{"document":{"slug":"rec-20260424-5312-2","title":"Exhibit No. PTO-0005 – Joint Rebuttal Testimony of Blazunas, Schafer, & Hammer","issued":"2026-04-24","accession":"20260424-5312","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"attachment","file":"sources/filings/text/20260424-5312_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5312","tier":"record","parent":"rec-20260424-5312","sha256":"0cad5d1a41125a9fed5e4f684343f9a45d8f5a5f90934b253319e6f14e0cbe4d","pages":34,"tokens":9420,"emptyPages":[33],"textThemes":["flex","colo","study","cost"]},"pages":[{"page":1,"startToken":0,"endToken":189,"text":"Exhibit No. PTO-0005 \nPage 1 of 31 \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C., et al.   \n)  \nDocket No. EL25-49-000 \n)  \nDocket No. EL25-49-001 \n) \nLarge Loads Co-Located at Generating Facilities  \n) \nDocket No. AD24-11-000 \n) \nConstellation Energy Generation, LLC  \n)  \nDocket No. EL25-20-000 \nv.  \n \n) \nPJM Interconnection, L.L.C.   \n)  \n(Consolidated) \nJOINT REBUTTAL TESTIMONY \nOF \nPETER BLAZUNAS, LANCE SCHAFER \nAND \nHANHAN HAMMER \nI. \nINTRODUCTION  \n1 \nQ.  \nPlease state your name, title, business address, and provide your professional \n2 \nbackground and relevant experience. \n3 \nA. \n[Blazunas] My name is Peter Blazunas, and my business address is 293 Boston Post Road \n4 \nWest, Marlborough, MA 01752. I am a Vice President with Concentric Energy Advisors, \n5 \nInc (“Concentric”). I am the same Peter Blazunas who sponsored Direct Joint Testimony \n6 \nfiled on February 23, 2026, in this proceeding. \n7 \n[Schafer] My name is Lance Schafer, and my business address is 293 Boston Post \n8 \nRoad West, Marlborough, MA 01752. I am a Senior Project Manager with Concentric. I \n9 \nam the same Lance Schafer who sponsored Direct Joint Testimony filed on February 23, \n10 \n2026, in this proceeding. \n11"},{"page":2,"startToken":189,"endToken":466,"text":"Exhibit No. PTO-0005 \nPage 2 of 31 \n[Hammer] My name is Hanhan Hammer, and my business address is 293 Boston \n1 \nPost Road West, Marlborough, MA 01752. I am a Senior Project Manager with Concentric. \n2 \nI am the same Hanhan Hammer who sponsored Direct Joint Testimony filed on February \n3 \n23, 2026, in this proceeding.   \n4 \n[Blazunas, Schafer, and Hammer] Our professional background and relevant \n5 \nexperience was provided in Exhibit No. PTO-0002 of our Direct Joint Testimony filed on \n6 \nFebruary 23, 2026, in this proceeding. \n7 \nII. \nBACKGROUND \n8 \nQ. \nWhat is the background for this proceeding? \n9 \nA. \n[Blazunas, Schafer, and Hammer] On December 18, 2025, the Commission issued its \n10 \norder in PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at P 193 (2025) (“Order”). In \n11 \nthe Order, the Commission found that PJM’s Open Access Transmission Tariff (“Tariff”) \n12 \n“is unjust and unreasonable because it does not contain provisions addressing with \n13 \nsufficient clarity or consistency the rates, terms, and conditions of service that apply to \n14 \ngenerators serving Co-Located Load and Eligible Customers taking transmission service \n15 \non behalf of Co-Located Load.”1 Specifically, the Commission found PJM’s Tariff “unjust \n16 \nand unreasonable because it does not include types of transmission service that reflect \n17 \nEligible Customers taking service on behalf of Co-Located Loads that are willing and able \n18 \nto limit their use of the transmission system under certain conditions.”2\n19 \nThe Commission ordered PJM to offer three new forms of transmission service \n20 \nunder its Tariff, and identified these three new forms of transmission service as: (i) Firm \n21 \n1\nOrder at P 2. \n2\nId."},{"page":3,"startToken":466,"endToken":898,"text":"Exhibit No. PTO-0005 \nPage 3 of 31 \nContract Demand transmission service (“Firm Contract Demand Service”); (ii) Non-Firm \n1 \nContract Demand transmission service (“Non-Firm Contract Demand Service”); and (iii) \n2 \ninterim, non-firm transmission service (usually referred to as “Interim NITS”). The \n3 \nCommission also established a paper hearing to determine the just and reasonable rates, \n4 \nterms, and conditions for these new transmission services. The paper hearing process \n5 \nprovides for initial briefs, responses to initial briefs, and replies to those responses. \n6 \nIII.  \nPURPOSE OF TESTIMONY \n7 \nQ. \nWhat is the purpose of your testimony?  \n8 \nA.   \n[Blazunas, Schafer, and Hammer] The purpose of our testimony is twofold. First, we \n9 \nprovide additional detail regarding a proposal to impose financial penalties for Eligible \n10 \nCustomers3 taking service on behalf of Co-Located Load that make unreserved use of the \n11 \ntransmission system. Second, we respond to certain criticisms made by parties in their reply \n12 \nbriefs regarding the rate designs proposed by the PJM Transmission Owners4 for the three \n13 \nnew transmission services required by the Order. This includes our responses to testimony \n14 \n3\nAll capitalized terms that are not otherwise defined herein shall have the meaning set forth in the PJM Tariff \nor Amended and Restated Operating Agreement of PJM Interconnection, L.L.C. \n4\nFor purposes of this testimony and the accompanying reply brief, the PJM Transmission Owners are: \nAmerican Electric Power Service Corporation on behalf of its affiliates, Appalachian Power Company, Indiana \nMichigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling \nPower Company, AEP Appalachian Transmission Company, AEP Indiana Michigan Transmission Company, AEP \nKentucky Transmission Company, AEP Ohio Transmission Company, and AEP West Virginia Transmission \nCompany; The Dayton Power and Light Company d/b/a AES Ohio; Dominion Energy Services, Inc. on behalf of \nVirginia Electric and Power Company d/b/a Dominion Energy Virginia; Duke Energy Business Services, LLC for \nDuke Energy Kentucky, Inc. and Duke Energy Ohio, Inc.; Duquesne Light Company; East Kentucky Power \nCooperative; Exelon Corporation on behalf of its affiliates Atlantic City Electric Company, Baltimore Gas and Electric \nCompany, Commonwealth Edison Company, Commonwealth Edison Company of Indiana, Inc., Delmarva Power & \nLight Company, PECO Energy Company, and Potomac Electric Power Company; FirstEnergy Service Company, on \nbehalf of its affiliates American Transmission Systems, Incorporated, Jersey Central Power & Light Company, Mid-\nAtlantic Interstate Transmission LLC, The Potomac Edison Company, Monongahela Power Company, Keystone \nAppalachian Transmission Company, and Trans-Allegheny Interstate Line Company (collectively, the “FirstEnergy \nCompanies”); PPL Electric Utilities Corporation; Public Service Electric and Gas Company; Rockland Electric \nCompany; and the Southern Maryland Electric Cooperative."