{"document":{"slug":"rec-20260430-0002","title":"Petition for Review filed in the U.S. Court of Appeals for the District of Columbia Circuit of American Transmission Systems, Incorporated, et al. re…","issued":"2026-04-30","accession":"20260430-0002","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"AMERICAN TRANSMISSION SYSTEMS, INCORPORATEDJERSEY CENTRAL POWER & LIGHT COMPANYMID-ATLANTIC INTERSTATE TRANSMISSION LLC ,KEYSTONE APPALACHIAN TRANSMISSION COMPANY ,THE POTOMAC EDISON COMPANY ,MONONGAHELA POWER COMPANY ,TRANS-ALLEGHENY INTERSTATE LINE COMPANY ,","kind":"filing","file":"sources/filings/text/20260430-0002_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260430-0002","tier":"record","sha256":"0a16be2a04786d4420fd6ea4f73840350e9ab968ab9360454f330c76af287eb3","pages":219,"tokens":66783,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},"pages":[{"page":1,"startToken":0,"endToken":9,"text":", \n.. \ntORIGINAL \n \n30 A S: 00 \n,3SION \nF,Lz5-qq-c)Oa"},{"page":2,"startToken":9,"endToken":126,"text":"IN THE UNITED STATES COURT OF APPEALS \nFOR THE DISTRICT OF COLUMBIA CIRCUIT \nAmerican Transmission Systems, \nIncorporated; Jersey Central Power & \nLight Company; Mid-Atlantic Interstate \nTransmission LLC; Keystone \nAppalachian Transmission Company; \nThe Potomac Edison Company; \nMonongahela Power Company; and \nTrans-Allegheny Interstate Line \nCompany, \nPetitioners, \nv. \nFederal Energy Regulatory Commission, \nRespondent. \nNo. 26 -\n \n \nPETITION FOR REVIEW \nPursuant to Section 313(b) of the Federal Power Act, 16 U.S.C. \n§ 8251(b), Federal Rule of Appellate Procedure 15(a), and D.C Circuit \nRule 15, Petitioners American Transmission Systems, Incorporated; \nJersey Central Power & Light Company; Mid-Atlantic Interstate \nTransmission LLC; Keystone Appalachian Transmission Company; The \nPotomac Edison Company; Monongahela Power Company; and Trans-\nAllegheny Interstate Line Company (collectively, the FirstEnergy"},{"page":3,"startToken":126,"endToken":336,"text":"Transmission Companies or FirstEnergy) hereby petition this Court for \nreview of the following orders of the Federal Energy Regulatory \nCommission: \nPJM Interconnection, L.L.C., Order on Show Cause Proceeding, \nDirecting Compliance Filings, Establishing Paper Hearings, and \nGranting in Part and Denying in Part Complaint, 193 FERC \n¶ 61,217, Docket Nos. EL25-49-000, EL25-49-001, AD24-11-000, \nEL25-20-000 (Dec. 18, 2025) (Attachment A). \nPJM Interconnection, L.L.C., Notice of Denial of Rehearing By \nOperation of Law and Providing for Further Consideration, 194 \nFERC ¶ 62,089, Docket Nos. EL25-49-002, AD24-11-001, EL25-20-\n001 (Feb. 20, 2026) (Attachment B). \nThe FirstEnergy Transmission Companies petition for review of these \norders on the grounds that the Commission's orders are arbitrary and \ncapricious, reflect a failure to engage in reasoned decision-making, are \nnot supported by substantial evidence, and are otherwise contrary to law. \nThe FirstEnergy Transmission Companies, as Indicated PJM \nTransmission Owners, were parties of record in the underlying Federal \nEnergy Regulatory Commission proceedings, and sought rehearing from \nthe December 18, 2025 Order under 16 U.S.C. § 8251(a). \nBecause the Commission denied that request for rehearing by \noperation of law on February 20, 2026, this petition for review is timely. \nVenue in this Court is proper under 16 U.S.C. § 8251(b) because the \n2"},{"page":4,"startToken":336,"endToken":503,"text":"FirstEnergy Transmission Companies are \"public utilities] to which the \nOrder relates.\"' \nRespectfully submitted, \nMorgan E. Parke \nAssociate General Counsel \nAmanda Parker \nCorporate Counsel \nFIRSTENERGY SERVICES COMPANY \n341 White Pond Dr. \nAkron, OH 44320 \n(330) 730-8558 \nmparke@firstenergycorp.com \naparker@firstenergycorp.com \n/s/ David M. Gossett  \nDavid M. Gossett \nMichael Kunselman \nDAVIS WRIGHT TREMAINE LLP \n1301 K Street, NW, Ste. 500-E \nWashington, DC 20005 \n(202) 973-4200 \ndavidgossett@dwt.com \nmichaelkunselman@dwt.com \nAttorneys for the FirstEnergy Transmission Companies \nApril 16, 2026 \n1 A petition challenging these same orders was recently filed in the Third \nCircuit. See PJM Industrial Customer Coalition v. FERC, No. 26-1840 \n(3d Cir.). We presume this case will be transferred in due course to the \nThird Circuit, but are filing in this Court because of the venue rules in \n16 U.S.C. § 8251(b). We also note that FERC has stated in its Feb. 20, \n2026 Notice that it is likely to issue another, substantive, order in \nresponse to the request for rehearing. \n3"},{"page":5,"startToken":503,"endToken":673,"text":"CORPORATE DISCLOSURE STATEMENT \nPursuant to Federal Rule of Appellate Procedure 26.1 and DC \nCircuit Rule 26.1, Petitioners state as follows: \n1. Petitioners Jersey Central Power & Light Co., The Potomac \nEdison Co., and Monongahela Power Co. are wholly owned subsidiaries \nof FirstEnergy Corporation, a publicly held company (ticker symbol FE \non the New York Stock Exchange). No publicly held company owns more \nthan 10% of FirstEnergy Corporation. \n2. Petitioners American Transmission Systems, Inc., Mid-Atlantic \nInterstate Transmission LLC, Keystone Appalachian Transmission Co., \nand Trans-Allegheny Interstate Line Co. are wholly owned subsidiaries \nof FirstEnergy Transmission, LLC (FET). The majority of FET is in turn \nowned by FirstEnergy Corporation. 49.9% of FET is owned by North \nAmerican Transmission Company II L.P., a controlled investment vehicle \nentity of Brookfield Infrastructure Partners (ticker symbol BIP on the \nNew York Stock Exchange). \nNo other publicly held corporation has a direct financial interest in \nthe outcome of the litigation through the FirstEnergy Transmission \nCompanies by reason of a franchise, lease, other profit sharing \n4"},{"page":6,"startToken":673,"endToken":704,"text":"agreement, insurance, or indemnity agreement, and there is no affiliated \nmaster limited partnership, real estate investment trust, or other \nsimilarly situated legal entity whose shares are publicly held or traded. \n5"},{"page":7,"startToken":704,"endToken":804,"text":"CERTIFICATE OF SERVICE \nPursuant to Rules 15(c) and 25(c) of the Federal Rules of Appellate \nProcedure, I hereby certify that I have this 16th day of April, 2026, \ncaused to be served copies of the foregoing Petition for Review and \nCorporate Disclosure Statement by first class mail to: \nDebbie-Anne A. Reese, Secretary \nFederal Energy Regulatory Commission \n888 First Street, NE \nWashington, DC 20426 \nRobert Solomon, Solicitor \nFederal Energy Regulatory Commission \n888 First Street, NE \nWashington, DC 20426 \nand by email on all parties on the Commission's service lists for Docket \nNos. EL25-49, AD24-11, and EL25-20. (Attachment C). \n6"},{"page":8,"startToken":804,"endToken":844,"text":"ATTACHMENT A \nPJM Interconnection, L.L. C., Order on Show Cause \nProceeding, Directing Compliance Filings, Establishing \nPaper Hearings, and Granting in Part and Denying in Part \nComplaint, 193 FERC ¶ 61,217, Docket Nos. EL25-49-000, \nEL25-49-001, AD24-11-000, EL25-20-000 (Dec. 18, 2025)"},{"page":9,"startToken":844,"endToken":1030,"text":"193 FERC ¶ 61,217 \nUNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \nBefore Commissioners: Laura V. Swett, Chairman; \nDavid Rosner, Lindsay S. See, \nJudy W. Chang, and David LaCerte. \nPJM Interconnection, L.L.C. \nDocket Nos. EL25-49-000 \nAllegheny Electric Cooperative, Inc. \nEL25-49-001 \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. \nAEP Kentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company"},{"page":10,"startToken":1030,"endToken":1265,"text":"Docket No. EL25-49-000, et al. \n2 \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public Utilities, \nDivision of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \nLarge Loads Co-Located at Generating Facilities \nAD24-11-000 \nConstellation Energy Generation, LLC \nEL25-20-000 \n(Consolidated) \nv. \nPJM Interconnection, L.L.C. \nORDER ON SHOW CAUSE PROCEEDING, DIRECTING COMPLIANCE FILINGS, \nESTABLISHING PAPER HEARING, AND GRANTING IN PART AND DENYING \nIN PART COMPLAINT \n(Issued December 18, 2025) \n1. \nOn March 24, 2025, PJM Interconnection, L.L.C. (PJM) and the PJM transmission \nowners filed answers in Docket No. EL25-49-000, to comply with the Commission's \nFebruary 20, 2025 order establishing a show cause proceeding, under section 206 of the \nFederal Power Act (FPA).' The Show Cause Order directed PJM and the transmission \nowners to either: (1) show cause as to why the Open Access Transmission Tariff \n(OATT), the Amended and Restated Operating Agreement of PJM, and the Reliability \nAssurance Agreement Among Load Serving Entities in the PJM Region (the Tariff) \nremains just and reasonable and not unduly discriminatory or preferential without \nPJM Interconnection, L.L.C., 190 FERC ¶ 61,115 (2025) (Show Cause Order)."},{"page":11,"startToken":1265,"endToken":1742,"text":"Docket No. EL25-49-000, et al. \n3 \nprovisions addressing with sufficient clarity or consistency the rates, terms, and \nconditions of service that apply to Co-Location Arrangements;2  or (2) explain what \nchanges to the Tariff would remedy the identified concerns if the Commission were to \ndetermine that the Tariff has in fact become unjust and unreasonable or unduly \ndiscriminatory or preferential and, therefore, proceeds to establish a replacement Tariff. \nThe Show Cause Order consolidated the new show cause proceeding with a pending \ncomplaint proceeding in Docket No. EL25-20 involving Co-Located Load.3 \n2. \nAs discussed below, we fmd that PJM's Tariff is unjust and unreasonable because \nit does not contain provisions addressing with sufficient clarity or consistency the rates, \nterms, and conditions of service that apply to generators serving Co-Located Load and \nEligible Customers taking transmission service on behalf of Co-Located Load.4 \nSpecifically, we fmd that PJM's Tariff is unjust and unreasonable because it does not \ninclude types of transmission service that reflect Eligible Customers taking service on \nbehalf of Co-Located Loads that are willing and able to limit their use of the transmission \nsystem under certain conditions. We direct PJM to file, within 60 days of the date of \nissuance of this order, a compliance filing to revise its Tariff to set forth specific terms \nand conditions that an Interconnection Customer' in PJM seeking to serve \n2  The Show Cause Order defined Co-Location Arrangements as referring to both \nthe Co-Located Load and the associated generator. Id. P 3 & n.4. \n3  The Show Cause Order defined Co-Located Load as a \"configuration [that] \nrefers to end-use customer load that is physically connected to the facilities of an existing \nor planned Customer Facility on the Interconnection Customer's side of the Point of \nInterconnection to the PJM Transmission System.\" Id. \n4  The PJM Tariff defines an Eligible Customer as (1) any electric utility or any \nperson generating electric energy for sale for resale, but with respect to transmission \nservice that the Commission is prohibited from ordering by section 212(h) of the Federal \nPower Act, such entity is eligible only if the service is provided pursuant to a state \nrequirement that the Transmission Provider or Transmission Owner offer the unbundled \ntransmission service, or pursuant to a voluntary offer of such service by a Transmission \nOwner or (2) any retail customer taking unbundled transmission service pursuant to a \nstate requirement that the Transmission Provider or a Transmission Owner offer the \ntransmission service, or pursuant to a voluntary offer of such service by a Transmission \nOwner. PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions - E-F (41.0.0). An Eligible \nCustomer may include but is not limited to electric utilities and power marketers. \n5  PJM defines Interconnection Customer as a Generation Interconnection \nCustomer and/or a Transmission Interconnection Customer. PJM, Intra-PJM Tariffs, \nOATT, § I.1 Defmitions - I - J - K (15.0.0)"},{"page":12,"startToken":1742,"endToken":2204,"text":"Docket No. EL25-49-000, et al. \n4 \nCo-Located Load must follow in order to effectuate a Co-Location Arrangement. We \nalso direct PJM to file, within 30 days of the date of issuance of this order, a compliance \nfiling to revise its Tariff to make clear how Interconnection Customers can make use of \nprovisional interconnection service, the ability to request interconnection service below \nnameplate capacity, the potential to accelerate the interconnection process under certain \ncircumstances, and surplus interconnection service to interconnect new generating \nfacilities seeking to serve Co-Located Load. In addition, we direct PJM to modify its \nTariff to require that the Eligible Customer taking transmission service on behalf of the \nCo-Located Load takes one of three transmission services: (1) Network Integration \nTransmission Service (NITS), (2) a new Firm Contract Demand transmission service, or \n(3) a new Non-Firm Contract Demand transmission service.' We establish a paper \nhearing to determine the just and reasonable rates, terms, and conditions for these new \ntransmission services. We further find that the Behind the Meter Generation (BTMG) \nrules in PJM's Tariff are no longer just and reasonable because loads with BTMG are not \nfully accounted for in resource adequacy planning and shift costs onto other transmission \ncustomers contrary to the Commission's cost causation principles. We therefore direct \nPJM to revise its Tariff to revise the BTMG rules and to implement a transition process \nfor existing BTMG participants, as described below. We also grant in part and deny in \npart Constellation Energy Generation, LLC's (Constellation) complaint against PJM in \nDocket No. EL25-20-000. Finally, we require PJM to submit an informational report \nwithin 30 days of the date of issuance of this order. \nI. \nBackground \nA. \nShow Cause Order \n3. \nThe Show Cause Order defined Co-Located Load as a \"'configuration [that] refers \nto end-use customer load that is physically connected to the facilities of an existing or \nplanned Customer Facility on the Interconnection Customer's side of the Point of \nInterconnection to the PJM Transmission System.\"' As the Commission did in the Show \n6  Capitalized terms used but not otherwise defined in this order have the meanings \nascribed to them in the Tariff. \nShow Cause Order, 190 FERC ¶ 61,115 at P 3 & n.4. We note that, in the Show \nCause Order, the Commission adopted this definition from the Guidance Document that \nPJM developed on Co-Located Load. See id. As noted below, PJM rescinded this \ndocument pending Commission guidance in this docket. PJM March 24 Answer at 33. \nPrior to PJM's transition to its new interconnection process, PJM used the terms \nInterconnection Customer and Generation Interconnection Customer. PJM's Tariff \ndefines Generation Interconnection Customer as \"an entity that submits \nan Interconnection Request to interconnect a new generation facility or to increase the \ncapacity of an existing generation facility interconnected with the Transmission"},{"page":13,"startToken":2204,"endToken":2583,"text":"Docket No. EL25-49-000, et al. \n5 \nCause Order, when referring to both the Co-Located Load and the associated generator, \nwe will use the term Co-Location Arrangement. \n4. \nAs explained in the Show Cause Order, Co-Location Arrangements are becoming \nincreasingly common in PJM and, since the issuance of the Show Cause Order, entities \ncontinue to raise issues involving Co-Location Arrangements with the Commission.8  The \nCommission instituted the Show Cause Order to determine whether the Tariff remains \njust and reasonable and not unduly discriminatory or preferential.' The Commission set \nforth, in the Show Cause Order, the principles relating to the Commission's jurisdiction \nover the matters relevant to Co-Location Arrangements.10  The Commission also made \nseveral preliminary findings about the justness and reasonableness of the Tariff. First, \nthe Commission found that the Tariff appears to be unjust and unreasonable or unduly \ndiscriminatory or preferential because it does not contain provisions addressing with \nsufficient clarity or consistency the rates, terms, and conditions of service that apply to \nCo-Location Arrangements.\" In addition, the Commission preliminarily found that this \nSystem in the PJM Region.\" PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions — G - H \n(9.0.1) (defining Generation Interconnection Customer). The Tariff's new rules for \ngeneration interconnection, effective January 3, 2023, utilize the terms Project Developer \nand Generation Project Developer. PJM's Tariff defines Generation Project Developer as \n\"an entity that submits a Generation Interconnection Request to interconnect a new \ngeneration facility or to increase the capacity of an existing generation facility \ninterconnected with the Transmission System in the PJM Region.\" PJM, Intra-PJM \nTariffs, OATT, § VIII.A 400 Defmitions G (0.1.0) (defining Generation Project \nDeveloper). For ease of simplicity in this order, and consistent with the Show Cause \nOrder, the Commission will use the term Interconnection Customer to refer to both the \nPJM Tariff definitions of Generation Interconnection Customer and Generation Project \nDeveloper. \n8  See, e.g., PJM Interconnection, L.L. C., 191 FERC ¶ 61,112 (2025) (accepting \nnecessary studies agreement). The Show Cause Order consolidated the new show cause \nproceeding with a pending complaint proceeding in Docket No. EL25-20-000 involving \nCo-Located Load. We address that complaint below. See discussion infra Part IV.B.7. \n9  Show Cause Order, 190 FERC ¶ 61,115 at P 2. \n1° Id. P 66. \n\" Id. P 74."},{"page":14,"startToken":2583,"endToken":2958,"text":"Docket No. EL25-49-000, et al. \n6 \nlack of applicable Tariff provisions raises the potential for undue discrimination or \npreferential treatment.12 \n5.\nAs to specific concerns raised regarding Co-Location Arrangements, the \nCommission found that the Tariff may be unjust, unreasonable, unduly discriminatory, or \npreferential as it does not specify the transmission service that Co-Location \nArrangements must take, if any, or otherwise provide a process to ensure that Co-\nLocation Arrangements are paying for the benefits they receive from the transmission \nsystem consistent with the cost causation principle, which provides that all Commission-\njurisdictional rates and charges must \"reflect to some degree the costs actually caused by \nthe customer who must pay for them,\" and that costs must be allocated in a manner that is \nat least roughly commensurate with the benefits that entity receives.13  The Commission \nalso found that the absence of rates, terms, and conditions of interconnection service \nspecific to Co-Location Arrangements, and, especially regarding studies of the impacts of \nthose arrangements, may render the Tariff unjust and unreasonable or unduly \ndiscriminatory or preferential.14  Moreover, the Commission found that the absence of \nrates, terms, and conditions governing the use and sale of ancillary services and black \nstart services by Co-Location Arrangements may render the Tariff unjust and \nunreasonable or unduly discriminatory or preferentia1.15 \n6.\nThe Commission also expressed concern about the reliability and resource \nadequacy implications of Co-Location Arrangements.16  The Commission stated that it \nwas concerned that the Tariff may be unjust and unreasonable and unduly discriminatory \nor preferential insofar as it lacks rules necessary to provide PJM with sufficient \ninformation to perform appropriate analysis to ensure reliable system operations given \nthe characteristics of Co-Location Arrangements. In response to concerns about the \nmarket and price impacts of Co-Location Arrangements, the Commission recognized that \nthese concerns are not necessarily unique to Co-Location Arrangements and that \nsignificant load growth more generally may raise many of the same concerns.17  The \n12  Id. P 75. \n13  Id. PP 74-78 (citing Midwest ISO Transmission Owners v. FERC, 373 F.3d \n1361, 1368 (D.C. Cir. 2004); Ill. Com. Comm'n v. FERC, 576 F.3d 470, 476 (7th Cir. \n2009)). \n14  Id. P 79. \nj5  Id. P 82. \n/d. P 83. \n17  Id. PP 84-85."