{"document":{"slug":"rec-20260424-5219","title":"Motion for Leave to Answer and Answer of the Indicated PJM Transmission Owners in response to certain parties’ protests and comments on PJM Interconnection,…","issued":"2026-04-24","accession":"20260424-5219","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"protest","file":"sources/filings/text/20260424-5219_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5219","tier":"record","sha256":"8d9f348c95899746a18399d1338a841bc0fe166be005668eb3613cc45825004a","pages":9,"tokens":2495,"emptyPages":[],"textThemes":["colo","study","flex"]},"pages":[{"page":1,"startToken":0,"endToken":483,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C.   \n \n)  \n \nDocket No. ER26-1479-000 \n \nMOTION FOR LEAVE TO ANSWER AND ANSWER OF  \nTHE INDICATED PJM TRANSMISSION OWNERS \n \nPursuant to Rules 212 and 213 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission (“Commission”), 18 C.F.R. §§ 385.212 and 385.213, the Indicated PJM \nTransmission Owners1 submit this Answer in response to certain parties’ protests and comments \non PJM Interconnection, L.L.C.’s (“PJM”) 60-Day Compliance Filing in the above-captioned \nproceeding.2 \n \n1  \nFor purposes of this filing, the Indicated PJM Transmission Owners are: American Electric Power Service \nCorporation on behalf of its affiliates, Appalachian Power Company, Indiana Michigan Power Company, Kentucky \nPower Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian \nTransmission Company, AEP Indiana Michigan Transmission Company, AEP Kentucky Transmission Company, \nAEP Ohio Transmission Company, and AEP West Virginia Transmission Company; The Dayton Power and Light \nCompany d/b/a AES Ohio; Dominion Energy Services, Inc. on behalf of Virginia Electric and Power Company d/b/a \nDominion Energy Virginia; Duke Energy Business Services, LLC for Duke Energy Kentucky, Inc. and Duke Energy \nOhio, Inc.; Duquesne Light Company; East Kentucky Power Cooperative; Exelon Corporation on behalf of its \naffiliates Atlantic City Electric Company, Baltimore Gas and Electric Company, Commonwealth Edison Company, \nCommonwealth Edison Company of Indiana, Inc., Delmarva Power & Light Company, PECO Energy Company, and \nPotomac Electric Power Company; FirstEnergy Service Company, on behalf of its affiliates American Transmission \nSystems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate Transmission LLC, The \nPotomac Edison Company, Monongahela Power Company, Keystone Appalachian Transmission Company, and \nTrans-Allegheny Interstate Line Company (collectively, the “FirstEnergy Companies”); PPL Electric Utilities \nCorporation; Public Service Electric and Gas Company; Rockland Electric Company; and the Southern Maryland \nElectric Cooperative (“PJM Transmission Owners”). \n2  \nTo the extent required, the PJM Transmission Owners respectfully move for leave to answer.  The \nCommission’s procedural rules generally prohibit answers to protests.  Specifically, Rule 213 states that “[a]n answer \nmay not be made to a protest . . . unless otherwise ordered by the decisional authority.”  18 C.F.R. § 385.213(a)(2).  \nThe Commission has the discretion to waive its prohibition of answers to protests for good cause shown, i.e., to assist \nthe Commission’s understanding and resolution of the issues raised or to ensure a complete record.  See, e.g., Pioneer \nTransmission, LLC v. N. Ind. Pub. Serv. Co., 140 FERC ¶ 61,057, at P 94 (2012); Midwest Indep. Transmission Sys. \nOperator, Inc., 120 FERC ¶ 61,083, at P 23 (2007); Morgan Stanley Cap. Grp., Inc. v. N.Y. Indep. Sys. Operator, Inc., \n93 FERC ¶ 61,017, at 61,036 (2000); CNG Transmission Corp., 89 FERC ¶ 61,100, at 61,287 n.11 (1999).  This \nAnswer is submitted to ensure a complete and accurate record.  Accordingly, good cause exists to permit this answer."},{"page":2,"startToken":483,"endToken":843,"text":"2 \nI. \nANSWER TO PROTESTS AND COMMENTS \nA. \nBehind-the-Meter Generation \nIn its 60-Day Compliance Filing, PJM proposes revisions to the Behind the Meter \nGeneration (“BTMG”) provisions in its Open Access Transmission Tariff (“Tariff”) to comply \nwith the Commission’s December 18, 2025 Order, which directed PJM to propose a new \nmateriality threshold for Retail BTMG, establish a three-year transition period, and provide legacy \ntreatment for certain existing contractual arrangements above the new threshold.3 \nPJM proposes to establish a materiality threshold of up to 50 MW for Retail BTMG \neligibility based on the cumulative nameplate rating of generation used to serve retail load by a \nNetwork Customer4 at the at the same electrical location, excluding qualifying backup generation, \nwhile otherwise preserving existing substantive netting rules.5  Several commenters argue that a \nnameplate-based threshold is inappropriate and urge the Commission to adopt a materially higher \nthreshold, such as 200 MW.6   \nThe Commission should reject those arguments because the 50 MW threshold strikes the \nappropriate balance between allowing continued use of Retail BTMG and appropriate limitations \nto ensure reliability.  