},{"page":4,"startToken":898,"endToken":1162,"text":"Exhibit No. PTO-0005 \nPage 4 of 31 \naccompanying the reply briefs filed by Constellation Energy Generation, LLC \n1 \n(“Constellation”) and Vistra Corp. (“Vistra”) that address the PJM Transmission Owners’ \n2 \nGrid Reliance Charge proposal. \n3 \nIV. \nFINANCIAL PENALTY PROPOSAL \n4 \nQ. \nShould unreserved use penalties apply to Eligible Customers taking Firm Contract \n5 \nDemand Service, Non-Firm Contract Demand Service, or Interim NITS on behalf of \n6 \nCo-Located Load? \n7 \nA. \n[Hammer] Yes. Robust penalty provisions are a necessary component of the new services \n8 \nrequired by the Commission. First, and most importantly, any penalties must be sufficient \n9 \nto meaningfully deter Co-Located Load customers from exceeding their contract demand \n10 \nor Interim NITS limits and making unreserved use of the transmission system. Because \n11 \nnetwork upgrades are planned and built only to accommodate load covered by Firm \n12 \nContract Demand Service or NITS, it is crucial that Co-Located Loads respect their \n13 \ncontractual limits, including any related curtailment or other instructions from PJM. This \n14 \nconcern is particularly acute because many of these arrangements will likely involve \n15 \nsubstantial amounts of load—hundreds, if not thousands of MW—being served by on-site \n16 \ngeneration but still connected to the grid. If these limits are not respected, the reliability \n17 \nconsequences to the system—and to existing customers that rely on the reliable operation \n18 \nof that system—could be severe. \n19 \nQ. \nHas PJM proposed any penalties? \n20 \nA. \n[Hammer] Yes. PJM’s Initial Brief includes a table summarizing PJM’s proposed \n21 \noperational penalties applicable to Eligible Customers taking service on behalf of Co-\n22"},{"page":5,"startToken":1162,"endToken":1465,"text":"Exhibit No. PTO-0005 \nPage 5 of 31 \nLocated Load.5 PJM explains that it also supports a financial penalty in addition to its \n1 \nproposed operational penalties and that it intends to work with the PJM Transmission \n2 \nOwners to explore a financial penalty framework.6 Specifically, PJM states that \n3 \n“[u]nreserved use penalties should apply to Eligible Customers taking Firm Contract \n4 \nDemand Transmission Service, Non-Firm Contract Demand Transmission Service, or \n5 \nInterim NITS on behalf of Co-Located Load.”7\n6 \nThe PJM Transmission Owners agree with PJM that the imposition of financial \n7 \npenalties is appropriate, as any penalty regime should rely on both operational \n8 \nconsequences and complementary financial penalties. Although the PJM Transmission \n9 \nOwners anticipate that operational penalties will provide the primary deterrent against \n10 \nEligible Customers serving Co-Located Load exceeding their reserved transmission \n11 \nservice use, financial penalties will play a valuable role in enhancing this deterrent as well \n12 \nas ensuring the market and other ratepayers are made whole if an Eligible Customer serving \n13 \nCo-Located Load exceeds its contract demand or Interim NITS limits. \n14 \nQ. \nDo the PJM Transmission Owners have a proposal for an appropriate penalty charge \n15 \nto address any unreserved use of the PJM transmission system by an Eligible \n16 \nCustomer taking transmission service on behalf of a Co-Located load?\n17 \nA. \n[Hammer] Yes. In addition to PJM’s proposed operational penalties for failure to curtail \n18 \nupon instruction, the PJM Transmission Owners propose to apply financial penalties in \n19 \ninstances in which an Eligible Customer taking service on behalf of Co-Located Load \n20 \nexceeds the authorized transmission service limits, as described in more detail below. The \n21 \n5\nPJM Initial Brief, Docket Nos. EL25-49, et al., at 41 (filed Feb. 23, 2026). \n6\nId. at 50. \n7\nId. at 51."},{"page":6,"startToken":1465,"endToken":1758,"text":"Exhibit No. PTO-0005 \nPage 6 of 31 \nauthorized transmission service limits will include any reduction based on curtailments \n1 \ndirected by PJM. \n2 \nQ. \nDo the PJM Transmission Owners propose that the Commission adopt a separate \n3 \n“Failure-to-Curtail” Financial Penalty?  \n4 \nA. \n[Hammer] No. The PJM Transmission Owners are not proposing that the Commission \n5 \nadopt a separate “failure‑to‑curtail” financial penalty. Instead, failure to curtail should be \n6 \ntreated as a form of unreserved use and addressed through a single, unified unreserved use \n7 \nfinancial penalty framework. Failure to curtail inherently results in unauthorized use of the \n8 \ntransmission system. As such, it is part of unreserved use and does not warrant a distinct \n9 \npenalty mechanism. However, as indicated above, the financial penalties proposed here \n10 \nwill account for any failure to curtail by factoring any curtailments directed by PJM into \n11 \nthe determination of an Eligible Customer’s authorized transmission service limits.  \n12 \nQ. \nPlease describe the PJM Transmission Owners’ proposed financial penalties for \n13 \nunreserved use. \n14 \nA. \n[Hammer] The PJM Transmission Owners propose a financial penalty charge structure \n15 \nfor unreserved use with two components: (1) a base penalty charge, which applies to each \n16 \nindividual hour in which the reserved transmission service limit is exceeded, and (2) a \n17 \npenalty ratchet, which applies when such exceedances occur repeatedly. \n18 \nQ. \nWhat is the base penalty charge? \n19 \nA. \n[Hammer] As described in more detail below, when an Eligible Customer taking service \n20 \non behalf of Co-Located Load exceeds its reserved transmission service limit, the base \n21 \npenalty charge will be assessed for any hour in which at least one five-minute interval \n22 \noccurs during which a customer’s telemetered load at the Point of Delivery exceeds its \n23"},{"page":7,"startToken":1758,"endToken":2053,"text":"Exhibit No. PTO-0005 \nPage 7 of 31 \nreserved transmission service limit. This five-minute interval is defined as an Exceedance \n1 \nInterval, and such an hour is defined as an Exceedance Hour. The base penalty charge will \n2 \napply to each Exceedance Hour.  \n3 \nQ. \nWhat is the penalty rachet? \n4 \nA. \n[Hammer] As described in more detail below, the penalty rachet applies when multiple \n5 \nExceedance Hours occur during a particular time period. It is designed to discourage \n6 \nrecurring reliance on unreserved transmission capacity. Under the penalty rachet \n7 \nframework, the penalty charges escalate as the frequency of unreserved transmission use \n8 \nincreases. Specifically, if more than one Exceedance Hour occurs on the same calendar \n9 \nday, an additional daily penalty applies. If exceedances occur on multiple calendar days \n10 \nwithin the same calendar week, an additional weekly penalty applies. Likewise, if \n11 \nexceedances occur in multiple calendar weeks within the same month, an additional \n12 \nmonthly penalty applies, and if exceedances occur in multiple months within the same year, \n13 \nan additional yearly penalty applies. By progressively increasing the economic \n14 \nconsequences of repeated penalties, the penalty ratchet reinforces the expectation that \n15 \nEligible Customers taking service on behalf of Co-Located Load customers manage their \n16 \nload in a manner consistent with their reserved transmission service. \n17 \nBase Penalty Charge \n18 \nQ. \nPlease describe the base penalty charge in more detail. \n19 \nA. \n[Hammer] The base penalty charge will be assessed for any hour in which at least one \n20 \nfive-minute interval occurs during which a customer’s telemetered load at the Point of \n21 \nDelivery exceeds its reserved transmission service limit. Such a five-minute interval is \n22 \ndefined as an Exceedance Interval, and such an hour is defined as an Exceedance Hour. \n23"},{"page":8,"startToken":2053,"endToken":2340,"text":"Exhibit No. PTO-0005 \nPage 8 of 31 \nThe base penalty charge will apply to each Exceedance Hour. For purposes of determining \n1 \nwhether one or more exceedances have occurred, each five-minute interval beginning with \n2 \nthe first minute of each hour shall constitute a separate interval.  Similarly, each hour from \n3 \n0100 through 2400 shall constitute a separate hour. I explain the calculation of the reserved \n4 \ntransmission service limit and the base penalty charge in the following questions. \n5 \nQ. \nHow is the reserved transmission service limit determined? \n6 \nA. \n[Hammer] For an Eligible Customer taking only Firm Contract Demand Service, the \n7 \nreserved transmission service limit will equal the Firm Contract Demand minus any  \n8 \ncurtailed MW.  For an Eligible Customer taking only Non-Firm Contract Demand Service, \n9 \nthe reserved transmission service limit will equal the approved Non-Firm Contract Demand \n10 \nminus any curtailed MW. For an Eligible Customer taking Firm Contract Demand Service \n11 \nand Non-Firm Contract Demand Service, the reserved transmission service limit will equal \n12 \nthe Firm Contract Demand plus the approved Non-Firm Contract Demand minus any \n13 \ncurtailed MW.  