},{"page":15,"startToken":2958,"endToken":3379,"text":"Docket No. EL25-49-000, et al. \n7 \nCommission stated that, while both Co-Located Load and non-co-located load may have \nsimilar resource adequacy impacts, the speed at which Co-Located Load can be added to \nthe grid may pose particular resource adequacy challenges, especially if Co-Location \nArrangements are not adequately and transparently reflected in existing resource \nadequacy planning mechanisms, e.g., the PJM capacity market.18 \nB. \nBehind the Meter Generation \n7.\nRegarding PJM's BTMG rules (which we and commenters sometimes refer to as \nretail BTMG),19  the Tariff allows load serving entities (LSEs) that provide service to \nloads with qualifying BTMG to reduce their costs by netting output from BTMG in the \ncalculation of their peak demand for the purpose of determining NITS charges.2° The \nCommission has previously found that BTMG netting is just and reasonable because it \nwould encourage load response during periods when generation or transmission are in \nshort supply and prices are rising.21  The Commission has also found that \"charges for \nuse of PJM's transmission system should be allocated to network customers based on a \nnetwork customer's actual use of PJM's system, consistent with the principle of cost \ncausation.\"22 \n8.\nTransmission rates for NITS and Point-to-Point Service (PTPS) are based on \ntransmission formula rates filed by the transmission owners. Transmission formula rates \ncapture utilities' cost of providing transmission service and include the cost of operating \nand maintaining the transmission facilities, depreciation expenses, taxes, and a rate of \n18 Id. P 85. \n19  PJM defines BTMG as \"a generation unit that delivers energy to load without \nusing the Transmission System or any distribution facilities (unless the entity that owns \nor leases the distribution facilities has consented to such use of the distribution facilities \nand such consent has been demonstrated to the satisfaction of the Office of the \nInterconnection); provided, however, that [BTMG] does not include (i) at any time, any \nportion of such generating unit's capacity that is designated as a Generation Capacity \nResource; or (ii) in an hour, any portion of the output of such generating unit that is sold \nto another entity for consumption at another electrical location or into the PJM \nInterchange Energy Market.\" PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions — A-B \n(21.0.0) (defming BTMG). \n20  See PJM Interconnection, L.L.C., 107 FERC ¶ 61,113, at P 6 (2004); PJM, \nIntra-PJM Tariffs, OATT, § III.34.2 Netting of Behind the Meter Generation (0.0.0). \n21  PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 at PP 27-28. \n22 Id. P 28."},{"page":16,"startToken":3379,"endToken":3784,"text":"Docket No. EL25-49-000, et al. \n- 8 - \nreturn for the utility. The rates also include the costs of any Network Upgrades needed to \nensure ongoing reliability or deliverability of generation to Network Load,23  including \nplanned regional transmission upgrades. Transmission rates are charged based on \ndemand coincident with the annual peak(s) of the zone.24  For loads using BTMG, only \nthe net demand is used for billing, but for loads not relying on BTMG, transmission \ncharges are based on their gross use of the transmission system at the time of the \ncoincident peak.25 \n9.\nRecognizing that Co-Location Arrangements may interact with the transmission \nsystem in a similar way to BTMG arrangements, the Show Cause Order sought briefing \non how any proposed replacement rate adopted in this proceeding would interact with \nexisting BTMG arrangements.' \nC. \nEligible Customer \n10.\nIn Order No. 888 and its progeny, the Commission established specific criteria for \npotential transmission customers to be eligible to receive non-discriminatory open access \ntransmission service.' Consistent with the Commission's findings about who is an \n23  PJM defines Network Load as the load that a Network Customer designates for \nNITS, including all load served by the output of any Network Resources designated by \nthe Network Customer. See PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions - L-M-N \n(51.0.1) (defming Network Load). \n24  See id. § III.34.1 Monthly Demand Charge (1.0.0). PJM's 22 transmission \nzones represent the geographical areas served by individual PJM transmission owners. \nSee id., attach. J (8.0.0). \n25  See id. § III.34.2 Netting of Behind the Meter Generation (0.0.0). \n26  Show Cause Order, 190 FERC ¶ 61,115 at P 88, pt. a.iv (\"parties may also ... \nconsider how any proposed replacement rate would interact with [BTMG] \narrangements\"). \n27  See, e.g., Recovery of Stranded Costs by Pub. Utils. and Transmitting Utils., \nOrder No. 888, FERC Stats. & Regs. ¶ 31,036 (1996) (cross-referenced at 75 FERC \n¶ 61,080), order on reh'g, Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,214 \n(modifying definition of Eligible Customer) (cross-referenced at 78 FERC ¶ 61,220), \norder on reh'g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), order on reh'g, Order \nNo. 888-C, 82 FERC ¶ 61,046 (1998), aff'd in relevant part sub nom. Transmission \nAccess Pol'y Study Grp. v. FERC, 225 F.3d 667 (D.C. Cir. 2000) (TAPS), affd sub nom. \nNew York v. FERC, 535 U.S. 1 (2002)."},{"page":17,"startToken":3784,"endToken":3975,"text":"Docket No. EL25-49-000, et al. \n9 \neligible customer in the pro forma tariff, PJM's Tariff currently defines an Eligible \nCustomer as: \n(i)Any electric utility ... or any person generating electric \nenergy for sale for resale ... However, with respect to \ntransmission service that the Commission is prohibited from \nordering by Section 212(h) of the Federal Power Act, such \nentity is eligible only if the service is provided pursuant to a \nstate requirement that the Transmission Provider or \nTransmission Owner offer the unbundled transmission \nservice, or pursuant to a voluntary offer of such service by a \nTransmission Owner. \n(ii)Any retail customer taking unbundled transmission service \npursuant to a state requirement that the Transmission Provider \nor a Transmission Owner offer the transmission service, or \npursuant to a voluntary offer of such service by a Transmission \nOwner, is an Eligible Customer under the Tariff....28 \n11. \nThis definition forms the basis for PJM's existing transmission cost allocation \napproach, through which each Eligible Customer is billed for the charges associated with \nthe transmission services used to serve its load. \n28  PJM, Intra-PJM Tariffs, OATT, § I.1 Defmitions - E-F (41.0.0) (defining \nEligible Customer)."},{"page":18,"startToken":3975,"endToken":4357,"text":"Docket No. EL25-49-000, et al. \n- 10 - \nII. \nPJM's Answer to Show Cause Order and Responsive Pleadings\" \nA. \nPJM's Options for Co-Location Arrangements \n12.\nPJM states that its existing Tariff remains just and reasonable \"although \nimprovements and clarifications may be appropriate based on Commission guidance.\"3° \nAs further detailed below, PJM discusses eight pathways to facilitating co-location \nservice, three of which exist in the current Tariff and five of which would be new. PJM \nsupports only five of the eight options and identifies problems with the remaining three. \nPJM requests that, if \"the record supports consideration of additional options,\" the \nCommission issue detailed guiding principles that PJM can operationalize in an FPA \nsection 205 filing.31 \n13.\nPJM notes that the options are not mutually exclusive and instead may be used \nseriatim or concurrently. PJM further clarifies that it does not consider all of the options \n\"equivalent, desirable, or even necessarily workable.\"32  For example, PJM argues that \nstate law may limit the availability of various options. PJM also notes that six of its \noptions are premised on large Co-Located Load being Network Load, where the large \nCo-Located Load would realize significant benefits. PJM also argues that Co-Location \nArrangements implicate several different, interrelated study frameworks and cost \nallocation constructs. PJM further notes that there is a resource adequacy dimension to \nCo-Location Arrangements and explains that three of its potential new options relate to \nadding additional supply and operational flexibility. \n14.\nTurning to the eight options, first, PJM states that new loads may interconnect as \ntraditional Network Load that takes NITS in accordance with traditional load \n29  The appendix lists the entities who intervened and filed responsive pleadings in \nDocket No. EL25-49-000, along with short names. On March 21, 2025, then-Chairman \nChristie responded individually to comments filed with the Commission by Pennsylvania \nGovernor Josh Shapiro of Pennsylvania on October 4, 2024, and by Virginia Governor \nGlenn Youngkin on November 1, 2024, respectively, on data centers and Co-Located \nLoad. On April 2, 2025, then-Chairman Christie responded to a letter filed on \nFebruary 19, 2025, by United States Senators Chris Van Hollen, Cory A. Booker, \nMark Kelly, and Tim Kaine inquiring about a technical conference addressing data \ncenters and other large new loads. \n3° PJM March 24 Response at 4. \n31  Id. \n32  Id at 5."},{"page":19,"startToken":4357,"endToken":4784,"text":"Docket No. EL25-49-000, et al. \n- 11 - \ninterconnection processes (PJM option 1).33  PJM states that the load uses and pays for \nNITS, energy, ancillary services, and capacity. PJM explains that the load has a separate \npoint of interconnection with the grid and thus need not be at the same site as the \ngenerator. PJM supports this option. \n15.\nSecond, PJM explains that load could co-locate with generation behind the same \npoint of interconnection (PJM option 2).34  PJM states that, in this configuration, the load \nis Network Load and the generator is a Capacity Resource, each separately metered, with \nno change to the generator's Capacity Interconnection Rights. PJM states that the load \nuses and pays for NITS, energy, ancillary services, and capacity. PJM also explains that \nthe large load is studied and could be connected to the grid under existing load \ninterconnection processes. PJM supports this option. \n16.\nThird, PJM states that a Network Load could co-locate with generation and then \nuse PJM's BTMG rules under which the load would be charged for its net use of the grid, \nafter deducting BTMG (PJM option 3).35  PJM states that the load uses NITS, energy, \nancillary services, and capacity and pays for these services based on the net peak \nwithdrawal quantity. PJM does not support this option, explaining that historically, \nBTMG has supported relatively small loads, not on the scale of large data centers. PJM \nfurther states that charging load for its net use of the grid under the BTMG rules may not \ncapture the costs caused by co-located data center arrangements because such \narrangements could avoid all costs by netting to zero if the entire data center load is \nsupplied by the associated generator.36 \n17.\nFourth, turning to new options not currently in the existing Tariff, PJM explains \nthat a possible Co-Located Load configuration could include a load located behind a \ngenerator, with system protection facilities in place to prevent the delivery of system \nenergy to serve the load (PJM option 4). PJM states that \"in this configuration, load is \nnot Network Load unless designated by the customer subject to applicable state law.\"37 \nPJM explains that the load is located behind the Point of Change of Ownership between \nthe transmission owner and generator, and system protection facilities are installed to \nprevent delivery of system energy from the grid if the generator goes offline. PJM \nclarifies that this configuration should not be considered \"fully\" or \"wholly\" isolated, \n33  Id. at 10. \n34  Id. at 11. \n\" Id. at 12-13. \n36  Id. at 36. \n37  Id. at 14."},{"page":20,"startToken":4784,"endToken":5197,"text":"Docket No. EL25-49-000, et al. \n- 12 - \narguing that it is inconsistent with engineering and economic principles.38  PJM argues \nthat the configuration relies on and takes grid services (e.g., ancillary services) and \nshould pay its fair share of those charges. PJM does not support this option, raising \nconcerns that this configuration carries operational risk because it depends on a \nprotection system to support reliability, and, if the protection system fails, the large load \nwould instantly take significant energy from the system. PJM argues that, though a few \nsuch configurations may seem tolerable, the risk increases with large quantities of such \nconfigurations. \n18.\nFifth, PJM identifies a new option that is the same configuration as PJM option 4, \nbut the load can receive back-up service from the grid with PJM's advanced authorization \n(PJM option 5).39  PJM clarifies that this option requires real-time, bespoke operational \ndecision-making to determine if load can continue to be served. PJM explains that \napproval for back-up service is subject to condition, including withdrawing or \nwithholding authorization if needed to protect grid reliability or integrity. PJM does not \nsupport this option, because, like PJM option 4, the load is not designated as Network \nLoad, which concerns PJM because of the dependence on protection schemes.\" \n19.\nSixth, PJM discusses a new option that would allow new large Network Load \nadditions to bring additional generation that could serve as a Capacity Resource (PJM \noption 6).4' The additional generation, PJM clarifies, could take different forms, such as \nnew incremental generation, generation that has or is scheduled to deactivate, or existing \ngeneration so long as the generator is available to PJM as a Capacity Resource if it clears \nin the capacity market. PJM indicates that incentives could be explored to offer faster \nprocessing of generation that enters the queue under this option, such as (1) accelerating \ninterconnection studies of new generation, (2) enhancing existing provisional \ninterconnection service options at discrete study points to accelerate in a \nnon-discriminatory manner the ability of new generation to achieve commercial \noperation, and (3) states assuming cost responsibility for transmission upgrades in the \nRegional Transmission Expansion Plan pursuant to the State Agreement Approach to \npromote state policies to encourage large load development. PJM clarifies that a physical \nco-location configuration can be used, but the new generation may additionally enter a \nbilateral agreement with the load for financial or contractual purposes. PJM states that \n38  Id. \n39  Id. at 15. \n4° Id. at 39. \n41  Id. at 16-17."},{"page":21,"startToken":5197,"endToken":5594,"text":"Docket No. EL25-49-000, et al. \n- 13 - \nthis option would involve an interconnection study for the new generation resource. PJM \nsupports this option. \n20.\nSeventh, PJM discusses a new option that would allow a new large load to become \nNetwork Load at a potentially faster pace subject to the load electing a new transitional \nnon-capacity backed service offering (PJM option 7).42  PJM states that large loads would \nhave the option to be classified as a non-capacity backed load for a transitional period \nuntil any resource adequacy supply/demand imbalances associated with this load addition \nare addressed. Then, PJM explains, the load could assume full Network Load status. \nPJM states that, under this offering, the load would avoid capacity costs during the \ntransition period in return for its willingness to curtail. PJM indicates that variations of \nthis option could be explored to enhance resource adequacy and allow large loads to \nefficiently connect to the system through incentives to be flexible. PJM states that a \nphysical co-location configuration can be used but all load would be in front of the meter. \nPJM supports this option. \n21.\nEighth, PJM discusses a new option where Co-Located Load that is Network Load \nmay be able to participate in the PJM wholesale markets as a Demand Response resource \n(PJM option 8).43  PJM explains that this option already exists in PJM but there could be \nan additional review of Demand Response rules or review of emissions restrictions on \nback-up generation to enhance this option, potentially requiring Tariff revisions. PJM \nstates that back-up generation provides a way to serve the Co-Located Load when asked \nto curtail for Demand Response. PJM contends that this option may enhance resource \nadequacy under tight system conditions in the short term. PJM supports this option. \nB. \nGeneral \n1. \nPJM's March 24 Response \n22.\nPJM argues that the Tariff remains just and reasonable.44  PJM argues that its \nTariff is not unjust and unreasonable merely because it does not provide alternative \npathways to accommodate a business goal. However, as noted, PJM discusses \neight pathways, acknowledging that \"clarifications and enhancements could well be in \norder given this is an evolving area and Tariff provisions did not contemplate the type of \narrangements at issue in this docket or their implications.\"45  PJM notes that it rescinded \n42  Id at 18-19. \n43  Id. at 20. \n44  Id. at 32-34. \n45  Id. at 32."},{"page":22,"startToken":5594,"endToken":5955,"text":"Docket No. EL25-49-000, et al. \n- 14 - \nits Guidance Document46  pending Commission guidance in this docket about a \nCommission-approved path forward. \n2. \nTransmission Owners' March 24 Responses47 \n23. \nGenerally, Indicated Transmission Owners contend that no Tariff changes are \nneeded.48  Indicated Transmission Owners argue that the Tariff addresses and \nencompasses Co-Location Arrangements. According to Indicated Transmission Owners, \nall load in PJM must be designated as Network Load and served by a Network Customer \n(or take PTPS), thereby ensuring this load pays its fair share of transmission costs. AES \nOhio also argues that the PJM Tariff is just and reasonable regarding service to \nCo-Located Load taken under NITS or Firm PTPS, but acknowledges there may also be \nalternative reasonable transmission service arrangements.49 \n3. \nReply Comments \n24. \nSome parties agree with PJM and transmission owners that the Tariff remains just \nand reasonable, arguing, for example, that it ensures visibility into Co-Located Loads, \nthat Co-Located Load pays its fair share of costs, and that the grid can continue to rely on \nexisting generation resources.5° However, a number of parties disagree with PJM and \ntransmission owners, arguing that PJM's Tariff is unjust, unreasonable, and unduly \ndiscriminatory and preferential as to Co-Located Load because the Tariff lacks clarity \nand does not provide for rates, terms, and conditions applicable to Co-Location \n46  PJM developed a Guidance Document on Co-Located Load, first posted in \n2024, which includes non-binding guidance for generators and loads seeking to enter into \nCo-Location Arrangements in PJM. PJM, PJM Guidance on Co-Located Load (Mar. 22, \n2024) (updated Apr. 17, 2024), https://www.pjm.com/-/media/DotCom/markets-\nops/rpm/rpm-auction-info/pjm-guidance-on-co-located-load.pdf. \n47 Apart from the arguments summarized below, several transmission owners \nsubmitted responses that took no position on the issues raised in the Show Cause Order, \nspecifically Allegheny Electric Cooperative, Inc., NextEra Energy Transmission \nMidAtlantic, Inc., and Silver Run Electric, LLC. \n48  Indicated Transmission Owners March 24 Response, attach. A at 2-3. \n49  AES Ohio March 24 Response at 1. \n\" See Buckeye April 23 Reply Comments at 3, 5; Glatz/Silverman April 23 Reply \nComments at 4; NOVEC April 23 Reply Comments at 8, 10; NREMC April 23 Reply \nComments at 4-6."},{"page":23,"startToken":5955,"endToken":6343,"text":"Docket No. EL25-49-000, et al. \n- 15 - \nArrangements.\" Other parties allege the Tariff is unclear and/or urge the Commission to \nprovide guidance on Co-Location Arrangements.52  Indicated Transmission Owners argue \nno party has shown the existing Tariff is unjust and unreasonable, and recent events \nindicate that existing types of service can be used.53 \nC. \nJurisdiction \n1. \nPJM's March 24 Response \n25.\nPJM contends that different state laws may impact the permissibility of certain \npotential Co-Location Arrangements.54  PJM explains that states in the PJM region \nassessed several decades ago whether to introduce competition for retail service. As to \nstates that did not pursue deregulation, PJM argues that the state's exclusive retail \nfranchise territory law may restrict non-franchised suppliers from serving Co-Located \nLoad. PJM further asserts that state laws in deregulated states may or may not impose \nlimitations on Co-Located Load suppliers, such as requiring load to be designated as \nNetwork Load or take a specific transmission service. \n26.