The Order expressly directed PJM to propose a new MW threshold for Retail \nBTMG and explained that such a threshold should reduce the reliability and resource adequacy \n \n3  \nSee PJM 60-Day Compliance Filing, Docket No. ER26-1479-000, at 4 (filed Feb. 23, 2026); see also PJM \nInterconnection, L.L.C., 193 FERC ¶ 61,217, at PP 179, 221-224 (2025) (“Order”). \n4  \nTerms not otherwise defined herein shall have the same meaning as set forth in the PJM Tariff. \n5  \nPJM 60-Day Compliance Filing at 5-17. \n6  \nSee Protest of Calibrant Energy; Antora Energy, Inc.; Convergent Energy and Power; Eolian L.P.; and \nMainspring Energy, Inc., Docket No. ER26-1479-000, at 6-8, 11-12 (filed Mar. 16, 2026) (collectively, the “BTMG \nParties”); Comments of Crusoe Technologies LLC, Docket No. ER26-1479-000, at 2, 4-5 (filed Mar. 16, 2026) \n(“Crusoe”); Joint Protest and Comments of the PJM Industrial Customer Coalition, the Industrial Energy Consumers \nof America, and the National Railroad Passenger Corporation, Docket No. ER26-1479-000, at 5, 9, 23-33 (filed Mar. \n16, 2026); Protest and Comments of Eastman Chemical Company, Docket No. ER26-1479-000, at 6 (filed Mar. 16, \n2026)."},{"page":3,"startToken":843,"endToken":1094,"text":"3 \nrisks posed by large Retail BTMG, while allowing smaller customers to continue netting in a \ntransparent and not unduly discriminatory manner.7  PJM reasonably selected 50 MW because that \nthreshold aligns with the PJM Board’s definition of large load additions, preserves existing \ntreatment for smaller and longstanding Retail BTMG arrangements, and avoids sweeping in retail \ncustomers whose grid impacts are comparatively limited.8  PJM reasonably based the threshold on \ngenerator size—measured by cumulative nameplate rating—because generator capacity is static \nand administrable, whereas load can fluctuate.9  The Commission should therefore reject \ncommenters’ requests to materially increase the MW threshold or replace PJM’s brightline, \nnameplate-based standard with a more variable approach. \nHowever, it is important that this threshold be paired with grandfathering provisions that \nappropriately recognize that industrial and commercial customers have relied on Retail BTMG \nrules and that eliminating the ability to continue relying on those provisions could cause them \nsubstantial financial harm.  To that end, the PJM Transmission Owners support certain proposed \nadditions and clarifications to PJM’s grandfathering proposal, namely: \n Grandfathering treatment should extend to projects that are not yet in service and would \nhave been eligible for Retail BTMG treatment, but have made substantial progress \ntowards completion. \n The “existing contract” exception to the application of the new Retail BTMG rules \nshould be construed broadly to cover a wide range of contracts and recognition of \nrenewal rights in those contracts. \n \n7  \nOrder at PP 186, 221. \n8  \nPJM 60-Day Compliance Filing at 11-13. \n9  \nId. at 14."},{"page":4,"startToken":1094,"endToken":1361,"text":"4 \n Grandfathering treatment should be extended to existing Retail BTMG arrangements \nthat have been physically in service and operating for a significant period of time to \navoid disrupting these long-standing arrangements. \nB. \nTransmission Services for Co-Located Load \nConsistent with the Order, PJM proposes Tariff revisions establishing the transmission-\nservice framework applicable to Eligible Customers taking transmission service on behalf of Co-\nLocated Load, including three new transmission service options in addition to Network Integration \nTransmission Service (“NITS”).10   \n1. \nThe Commission Should not Mandate a Combined Interconnection \nand Transmission Study Process for Co-Located Loads and Generation \nIn its comments, Invenergy Renewables LLC and Invenergy Thermal LLC argue that the \nCommission and PJM should clarify how the transmission and generator interconnection study \nprocesses can work in tandem.11  In Invenergy’s view, developers and lenders will be reluctant to \ncommit to projects without both sets of study results showing that the project is viable and \nidentifying expected upgrade costs, and coordinated studies would better align generation and \nload, improve efficiency, reduce system costs, and provide the certainty needed for co-location \nprojects to be financed and developed at scale.12 \nInvenergy’s comments primarily address PJM’s initial brief in the paper hearing process \nimposed by the Commission in Docket Nos. EL25-49, et al.,13 and the PJM Transmission Owners \nwill respond fully to those comments in that proceeding.  