For an Eligible Customer taking Interim NITS, the reserved transmission \n14 \nservice limit will equal the Interim NITS demand minus any curtailed MW. \n15 \nQ. \nHow is the base penalty charge applied to each Exceedance Hour? \n16 \nA. \n[Hammer] Under the PJM Transmission Owners’ proposal, the base penalty charge will \n17 \nbe applied to each Exceedance Hour and will be calculated as: \n18 \nHourly Exceedance MW × Equivalent Hourly Firm Contract Demand (“FCD”) rate × \n19 \nnumber of Exceedance Intervals within the hour \n20 \nWhere: \n21 \n\nHourly Exceedance MW = Maximum telemetered load during the hour – Reserved \n22 \nTransmission Service Limit for the hour \n23"},{"page":9,"startToken":2340,"endToken":2734,"text":"Exhibit No. PTO-0005 \nPage 9 of 31 \n\nEquivalent Hourly FCD rate = FCD rate / 8,760 hours \n1 \nQ. \nWhy is the Firm Contract Demand Rate used as the basis for assessing the penalty? \n2 \nA. \n[Hammer] The Firm Contract Demand rate is used as the basis for assessing the penalty \n3 \nbecause, when a customer exceeds its reserved transmission service limit without \n4 \nauthorization, the excess usage effectively imposes firm‑level demand on the system. In \n5 \neffect, the customer utilizes transmission facilities in the same manner as a firm load. \n6 \nQ. \nCan you provide an example to illustrate the application of the base penalty charge \n7 \nconcept? \n8 \nA. \n[Hammer] Yes. The following example demonstrates the application of the base penalty \n9 \ncharge concept.  This example is a hypothetical for illustration purposes only. \n10 \nFirm Contract Demand (“FCD”) Rate is $72,000/MW-Year.  \n11 \n12 \n\nEquivalent Monthly FCD Rate: $6,000/MW-Month \n13 \n\nEquivalent Weekly FCD Rate: $1,385/MW-Week \n14 \n\nEquivalent Daily FCD Rate: $197.26/MW-Day \n15 \n\nEquivalent Hourly FCD Rate: $8.22/MW-Hour \n16 \n17 \nApril 7, during Houring Ending (“HE”) 12:00 p.m., a Firm Contract Demand customer has \n18 \na total load of 500 MW and on-site generation of 400 MW. The customer has 100 MW \n19 \nFCD and no approved Non-Firm Contract Demand for the hour. \n20 \n21 \nAt 11:17 a.m., the customer experiences a sudden trip of 400 MW of on‑site generation. \n22 \nWhile internal power controls immediately begin ramping down load and transferring \n23 \nsupply to backup generation, there is a brief delay before the protection systems fully \n24 \nrespond. As a result, the customer draws approximately 300 MW from the transmission \n25 \nsystem for a period of seven minutes, from 11:17 a.m. to 11:24 a.m. (i.e., spanning two \n26 \nfive-minute intervals (11:15-11:20 a.m. and 11:20-11:25 a.m.)). \n27 \n28 \nBecause the customer’s telemetered load exceeded its 100 MW of reserved transmission \n29 \nservice limit during the HE 12:00 p.m., the HE 12:00 p.m. qualifies as an Exceedance Hour, \n30 \ntriggering a financial penalty. \n31 \n32 \nFor HE 12:00 p.m.: \n33 \n\nMaximum telemetered load = 300 MW \n34 \n\nReserved Transmission Service Limit = 100 MW \n35 \n\nHourly Exceedance MW = 300 MW – 100 MW = 200 MW \n36"},{"page":10,"startToken":2734,"endToken":3002,"text":"Exhibit No. PTO-0005 \nPage 10 of 31 \n\nHourly FCD Rate = $8.22/MW‑Hour \n1 \n\nNumber of Exceedance Intervals during the hour = 2  \n2 \n3 \nBase Penalty Charge for the HE 12:00 p.m.: \n4 \n= 200 MW × $8.22/MW‑Hour x 2  \n5 \n= $3,288 \n6 \n7 \nThis penalty charge is in addition to the customer’s existing obligation to pay for its 100 \n8 \nMW of FCD under its transmission service agreement. \n9 \n10 \nPenalty Ratchet \n11 \nQ. \nPlease describe the penalty ratchet in more detail.\n12 \nA. \n[Hammer] The PJM Transmission Owners’ also propose a penalty ratchet to address \n13 \nrepeated exceedance behavior based on the frequency of unreserved use of the transmission \n14 \nsystem. This penalty rachet is designed to discourage recurring reliance on unreserved \n15 \ntransmission capacity. Under this framework, the penalty rate escalates as the frequency of \n16 \nunreserved transmission use increases. By progressively increasing the economic \n17 \nconsequences of repeated exceedances, the penalty ratchet reinforces the expectation that \n18 \nEligible Customers manage their Co-Located Load in a manner consistent with their \n19 \nreserved transmission service limits. \n20 \nQ. \nCan you explain the overall mechanics of the penalty ratchet? \n21 \nA. \n[Hammer] Yes. The penalty ratchet is based on an Eligible Customer’s exceedance pattern \n22 \nand applies escalating FCD–equivalent rates as the frequency of unreserved transmission \n23 \nuse increases. Depending on whether exceedances occur within the same calendar day, \n24 \ncalendar week, calendar month, or calendar year, the penalty ratchet applies daily, weekly, \n25 \nmonthly, or annual penalty charges, respectively. Below is an overview of the penalty \n26 \nratchet: \n27 \n28"},{"page":11,"startToken":3002,"endToken":3303,"text":"Exhibit No. PTO-0005 \nPage 11 of 31 \nExceedance Pattern \nPenalty Rate Applied \nMultiple Exceedance Hours in a single calendar day\nDaily FCD-Equivalent Rate\nMultiple Exceedance Days within a calendar week\nWeekly FCD-Equivalent Rate\nMultiple Exceedance Weeks within a calendar month\nMonthly FCD-Equivalent Rate\nMultiple Exceedance Months within a calendar year\nFCD Annual Rate\n1 \nDaily Penalty Charge \n2 \n3 \nQ.  \nWhen does the Daily Penalty Charge apply, and how is it calculated? \n4 \nA.  \n[Hammer] The Daily Penalty Charge applies when multiple Exceedance Hours occur on \n5 \nthe same calendar day. In that circumstance, the Daily Penalty Charge is calculated as: \n6 \nMaximum Hourly Exceedance MW during the calendar day \n7 \n× Daily FCD-Equivalent Rate \n8 \n× Number of Exceedance Hours in the calendar day \n9 \n10 \nQ. \n Can you provide an example of the Daily Penalty Charge? \n11 \nA.   \n[Hammer] Using the same example as in the base penalty charge section, assume the \n12 \ncustomer exceeds its reserved transmission service limit in two separate hours on the same \n13 \ncalendar day (one exceedance at 10:30 a.m. and another at 11:15 p.m.). As I explained \n14 \nabove, each clock hour will be treated as a separate hour for purposes of this determination, \n15 \nso even though these exceedances occurred within an hour of each other, they will be \n16 \ntreated as two Exceedance Hours. In that case: \n17 \n\nMaximum Exceedance MW during the calendar day = 200 MW \n18 \n\nDaily FCD Rate = $197.26/MW‑Day \n19 \n\nNumber of Exceedance Hours in the calendar day = 2  \n20 \n21 \nDaily Penalty Charge is calculated as: \n22 \n23 \n200 MW× $197.26/MW‑Day x 2  \n24 \n= $78,904 \n25 \n26 \nThe Daily Penalty Charge is assessed in addition to the base penalty charge applicable to \n27 \neach individual Exceedance Hour. \n28"},{"page":12,"startToken":3303,"endToken":3570,"text":"Exhibit No. PTO-0005 \nPage 12 of 31 \nWeekly Penalty Charge \n1 \n2 \nQ.  \nWhen does the Weekly Penalty Charge apply, and how is it calculated? \n3 \nA.  \n[Hammer] The Weekly Penalty Charge applies when Exceedance Hours occur on multiple \n4 \ncalendar days within the same calendar week. The Weekly Penalty Charge is calculated as: \n5 \nMaximum Hourly Exceedance MW during the calendar week \n6 \n× Weekly FCD-Equivalent Rate \n7 \n× Number of Exceedance Days in the calendar week \n8 \n9 \nQ.  \nCan you provide an example of the Weekly Penalty Charge?\n10 \nA.  \n[Hammer] Using the same example, assume the customer exceeds its reserved \n11 \ntransmission service limit in two different calendar days (Monday and Wednesday) within \n12 \nthe same calendar week. In that case:\n13 \n\nMaximum Hourly Exceedance MW during the calendar week = 200 MW \n14 \n\nWeekly FCD Rate= $1,385/MW‑Week \n15 \n\nNumber of Exceedance Days in a calendar week = 2  \n16 \n17 \nWeekly Penalty Charge is calculated as: \n18 \n19 \n200 MW× $1,385/MW‑Week x 2  \n20 \n= $554,000 \n21 \n22 \nThe Weekly Penalty Charge is assessed in addition to the base penalty charge and any \n23 \napplicable Daily Penalty Charge. \n24 \nMonthly Penalty Charge \n25 \n26 \nQ.  \nWhen does the Monthly Penalty Charge apply, and how is it calculated?\n27 \nA.  \n[Hammer] The Monthly Penalty Charge applies when Exceedance Hours occur during \n28 \nmultiple calendar weeks within the same calendar month. The Monthly Penalty Charge is \n29 \ncalculated as:\n30 \nMaximum Hourly Exceedance MW during the calendar month \n31 \n× Monthly FCD-Equivalent Rate \n32 \n× Number of Exceedance Weeks in the calendar month \n33"},{"page":13,"startToken":3570,"endToken":3827,"text":"Exhibit No. PTO-0005 \nPage 13 of 31 \n1 \nQ.  \nCan you provide an example of the Monthly Penalty Charge?\n2 \nA.  \n[Hammer] Using the same example, assume the customer exceeds its reserved \n3 \ntransmission service limit in two separate calendar weeks within the same calendar month. \n4 \nIn that case: \n5 \n\nMaximum metered withdrawal during the month = 200 MW \n6 \n\nMonthly FCD Rate = $6,000/MW‑Month \n7 \n\nNumber of Exceedance Weeks in a calendar month = 2  \n8 \n9 \nMonthly Penalty Charge: \n10 \n11 \n 200 MW × $6,000/MW‑Month x 2  \n12 \n= $2,400,000 \n13 \n14 \nThe Monthly Penalty Charge is assessed in addition to the base, Daily, and Weekly Penalty \n15 \nCharges. \n16 \nAnnual Penalty Charge \n17 \n18 \nQ.  \nWhen does the Annual Penalty Charge apply, and how is it calculated?\n19 \nA.  \n[Hammer] The Annual Penalty Charge applies when Exceedance Hours occur during \n20 \nmultiple calendar months within the same calendar year. The Annual Penalty Charge is \n21 \ncalculated as: \n22 \nMaximum Hourly Exceedance MW during the calendar year \n23 \n× Annual FCD Rate \n24 \n× Number of Exceedance Months in the calendar year \n25 \n26 \nQ.  \nCan you provide an example of the Annual Penalty Charge? \n27 \nA.  \n[Hammer] Using the same example, assume the same customer exceeds its reserved \n28 \ntransmission service limit in two separate months within the same year. In that case: \n29 \n\nMaximum Hourly Exceedance MW during a calendar year = 200 MW \n30 \n\nFCD Rate = $72,000/MW‑Year \n31 \n\nNumber of Exceedance Weeks in a Year = 2  \n32 \n33"},{"page":14,"startToken":3827,"endToken":3968,"text":"Exhibit No. PTO-0005 \nPage 14 of 31 \nAnnual Penalty Charge is calculated as: \n1 \n 200 MW × $72,000/MW‑Year x 2  \n2 \n= $28.8 Million \n3 \n4 \nThe Annual Penalty Charge is accessed in addition to the Base Penalty Charge and all \n5 \napplicable Daily, Weekly, and Monthly Penalty Charges. \n6 \nQ. \nWhat is the total penalty exposure under the calculations above? \n7 \nA. \n[Hammer] In aggregate, if the Eligible Customer experiences two Exceedance Intervals \n8 \nwithin a single hour, two hours within a single calendar day, two calendar days within a \n9 \nsingle calendar week, and two calendar weeks within the same calendar month during two \n10 \nmonths of the year (e.g., April and May), the total assessed financial penalty would be \n11 \napproximately $36.5 million. The calculation supporting this total is summarized as \n12 \nfollows. \n13"},{"page":15,"startToken":3968,"endToken":4516,"text":"Exhibit No. PTO-0005 \nPage 15 of 31 \n1 \n2 \nQ. \nWhat do the PJM Transmission Owners propose to do with the revenues collected \n3 \nfrom the financial penalties? \n4 \nA. \n[Hammer] Revenues collected from daily, weekly, and monthly financial penalty charges \n5 \nwill be returned on a monthly basis to Eligible Customers taking NITS and Firm Contact \n6 \nDemand Service that have not been penalized during the month as bill credits, based on \n7 \neach Eligible Customer’s pro rata share of the Zone’s annual peak load based on the most \n8 \nrecent 12-month period ending October 31.  Revenues collected from annual penalty \n9 \ncharges will be retuned on an annual basis to Eligible Customers taking NITS and Firm \n10 \nContract Demand Service that have not been penalized during the year as bill credits, based \n11 \n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\nUnreserved Use Violations (200 MW):\nNo. of Exceedance Intervals\nNo. of Exceedance Hours\nNo. of Exceedance Days No. of Exceedance Weeks No. of Exceedance Months\n(1)\nTuesday, April 7, 2026 @ HE 12:00 p.m.\n2\n(2)\nTuesday, April 7, 2026 @ HE 2:00 p.m.\n2\n(3)\nWednesday, April 8, 2026 @ HE 12:00 p.m.\n2\n(4)\nWednesday, April 8, 2026 @ HE 2:00 p.m.\n2\n(5)\nTuesday, April 14, 2026 @ HE 12:00 p.m.\n2\n(6)\nTuesday, April 14, 2026 @ HE 2:00 p.m.\n2\n(7)\nWednesday, April 15, 2026 @ HE 12:00 p.m.\n2\n(8)\nWednesday, April 15, 2026 @ HE 2:00 p.m.\n2\n(9)\nThursday, May 7, 2026 @ HE 12:00 p.m.\n2\n(10)\nThursday, May 7, 2026 @ HE 2:00 p.m.\n2\n(11)\nFriday, May 8, 2026 @ HE 12:00 p.m.\n2\n(12)\nFriday, May 8, 2026 @ HE 2:00 p.m.\n2\n(13)\nThursday, May 14, 2026 @ HE 12:00 p.m.\n2\n(14)\nThursday, May 14, 2026 @ HE 2:00 p.m.\n2\n(15)\nFriday, May 15, 2026 @ HE 12:00 p.m.\n2\n(16)\nFriday, May 15, 2026 @ HE 2:00 p.m.\n2\n(17)\nBase Charge (Exceedance Intervals)\n32.00\n(18)\nMaximum Hourly Exceedance MW\n200.00\n(19)\nEquivalent Hourly FCD Rate ($/MW-Hour)\n$8.22\n(20)\nBase Charge - Total\n$52,602.74\n(21)\nDaily Penalty Charge (Exceedance Hours)\n16.00\n(22)\nMaximum Hourly Exceedance MW (Day)\n200.00\n(23)\nEquivalent Daily FCD Rate ($/MW-Day)\n197.26\n$                                           \n(24)\nDaily Penalty Charge - Total\n$631,232.88\n(25)\nWeekly Penalty Charge (Exceedance Days)\n8.00\n(26)\nMaximum Hourly Exceedance MW (Week)\n200.00\n(27)\nEquivalent Weekly FCD Rate ($/MW-Week)\n1,384.62\n$                               \n(28)\nWeekly Penalty Charge - Total\n$2,215,384.62\n(29)\nMonthly Penalty Charge (Exceedance Weeks)\n4.00\n(30)\nMaximum Hourly Exceedance MW (Month)\n200.00\n(31)\nEquivalent Monthly FCD Rate ($/MW-Month)\n6,000.00\n$                                  \n(32)\nMonthly Penalty Charge - Total\n$4,800,000.00\n(33)\nAnnual Penalty Charge (Exceedance Months)\n2.00\n(34)\nMaximum Hourly Exceedance MW (Annual)\n200.00\n(35)\nFCD Rate ($/MW-Year)\n72,000.00\n$                                 \n(36)\nAnnual Penalty Charge - Total\n$28,800,000.00\n(37)\nPenalty\n$52,602.74\n$631,232.88\n$2,215,384.62\n$4,800,000.00\n$28,800,000.00\n(38)\nTotal Penalty\n$36,499,220.23\n1\n1\n2\n2\n2\n2\n1\n1\n1\n1\n2\n2\n2\n2\n2\n2\n2\n2"},{"page":16,"startToken":4516,"endToken":4824,"text":"Exhibit No. PTO-0005 \nPage 16 of 31 \non each Eligible Customer’s pro rata share of the Zone’s annual peak load based on the \n1 \nmost recent 12-month period ending October 31. \n2 \nV. \nGRID RELIANCE CHARGE \n3 \nQ. \nConstellation Witness Zachary Ming argues that the PJM Transmission Owners’ \n4 \nproposed Grid Reliance Charge is “not grounded in sound ratemaking principles, \n5 \nviolates cost causation principles, and is unreasonably high.”8 How do you respond? \n6 \nA. \n[Schafer] I disagree. The PJM Transmission Owners’ proposed Grid Reliance Charge \n7 \nmethodology represents an appropriate balance between fairly estimating the grid reliance \n8 \nbenefits to Co-Located Load with the need to ensure the rate can be practically \n9 \nimplemented. These grid benefits include delivering ancillary services and a suite \n10 \nof essential reliability services, such as frequency support, inertia, voltage stability, fault \n11 \ncurrent capability, ride-through and protection coordination, and providing sufficient \n12 \nshort-circuit capability. Practicality concerns are particularly pertinent here given the \n13 \nCommission’s desire to expedite the interconnection of data center loads.   \n14 \nMr. Ming’s criticisms of the PJM Transmission Owners’ proposal are largely based \n15 \non his belief that Co-Located Load customers with zero demand should not be charged for \n16 \ndemand-driven transmission costs.9 Under this belief, Co-Located Load customers with \n17 \nzero demand would not be allocated the cost of transmission infrastructure through a Grid \n18 \nReliance Charge because transmission costs are largely demand-driven.10\n19 \n20 \n8\nSee Reply Brief of Constellation, Attachment 1, Testimony of Zachary Ming at 4:10-12 (“Ming Testimony”).  \n9\nId. at 12:16-21. \n10\nWith respect to the notion that transmission costs are largely demand-driven, see, e.g., the National \nAssociation of Regulatory Utility Commissioners, Electric Utility Cost Allocation Manual (Jan. 1992), at Chapter 5.  \nSee also Lawrence J. Vogt, P.E., Electricity Pricing: Engineering Principles and Methodologies 522 (2009)."},{"page":17,"startToken":4824,"endToken":5146,"text":"Exhibit No. PTO-0005 \nPage 17 of 31 \nQ. \nWhat do you mean when you say that “transmission costs are largely demand-\n1 \ndriven?” \n2 \nA. \n[Schafer] Transmission systems are planned, built, and operated to serve bulk power flows \n3 \nand meet system-wide reliability criteria. Most transmission system investments and \n4 \nassociated costs are driven by the need to meet peak demand, not by the total volume of \n5 \nenergy delivered. Transmission facilities such as substations, lines, transformers, and \n6 \nrelated equipment, are designed to serve maximum coincident peak demand plus required \n7 \nreserve margins. Therefore, the primary cost drivers of the transmission system are largely \n8 \nclassified as demand-related rather than energy-usage related. \n9 \nQ. \nDoes Mr. Ming believe that the concept of a Grid Reliance Charge is unreasonable? \n10 \nA. \n[Schafer] No, he does not. In fact, he states “. . . it is reasonable for co-located load \n11 \ncustomers to make some contribution to the cost of wires of the PJM system in the form of \n12 \na [Grid Reliance Charge].”11\n13 \nQ. \nDoes Mr. Ming offer an alternative means for calculating the Grid Reliance Charge? \n14 \nA. \n[Schafer] Yes. Similar to the PJM Transmission Owners’ proposal, Mr. Ming’s Grid \n15 \nReliance Charge is calculated as a percentage of the NITS rate. The percentage of the NITS \n16 \nrate used to calculate the Grid Reliance Charge is referred to by Mr. Ming as the “Grid \n17 \nReliance Percentage Allocator.”12 As an alternative to the PJM Transmission Owners’ \n18 \nproposed methodology for the calculation of the Grid Reliance Charge Fixed Percentage \n19 \nAllocator, Mr. Ming proposes the adoption of the “minimum system” method.13 However, \n20 \n11\nMing Testimony at 9:1-3. \n12\nIn the Illustrative Tariff sheets filed by the PJM Transmission Owners, this is referred to as the Grid Reliance \nFixed Percentage Allocator.  See PJM Transmission Owners Reply Brief, Exhibit PTO-0006 (filed Apr. 24, 2026). \n13\nId. at 24:6-8."},{"page":18,"startToken":5146,"endToken":5424,"text":"Exhibit No. PTO-0005 \nPage 18 of 31 \nby proposing the minimum system method for the calculation of the Grid Reliance Charge \n1 \nFixed Percentage Allocator, Mr. Ming is advocating for a reclassification of a portion of \n2 \nPJM transmission costs as customer-related even though this reclassification is not only \n3 \ninappropriate but contradicts standard industry literature.14\n4 \nQ. \nWhat is the minimum system method?\n5 \nA. \n[Schafer] The minimum system method is a cost allocation approach sometimes used in \n6 \nelectric distribution cost of service studies to distinguish between customer-related and \n7 \ndemand-related components of a portion of distribution plant investment. The method is \n8 \nbased on the principle that a portion of the distribution system must be constructed to serve \n9 \ncustomers regardless of their level of demand, while additional investment is driven by the \n10 \nmagnitude of load served.  \n11 \nUnder this method, a “minimum system” is defined as the lowest-cost configuration \n12 \nof the distribution system that would be required to provide basic service to customers, \n13 \nassuming minimal load requirements. This minimum system typically reflects the facilities \n14 \nnecessary to connect customers to the grid and ensure system operability, independent of \n15 \nhigher demand levels. The costs associated with this minimum system are classified as \n16 \ncustomer-related, as they are incurred to serve customers regardless of their usage.\n17 \nThe customer-related portion of distribution plant investment identified through the \n18 \nminimum system method is typically allocated on the basis of the number of customers in \n19 \neach class, reflecting the premise that these costs are driven by customer count rather than \n20 \nby demand or energy use.  \n21 \n14\nSee supra note 10."},{"page":19,"startToken":5424,"endToken":5701,"text":"Exhibit No. PTO-0005 \nPage 19 of 31 \nThe remaining portion of distribution plant investment, representing the additional \n1 \ncapacity required to meet higher levels of demand, is classified as demand-related. These \n2 \ncosts are then allocated among customer classes based on appropriate demand allocators, \n3 \nsuch as non-coincident peak demand.  \n4 \nQ. \nDoes Mr. Ming attempt to conduct a minimum system study for the PJM transmission \n5 \nsystem to calculate the Grid Reliance Charge Fixed Percentage Allocator? \n6 \nA. \n[Schafer] He claims to have done so. Mr. Ming states: “to approximate the cost of the \n7 \nminimum system, I identified the relevant minimum system components and associated \n8 \nunit costs and applied them to the component count estimate.”15\n9 \nQ. \nDoes Mr. Ming present a true minimum system study for the PJM transmission \n10 \nsystem? \n11 \nA. \n[Schafer] No, he does not. This can be seen in his selection of minimum system \n12 \ncomponents, shown in Table 1 of his testimony.16  For example, Mr. Ming, when choosing \n13 \nthe minimum system component for transmission poles and transmission towers, chooses \n14 \n“distribution wood pole[s].”17 In other words, Mr. Ming’s minimum system study assumes \n15 \nthat a minimum transmission system could be built with distribution wood poles. This \n16 \nassumption violates the engineering reality of the transmission system. A distribution wood \n17 \npole cannot perform the function of a transmission structure in that it cannot support \n18 \nrequired voltages, cannot meet clearance requirements, and cannot handle mechanical \n19 \nloads (e.g., span length, conductor weight). The minimum system study establishes a \n20 \n15\nMing Testimony at 19:14-16. \n16\nId. at 20:1. \n17\nId."},{"page":20,"startToken":5701,"endToken":5984,"text":"Exhibit No. PTO-0005 \nPage 20 of 31 \nminimum feasible configuration of the same system that could actually provide the service \n1 \n(at minimal load). Mr. Ming did not create such a minimum system. He substituted \n2 \ndistribution assets into a transmission function. In the context of a study that, for \n3 \nmethodological reasons, should never have been attempted in the first place, Mr. Ming’s \n4 \ninclusion of distribution poles renders his results meaningless. \n5 \nQ. \nEven if Mr. Ming had appropriately conducted a minimum system study, would that \n6 \napproach be reasonable for calculating the Grid Reliance Charge Fixed Percentage \n7 \nAllocator? \n8 \nA. \n[Schafer] No. The minimum system method is not an appropriate means for calculating \n9 \nthe Grid Reliance Charge Fixed Percentage Allocator at the transmission level.  \n10 \nQ. \nWhy is the minimum system method not an appropriate means for calculating the \n11 \nGrid Reliance Charge Fixed Percentage Allocator at the transmission level? \n12 \nA. \n[Schafer] The minimum system method is not an appropriate means for calculating the \n13 \nGrid Reliance Charge Fixed Percentage Allocator at the transmission level because the \n14 \nfoundational premise of the method is incompatible with that calculation. That premise is \n15 \nthat a definable portion of the system is built solely to connect customers largely \n16 \nindependent of load.   \n17 \nQ. \nWhy is that premise not applicable to transmission systems?  \n18 \nA. \n[Schafer] The premise is not applicable to transmission systems because transmission \n19 \nsystems are not planned and built to connect customers independent of load. Rather, they \n20 \nare planned, built and operated to move large amounts of electricity reliably, efficiently, \n21 \nand economically from where it is produced to where it is consumed.  \n22"},{"page":21,"startToken":5984,"endToken":6294,"text":"Exhibit No. PTO-0005 \nPage 21 of 31 \nQ. \nIs Mr. Ming aware that the minimum system method is not used at the transmission \n1 \nlevel?\n2 \nA. \n[Schafer] Yes. He states in his testimony: “the minimum system method is generally not \n3 \nused in the context of transmission system cost allocation and rate design.”18\n4 \nQ. \nHow does Mr. Ming justify the adoption of the minimum system method at the \n5 \ntransmission level in this proceeding? \n6 \nA. \n[Schafer] Mr. Ming attempts to justify his proposal to adopt the minimum system method \n7 \nat the transmission level in this case by asserting that “[w]hile the minimum system method \n8 \nis typically not used in the context of transmission cost allocation or ratemaking, the cost \n9 \nof the minimum system is precisely the set of costs that a co-located load that benefits from \n10 \nthe existence of wires but imposes no demand on the grid should share.”19\n11 \nQ. \nWhat is wrong with Mr. Ming’s assertion? \n12 \nA. \n[Schafer] Mr. Ming ignores the methodological inappropriateness of applying the \n13 \nminimum system method to the transmission system, apparently attributing the industry-\n14 \nstandard exclusion of this method from transmission system cost of service analysis as \n15 \nowing to the larger size and higher cost of transmission components. But it is not because \n16 \nof the size or cost of the components that the minimum system method is excluded from \n17 \ntransmission system cost of service analysis but rather due to the fact that transmission \n18 \nsystems do not have a definable minimum, customer-driven component. Although Mr. \n19 \nMing acknowledges that the minimum system method is not used at the transmission level, \n20 \nhe nonetheless believes that the minimum system method, which is only used at the \n21 \n18\nSee Ming Testimony at 16:9-10. \n19\nId. at 17:3-6."},{"page":22,"startToken":6294,"endToken":6593,"text":"Exhibit No. PTO-0005 \nPage 22 of 31 \ndistribution level by some, but not all, utilities to define customer-related costs, would \n1 \nsomehow “precisely” identify the set of costs that a co-located customer imposing no load \n2 \non the grid should pay for grid reliance.20\n3 \nQ. \nHow does Mr. Ming use the concept of the minimum system method to argue that the \n4 \nPJM Transmission Owners’ proposed Grid Reliance Charge is too high? \n5 \nA. \n[Schafer] Mr. Ming outlines the following relationship between the Grid Reliance Charge \n6 \nand the minimum system method: 1) the minimum system method is not used at the \n7 \ntransmission level because the components are large and costly in relation to the minimum \n8 \nsystem; 2) the fact that the minimum system method is not used implies that the minimum \n9 \nsystem value is 0% for the transmission system; and 3) because the minimum system value \n10 \nis 0%, it is “reasonable to assume that a proper minimum system study when applied to the \n11 \ntransmission system would yield a value significantly lower than 25.8%” (i.e., the PJM \n12 \nTransmission Owner’s proposed initial Grid Reliance Charge Fixed Percentage \n13 \nAllocator).21\n14 \nQ. \nIs this line of reasoning sensible? \n15 \nA. \n[Schafer] Not at all. First, Mr. Ming once again ignores that there are methodological \n16 \nreasons that the minimum system method is not used at the transmission level. Second, his \n17 \nreasoning simply does not hold. Mr. Ming states “. . . no utilities that I am aware of classify \n18 \nany transmission costs to the customer cost driver, meaning they are implicitly assuming a \n19 \nminimum system value of 0% for the transmission system.”22 Therefore, according to Mr. \n20 \n20\nId. \n21\nId. at 18:13-15. \n22\nId. at 18:11-13."},{"page":23,"startToken":6593,"endToken":6900,"text":"Exhibit No. PTO-0005 \nPage 23 of 31 \nMing, because the minimum system method is not used at the transmission level, the \n1 \nCommission must assume a minimum system value that is much lower than the 25.8% that \n2 \nthe PJM Transmission Owners calculated for the Grid Reliance Charge Fixed Percentage \n3 \nAllocator.  However, the only reasonable conclusion to the fact that the minimum system \n4 \nmethod is not used at the transmission level is that that method and any results of that \n5 \nmethod are entirely irrelevant to the assessment of a transmission-level charge, such as the \n6 \nproposed Grid Reliance Charge.  \n7 \nQ. \nHow are the results of a distribution minimum system study used in a typical \n8 \ndistribution class cost of service study? \n9 \nA. \n[Schafer] For the distribution plant accounts included in the study, the identified customer-\n10 \nrelated portions of the account balances are allocated to customer classes based on the \n11 \ncount of customers. The identified demand-related portions of the account balances are \n12 \nallocated to the customer classes with a demand allocator. \n13 \nQ. \nHow does Mr. Ming propose to apply the percentage result of his minimum system \n14 \nstudy? \n15 \nA. \n[Schafer] He proposes to apply the result of his minimum system study, which he presents \n16 \nas 6%, directly to the NITS rate as the Grid Reliance Charge Fixed Percentage Allocator.23\n17 \nQ. \nIn a minimum system study for the distribution system, is the application of the \n18 \nminimum system results similar to the application proposed by Mr. Ming? \n19 \nA. \n[Schafer] No. The percentage of customer-related costs developed in the distribution \n20 \nminimum system study is applied to the relevant distribution plant account balances. The \n21 \ncustomer-related portion of the balance is then allocated to the customer classes based on \n22 \n23\nId. at 25:3-4."},{"page":24,"startToken":6900,"endToken":7204,"text":"Exhibit No. PTO-0005 \nPage 24 of 31 \nthe count of customers. The demand-related portion of the balance is then allocated to the \n1 \ncustomer classes based on a measure of demand. The allocated balances are then included \n2 \nin each customer class’s revenue requirement. The revenue requirement includes items \n3 \nsuch as return on rate base, operations and maintenance expenses, depreciation, and taxes. \n4 \nIn other words, the minimum system study is performed in the context of the development \n5 \nof the revenue requirement for customer-related and demand-related infrastructure. Mr. \n6 \nMing’s application of a percentage result from his minimum system study directly to NITS \n7 \nis incompatible with the purpose of performing a minimum system study, because the \n8 \npercentage he develops cannot be directly applied to the revenue requirement. \n9 \nQ. \nWhen Mr. Ming proposes to apply the results of his transmission minimum system \n10 \nstudy directly to the NITS rate, is he violating cost causation principles that he \n11 \ndescribes in his testimony? \n12 \nA. \n[Schafer] Yes. Mr. Ming states that “the Transmission Owners’ Grid Reliance Charge \n13 \nproposal violates cost causation principles by charging for demand-driven transmission \n14 \ncosts that co-located customers with zero demand that their service does not cause.”24 Mr. \n15 \nMing conducts a minimum system study, identifies a portion of what he believes to be \n16 \ncustomer-related cost, then recovers that customer-related cost via demand. In doing so, he \n17 \nassigns customer-related costs to customers who did not cause that cost to be incurred. In \n18 \na distribution minimum system study, the customer-related cost is allocated on a per-\n19 \ncustomer basis, i.e., the same amount is allocated to each customer regardless of their usage \n20 \nof the system. Mr. Ming’s proposal clearly allocates more or less customer-related cost \n21 \n24\nId. at 12:18-21."