\nPJM argues that the Show Cause Order did not capture some nuance regarding the \nCommission's jurisdiction.55  PJM asserts that, due to both federal- and state-level \nderegulation, there could be regulatory gaps with respect to Co-Location Arrangements. \nPJM cautions against overgeneralizing when characterizing what states may or may not \nregulate regarding Co-Location Arrangements. PJM asserts that state law does not \n51  See SEIA April 23 Reply Comments at 2, 5-6; CATF April 25 Reply Comments \nat 6; Constellation April 23 Reply Comments at 13-14; Antora April 23 Reply Comment \nat 2; EPSA/P3 April 23 Reply Comments at 9-12; Enchanted Rock April 23 Reply \nComments at 2; Mainspring April 23 Reply Comments at 2, 4; AEU April 23 Reply \nComments at 10. See also Joint Parties' April 22 Motion to Stay at 3. \n52  See Market Monitor April 23 Reply Comments at 2; BrightNight April 23 Reply \nComments at 3; Bloom April 23 Reply Comments at 2; DCC April 23 Reply Comments \nat 7; Industrials April 23 Reply Comments at 14. See also National Security Experts \nApril 22 Reply Comments at 1. \n53  Indicated Transmission Owners June 3 Answer at 3; Indicated Transmission \nOwners June 27 Answer at 2-3 (noting Talen's announcement that the co-location \narrangement between Talen and Amazon will transition to a front-of-the-meter \narrangement). \n54  PJM March 24 Response at 23, 26-27. \n55  Id. at 21, 27-29."},{"page":24,"startToken":6343,"endToken":6757,"text":"Docket No. EL25-49-000, et al. \n- 16 - \nnecessarily regulate companies making end-use sales, for example, in the case of \nindustrial customers' self-supply of electricity in Indiana. Moreover, PJM contends that, \nbased on its understanding of Pennsylvania law, a company agreeing to sell electricity to \na data center may not be subject to public utility regulation in that state. PJM alleges that \nNew Jersey has similarly declined to exercise its authority to regulate retail sales to large \nend users. \n27.\nPJM presents several arguments that the Commission has authority over \nCo-Location Arrangements pursuant to its jurisdiction under the FPA over transmission \nin interstate commerce.56  PJM states that, to adequately support a finding based on \ninterstate transmission jurisdiction, one can show that a utility's lines are indirectly \nconnected to the interstate grid. PJM argues that the Commission has jurisdiction \nregarding the transmission service associated with the ancillary services that Co-Location \nArrangements use because the data center in the arrangement will be interconnected to \nthe grid. PJM separately argues that the Commission's transmission jurisdiction is \nimplicated because the Commission has authority over interconnections to the grid, \nincluding modifications by the generator to add load. With respect to the Commission's \njurisdiction over wholesale sales in interstate commerce, PJM argues that it is \nincreasingly complicated to analyze such sales due to the interconnectivity of the grid, \ntechnological advancements, and industry deregulation, but suggests that some \nCo-Location Arrangements may involve Commission-jurisdictional sales for resale. \n2. \nTransmission Owners' March 24 Responses \n28.\nIndicated Transmission Owners state that they generally agree with the \njurisdictional principles outlined in the Show Cause Order.57  Indicated Transmission \nOwners argue that the Commission can set a transmission rate that Network Customers \nserving all Network Load must pay for services and associated charges, but how a state \nchooses to assign and allocate the recovery of the cost of that charge between individual \nretail customers or among classes of end-use load may vary, as long as there is no \ncost-trapping. Indicated Transmission Owners state they would welcome the \nCommission reaffirming that PJM generation interconnection procedures apply to the \ninterconnection of and service to generation, including generation with Co-Located Load, \nbut not to the load itself, which interconnects under state jurisdiction. \n29.\nAES Ohio argues that no changes are necessary to ensure clarity regarding the \naspects of service to Co-Location Arrangements that may be administered through the \n56 Id. at 30-31. \n57  Indicated Transmission Owners March 24 Response, attach. A at 1-2; AES Ohio \nMarch 24 Response at 1."},{"page":25,"startToken":6757,"endToken":7168,"text":"Docket No. EL25-49-000, et al. \n- 17 - \nTariff versus state jurisdictional retail tariffs.58  Indicated Transmission Owners state that \nthe Commission could clarify that generation interconnection agreements do not \"confer \nthe right to serve end-use retail load or the right of new load to take retail service at a \nspecific point or under particular rates\" as those rights are regulated under state law.59 \nAES Ohio and Indicated Transmission Owners state that, in general, the continued \nobligation, if any, of generation to serve classes of end-use customers to pay for that \ngeneration is a matter of state jurisdiction and concern.\" \n3. \nReply Comments \na. \nRequests to Clarify the Scope of Federal Jurisdiction \n30. \nSeveral parties contest that there is shared responsibility between states and the \nCommission with respect to service to Co-Located Load and generation61  and request that \nthe Commission clarify the scope of its jurisdiction. OPSI, NRDC, and Pennsylvania \nCommission request that the Commission affirm that the sale between a Co-Located \nLoad and a generator is a retail sale subject to state jurisdiction and that states also have \npower to regulate wholesale sales not in interstate commerce, as well as facilities used for \nthe generation and distribution of electricity.62  ELCON and Talen request that the \nCommission use this proceeding to clarify that the Commission generally has jurisdiction \nover the types of large-scale Co-Location Arrangements discussed in PJM's Answer to \nthe Show Cause Order.63  Talen also requests that the Commission clarify that the basis \nof the Commission's jurisdiction will vary based on the specifics of the Co-Location \nArrangement and confirm that the Commission's limited role is to ensure that the \nCo-Location Arrangement does not impair overall system reliability; that \ninterconnections between generators and the grid are safe and reliable; and that the rate \nS8  AES Ohio March 24 Response at 12. \n89  Indicated Transmission Owners March 24 Response, attach. A at 20-21. \n60 r la attach. A at 21-22; AES Ohio March 24 Response at 13. \n61  See AEU April 23 Reply Comments at 8; Talen April 23 Reply Comments at 9 \n(citing New York v. FERC, 535 U.S. at 20-24). \n62  OPSI April 23 Reply Comments at 6; NRDC April 23 Reply Comment at 2; \nPennsylvania Commission April 22 Reply Comments at 2-3 (citing Nat'l Ass 'n of Regul. \nUtil. Comm 'rs v. FERC, 964 F.3d 1177, 1187 (D.C. Cir. 2020)). \n63  ELCON April 23 Reply Comments at 4-5; Talen April 23 Reply Comments \nat 3."},{"page":26,"startToken":7168,"endToken":7536,"text":"Docket No. EL25-49-000, et al. \n- 18 - \nfor any service is reasonable.64  Talen argues that the Commission cannot favor one type \nof Co-Location Arrangement or configuration over another. \n31.\nMany parties commented on the scope of the Commission's authority over \nCo-Location Arrangements, but several disagree on the components that are subject to \nCommission oversight. California Utilities, EPSA/P3, AEU, and Talen agree with PJM \nthat the Commission has jurisdiction over the allocation of transmission, ancillary \nservices, and other related costs between customers using or benefiting from the \ntransmission system, but clarify that state or local regulators may choose to reallocate \nsuch costs in retail rates.65  EPSA/P3 qualifies its comments by noting that in states with \nretail choice, there is no nexus between state regulation and the transmission rates \nestablished by the Commission, such that only the Commission-approved transmission \nrate and interconnection procedures govern.66 \nb. \nAreas of Commission Jurisdiction \n32.\nSeveral parties support the Commission's exercise of jurisdiction over the taking \nof transmission service.67  Market Monitor and UCS argue that Co-Location \nArrangements are interconnected to the transmission grid and receive jurisdictional \nservice from jurisdictional transmission facilities.68  CATF argues that the Commission \nhas jurisdiction to require transmission tariff provisions for Co-Located Load because all \nco-located configurations receive essential services from the transmission grid, and \ntherefore, all rates, practices, and procedures involving such facilities must be just, \nreasonable, and not unduly discriminatory.69 \n33.\nTalen contends that if the load is not using any transmission network, \npoint-to-point, or ancillary services, then the basis of Commission jurisdiction is not that \n64  Talen April 23 Reply Comments at 3, 9-10 (citing 16 U.S.C. § 824d). \n65  California Utilities April 23 Reply Comments at 3-4. \n66 EPSA/P3 April 23 Reply Comments at 6-8. \n67  NOVEC April 23 Reply Comments at 8. \n68  Market Monitor April 23 Reply Comments at 13; UCS April 11 Reply \nComments at 16 (citing Show Cause Order, 190 FERC ¶ 61,115 at P 76 (\"The \nCommission has defined transmission service as the provision of `electric transmission, \nnetwork or point-to-point service, ancillary services or other methods of electric \ntransmission, or the interconnection with jurisdictional transmission facilities.'\")). \n69 CATF April 25 Reply Comments at 5."},{"page":27,"startToken":7536,"endToken":7897,"text":"Docket No. EL25-49-000, et al. \n- 19 - \nthe Co-Located Load itself takes a Commission-jurisdictional form of transmission \nservice but that the Interconnection Service Agreement (ISA) governing the Co-Location \nArrangement is jurisdictional.70  Talen contends that there may be situations in which \nCo-Located Load takes Commission jurisdictional transmission service. \n34.\nTalen also agrees with PJM that \"the Commission's jurisdiction over transmission \nservice in interstate commerce\" is \"necessarily implicated in matters relating to \nco-located load arrangements where generator interconnections are being modified,\" or \nwhere a generator's ISA contemplates a Co-Location Arrangement.\" California Utilities \ndisagree, arguing that the Commission has jurisdiction only over the wholesale generator \ninterconnection and cannot \"bootstrap such jurisdiction to dictate the terms and \nconditions of service to retail load.\"72  Talen asserts that Co-Location Arrangements may \nalso create different (or supplementary) bases for Commission jurisdiction either because \nsales are interstate sales or when they constitute sales for resale.73  Talen concludes that \nwhen the load has no grid connection, there can be no jurisdictional service. \n35.\nTalen argues, however, that the Commission should not condition its assertion of \njurisdiction on the assumption that Co-Located Loads always take \nCommission-jurisdictional services from the transmission system. Talen contends that \nthe specifics of Susquehanna's Co-Location Arrangement, in which the Co-Located Load \nis not a network customer and has no right to take transmission service or backup from \nthe grid, make clear why it would be a mistake for the Commission to assert blanket \njurisdiction over Co-Location Arrangements based on that load's supposed receipt of \njurisdictional transmission service or ancillary services. Talen contends that the practical \neffect of such an assertion would be to improperly federalize the entire electric system. \n36.\nPPL argues that the Commission has the jurisdictional authority to ensure that \nCo-Location Arrangements do not impact the safety or reliability of the bulk electric \nsystem and do not create conditions for improper subsidization of Co-Located Loads by \n70  Talen April 23 Reply Comments at 4-5. \n71  Id. at 5. \n72  Id. at 2; California Utilities April 23 Reply Comments at 4; EPSA/P3 April 23 \nReply Comments at 6; AEU April 23 Reply Comments at 8. \n73  Talen April 23 Reply Comments at 4-8."},{"page":28,"startToken":7897,"endToken":8230,"text":"Docket No. EL25-49-000, et al. \n- 20 - \nnetwork customers.74  Chevron states that the Commission has the right to clarify rules \nrelating to the ongoing sales of essential reliability services by the generator.75 \nc. \nAreas of Exclusive State Jurisdiction \n37. \nMany parties note that states retain sole jurisdiction over distribution and retail \nrates and sales, non-bypassable charges, and interconnection of load at distribution \nvoltage levels, whereas the Commission has jurisdiction over the interaction of generators \nwith the PJM markets.76  Among other retail charges, PIOs argue that states retain \nauthority over whether consumption by a Co-Located Load should count for purposes of \nallocating transmission and distribution system charges to retail customers.77  Indicated \nTransmission Owners note that state jurisdictional special contracts or rates can provide \nother financial benefits to the Co-Located Load.78  Constellation and Talen state that the \nCommission has no authority to prohibit a generator from selling directly to Co-Located \nLoad.79  Talen adds that the Commission cannot compel participation in federally \nregulated energy or capacity markets.80 \nd. \nPotential Jurisdictional Gap \n38. \nCommenters disagree on whether the FPA's division of jurisdictional authority \nleaves a regulatory gap with respect to Co-Location Arrangements. PPL agrees with PJM \n74 PPL April 23 Reply Comments at 7. \n75  Chevron April 23 Reply Comments at 4. \n76  See Constellation April 23 Reply Comments at 68, 70; EDFR April 23 Reply \nComments at 7; Joint Consumer Advocates April 23 Reply Comments at 8; NOVEC \nApril 23 Reply Comments at 8. EPSA/P3 April 23 Reply Comments at 6; AEU April 23 \nReply Comments at 8; Talen April 23 Reply Comments at 2; PPL April 23 Reply \nComments at 1; Indicated Transmission Owners April 23 Reply Comments at 2; \nCalifornia Utilities April 23 Reply Comments at 2. \n77  PIOs April 23 Reply Comments at 42. \n78  Indicated Transmission Owners April 23 Reply Comments at 14. \n79  Constellation April 23 Reply Comments at 72; Talen April 23 Reply Comments \nat 10. \nTalen April 23 Reply Comments at 10."},{"page":29,"startToken":8230,"endToken":8623,"text":"Docket No. EL25-49-000, et al. \n- 21 - \nthat there is a potential jurisdictional gap.81  PPL states that under prevailing \nPennsylvania law, a single generator providing service to a single customer is not a \npublic utility and is not subject to the retail jurisdiction of the Pennsylvania Commission, \nnor are the terms of that retail sale subject to federal oversight. Pennsylvania \nCommission rejects this view, however.82  Pennsylvania Commission argues that when \nCo-Located Load receives services from the grid, the respective Commission that \nregulates that portion of the grid has jurisdiction over those services.83  OPSI also argues \nthat there is no regulatory gap, explaining that sales of electricity from a generator to an \nend use customer in intrastate commerce are subject to state jurisdiction.84  OPSI \ndisagrees with PJM's assertion that jurisdiction across the PJM region is unclear, \nemphasizing that OPSI's member states have processes by which jurisdictional issues can \nbe resolved. Constellation states that differing treatment of direct sales by states is not \nindicative of a regulatory gap, but a deliberate policy choice.85 \ne. \nJurisdiction over Large Load Interconnection \n39. \nCommenters also disagree on whether the Commission should assert jurisdiction \nover the interconnection of large loads. California Utilities state that the Commission \ncannot exercise jurisdiction over the interconnection of a Co-Located Load to the \ntransmission system as an element of transmission service in interstate commerce where \nthe purpose of the arrangement is to facilitate a retail sale.86  PIOs argue, however, that \nthe Commission should assert jurisdiction over Co-Location Arrangements on PJM's \ntransmission system and must not disclaim jurisdiction over interconnection of large \nloads.87  PIOs note that the introduction of large loads has potential to disrupt \ntransmission system reliability. PIOs state that the Commission has not historically \nexercised jurisdiction over \"any and all transmission-level interconnections of retail \n81  PPL April 23 Reply Comments at 7. \n82  Pennsylvania Commission April 22 Reply Comments at 3-4 (citing 66 Pa.C.S. \n§ 102; Drexelbrook Assocs. v. Penn. Pub. Util. Comm'n, 212 A.2d 237, 240 (Pa. 1965); \nBorough of Ambridge v. Pub. Serv. Comm 'n of Penn., 165 A. 47, 49 (Pa. Super. Ct. \n1933)). \n83  Id. at 5. \n84  OPSI April 23 Reply Comments at 5-6. \n85  Constellation April 23 Reply Comments at 73. \n86  California Utilities April 23 Reply Comments at 5. \n87 PIOs April 23 Reply Comments at 34-35, 37."},{"page":30,"startToken":8623,"endToken":9041,"text":"Docket No. EL25-49-000, et al. \n- 22 - \nload.\" 88  PIOs interpret \"any and all\" to mean the Commission has not exercised plenary \nauthority over every transmission-level load interconnection, although there are cases \nwhere the Commission and its regulated entities have sought to control interconnections \nof load. PIOs assert that \"the Commission's statutory mandate to ensure that \ntransmission users, owners, or operators satisfy reliability criteria provides ample support \nfor regulating the interconnections of large loads that . . . have usage characteristics that \ncan cause unacceptable disruption to the bulk power system.\"89  PIOs argue that the \nCommission must plan for wholesale sales at co-located facilities. \n40.\nTalen asserts that interconnection service is a form of Commission-jurisdictional \nservice, and a generator's interconnection to the interstate transmission system does not \nstop being Commission-jurisdictional merely because there is Co-Located Load behind \nthe point of interconnection.90  Talen argues that for that reason, the Commission has for \ndecades approved amendments to ISAs designed to accommodate Co-Located Load, and \nnotes that Order No. 2003 rejected the idea that the Commission loses jurisdiction over \ninterconnections if the generator makes behind-the-meter sales. Talen states that the \npresence of non-jurisdictional facilities behind the meter does not divest the Commission \nof jurisdiction over the generator's interconnection, because non jurisdictional facilities \n(including the generator itself) always exist behind the meter. Talen contends that the \nargument that the Commission does not have jurisdiction over the interconnection of \nend-use load is undermined by the Supreme Court's decision in EPSA, which confirmed \nthat the Commission can exercise jurisdiction over matters the FPA charges it with \nadministering, even if the exercise of jurisdiction indirectly affects the states' regulatory \npowers, so long as Commission's action does not \"target\" the states' domain.91 \nf. \nNeed for Flexible PJM Tariff Provisions \n41.\nAEU, NOVEC, and PIOs argue that any tariff changes put forward by PJM must \nbe flexible enough to accommodate states' different regulatory frameworks and \n88 Id. at 34 (citing Show Cause Order, 190 FERC ¶ 61,115 at P 72). \n89  Id. at 36. \n9°  Talen April 23 Reply Comments at 8-9. \n91  Id. at 9 (citing Standardization of Generator Interconnection Agreements & \nProcs., Order No. 2003, 104 FERC ¶ 61,103, at PP 813-14 (2003), order on reh'g, Order \nNo. 2003-A, 106 FERC ¶ 61,220, order on reh'g, Order No. 2003-B, 109 FERC ¶ 61,287 \n(2004), order on reh'g, Order No. 2003-C, 111 FERC ¶ 61,401 (2005), aff'd sub nom. \nNat'l Ass 'n of Regul. Util. Comm 'rs v. FERC, 475 F.3d 1277 (D.C. Cir. 2007) \n(NARUC))."},{"page":31,"startToken":9041,"endToken":9400,"text":"Docket No. EL25-49-000, et al. \n- 23 - \nacknowledge that not all Co-Location Arrangements will be available in all states.' \nAEU argues that such flexibility will allow states to decide whether changes to state law \nare needed to either expand or constrain access to Co-Location Arrangements, according \nto state-specific circumstances and policy goals. NOVEC explains that, under its \nunderstanding of relevant state law, the Co-Location Arrangements sought by \nConstellation in Docket No. EL25-20 would not be permissible in Virginia unless the \nsupplier to the Co-Located Load is authorized under state law to be a retail supplier in the \ngeographic area in which the Co-Located Load is located.93 \n42.