{"document":{"slug":"rec-20260424-5303","title":"Response Brief of Constellation Energy Generation, LLC","issued":"2026-04-24","accession":"20260424-5303","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"brief","file":"sources/filings/text/20260424-5303_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5303","tier":"record","sha256":"8cc4e22e2f25a851b8d0ba7cc3448b86d1028ebaa780b4379a3f2598566df149","pages":31,"tokens":9544,"emptyPages":[],"textThemes":["colo","study","flex"]},"pages":[{"page":1,"startToken":0,"endToken":265,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C., et al. \nLarge Loads Co-Located at Generating Facilities \nConstellation Energy Generation, LLC \n    v. \nPJM Interconnection, L.L.C. \n) \n) \n \n)  \n \n \n)  \n) \n) \n) \n) \n) \n) \nDocket No. EL25-49-000 \nDocket No. EL25-49-001 \nDocket No. AD24-11-000 \nDocket No. EL25-20-000 \n(Consolidated) \nRESPONSE BRIEF OF CONSTELLATION ENERGY GENERATION, LLC \n \nConstellation1 submits this response brief to discuss three points with broad support in the \nreply briefs regarding how PJM and the Transmission Owners2 must modify their proposals to \nensure compliance with the Commission’s December 18th Order. \nFirst, a proposed effective date of June 2029 runs counter to the spirit of the Commission’s \nDecember 18th Order.3 PJM and Transmission Owners must act expeditiously. Winning the AI \nrace requires a sprint, not a stroll. The Commission could help accelerate the interconnection of \nlarge loads by setting the new transmission services on separate tracks. Interim Network \n \n1 Constellation Energy Generation, LLC (“Constellation”) submits this response in accordance with the hearing \nprocedures established by the Commission in its December 18, 2025 Order. See PJM Interconnection, LLC, 193 \nFERC ¶ 61,217, at P 220 (2025) (“December 18th Order”). \n2 The Transmission Owners that filed the February 23, 2026 Initial Brief are a subset of Transmission Owners in PJM, \nexcluding Old Dominion Electric Cooperative, for example. The same subset filed the March 25, 2026 Reply \n(“Indicated TO Mar. 25 Reply”). \n3 In the same spirit of expedition, Constellation largely acceded to the rate proposals submitted by the PJM \nTransmission Owners – avoiding a potentially protracted litigation over the precise rates avoids delay in \nimplementing these needed new services."},{"page":2,"startToken":265,"endToken":569,"text":"2 \nIntegration Transmission Service (“Interim NITS”)4 should go first and should be implemented by \nOctober 1, 2026. \nSecond, Interim NITS and Contract Demand Services should be fully supported, not made \n“meaningless.”5 The Commission’s December 18th Order was a “landmark” order intended to \naddress the “urgent need ... that large loads are ‘able to connect to the transmission system in a \ntimely, orderly, and non-discriminatory manner.’”6 PJM and the Transmission Owners cannot \nimpose rates, terms and conditions that risk discrimination and render the new services so \nunattractive that Network Integration Transmission Service (“NITS”) remains the only viable \noption. New service terms and conditions must be just and reasonable. \nWithout delay, the Commission should reject and direct further compliance on PJM’s and \nthe Transmission Owners’ proposals that restrict, discriminate, eliminate, or otherwise discourage \nthe new transmission services. PJM and the Transmission Owners’ initial briefs included several \nprovisions that would enable undue discrimination by Transmission Owners and continue to delay \nlarge load interconnections. On reply, the Transmission Owners introduce several more. Two \nsimple solutions can prevent discrimination and delay: first, deadlines for deliverables from the \nTransmission Owners, such as studies, and second, requiring standards, practices, and technical \nrequirements to be clear and on file at the Commission.  \nThird, several critical terms of service need to be refined to make Interim NITS and \nContract Demand Services commercially workable. Before investing hundreds of millions of \n \n4 Unless otherwise defined, all capitalized terms have the same meaning as in the December 18th Order. \n5 Independent Market Monitor for PJM Interconnection, LLC March 25, 2026 Reply at 6 (stating Non-Firm Contract \nDemand Service “would not be available on a consistent basis and would therefore be meaningless.”) (“Market \nMonitor Mar. 25 Reply”). \n6 Interconnection of Large Loads to the Interstate Transmission Sys., 195 FERC ¶ 61,045, at P 2 (2026)."},{"page":3,"startToken":569,"endToken":987,"text":"3 \ndollars, Eligible Customers and Co-Located Loads must have clarity on how PJM will determine \nwhether the transmission services can be reliably provided and how loads will be curtailed. A lack \nof clarity was the exact basis for the Commission finding PJM’s Tariff unjust and unreasonable.7 \nConsistent with the December 18th Order, the Commission should require these critical terms of \nservice to be stated clearly. We cannot afford continued setbacks from incremental or incomplete \nproposals. \nREPLY \nI. \nWinning the AI Race Requires a Sprint, Not a Stroll \nA June 2029 effective date imposes a “three- to five- year moratorium” on the co-location \nof large loads.8 This goes against the speedy interconnection that the Commission envisioned and \nthat is needed to win the AI race.9 Moreover, it allows rates found to be unjust and unreasonable—\nthat is, unlawful—to remain in place for three and a half more years, fundamentally undermining \nthe December 18th Order, not to mention the purpose of the Federal Power Act.10  \n \n7 December 18th Order, 193 FERC ¶ 61,217 at P 2 (“[W]e find that PJM’s Tariff is unjust and unreasonable because \nit does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of \nservice that apply to generators serving Co-Located Load and Eligible Customers taking transmission service on \nbehalf of Co-Located Load.”). \n8 Vistra Corp. March 25, 2026 Reply at 4 (“Vistra Mar. 25 Reply”). \n9 Id. at 5-6 (“This entire proceeding exists because co-located loads need to access the transmission system quickly in \norder to satisfy the nation’s time-sensitive demand for the computing and manufacturing capability necessary to win \nthe global race for AI dominance.”); Joint Co-Location Developers March 25, 2026 Reply at 2 (“The Commission \nissued the Co-Location Order within the context of a broader national effort to confront the affordability, reliability, \nand speed-to-power challenges that rapid large load growth poses for the electricity system.”) (“Joint Developer \nMar. 25 Reply”): Constellation Energy Generation, LLC March 25, 2026 Reply at 1-2 (“Constellation Mar. 25 \nReply”). \n10 See 16 U.S.C. § 824d(a) (“[A]ll rules and regulations affecting or pertaining to such rates or charges shall be just \nand reasonable, and any such rate or charge that is not just and reasonable is hereby declared to be unlawful.”); see \nalso Joint Developers Mar. 25 Reply at 27 (“the Commission should not leave the rates that it found unjust and \nunreasonable in the Co-Location Order in place for more than three more years”)."},{"page":4,"startToken":987,"endToken":1620,"text":"4 \nThe Commission should direct PJM to act expeditiously.11 PJM has devoted significant \nresources to such changes for well over a year.12 PJM also has the tools to implement new rules \nquickly but seems determined to slow roll the transmission services that PJM disfavors. “[W]hen \nPJM integrated energy storage resources into its markets pursuant to Order No. 841, PJM required \nonly one year to develop software to accommodate an operationally distinct asset class.”13 PJM \nshould be capable of following at least the same course when there is national urgency. The \nCommission should also clarify this is not the time for providing “basic outline[s]” with “more \n \n11 See Written Testimony of Laura V. Swett, Chairman, Federal Energy Regulatory Commission, Before the U.S. \nHouse of Representatives, Committee on Energy and Commerce, Subcommittee on Energy, at 1-2 (Feb. 3, 2026) \nhttps://www.ferc.gov/news-events/news/testimony-laura-v-swett-chairman-federal-energy-regulatory-commission-\nus-house (“We’re in a global energy arms race created by the rise of technology, its tremendous load growth, and \nour push to onshore manufacturing and jobs. I want the United States to lead that race; This is the moment to cement \nAmerica’s energy leadership.”); Written Testimony of Lindsay