},{"page":25,"startToken":7204,"endToken":7512,"text":"Exhibit No. PTO-0005 \nPage 25 of 31 \nbased on a customer’s load requirements. There is no justification for this in the context of \n1 \nthe methodology he has adopted. \n2 \nQ. \nDoes Mr. Ming provide justification for the costs he includes in his minimum system \n3 \nmethod? \n4 \nA. \n[Schafer] No. Mr. Ming states that “co-located load customers receive ancillary services \n5 \nfrom the existence of the wires that synchronize them to the rest of the PJM system.”25 He \n6 \nthen implies that including the full cost of the “wires” in a Grid Reliance Charge would be \n7 \ninappropriate, since the full cost of the wires was incurred to meet peak demand.  He then \n8 \nconcludes that using the minimum system method in order “to calculate precisely the costs \n9 \nof constructing wires to connect all customers” is appropriate.26 From this argument, it \n10 \nappears that Mr. Ming’s entire justification of the costs he includes in his minimum system \n11 \nstudy is as follows: the costs underlying the Grid Reliance Charge are the same customer-\n12 \nrelated costs necessary to connect all customers. He confirms this when he states: “[w]hile \n13 \nthe minimum system method is typically not used in the context of transmission cost \n14 \nallocation or ratemaking, the cost of the minimum system is precisely the set of costs that \n15 \na co-located load that benefits from the existence of wires but imposes no demand on the \n16 \ngrid should share.27 The costs of the minimum system therefore provide a theoretically-\n17 \nsound basis to calculate the Grid Reliance Charge.”28 Mr. Ming, however, fails to establish \n18 \nthe relationship between Grid Reliance Charge-related costs and the costs included in the \n19 \n25\nId. at 14:7-8. \n26\nId. at 14:14-17. \n27\nId. at 17:3-6. \n28\nId. at 17:6-7."},{"page":26,"startToken":7512,"endToken":7811,"text":"Exhibit No. PTO-0005 \nPage 26 of 31 \nminimum system study. Moreover, as described above, he violates any supposed \n1 \n“theoretically-sound basis” when he allocates customer-related costs on demand.  \n2 \nQ. \nMr. Ming criticizes the PJM Transmission Owners’ Grid Reliance Charge proposal \n3 \non the basis of the costs that were included or excluded from the methodology, such \n4 \nas return on rate base and depreciation.  Does Mr. Ming’s minimum system proposal \n5 \nremedy his criticisms? \n6 \nA. \n[Schafer] No. As shown in Table 1 of his testimony,29 Mr. Ming’s 6% minimum system \n7 \nstudy result, which he proposes be applied directly to NITS, is based entirely on \n8 \nreplacement cost.30 In other words, his calculated 6% is the result of comparing the cost of \n9 \na “new” minimum transmission system to the cost of an entirely “new” transmission \n10 \nsystem. Mr. Ming does not develop any greater detail than that. He does not incorporate \n11 \nrate of return, taxes, depreciation, operations and maintenance, or any other element of the \n12 \nrevenue requirement.  \n13 \nQ. \nMr. Ming accuses the PJM Transmissions Owners of having provided little \n14 \njustification for which costs are included or excluded from the Grid Reliance Charge.  \n15 \nHow do you respond? \n16 \nA. \n[Schafer] First, Mr. Ming’s criticism fails to acknowledge the account-by-account \n17 \njustification of cost inclusion provided in Tables 1 and 2 of Exhibit No. PTO-0001.31\n18 \nSecond, Mr. Ming cites only two aspects of the inclusion/exclusion criteria in his testimony \n19 \nwithout properly situating them in the context of the full proposal. In Exhibit No. PTO-\n20 \n29\nId. at 20:1. \n30\nId. at 19:5-18. \n31\nPJM Transmission Owners Initial Brief, Exhibit No. PTO-0001, Direct Joint Testimony of Peter Blazunas, \nLance Schafer, and Hanhan Hammer at 20-21."},{"page":27,"startToken":7811,"endToken":8098,"text":"Exhibit No. PTO-0005 \nPage 27 of 31 \n0001, I provided multiple reasons as to why the PJM Transmission Owners’ Grid Reliance \n1 \nCharge methodology is just and reasonable.32\n2 \nQ. \nDoes the Grid Reliance Charge methodology proposed by the PJM Transmission \n3 \nOwners result in a just and reasonable rate?  \n4 \nA. \n[Schafer] Yes. While the methodology includes certain costs and excludes others, it does \n5 \nso in pursuit of the goal of developing a cost-based, transparent, and practically \n6 \nimplementable calculation that relies on publicly available data. Mr. Ming claims that the \n7 \nPJM Transmission Owners’ Grid Reliance Charge methodology is not grounded in sound \n8 \nratemaking and cost-causation principles because of the exclusion of certain items such as \n9 \nreturn on rate base.33 However, it is notable that in his own proposal, not only does he not \n10 \ninclude return on rate base, but he does not calculate any specific element of the revenue \n11 \nrequirement. His proposed Grid Reliance Charge Fixed Percentage Allocator is entirely \n12 \nbased on the ratio of the cost of a theoretical “new” transmission minimum system to the \n13 \ncost of an entirely “new” transmission system. \n14 \nQ. \nPlease summarize your response to Constellation Witness Zachary Ming.\n15 \nA. \n[Schafer] Mr. Ming’s critique of the proposed Grid Reliance Charge is internally \n16 \ninconsistent and unsupported by accepted ratemaking practice. Although he agrees that \n17 \nco‑located customers should pay a Grid Reliance Charge, he provides little justification for \n18 \nhis proposed minimum system study solution. The minimum system method is not used \n19 \nfor transmission cost of service analysis because transmission systems are built to serve \n20 \n32\nId. at 24-25. \n33\nMing Testimony at 11:18-12:1."},{"page":28,"startToken":8098,"endToken":8389,"text":"Exhibit No. PTO-0005 \nPage 28 of 31 \nbulk power flows and reliability needs and do not have a separable, customer‑driven \n1 \n“minimum system” component. \n2 \nDespite acknowledging that the minimum system method is inappropriate at the \n3 \ntransmission level, Mr. Ming nonetheless applies it using assumptions that are not feasible \n4 \nfrom an engineering standpoint and that substitute distribution facilities for transmission \n5 \ninfrastructure. His analysis also omits basic elements of the revenue requirement and \n6 \nproposes to inappropriately recover what he describes as customer‑related costs through \n7 \ndemand charges, contrary to the very cost‑causation principles he evokes. Mr. Ming’s \n8 \nestimates of what he believes to be a reasonable level of Grid Reliance Charge must be \n9 \nrejected, as his proposal is methodologically unsound. \n10 \nQ. \nVistra Witness Rebecca Stadelmeyer also challenges the PJM Transmission Owners’ \n11 \nproposed calculation of the Grid Reliance Charge Fixed Percentage Allocator. What \n12 \nis Ms. Stadelmeyer’s alternative proposal? \n13 \nA. \n[Schafer] Ms. Stadelmeyer believes that the Grid Reliance Charge Fixed Percentage \n14 \nAllocator should be based on the benefits customers receive from the grid in supporting \n15 \nblack start and regulation service only.34 Accordingly, she proposes that the percentage be \n16 \nbased on PJM’s monthly billings for black start and regulation charges.35\n17 \nQ. \nWhat is wrong with this alternative proposal for the calculation of the Grid Reliance \n18 \nCharge Fixed Percentage Allocator? \n19 \nA. \n[Schafer] Ms. Stadelmeyer’s alternative calculation of the Grid Reliance Charge Fixed \n20 \nPercentage Allocator is based on the ratio of PJM’s monthly black start and regulation \n21 \n34\nSee Response Brief of Vistra, Attachment A, Affidavit of Rebecca Stadelmeyer at 12:8-11 (“Stadelmeyer \nAffidavit”). \n35\nVistra at 22-23; Stadelmeyer Affidavit at 11:4-12:4."