\nNOVEC submits that the Commission should not create a novel contractual \narrangement in the PJM Tariff that allows Co-Location Arrangements to bypass \ntransmission service, local distribution utilities, and the capacity market.94  If it does, \nNOVEC contends that the Commission risks creating an uneven patchwork of \nco-location rules across PJM as some jurisdictions permit it and others do not. PIOs \nargue that PJM must not limit states' authority over the co-located generation mix.95 \nPIOs add that the PJM Tariff should treat Co-Located Load as any other consumption. \n43.\nConstellation argues that requiring Co-Located Loads to take NITS unduly limits \nstate jurisdiction and flexibility.96  Constellation asserts that requiring large loads to take \nwholesale service, rather than taking service directly from a generator, and requiring the \ngenerator to only make wholesale sales, rather than providing service directly to a \nCo-Located Load, effectively precludes states from regulating transactions that fall \nsquarely within their jurisdiction. \nD. \nCost Allocation \n1. \nPJM's March 24 Response \n44.\nPJM states that Co-Location Arrangements should pay the costs of any grid \nservices they consume.97  PJM states that it believes the load and generator must be \ncompletely isolated and physically disconnected from the grid to ensure the load never \n92  AEU April 23 Reply Comments at 8; NOVEC April 23 Reply Comments at 8. \n93  NOVEC April 23 Reply Comments at 8. \n94  Id. \n95  PIOs April 23 Reply Comments at 40-43. \n96  Constellation April 23 Reply Comments at 26-28, 73-74. \n97  PJM March 24 Response at 4, 42-45."},{"page":32,"startToken":9400,"endToken":9841,"text":"Docket No. EL25-49-000, et al. \n- 24 - \ntakes any form of transmission service. PJM maintains that it is always possible that any \nprotection system in an isolated (but not islanded) Co-Location Arrangement could \nmis-operate, be disabled, or degrade, and that, in the few instances where such schemes \nexist on the PJM system, PJM has observed these schemes fail, and the load has taken \ngrid service. Other challenges, PJM notes, include unplanned generator run-backs or \nreductions in output, generator megawatt (MW) oscillations, and Co-Located Load \nutilization fluctuations. PJM argues that, when these conditions occur, they result in \nbrief, but routine, imbalances between the load and the generation that would need to rely \non the grid to balance. \n45. \nPJM explains that proposed Co-Located Loads are not \"wholly isolated from the \ngrid\" because the load and generator are connected to and synchronized with the \nmulti-state bulk power system.98  PJM avers that there are obligations to ensure power to \nnuclear plants to ensure safe shutdown. PJM explains that synchronized to the grid \nmeans the generator matches the voltage, frequency, and phase of the entire grid before \nconnecting to the grid to facilitate safe, stable power transfer. PJM also asserts that \nCo-Located Load is connected to and synchronized with the multi-state bulk power \nsystem and, at minimum, benefits from ancillary services. \n46. \nPJM states that it prefers that Co-Location Arrangements be designated as \nNetwork Load in front of the meter.99  In support of its preference, PJM argues the \nNetwork Load designation means: (1) more reliable service for these critical loads; \n(2)more comprehensive and holistic system planning based on Network Load status; \n(3)enhanced ability to manage load curtailment priority in emergency conditions; (4) less \noperating complexity and reduced dependence on protective schemes, which can \nmis-operate and are designed to address N-1 conditions; (5) greater access to potential \nDemand Response capabilities of large Co-Located Loads; and (6) fewer negative \nimplications for resource adequacy if accompanied by some of the optional offerings \n(i.e., Demand Response, incentives to bring generation, or use of a new \nnon-capacity-backed service). PJM suggests that it may be an open question what level \nof NITS charges, if any, should be assessed to certain Co-Location Arrangements in \naccordance with cost causation principles. \n47. \nPJM recognizes that Co-Location Arrangements involving large data centers may \nappear similar to the BTMG configuration in PJM's Tariff but that the rules were not \ndesigned for large loads and are not a good fit.10°  PJM explains that its BTMG Tariff \nprovisions were developed in 2004 and that BTMG netting is only available to entities \n98  Id. at 42-43. \n99  Id. at 38-40. \nioo Id. at 34-36."},{"page":33,"startToken":9841,"endToken":10232,"text":"Docket No. EL25-49-000, et al. \n- 25 - \ntaking NITS. PJM states that BTMG netting was justified at the time it was proposed \nbecause certain market participants \"rely to a lesser degree on the PJM integrated \ntransmission system to serve load.99101 However, PJM cautions that \"20-years later cost \ncausation principles may dictate a different outcome for co-located data center loads that \nappear to have different customer profile and load characteristics.\"102  PJM contends that \nco-located data center configurations use the transmission grid to receive service because \nthey \"appear to require certain ancillary services (load following) and black start service\" \nand ancillary services \"pass through transmission lines, not the air.\"103  PJM asserts that \n\"simple netting may not capture the costs `caused' by co-located data center \narrangements\" because they would always net to zero where the generator serves the \nentire data center load.104  PJM notes that BTMG does not carry reserves, and that PJM's \nplanning and resource adequacy will not account for loads in this configuration. PJM \nsuggests that the record \"raise[s] questions about the status\" of the BTMG rules.\"' \n2. \nTransmission Owners' March 24 Responses \n48. \nIndicated Transmission Owners and AES Ohio argue that Co-Located Load \ninterconnected to the transmission system is using and benefiting from the transmission \nsystem, causes changing flows from second to second, and should pay its costs of \nessential grid services.106  Indicated Transmission Owners state that Co-Located Load \nthat is connected to the grid has the potential to draw real or reactive power from the grid \nat any time and relies on and benefits from its connection to the transmission system at all \ntimes. Indicated Transmission Owners state that the presence of on-site backup \ngeneration does not exempt load from paying the costs of transmission service because it \nstill benefits from the transmission system. \n101 Id. at 36 (citing PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 at P 7). \n102 Id. (citing Cities of Bethany v. FERC, 727 F.2d 1131, 1138 (D.C. Cir. 1984) \n(recognizing different rates could be charged to different customer groups); Ala. Elec. \nCoop., Inc. v. FERC, 684 F.2d 20, 27-28 (D.C. Cir. 1982) (explaining undue \ndiscrimination)). \n103 Id. \n104 Id. \n' °51d \n106  Indicated Transmission Owners March 24 Response at 5, 7, 14; id., attach. A \nat 5, 19-20; AES Ohio March 24 Response at 2."},{"page":34,"startToken":10232,"endToken":10688,"text":"Docket No. EL25-49-000, et al. \n- 26 - \n49.\nIndicated Transmission Owners state that the only arrangement where the end-use \nload does not need to take some form of transmission service is one in which the load is \ncompletely islanded and does not connect to, take service from, or rely on the \ntransmission or distribution system in any way, for any grid service, at any time.107 \nIndicated Transmission Owners note that such an arrangement would not be within the \nCommission's jurisdiction. Indicated Transmission Owners further contend that \"[e]ven \nif operational protection and control technologies, such as relay switches, are used with \nCo-Located Load and generation, the load still benefits from and utilizes grid services \nwhen 1) the load and generator are both connected to the system, and 2) the load is \nconnected and the generator is disconnected from the system, even if the load is \nconnected momentarily before it trips.\" Further, Indicated Transmission Owners argue \nthat, regardless of Co-Located Load using grid services, Co-Location Arrangements rely \non the grid and grid facilities without which the generator could not operate and the \narrangement could not exist. \n50.\nIndicated Transmission Owners argue that load cannot be \"fully isolated\" if it \nremains connected to the transmission and/or distribution grid, even through protection \nsystems.108  Indicated Transmission Owners note that the definition of a Co-Location \nArrangement that the Commission adopted in the Show Cause Order \"obscures the \nengineering and economic truth that the load relies upon the functioning grid and grid \nservices whichever side of the meter it is located on.\"109  Indicated Transmission Owners \nstate that PJM's pro forma tariffs and interconnection agreements require that all \ninterconnection customers be synchronized to the grid as a condition of service and \nexplain that this is necessary to preserve voltage stability and reliability.110 \n51.\nIndicated Transmission Owners argue that the transmission system must be \nplanned and built to support any load able to be served by the transmission system to \nensure compliance with state requirements that end-use load must be served.' Indicated \n107  Indicated Transmission Owners March 24 Response, attach. A at 9-10. \n1°8  Id. at 7, 9. \n109  Id. at 7, n.17. \nII°  Id. attach. A at 9 (citing e.g., PJM, Intra-PJM Tariffs, OATT, attach. 0 app. 2, \n§ 1.4 Initial Operation)). \n111  Id. at 5, 8, 16, attach. A at 6 (citing PJM, Intra-PJM Tariffs, OATT, § 28.2 \nTransmission Provider Responsibilities (stating, \"[t]he Transmission Provider shall \ninclude the Network Customer's Network Load in the Transmission System planning and \nthe Transmission Owners shall, consistent with the terms and conditions of the Tariff, the \nOperating Agreement, and Good Utility Practice, endeavor to construct and place into \nservice sufficient transfer capability to deliver the Network Customer's Network"},{"page":35,"startToken":10688,"endToken":11123,"text":"Docket No. EL25-49-000, et al. \n- 27 - \nTransmission Owners explain that the fact that the load is not constant does not reduce \nthe capital investment or operational and maintenance costs incurred to ensure the system \nis available to the customer if the customer has the ability to serve their full load from the \ntransmission system. \n52.\nIndicated Transmission Owners argue that Co-Located Load fits within the current \nTariff construct and should receive either NITS or PTPS.\"2  Indicated Transmission \nOwners argue that this will ensure Co-Located Loads are appropriately studied, charged, \nand factored in operationally by PJM and transmission owners. Indicated Transmission \nOwners therefore conclude that the PJM Tariff is just and reasonable and there is no basis \nfor the Commission to act under FPA section 206. Indicated Transmission Owners \nclarify that no party has alleged that the current Tariff, which requires load to take either \nNITS or PTPS, has impaired any load's ability to secure service safely, reliably, and at \nreasonable cost, or that service had been unobtainable. Indicated Transmission Owners \nargue that there have been, instead, allegations that efforts to request service outside of \nthe PJM Tariff provisions have been thwarted, but that such allegations do not impact the \nTariff AES Ohio generally agrees, but notes that different configurations of Co-Located \nLoad may result in different forms of service and there may be new approaches that are \njust and reasonable and incentivize Co-Located Load to provide reliability benefits and \ncost savings.\"3 \n53.\nIndicated Transmission Owners suggest that adding a definition of Co-Located \nLoad to the PJM Tariff specifying that co-located must be either Network Load or served \nby PTPS and does not meet the definition of BTMG may clarify expectations and \nobligations associated with such load.\"' Indicated Transmission Owners argue that \nallowing Co-Located Load to evade existing Tariff charges for grid usage by carving out \nthis load from NITS or PTPS would violate cost causation principles.15 \n54.\nIndicated Transmission Owners further contend that if Co-Located Loads are not \ndesignated as Network Load, it would undercut reliability and exacerbate affordability \nResources to serve its Network Load on a basis comparable to the delivery of each \nTransmission Owner's own generating and purchased resources to its Native Load \nCustomers\")). \n112  Id. at 2-3, 13; id., attach. A at 7, 21. \n113  AES Ohio March 24 Response at 2, 5. \n114  Indicated Transmission Owners March 24 Response, attach. A at 2, 9, 18. \n115  Id. at 18 (citing Pub. Serv. Elec. & Gas Co. v. FERC, 989 F.3d 10, 13 (D.C. \nCir. 2021) (quoting Midwest ISO Transmission Owners v. FERC, 373 F.3d at 1368-69))."},{"page":36,"startToken":11123,"endToken":11549,"text":"Docket No. EL25-49-000, et al. \n- 28 - \nconcerns because it would allow Co-Located Load to avoid \"wires charges,\" including \nthe fixed costs of the poles, wires, transformers, and substations that comprise the \ntransmission and distribution network that would then be subsidized by other \ncustomers.16  Indicated Transmission Owners allege that \"carving a 480 MW \nCo-Located Load in the Commonwealth Edison territory (which hosts multiple nuclear \nunits) out from Network Service would avoid approximately $121 million in annual \ncharges, leading to a 1.53% increase in representative residential customer bills, or about \n$25.57 annually, compared to a similar load customer who paid its share of the costs of \nthe grid.\"'\" \n55.\nIndicated Transmission Owners explain that transmission owners are allowed to \nrecover the embedded costs of the transmission grid from network customers on a \npostage stamp basis without consideration of the distance between load and generation.\"8 \nIndicated Transmission Owners argue the idea that load is responsible for the embedded \ncosts of the transmission grid based on fairness predates Order No. 888.119  Indicated \nTransmission Owners state that the Commission's pro forma definition of Network Load \ndoes not allow a Network Customer to designate only part of the load at a discrete Point \nof Delivery as Network Load unless arrangements for PTPS are made. Indicated \nTransmission Owners explain the Commission found in Order No. 888-A that \"all \npotential transmission customers, including those with generation behind the meter, must \nchoose between [NITS] or [PTPS].99120 \n56.\nIndicated Transmission Owners argue that the PJM RAA provides that a Load \nServing Entity (LSE) is defined as \"any entity (or the duly designated agent of such an \nentity), including a load aggregator or power marketer, (i) serving end-users within the \nPJM Region and (ii) that has been granted the authority or has an obligation pursuant to \nstate or local law, regulation or franchise to sell electric energy to end-users located \n'Id. at 3, 18. \n1\" Id. at 18-19. \n18  Id. at 10-12, 17-18. \n19  Id. at 10-11 (citing Order No. 888, FERC Stats. & Regs. ¶ 31,036 at 31,707; \nFla. Mun. Power Agency v. Fla. Power & Light Co., 67 FERC ¶ 61,167, at 61,482 \n(1994)). \n120  Id. at 11-12 (citing Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,260). \nIndicated Transmission Owners argue the Commission has recently rejected requests that \nsome load should be treated as \"special third categories.\" Id. at 17-18 (citing e.g., Nat'l \nR.R. Passenger Corp. v. PPL Elec. Utils. Corp., 171 FERC ¶ 61,237, order on reh'g, \n173 FERC ¶ 61,043 (2020) (Amtrak))."},{"page":37,"startToken":11549,"endToken":11924,"text":"Docket No. EL25-49-000, et al. \n- 29 - \nwithin the PJM Region.'9121 According to Indicated Transmission Owners, the RAA \nfurther requires that LSEs shall \"provide or arrange for Network Transmission Service or \nFirm Point-to-Point Transmission Service for service to the projected load of the \nParty....\"122  Indicated Transmission Owners contend that, together, these provisions \nmean that any entity serving an end-use load, including a Co-Located Load, must become \nan LSE and is responsible for ensuring that its load is taking either NITS or PTPS. \n57.\nIndicated Transmission Owners state that the BTMG rules do not apply to \nCo-Located Load that is Network Load because such arrangements must deliver energy \nto load without using the transmission system.123  Further, Indicated Transmission \nOwners explain, BTMG adjustments are only available to Network Customers and would \nnot be available to Co-Located Loads served by a contractual intermediary, rather than \nthe generator directly, as the generator would only be an upstream supplier. \n58.\nPSE&G states that transmission charges, if imposed, must apply cost causation \nprinciples that are based on a party's actual usage of the transmission system, which \nPSE&G argues should include netting consistent with BTMG rules.124  PSE&G and AES \nOhio state that both Co-Located Load and BTMG employ similar configurations and \nshould pay for transmission services based on their actual system usage, i.e., net use.125 \nPSE&G argues that Co-Located Load is not using or impacting the transmission system \nany differently than BTMG customers and urges the Commission to ensure that there is \nno undue discrimination in the treatment of Co-Location Arrangements.' PSE&G adds \nthat any replacement rate must not adversely impact existing customers with BTMG. \n59.\nThe transmission owners also argue that Co-Located Load that is physically \ninterconnected with and synchronized to the grid uses ancillary services and black start \n121  Id. at 15-16 (citing PJM, Intra-PJM Tariffs, RAA, ARTICLE 1 -\nDEFINITIONS (53.0.0) (Definition of Load Serving Entity)). \n122 Id. (citing PJM, Intra-PJM Tariffs, RAA, Article 9 Sec 1 - Overall \nCoordination (2.0.0)). \n123  Id., attach. A at 4. \n124  PSE&G March 24 Response at 5-6, 11-13. \n125  Id. at 15; AES Ohio March 24 Response at 4. \n126  PSE&G March 24 Response at 2, 13-14, 18."},{"page":38,"startToken":11924,"endToken":12280,"text":"Docket No. EL25-49-000, et al. \n- 30 - \nservice.127  Indicated Transmission Owners state that Co-Located Load that is connected \nto the grid has the potential to draw real or reactive power from the grid and change \npower flows at any time, even if connected to the distribution system.128  Indicated \nTransmission Owners note load co-located with nuclear units depends on the grid for \nload following, voltage support, black start, and other ancillary services. PSE&G argues \nthat the Commission should establish ancillary services charges for Co-Located Load \nconfigurations based on actual use consistent with cost causation principles.'\" \n3. \nReply Comments \na. \nGeneral \n60. \nSeveral commenters urge the Commission to ensure any cost allocation to \nCo-Location Arrangements is consistent with the Commission's cost causation and \nbeneficiary pays principes.13° California Utilities argue that cost allocation will depend \non whether a state or local regulator allows a generator to serve Co-Located Load and \nwhether the regulator requires the Co-Located Load to pay for retail transmission \nservice.\"' Data Center Coalition argues that large loads, particularly data center \noperators, must retain the ability to pursue behind-the-meter and other innovative \nconfigurations.132  United States Senators argue that the Show Cause Order is an \nimportant start to address a crisis affecting ratepayers, and the Commission should ensure \n127  Indicated Transmission Owners March 24 Response, attach. A at 5; AES Ohio \nMarch 24 Response at 7-8. \n128  Indicated Transmission Owners March 24 Response, attach. A at 5. \n129  PSE&G March 24 Response at 9-13. \n130 See AEU April 23 Reply Comments at 17-19; ACEG April 23 Reply \nComments at 2; BrightNight April 23 Reply Comments at 7; Consumers' Research \nApril 23 Reply Comments at 1-2; EEI April 23 Reply Comments at 7; ELCON April 23 \nReply Comments at 6-7; PIOs April 23 Reply Comments at 25-26; Vistra April 23 Reply \nComments at 24 (citing Midwest ISO Transmission Owners v. FERC, 373 F.3d at 1368; \nIll. Com. Comm 'n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009) (ICC v. FERC I)). \n131  California Utilities April 23 Reply Comments at 2, 8. \n132  Data Center Coalition April 23 Reply Comments at 4."