S. See, Commissioner, Federal Energy Regulatory \nCommission, Before the U.S. House of Representatives, Committee on Energy and Commerce, Subcommittee on \nEnergy, at 3 (Feb. 3, 2026), https://www.ferc.gov/news-events/news/testimony-lindsay-s-see-commissioner-\nfederal-energy-regulatory-commission (“our national imperative of speed to power and winning the AI race”); \nWritten Testimony of David LaCerte, Commissioner, Federal Energy Regulatory Commission, Before the U.S. \nHouse of Representatives, Committee on Energy and Commerce, Subcommittee on Energy, at 1 (Feb. 3, 2026), \nhttps://www.ferc.gov/news-events/news/testimony-david-lacerte-commissioner-federal-energy-regulatory-\ncommission-house (“[T]he AI race, and even more importantly, who ultimately wins, will also fundamentally \ntransform how Americans engage, transact, and compete on the global stage. The AI race is here and America’s \npower grid is a major battlefield.”); Data Center Coalition March 25, 2026 Reply at 10 (urging “the Commission to \nrequire targeted modifications to ensure that the final framework … can be implemented in a timeframe that supports \ncurrent and near-term development”) (“DCC Mar. 25 Reply”); Joint Developer Mar. 25 Reply at 3 (“Given the \nurgent need to address the impacts of load growth on the PJM system today, the Commission should require PJM to \nmake the new tariff provisions related to the new transmission services effective sooner than June 1, 2029.”). \n12 Initial Brief of PJM Interconnection, L.L.C. (Mar. 24, 2025) (proposing seven options for addressing Co-Location \nArrangements). Even prior to PJM’s Initial Brief, in 2024 PJM had provided guidance on co-location issues. This \nguidance was featured in Constellation’s complaint that ultimately gave rise to the show cause proceeding. See \nComplaint Requesting Fast Track Processing of Constellation Energy Generation, LLC, Constellation Energy \nGeneration, LLC v. PJM Interconnection, L.L.C., Docket No. EL25-20-000 at 5 (Nov. 22, 2024) (citing PJM \nGuidance on Co-Located Load (March 22, 2024) (Updated April 17, 2024)) (“Constellation Complaint”). \n13 Vistra Mar. 25 Reply Comments at 11 (emphasis added); see also Joint Developer Mar. 25 Reply at 29-30 (“It is \nnot clear why PJM will be able to implement its Connect and Manage proposal and SPP will be able to make non-\nfirm conditional transmission service available this year while PJM claims to need 40 months to implement the new \ntransmission services at issue in this proceeding.”); id. at Attachment A, Affidavit of Andrew Levitt and Aniruddh \nMohan at 20:16-17 (“PJM can achieve implementation of all three services faster than proposed.”) (“Levitt & Mohan \nAffidavit”); id. at 21:27-22:2 (“Southwest Power Pool’s recent proposal to implement non-firm transmission service \nfor load (CHILLS) by July 1, 2026 offers further evidence that such changes to dispatch can be implemented faster \nthan envisaged by PJM.”)."},{"page":5,"startToken":1620,"endToken":2033,"text":"5 \ndetails forthcoming in future filings in this proceeding.”14 That is not compliance with the \nCommission’s directives. Complete and clear proposals are needed for parties to provide comment \nto ensure the new transmission services can work commercially as the Commission intended; that \nis particularly necessary in this proceeding given the demonstrated history of discriminatory \ntreatment. \nThe Commission can accelerate interconnection of large loads by establishing separate \ntracks for transmission services that can proceed on faster timelines.15 The Commission should \nestablish a separate track to promptly approve the rates and terms for Interim NITS, including the \nstudy process, consistent with Constellation’s recommended modifications discussed below and \nin prior pleadings. The effective date should be no later than October 1, 2026, as our \nrecommendations are targeted only at critical issues that would delay or otherwise render \nmeaningless the new transmission services. We have intentionally decided not to contest other \nelements of PJM’s and the Transmission Owners’ proposals that potentially concern us, so as to \nexpeditiously complete these proceedings, timely implement new transmission services, and avoid \nprotracted litigation.16 \n \n14 Indicated TO Mar. 25 Reply at 12; see also id. (“The PJM Transmission Owners will also provide additional details \non this proposal in future filings.”); Northern Virginia Electric Cooperative, Inc. March 25, 2026 Reply at 13 (“At \nthis time, neither PJM nor the PJM Transmission Owners have a specific concept for the Commission to consider, \nbut have committed to working together to explore penalty options.”); DCC Mar. 25 Reply at 8 (“DCC is also \nconcerned that the proposed framework leaves numerous critical elements undefined or deferred.”); Constellation \nMar. 25 Reply at 18-19 (discussing PJM and Transmission Owners “offer no proposal on a penalty charge”). \n15 See DCC Mar. 25 Reply at 9 (“PJM has not demonstrated that all elements of the proposed services must be deferred \nfor several years, nor has it identified opportunities for phased or interim implementation. Given the immediate and \ngrowing demand for large load interconnection, the Commission should consider whether certain components of the \nframework can be implemented on an accelerated or staged basis to provide near-term benefits while longer-term \nsystems are developed.”); Joint Developer Mar. 25 Reply at 9 (“For Non-Firm CDS and Interim NITS, the \nCommission should direct PJM to adopt an effective date as soon as practicable, based on a detailed projection of \nproject schedule components, moving with urgency.”); Constellation Mar. 25, 2026 Reply (explaining the \nCommission should fast track Interim NITS). \n16 See supra note 3."},{"page":6,"startToken":2033,"endToken":2559,"text":"6 \nII. \nNew Transmission Services Should Be Supported, Not Discouraged or Made \n“Meaningless” \nThe landmark December 18th Order directed PJM “to ensure that large loads are ‘able to \nconnect to the transmission system in a timely, orderly, and non-discriminatory manner.’”17 The \nmajority of commenters agree that PJM’s and the Transmission Owners’ proposals are \nfundamentally at odds with the Commission’s directive.18 The proposals restrict, delay, \ndiscriminate, or otherwise discourage the use of Interim NITS and Contract Demand Services. The \nproposals produce the opposite effect of “releas[ing] the bottleneck of large load investments \nacross the PJM footprint”19 and are contrary to the core requirement in the Federal Power Act that \nrates and terms be “just and reasonable.”20 Given the depth of PJM’s and the Transmission \nOwners’ resistance,21 immediate Commission intervention is warranted. Without delay, the \n \n17 Interconnection of Large Loads to the Interstate Transmission Sys., 195 FERC ¶ 61,045 at P 2.  \n18 See Joint Developer Mar. 25 Reply at 31 (“Rather, they propose the minimum possible ambition to offer non-firm \nand contract transmission services …. The Commission should not allow this attempt to water down the Co-Location \nOrder, which would prevent it from realizing its goals.”); id. at 2 (“PJM departs from the requirements and spirit of \nthe Co-Location Order again and again, rendering the new transmission services commercially unworkable.”); DCC \nMar. 25 Reply at 2 (“[T]he proposals introduce significant operational rigidity, limit flexibility, and create \ndisincentives that will impede the development of co-located load and associated generation. This is fundamentally \nat odds with the Commission’s December directive.”); Geronimo Power, LLC March 25, 2026 Response Brief at 2-\n3 (“[C]ertain proposals outlined in the initial brief filed by the PJM Transmission Owners run counter to the \nobjectives outlined in the Commission’s order in this proceeding and will result in charges that do not reflect co-\nlocated loads’ actual impact on the grid, disincentivize large loads from co-locating with new generation resources, \nand ultimately extend the status quo in PJM that the Commission has found to be unjust and unreasonable.”); \nEnchanted Rock March, 25, 2026 Protest and Reply Brief at 2 (“PJM’s Proposed Interim NITS Limitation, if \nenacted, would make it commercially impractical for Eligible Customers to ever utilize Interim NITS to serve their \nCo-Located Load.”); Constellation Mar. 25 Reply at 10-30. \n19 FERC, News Release, FERC: Directs Nation’s Largest Grid Operator to Create New Rules to Embrace