},{"page":29,"startToken":8389,"endToken":8670,"text":"Exhibit No. PTO-0005 \nPage 29 of 31 \nbillings to total monthly billings.36 In other words, rather than attempting to identify costs \n1 \nunderlying grid reliance (or any subset of grid reliance, such as black start or regulation \n2 \nservice), Ms. Stadelmeyer simply lowers the PJM Transmission Owners’ proposed Grid \n3 \nReliance Charge with a sales ratio.  \n4 \nQ. \nWhy was it inappropriate for Ms. Stadelmeyer to simply lower the PJM Transmission \n5 \nOwners’ proposed Grid Reliance Charge with a sales ratio? \n6 \nA. \n[Schafer] As noted above, Ms. Stadelmeyer’s sales ratio represents the ratio of black start \n7 \nand regulation service monthly billings to total monthly billings. This sales ratio does not \n8 \nrepresent the transmission costs that underlie grid reliance, and thus is not a reasonable \n9 \nproxy for the Grid Reliance Charge Fixed Percentage Allocator. There is no relationship \n10 \nbetween the percentage of billed revenues for black start and regulation and the costs of \n11 \nthe transmission system used to deliver those services. Indeed, a comparison of the billings \n12 \nfor black start and regulation service to the costs required to deliver those services is \n13 \nmeaningless. As the Commission has stated, the Grid Reliance Charge and thus the Grid \n14 \nReliance Charge Fixed Percentage Allocator is a function of the facilities and expenses \n15 \nrelated to the delivery of ancillary services; they are not associated with PJM’s billings for \n16 \nthe actual ancillary services.37 In short, Ms. Stadelmeyer does not justify the supposed \n17 \nrelationship between her sales ratio and the transmission cost of delivering ancillary \n18 \nservices.  For this reason, her alternative proposal is unreasonable.  \n19 \n20 \n36\nId. \n37\nOrder at P 183."},{"page":30,"startToken":8670,"endToken":8973,"text":"Exhibit No. PTO-0005 \nPage 30 of 31 \nQ. \nMs. Stadelmeyer also states that the proposed Grid Reliance Charge will shift costs \n1 \ninappropriately between classes because it will allow NITS customers to pay less than \n2 \nthey currently do for a superior product compared to either Firm Contract Demand \n3 \nService or Non-Firm Contract Demand Service. Do you agree? \n4 \nA. \n[Blazunas] No. Ms. Stadelmeyer bases her statement on two erroneous arguments. First, \n5 \nshe argues that the proposed Grid Reliance Charge calculation and credit allocation process \n6 \nresult in subsidies from Non-Firm Contract Demand Service customers to customers \n7 \nreceiving service via NITS.38 Her characterization of the bill credits that flow from Non-\n8 \nFirm Contract Demand Service to both NITS and Firm Contract Demand Service \n9 \ncustomers, however, is inaccurate. The bill credits are not subsidies but instead represent \n10 \noffsets that reduce the amount paid by firm customers (i.e., customers receiving service \n11 \neither through NITS or Firm Contract Demand Service) for the firm transmission service \n12 \nthey receive. This is entirely appropriate. Rates are designed to recover the fixed costs of \n13 \nbuilding and maintaining the system so as to provide service to firm customers and so the \n14 \nrevenues received from Non-Firm Contract Demand Service, which is only provided in \n15 \ninstances where it can be accommodated by the system and is interruptible, are used to \n16 \noffset those fixed costs.  \n17 \nSecond, Ms. Stadelmeyer argues that the proposed Grid Reliance Charge \n18 \ncalculation and credit allocation also result in transmission charges that are not \n19 \ncommensurate with the benefits received by different types of customers.39 In particular, \n20 \nshe takes issue with the application of the proposed Grid Reliance Charge to Non-Firm \n21 \n38\nStadelmeyer Affidavit at 8:8-10.  \n39\nId. at 8:10-11."},{"page":31,"startToken":8973,"endToken":9154,"text":"Exhibit No. PTO-0005 \nPage 31 of 31 \nContract Demand Service when no service or only de minimis service is taken.40 According \n1 \nto Ms. Stadelmeyer, the current proposed Grid Reliance Charge calculation and application \n2 \ndoes not accurately reflect the benefits received by Non-Firm Contract Demand Service \n3 \ncustomers,41 which she asserts are limited to black start and regulation services only.42 This \n4 \nassertion, however, fails to reflect the operational and reliability benefits a customer \n5 \nreceives from a connection to the grid. These grid benefits include delivering ancillary \n6 \nservices and a suite of essential reliability services, such as frequency support, inertia, \n7 \nvoltage stability, fault current capability, ride-through and protection coordination, \n8 \nand providing sufficient short-circuit capability. As discussed above, the proposed Grid \n9 \nReliance Charge methodology results in a just and reasonable rate that appropriately \n10 \nreflects the value of these benefits.  \n11 \nQ. \nDoes this complete your testimony at this time? \n12 \nA. \n[Blazunas, Schafer, and Hammer] Yes. \n13 \n40\nId. at 9:2-5.  \n41\nId. at 9:4-5. \n42\nId. at 10:6-9."},{"page":32,"startToken":9154,"endToken":9298,"text":"UNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\nP.ll\\,f Irrtercontrection. I-.L.C.. et ul\nDocket No. EL25-4q-000\nL)ocket No. EL25-,-tq-00 i\nl.arge Loads Co-Located at Generating Facilities\nConstellation F.nergv Generation. LLC\n\\.\nP\"l M Interconnectior.r\" I.. L.Cl.\n(Consolidated)\nDECLARATION OF PETER BLAZUI{AS\nI deposc and state under penaltl, of perjun' that the fbregoing exhihits \\\\ere preparecl c-,r\nassembled by' rne or under m-v direction. and that I have read the foregoing questions and ansr,vers\niabeled as m\\ testimonl,: that if asked the same questions my ans\\&iers in response lr,oul,l be as\nshor,vn: and that the facts contained in mv ans\\tr-ers are true to the best ol' mv knor,r,ledge.\ninfbrmation. and beliel.\nApril 24.2\n)\n)\n)\n)\n)\n)\n)\n)\nDockel No. AD24-11-000\nDccket }io. EL2--s -2 0-000"},{"page":33,"startToken":9298,"endToken":9298,"text":""},{"page":34,"startToken":9298,"endToken":9420,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al.   \n \n)  \nDocket No. EL25-49-000 \n \n \n \n \n \n \n \n)  \nDocket No. EL25-49-001 \n \n \n \n \n \n \n \n) \nLarge Loads Co-Located at Generating Facilities  \n) \nDocket No. AD24-11-000 \n \n \n \n \n \n \n \n) \nConstellation Energy Generation, LLC  \n \n)  \nDocket No. EL25-20-000 \nv.  \n \n \n \n \n \n) \nPJM Interconnection, L.L.C.   \n \n \n)  \n(Consolidated) \n \n \nDECLARATION OF HANHAN HAMMER \n \n \nI depose and state under penalty of perjury that the foregoing exhibits were prepared or \nassembled by me or under my direction, and that I have read the foregoing questions and answers \nlabeled as my testimony: that if asked the same questions my answers in response would be as \nshown; and that the facts contained in my answers are true to the best of my knowledge, \ninformation, and belief. \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nApril 24, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":499,"startToken":0,"endToken":64},{"p":1,"at":499,"title":"I. INTRODUCTION","method":"printed heading","endPage":2,"endAt":537,"startToken":64,"endToken":278},{"p":2,"at":537,"title":"II. BACKGROUND","method":"printed heading","endPage":3,"endAt":577,"startToken":278,"endToken":548},{"p":3,"at":577,"title":"III. PURPOSE OF TESTIMONY","method":"printed heading","endPage":4,"endAt":243,"startToken":548,"endToken":933},{"p":4,"at":243,"title":"IV. FINANCIAL PENALTY PROPOSAL","method":"printed heading","endPage":16,"endAt":179,"startToken":933,"endToken":4548},{"p":16,"at":179,"title":"V. GRID RELIANCE CHARGE","method":"printed heading","endPage":34,"endAt":938,"startToken":4548,"endToken":9420}]}