},{"page":39,"startToken":12280,"endToken":12692,"text":"Docket No. EL25-49-000, et al. \n- 31 - \nthat data center owners and operators do not burden households with more than their fair \nshare of power infrastructure costs.133 \n61.\nSeveral commenters argue that Co-Located Load should be assessed charges based \non services it uses.134  OPSI states that the Commission must determine the extent to \nwhich Co-Location Arrangements rely on the bulk power system and impact rates for \nother customers in determining cost allocation.135  Several commenters argue that \nCo-Located Load uses and benefits from its connection to the transmission system.'36 \nNREMC states that the intermittent nature of Co-Located Load does not lessen the need \nfor ongoing investment in infrastructure or the operational costs to ensure reliability.137 \nCATF similarly argues that Co-Located Load creates the need for additional new \ninvestment in transmission infrastructure and grid services. Pennsylvania Commission \nstates that the grid must be planned to accommodate the Co-Located Load should any \nprotection schemes fail. Several parties warn of potential cost shifts to consumers if costs \nare not appropriately allocated to Co-Located Load.138  NOVEC argues that co-location \nproposals that exempt Co-Located Load from the costs of transmission service effectively \ngive them free use of the transmission system and cause other load to subsidize that use. \n62.\nSeveral parties argue Co-Located Load cannot be fully isolated because \nCo-Located Load and generators are physically interconnected to and rely on the \n133  United States Senators November 25 Letter at 2. \n134  See SEIA April 23 Reply Comments at 3-4; EDFR April 23 Reply Comments \nat 10; Glatz/Silverman April 23 Reply Comments at 5; AEU April 23 Reply Comments \nat 18; EPSA/P3 April 23 Reply Comments at 13; BrightNight April 23 Reply Comments \nat 7; Ohio FEA April 23 Reply Comments at 5. \n135  OPSI April 23 Reply Comments at 4. \n136  See CATF April 25 Reply Comments at 4; NREMC April 23 Reply Comments \nat 7; NOVEC April 23 Reply Comments at 10; Pennsylvania Commission April 22 Reply \nComments at 4-5; UCS April 11 Reply Comments at 1-2. \n137  NREMC April 23 Reply Comments at 7. \n138  See id. at 5-6; CATF April 25 Reply Comments at 12; Consumers' Research \nApril 23 Reply Comment at 1-2; ELCON April 23 Reply Comments at 7; PIOs April 23 \nReply Comments at 26-28; ACEG April 23 Reply Comments at 2; Market Monitor \nApril 23 Reply Comments at 4, 7; NOVEC April 23 Reply Comments at 11; \nPennsylvania Commission April 22 Reply Comments at 4."},{"page":40,"startToken":12692,"endToken":13091,"text":"Docket No. EL25-49-000, et al. \n- 32 - \ntransmission system.'\" CATF states Co-Location Arrangements routinely include \nunplanned generator run-backs, MW output oscillations, and load utilization fluctuations, \nresulting in brief imbalances that rely on the grid for support. Parties also argue that \nprotection systems could fail and the generator may go offline.140  NOVEC contends that \n\"fully isolated\" Co-Located Load is not fully isolated if there is any physical tie to the \ntransmission system. NOVEC asserts that the benefits of, and the need for, the \ntransmission system is why Co-Located Loads do not seek islanded arrangements. \nCalifornia Utilities similarly argue for Co-Located Load to be fully isolated, neither the \ngenerator nor the load may be electrically connected to the transmission system. UCS \nargues that the Co-Located Load would require system generation reserves and \ntransmission capacity when the output of the generator does not match their consumption \nand may impact load ramp rates.141  OPSI discourages the Commission from accepting \nthe premise that load can be wholly isolated from the grid without a comprehensive \nshowing that it is impossible for the load to ever receive grid services or impact \ntransmission rates for existing customers.142 \n63.\nELCON states that large loads that do not take any grid services should not be \nallocated any grid costs unless there is a demonstration that such configuration has a \ndirect cost impact on other grid consumers.143 \nb. \nNetwork Service \n64.\nSeveral commenters argue that Co-Location Arrangements should be required to \ntake either NITS or PTPS.\" NOVEC notes that PJM charges transmission customers on \n139  See CATF April 25 Reply Comments at 4; Pennsylvania Commission April 22 \nReply Comments at 4; Joint Consumer Advocates at 5; UCS April 11 Reply Comments \nat 4-5; PIOs April 23 Reply Comments at 25; Buckeye April 23 Reply Comments at 8; \nNOVEC April 23 Reply Comments at 9; California Utilities April 23 Reply Comments \nat 8. \n140 UCS April 11 Reply Comments at 4-5; Buckeye April 23 Reply Comments \nat 8. \n141  UCS April 11 Reply Comments at 4-5, 8-9. \n142  OPSI April 23 Reply Comments at 4-5. \n143  ELCON April 23 Reply Comments at 7. \n144 UCS April 11 Reply Comments at 16; NREMC April 23 Reply Comments at 4; \nNOVEC April 23 Reply Comments at 9-10; AMP April 23 Reply Comments at 3; PIOs \nApril 23 Reply Comments at 8 (Network Load); CATF April 25 Reply Comments at 4;"},{"page":41,"startToken":13091,"endToken":13528,"text":"Docket No. EL25-49-000, et al. \n- 33 - \na formulary basis without regard for the distance between load and generation and thus \ndistance does not relieve one of the need to procure transmission service. Pennsylvania \nCommission states that if a retail customer is served by a generator connected to the \ntransmission system that is prima facie evidence the Co-Located Load is Network Load. \nBuckeye notes non-Network Load, \"behind-the-generator\" Co-Location Arrangements \nmay not be permissible in all states and argues that treating Co-Located Load as Network \nLoad respects state laws while providing for consistent application of the Tariff across \nthe PJM footprint. AMP states that it is important that Co-Located Load should take \nNITS or PTPS to avoid unjust and unreasonable cost-shifting and to promote reliable \ntransmission planning and resource adequacy. PIOs argue that it would violate cost \ncausation and beneficiary pays principles to allow Co-Location Arrangements that rely \non ancillary services to avoid paying transmission rates because transmission service is \nrequired to receive these services.\"5 \n65.\nBuckeye states that ensuring Co-Located Load is Network Load will ensure \nvisibility to the grid operator, allow PJM to conduct appropriate planning to ensure grid \nreliability, ensure the load pays for its share of grid costs, and ensure generation resources \nremain available for the entire grid.'\" Buckeye states that, conversely, co-located large \nload arrangements where the load is behind the meter of the generator, and is not \nNetwork Load, may create significant impacts to the grid, increase costs, and decrease \nreliability for those that rely on the grid for affordable and reliable electricity. Buckeye \nstates that, while certain parties have advocated that these \"fully isolated\" arrangements \nwill avoid transmission investments, those potential cost savings are outweighed by \nsignificant concerns about impacts to reliability, resource adequacy, and just and \nreasonable rates. \n66.\nOther commenters disagree that Co-Located Load should be required to take NITS \nor PTPS.147  Industrials state that requiring all Co-Located Load be Network Load would \nbe a departure from precedent that actual use of the transmission system is the \nappropriate way to measure cost causation. Constellation states that Co-Located Load \nshould not be required to pay for transmission service where there are physical \nprotections to prevent the delivery of system energy from the grid. EDFR asserts that \nBuckeye April 23 Reply Comments at 5, 7-8; Pennsylvania Commission April 22 Reply \nComments at 5. \n145  PIOs April 23 Reply Comments at 26. \n146  Buckeye April 23 Reply Comments at 5-6. \n147  Industrials April 23 Reply Comments at 3; Constellation April 23 Reply \nComments at 82-83; EDFR April 23 Reply Comments at 11, 13; EPSA/P3 \nApril 23 Reply Comment at 13."},{"page":42,"startToken":13528,"endToken":13897,"text":"Docket No. EL25-49-000, et al. \n- 34 - \nCo-Located Load that places minimum demands on the transmission system should pay \nless in grid costs. EPSA/P3 argues that Co-Located Load that is behind the meter does \nnot require full Network Services for gross load. SEIA urges the Commission not to \nmandate one approach.'48 \n67.\nData Center Coalition argues that requiring all load to be classified as Network \nLoad risks undermining commercial arrangements, misaligning cost allocation, and \nchilling innovation.149  BrightNight states that Co-Located Load should not have to \nsubsidize other customers.' Constellation asserts that requiring all large Co-Located \nLoads to take NITS is unjust and unreasonable because it: (1) would delay service to \ndata centers due to system studies and the need for new upgrades; (2) would impose \nunnecessary transmission upgrade costs on all existing customers; (3) does not respect \nstate jurisdictional authority; and (4) violates fundamental ratemaking principles and is \nunduly discriminatory by imposing a one-size-fits-all solution on loads that are not \nsimilarly situated.151  Constellation states that the expected integration cost of a \n1,000 MW large load is about $126 million, which would be socialized across all \ntransmission customers under a NITS-only approach. Antora argues that requiring \nCo-Located Load to be Network Load would overcharge both the interconnecting load \ncustomer and other customers on the system for transmission service or upgrades to the \nextent PJM assumes it must serve the customer's full peak demand even if the load is \nflexible or curtailable.15' \n68.\nELCON states that the Commission should ensure that there are no regulatory \nbarriers to islanded configurations with no connection to the larger grid if allowed by \nstate law.'\" ELCON states that forcing all large loads into either NITS or PTPS and \nlimiting flexibility risks driving significant increased overall system costs and limits the \nability of customers, state regulators, and utilities to find creative and cost-effective \nsolutions based on individual needs and circumstances. \n148  SEIA April 23 Reply Comments at 4. \n149  Data Center Coalition April 23 Reply Comments at 7. \n150 BrightNight April 23 Reply Comments at 7. \n151  Constellation April 23 Reply Comments at 15, 20. \n152  Antora April 23 Reply Comments at 11. \n153  ELCON April 23 Reply Comments at 6."},{"page":43,"startToken":13897,"endToken":14321,"text":"Docket No. EL25-49-000, et al. \n- 35 - \nc. \nNetting \n69.\nSeveral commenters argue that Co-Located Load should be charged for any \nwholesale services it uses on a net demand basis.\"' Industrials state that a gross load \nmetering approach is analogous to the gross load outcome that the Commission rejected \nin prior cases.155  Industrials assert that this approach would cause significant rate \nincreases and disincentivize customers from taking steps to manage use of the grid which \ncould otherwise lead to the avoidance of network upgrades. \n70.\nConstellation argues that requiring Co-Located Loads to be charged NITS on a \ngross basis is unduly discriminatory because it would charge the same rates to customers \nwho impose different costs on the system.'56  Constellation states that Co-Located Load \nshould have the choice to be Network Load and pay gross NITS or to pay net NITS if the \nportion of the generator serving the load delists and PJM procures capacity for the load \nbased on net load during the coincident peaks. Constellation states that since Co-Located \nLoad is unlikely to be withdrawing energy during coincident peak hours, it is appropriate \nto charge the higher of NITS or a `standby charge' to reflect that the system must be built \nto a certain extent to serve the load on a firm basis. \n71.\nConstellation further argues that charging all large Co-Located Loads NITS based \non gross demand would be unduly discriminatory because it is inconsistent with \ntreatment of BTMG.'57  Constellation argues that there are no physical, technical, or \neconomic reasons why netting rules applied to existing retail BTMG customers should \nnot apply to co-located. Constellation states that size is not a rationale for discriminatory \nrate treatment. In response to concerns that PJM is not required to carry reserves for \nBTMG, Constellation states that BTMG rules could be modified to require the \nCo-Located Load to carry or pay for reserves and ancillary services or, if needed, a \nminimum demand charge for NITS for any non-volumetric costs the BTMG load imposes \non the system. \n72.\nOn the other hand, Indicated Transmission Owners argue that to afford \nCo-Located Load similar treatment to BTMG load would be to grant an undue preference \n's\" Vistra April 23 Reply Comments at 25; Constellation April 23 Reply \nComments at 31; Industrials April 23 Reply Comments at 4. \n155  Industrials April 23 Reply Comments at 4-5 (citing Occidental Chem. Corp. v. \nPJM Interconnection, L.L.C., 102 FERC ¶ 61,275 (2003)). \n156  Constellation April 23 Reply Comments at 31-33, 40-41. \n157  Id. at 32-33, 39, 41-45, 77, 80-81."},{"page":44,"startToken":14321,"endToken":14729,"text":"Docket No. EL25-49-000, et al. \n- 36 - \nto such configurations over others that also rely upon Network Service.1S8  Indicated \nTransmission Owners and AMP argue that because Co-Location Arrangements use the \ntransmission system, they cannot qualify as BTMG. PPL states that behind-the-meter \ngeneration at an existing load differs both in kind and degree from load appearing behind \nthe meter of an existing generator. Indicated Transmission Owners and NREMC argue \nthat allowing large Co-Located Load to utilize the BTMG model of netting generation \nagainst load could allow these facilities to avoid most, if not all, costs, unfairly shifting \ncosts to other grid users since Co-Located Loads rely on and benefit from the grid. \n73.\nAMP and NREMC agree with PJM that BTMG was not designed to accommodate \nlarge loads.159  NOVEC argues that BTMG loads had or developed generation to supply \nthe load, but Co-Located Load as contemplated in this record would instead repurpose \nexisting generation from the supply stack.160  NOVEC contends that the additional \ngeneration provides greater flexibility to customers and PJM, not less, and that \nCo-Located Loads are on a significantly larger scale than existing BTMG and may have \nlarger impacts on the PJM system. NREMC argues that large Co-Located Loads paired \nwith BTMG present significantly greater operational risks than traditional BTMG \narrangements because they lack adequate reserves.161 \n74.\nAMP states that regardless of what the Commission decides with respect to \nCo-Located Load, the Commission should preserve the current BTMG netting provisions \nin the PJM Tariff.162  AMP contends that PJM does not provide any citations to \ndiscussion in the record regarding PJM's BTMG rules that call the existing netting \nprovisions into question, nor does it identify any reason why the practice of netting loads \nserved by BTMG might no longer be consistent with cost causation principles. AMP \nstates that the longstanding nature of the netting provisions is a reason to retain, not \n158  Indicated Transmission Owners April 23 Reply Comments at 6-7 (citing \n16 U.S.C. § 824d(b)). See also AMP April 23 Reply Comments at 12 (citing PSE&G \nMarch 24 Response at 15); PPL April 23 Reply Comments at 8; NREMC April 23 Reply \nComments at 5. \n159  NREMC April 23 Reply Comments at 5; AMP April 23 Reply Comments \nat 11-12 (citing PJM March 24 Response at 35). \n16° NOVEC April 23 Reply Comments at 18. \nNREMC April 23 Reply Comments at 5. \n162  AMP April 23 Reply Comments at 13."},{"page":45,"startToken":14729,"endToken":15069,"text":"Docket No. EL25-49-000, et al. \n- 37 - \nrevisit them, given the reliance interests of PJM market participants in the existing \nrules.163 \nd. \nReplacement Rates \ni. \nPJM Options \n75.\nAEU contends that all eight PJM co-location options should be accommodated, \nalthough each also requires additional development.164  Vistra argues that if PJM option 3 \n(BTMG where load is Network Load) left the BTMG rules unchanged, it would be \nunduly discriminatory to prohibit behind-the-meter loads from engaging in the same type \nof netting.165  Vistra also argues that PJM option 4 configurations (Co-Located Load \nconnected to the grid with protection facilities) would use the transmission system less \nthan a retail BTMG configuration because protective systems ensure that the load never \ndraws energy from the grid, whereas retail BTMG arrangements may do so. Antora \nargues that PJM option 4 is the only pathway that allows for the fully coordinated study \nof co-located generation and load.'\" Antora states that the risks PJM identifies with this \noption would be mitigated for low-load factor loads that only charge when energy is \nabundant and low cost. \n76.\nVistra argues that when option 5 configurations (Co-Located Load connected to \nthe grid with protection facilities, but with back-up service from the grid) draw power \nfrom the grid, PJM should apply netting provisions consistent with the BTMG \nprogram.167  Vistra states that, during those periods when the configuration is drawing \npower from the grid, it may make sense to require such configurations to pay for PTPS, \nNITS, or a new conditional, non-firm transmission service. PPL states that under this \noption, PJM must modify its Tariff to facilitate the type of \"real-time, bespoke \noperational decision-making to determine whether load can continue to be served\" that \n163  Id. at 10-11 (citing Dep't of Homeland Sec. v. Regents of the Univ. of Cal., \n591 U.S. 1, 30 (2020)). \n164  AEU April 23 Reply Comments at 11-17. \n165  Vistra April 23 Reply Comments at 14. \n166  Antora April 23 Reply Comments at 6, 13-14-15. \n167  Vistra April 23 Reply Comments at 8, 28."},{"page":46,"startToken":15069,"endToken":15500,"text":"Docket No. EL25-49-000, et al. \n- 38 - \nPJM contemplates.168  PPL notes that under Pennsylvania law, PPL cannot deny backup \nservice properly requested under its General Tariff.169 \n77.\nAntora argues that the Commission should direct PJM to build out option 7 by \ndeveloping a new non-capacity backed service offering that is available on both a \npermanent and transitional basis (as PJM's option 7 is only transitional) to facilitate the \nintegration of highly flexible, low load factor Co-Located Loads.17' Antora argues that \noffering non-capacity backed transmission service on a permanent basis would allow \nPJM to capture the benefits of co-located facilities, serving the same amount of total load \nat lower cost, with less transmission infrastructure and fewer capacity resources. \n78.\nConstellation states it supports an interruptible transmission service assessed on \nnet load to promote a more efficient use of the system's existing headroom, resource \nadequacy benefits, and lower costs for customers.171  Constellation argues that allowing \nload to temporarily curtail consumption during peak periods would limit needed \nupgrades, arguing a study showed that a new load curtailment rate of just 0.5% annually \nwould result in nearly 18 GW of potential new load integration in PJM without capacity \nexpansion. Constellation states that an interruptible service should cease to be available \nonce the upgrades are complete—not based on PJM's assessment of resource adequacy as \nPJM suggests. NRDC states that it has concerns that the proposed no-capacity backup \nservice could lead to unduly preferential results and argues it would be preferable to use \nexisting demand products than invent new ones.172  Indicated Transmission Owners argue \nthat if Co-Located Load wishes to be compensated for being interruptible, at the \ntransmission level, such load must show why that outcome is the correct rate design and \n168  PPL April 23 Reply Comments at 11. \n169  Id. (citing PPL Electric Utilities Corporation General Tariff, Rule 6, \nhttps://www.pplelectric.com/-/media/PPLElectric/At-Your-Service/Docs/Current-\nElectric-Tariff/rule6.pdf (providing for \"[s]ervice to customers who have another source \nof power which can be substituted for Company's service for any of customer's \noperations\"); PPL Electric Utilities Corporation General Tariff, Rule 7, \nhttps://www.pplelectric.com/-/media/PPLElectric/At-Your-Service/Docs/Current-\nElectric-Tariff/rule7.pdf (providing for \"[t]emporary service . . . for less than one year or \nfor a year or more when Company must install facilities that will be used solely for a \nservice that is known to be limited in duration.