation, or the precise scope of co-location arrangements under state and federal law. Rather, \nASE focuses on a question that remains underdeveloped in the record and is squarely within \nASE’s expertise: what conditions should govern when large loads receive favorable treatment in"},{"page":2,"startToken":403,"endToken":846,"text":"any interconnection framework, whether through expedited processing, flexible service, or \nreduced cost obligations? The Alliance to Save Energy believes the answer must be grounded in \nverifiable and commercially committed system impact, rather than anticipated or speculative \nload growth. Planning, interconnection, and cost-allocation decisions should increasingly reflect \nverified load, measured system performance, and enforceable commitments, ensuring that \ninfrastructure investment aligns with actual system needs. \nSummary of Position \nThe Alliance to Save Energy supports clear, durable rules that enable responsible large-load \nintegration while preserving reliability, cost causation, and affordability. Rapid load growth from \ndata centers, AI, and advanced manufacturing is real and urgent, and many parties are correct \nthat the Commission should preserve innovation and speed where possible. At the same time, the \nrecord is equally clear that the Commission must guard against hidden reliability risks, \nunjustified cost shifts, and one-sided frameworks that either overbuild the system or let favored \ncustomers evade meaningful obligations.  \nThe Alliance to Save Energy therefore urges the Commission to center its analysis on the \nconditions for favorable treatment rather than on a binary fight over whether all co-located loads \nmust be treated as full Network Load or whether broad categories of netting should be allowed. \nIn The Alliance to Save Energy’s view, favorable treatment, whether in the form of expedited \ninterconnection, flexible service, or lower cost responsibility, should be available only where a \nlarge load can demonstrate verifiable reductions in system burden through efficient design, direct \nload flexibility commitments, or independently accredited demand-side contributions. \nIn January 2026, the Alliance to Save Energy released Bridging the Load Gap: A Collaborative \nPath for Utilities, Hyperscalers and Customers1, which introduces the “Bring Your Own \nDistributed Capacity” (“BYODC”)(See Exhibit A attached) concept. Under that framework, a \nlarge load customer funds incremental, utility-directed demand-side management investments, \nincluding demand response, energy efficiency, managed EV charging, storage, and similar \nmeasures, to create independently verified capacity headroom in constrained areas. The paper \nemphasizes four principles directly relevant here: location and timing matter more than \nsystemwide averages; utilities need bridge strategies while longer-term upgrades are built; \nverification and accreditation must be robust; and customer protection and fairness are non-\nnegotiable.  \nOn pages 5–6, the report summarizes analysis showing that a curated DR/EE portfolio for a \nrepresentative Midwestern utility could meet up to 18 percent of 2030 seasonal peak, provide \nroughly 1 GW of dependable peak reduction across critical hours, and do so at an average cost of \napproximately $33/kW-year.2 That is the kind of bridge capacity that can improve affordability, \n \n1 https://www.ase.org/blog/why-we-need-energy-efficiency-more-ever  \n2 https://www.ase.org/sites/ase.org/files/large_load_customer_concept_report_-_jan_2026.pdf"},{"page":3,"startToken":846,"endToken":1289,"text":"reduce near-term pressure on infrastructure timelines, and create room for faster large-load \nintegration, if the Commission and PJM create the right rules.  \n \nI. Grid Reliability & Planning: Integrating Large Loads While Leveraging Energy \nEfficiency \nThe Alliance to Save Energy agrees with PJM, transmission owners, and multiple state \ncommenters that large-load growth raises real reliability and planning concerns. PJM’s filings \nand the Commission’s December 2025 order reflect concerns that load can arrive faster than \ntransmission and generation can be developed, and that the system needs more visibility into \nhow these loads will operate if planning and resource adequacy are to remain sound. The \nCommission also directed PJM to provide an informational report on enhanced load forecasting \nand demand flexibility measures, signaling that the current planning framework is incomplete.  \nThe Alliance to Save Energy also agrees with developers and other stakeholders that the planning \nprocess can be more coordinated and more efficient. Bloom, Invenergy, and others argue that \nload and generation should be studied in a more integrated manner to reduce duplicative or \nunnecessary upgrades and to align interconnection and service timelines more effectively. Those \ncommenters are right that large-load growth should not be planned solely as a wires problem. \nBut the answer is not simply coordinated load-and-generation studies. It is integrated planning of \nload, generation, and demand-side capacity.  \nThe Alliance to Save Energy therefore recommends that PJM’s final tariff framework explicitly \nincorporate verifiable energy efficiency and demand flexibility into the conditions for favorable \ntreatment. If a large load seeks expedited service, conditional service, or reduced cost \nresponsibility, PJM should require that the customer demonstrate measurable reductions in \nsystem burden through one or more of the following: direct load-management capability, \nverifiable curtailability, utility-directed demand-side capacity contributions, or other \nperformance-based mechanisms that reduce the need for peak infrastructure. This would respond \ndirectly to the core reliability concern in the record—whether the system must be planned for a \ngiven load—by tying favorable treatment to demonstrable reductions in that planning obligation. \nThe Alliance to Save Energy also recommends that the Commission not permit enhanced load \nforecasting and demand flexibility measures to remain only in an informational report. The \nDecember 2025 order properly required PJM to report on those measures, but ASE urges the \nCommission to require PJM to convert mature, administrable elements of that work into \nenforceable tariff language on an accelerated schedule. Demand flexibility that materially affects \nplanning, interconnection timing, or service eligibility should not sit outside the tariff. Current \nplanning processes are increasingly influenced by anticipated rather than verified load growth, \nwhich can overstate system needs and drive unnecessary infrastructure investment. The Alliance \nto Save Energy agrees that improving load verification, readiness criteria, and forecasting"},{"page":4,"startToken":1289,"endToken":1744,"text":"transparency will be critical to ensure that system planning remains grounded in real, deliverable \ndemand rather than duplicative or speculative requests. \n \nII. Cost Allocation & Transmission Service Design: Conditions for Favorable Treatment \nThe record sharply divides between parties favoring full Network Load treatment and parties \nfavoring actual-use or net-impact approaches. The Alliance to Save Energy does not believe it is \nnecessary, or especially useful, for ASE to take a categorical side in that broader architectural \ndispute. Instead, the Alliance to Save Energy believes the Commission should focus on what \nconditions should justify more favorable treatment within whatever service framework PJM \nultimately adopts. \nThe Alliance to Save Energy strongly supports cost-causation principles. Facilities should bear \ncosts in a manner reasonably aligned with the burden they impose on the system and the benefits \nthey receive from it. That principle cuts both ways. It does not support blanket gross-load \ntreatment for every configuration regardless of actual performance, nor does it support allowing \ncustomers to receive accelerated service or sharply reduced charges without providing \nmeasurable system value in return.  \nOne live issue illustrates the point. In her concurrence to the Commission’s December 18, 2025 \norder, Commissioner Chang emphasized the importance of developing a minimum charge for the \nnew transmission services, warning that otherwise a co-located load that takes little or no grid \nservice could pay almost nothing while still relying on the grid’s existence and PJM’s services. \nThe Alliance to Save Energy agrees that the minimum-charge question is important and should \nbe resolved in a way that protects other customers from unjustified cost shifts. At the same time, \nthe Alliance to Save Energy takes no position on a specific dollar figure. Instead, the Alliance to \nSave Energy recommends that any minimum-charge framework include an efficiency-\nperformance pathway: facilities that can demonstrate verified load flexibility, efficient operation, \nand compliance with measurable service limits should be able to reflect that performance in their \nultimate cost obligations. In short, the minimum charge should protect against free-ridership \nwithout flattening legitimate differences in system burden.  \nFurther, where large-load facilities are capable of providing additional system value, such as \nthrough the use of on-site assets, storage, or controllable load, the Commission should ensure \nthat such contributions can be recognized and, where appropriate, compensated, consistent with \nreliability and market rules. This aligns with the broader principle that large loads, when \ndesigned appropriately, can function not only as demand but also as active system participants. \nThe Alliance to Save Energy’s BYODC concept provides a helpful model for thinking about this \nbalance. Under that concept, a large load does not simply claim favorable treatment because it is \nlarge or innovative. It commits capital to incremental, utility-directed, independently accredited \ndemand-side measures that create real capacity headroom and improve affordability and"},{"page":5,"startToken":1744,"endToken":2168,"text":"reliability. That is the kind of performance-based pathway the Alliance to Save Energy believes \nthe Commission should preserve room for in PJM’s tariff. Favorable treatment should be earned \nthrough verifiable system contributions, not assumed by configuration alone.  \n \nIII. Flexible Load & Demand-Side Capacity: Option 7, Option 8, and the Need for Strong \nM&V \nThis is where the Alliance to Save Energy believes the record most needs development. \nPJM’s March 2025 answer to the show cause order proposed eight conceptual options for co-\nlocation, including Option 7, an interim interruptible transmission service or non-capacity-\nbacked service for curtailable large loads, and Option 8, participation by co-located Network \nLoad as a Demand Response resource. Those two options represent the clearest demand-side \npathways in the record. Yet the Commission’s December 2025 order ultimately directed PJM to \npropose NITS, Firm Contract Demand service, and Non-Firm Contract Demand service, and to \nproceed through compliance and paper hearing processes, without converting Option 7 and \nOption 8 themselves into concrete, enforceable tariff language. ASE recommends that PJM’s \ntariff revisions now do so.  \nSpecifically, the Alliance to Save Energy recommends that PJM’s final tariff revisions include \nconcrete provisions that operationalize the underlying concepts of Option 7 and Option 8. For \nOption 7, that means a defined flexible or curtailable service product with clear eligibility rules, \nmeasurable curtailment obligations, locational specificity where appropriate, telemetry or other \nverifiable monitoring requirements, baseline methodology, settlement rules, and meaningful \nnonperformance consequences. For Option 8, that means a direct demand-response participation \npathway for large loads that is tied to real operational obligations rather than broad assumptions \nabout demand-side behavior. These provisions should not remain conceptual; they should be \nembedded in enforceable tariff text.  \nThe Alliance to Save Energy further believes this is the right place to be precise about \nmeasurement and verification (“M&V”). The Alliance to Save Energy recognizes that \nmeasurement and verification must strike a balance between rigor and practicality. Standards \nshould be sufficiently robust to support planning-grade recognition and system operator \nconfidence, while remaining administrable and scalable to avoid creating unnecessary barriers to \nparticipation. \nIn 2024, the Independent Market Monitor for PJM challenged the way certain energy efficiency \nsellers were claiming capacity-market payments, arguing that the reports supporting those \npayments relied on retail sales data, lacked direct contracts with end users, failed to establish \nlegal rights to the claimed reductions, created risks of duplicative claims, and did not \ndemonstrate that the sellers’ actions actually caused the reductions. In parallel, the Market \nMonitor’s 2024 State of the Market reporting criticized the absence of a robust registration"},{"page":6,"startToken":2168,"endToken":2561,"text":"system, clear eligibility requirements, signed customer contracts, and stronger evidentiary \nrequirements. FERC later accepted PJM’s filing to remove Energy Efficiency Resource \nparticipation from PJM’s capacity market. ASE does not seek to relitigate those disputes, and the \nAlliance to Save Energy is not defending the legacy EE subsidy model that gave rise to them.  \nThat history matters here because it clarifies what standards should govern favorable treatment \ngoing forward. The Alliance to Save Energy agrees with the core lesson: favorable treatment \nshould not rest on assumed or weakly attributed savings. It should rest on direct commitments, \nclear contractual rights, independent verification, and measurable performance. But The Alliance \nto Save Energy also believes it is important not to conflate legacy EE-in-capacity-market \nparticipation with demand flexibility commitments by large loads. They are different constructs \nand should be treated differently. The former involved claims to have long-duration reductions \nsold into the capacity market, often through upstream or midstream channels. The latter concerns \noperational commitments by identifiable large loads that may seek favorable service treatment in \nreturn for verifiable flexibility, curtailability, or direct funding of incremental demand-side \ncapacity. The distinction is material. \nThat distinction is also reflected in the IMM’s later treatment of large-load demand-side options. \nIn October 2025 and again in December 2025, the IMM argued that demand-side options, \nincluding DR and PRD, are not equivalent to new generation and that any demand-side solution \nfor large data center load must be premised on performance-based compensation tied to actual, \nverifiable load reductions, with availability and pricing rules that meaningfully affect real-time \ndemand. The Alliance to Save Energy agrees with that core point. Demand-side flexibility should \nnot be treated as a loose substitute for new generation. It should be treated as a distinct product \nwith its own strong performance standard.  \nFor that reason, the Alliance to Save Energy recommends that any tariff provisions implementing \nOption 7, Option 8, or related flexible-service pathways include: \n• \nDirect contractual commitments from the participating large load or its designated \ncounterparty, \n• \nIndependent M&V of actual load reductions or service-limiting behavior, \n• \nBaseline and settlement rules designed for large-load operating profiles, \n• \nLocational specificity where flexibility is being used to support local planning or \nconstrained areas, \n• \nMeaningful performance consequences for failure to deliver, \n• \nAnd clear rules that distinguish verified operational flexibility from generalized program \nassumptions. \nThese are the conditions that make favorable treatment credible, durable, and fair."},{"page":7,"startToken":2561,"endToken":2817,"text":"Conclusion \nThe Alliance to Save Energy appreciates the Commission’s continuing work to bring clarity to \nthis important issue. The Commission’s December 18, 2025 order properly moved the \nproceeding forward, but the record still lacks sufficient development of the demand-side \nconditions that should govern favorable treatment for large loads. The Alliance to Save Energy \nbelieves that is where ASE can make the most constructive contribution. \nThe Alliance to Save Energy therefore urges the Commission to ensure that whatever \ninterconnection or service framework PJM ultimately adopts, whether for co-located load, \nflexible service, or broader large-load treatment, it includes a clear pathway for facilities to earn \nfavorable treatment through verified efficiency, direct demand flexibility, and independently \naccredited demand-side contributions. PJM’s Option 7 and Option 8 concepts should be \ntranslated into enforceable tariff language with strong M&V requirements. The minimum-charge \nframework should protect other customers while allowing efficient, well-performing facilities to \nreflect that performance in their cost obligations. And the demand flexibility and enhanced \nforecasting work the Commission has already required from PJM should be converted, where \nmature and administrable, into tariff language rather than left as a stand-alone report.  \nBy taking this approach, the Commission can avoid being forced into a false choice between \nrigidity and risk. It can instead build a framework that supports affordability, reliability, and \neconomic growth, and that uses the demand side as a real system tool, under standards rigorous \nenough to deserve confidence from regulators, utilities, customers, and the market alike. \nRespectfully submitted, \nSapna Dowla  \nAVP Policy and Research  \nAlliance to Save Energy"},{"page":8,"startToken":2817,"endToken":2819,"text":"Exhibit A"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":161,"startToken":0,"endToken":868},{"p":3,"at":161,"title":"I. Grid Reliability & Planning: Integrating Large Loads While Leveraging Energy","method":"printed heading","endPage":4,"endAt":159,"startToken":868,"endToken":1310},{"p":4,"at":159,"title":"II. Cost Allocation & Transmission Service Design: Conditions for Favorable Treatment","method":"printed heading","endPage":5,"endAt":273,"startToken":1310,"endToken":1781},{"p":5,"at":273,"title":"III. Flexible Load & Demand-Side Capacity: Option 7, Option 8, and the Need for Strong","method":"printed heading","endPage":7,"endAt":0,"startToken":1781,"endToken":2561},{"p":7,"at":0,"title":"Conclusion","method":"printed heading","endPage":8,"endAt":9,"startToken":2561,"endToken":2819}]}