{"document":{"slug":"rec-20260424-5276","title":"Reply of Northern Virginia Electric Cooperative, Inc. to Responses to Initial Brief of PJM Interconnection, L.L.C. and to Initial Brief and Joint Responses…","issued":"2026-04-24","accession":"20260424-5276","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"brief","file":"sources/filings/text/20260424-5276_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5276","tier":"record","sha256":"a4f90194904c303f093412c5da277cb2ed07785f0f4a74cc26ec6aa5f8f5a31c","pages":29,"tokens":9173,"emptyPages":[],"textThemes":["colo","flex","cost","retail"]},"pages":[{"page":1,"startToken":0,"endToken":187,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. \nAEP Kentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \nDocket Nos. EL25-49-000 \n                      EL25-49-001"},{"page":2,"startToken":187,"endToken":464,"text":"2 \n \nLinden VFT, LLC \nCity of Cleveland, Department of Public Utilities, \nDivision of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc.\nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \n \nLarge Loads Co-Located at Generating Facilities  \n \n \nConstellation Energy Generation, LLC \n \nv.  \n \nPJM Interconnection, L.L.C. \n \n) \n) \n)\n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n \n \n \n \n \n \n \n \n \n \n \nAD24-11-000\n \nEL25-20-000\n                    (Consolidated) \nREPLY OF NORTHERN VIRGINIA ELECTRIC COOPERATIVE, INC. TO \nRESPONSES TO INITIAL BRIEF OF PJM INTERCONNECTION, L.L.C. AND TO \nINITIAL BRIEF AND JOINT RESPONSES OF THE INDICATED PJM \nTRANSMISSION OWNERS TO PAPER HEARING QUESTIONS \n \nPursuant to the Federal Energy Regulatory Commission’s (“Commission”) December 18, \n2025 order (“Co-Location Order”),1 Northern Virginia Electric Cooperative, Inc. (“NOVEC”) \nrespectfully submits this reply to the responses to the initial briefs and joint responses to the \npaper hearing questions submitted by PJM Interconnection, L.L.C. (“PJM”)2 and the Indicated \nPJM Transmission Owners (“PJM Transmission Owners”).3 \n \n \n1 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, PP 219-20 (2025) (“Co-Location Order”); see also PJM \nInterconnection, L.L.C., Notice of Extension of Time, Docket Nos. EL25-49-000, et al. (Jan. 23, 2026) (Accession \nNo. 20260123-3062) (Extending the due date for responses to initial briefs by seven days, from April 17, 2026, to \nApril 24, 2026).  \n2 PJM Interconnection, L.L.C., Initial Brief, Docket Nos. EL25-49-000, et al. (filed Feb. 23, 2026) (Accession No. \n20260223-5189) (“PJM Initial Brief”). \n3 Indicated PJM Transmission Owners, Initial Brief and Joint Responses of the Indicated PJM Transmission Owners, \nDocket Nos. EL25-49-000, et al. (filed Feb. 23, 2026) (Accession No. 20260223-5190) (“PJM TO Initial Brief”)."},{"page":3,"startToken":464,"endToken":745,"text":"3 \n \nI. \nINTRODUCTION \nWhen the Commission issued the Co-Location Order4 ordering PJM to provide new \ntransmission services to accommodate serving Co-Located Loads, the Commission left \nimplementation details to be developed through this paper hearing. PJM and the PJM \nTransmission Owners have addressed many, but not all, of the necessary implementation details. \nNOVEC disagreed5 and continues to disagree that any new transmission service should be \nformulated for Co-Located Loads rather than requiring them to use Network Integration \nTransmission Service (“NITS”), largely because it is not just or reasonable for other transmission \ncustomers to subsidize Co-Located Load. But, respecting that the Commission has decided to \nrequire the development of these new variations of transmission service, NOVEC generally \nsupported the proposals of PJM and the PJM Transmission Owners because they are designed to \nprevent existing transmission customers from subsidizing Co-Located Load.6  \nThe responses to the initial briefs demonstrate that additional clarity is needed on certain \nthreshold issues regarding which kinds of entities are or are not Eligible Customers (including \nwhether a Load Serving Entity (“LSE”) like NOVEC can be required to serve as an Eligible \nCustomer if a Co-Located Load or generator serving Co-Located Load were to interconnect to \nNOVEC’s distribution system in order to access the PJM transmission system), as well as \nCommission guidance on other aspects of the rates, terms, and conditions of the new \ntransmission services. NOVEC’s comments focus on threshold issues relating to who is or must \n \n4 See Co-Location Order. \n5 NOVEC, Protest, Docket No. EL25-20-000 (filed Dec. 18, 2024) (Accession No. 20241218-5285); see also \nNOVEC, Response to Initial Briefs, Docket Nos. EL25-49-000, et al. (filed Mar. 25, 2026) (Accession No. \n20260325-5220”) (“NOVEC Brief”). \n6 See NOVEC Brief."},{"page":4,"startToken":745,"endToken":1079,"text":"4 \n \nbe an Eligible Customer and on a number of issues relating to the rates, terms, and conditions of \nthe new transmission services that require additional development.  \nAs explained below, NOVEC respectfully requests that the Commission provide \nadditional guidance on who may act as an Eligible Customer. NOVEC also requests that the \nCommission: (1) approve the use of the NITS rate for Non-Firm Contract Demand Transmission \nService (“Non-Firm CDS”); (2) approve PJM’s proposal to restrict a Co-Located Load receiving \nInterim NITS from taking energy and capacity from the co-located generating facility when the \nCo-Located Load is curtailed; (3) confirm that there should be a Grid Reliance Charge; (4) \nconsider the financial penalty proposal of the PJM Transmission Owners, subject to additional \ndetails; and (5) approve an effective date that allows all parties involved to prepare for providing \nservices to Co-Located Load.  \nII. \nANSWER \nA. The Commission should make clear who may or must act as an Eligible \nCustomer and address related questions about the terms of service. \n \nThere are unanswered questions regarding the definition and role of Eligible Customer \nfor purposes of the new transmission services for Co-Located Load. The Co-Location Order \nprovides that it is the Eligible Customer that will take transmission service on behalf of the Co-\nLocated Load.7 The PJM Open Access Transmission Tariff (“Tariff”), consistent with the pro \nforma tariff under Order No. 888, defines Eligible Customer as follows:  \n(i) Any electric utility … or any person generating electric energy for sale \nfor resale … (ii) Any retail customer taking unbundled transmission service \npursuant to a state requirement that the Transmission Provider or a \nTransmission Owner offer the transmission service, or pursuant to a \nvoluntary offer of such service by a Transmission Owner, is an Eligible \nCustomer under the Tariff . . . .8 \n \n7 Co-Location Order at PP 175-176; id. at n.379 (“…the replacement rate we establish in Part IV.B.4 applies to \nEligible Customers taking transmission service on behalf of Co-Located Load….”).   \n8 PJM Tariff, Part I, § 1, Definitions E-F."