However, because Invenergy also \n \n10  \nPJM 60-Day Compliance Filing at 18. \n11  \nComments of Invenergy Renewables LLC and Invenergy Thermal LLC, Docket Nos. EL25-49, et al., at 5 \n(filed Mar. 16, 2026) (“Invenergy”). \n12  \nId. at 4. \n13  \nOrder at PP 2, 219-220."},{"page":5,"startToken":1361,"endToken":1677,"text":"5 \nincluded the PJM 60-Day Compliance Filing docket in the caption of its comments, the PJM \nTransmission Owners summarize their response here as well.   \nIt is unclear what Invenergy is asking for here, but to the extent it is requesting that the \nCommission impose a combined transmission and interconnection study process for Co-Located \nLoad and generation, the Commission should decline.  In its initial brief in the paper hearing \nprocess, PJM has already proposed a coordinated load and generation study process, with the PJM \nTransmission Owners conducting load integration studies and PJM performing generator \ninterconnection and transmission service studies, as necessary.  Requiring PJM to administer a \nsingle study process goes beyond the issues set for hearing by the Commission in the Order, as \nwell as the scope of compliance directed by the Commission in the instant proceeding.   \nFinally, end-use load is still retail load and existing load interconnection rules set forth in \nstate jurisdictional tariffs and agreements cannot be ignored or sidestepped.  However, there is no \nneed for the Commission to entangle itself in questions regarding the division between its \njurisdiction over interstate transmission matters and state jurisdiction over retail service in this \nproceeding.  The coordinated study approach proposed by PJM will provide a just and reasonable \nopportunity for Co-Located Load to interconnect and assess the appropriate type and level of \ntransmission service that it wishes to obtain. \n2. \nUse of New Transmission Services by Behind-the-Meter Generation \nand Load-Only Customers \nThe Joint Parties14  ask the Commission to reject, or at least defer action on, PJM’s proposal \nto limit PJM’s new transmission service options to Co-Located Load, while excluding Retail \nBTMG customers and other load-only customers that can limit withdrawals from the grid unless \n \n14  \nProtest of Eolian L.P.; Antora Energy, Inc.; Calibrant Energy; Convergent Energy and Power; Mainspring \nEnergy, Inc.; and Verrus, LLC, Docket No. ER26-1479-000, at 10-15 (filed Mar. 16, 2026) (collectively, the “Joint \nParties”)."},{"page":6,"startToken":1677,"endToken":1973,"text":"6 \nPJM revises the tariff to make the new transmission services available to BTMG and similarly \nsituated load-only customers.15  According to the Joint Parties, BTMG-served loads and similarly \nflexible load-only customers are sufficiently comparable to Co-Located Load that they should have \naccess to the same transmission service options, rather than being required to take full NITS simply \nbecause they are not connected to a generating facility with PJM interconnection rights.16 \nThe Commission should reject the Joint Parties’ request that it reject or defer action on \nPJM’s proposal to limit the new transmission service options to Co-Located Load.  In the Order, \nthe Commission made clear that the new transmission services are limited to Eligible Customers \ntaking transmission service on behalf of Co-Located Load, and repeatedly described NITS, Firm \nContract Demand Transmission Service, and Non-Firm Contract Demand Transmission Service \nas options available only within that Co-Located Load framework.17   \nWhile a number of PJM Transmission Owners disagree that the new transmission services \nare necessary at all, there is absolutely no evidence in the record to suggest that load-only \ncustomers should be entitled to utilize these transmission services.  Those customers must continue \nto take NITS.  Moreover, the Joint Parties’ assertion that Co-Located Load and ordinary BTMG \nor other load-only customers are “similarly situated” should be rejected because it ignores the line \nthe Commission expressly drew in the Order.  The Commission did not establish a generally \navailable transmission-service option for any customer that claims it can limit withdrawals from \nthe grid.  Rather, it directed PJM to create those new services only for an Eligible Customer taking \ntransmission service on behalf of Co-Located Load, which the Commission defined as load \n \n15  \nJoint Parties at 10-12, 14-15. \n16  \nId. at 10-14. \n17  \nOrder at PP 2, 186, Ord. Para. (C)."