Innovation \nand Protect Consumers (Dec. 18, 2025), https://www.ferc.gov/news-events/news/ferc-directs-nations-largest-grid-\noperator-create-newrules-embrace-innovation-and?new= (quoting Chairman Swett). \n20 16 U.S.C. § 824d. \n21 Indicated TO Mar. 25 Reply at 2-3 (“Moreover, assuming that the new transmission services are ultimately required \nto be implemented, an action with which some PJM Transmission Owners strongly disagree ….”); see also \nConstellation April 8, 2026 Supplemental Protest, Docket Nos. ER26-1088-000, et al., at 3 (explaining that “[du]ring \nthe week of March 30, 2026, [a] Transmission Owner informed Constellation that it would not study Constellation’s \nproposed design unless Constellation agreed to transfer ownership of the ring bus facilities to the Transmission \nOwner.”); Exelon Corporation April 14, 2026 Public Version of Answer, Docket Nos. ER26-1088-000, at 3-4"},{"page":7,"startToken":2559,"endToken":2911,"text":"7 \nCommission should issue an order promptly approving PJM’s proposed rates and terms for Interim \nNITS, with the following modifications: \n• Establish a transitional mechanism for large loads with pending NITS applications \nto apply for Interim NITS.22 \n• Establish clear and transparent rules on the studies performed by PJM and \nmechanisms to prevent delay and discrimination by Transmission Owners, \nincluding, as discussed below, studies to determine special protection schemes or \nother remediation necessary to maintain system reliability.23 \n• Establish reasonable and not unduly discriminatory processes for determining \nspecial protection schemes or other remediation that is required for Co-Location \nArrangements.24 As detailed below, remediation should be commensurate with the \nneed to protect the system from actual overloads and conditions that PJM cannot \nmitigate through normal operations. \n• Adopt the penalty scheme in Section 14.5 of Part II of the PJM Tariff for unreserved \nuse by Non-Firm Point to Point Transmission Service and reject PJM’s proposal to \nsuspend and disqualify Eligible Customers for unreserved use of the transmission \nsystem, measures that are not imposed on Non-Firm Point to Point Transmission \nService.25 \n• Reject PJM’s proposed requirement that an Eligible Customer provide PJM \nauthorization or certification from the Relevant Electric Retail Regulatory \nAuthority.26  \nIn particular, the Commission should reject any proposal to delay allowing existing \ngeneration to co-locate with large loads while accelerating the co-location of load with new \n \n(stating Constellation’s allegations are “absurd” and “Exelon is totally supportive of service to new large loads, so \nlong as the service is consistent with safe and reliable service, adheres to state and federal legal and regulatory \nrequirements, and properly contributes to the services provided at both the transmission and distribution level.”) \n(emphasis added).  \n22 Constellation Mar. 25 Reply at 14. \n23 Id. at 14-18. \n24 Id. at 21-25. See also Exhibit 1 attached, the Affidavit of Michael Kormos (“Kormos Second Affidavit”), discussing \npurpose of special protection schemes and recommending PJM adopt its New Service Request Study Process and \nRegional Transmission Expansion Plan process to study reliability impacts of Co-Located Load requests and \ndetermine appropriate remediation. \n25 Id. 18-21. \n26 Constellation Mar. 25 Reply at 29."},{"page":8,"startToken":2911,"endToken":3355,"text":"8 \ngeneration.27 Policies in favor of new resources are called “vintaging,” and they have long been \ndiscredited.28 \nIn addition, the Commission should direct PJM and the Transmission Owners to course-\ncorrect on the rates and terms for Contract Demand Services. The Commission should reject PJM’s \nnarrowing of Non-Firm Contract Demand Service to outages of the co-located generator, which \nnearly every party filing reply comments agrees is “not consistent with the Commission’s \ndefinition” of the service.29 The Commission should adopt the cost-based and legally durable Grid \nReliance Charge methodology proposed by electric market expert Zachary Ming over the \nTransmission Owners’ flawed Grid Reliance Charge.30 And the Commission should deny PJM’s \nrequirement to construct different feeders to take the new services.31 To allow more time if needed, \n \n27 See Levitt & Mohan Affidavit at 21:8-11 (“If PJM’s concern regarding a capacity market shock that cannot be \ncovered through an incremental auction is focused on existing co-located generation withdrawing from the capacity \nmarket, it should delay only that use case, while accelerating other use cases (i.e., co-location with new generation \nfacilities).”). \n28 See Constellation Energy Generation, LLC December 5, 2025 Supporting Reply Comments, Docket No. RM26-4-\n000, at 38-39; Constellation Energy Generation, LLC November 21, 2025 Supporting Comments, Docket No. \nRM26-4-000, at 16. \n29 Market Monitor Mar. 25 Reply at 5 (“The conditions for taking non-firm CDS identified by PJM … are not \nconsistent with the Commission’s definition of non-firm CDS.”); see also Vistra Mar. 25 Reply Comments at 26 \n(“Nothing in the Commission’s Order suggested that Non-Firm Contract Demand Transmission Service should be \nso limited.”); DCC Mar. 25 Reply at 6 (“PJM’s proposal does not merely interpret the Commission’s directive—it \nmaterially narrows it. By constraining Non-Firm CDS to a limited outage-only function, PJM eliminates the very \nflexibility the Commission sought to introduce.”); Advanced Energy United and Solar Energy Industry Association \nMarch 25, 2026 Reply Brief at 3 (“PJM’s proposed Non-Firm Contract Demand Transmission Service departs \nmaterially from the Commission’s directives by restricting the service to periods when the colocated generating \nfacility is on outage.”) (“United & SEIA Mar. 25 Reply”); Joint Developer Mar. 25 Reply at 7 (“Even if the Co-\nLocation Order were unclear (which it is not), PJM has not offered an adequate rationale for limiting the availability \nof Non-Firm CDS to periods of generator outages.”); Constellation Mar. 25 Reply at 10-13 (“the Commission did \nnot limit Eligible Customers to taking Non-Firm Contract Demand Service only at times when the Co-Located \nGenerating Facility is on outage … [and] PJM’s justifications for limiting Non-Firm Contract Demand Service are \nunpersuasive”). \n30 Constellation Mar. 25 Reply at Att. 1. \n31 Id. at 29-30."},{"page":9,"startToken":3355,"endToken":3643,"text":"9 \nthe Commission can establish the rates and terms of the new Contract Demand Services on a \nseparate track. \nA. The Commission Should Be on Guard for Opportunities that Allow for Undue \nDiscrimination and Continued Delay of Large Load-Interconnection. \nNumerous service terms proposed by PJM and the Transmission Owners introduce \nopportunities for undue discrimination that have stifled competition and barred the timely \ninterconnection of loads to date.32 On reply, the Transmission Owners introduce several more, \nincluding proposing to replace “Delivery Point” in the Illustrative Tariff with “Point of Change in \nOwnership” to be “consistent” with PJM’s now-rejected definition of Co-Located Load and a host \nof other proposals that could also give Transmission Owners unfettered discretion.33 The proposal \nto replace “Delivery Point” with “Point of Change in Ownership” should be denied. Similar to \nPJM’s rejected definition of Co-Located Load, using Point of Change in Ownership in the \nIllustrative Tariff would risk “uncertainty or delays for parties in Co-Located Load \nconfigurations.”34 To make the Illustrative Tariff consistent with the definition of Co-Located \nLoad, “Delivery Point” should be replaced with “Point of Interconnection.” \n \n32 See Vistra Mar. 25 Reply at 4-5 (“The proposal appears to allow PJM and the Transmission Owners to determine, \nfor each transmission service request, whether studies are required, which studies to conduct, the timeline for doing \nso, and how to prioritize different requests. That level of discretion creates textbook opportunities for the type of \nundue discrimination that the Order was intended to prevent.”); Constellation Mar. 25 Reply at 21-25 (discussing \nTransmission Owners’ recommendations on special protection schemes); see also supra note 21. \n33 Indicated TO Mar. 25 Reply at 19. \n34 PJM Interconnection, L.L.C., 195 FERC ¶ 61,030, at P 27 (2026)."