\")). \n17° Antora April 23 Reply Comments at 6-7, 13, 16-18. \n\" 1  Constellation April 23 Reply Comments at 23-26, 56-57. \n172  NRDC April 23 Reply Comments at 5-6."},{"page":47,"startToken":15500,"endToken":15896,"text":"Docket No. EL25-49-000, et al. \n- 39 - \nwhy the current demand response rules fail to adequately compensate load \nappropriately.13 \nOther \n79.\nVistra states that it would be reasonable to create a penalty regime to address any \nunintended grid use by Co-Located Loads with protective schemes.174  Vistra explains \nthat such a penalty would be conceptually similar to the unreserved use penalties that the \nCommission created in Order No. 890 that subject transmission customers to penalties for \nusing transmission service that they did not reserve. Buckeye raises concerns with an \nannual single coincident peak (1 CP) transmission cost allocation, arguing that reduction \nin the load during a single hour after building the transmission infrastructure to serve that \nload will not reduce overall costs.'\" Buckeye suggests a potential mechanism that \nshould be considered to help mitigate unreasonable cost shifts is changing the 1 CP \nbilling determinant to 12 coincident peaks (12 CP) or to one or more non-coincident \npeaks (NCP). Buckeye argues that moving to 12 CP may make it more difficult for large \nloads to shift costs to other wholesale customers and their retail members, but notes this \nwould not address stranded costs. \n80.\nGlatz and Silverman recommend the Commission explore the potential to develop \na new level of non-firm or interruptible transmission service that prioritizes connection of \nnew flexible loads, regardless of whether they are co-located with generation.176 \nEnchanted Rock supports a transitional non-firm service where the load relies on PJM to \nprovide energy, but where the load is under a commitment to dispatch co-located \ngeneration during PJM curtailments.177  Under this option, Enchanted Rock maintains \nthat the co-located facilities could be quickly interconnected and would only require \ncurtailment in a small number of hours of a year, allowing more efficient use of \ngeneration resources and transmission capacity, lowering costs to customers, and buying \ntime for new infrastructure to be built. \n81.\nConstellation states Co-Located Loads should have three options: (1) a firm NITS \noption with the load paying based on either gross load or net load, depending on its \nconfiguration; (2) a generator-contingent option where Co-Located Load does not pay \n173  Indicated Transmission Owners April 23 Reply Comments at 12. \n174  Vistra April 23 Reply Comments at 13, 25-26. \n1\" Buckeye April 23 Reply Comments at 12. \n176  Glatz/Silverman April 23 Reply Comments at 12-13. \n177  Enchanted Rock April 23 Comments at 10-12."},{"page":48,"startToken":15896,"endToken":16291,"text":"Docket No. EL25-49-000, et al. \n- 40 - \nNITS but pays for any necessary upgrades and could pay a discounted transmission \ncharge for as-available energy purchases, if any; and (3) an interruptible transmission \noption—lasting until network upgrades are completed—where Co-Located Load pays a \ndiscounted transmission charge reflecting its inferior service.178  Constellation proposes \nthat, regarding the generator-contingent option, it would be reasonable to provide \nas-available energy at the locational marginal price plus a discounted transmission charge \nbecause, while energy would be drawn from the grid, it would only be \"as-available\" \nwhen it is not adding any burden to the transmission system and the load would not need \nto be planned for reliability or resource adequacy. \n82.\nIndicated Transmission Owners oppose Constellation's proposal, arguing that a \ndiscounted transmission rate for Co-Located Load only taking energy from the \ntransmission system on an as-available basis would be unduly discriminatory because \ntransmission rates are charged to all other customers based on full embedded costs, \nregardless of whether they take energy during peak times.'\" Indicated Transmission \nOwners also argue that allowing certain customers with bundled load and generation to \nchoose their own level of transmission service outside of NITS would be a departure \nfrom NERC Reliability Standards FAC-002-2 and TPL-001-5. Finally, Indicated \nTransmission Owners' affiant argues a flexible bundled interconnection framework is a \nnew concept. Constellation opposes Indicated Transmission Owners' claims about \nNERC violations and Constellation emphasizes that it does not oppose studies of \nCo-Located Load, consistent with Reliability Standard FAC-002-2.18° \n83.\nCalifornia Utilities state that, if PJM permits netting of load for transmission \nservice, one option for cost allocation would be to require the Co-Located Load to pay for \nretail stand-by transmission service.\"' Joint Consumer Advocates argue that forms of \nservice tailored to specific Co-Located Load will lead to litigation that will further muddy \nthe regulatory waters.182  Invenergy asserts that while new comprehensive rules are \ndeveloped, PJM should implement a transition process so that large loads customers can \nmove forward with Co-Location Arrangements in the short-term.183  Specifically, \n178  Constellation April 23 Reply Comments at 37-38, 51. \n179  Indicated Transmission Owners June 3 Answer at 20-21 (citing Powers \nDeclaration at PP 7, 25-29). \n180 Constellation June 12 Answer at 6. \n181  California Utilities April 23 Reply Comments at 9. \n182  Joint Consumer Advocates April 23 Reply Comments at 7. \n183  Invenergy April 23 Reply Comments at 7."},{"page":49,"startToken":16291,"endToken":16662,"text":"Docket No. EL25-49-000, et al. \n- 41 - \nInvenergy suggests that large-load customers should be allowed to pursue \nbehind-the-meter configurations with new generating facilities without being considered \nNetwork Load. \ne. \nAncillary Services  \n84.\nSeveral parties argue that any ancillary services charges assessed to Co-Located \nLoad must be based on the extent to which Co-Located Loads use ancillary services.'\" \nMarket Monitor argues that co-location allows large loads to avoid ancillary service \ncharges.185  Several commenters argue that Co-Located Load configurations either benefit \nfrom the provision of or contribute to the need for certain ancillary services and other \nservices, including load balancing, reactive compensation, frequency response, voltage \ncontrol, regulation, and black start service.'86 \n85.\nNREMC argues that Co-Located Load benefits from the full range of ancillary \nservices since both transmission and distribution operators depend on ancillary services \nto maintain grid reliability, stability, and power quality.187  California Utilities argue that \ngenerators synchronized to the grid serving Co-Located Load should pay ancillary \nservice costs because they are not fully isolated, use ancillary services, and benefit from \nreliability and recovery services such as spinning reserve.188  UCS states that load \nvariability from data centers can create imbalances more quickly than generators can \ncorrect them, resulting in voltage disturbances, thermal overloads, and stability issues, \n184  See OPSI April 23 Reply Comments at 4; Pennsylvania Commission April 22 \nReply Comments at 5; Talen April 23 Reply Comments at 13; ACEG April 23 Reply \nComments at 2. \n185  Market Monitor April 23 Reply Comments at 4. \n186  See Pennsylvania Commission April 22 Reply Comments at 4-5; California \nUtilities Reply Comments at 8-9; UCS April 11 Reply Comments at 14, 15 n.42 (citing \nKyle Hannah of Dominion Energy Inc., Pre-Conference Statement, Docket \nNo. AD24-11-000 (filed Nov. 1, 2024)); ENGIE April 23 Reply Comments at 7; \nNREMC April 23 Reply Comments at 7; NOVEC April 23 Reply Comments at 9-10; \nPIOs April 23 Reply Comments at 25; ACEG April 23 Reply Comments at 2; California \nUtilities April 23 Reply Comments at 8-9; Buckeye April 23 Reply Comments at 8; AEU \nApril 23 Reply Comments at 19; ELCON April 23 Reply Comments at 7. \n187  NREMC April 23 Reply Comments at 7. \n188  California Utilities April 23 Reply Comments at 8."},{"page":50,"startToken":16662,"endToken":17041,"text":"Docket No. EL25-49-000, et al. \n- 42 - \nwhich can be mitigated by ancillary services.189  UCS states that Co-Location \nArrangements benefit from essential reliability services including short-circuit fault \ncurrent and system inertia. ACEG contends that if Co-Located Loads avoid their share of \nsystem costs while relying on that system in emergencies, or even just for stability, such \nreliance would undermine cost causation principles and unfairly shift costs onto other \nratepayers.19° Mainspring argues that black start and ancillary service cost allocation will \nvary by technology type as some generators can provide ancillary services others \ncarmot.191 \n86.\nNOVEC argues that the grid necessarily responds to all power-quality issues, \nincluding but not limited to frequency response, reactive needs, transient issues, and \nvoltage contro1.192  NOVEC contends that Co-Located Load is akin to \"parasitic load\" \nbecause the transmission grid cannot differentiate between energy that is injected into the \nmarket and energy that is injected to serve Co-Located Load. Additionally, NOVEC \nargues that nuclear powered generation units are not operated as flexible or partially \nloaded assets but instead operate at full load between fueling cycles to maximize the \nvalue of their fuel rods and therefore, nuclear powered generation assets depend upon \nother generators on the grid to provide all ancillary service and other power-quality \nneeds. \n87.\nCalifornia Utilities argue it is up to the generator to decide how or whether to pass \nancillary and black start service costs onto Co-Located Load.193  Talen states that while it \ncontinues to believe Co-Located Load should not pay for services it is not using, in the \ninterest of compromise, Talen supports the load paying for certain ancillary services.'\" \n88.\nConstellation argues that, while there may be some benefit to Co-Located Load for \nsome ancillary services provided to the interconnected generator, a universal requirement \nfor every Co-Located Load to pay for all ancillary services is unjust and unreasonable \nand unduly discriminatory and preferentia1.195  Constellation acknowledges, for example, \n189  UCS April 11 Reply Comments at 13-15. \n190 ACEG April 23 Reply Comments at 2. \n191  Mainspring April 23 Reply Comments at 9. \n192  NOVEC April 23 Reply Comments at 9-10. \n193  California Utilities April 23 Reply Comments at 8-9. \n194  Talen April 23 Reply Comments at 13. \n195  Constellation April 23 Reply Comments at 34, 48, 85-86."},{"page":51,"startToken":17041,"endToken":17386,"text":"Docket No. EL25-49-000, et al. \n- 43 - \nthat Co-Location Arrangements drawing energy from the system benefit from ancillary \nservices and black start, but argues the generator relies on the service, not the load, and \ncurrent Commission policy does not support charging generators for ancillary services. \n89.\nVistra requests that the Commission create a new rate design to ensure that \nCo-Located Load that is not Network Load pays only for ancillary services that they \nuse.196  However, Vistra argues that PJM has not provided analysis of which ancillary \nservices benefit Co-Located Load. As an example, Vistra offers that variances in the \nCo-Located Load could be viewed as related to the need for regulation service. \n90.\nVistra argues that ongoing charges for reactive power supply and black start \nservice should not be assessed to Co-Located Load, however.197  Vistra argues that \"the \nability to isolate large loads so they cannot draw power from the system would act to \nsectionalize the grid and make black start more manageable.\"198  AEU argues Co-Located \nLoads should be compensated for any ancillary services their connections provide.'99 \nE. \nInterconnection Procedures and Cost Allocation \n1. \nPJM's March 24 Response \n91.\nPJM states that the necessary study process is among several studies it may \nemploy to evaluate Co-Location Arrangements, depending upon the type of co-location \narrangement.200  PJM explains that it does not have a tariffed study process for \nnon-Network Load located behind a generator's point of interconnection. PJM explains \nthat its necessary studies process is designed to evaluate the potential reliability impact of \na proposed addition or reduction of a Co-Located Load configuration on the PJM \nTransmission System.201  PJM explains that the scope of the study addresses generation \ndeliverability, N-1 and N-1-1 thermal and voltage studies, special protection systems \nreview, baseline stability, and, if applicable, a nuclear plant interface requirements \nvoltage analysis. \n196  Vistra April 23 Reply Comments at 8, 26-27. \n197  Id. at 27-28. \nI\" Id. at 28 (quoting Shanker Aff. ¶ 66). \n199  AEU April 23 Reply Comments at 19. \n200 PJM March 24 Response at 47-49. \n201  Id. at 48-50."},{"page":52,"startToken":17386,"endToken":17782,"text":"Docket No. EL25-49-000, et al. \n- 44 - \n92.\nPJM explains that load studies currently are performed only through the traditional \nretail load integration processes. PJM commits, however, to exploring opportunities to \nenhance the visibility of the necessary study process and results where Co-Located Load \nis not Network Load. PJM notes that a deactivation study, unlike the necessary study, \nwould not be appropriate for Co-Location Arrangements because deactivation studies are \ndesigned for the complete cessation of operations by a generator. \n93.\nPJM states that its current necessary study process allows a co-location \narrangement to demonstrate its capability to flexibly adjust its withdrawals from or \ninjections to the transmission system.202  PJM clarifies that Co-Located Load \nconfigurations usually are modeled as if they never take power from the grid -that this \n\"always on\" load is modeled as offsetting the net output of a generator. PJM adds that if \nthe result of this study indicates a thermal or voltage violation, the generator must \nmitigate the violation before the load can be added. \n94.\nPJM states that, under certain Co-Location Arrangements, it is possible that the \ngeneration owner could propose a special protection scheme or Remedial Action Scheme \nto reduce the load under certain conditions.203  PJM states that, if such a configuration \nwere permitted by the Commission, PJM would require language similar to the protection \nfacilities language proposed in the most-recently filed Susquehanna ISA. PJM asserts \nthat, if and where such facilities might misoperate, additional new language should be \ndeveloped to require the generator to take immediate steps to stop the flow of energy \nfrom the grid to any co-located load or risk breach and non-compliance (given the \nabsence of contractual privity between and among PJM, the Transmission Owner, and the \nCo-Located Load in certain situations). \n95.\nPJM states that it conducts dynamic studies for Co-Located Load projects, which \nevaluate all applicable NERC, PJM, and transmission owner-specific contingencies and \ncriteria.2°4  PJM notes that it also assesses the impact of the ramping behaviors of large \nloads, generally, and the stability impact of large Co-Located Loads, specifically. \n96.\nPJM states that it would not support creating an additional interconnection queue \nfor Co-Located Load because the necessary study process is capable of incorporating and \nevaluating the impact of Co-Location Arrangements.2°5 \n202  Id at 51-52. \n2°3  Id at 52. \n2°4  Id. at 53. \n2°5  Id at 56."},{"page":53,"startToken":17782,"endToken":18047,"text":"Docket No. EL25-49-000, et al. \n- 45 - \n2. \nTransmission Owners' March 24 Responses \n97.\nIndicated Transmission Owners state that the necessary study process, together \nwith other studies, including the individual transmission owners' studies, \"are designed to \nensure appropriate evaluation of, among other things, generator interconnections, \nmodifications, and retirements and load additions.\"206 Indicated Transmission Owners \nexplain that these studies are typically compatible with retail load addition studies and \ncan be coordinated. Indicated Transmission Owners argue that these studies are \ncollectively sufficient and that a separate study process for Co-Located Load is not \nnecessary or appropriate. \n98.\nIndicated Transmission Owners explain that it would not be appropriate for the \nnecessary study process to include a \"flexibility\" analysis because whether a Co-Location \nArrangement is capable of being flexible does not guarantee how the end-use load or \ngenerator will operate in real time.207  Indicated Transmission Owners state that, \"[i]n the \nabsence of a state law or retail tariff allowing for a more durable commitment, any \ncontractual commitment by end-use load to interrupt its operations or its use of retail \nelectric service will at best be limited to the current contracting party.99208 However, \nIndicated Transmission Owners note, known flexibility should be captured in PJM's large \nload forecast. \n99.\nIndicated Transmission Owners state that the existing queue process is sufficient \nto study the interconnection of generation and that all load and generation seeking to \ninterconnect should go through the established processes, as they can operate \nindependently.209 \n206  Indicated Transmission Owners March 24 Response, attach. A at 12-13. \n207 id \n208 Id \n209 id , attach. A at 16."},{"page":54,"startToken":18047,"endToken":18369,"text":"Docket No. EL25-49-000, et al. \n- 46 - \n3. \nReply Comments  \na. \nInterconnection Procedures  \ni. \nExpedited Process & Joint Queue \n100. Several parties generally support creating a separate process in PJM for expediting \nthe interconnection of new generation to serve Co-Located Load,210  such as a joint review \nprocess for large load and generation.2\" ENGIE and Enchanted Rock note challenges \nwith having different studies for generation and load, including potential mismatching of \nthe time when the load and the generation come online, mismatches in the lifetime of the \nload versus the lifetime of the generation, and variances of operational characteristics.212 \nEnchanted Rock also argues that generation interconnection study processes and queues \ndo not adequately recognize the benefits Co-Location Arrangements can provide.213 \nBrightNight, Invenergy, EDFR, and ENGIE recommend that the Commission and PJM \nexplore studying Co-Location Arrangements based on the net impact on the grid.214 \n101. Invenergy proposes studying large loads over 50 MW or interconnecting to \nfacilities at voltages greater than 115 kV along with generation and argues that this would \nmore efficiently use the transmission system, decrease ratepayer costs, promote \ntransparency, ensure that network upgrades reflect the expected topology of the system, \nand address a number of concerns raised in the Show Cause Order.' \n210  See SEIA April 23 Reply Comments at 2; BrightNight April 23 Reply \nComments at 9; Chevron April 23 Reply Comments at 7; AEU April 23 Reply Comments \nat 19-21. \n211  See ENGIE April 23 Reply Comments 8; Invenergy April 23 Reply Comments \nat 3; EDFR April 23 Reply Comments at 7. \n212  ENGIE April 23 Reply Comments at 8; Enchanted Rock April 23 Reply \nComments at 14. \n213  Enchanted Rock April 23 Reply Comments at 15. \n214  See ENGIE April 23 Reply Comments at 8; BrightNight April 23 Reply \nComments at 9; Invenergy April 23 Reply Comments at 5-6; EDFR April 23 Reply \nComments at 7, 9. \n215  Invenergy April 23 Reply Comments at 3-5."