},{"page":5,"startToken":1079,"endToken":1401,"text":"5 \n \n \nThe Commission expanded on that definition in the Co-Location Order, stating that an Eligible \nCustomer could be “for example, any person generating electric energy for resale or any retail \ncustomer taking unbundled transmission service under certain conditions…,”9 or that “subject to \napplicable state law, the Eligible Customer could create a corporate intermediary to serve the Co-\nLocated Load, or the Co-Located Load, acting as an Eligible Customer, could request service \nfrom the relevant transmission owner directly”10 while referring back to the PJM Tariff \ndefinition for “the full definition of Eligible Customer….”11  \n \nSeveral parties raised a question about who can act as an Eligible Customer. Invenergy \nRenewables LLC and Invenergy Thermal LLC (collectively, “Invenergy”) asked the \nCommission to confirm that “where a state retail choice program results in unbundled retail \naccess, customers may take transmission service as an Eligible Customer[,]” effectively asking \nwhen a Co-Located Load could qualify as an Eligible Customer.12 Old Dominion Electric \nCooperative (“ODEC”) sought clarification as to whether it would have to provide authorization \nunder circumstances where it is the Relevant Electric Retail Regulatory Authority (“RERRA”).13 \n \nThe Commission should consider a more definitive delineation of who may be an \nEligible Customer as well as the scope of the Eligible Customer’s obligations. NOVEC also \nseeks confirmation that it cannot be required to serve as an Eligible Customer serving Co-\nLocated Load unless it agrees to do so. In the Co-Location Order, the Commission gives agency \nto the Eligible Customers who may “at their option, take a new interim, non-firm transmission \n \n9 Co-Location Order at n.404. \n10 Id. at n.407. \n11 Id. at n.404.  \n12 Invenergy Renewables LLC and Invenergy Thermal LLC, Comments, Docket Nos. EL25-49-000, et al., at 6 \n(filed Mar. 16, 2026) (Accession No. 20260316-5254) (“Invenergy Brief”).  \n13 Old Dominion Electric Cooperative, Reply Brief, Docket Nos. EL25-49-000, et al., at 7 (filed Mar. 25, 2026) \n(Accession No. 20260325-5233) (“ODEC Brief”)."},{"page":6,"startToken":1401,"endToken":1692,"text":"6 \n \nservice until all Network Upgrades necessary to provide NITS are complete” if the Eligible \nCustomer is seeking to provide NITS or the Eligible Customer “can choose to take [Firm or Non-\nFirm CDS] on behalf of a Co-Located Load instead of taking NITS.”14  \n \n NOVEC is an electric distribution cooperative and LSE that serves many of the data \ncenters in “Data Center Alley” in Northern Virginia, sometimes referred to as the “Data Center \nCapital of the World.” NOVEC needs to understand what obligations, if any, the Commission is \nintending to impose on LSEs with respect to Co-Located Load that seeks to use the new \ntransmission services required by the Co-Location Order. NOVEC is not a PJM Transmission \nOwner but does own and operate a significant distribution system which has numerous points of \ninterconnection with the transmission system in PJM’s Dominion transmission pricing zone. \nNOVEC relies on PJM NITS to serve all of its load, including its very significant and constantly \ngrowing data center load.  \nNOVEC is an Eligible Customer under the PJM Tariff’s existing definition of that term, \nbut seeks clarification of its obligations under the Co-Location Order to act as an Eligible \nCustomer on behalf of a Co-Located Load in the event one were to interconnect to NOVEC’s \ndistribution system and wish to use these new transmission services:  \n(1) Is a Co-Located Load eligible for these new transmission services if it interconnects \nto an LSE’s distribution infrastructure rather than directly to the transmission system? \n(2)  Even assuming that a Co-Located Load that is interconnected to distribution \ninfrastructure that is not dedicated to or part of the PJM transmission system is \neligible to use these new services under the PJM Tariff, NOVEC seeks confirmation \n \n14 Co-Location Order at P 160."},{"page":7,"startToken":1692,"endToken":2006,"text":"7 \n \nthat the Commission is not requiring an LSE like NOVEC to serve as an Eligible \nCustomer on behalf of the Co-Located Load unless it voluntarily elects to do so.  \nRequiring an LSE like NOVEC to serve as an Eligible Customer on behalf of a Co-\nLocated Load carries many complications. From a legal standpoint, because the states determine \nwho may provide retail service, sales to the Co-Located Load as the end-user must be authorized \nunder state law and the Co-Located Load cannot be an Eligible Customer unless state law allows \nit to take unbundled transmission service.15 The Commission of course must respect state \njurisdiction over retail rates, which means, inter alia, that the Commission cannot require LSEs \nto modify their retail rates to accommodate these new service and undertake the administrative \nburden of being an Eligible Customer for a Co-Located Load unless the LSE chooses to do so.  \nFrom a compliance and liability standpoint, LSEs like NOVEC should not be subject to \npotential liability for the transmission costs, much less penalties for non-compliance with the \nTariff’s requirements, if a Co-Located Load for which NOVEC is serving as Eligible Customer \nfails to meet or comply with all applicable provisions of these services, including curtailing load \nwhen required to do so. Operationally, NOVEC is uncertain as to how the Co-Located Load \nmight be curtailed without potentially creating operational constraints that are highly sensitive to \nthe timing and frequency of curtailment notifications. In particular, frequent notices or ones that \nare insufficiently in advance of required implementation could hinder effective operational \nplanning and resource allocation. Consideration of these dynamics is important to mitigate \npotential disruptions and maintain reliable system operations. \nFrom a practical and PJM Tariff standpoint, if an LSE relies on NITS to serve its load, it \nis NOVEC’s understanding that the Co-Located Load would have to be electrically isolated from \n \n15 Id. P 168."},{"page":8,"startToken":2006,"endToken":2386,"text":"8 \n \nthe remainder of the LSE’s network load if the Co-Located Load seeks to use Firm CDS, Non-\nFirm CDS, or Interim NITS, because typically an LSE cannot use NITS for only a portion of its \nload unless that portion is electrically isolated from the balance of the LSE’s load.16 Electrically \nisolating such Load would require physical and electrical configurations that would be unique to \nthat of Co-Located Load and could require significant upgrades or additions.   \nNOVEC believes that utilities should be prepared to serve all customers within their \nauthorized service areas, but NOVEC is concerned about the implications of being required to \nprocure transmission service other than NITS to meet the load it serves. Absent a compelling \nbenefit to its customers or arrangements that fully protect other customers from any adverse costs \nor operational impact arising out of service to Co-Located Load, NOVEC would rather not act as \nan Eligible Customer serving Co-Located Load for any service other than NITS. NOVEC \nrespectfully requests that the Commission confirm that that NOVEC is not obligated to apply for \nFirm CDS, Non-Firm CDS, or Interim NITS on behalf of Co-Located Load that is interconnected \nto NOVEC’s distribution facilities or connected to Dominion but within NOVEC’s service area.   \nB. The Commission should address questions raised during the proceeding \nregarding the rates, terms, and conditions of Firm CDS, Non-Firm CDS, and \nInterim NITS. \n \n1. The Commission should approve the use of the NITS rate for Non-Firm \nCDS. \n \nThe PJM Transmission Owners proposed charging the NITS rate for Non-Firm CDS.17 In \nresponsive briefs, several participants indicated opposition to the use of the NITS rate for Non-\nFirm CDS.18 NOVEC supported the proposal and continues to support this proposal. Non-Firm \n \n16 See, e.g., FERC Pro Forma Open Access Transmission Tariff, Part I, § 1.23 Network Load (stating that a \ncustomer may not designate only part of the load at a discrete Point of Delivery as Network Load).  \n17 See PJM TO Initial Brief at 10. \n18 Geronimo Power, LLC, Response Brief, Docket Nos. EL25-49-000, et al., at 4-9 (filed Mar. 25, 2026) (Accession \nNo. 20260325-5235) (“Geronimo Power Brief”); Vistra Corp., Response Brief, Docket Nos. EL25-49-000, et al., at \n16-18 (filed Mar. 25, 2026) (Accession No. 20260325-5239) (“Vistra Brief”); Joint Co-Location Developers, Reply"},{"page":9,"startToken":2386,"endToken":2740,"text":"9 \n \nCDS “is a transmission service that allows an Eligible Customer taking service on behalf of Co-\nLocated Loads to obtain non-firm, interruptible transmission service on behalf of a Co-Located \nLoad in the event the Co-Located Generating Facility is on outage and unable to provide any of \nthe dedicated level of energy….”19 Under PJM’s proposal, it is only available when the generator \nis on outage. Reservations are available “for terms ranging from one hour to one month, \nconsistent with the terms available for non-firm [Point-to-Point Service (“PTPS”)] currently in \nthe PJM Tariff.”20 As proposed by the PJM Transmission Owners, “the maximum rate for Non-\nFirm Contract Demand Service on behalf of Co-Located Load will be calculated by multiplying \n(i) their reserved, non-firm contract demand amount (in MWs) by (ii) the applicable zonal NITS \nrate.”21 The Non-Firm CDS customer will also receive an adjustment to reflect the impact of the \nGrid Reliance Charge in order to prevent double-recovery.22  \nBased on the design proposed by the PJM Transmission Owners, the intention behind the \nproposal is to charge Non-Firm CDS customers only when they make a reservation to use \ntransmission capacity on an as-available basis. This is reflected in the PJM Transmission \nOwners’ request for clarification that “an Eligible Customer’s initial application for a certain \namount of Non-Firm Contract Demand Transmission Service would essentially serve as a \n‘holding’ request, and the actual reservation and use of Non-Firm Contract Demand \nTransmission Service would require the Eligible Customer to submit individual requests for \nservice in advance of the interval during which it wishes to obtain such service.”23 The PJM \n \nBrief and Motion to Intervene Out-of-Time, Docket Nos. EL25-49-000, et al., at 20-23 (filed Mar. 25, 2026) \n(Accession No. 20260325-5236) (“Joint Co-Location Developers Brief”). \n19 PJM Initial Brief, Illustrative Tariff at § 709.2(b).  \n20 PJM TO Initial Brief, Blazunas, Shafer, & Hammer Testimony, PTO-0001 at 11:12-13.  \n21 Id. at 11:20-12:2.  \n22 PJM TO Initial Brief at 7. \n23 Indicated PJM Transmission Owners, Joint Response, Docket Nos. EL25-49-000, et al., at 4 (filed Mar. 25, 2026) \n(Accession No. 20260325-5203) (“PJM TO Reply Brief”)."},{"page":10,"startToken":2740,"endToken":3029,"text":"10 \n \nTransmission Owners added that “the amount that PJM determines is available for a particular \nrequested interval or intervals would presumably serve as the basis for determining the relevant \ncharge to the Eligible Customer for Non-Firm Contract Demand Transmission Service.”24 The \nPJM Transmission Owners concluded by asking PJM to “confirm [that] these understandings are \ncorrect and add appropriate language to its proposed Tariff provisions.”25 \nSome of the opposition appears to come from a misapprehension of the proposal, which \nillustrates why the request for clarification by the PJM Transmission Owners should be granted. \nGeronimo Power, LLC (“Geronimo Power”) suggests by way of example that a “100 MW load \nco-located with a 100 MW generator located within a zone with a NITS and Firm Contract \nDemand transmission service rate of $10,000/MW/year and a Grid Reliance Charge of \n$2,580/MW/Year” would “pay the same amount if it reserved 100 MW of Firm Contract \nDemand transmission service or 100 MW of Non-Firm Contract Demand transmission \nservice.”26 But, under PJM’s proposal, Geronimo Power’s hypothetical customer would only \ntake and pay for Non-Firm CDS when the generator was experiencing an outage. Even under an \nalternative scenario where Eligible Customers had greater flexibility to mix and match Firm and \nNon-Firm CDS, the Eligible Customer would only pay for the actual Non-Firm CDS it receives \nto cover whatever it chooses not to generate or procure through Firm CDS. In contrast, the \ncustomer would pay for Firm Contract Demand Service throughout the term of its reservation \nregardless of its usage. The same rate thus does not equate to the same cost to the customer, as \nGeronimo Power seems to argue. \n \n24 Id. \n25 Id. \n26 Geronimo Power Brief at 5."},{"page":11,"startToken":3029,"endToken":3405,"text":"11 \n \nOther opposition to the proposal is rooted in a flawed analysis of Commission precedent \nand the cost-causation principle or an appeal to policy reasons. The cost-causation principle \nrequires that all approved rates reflect to some degree the costs actually caused by the customer \nwho must pay them, and the courts “evaluate compliance with this unremarkable principle by \ncomparing the costs assessed against a party to the burdens imposed or benefits drawn by that \nparty.”27 While adhesion to the cost causation principle does not require “exacting precision,” the \nCommission must have an “articulable and plausible reason” to believe that the benefits are \nroughly commensurate with costs.28   \nVarious parties argue that Non-Firm CDS service imposes lesser costs on the grid that \nshould warrant a discount.29 This premise remains unproven. When the Co-Located Load is \nusing Non-Firm CDS and is not curtailed, its use of the transmission system is comparable to the \nway NITS customers use it. Unlike a point-to-point transmission service product, Non-Firm CDS \nis not restricted to designated sources and sinks. And although under PJM’s construct Non-Firm \nCDS is only available when the generator is experiencing an outage, that may occur more \nfrequently than expected. In its reply brief, the Independent Market Monitor for PJM (“IMM”) \npointed out that “[g]enerators providing co-located service will not be available for 8,760 hours \nper year.”30 Rather, the availability factor for other PJM generators “was 83.2 percent…in 2025” \nand “the system would become unmanageable if all or a significant part of the data center users \nwanted to use non-firm CDS….”31 Unlike NITS, which “ensures the system overall is \n‘proactively’ planned to a forecasted level of service and the needed resource capacity to \n \n27 Midwest ISO Transmission Owners v. FERC, 373 F.3d 1361, 1368 (D.C. Cir. 2004); see also Old Dominion \nElectric Cooperative v. FERC, 898 F.3d 1254, 1255 (D.C. Cir. 2018). \n28 Illinois Commerce Commission v. FERC, 576 F.3d 470, 477 (7th Cir. 2009). \n29 Geronimo Power Brief at 8-9; Joint Co-Location Developers Brief at 20-22; Vistra Brief at 16-17. \n30 Independent Market Monitor for PJM, Reply Brief, Docket Nos. EL25-49-000, et al., at 6 (filed Mar. 26, 2026) \n(Accession No. 20260326-5062) (“IMM Brief”). \n31 Id."