},{"page":10,"startToken":3643,"endToken":3909,"text":"10 \nThe Commission should also act to mitigate the Transmission Owners’ new proposals that \ncould give them unfettered discretion over the timelines and technical requirements, including the \nfollowing Transmission Owner requests: \n• “Tariff should specify that Transmission Owners’ load integration studies will be \ncompleted first;”35 \n• “[T]he relevant Transmission Owner’s approval must be included in the process of \nallowing service to be reinstated” after service was suspended;36 \n• “[T]echnical requirements should also require an Eligible Customer to satisfy any \napplicable Transmission Owner-imposed technical requirements;”37 \n• “PJM Transmission Owners request that PJM add, as a condition precedent for \nreceiving service, that the Eligible Customer satisfy any load-connection related \nrequirements imposed by the applicable PJM Transmission Owner(s);”38 and \n• “[T]he PJM Transmission Owners request that PJM add language to the list of \ninformation to be provided in an application for Firm Contract Demand \nTransmission Service and/or Non-Firm Contract Demand Transmission Service to \nthe effect that the customer has met applicable load interconnection study \nobligations.”39 \nIt is possible that some of these proposed requirements, with sufficient transparency, \nstandards and timelines, could be reasonable. However, without clarity with respect to the \nobligations on Eligible Customers, Co-Located Generators, and the Transmission Owners that \ncurrently function as gatekeepers for the implementation of these configurations, it is almost \ncertain that the expedition desired by the Commission in issuing this landmark order will not be \n \n35 Indicated TO Mar. 25 Reply at 6 (emphasis added). \n36 Id. at 11 (emphasis added).  \n37 Id. at 13 (emphasis added). \n38 Id. at 18 (emphasis added). \n39 Id. at 19 (emphasis added)."},{"page":11,"startToken":3909,"endToken":4555,"text":"11 \nachieved. The history of this proceeding suggests that the parties have widely disparate views of \nthe appropriate process, timing, and obligations.40  \nThe Commission can deter these delays and potential disputes with two simple solutions. \nFirst, the Commission can direct PJM to establish deadlines for studies and other Transmission \nOwner approvals or consultation requirements. Deadlines are commonplace in PJM’s Tariff and \nprocedures.41 PJM should be able to adopt them here.  \n \n40 See, e.g., Constellation Complaint at 7 (“Exelon is refusing to process necessary studies on these grounds, \ndemanding expensive upgrades under their unfiled interconnection procedures, delaying agreed-upon work which \nwill force a nuclear plant to take additional outages, and forcing additional services to be procured.”); id. at 7-8. \n(“Exelon fulfilled its responsibilities as an interconnection provider to review PJM’s necessary studies for one \nConstellation nuclear station, the LaSalle Clean Energy Center (‘LaSalle’), but later refused to do so at the other two \nstations, insisting that Constellation or its potential customer must first apply for retail service and designate what \nsort of wholesale transmission service it will take from Exelon.”); id. at 17 (“But for Constellation’s … Limerick \nClean Energy Center (‘Limerick’) in Pennsylvania, Exelon has refused to conduct its review of PJM’s completed \nnecessary studies, insisting that Constellation or its potential customer must first apply for retail service and \ndesignate what sort of wholesale transmission service it will take from Exelon.”); id. at 8 (“projects are being held \nhostage by a few monopolies refusing to cooperate with reliability studies related to interconnection modifications”); \nid. at 10 n.25 (“Exelon refuses to review co-location reliability studies as required by the OATT and pro forma ISA”) \n(citing Constellation PDO Protest, Exhibit 1, Declaration of James R. McCoskey at ¶ 13); id. at 16 (“Proposed Fully \nIsolated Co-Located data center projects in PJM are currently being held hostage by one or two monopoly utilities’ \nrefusal to cooperate … with reliability studies related to interconnection modifications.”); see also Constellation \nEnergy Generation, LLC November 21, 2025 Supporting Comments, Docket No. RM26-4-000 at 3-4 (Nov. 21, \n2025) (“Some Transmission Owners have simply refused to participate in PJM’s studies to analyze reliability \nimpacts; and some, acting under unfiled interconnection study procedures, have changed their entire construct and \ntimetable for processing load studies.”); Answer of Constellation Energy Generation, LLC, PJM Interconnection, \nL.L.C. et al., Docket Nos. EL25-49-000, et al., at 3 (Apr. 23, 2025) (“The Indicated Transmission Owners read the \nexisting Tariff to require this one-size-fits-all limitation, and they have refused to perform studies for new load \nseeking a different configuration.”); id. at 14 (“What is more, regardless of what the Tariff actually says and does \nnot say, some of the Indicated Transmission Owners have refused to cooperate in PJM’s ‘necessary studies’ process \nunless the load agrees to taking NITS, claiming justification under the Tariff. Some of the Indicated Transmission \nOwners have refused to process necessary studies, demanded expensive upgrades under their unfiled interconnection \nprocedures, and forced a generator seeking to serve co-located load to procure additional services not required by \nthe Tariff.”) (citing Constellation Complaint at 7); Constellation Complaint at 9 (“Exelon’s also is refusing to \nperform work on LaSalle’s interconnection facilities to accommodate co-location, none of which affects the grid. \nExelon’s refusal to complete previously agreed-upon work as scheduled during an upcoming planned outage will \nincrease costs to Constellation by $15.3-$19 million at that site alone, just so Exelon can pursue its litigation \npositions.”); see also PJM Interconnection, L.L.C., 190 FERC ¶ 61,115, at P 75 (2025) (“[T]here are allegations in \nthe record that Exelon has delayed work on Constellation’s requests to co-locate load with its generators at certain \nfacilities due to Exelon’s concerns that such requests are not allowed under the Tariff without arranging for \nwholesale transmission or retail distribution service.”). \n41 Vistra Mar. 25 Reply at 34 (discussing timelines for generator interconnection requests)."},{"page":12,"startToken":4555,"endToken":4972,"text":"12 \nSecond, the Commission should require PJM’s and Transmission Owners’ standards, \nrequirements, guidance, and practices on Co-Location Arrangements to be on file with the \nCommission on a standalone basis or reflected in PJM’s Tariff.42 Rules for Co-Location \nArrangements must be clearly stated and available as they “significantly affect rates, terms and \nconditions” of service and can be “readily susceptible to specification.”43 They cannot be hidden \nand subject to unilateral change without any notice or without any Commission oversight.44 \nIn particular, the study process and standards applicable to Interim NITS requests should \nbe the first priority. Interim NITS should be the easiest of the various new transmission services \nto implement for the reasons Constellation has discussed previously.45 Furthermore, many co-\nlocation requests are for front of the meter NITS, for which an Interim NITS option would provide \nimmediate relief. PJM’s omission of any detail with respect to this study process does not comply \nwith the Commission’s directive to provide additional record evidence to set the appropriate \nreplacement rates, terms and conditions for Interim NITS.46 The Commission should direct PJM \nto file its study process for Interim NITS within 30 days. \n \n42 Id. at 5 (“In directing further compliance, Vistra urges the Commission to provide as specific and detailed guidance \nas possible, in addition to setting tight compliance deadlines, to achieve the Commission’s laudable goal of providing \nthe clarity needed to promote the expeditious interconnection of large loads.”); id. at 31 (“The study process in \nPJM’s proposal is flawed because it reserves for PJM and the Transmission Owners too much discretion to determine \nwhether studies are required for a particular customer, which studies to conduct, the timeline for doing so, and how \nto prioritize different requests.”); id. at 32 (“[I]t reserves to PJM and the Transmission Owners unfettered discretion \nwith respect to ‘the necessary steps that apply to Interconnection Customers seeking to serve Co-Located Load \nthrough a Co-Location Arrangement.’”). \n43 Energy Storage Ass’n v. PJM Interconnection, L.L.C., 162 FERC ¶ 61,296, at P 103 (2018). \n44 See RWE Clean Energy, LLC v. PJM Interconnection, L.L.C., 194 FERC ¶ 61,212, at P 38 (2026) (“The \nCommission does not review and approve PJM’s manuals, as they are not filed with the Commission. As a result, \nwe have no statutory obligation to enforce the terms of Manual 14B.”) (citations omitted). \n45 See Constellation Mar. 25 Reply at 6-9. \n46 December 18th Order, 193 FERC ¶ 61,217 at P 219 & Ordering Para. (D)."