},{"page":7,"startToken":1973,"endToken":2252,"text":"7 \nphysically connected to an Interconnection Customer’s existing or planned generator.18  The new \nservices are tied to generator-specific attributes that ordinary load-only customers do not share, \nincluding an associated generator, separate metering from that generator, and the ability and \nwillingness to prevent or limit withdrawals through the co-location configuration itself.19  The \nCommission also declined to comprehensively address retail load interconnection more generally, \nconfirming that the replacement rate was directed to Co-Located Load, not load-only customers as \na class.20 \n3. \nPermitting Interim NITS Customers to Serve On-Site Load with On-\nSite Generation During a Curtailment \nThe Data Center Coalition and Crusoe argue that PJM’s proposed Interim NITS framework \nis unworkable unless a curtailed customer may continue to serve on-site load with co-located \ngeneration.21  They contend that curtailment should limit withdrawals from the transmission \nsystem, not prevent a customer from using its own co-located generation or Retail BTMG, because \notherwise Interim NITS would provide little or no practical value and significantly undermine the \nviability of co-location arrangements.22  They therefore urge the Commission to clarify that an \nInterim NITS customer may continue to use co-located generator during curtailment, including \nwhile the generator remains in the interconnection study process.23 \nThe PJM Transmission Owners do not oppose the requested clarification that Interim NITS \ncustomers be permitted to continue serving on-site load with co-located generation during a \n \n18  \nId. at P 164. \n19  \nId. at PP 204-205. \n20  \nId. at P 170. \n21  \nComments of Data Center Coalition, Docket No. ER26-1479-000 at 6-7 (filed Mar. 16, 2026); Crusoe at 6-\n7. \n22  \nData Center Coalition at 6-7; Crusoe at 6-7. \n23  \nData Center Coalition at 6-7; Crusoe at 6-7."},{"page":8,"startToken":2252,"endToken":2411,"text":"8 \ncurtailment event, provided that PJM implements appropriate safeguards to ensure that any such \noperation does not result in unreserved use of the transmission system or otherwise compromise \nreliability.  This position is consistent with the Commission’s recognition in the Order that, when \ncurtailed, an Eligible Customer taking Interim NITS on behalf of Co-Located Load “may be able \nto continue to take energy from the Interconnection Customer with which they are co-located if \nPJM’s Tariff otherwise allows.”24 \nII. \nCONCLUSION \nThe PJM Transmission Owners respectfully request that the Commission accept this \nanswer and that any subsequent Commission orders addressing these issues be consistent with the \ndiscussion herein. \n \nRespectfully submitted, \n \n \n \n \n \n \n \n/s/ Michael Kunselman \n \n \n \n \n \n \nMichael Kunselman  \n \n \n \n \n \n \nRichard P. Sparling \n \n \n \n \n \n \n \n \n \nNicholas J. Cicale \n \n \n \n \n \n \nJonathan A. Namazi \n \n \n \n \n \n \nDavis Wright Tremaine LLP \n \n \n \n \n \n \n1301 K Street NW \n \n \n \n \n \n \nSuite 500 East \n \n \n \n \n \n \nWashington, DC 20005 \n \n \n \n \n \n \nCounsel for the FirstEnergy  \n \n \n \n \n \n \n  Companies \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nOn behalf of the PJM   \n \n \n \n \n \n \n  Transmission Owners \n \n \n \n \n \n \nDated:  April 24, 2026 \n \n \n \n24  \nOrder at P 201 (emphasis added)."},{"page":9,"startToken":2411,"endToken":2495,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list for the above-captioned docket, in accordance with the \nrequirements of Rule 2010 of the Commission’s Rules of Practice and Procedure (18 C.F.R. § \n385.2010). \nDated at Washington, DC this 24th day of April, 2026. \n \n/s/ Deiman Flores \n \nDeiman Flores \n \nDavis Wright Tremaine LLP \n \n1301 K Street, NW \n \nSuite 500 East \n \nWashington, DC 20005 \n \n(202) 402-4037 \n \ndeimanflores@dwt.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":3,"startToken":0,"endToken":484},{"p":2,"at":3,"title":"I. ANSWER TO PROTESTS AND COMMENTS","method":"printed heading","endPage":2,"endAt":40,"startToken":484,"endToken":490},{"p":2,"at":40,"title":"A. Behind-the-Meter Generation","method":"printed heading","endPage":4,"endAt":227,"startToken":490,"endToken":1125},{"p":4,"at":227,"title":"B. Transmission Services for Co-Located Load","method":"printed heading","endPage":8,"endAt":522,"startToken":1125,"endToken":2329},{"p":8,"at":522,"title":"II. CONCLUSION","method":"printed heading","endPage":9,"endAt":0,"startToken":2329,"endToken":2411},{"p":9,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":9,"endAt":535,"startToken":2411,"endToken":2495}]}