},{"page":55,"startToken":18369,"endToken":18785,"text":"Docket No. EL25-49-000, et al. \n- 47 - \n102. BrightNight states that an expedited process for generation serving Co-Located \nLoad would incentivize Co-Located Load to bring its own generation.216  BrightNight \nsuggests using the surplus interconnection process to screen for material impacts and, if \nfound, shifting the request into the normal interconnection process. Chevron argues that \na separate expedited interconnection process for Co-Located Load is required to support \nAI data centers as part of the declared emergency processes and national security policy \nof the United States.217  Consumers' Research states that if Co-Located Load uses \ndispatchable fossil fuels, it should be moved ahead in the interconnection queue because \nit can increase grid reliability.218  EDFR states that the Commission should encourage \nPJM and other Independent System Operators to develop an expedited process for \ncontrollable load to interconnect and economically dispatch in the wholesale market, or \nto participate as voluntary load shed resources. \n103. Several parties support PJM's option 6 specifically.219  Market Monitor states that \nit supports an expedited interconnection process for load and matching new generation \nthat is consistent with PJM's queue process so long as the load is connected to the grid \ndirectly and the new generation resource becomes a Capacity Resource. Ohio FEA \nexplains this could mitigate both local grid impacts and regional resource adequacy \nconcerns. AEU argues that allowing large loads to bring their own new generation would \naddress the root causes of co-location while reducing the new load's impact on resource \nadequacy. \n104. PPL generally supports PJM's option 6, but notes that the option appears to be \nindependent from questions around Co-Located Load.22° Enchanted Rock argues that, to \nthe extent that the Commission directs PJM to implement option 6, load co-located with \ndispatchable generation projects should also be permitted to participate.221  SETA asks the \nCommission to direct PJM to modify option 6 to implement an expedited co-located \ninterconnection process, separate from the queue, to determine whether the \n216 BrightNight April 23 Reply Comments at 9. \n217  Chevron April 23 Reply Comments at 7. \n218  Consumers' Research April 23 Reply Comment at 4. \n219  See Mainspring April 23 Reply Comments at 11; Market Monitor April 23 \nReply Comments at 11; PPL April 23 Reply Comments at 13; Buckeye April 23 Reply \nComments at 9; Ohio FEA April 23 Reply Comments at 4-5; Exus May 15 Reply \nComments at 1; AEU April 23 Reply Comments at 14. \n220 PPL April 23 Reply Comments at 13. \n221  Enchanted Rock April 23 Comments at 15."},{"page":56,"startToken":18785,"endToken":19169,"text":"Docket No. EL25-49-000, et al. \n- 48 - \ninterconnection request for the co-located generation would require new network \nupgrades.222  SEIA suggests that this process would be analogous to surplus \ninterconnection service and that there would be no queue jumping because the co-located \nresources would not be competing for network upgrades. SEIA argues that such service \nis beneficial as it may help prevent transmission system overbuild and would help \naddress issues of supply and demand. \n105. Other parties oppose PJM's option 6.223  Bloom argues that PJM's proposal to \noffer incentives for faster interconnection when the load is Network Load is too narrow. \nBloom also asserts that a requirement that a generator with Co-Located Load be a \nCapacity Resource appears to mandate that the generator enter into a financial contract \nwith Co-Located Load and may undermine resource adequacy goals by disincentivizing \nload seeking only physical arrangements. Bloom proposes an alternative to PJM's \noption 6 to adopt reforms to interconnect generation and Co-Located Load (both new) as \na composite facility called an \"energy park,\" instead of studying the load in one process \nand the generation in another.224 \n106. Constellation asserts that PJM's option 6 is discriminatory against existing \ngeneration because it is functionally equivalent to an out-of-market payment or subsidy \nthat depresses market economics for all other resources.225  Glatz and Silverman also \nquestion why PJM's option 6 should provide a preference to large load customers over \ncustomers aiming to meet other objectives, like clean energy commitments.226  Invenergy \nasserts that Co-Location Arrangements should not get priority access to available \ntransmission system headroom, or deprive PJM of the resources needed to process the \ninterconnection queue, in keeping with the Commission's long-standing policy against \nqueue jumping.227  Constellation also argues it will lead to reduced new entry outside of \nthe large load contract path and restrict the right to integrate with the system to only those \n222  SEIA April 23 Reply Comments at 10-11. \n223  See e.g., Bloom April 23 Reply Comments at 8; Constellation April 23 Reply \nComments at 52; NRDC April 23 Reply Comments at 3-4. \n224  Bloom April 23 Reply Comments at 2, 10. \n225  Constellation April 23 Reply Comments at 52 (citing Patterson Aff. ¶ 40). \n226  Glatz/Silverman April 23 Reply Comments at 8-9. \n227  Invenergy April 23 Reply Comments at 6."},{"page":57,"startToken":19169,"endToken":19531,"text":"Docket No. EL25-49-000, et al. \n- 49 - \nloads that bring their own generation. In addition, Constellation states that this option \nmay create perverse incentives for existing generators to retire.228 \n107. CATF states that the Commission must require large loads with co-located \ngeneration (such as data centers) to follow the same interconnection requirements of \nOrder No. 2023 and Order No. 1920.229  PIOs argue that the Commission should reject \nproposals to allow generators seeking Co-Location Arrangements to access special, \nexpedited interconnection pathways, because this would run counter to Order No. 2023 \nand Commission precedent, offer unduly preferential terms and conditions to a select set \nof entities, and come at the expense of the significantly backlogged interconnection \nprocess.230  NRDC states that PJM's proposal could erode open access principles as this \nwould be dividing what types of load can get this qualified access.231  Glatz and \nSilverman argue it is unclear whether option 6 would interconnect generation faster than \nthe current interconnection queue.232  United States Senators argue that the Commission \nshould not support arguments that large fossil fuel generators can jump the \ninterconnection queue because of data center demand projections.233 \nii. \nStudy Processes \n108. Some parties argue that PJM's necessary study process remains just and \nreasonable. Constellation asserts that the necessary study process evaluates system-wide \nreinforcements and provides transparency and predictability into the development of \nCo-Location Arrangements. 234  Constellation and Vistra support adding clarifying \n228  Glatz/Silverman April 23 Reply Comments at 8-9. \n229  CATF April 25 Reply Comments at 16. \n238  PIOs April 23 Reply Comments at 28-30 (citing Midcontinent Indep. Sys. \nOperator, Inc., 186 FERC ¶ 61,054, at P 17 (2024); Order No. 2003, 104 FERC 61,103 \nat P 12; Improvements to Generator Interconnection Procs. & Agreements, Order \nNo. 2023, 184 FERC ¶ 61,054, at PP 4, 5, 177, order on reh'g, 185 FERC ¶ 61,063 \n(2023), order on reh'g, Order No. 2023-A, 186 FERC ¶ 61,199, errata notice, 188 FERC \n¶ 61,134 (2024)). \n231  NRDC April 23 Reply Comments at 3-4. \n232  Glatz/Silverman April 23 Reply Comments at 8. \n233  United States Senators November 25 Letter at 2. \n234  Constellation April 23 Reply Comments at 47, 62-63, 94-95."},{"page":58,"startToken":19531,"endToken":19989,"text":"Docket No. EL25-49-000, et al. \n- 50 - \nlanguage to the Tariff of the obligation of transmission owners to cooperate and provide \ntimely feedback on the necessary studies.235 \n109. On the other hand, several parties express concern that the necessary study process \nis not adequate or appropriate to study Co-Location Arrangements.236  Antora argues that \nstudying co-location using PJM's necessary study process offers a significant efficiency \nadvantage over studying load separately from the co-located generation, as it assesses the \nelectrical impacts of proposed new generation and load in a single interconnection \nprocess. However, Antora argues that the existing process is inadequate, because the \nTariff's study procedures lack the necessary detail to inform customers such as Antora \nhow their charging loads will be studied and confirm that the loads' flexibility will be \naccounted for. PIOs argue that the necessary study \"may not be fully capturing the \ntransmission system impacts of co-locating load,\" and thus could result in Co-Location \nArrangements with already-operational generators, \"not paying the costs of network \nupgrades that would be caused by the co-location.\"237  Similarly, Market Monitor also \nargues that necessary study agreements miss the most fundamental issues associated with \nco-location. PIOs argue that the necessary studies process was designed for studying \npotential impacts from more minor, routine changes to the electrical characteristics of \nexisting generating units previously studied by PJM and is a poor fit for the more \nsignificant nature of an existing generator entering into a Co-Location Arrangement for \nall or most of its energy production. PIOs argue that PJM has not allowed the addition of \nbattery storage to existing generation to go through the necessary study process, in large \npart because batteries can act as load. PIOs argue that PJM offers no explanation for why \nCo-Located Load is thus offered preferential treatment. \n110. PIOs state that PJM defends the necessary study process for studying co-location \nwith an existing generator by explaining that other study processes are also used; \nhowever, PIOs argue that each of the other studies that PJM identifies pass costs to \nbroader sections of load, not the large load customer(s) causing the need for the \nupgrades.238  PIOs argue that the necessary study process is the only process that PJM \nuses to identify the direct interconnection-related cost responsibility of co-locating large \n235 /d. at 89; Vistra April 23 Reply Comments at 33-34. \n236  Glatz/Silverman April 23 Reply Comments at 7; PIOs April 23 Reply \nComments at 9-10, 14; OPSI April 23 Reply Comments at 3; RMI April 23 Reply \nComments at 3-4; Market Monitor April 23 Reply Comments at 9; Antora April 23 Reply \nComments at 7-8. \n237  PIOs April 23 Reply Comments at 9 (citing Show Cause Order, 190 FERC \n¶61,115 at P 79). \n238  Id at 10-11."},{"page":59,"startToken":19989,"endToken":20396,"text":"Docket No. EL25-49-000, et al. \n- 51 - \nload with an existing generator, and it fails to do so with appropriate accuracy. RMI \nstates that PJM's necessary study process is not adequate because it does not assess the \nprotection system that would prevent the load from using the transmission system.239 \n111. Glatz and Silverman argue that a generator's reduction in Capacity \nInterconnection Rights (CIR) is effectively a partial deactivation and that evaluating such \nchanges without a deactivation study appears to be a means to avoid review by the \nMarket Monitor, as such CIR reductions can affect market outcomes.240  Glatz and \nSilverman also maintain that, when CIRs are removed from the system, the existing load \nmust still be served and the generation to serve that load may require new network \nupgrades. Glatz and Silverman also charge that any system capacity potentially available \ndue to a reduction in CIRs becomes unavailable if studied in concert with a \nbehind-the-meter load addition. \n112. Ohio FEA also notes that Co-Location Arrangements that propose to take existing \ngeneration off the system have broad implications because they would change the power \nflow across the transmission system and affect the mix of resources available to \nparticipate in PJM's energy and capacity markets and should be subject to a robust \nanalysis before they are allowed to proceed.' \n113. Several parties argue that the necessary study process lacks transparency.242  OPSI \nemphasizes that modifications are privately negotiated and under non-disclosure \nagreements.243  OPSI also states that these arrangements avoid a comprehensive \nreliability analysis because the necessary study process was developed to study \nmodifications to existing generating units, not the addition of large Co-Located Loads \nthat are sometimes as large as metropolitan areas. PIOs argue the opaque process \nprevents ratepayer advocates from effectively challenging the prudence of transmission \ninvestments and cost allocation at either the federal or the state level. \n114. Pennsylvania Commission states that PJM's necessary study process must be \nrevised to provide more information to regulators at the initial stage of the generation \n239  RMI April 24 Reply Comments at 3-4. \n24° Glatz/Silverman April 23 Reply Comments at 8. \n241  Ohio FEA April 23 Reply Comments at 4. \n242  Glatz/Silverman April 23 Reply Comments at 7; OPSI April 23 Reply \nComments at 3; PIOs April 23 Reply Comments at 9, 14; Pennsylvania Commission \nApril 22 Reply Comments at 7. \n243  OPSI April 23 Reply Comments at 3; PIOs April 23 Comments at 11, 15."},{"page":60,"startToken":20396,"endToken":20758,"text":"Docket No. EL25-49-000, et al. \n- 52 - \ninterconnection process because, sometimes when Co-Located Load comes online, the \nfirst time a state regulator hears about it is when the arrangement is filed with the \nCommission, unlike with generation retirement, even though they can have the same \neffects.\"' Glatz and Silverman note that Indicated Transmission Owners mentioned that \nthe necessary study process is conducted \"together with other studies and analysis\" but \nthese other studies and analyses are not spelled out, nor is there transparency for \nconsumers.245 \n115.\nSeveral parties ask the Commission for further clarity on how Co-Location \nArrangements will be studied and how those studies will be evaluated.246  AEU contends \nthere must be a level of uniformity and detail outlining study requirements to ensure \nregulatory certainty for large loads and new generation and storage resources seeking to \nserve large loads.247  Glatz and Silverman recommend the Commission adopt a principle \nof \"comparability\" to ensure that new Co-Location Arrangements go through a study \nprocess comparable in terms of timing and cost responsibility to a new load locating in \nfront of the meter.248 \n116.\nRegarding PJM's current load interconnection process, Invenergy asserts that \nAttachment M-3 was designed for supplemental transmission projects, not load \ninterconnection, and is not suitable for large load interconnection.249  EDFR asks the \nCommission to provide guidance to PJM and other Regional Transmission Organization \nor Independent System Operator (RTO/ISO) and non-RTO/ISO regions for developing a \nstandardized and transparent load interconnection process at the federal leve1.25° \n117.\nVistra explains that transmission owner load integration studies \"live in a \nregulatory gap,\" because the studies, processes, and facilities associated with those \ninterconnections are not currently subject to Commission regulation or oversight, despite \n244 Pennsylvania Commission April 22 Reply Comments at 7. \n245  Glatz/Silverman April 23 Reply Comments at 7 (citing Indicated Transmission \nOwners March 24 Response, attach. A at 12). \n246  AEU April 23 Reply Comments at 19; Glatz/Silverman April 23 Reply \nComments at 6. \n247  AEU April 23 Reply Comments at 19. \n248  Glatz/Silverman April 23 Reply Comments at 6. \n249  Invenergy April 23 Reply Comments at 3-4. \n25° EDFR April 23 Reply Comments at 6."},{"page":61,"startToken":20758,"endToken":21147,"text":"Docket No. EL25-49-000, et al. \n- 53 - \nthe fact that these configurations involve interconnections directly to the transmission \nsystem.251  Vistra argues that the Commission has jurisdiction to close this regulatory gap \nbecause the Commission has jurisdiction when load interconnects to the transmission \nsystem in interstate commerce based on its exclusive authority over interstate \ntransmission, just as the Commission regulates the terms of generation interconnections \nto the transmission system. Vistra states that the Commission should consider \ncommencing a separate proceeding to explore the issue of front-of-the-meter load \ninterconnection practices. Vistra argues that the Commission should exercise its \nauthority over load interconnection to the transmission system to prevent undue \ndiscrimination and ensure that interconnection service is provided in a just and reasonable \nmanner, perhaps by issuing a notice of inquiry on this issue. \n118. Data Center Coalition recommends that the Commission direct PJM to enhance \nvisibility into the relationship between new large loads and the transmission upgrades that \nsupport them by requiring: (1) disclosure of load linkages for Supplemental Projects, and \n(2) confirmation that loads driving Supplemental Projects have already been incorporated \ninto PJM's load forecast.252 \n119. Market Monitor argues for complete transparency in PJM's planning on the load \nside.253  Market Monitor requests that the PJM planning process be modified to integrate \ntransmission planning with markets planning to eliminate major gaps. Market Monitor \nargues that PJM must have the authority to plan to meet large load additions as it does for \ngeneration additions. \niii. \nChanges to Pro Forma Interconnection Procedures \n120. Several parties request that the Commission modify the pro forma generator \ninterconnection procedures and ISA. BrightNight states that at a minimum the pro forma \nprocess and agreement should allow for three configurations: (1) load and generation \nfully islanded from the electric grid, with no services from the grid; (2) flexible loads or \ndemand response loads; and (3) loads that require backup service (e.g., behind-the-meter \ngeneration).254  Glatz and Silverman propose a new pro forma process for co-location.255 \nVistra requests that the Commission modify the pro forma ISA to include a co-location \n251  Vistra April 23 Reply Comments at 14-15, 36-39. \n252  Data Center Coalition April 23 Reply Comments at 11-12. \n253  Market Monitor April 23 Reply Comments at 7-9. \n254  BrightNight April 23 Reply Comments at 7. \n255  Glatz/Silverman April 23 Reply Comments at 9."},{"page":62,"startToken":21147,"endToken":21539,"text":"Docket No. EL25-49-000, et al. \n- 54 - \nsection that will govern the applicable data exchange and coordination requirements and \nformalize any requirements regarding applicable protective schemes.256  Vistra argues \nthat, in addition to the items highlighted by PJM in its response, the pro forma ISA must \ninclude (1) details about coordinating the use of a secondary backup generator and (2) a \nprocess relating to the treatment of the generator's CIRs. \nb. \nCost Allocation \n121. Center refers to a Harvard Law School report stating that utilities are socializing \nthe costs of data center booms by: (1) entering into special contracts; (2) taking \nadvantage of discrepancies between federal and state regulations over cost allocation; and \n(3) relying on co-location agreements.257  Center points out that quick moves to \naccommodate this load growth may result in residential customers shouldering \ninfrastructure costs that are not ultimately needed. ELCON states that the Commission \nshould ensure that regulatory authorities consider the long-term impacts of new large load \nprojects in allocating network upgrade costs to protect non-large load ratepayers from \npaying the generation and transmission costs to serve large load even after initial electric \nservice agreement terms expire.258 \n122. Glatz and Silverman argue that the Commission should address the risk of \nstranded transmission investment associated with co-location where load does not \nmaterialize, particularly as all of PJM's proposed solutions socialize transmission costs, \noften spreading costs over multiple jurisdictions.259  Glatz and Silverman urge the \nCommission to ensure that any tariff changes account for the potential that data center \nload does not materialize and collaborate with states to manage this risk. Glatz and \nSilverman suggest that the Commission consider imposing \"take-or-pay\" structures for \nnew large loads triggering transmission upgrades and backed by financial security \npostings.260  Consumers' Research states that retail customers should not bear any of the \n256  Vistra April 23 Reply Comments at 8, 29. \n257  Center April 23 Reply Comments at 22 (citing Eliza Martin and Ari Peskoe, \nExtracting Profits from the Public: How Utility Ratepayers Are paying for Big Tech's \nPower, Environmental & Energy Law Program, Harvard Law School, (Mar. 2025), \nhttps ://eelp. law. harvard. edu/extracting-profits-from-the-public-how-utility-ratepayers-\nare-paying-for-big-techspower); id. at 25-26. \n258  ELCON April 23 Reply Comments at 7. \n259  Glatz/Silverman April 23 Reply Comments at 11-12. \n260 id. (indicating such structures are comparable to those debated in a proceeding \nbefore the Ohio Public Utilities Commission)."