},{"page":13,"startToken":4972,"endToken":5260,"text":"13 \nB. Without Intervention, the Commission’s Requirement for Special Protection \nSchemes is at Risk for Misuse  \nOn balance, the Commission must be on guard for attempts by Transmission Owners to \neffectively block access to the new Interim NITS and Contract Demand Services. One proposal \nwith the potential to continue to delay and thwart Co-Location Arrangements is the request that \nCo-Location Arrangements reflect Transmission Owners’ mandates for special protection \nschemes.47 In our Reply Brief, we explained that several recommendations on special protection \nschemes proposed in the Transmission Owners’ Initial Brief are “unsupported and unduly \ndiscriminatory towards Co-Located Load arrangements,” including recommendations to require \ndouble special protection schemes on both the customer and Transmission Owner side of the Point \nof Interconnection, to allow Transmission Owners to own an Eligible Customer’s special \nprotection schemes, to limit the amount of load that can be covered by the special protection \nscheme, and to test special protection schemes for Co-Located Loads more frequently.48 \nConstellation explained “[p]rotection schemes ‘regularly employed on the PJM transmission \nsystem’ are not subject to these new requirements” and there is “no legitimate basis for treating \nCo-Located Load arrangements differently.”49 \nIn their Reply Brief, the Transmission Owners continue to advocate that PJM “make clear \nthat necessary control technologies and protection systems may (some would say should) be \nrequired on … both the customer’s side and the Transmission Owner’s side of the point of \ninterconnection.”50 Like before, the recommendation that PJM impose double protection schemes \n \n47 December 18th Order, 193 FERC ¶ 61,217 at P 205. \n48 Constellation Mar. 25 Reply at 24-25. \n49 Id. at 25 (quoting December 18th Order, 193 FERC ¶ 61,217 at P 205). \n50 Indicated TO Mar. 25 Reply at 8 (emphasis added)."},{"page":14,"startToken":5260,"endToken":5669,"text":"14 \nfor Co-Located Loads as a default requirement is unsupported and unduly discriminatory. As \nMichael Kormos, PJM’s former Chief Operations Officer and Exelon’s Senior Vice President, \nexplains in his Affidavit attached here, “there is no rational basis to require double special \nprotection schemes by default”51 and, in fact, double special protection schemes52 would likely be \nappropriate only in “rare”53 situations. Put simply, always requiring double special protection \nschemes is not good utility practice.54 \nGiven our concerns regarding discrimination,55 we elaborate further here on the need for \nPJM to establish a fair and transparent study process for determining the required special \nprotection schemes to prevent further delays of Co-Location Arrangements and the effective \nblocking of large loads from taking the new transmission services. As Mr. Kormos recommends, \nPJM can develop a Co-Located Load request study process that leverages its existing generator \n \n51 Kormos Second Affidavit at ¶ 7. \n52 The terms “special protection scheme,” “remedial action scheme, “special protection system,” and “system \nprotection scheme” are used interchangeably. See NERC, Glossary of Terms Used in NERC Reliability Standards, \nat 49 (updated Apr. 1, 2026) (“NERC Glossary”) (stating the definition of “Special Protection System (Remedial \nAction Scheme)” is “See ‘Remedial Action Scheme’”); December 18th Order, 193 FERC ¶ 61,217 at P 204 (“special \nprotection scheme, also known as a remedial action scheme”). We use the term “special protection scheme” to be \nconsistent with the December 18th Order. Id. The Commission defines “special protection scheme” as “a plan \ndesigned to detect abnormal system conditions and to automatically take appropriate corrective action, to maintain \nsystem stability, acceptable system voltages, and acceptable facility loading.” Id. NERC defines “remedial action \nscheme” as “[a] scheme designed to detect predetermined System conditions and automatically take corrective \nactions that may include, but are not limited to, adjusting or tripping generation (MW and Mvar), tripping load, or \nreconfiguring a System(s).” NERC Glossary at 43-45. NERC identifies fourteen schemes and systems that are not \nconsidered a special protection scheme, including, “Schemes for automatic underfrequency load shedding (UFLS) \nand automatic undervoltage load shedding (UVLS) comprised of only distributed relays.” Id.  \n53 Kormos Second Affidavit at ¶ 11; see also id. at ¶ 7 (“Double special protection schemes may be appropriate in \nsome circumstances where the risks are so severe that redundancy is critical, but as I discuss below, that is more \nlikely to be exception for Co-Location Arrangements than the rule.”). \n54 Id. at ¶ 7. \n55 See supra note 40."},{"page":15,"startToken":5669,"endToken":5922,"text":"15 \ninterconnection process and Regional Transmission Expansion Plan (“RTEP”) process.56 Three \nprinciples should guide PJM in adopting these existing frameworks.57 \nFirst, system studies of unauthorized use “should be standardized, transparent, and based \non reasonable assumptions set ahead of time.”58 The absence of such provisions creates the exact \ncircumstances that led to the Commission finding PJM’s Tariff unjust and unreasonable— \n“disparate treatment in PJM” where Transmission Owners take “different approaches to \nperforming the necessary steps that apply to Interconnection Customers seeking to serve Co-\nLocated Load through a Co-Location Arrangement.”59 PJM can adopt the standardized study \nprocesses used in its existing generator interconnection process and RTEP process and that \ndetermine whether a special protection scheme is needed in the first place. There are already well-\nestablished reliability tests in both the RTEP and the generator interconnection process that can \nevaluate whether a new request would create reliability criteria violations that need to be mitigated \nby a proposed special protection scheme.60 \nSecond, criteria should be reasonable and transparent for PJM to assess system \nperformance against.61 In the RTEP process, PJM assesses system performance against the \nmandatory planning requirements in NERC Reliability Standards, PJM’s own planning criteria, \nand individual Transmission Owner planning criteria reflected in each Transmission Owner’s \n \n56 Kormos Second Affidavit at ¶ 12 (citing PJM Manuals 14A and 14B). \n57 Id. at ¶ 13. \n58 Id. \n59 December 18th Order, 193 FERC ¶ 61,217 at P 175. \n60 PJM Manual 14A, §§ 4.3-4.4. \n61 Kormos Second Affidavit at ¶ 14."},{"page":16,"startToken":5922,"endToken":6236,"text":"16 \nForm No. 715. The current criteria should be leveraged to develop specific criteria regarding co-\nlocated load risk.62 \nThird, the special protection scheme that PJM requires an Eligible Customer to implement \nshould be commensurate with the risks identified in the studies.63 While PJM has commonly used \nspecial protection systems for over 30 years,64 Mr. Kormos states “special protection schemes \n(above and beyond normal equipment protection) are not appropriate for every situation.”65 PJM \nonly requires them when “appropriate,”66 that is, when studies identify “actual overloads and \nconditions that could cause cascading failures that PJM cannot mitigate through normal \noperations.”67 PJM does not use special protection schemes to mitigate contractual issues (such as \nunauthorized withdrawals).68 The appropriate remediation for Co-Location Arrangements will \nvary “depending on the Co-Location Arrangement, location of the co-located generator on the \nsystem, the robust nature of the system in the vicinity and other factors.”69 Mr. Kormos discusses \nthe likely appropriate remediation for the following three examples to illustrate this variability. \n• Example 1: a Co-Location Arrangement where the Co-Located Load is physically \nconnected to an existing large generator that is connected to the Extra-High Voltage \nsystem (i.e., 345kV, 500 kV, or 765 kV) and the Co-Located Load is less than the \ngeneration at the site (i.e., a 2500 MW generator with 500 MW of load).70 \n• Example 2: a Co-Location Arrangement where the Co-Located Load is physically \nconnected to an existing large generator that is connected to the Extra-High Voltage \n \n62 See PJM Manual 14B at 116. \n63 Kormos Second Affidavit at ¶ 15. \n64 See PJM Manual 03 at Att. A (listing 14 remedial action schemes in PJM, two of which were installed pre-1995). \n65 Kormos Second Affidavit at ¶ 6. \n66 PJM Manual 14B at 116. \n67 Kormos Second Affidavit at ¶ 5. \n68 Id.  \n69 Id. at ¶ 8. \n70 Id. at ¶ 9."},{"page":17,"startToken":6236,"endToken":6521,"text":"17 \nsystem and the Co-Located Load is equal to the generation at the site (i.e., a \n700 MW generator physically connected with 700 MW of load).71 \n• Example 3: a Co-Location Arrangement where the Co-Located Load will be \nphysically connected to a new generator in an area without robust transmission.72 \nIn Example 1, Mr. Kormos explains that “technical studies would likely show that the loss \nof the generator serving the Co-Located Load without the load immediately tripping (a net loss of \n500 MW of generation) may have no reliability impact on the grid in all scenarios studied.”73 In \nthat circumstance, Mr. Kormos posits that appropriate remediation could be to “simply have \noperating procedures to manually remove the load should the load not automatically disconnect \nafter a generator trip with the ability, if required, for the Transmission Owner to remotely operate \nbreakers to ensure the load is removed to prevent reliability issues.”74 \nIn Example 2, Mr. Kormos states that “technical studies could show that the loss of the \ngeneration could cause unplanned withdrawals that result in some criteria violations but only cause \ncontingency overloads or actual overloads that are still within short term ratings (i.e., 4-hour \nratings) and within timeframes that allow normal operator actions.”75 In that circumstance, \nMr. Kormos suggests the “appropriate remediation could include primary and secondary relaying \nto remove the load after a generation reduction and operating procedures to require manual load \ntripping with the ability of the Transmission Owner to remotely trip the load if the customer does \nnot comply with a System Operator’s request.”76 \n \n71 Id. at ¶ 10. \n72 Id. at ¶ 11. \n73 Id. at ¶ 9. \n74 Id.  \n75 Id. at ¶ 10. \n76 Id."},{"page":18,"startToken":6521,"endToken":6811,"text":"18 \nIn Example 3, Mr. Kormos states, “technical studies would likely show that the system \ndoes not have the capability to handle large withdrawals under most conditions and identify \nsignificant criteria violations where actual overloads could cause a possible cascading event.”77 In \nsuch circumstance, Mr. Kormos suggests “a fully redundant special protection scheme located on \nboth Eligible Customer Interconnection Facilities and Transmission Owner Interconnection \nFacilities could be appropriate.”78 Mr. Kormos, however, explains Co-Location Arrangements \nwith new generation are “unlikely” to locate in areas without robust transmission, likely making \nthe necessity for double special protection schemes to maintain reliability “rare.”79 Double special \nprotection schemes should not be employed when other measures can maintain system reliability \nand real time monitoring can address any unexpected reliability issue.80 \nIII. \nCritical Terms of Service Need Refinement \nSeveral critical terms of service require further elaboration to make the new transmission \nservices commercially workable. PJM should clarify how it will determine the future and real-time \navailability of Non-Firm Contract Demand Service.81 Consistent with the December 18th Order, \nNon-Firm Contract Demand Service should be available “when transmission capacity is available \nand not needed by firm customers.”82 \n \n77 Id. at ¶ 11. \n78 Id. \n79 Id. \n80 Id. ¶ 16. \n81 Indicated TO Mar. 25 Reply at 4 (stating “it is not clear” if the study process for determining what level of Contract \nDemand Services can be provided is “meant to cover only the initial service study, or also subsequent determinations \nas to available Non-Firm capacity based on specific reservation requests”); Vistra Mar. 25 Reply at 31 (“the \nCommission should require PJM to clarify how it will assess whether non-firm service can occur “reliably”). \n82 December 18th Order, 193 FERC ¶ 61,217 at P 214."},{"page":19,"startToken":6811,"endToken":7176,"text":"19 \nPJM should also clarify when and how Interim NITS and Non-Firm Contract Demand \nService will be curtailed.83 In doing so, PJM should not modify its curtailment order “so that Non-\nFirm Contract Demand Transmission Service load is curtailed prior to generation redispatch,” as \nrecommended by the Transmission Owners.84 The Transmission Owners claim that modifying the \ncurtailment order only for Non-Firm Contract Demand Service is necessary to address their \nconcern that requiring Eligible Customers to pay redispatch costs “could result in cost shifts onto \nother customers because Eligible Customers may represent multiple load customers.”85 Generation \nredispatch, however, occurs all the time. If Non-Firm Contract Demand Service is curtailed in \nevery instance, the product would be unusable. The curtailment order for Non-Firm Contract \nDemand Service should be the same as Non-Firm Point to Point Transmission. Only those Non-\nFirm Point to Point Transmission Service customers “not willing to pay through congestion,” that \ndid not elect to pay redispatch costs, are required to curtail before generation redispatch. \nWithout these clarifications, Eligible Customers and Co-Located Loads could be deterred \nfrom investing hundreds of millions of dollars on Co-Location Arrangements that would otherwise \navoid unnecessary transmission upgrades to the benefit of all PJM customers, while \nsimultaneously contributing to our nation’s security and economic interests. \n \n83 Indicated TO Mar. 25 Reply at 15 (“There should be load shedding practice guidelines applicable to Co-Located \nLoad arrangements established by PJM.”); Joint Developer Mar. 25 Reply at 17 (“PJM’s proposed tariff does not \nprovide adequate clarity regarding when and how Non-Firm CDS and Interim NITS shall be curtailed.”); United & \nSEIA Mar. 25 Reply at 12. (“PJM has provided no information about the conditions that would actually trigger \ncurtailment of Interim NITS or Non-Firm Contract Demand Transmission Service in practice.”); id. at 11 (stating \nPJM discussion on its curtailment order is “contradictory” and “must be clarified and reconciled to confirm \nconsistency with the Commission’s directive.”); DCC Mar. 25 Reply at 7 (“PJM’s proposal relies heavily on \ncurtailment as a mechanism to maintain system reliability, but it does not provide sufficient clarity regarding how \ncurtailment will be applied in practice.”). \n84 Indicated TO Mar. 25 Reply at 17. \n85 Id. at 17."},{"page":20,"startToken":7176,"endToken":7384,"text":"20 \nCONCLUSION \nWHEREFORE, Constellation respectfully requests that the Commission without delay \nissue an order (1) approving and making Interim NITS effective October 1, 2026, (2) directing \nPJM and the Transmission Owners to support new transmission services and rejecting attempts to \nrestrict, delay, or otherwise discourage them and requiring oversight to ensure undue \ndiscrimination does not delay interconnection of large loads, and (3) directing PJM and the \nTransmission Owners to refine their proposals to provide sufficient certainty to make the new \ntransmission services commercially workable. \n \n \n \n \n \n \n \n    Respectfully submitted, \n \n \n \n \n \n \n \n    /s/ Paul F. Wight \n \n \n \nApril 24, 2026 \nCarrie Hill Allen \nSr. Vice President & Deputy General Counsel \nSeth T. Lucia \nAssistant General Counsel \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \ncarrie.allen@constellation.com \nseth.lucia@constellation.com \n  \nChristopher A. Wilson \nManaging Director, Federal Regulatory Affairs \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \n202-347-7500 \nFERCe-filings1@constellation.com \n \nPaul F. Wight \nCarolyn E. Clarkin \nDLA Piper LLP (US) \n500 Eighth Street NW \nWashington, D.C. 20004 \n703-773-4058 \npaul.wight@us.dlapiper.com  \ncarolyn.clarkin@us.dlapiper.com  \n \nSophia Browning \n4365 Executive Drive \nSuite 1100 \nSan Diego, CA 92121 \n858-677-1455 \nsophia.browning@us.dlapiper.com \n \nCounsel for Constellation Energy \nGeneration, LLC"},{"page":21,"startToken":7384,"endToken":7462,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have on this 24th day of April, 2026, caused to be served a copy of \nthe foregoing upon all parties on the service lists in these proceedings in accordance with the \nrequirement of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. \n§ 385.2010 (2025). \n/s/ Sophia Browning \n \n \nSophia Browning \n4365 Executive Drive \nSuite 1100 \nSan Diego, CA 92121 \n858-677-1455 \nsophia.browning@us.dlapiper.com"},{"page":22,"startToken":7462,"endToken":7468,"text":"EXHIBIT 1 \nAFFIDAVIT OF MICHAEL KORMOS"},{"page":23,"startToken":7468,"endToken":7620,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C., et al. \nLarge Loads Co-Located at Generating Facilities \nConstellation Energy Generation, LLC \n    v. \nPJM Interconnection, L.L.C. \n) \n) \n \n)  \n \n \n)  \n) \n) \n) \n) \n) \n) \nDocket No. EL25-49-000 \nDocket No. EL25-49-001 \n \nDocket No. AD24-11-000 \nDocket No. EL25-20-000 \n(Consolidated) \nAFFIDAVIT OF \nMICHAEL KORMOS \n \nApril 24, 2026 \n \nI. \nQUALIFICATIONS AND OVERVIEW OF AFFIDAVIT \n1. \nMy name is Michael Kormos. My extensive professional experience includes transmission \nplanning and operations as a senior executive at both PJM Interconnection, L.L.C. (“PJM”) and \none of the largest transmission owners within the PJM region. I currently serve as an electric utility \nconsultant helping industry participants develop transmission interconnection and transmission \nsolutions and resolve issues related thereto. Until 2021, I was Sr. Vice President, Transmission & \nCompliance for Exelon Corporation, where I was responsible for the operations and long-term \nplanning for transmission systems of Exelon utilities Atlantic City Electric, Baltimore Gas &"},{"page":24,"startToken":7620,"endToken":7891,"text":"2 \nElectric, ComEd, Delmarva Power, PECO, and PEPCO. In that role, I shaped Exelon and its \nutilities’ policy positions on issues related to the Federal Energy Regulatory Commission \n(“FERC”), Regional Transmission Organizations (“RTOs”), and national transmission matters. \n2. \nBefore joining Exelon, I spent 27 years at PJM. As PJM’s Chief Operations Officer, I was \nresponsible for grid planning and operations and directly involved in implementing numerous \nsignificant FERC orders, including Order No. 1000, and supported the development and \nimplementation of competitive wholesale markets in PJM. Earlier in my career at PJM, I oversaw \nan operational expansion that tripled the size of the system controlled by PJM. I also held \nmanagement and engineering positions in transmission operations while at PJM. \n3. \nI have been asked by Constellation Energy Generation, LLC (“Constellation”) to prepare \nan affidavit that responds to comments on special protection schemes in the Reply Brief filed by \nthe Indicated Transmission Owners.1 In Section II, I rebut three assumptions the Indicated \nTransmission Owners imply about special protection schemes and discuss the general purpose of \nspecial protection schemes as well as how PJM currently determines the remediation necessary to \nmaintain system reliability. In Section III, I recommend that PJM leverage its existing generator \ninterconnection process and Regional Transmission Expansion Plan (“RTEP”) process as the \nmodel for studying and determining appropriate remediation for Co-Located Load requests.2 In \n \n1 See Indicated Transmission Owners March 25, 2026 Reply Brief. The Indicated Transmission Owners that filed the \nMarch 25, 2026 Reply Brief are a subset of Transmission Owners in PJM, excluding Old Dominion Electric \nCooperative, for example. \n2 See PJM Manual 14A and 14B."},{"page":25,"startToken":7891,"endToken":8131,"text":"3 \nSection IV, I explain that real time monitoring can support PJM in addressing reliability risks \ncaused by unreserved Co-Located Load use of the system. \nII. \nPURPOSE OF SPECIAL PROTECTION SCHEMES AND PROCESS FOR SELECTING \nAPPROPRIATE REMEDIATION \n4. \nThe reply comments by Indicated Transmission Owners imply three incorrect \nassumptions about special protection schemes: (1) the purpose of special protection schemes is to \n“ensure that a Co-Located Load does not exceed its specified level of transmission service,”3 that \nis, to deter unreserved use; (2) special protection schemes “must be implemented”4 for all Co-\nLocation Arrangements to maintain reliability; and (3) special protection schemes should be \nrequired on “both the customer’s side and the Transmission Owner’s side of the point of \ninterconnection.”5 Below, I rebut each assumption in turn while explaining the purpose of special \nprotection schemes and how PJM currently determines their necessity. \n5. \nFirst, the purpose of special protection schemes is not to deter unreserved use of the \ntransmission system. That is the purpose of penalties. Special protection schemes are intended to \nmaintain reliability by protecting the system from actual overloads and conditions that could \ncause cascading failures that PJM cannot mitigate through normal operations. They are not \nintended to manage contractual requirements or mitigate conditions that PJM can manage \nthrough normal operations, such as contingency overloads that can be tolerated based on a four-\n \n3 Indicated TO Mar. 25 Reply at 8. \n4 Id.  \n5 Id."},{"page":26,"startToken":8131,"endToken":8436,"text":"4 \nhour transmission line rating specification6 or other conditions where PJM has adequate time and \ntools to maintain reliability. \n6. \nSecond, requiring special protection schemes by default for every Co-Location \nArrangement is not good utility practice. While special protection schemes are commonly used,7 \nspecial protection schemes (above and beyond normal equipment protection) are not appropriate \nfor every situation. This is because the technical studies that PJM conducts, which form the basis \nfor remediation, do not always show that an interconnection request could result in a criteria \nviolation that could lead to severe actual overloads and the need for immediate or instantaneous \nresponse to maintain reliability. Requirements for special protections schemes should reflect the \nbasic principle that we should not require interventions that add technical complexity to the \nsystem when such interventions are not necessary, e.g., when the reliability risks do not merit \nsuch interventions. In short, special protection schemes should only be implemented when \nnecessary.     \n7. \nThird, it is not good utility practice to always require Co-Location Arrangements to have \nspecial protection schemes on “both the customer’s side and the Transmission Owner’s side of \nthe point of interconnection.”8 As I explain above, PJM studies do not always show that an \ninterconnection of load could lead to an actual overload and in such cases a special protection \nscheme would be inadvisable. Double special protection schemes may be appropriate in some \ncircumstances where the risks are so severe that redundancy is critical, but as I discuss below, \nthat is more likely to be exception for Co-Location Arrangements than the rule. There is no \n \n6 See PJM Manual 03, § 3.3. \n7 See id. at Att. A (listing 14 remedial action schemes in PJM). The term “remedial action scheme” has the same \nmeaning as special protection scheme. \n8 Indicated TO Mar. 25 Reply at 8."