},{"page":12,"startToken":3405,"endToken":3763,"text":"12 \n \nmaintain the reliability of service is secured ahead of time[,]” Non-Firm CDS is not accounted \nfor in models and will appear on the system frequently, but irregularly.32 PJM faces significant \nchallenges in planning to ensure that this can be done reliably.33  \nRather than contend that Non-Firm CDS imposes lesser costs on the transmission system \nthan NITS, it would be fairer to say that it imposes costs differently. It is true that PJM will not \nbe building upgrades to accommodate requests for Non-Firm CDS, but PJM will now be faced \nwith the prospect of receiving and managing these requests (for as much as 20 percent of the \ntime) for short-term transmission service. And the anticipated frequency of these requests based \non generators’ likely downtime points to a greater use and reliance on the transmission system \nthan the other parties represent.34 The Commission needs to be cautious to avoid providing “co-\nlocated generators a subsidized low cost option to use the system whenever they need backup.”35 \nPart of what NITS customers pay for is the ability to use the transmission system when needed. \nThe Commission should disfavor the argument that because Non-Firm CDS is a lower \npriority than NITS it should necessarily have a lower cost. The practical reality is that Co-\nLocated Load can game the system if the Commission accepts that premise. As part of the \napplication for Non-Firm CDS, PJM studies how much it can reliably provide. If the Co-Located \nLoad is unhappy with that result, it always has the option to request Interim NITS, NITS, or Firm \nCDS. Co-Located Load in areas where PJM can accommodate a large amount of Non-Firm CDS \ncould end up with the best of both worlds, where they are very rarely curtailed but pay a \nsubsidized rate for transmission service. If PJM later determines it can no longer accommodate \n \n32 PJM Initial Brief, Attachment B, Abdulsalam Affidavit at P 7.  \n33 Id. PP 9-12. \n34 See, e.g. Vistra Brief at 5, 19 (discussing Co-Located Load configurations that will allegedly not use transmission \nservice or make de minimis transmission service requests).  \n35 IMM Brief at 6."},{"page":13,"startToken":3763,"endToken":4122,"text":"13 \n \nthe required level of Non-Firm CDS, the Co-Located Load could simply switch to Firm CDS or \nNITS at that point. Choosing to accept the risk of curtailment could simply reflect the de minimis \nnature of that risk. Accordingly, the Commission should not sanction a discount from NITS \nsimply because the risk of curtailment exists. \nVistra argues that Non-Firm CDS should receive the same rate as non-firm PTPS \ncustomers because both services are non-firm.36 The Commission should reject this argument. In \naddition to a differing level of firmness,37 Non-Firm CDS differs from non-firm PTPS because it \nis not a point-to-point service, which Vistra does not acknowledge. It would not be appropriate to \nallow Non-Firm CDS the same discount as non-firm PTPS because the two products \nfundamentally differ.  \nThe Commission has said that non-firm transmission services may be charged at the same \nrate as NITS.38 The PJM Transmission Owners have adequately supported their proposal. The \nPJM Transmission Owners explained that Non-Firm CDS will “represent a superior level of \nservice compared to non-firm PTPS.”39 In addition to that superior level of service, Non-Firm \nCDS have greater flexibility and do not have to pay for generation capacity.40 Those benefits, \ncoupled with the potential reliability concerns and gaming issues, demonstrate that the NITS rate \nsatisfies the cost-causation principle for use as the Non-Firm CDS rate. \nThe PJM Transmission Owners further explained that “[b]efore determining whether a \ndiscount is appropriate for Non-Firm Contract Demand Service, and if so what level it should be \n \n36 Vistra Reply Brief at 16-18. \n37 PJM TO Initial Brief at 11-12.  \n38 See Co-Location Order at P 200 (“Eligible Customers taking this interim, non-firm transmission service on behalf \nof Co-Located Loads would pay the NITS rate for the new service, as well as ancillary services charges and charges \nfor black start service, but they would not be charged for generation capacity because, as interruptible loads, \ncapacity will not be procured on their behalf until such time as the Network Upgrades are in place to serve them.”); \nsee also PJM TO Initial Brief at 11-12. \n39 PJM TO Initial Brief at 12.  \n40 Id."},{"page":14,"startToken":4122,"endToken":4436,"text":"14 \n \nset at, it is necessary for the PJM Transmission Owners to gather data on how Non-Firm \nContract Demand Service customers are utilizing the service, taking into account the intended \npurpose of the service, and the effect of that utilization on the system.”41 NOVEC agrees that \nbefore a discount is set, it is appropriate to consider how Non-Firm CDS customers are using the \nservice and the effect of their utilization on the system. Without that practical experience, no one \ncan reasonably determine whether a discount is appropriate. If the Commission were to pre-\nemptively order a discounted rate, the Commission would effectively be forcing existing \ntransmission customers—which includes ordinary people struggling with affordability \nconcerns—to bear the risk that they will subsidize large loads. In addition to the impact of \ntransmission upgrades to accommodate large loads that are socialized to all transmission \ncustomers, large loads may also have an impact on aspects of PJM markets. NOVEC respectfully \nsubmits that as between the two types of customers that could bear that risk, the customer that \nshould bear the risk of any mistake should be the ones receiving a special privilege to facilitate \ntheir service. The Federal Power Act is a consumer-protection statute; therefore, the Commission \nshould protect the consumer, institute the NITS rate for Non-Firm CDS, and reserve the question \nfor a future filing by the PJM Transmission Owners. \nFinally, the Joint Co-Location Developers argue that the proposed rate would “discourage \nproductive industrial development, if adopted.”42 It is the Commission’s obligation to ensure that \nrates are just and reasonable, not to provide subsidies to select, power-intensive industries at the \nexpense of ordinary consumers. If some industries are not viable without subsidization by other \ncustomers, it is not the Commission’s role to provide them subsidies at the expense of \ntransmission customers at-large. \n \n41 Id. at 13. \n42 Joint Co-Location Developers Brief at 22."},{"page":15,"startToken":4436,"endToken":4829,"text":"15 \n \n2. When a Co-Located Load using Interim NITS is curtailed, it should not \nbe able to take energy from the co-located generating facility. \n \nAfter filing its initial brief, PJM explained in a March 16, 2026, stakeholder presentation \nthat Co-Located Load taking Interim NITS will not have the rights to the capacity and energy \nfrom any specific co-located generation in its proposed Interim NITS construct when curtailed.43 \nMany commenters objected to this aspect of PJM’s proposal.44 The arguments boil down to an \nassertion that the lack of those rights defeats the purpose of co-location or makes Interim NITS \nunworkable or unfair in some way. These arguments are without merit and should be \ndisregarded. \nInterim NITS is a temporary service provided while the transmission system is prepared \nto provide full NITS to the Co-Located Load. What is important to remember is that the end goal \nis NITS—the Co-Located Load is in that sense no different than any other large load. Proximity \nof a generator to the load is irrelevant when the Co-Located Load is being served under network \nservice. PJM has represented that it will “endeavor to dispatch the co-located generation to the \nmaximum extent to reduce, but not eliminate, the risk of curtailment to this interim NITS load” \nbut if load is curtailed, it is curtailed.45 Unlike Co-Located Load served by Firm or Non-Firm \nCDS, all of Interim NITS Co-Located Load is served by the transmission system, which means it \ndoes not have a dedicated generator that has given up its Capacity Interconnection Rights \n(“CIR”) and is no longer a Capacity Resource. In the case of an existing resource with a must-\noffer requirement, to do what PJM’s opponents ask seems to be incompatible with the \n \n43 PJM, Co-Located Load Use Cases, Presentation at 12 (Mar. 16, 2026), available at: 20260316-item-02---\ncolocated-load-use-cases---presentation.pdf (“Co-Location Presentation”).  \n44 See, e.g., Data Center Coalition, Response, Docket Nos. EL25-49-000, et al., at 3 (filed Mar. 25, 2026) \n(Accession No. 20260325-5208) (“Data Center Coalition Response”); Enchanted Rock, LLC, Reply Brief and \nProtest, Docket Nos. EL25-49-000, et al., at 7-10 (filed Mar. 25, 2026) (Accession No. 20260325-5191); Joint Co-\nLocation Developers Brief at 18-19; Advanced Energy United and Solar Energy Industries Association, Reply Brief, \nDocket Nos. EL25-49-000, et al., at 19-21 (filed Mar. 25, 2026) (Accession No. 20260325-5237).  \n45 Co-Location Presentation at 15."},{"page":16,"startToken":4829,"endToken":5147,"text":"16 \n \nobligations of a Capacity Resource, if it makes itself exclusively available to one customer on \ndemand. Even for new generation, setting aside the fact that it too would become a Capacity \nResource, the request does not make sense. If the Co-Located Load is taking NITS, it is using the \ntransmission system for service and if PJM has determined that power is insufficient or not \ndeliverable (i.e., the load is curtailed), generation is unavailable to serve the Co-Located Load. \nAccordingly, NOVEC respectfully requests that the Commission approve PJM’s \nproposal. NOVEC is concerned that to do otherwise would devalue the concept of NITS. Worse, \nit invites the same argument when the Co-Located Load is being served by full NITS, which \nwould end with some NITS customers being more equal than others, in the interest of validating \nthe decision to co-locate with a generator. Let NITS remain NITS and Interim NITS be just a \ntemporary, non-firm version of NITS. There is no need to blend Interim NITS with Firm and \nNon-Firm CDS. The Commission specifically created several co-location options. If prospective \ncustomers find that Interim NITS is not desirable, they have the flexibility to pursue a \ncombination of Firm and Non-Firm CDS. As a Firm CDS customer, the Co-Located Load even \nhas the option to transition to NITS. When the Co-Located Load is a full NITS customer, it \nwould not be able to call upon the co-located generator to avoid curtailment. It makes little sense \nto create a right exclusive to a temporary service just as it makes little sense to blur the \ndistinctions between co-location options.   \n3. The Commission must require a Grid Reliance Charge. \n \nIn the Co-Location Order, the Commission found that “Co-Located Loads benefit from \nblack start service even if they have zero net energy withdrawals and Eligible Customers taking \none of the new transmission services on behalf of Co-Located Load must be assessed for this"},{"page":17,"startToken":5147,"endToken":5519,"text":"17 \n \nservice based on gross demand basis at the existing Tariff rate.”46 The Commission made an \nidentical finding for regulation service.47 In Questions 3 and 4 of the Co-Location Order, the \nCommission asked whether there should be a charge to reflect that reliance and how it should be \ndetermined.48 In response, the PJM Transmission Owners proposed the Grid Reliance Charge. \nThus, the Commission has two questions before it, whether there should be a charge and what \nshould that charge be? There should be a charge, and the Commission should set the charge high \nenough to reflect the true reliance of the grid, rejecting the “minimum system” method as \nproposed by Constellation and Vistra’s ratio methodology.49 \na. A charge to reflect Co-Located Load’s reliance on the \ntransmission system is necessary. \n \nAny suggestion that there should not be any charge at all should be rejected outright. The \npropriety of some charge, whether the Grid Reliance Charge or not, is rooted in the services that \neven Co-Located Load with zero net energy withdrawals requires from the transmission system. \nThese critical services rely on the existence and operation of the transmission system to be \ndelivered and used. Black Start Service “is the ability of generators to start without an outside \nelectric supply or remain operating when disconnected from the transmission system.”50 The \nPJM Tariff requires all transmission customers to take Black Start Service.51 Black Start Service \nis critically important, as it “encompasses the well-planned, coordinated, and deliberate actions \n \n46 Co-Location Order at P 185.  \n47 Id. P 184.  \n48 Id. P 219(3),(4).  \n49 Constellation Energy Generation, LLC, Reply Brief, Docket Nos. EL25-49-000, et al., at 25-28 (filed Mar. 25, \n2026) (Accession No. 20260325-5238) (“Constellation Brief”); see Vistra Brief, Attachment A, Stadelmeyer \nAffidavit. \n50 Co-Location Order at P 185; PJM Tariff, Part I, § 1, Definitions A-B (Black Start Service: “‘Black Start Service’ \nshall mean the capability of generating units to start without an outside electrical supply or the demonstrated ability \nof a generating unit with a high operating factor (subject to Transmission Provider concurrence) to automatically \nremain operating at reduced levels when disconnected from the grid.”).  \n51 PJM Interconnection, L.L.C., 176 FERC ¶ 61,080, P 3 (2021)."},{"page":18,"startToken":5519,"endToken":5970,"text":"18 \n \nfacility operators must take after such a harmful system collapse (of whatever geographic scope) \nhas actually occurred, to bring the grid back into operation in a safe, prudent, and incremental \nmanner.”52 Because of the nature of the service, units capable of providing Black Start Service \nmust be located throughout PJM.53 PJM stated that there were 154 of these units in 2021.54 The \nunits work together to re-energize the transmission system: \nOnce started, Black Start Service resources can energize select transmission \nfacilities connecting to the next most critical generators or other critical \nloads that need to be brought online. This cycle establishes and extends \nservice areas to ensure the balance between load and generation, and then \nbrings together (i.e., synchronizes) those separate “islands” until the grid is \nfully restored.55 \n \nWithout the transmission system to stitch such units together, they could not bring the \ntransmission system (or the load and non-black start generation using it) back online following a \nblackout.56 Because transmission customers in PJM already pay for the right to use the \ntransmission system, the current formula for Black Start Service does not include a delivery \ncomponent.57  \n \nRegulation service is also necessary for Co-Located Loads, which are “unlikely to have a \nperfect load factor, and it will therefore be necessary for PJM to use regulation service to \nmaintain the power balance between the five-minute intervals of the real-time energy market.”58 \n \n52 PJM Interconnection, L.L.C., Transmittal Letter, Docket No. ER21-1635-000, at 4 (filed Apr. 7, 2021) (Accession \nNo. 20210407-5217) (emphasis in original) (“Black Start Filing”).  \n53 Black Start Filing, Attachment A, Bryson Affidavit at PP 7-8.  \n54 Black Start Filing, Attachment B, Hauske Affidavit at P 8.  \n55 PJM Interconnection, L.L.C., 192 FERC ¶ 61,190, P 2 (2025). \n56 Co-Location Order at P 183 (Noting that ancillary services pass through transmission lines).  \n57 PJM Tariff, Schedule 6A; see also Co-Location Order, Commissioner Chang, concurring, at P 6 (“Because the \ncharges for those services only account for the provision of those discrete ancillary services, they do not contribute \nto the actual cost of building, operating, or maintaining the grid, or the Co-Located Load’s explicit reliance on the \nPJM system. Black start and regulation service charges are nearly inconsequential. Thus, just paying black start and \nregulation service charges does not constitute the Co-Located Loads paying for their ‘fair share’ of the cost of \nmaintaining and operating the transmission system. Furthermore, under such a scenario, a Co-Located Load would \nnot pay for a portion of PJM’s administrative costs, which are typically included in transmission service rates, even \nthough the Co-Located Load benefits from services provided by PJM.”).  \n58 Co-Location Order at P 184."},{"page":19,"startToken":5970,"endToken":6313,"text":"19 \n \n“This variability will exist even if the Co-Located Load takes no energy from the transmission \nsystem.”59 Schedule 3 of the PJM Tariff states that:  \nRegulation and Frequency Response Service is accomplished by \ncommitting resources whose output is raised or lowered (predominantly \nthrough the use of automatic generating control equipment) and by other \nnon-generation resources capable of providing this service as necessary to \nfollow the moment-by-moment changes in load.  The obligation to maintain \nthis balance between resources and load lies with the Transmission \nProvider.60 \n \nThis service too, requires the transmission system. Nor does it have a delivery component. \n \nIn its reply brief, Geronimo Power argues that the delivery of Black Start Service and \nregulation service does not require the transmission system.61 Geronimo Power contends that \nbecause Black Start generators are called upon to restart the grid and are located in various \nlocations, Black Start generators “are not, as the PJM Transmission Owners seem to imply, \ndelivering Black Start Service to discrete points on the grid.”62 Vistra’s witness Ms. Stadelmeyer \nsimilarly ignores the necessity of the transmission system to deliver ancillary services.63 Black \nStart units are effectively delivering Black Start Service to every part of the grid. The fact that \nthere is no delivery component simply reflects the fact that all load besides Co-Located Load in \nPJM would otherwise cover the cost of transmission service required for Black Start Service.  \nGeronimo Power also implies that regulation service is not delivered to a discrete part of \nthe grid because it is provided on a zonal basis.64 Geronimo Power’s and Vistra’s assertions are \nbelied by the Commission’s recognition that these ancillary services “pass through transmission \n \n59 Id. \n60 PJM Tariff, Schedule 3.  \n61 Geronimo Power Brief at 12. Geronimo Power alternates between arguing that there should be no Grid Reliance \nCharge and arguing that the Grid Reliance Charge proposed by the Indicated PJM TOs is not just and reasonable.  \n62 Id. at 13.  \n63 Vistra Brief, Attachment A, Stadelmeyer Affidavit at 8:15-10:2.  \n64 Geronimo Power Brief at 13."},{"page":20,"startToken":6313,"endToken":6621,"text":"20 \n \nlines.”65 Geronimo Power’s misapprehension leads it to correctly observe that the PJM \nTransmission Owners have not “demonstrate[d] that there [is] a separate delivery component to \nblack start and regulation services.”66 That is precisely correct—the services do not have a \ndelivery component, which is why the Commission asked whether there should be a charge, as \nthey nonetheless rely on the transmission system, and the Commission was concerned that Co-\nLocated Loads would not be paying their “fair share” of the cost of maintaining and operating \nthe transmission system.  \n \nThere is a benefit simply to being connected to the transmission system. The \nCommission’s question anticipates that possibility, as it asks whether there should be an \nadditional charge “reflecting that the Co-Location Arrangement is physically connected and \nsynchronized to the PJM transmission system?”67 Constellation and Vistra both limit their \ninquiry to the role of the transmission system as the provider of ancillary services. Ms. \nStadelmeyer asserts that the Grid Reliance Charge should be “based on the benefits those \ncustomers receive from the grid in supporting black start and regulation services only,” referring \nto customers who reserve no transmission service or a de minimis amount of service.68 That \nnarrow view ignores the benefit of the transmission system as a “Plan B” to Co-Located Load. \nEven if the Co-Located Load draws only from the generator it is sited with, its connection to the \ntransmission system allows it to draw on the transmission system if needed. For example, if the \nco-located generating facility trips offline, the transmission system is available to provide the \nnecessary power to bring it back online. The Co-Located Load could reserve Non-Firm CDS if \n \n65 Co-Location Order at P 183.  \n66 Geronimo Power Brief at 13. \n67 Co-Location Order at P 219(4).  \n68 Vistra Brief, Attachment A, Stadelmeyer Affidavit at 10:6-9."},{"page":21,"startToken":6621,"endToken":7030,"text":"21 \n \nneeded and it could apply for Firm CDS. The option to do so is a benefit, and unless the Grid \nReliance Charge reflects the value of that option, Co-Located Load is being undercharged.  \nThe optionality associated with interconnection is possibly more valuable than the \nprovision of ancillary services. If the only obstacles to islanding generation were regulation and \nBlack Start Service, then islanding data centers would be commonplace. The IMM’s comments \nregarding generator outage time illustrate that no generator can operate indefinitely without \nmaintenance and no generator can be guaranteed to operate without a forced outage.69 One way \nto consider the value of a grid interconnection would be to consider the difference between the \ncost of a proposed co-located configuration and the cost to island the co-located configuration \nwith the same level of service reliability as being interconnected to the transmission system. That \nwould presumably involve redundant generation, additional emergency equipment, and the \ninvestment to make the co-located generating facility able to start without external power. The \ndifference between the two costs is the cost that the Co-Located Load avoids, and thus benefits \nfrom the interconnection. While that may not be reducible to rates, it is one measure of the \nmagnitude of the benefit that Co-Located Load actually accrues from the existence of the \ntransmission system.  \n \nVistra’s suggestion that the Commission may not find any version of the Grid Reliance \nCharge necessary is incongruent with the benefits that Co-Located Load will draw from the \n \n69 IMM Brief at 5 (“The equivalent availability data (EAF is the equivalent availability factor) for all types of \ngenerators in PJM demonstrate that the non-firm service would have to be used on a regular basis. Generators \nproviding co-located service will not be available for 8,760 hours per year. The available factor (EAF) for PJM \nresources was 83.2 percent (1 – EAF is 16.8 percent) in 2025. Given the scale of potential data center users of non-\nfirm CDS, the system would become unmanageable if all or a significant part of the data center users wanted to use \nnon-firm CDS, and the service would not be available on a consistent basis and would therefore be meaningless.”); \nMonitoring Analytics, LLC, 2025 Annual State of the Market Report for PJM, Volume 2: Section 5 Capacity \nMarket, at 366 (Table 5-39) (Mar. 12, 2026) (available at \nhttps://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2025.shtml) (“2025 State of the Market \nReport”)."},{"page":22,"startToken":7030,"endToken":7331,"text":"22 \n \ntransmission system.70 “Such [a] scenario[] would fail to recognize the benefits Co-Located \nLoads receive from the grid and risk shifting system costs to other customers.”71 Consistent with \nthe cost-causation principle, NOVEC urges the Commission to find that a charge is necessary. \nb. The Commission should consider the PJM Transmission Owners’ \nproposed Grid Reliance Charge, but under no circumstances \nshould it adopt Constellation’s or Vistra’s proposals, either of \nwhich would result in an unreasonably low rate that does not \nreflect the extent of the Co-Located Load’s reliance on the \ntransmission system. \n \nThe next question is what the charge should be. Aside from the Commission’s inherent \nsection 206 authority to set its own replacement rate, the PJM Transmission Owners, \nConstellation, and Vistra have all suggested possible frameworks. NOVEC previously indicated \nthat it believed the Commission should accept the Grid Reliance Charge as filed by the PJM \nTransmission Owners, and further suggested that the Commission may want to consider a PJM \nstakeholder process to determine whether the rate should be changed in the future.72 NOVEC \ngenerally maintains that position, although NOVEC reserves the right to update its position in \nresponse to new developments, testimony, and pleadings in this proceeding. NOVEC’s principal \nconcern remains ensuring that existing transmission customers do not subsidize Co-Located \nLoad, which requires a complete understanding of the costs imposed on the grid and the benefits \ndrawn from the grid by Co-Located Load. That understanding may evolve as aspects of the co-\nlocation regime becomes more concrete. \n1. Constellation’s proposal should be rejected.  \nConstellation’s witness Mr. Ming proposes a “minimum system” method for determining \n“the costs of constructing wires to connect all customers, i.e., customer-driven costs” which he \n \n70 Vistra Brief at 22.  \n71 Co-Location Order, Commissioner Chang, concurring, at P 7.  \n72 NOVEC Brief at 10."},{"page":23,"startToken":7331,"endToken":7660,"text":"23 \n \nsubmits should be the basis for the Grid Reliance Charge.73 Mr. Ming explains that a minimum \nsystem is “a theoretical electricity system designed only to connect each customer and deliver a \nde minimis amount of power.”74 It is the “the minimum size of all electricity system components \n(e.g., poles, conductors, transformers, etc.) that could be used by the utility to recreate its system \nand connect each customer to the grid.”75  \nMr. Ming makes several arguments for why a “minimum system” method is appropriate, \nnone of which pass muster. Constellation argues that the minimum system method is cost-\naligned because Co-Located Load benefits from the existence of the wires but, “by definition, \ndoes not impose any demand on the PJM system.”76 This necessitates the development of a \n“customer-driven” rather than “demand-driven” basis to allocate costs. But Mr. Ming’s proposal \nis not cost-aligned with the use of Black Start Service or Regulation Service. Black Start Service \nimplicates a significant portion of the grid, and it is not clear from the testimony whether Mr. \nMing’s “minimum transmission system in PJM” corresponds to the transmission equipment \nneeded to provide Black Start Service, which spans the PJM region.77 In particular, units are \ngeographically dispersed and, in the event of a blackout, would have to work in concert across \nthe PJM transmission system to restore power. Black Start Service is a high cost service that \nprovides an invaluable guarantee that service can be restored safely in the event of a blackout. It \nrelies on the existence and durability of the transmission system in a way that Constellation’s \n“minimum system” methodology does not capture. Mr. Ming’s analysis also does not consider \nthe inherent benefit associated with being interconnected to the transmission system.78 The \n \n73 Constellation Brief, Attachment 1, Ming Testimony at 14:16-17. \n74 Id. at 14:19-20.  \n75 Id. at 14:21-15:2. \n76 Id. at 15:10-11.  \n77 Id. at 19:3-4.  \n78 Supra at 20-21."},{"page":24,"startToken":7660,"endToken":7987,"text":"24 \n \noption to use the entire transmission system by reserving transmission service when needed is its \nown benefit and must be accounted for.  \nMr. Ming argues that his proposal has been used for distribution purposes in alignment \nwith the cost-causation principle, even as he admits that the method is “generally not used in the \ncontext of transmission system cost allocation and rate design.”79 Mr. Ming references several \nuses in distribution cost allocation, but does not provide any examples of the method being used \nin the transmission context. This suggests that there may not be any and that the methodology is \nnot appropriate for transmission cost allocation.80 The methodology is also out of step with the \nCommission’s directives in its December 18, 2025, Co-Location Order. Both Commissioner \nRosner and Commissioner Chang stated in their concurrences that the goal was to make Co-\nLocated Load pay its fair share of the grid. A fair share of transmission costs must recognize Co-\nLocated Load’s reliance on the entire transmission system, not a hypothetical, curated subset of \ntransmission facilities. \nFinally, Mr. Ming’s reasoning for his six percent estimate of the PJM transmission \nsystem for the minimum transmission system does not seem to reflect the usual results of his \nown methodology.81 He explained that in the distribution context, “a typical range of results may \nshow that between 30% – 50% of distribution costs are driven by the number of customers on the \nsystem.”82 He tries to explain away the disparity by claiming that “[a]pplying the minimum \nsystem method to the transmission system would definitionally yield a smaller fraction than the \ndistribution-level values” because “transmission system components are much larger than \n \n79 Constellation Brief, Attachment 1, Ming Testimony at 16:9-10.  \n80 Which belies Constellation’s own assertion in its brief that the “minimum system” method is a “well-established \nmethodology.” Constellation Brief at 26. \n81 Constellation Brief, Attachment 1, Ming Testimony at 19:3-4.  \n82 Id. at 17:22-18:2."},{"page":25,"startToken":7987,"endToken":8367,"text":"25 \n \ndistribution system components, so the minimum system is a smaller fraction of total \ntransmission system costs.”83 If components of the transmission system are much larger than \ndistribution system components, then the corresponding minimum transmission system should \nalso be larger. Further, the argument that “no utilities…classify any transmission costs to the \ncustomer cost driver, meaning they are implicitly assuming a minimum system value of 0% for \nthe transmission system” and so a “minimum system” study applied to a transmission system \nshould be much less than the 25.8 percent proposed by the PJM Transmission Owners does not \nmake sense.84 Mr. Ming had just contended that transmission customers traditionally use the \ntransmission system, which meant that there has never been a reason to try to divide costs \nbetween those caused by demand and customers.85 No entity made the attempt to allocate costs \nin the way that Mr. Ming describes, but it does not follow that the lack of an attempt means it is \nzero. The Commission typically uses rolled-in pricing to allocate costs because all those who \nrely on the transmission system are deemed to benefit from the integrated network.86 The \nminimum system method is inconsistent with Commission precedent on cost allocation, so an \nargument about how it should be applied because it was not applied has no persuasive power.  \n2. Vistra’s proposal would violate the cost-causation principle \nand should be rejected.  \n \nVistra proposes to use the percentage of PJM’s total monthly billings that relate to Black \nStart and Regulation charges as a proxy for the amount of transmission system costs associated \n \n83 Id. at 18:6-10.  \n84 Id. at 18:11-15.  \n85 Id. at 16:9-19.  \n86 Kansas City Power and Light Co., 3 FERC ¶ 61,254, at 61,685 (1978) (“We reaffirm the view that the rolled-\nin method of cost allocation is favored except in exceptional circumstances.”); Municipal Energy Agency of \nNebraska v. Public Service Company of Colorado, 190 FERC ¶ 61,158, P 9 (2025) (“The Commission's \nlongstanding policy ‘favors a roll-in of rates on integrated transmission systems, absent special \ncircumstances.’ Network facilities such as the Power Pathway provide benefits to all network users by their \nnature, and so network transmission customers pay for these network facilities through rolled-in pricing.”) (internal \ncitations omitted)."},{"page":26,"startToken":8367,"endToken":8676,"text":"26 \n \nwith the transmission system’s role in delivering those ancillary services.87 Vistra reasons that \nthis principle is sound because the “vast majority of the costs of PJM’s total monthly billing are \nbased on the provision of actual transmission service, not the transportation of black start and \nregulation service over the grid.”88 Ms. Stadelmeyer estimated that to be 0.54% of the total PJM \nAnnual Transmission Revenue Requirement.89 \n \nThe problem with using this ratio is that it has no relation to the benefit being received. \nAlthough it is an ancillary transmission service, Black Start Service is a cost-based rate based on \nthe aggregate costs of various generators providing the service. It does not have a delivery \ncomponent, nor does regulation service. A Grid Reliance Charge, to address the use of the \ntransmission system in ensuring that a Co-Located Load could receive those ancillary services, \nshould be roughly commensurate to the use of the transmission system for that purpose. The ratio \nmethod advanced by Vistra arbitrarily confuses the cost of Black Start and Regulation services \nwith the cost of the transmission infrastructure necessary for customers to receive them. The \nrevenue requirements of units to be able to provide Black Start Service has no direct relation to \nthe cost of the transmission system. The same is true for regulation service. The Commission \nshould reject Vistra’s proposal.  \n4. The Commission should consider the financial-penalty structure \nproposed by the PJM Transmission Owners in their response to PJM’s \nInitial Brief. \n \nNOVEC supports a financial penalty to complement the proposed disqualification \npenalties proposed by PJM.90 The PJM Transmission Owners did not initially propose a financial \n \n87 Vistra Brief at 22-23.  \n88 Vistra Brief at 23; see also Vistra Brief, Attachment A, Stadelmeyer Affidavit at 10:6-12:4.  \n89 Vistra Brief, Attachment A, Stadelmeyer Affidavit at 11:13-14.  \n90 NOVEC Brief at 13."},{"page":27,"startToken":8676,"endToken":8989,"text":"27 \n \npenalty.91 In their response, the PJM Transmission Owners “propose a financial penalty charge \nstructure with two components: (1) a base penalty charge, which applies to each individual hour \nin which the reserved transmission service limit is exceeded, and (2) a penalty ratchet, which \napplies when such exceedances occur repeatedly.”92 When the Co-Located Load exceeds the \namount of its transmission reservation, the base penalty charge will be assessed for any hour \nduring which at least one five-minute interval occurs where the customer exceeds that limit. A \npenalty using a ratchet design escalates those charges as the frequency of that unreserved uses \nincreases. The PJM Transmission Owners do not provide any further details. NOVEC believes it \ncould generally support this framework, subject to the PJM Transmission Owners providing \nfurther information about the proposal. NOVEC reserves the right to update its position as new \ninformation becomes available and other proposals for a financial penalty are made available for \nconsideration.  \nC. The Commission should approve an effective date that accounts for the time \nnecessary for utilities and other relevant regulators to install policies, \nprocedures, and equipment required to align with and implement the order.  \n \nNOVEC supports an effective date that supports the timing necessary to align all \nnecessary processes, policies, and operations with implementing the order. As to the proposals \nby the Data Center Coalition and Constellation to phase-in Interim NITS if the other services \ncannot be expedited,93 NOVEC does not oppose the phased-in implementation of Interim NITS \nsince that service will ultimately result in the provision of NITS under the existing PJM Tariff, \nprovided that appropriate safeguards, including any necessary control technologies, are in place \nto ensure that the reliability of the transmission system is not impaired. \n \n91 PJM TO Initial Brief at 20.  \n92 PJM TO Reply Brief at 12.  \n93 Constellation Brief at 6-9; Data Center Coalition Response at 9."},{"page":28,"startToken":8989,"endToken":9095,"text":"28 \n \nIII. \nCONCLUSION \nWHEREFORE, for the foregoing reasons, NOVEC respectfully requests that the \nCommission accept this reply to the responses to the initial briefs of PJM and the PJM \nTransmission Owners and adopt a replacement rate consistent with the PJM and PJM \nTransmission Owners’ proposals and NOVEC’s comments on those proposals. \nRespectfully submitted, \n \n  //s// Alan I. Robbins \n \nAlan I. Robbins \nDebra D. Roby \nThomas B. Steiger III \nWashington Energy Law LLP \n900 17th Street, N.W., Suite 500-A  \nWashington, D.C. 20006 \nTel: (202) 326-9313 \nEmail: arobbins@washingtonenergylaw.com \ndroby@washingtonenergylaw.com \ntsteiger@washingtonenergylaw.com \n \nCounsel to Northern Virginia Electric Cooperative, Inc. \n \n \n \n \nDated: April 24, 2026."},{"page":29,"startToken":9095,"endToken":9173,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary of the Federal Energy \nRegulatory Commission in this proceeding. \nDated at Washington, D.C. this 24th day of April, 2026. \n \n  //s// Jessika Dziechciowska  \n \nJessika Dziechciowska \nEnergy Practice Analyst \nWashington Energy Law LLP \n900 17th Street, N.W., Suite 500-A \nWashington, D.C. 20006 \nTel: (202) 326-9308 \nEmail: jdziechciowska@washingtonenergylaw.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":5,"startToken":0,"endToken":465},{"p":3,"at":5,"title":"I. INTRODUCTION","method":"printed heading","endPage":4,"endAt":941,"startToken":465,"endToken":886},{"p":4,"at":941,"title":"II. ANSWER","method":"printed heading","endPage":4,"endAt":954,"startToken":886,"endToken":888},{"p":4,"at":954,"title":"A. The Commission should make clear who may or must act as an Eligible","method":"printed heading","endPage":8,"endAt":1312,"startToken":888,"endToken":2212},{"p":8,"at":1312,"title":"B. The Commission should address questions raised during the proceeding","method":"printed heading","endPage":27,"endAt":1066,"startToken":2212,"endToken":8835},{"p":27,"at":1066,"title":"C. The Commission should approve an effective date that accounts for the time","method":"printed heading","endPage":28,"endAt":6,"startToken":8835,"endToken":8990},{"p":28,"at":6,"title":"III. CONCLUSION","method":"printed heading","endPage":29,"endAt":0,"startToken":8990,"endToken":9095},{"p":29,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":29,"endAt":536,"startToken":9095,"endToken":9173}]}