},{"page":27,"startToken":8436,"endToken":8775,"text":"5 \nrational basis to require double special protection schemes by default. To the extent that there are \nconcerns about customers maintaining these schemes it would be more appropriate to handle \nthese situations through NERC and Regional standards with the appropriate financial penalties \nfor non-compliance as the industry does with the current special protection devices. \n8. \nStudy results, and thus, the appropriate remediation necessary to maintain reliability, will \nvary depending on the Co-Location Arrangement, location of the co-located generator on the \nsystem, the robust nature of the system in the vicinity and other factors. Three examples of Co-\nLocation Arrangements illustrate this point: \n9. \nExample 1: a Co-Location Arrangement where the Co-Located Load is physically \nconnected to an existing large generator that is connected to the Extra-High Voltage \nsystem (i.e., 345kV, 500 kV, or 765 kV) and the Co-Located Load is less than the generation \nat the site (i.e., a 2500 MW generator with 500 MW of load). \nIn Example 1, technical studies would likely show that the loss of the generator serving the \nCo-Located Load without the load immediately tripping (a net loss of 500 MW of generation) may \nhave no reliability impact on the grid in all scenarios studied. This is because the system supporting \nlarge generators is designed to handle all levels of potential generation dispatch and typically will \nhandle small amounts of net withdrawals without issue. Large generators also typically provide \nsignificant inertia that can help the local grid avoid or minimize the impact of many anomalies. In \nthis circumstance, the appropriate remediation to maintain reliability could likely be to simply \nhave operating procedures to manually remove the load should the load not automatically \ndisconnect after a generator trip with the ability, if required, for the Transmission Owner to \nremotely operate breakers to ensure the load is removed to prevent reliability issues. It is also quite \nlikely that customers may choose to put relaying in place to automatically remove the load to avoid \nany possible financial penalties for unauthorized withdrawals and further increase reliability."},{"page":28,"startToken":8775,"endToken":9114,"text":"6 \n10. \nExample 2: a Co-Location Arrangement where the Co-Located Load is physically \nconnected to an existing large generator that is connected to the Extra-High Voltage \nsystem and the Co-Located Load is equal to the generation at the site (i.e., a 700 MW \ngenerator with 700 MW of load). \nIn Example 2, where the existing generation and Co-Located Load are equal, technical \nstudies could show that the loss of the generation could cause unplanned withdrawals that result \nin some criteria violations but only cause contingency overloads or actual overloads that are still \nwithin short term ratings (i.e., 4-hour ratings) and within timeframes that allow normal operator \nactions. In this case, appropriate remediation could include primary and secondary relaying to \nremove the load after a generation reduction and operating procedures to require manual load \ntripping with the ability of the Transmission Owner to remotely trip the load if the customer does \nnot comply with a System Operator’s request. \n11. \nExample 3: a Co-Location Arrangement where the Co-Located Load will be physically \nconnected to a new generator in an area without robust transmission. \nIn Example 3, technical studies would likely show that the system does not have the \ncapability to handle large withdrawals under most conditions and identify significant criteria \nviolations where actual overloads could cause a possible cascading event. In this situation, a fully \nredundant special protection scheme located on both Eligible Customer Interconnection Facilities \nand Transmission Owner Interconnection Facilities could be appropriate. Given the increased \nreliability risks, however, most Co-Location Arrangements with new generation are unlikely to \nlocate in areas without robust transmission, making this example likely to be rare in practice. \nIII. \nA FAIR AND TRANSPARENT PROCESS FOR DETERMINING REMEDIATION MEASURES \n12. \nI understand that PJM has not articulated the studies it will perform on Co-Located Load \narrangements that would be the basis for determining the appropriate remediation necessary to \nmaintain system reliability. Without additional clarification, PJM risks further delaying the \ninterconnection of large loads and the potential of parties studying “extreme cases” to simply show"},{"page":29,"startToken":9114,"endToken":9418,"text":"7 \nviolations, not actual reliability and stability risks. To ensure a fair and transparent process, PJM \nshould develop a Co-Located Load request study process leveraging its existing generator \ninterconnection study process and RTEP process as models.  \n13. \nThree principles should guide PJM in adapting its existing processes. First, system studies \nof unauthorized use should be standardized, transparent, and based on reasonable assumptions set \nahead of time (and not guided by an opaque process and rules that differ from Transmission Owner \nto Transmission Owner). Like the generator interconnection study process, the study process for \nCo-Located Loads should be PJM-driven where most of the studies are all done based on RTO-\nwide processes and Transmission Owners have to justify any exception they require.  \n14. \nSecond, PJM should develop criteria for PJM to assess system performance to establish \nacceptable/unacceptable levels of risk. These criteria should be based on the existing NERC and \nRegional standards used today to assess reliability risk.  \n15. \nThird, remediation should be commensurate with the level of risk identified in the studies. \nIf the studies show no reliability issues, then no additional remediation should be required. This is \nnot to say there is no protection. Interconnection facilities typically always include general \nprotection schemes, such as equipment protection relaying and control devices. \nIV. \nADDITIONAL MEASURES TO ENSURE RELIABILITY \n16. \nSome may argue that because planning models may not capture all possible situations that \ncould present a reliability risk (which is true for all planning analysis), PJM should require special \nprotection scheme for all Co-Location Arrangements. While some scenarios may go unstudied, \nthe solution to ensuring adequate reliability and stability is not to over-mitigate. Rather, PJM \nshould monitor in real-time and adjust remediation as necessary. Real-time monitoring is standard \nfor a system operator. In fact, PJM proposes to monitor the Co-Located Load demand on the"},{"page":30,"startToken":9418,"endToken":9511,"text":"8 \nTransmission System.9 Real-time monitoring of Co-Located Load should also be simple for PJM \nto implement. Most standard metering equipment can provide real time telemetry. PJM needs to \nadd the individual load and generation to the model and set-up the standard communications to \nreceive the data. PJM already has standard process to do both on a routine basis. Including these \nresources should be no different than adding any other facility to the models. \n17. \nThis concludes my affidavit. \n \n \n9 Initial Brief of PJM Interconnection, L.L.C. at 64 (Feb. 23, 2026)."},{"page":31,"startToken":9511,"endToken":9544,"text":"VERIFICATION \nI declare under penalty of perjury that the foregoing Affidavit is true and correct to the best\nof my knowledge, information, and belief.  \nExecuted this 24th day of April, 2026.\n________________________ \nMichael Kormos"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":508,"startToken":0,"endToken":646},{"p":3,"at":508,"title":"I. Winning the AI Race Requires a Sprint, Not a Stroll","method":"printed heading","endPage":6,"endAt":3,"startToken":646,"endToken":2034},{"p":6,"at":3,"title":"II. New Transmission Services Should Be Supported, Not Discouraged or Made","method":"printed heading","endPage":9,"endAt":111,"startToken":2034,"endToken":3374},{"p":9,"at":111,"title":"A. The Commission Should Be on Guard for Opportunities that Allow for Undue","method":"printed heading","endPage":13,"endAt":4,"startToken":3374,"endToken":4973},{"p":13,"at":4,"title":"B. Without Intervention, the Commission’s Requirement for Special Protection","method":"printed heading","endPage":18,"endAt":933,"startToken":4973,"endToken":6649},{"p":18,"at":933,"title":"III. Critical Terms of Service Need Refinement","method":"printed heading","endPage":20,"endAt":4,"startToken":6649,"endToken":7177},{"p":20,"at":4,"title":"CONCLUSION","method":"printed heading","endPage":21,"endAt":0,"startToken":7177,"endToken":7384},{"p":21,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":23,"endAt":439,"startToken":7384,"endToken":7521},{"p":23,"at":439,"title":"I. QUALIFICATIONS AND OVERVIEW OF AFFIDAVIT","method":"printed heading","endPage":25,"endAt":157,"startToken":7521,"endToken":7916},{"p":25,"at":157,"title":"II. PURPOSE OF SPECIAL PROTECTION SCHEMES AND PROCESS FOR SELECTING","method":"printed heading","endPage":29,"endAt":1449,"startToken":7916,"endToken":9326},{"p":29,"at":1449,"title":"IV. ADDITIONAL MEASURES TO ENSURE RELIABILITY","method":"printed heading","endPage":31,"endAt":233,"startToken":9326,"endToken":9544}]}