},{"page":63,"startToken":21539,"endToken":21934,"text":"Docket No. EL25-49-000, et al. \n- 55 - \nrisks of co-location, e.g., the costs for the infrastructure not being recovered or the ability \nto access reliable power, and suggest long-term fmancial commitments, take-or-pay \nclauses, and paying for the development of additional reliable generation as a way to \nmitigate this risk.261  Consumers' Research also states that Co-Location Arrangements \nshould be transparent to the public to protect and inform customers. \n123. Buckeye argues that the Commission should consider requiring the LSE that is \ndriving the transmission investment (i.e., the LSE in whose service territory the retail \nlarge load is locating) to be responsible for any cost-shifting caused by large loads that do \nnot show up as expected, thereby covering the costs of transmission investments caused \nby their retail load.' Buckeye states that the LSE with the large new load should be the \nentity that receives this price signal, because it has a retail relationship with the large load \nthat creates the potential for stranded transmission investment and is therefore able to \npass the stranded cost responsibility to that retail load. Buckeye argues that any costs \ncollected under such retail arrangements should be credited to the wholesale transmission \nrevenue requirement to ensure that any stranded transmission costs associated with such \nlarge loads are not shifted to other LSEs in the zone. \n124. Parties advocate that costs assigned for network upgrades required to \naccommodate Co-Located Load should be consistent with cost causation principles.263 \nFor example, ELCON states that, according to cost causation, if a large consumer in any \nco-location configuration impacts electricity flows on the grid either through adding to \ncongestion, creating voltage or frequency instability, or impacting access to generation, \nand such impacts require upgrades to the distribution or transmission system, those costs \nshould be allocated to that large consumer.' Vistra requests that the Commission ensure \nthat Co-Location Arrangements pay their fair share, including by allocating the costs of \nupgrades identified in the necessary study process to the generator.265  Consumers' \n261  Consumers' Research April 23 Reply Comments at 2-3, 5. \n262  Buckeye April 23 Reply Comments at 12. \n263  Data Center Coalition April 23 Reply Comments at 4; ELCON April 23 Reply \nComments at 7; Vistra April 23 Reply Comments at 8; PIOs April 23 Reply Comments \nat 12. \n264  ELCON April 23 Reply Comments at 7. \n265  Vistra April 23 Reply Comments at 8."},{"page":64,"startToken":21934,"endToken":22335,"text":"Docket No. EL25-49-000, et al. \n- 56 - \nResearch states that to avoid improper subsidization the direct and indirect costs of \nCo-Located Load need to be considered, including any needed infrastructure upgrades.266 \n125. Pennsylvania Commission states that PJM should revisit the potential direct cost \nallocation of transmission network upgrade costs for large load and should consider how \nzonal disparities in congestion and resource adequacy impact network upgrade costs.267 \nPIOs similarly argue that PJM's existing Tariff fails to ensure that Co-Location \nArrangements pay their fair share of upgrade costs, which is unjust and unreasonable.268 \nPIOs note that when a Transmission Owner Load Integration Study identifies \nSupplemental Projects that resolve local transmission reliability needs, the costs are \nallocated not just to the large load customer that triggered the local transmission \nreliability need, but to the transmission owner's entire local utility footprint in that zone. \nPIOs argue that despite this cost allocation, there is no guarantee that these projects \nprovide greater system benefits. PIOs argue that the transmission upgrades required to \nreliably integrate Co-Location Arrangements are differently situated from transmission \nupgrades required to reliably deactivate uneconomic generation (the costs of which are \nalso socialized to load) and thus should be treated differently. PIOs state that while only \nthe remaining load—not the deactivating generator—would utilize the transmission \nupgrades associated with retirements, Co-Located Load will continue to rely on, and \nbenefit greatly from, such upgrades. PIOs argue that many early examples of \ntransmission upgrades driven by data center loads have not led to system benefits, but \nrather, only provide the benefit of allowing the large load to operate—disproportionately \nbenefiting the Co-Location Arrangement. \nF. \nPJM Capacity Market Reliability. and Resource Adequacy \n1. \nPJM's March 24 Response \n126. PJM states that it does not believe that any changes to capacity market rules are \nnecessary to accommodate Co-Location Arrangements.269  PJM explains that three of its \nproposed co-location options (PJM options 6, 7, and 8) address resource adequacy \nconsiderations. PJM adds that it is exploring with regulators and generators opportunities \n266  Consumers' Research April 23 Reply Comments at 2. \n267  For example, Pennsylvania Commission notes that the retirement of a \ngeneration resource to serve a single co-located customer may necessitate vastly different \ntransmission upgrade plans with significant cost implications for customers to whom \nthose costs may be allocated. \n268  PIOs April 23 Reply Comments at 8, 12-13. \n269  PJM March 24 Response at 57, 62-63."},{"page":65,"startToken":22335,"endToken":22753,"text":"Docket No. EL25-49-000, et al. \n- 57 - \nto leverage at least 50 hours (or more) of diesel back-up generator service to enhance the \navailable demand response portfolio. PJM also points to other ongoing efforts, including \nthe transition to a new interconnection process and implementation of the Reliability \nResource Initiative. \n127. PJM notes that, to the extent resources request removal from Capacity Resource \nstatus to serve non-PJM load, such requests will only be granted if Market Monitor \napproves it and PJM agrees, or if the Commission issues an order as such.270  PJM adds \nthat, to the extent PJM determines that a Co-Location Arrangement would result in \ntransmission reliability issues, upgrades would have to be funded and constructed. \n128. PJM states that there may be opportunities to clarify or enhance existing planning \nprocesses.\"' PJM states that one such opportunity includes addressing risks that arise \nbased on the existing load forecasting process since, given the potential size of these \nlarge load additions in the forecasts, uncertainty with respect to whether the large loads \nare actually added to the system could cause either overbuild or under-build to occur \nbased on a single customer addition. PJM states that if Co-Located Load is not Network \nLoad, questions arise as to how requirements for visibility and control of the Co-Located \nLoad configuration are applied since the third-party load would not be a signatory to \ninterconnection agreements. PJM states that the ISA and other governing documents \nmay need to be revised to ensure that the overall system will continue to operate reliably \nas designed or as imposed by any temporary operational conditions on the system, \nincluding, for example, the non-conforming provisions included in the Susquehanna ISA. \n2. \nTransmission Owners' March 24 Responses \n129. Indicated Transmission Owners state that if Co-Located Load is required to take \neither NITS or PTPS, no changes to the capacity market rules, energy market rules, or \nplanning and load forecasting processes are necessary.\"' Indicated Transmission Owners \nnote that if a Co-Located Load is not metered, it can create an emergency if it appears on \nthe system unexpectedly. AES Ohio urges PJM to consider whether the forecast \nfrequency and load addition certainty are adequate given the pace of large load \nadditions.273  AES Ohio argues that PJM should be required to advise stakeholders if it \n27° Id. at 58-59, 63-65. \n271  Id. at 60-62, 65-66. \n272  Indicated Transmission Owners March 24 Response, attach. A at 17-19; see \nalso AES Ohio March 24 Response at 12-13. \n273 AES Ohio March 24 Response at 13."},{"page":66,"startToken":22753,"endToken":23117,"text":"Docket No. EL25-49-000, et al. \n- 58 - \nreasonably expects to serve all load, including Co-Located Load, reliably, particularly in \nperiods of rapid load growth. \n3. \nReply Comments \n130. Market Monitor argues that there should be no artificial incentives or changes to \nfundamental capacity market rules that allow preferential treatment of large loads.274 \nOPSI states that Capacity Resources cannot prioritize serving non-PJM load, even as \nbackup, without undermining system reliability and that sellers should not be allowed to \nchoose between fulfilling PJM obligations or facing penalties.275  Vistra similarly states \nthat resources that are committed to providing primary service to a Co-Located Load \nshould not also sell that same capacity to PJM.276  NOVEC states that the lack of supply \narising from congestion in the interconnection queue, failures to act on existing \ninterconnection approvals, and retiring thermal generation are the collective impetus for \nthe interest in Co-Located Load, but those supply problems affect all load, and it is \ndiscriminatory to afford some load a lifeboat in the form of co-location while the \nremaining load must address the consequences made worse by that lifeboat.277 \n131. Pennsylvania Commission states that PJM's Tariff may not provide sufficient \nvisibility into Co-Located Load's potential impacts on reliability and resource adequacy \nwhen generation is removed from the grid.278  Delaware Commission states that the \nexisting Tariff will likely not maintain resource adequacy and reliability.279  Delaware \nCommission adds that the failure to adequately plan for and address resource adequacy \nshortages will result in system load curtailments and extreme shortage prices. \n132. Some parties argue that Co-Located Load should be Network Load to ensure \nreliability and resource adequacy.280 Indicated Transmission Owners contend that when \n274  Market Monitor April 23 Reply Comments at 6-7. \n275  OPSI April 23 Reply Comments at 3. \n276  Vistra April 23 Reply Comments at 30. \n277  NOVEC April 23 Reply Comments at 14. \n278  Pennsylvania Commission April 22 Reply Comments at 6. \n279  Delaware Commission April 23 Reply Comments at 1-2, 5. \n2\" See Buckeye April 23 Reply Comments at 6 (citing PJM March 24 Response \nat 16-20); Indicated Transmission Owners April 23 Reply Comments at 13; Joint \nConsumer Advocates April 23 Reply Comments at 3."},{"page":67,"startToken":23117,"endToken":23544,"text":"Docket No. EL25-49-000, et al. \n- 59 - \nCo-Located Load is hidden and not appropriately accounted for, there is not only a cost \nallocation problem, but the study process is undermined and, consequently, PJM may be \nunable to adequately procure enough capacity to serve the load because the full load will \nnot be accounted for in the capacity market, transmission planning, or operations \nprocesses and protocols. Buckeye states that Co-Located Load as Network Load \nprovides significant reliability benefits by avoiding reliance on protective relays and \nenhances PJM's visibility and control over the Co-Located Load. Buckeye asserts that, \n\"[i]f these large loads have the potential to appear on the system, even for a short time, \nthis could have a significant impact on the grid.1,281 \n133. Constellation argues that interruptible Co-Located Load and co-location \nconfigurations with protection schemes to prevent energy withdrawals should not be \nassessed capacity charges.282  Vistra also argues that special protection schemes are \ncommonly used and reliable technologies, also referred to as \"remedial action schemes,\" \nand that a NERC standard governs these technologies.283  On the other hand, NRDC \nstates that if Co-Located Load is not Network Load, existing rules would not allocate the \nload any capacity costs if the on-site generation was running during PJM's peak hours, \nwhich would shift capacity costs to other customers.284  California Utilities argue that \ntraditional customers could be forced to subsidize Co-Located Load or suffer impaired \nreliability without proper cost allocation of reliability services and resource adequacy \ncosts.285  California Utilities acknowledge that the Commission cannot prevent a \ngenerator from making retail sales, even if those sales erode reliability, but argues the \nCommission can require wholesale customers to procure adequate capacity. California \nUtilities argue that the entity directly selling at retail to the Co-Located Load should pay \nits capacity costs because the Co-Located Load can impact grid reliability, but notes that \nhow such costs are passed on to the load is a retail issue. \n134. Vistra requests that the Commission clarify that a secondary generator that \nprovides occasional, interruptible backup service to a Co-Located Load can also serve as \na Capacity Resource because the generator will be available to PJM when needed.286 \nVistra notes that existing retail BTMG provisions allow a generator that designates a \n281  Buckeye April 23 Reply Comments at 8. \n282  Constellation April 23 Reply Comments at 66. \n283  Vistra April 23 Reply Comments at 18-19. \n284 NRDC April 23 Reply Comments at 7-8. \n285  California Utilities April 23 Reply Comments at 2, 6-7. \n286  Vistra April 23 Reply Comments at 8, 30-31."},{"page":68,"startToken":23544,"endToken":24000,"text":"Docket No. EL25-49-000, et al. \n- 60 - \nportion of its resource as BTMG to sell the rest of its resource as a Capacity Resource. \nVistra argues that allowing secondary backup resources to participate in the capacity \nmarket ensures that the market gets the greatest reliability benefit from these resources \nbecause ratepayers would enjoy access to additional capacity that would otherwise be \nunderutilized, while the generation resource's owner would put its resource to use and \nincrease its contribution to the market. Comparing these secondary units to reliability \nmust run (RMR) units, Vistra notes that the Commission currently allows RMR resources \nto participate in the capacity market because they \"can be reasonably expected to \nperform\" and argues that a secondary unit that occasionally serves Co-Located Load on \nan interruptible basis can also be expected to perform when needed because PJM can \nrecall it. Vistra states that these secondary units also could be held subject to capacity \nmarket non-performance penalties and do not distort dynamic efficiency in the capacity \nmarket. Vistra adds that, if PJM deems it necessary, it could also create a mechanism to \naddress how the secondary unit complies with its capacity must offer obligation when it \nis serving the Co-Located Load. \n135. Several commenters argue that existing generators moving to Co-Located Load \nconfigurations could threaten grid reliability and worsen the affordability crisis.287  Joint \nConsumer Advocates note this shift may degrade resource adequacy at an accelerated \npace relative to connecting such load in traditional ways. Buckeye states that, although \nthe balance of demand and supply is arguably the same regardless of whether the load is \nco-located with the generation, a non-Network Load Co-Location Arrangement has the \npotential to accelerate the pace with which the incremental demand arrives on the system, \npotentially without sufficient additional incremental supply, thereby exacerbating \nresource adequacy concerns. Glatz and Silverman suggest requiring PJM to manage the \nrate at which co-location is allowed to ensure reliability and affordability and avoid \nshortage conditions. Buckeye states that removing generation that is associated with a \n\"fully isolated\" Co-Location Arrangement from the rest of the grid is inconsistent with \nthe grid's planning and operational foundations and thus threatens to alter flows in a \nmanner that could require additional transmission upgrades and impair the operational \nflexibility that is essential to reliability.288 \n136. NERC states that co-location of large loads with generation facilities can have \nsubstantial reliability impacts due to interconnection timelines and loss of load incidents, \nwhile also presenting unique challenges and opportunities for grid transformation that \n287  See Glatz/Silverman April 23 Reply Comments at 10-11; Joint Consumer \nAdvocates April 23 Reply Comments at 5; NOVEC April 23 Reply Comments at 14; \nBuckeye April 23 Reply Comments at 6-7. \n288  Buckeye April 23 Reply Comments at 7."},{"page":69,"startToken":24000,"endToken":24361,"text":"Docket No. EL25-49-000, et al. \n- 61 - \nrequire special consideration.289  NOVEC argues Co-Located Loads can impact reliability \nand resource adequacy since, for example, protection systems may fail and place the full \nburden of the Co-Located Load onto the grid.290  PPL similarly states that because the \nCommission denied the amended Susquehanna ISA on unrelated grounds, the PJM Tariff \ndoes not include sufficient protections against this reliability risk.291  On the other hand, \nConstellation argues that it would be discriminatory to suggest that protective relaying \ncannot be used in the context of Co-Location Arrangements or that Co-Located Load \nmust be designed to a different standard. 292  Constellation states that each element of the \nprotective scheme is redundant, and the system is not planned for nor does PJM require \nupgrades to address subsequent \"third contingency events.\"293 \n137. Glatz and Silverman also express concern that, when load directly connects to \nanother customer's facilities, the connection may not be subject to PJM's Consolidated \nTransmission Owners Agreement, which ensures not only that each PJM Transmission \nOwner maintain its system reliably, but also any connections to other systems, including \nload customers and other transmission systems as well 294  UCS states new variability in \nload resulting from data centers may require new Transmission Reliability Margin levels \nin some or all of PJM.295 \n138. On the other hand, Vistra states that the development of Co-Located Load \nconfigurations \"provides ample time for the PJM capacity market to calibrate to respond \nto changes in the balance of supply and demand.\"296  Vistra concludes that neither \nresource adequacy nor reliability concerns justify the failure to accommodate \nbehind-the-meter Co-Located Load. Constellation argues that new load is no different \nthan existing load with respect to resource adequacy planning, and the Commission \nshould determine whether there are additional tools to address near-term capacity needs \n289  NERC April 23 Reply Comments at 3. \n29°  NOVEC April 23 Reply Comments at 11-12. \n291  PPL April 23 Reply Comments at 10-11. \n292  Constellation April 23 Reply Comments at 49. \n293  Id. \n294  Glatz/Silverman April 23 Reply Comments at 13-14. \n295  UCS April 11 Reply Comments at 16-17. \n296 Vistra April 23 Reply Comments at 17-18."},{"page":70,"startToken":24361,"endToken":24756,"text":"Docket No. EL25-49-000, et al. \n- 62 - \nin separate proceedings.297  Antora also contends that if properly incorporated into PJM's \noperations, fully flexible load need not impose any new resource adequacy burden.298 \n139. Some commenters argue that Co-Location Arrangements can provide reliability \nbenefits.299  ENGIE contends that Co-Location Arrangements can offer improved grid \nreliability and stability. Data Center Coalition states that flexible, efficient service \narrangements like co-location can help alleviate pressure on the broader system, which \ncan serve both reliability and affordability objectives. Constellation argues that \nco-location provides reliability benefits by minimizing grid operational risks because \nfewer grid infrastructure facilities and potential failure points are implicated in serving \nthe load. \n140. Several commenters recommend enhancements, such as additional clarity and \ntransparency, to PJM's resource adequacy planning to account for the addition of large \nCo-Located Loads.30° Glatz and Silverman express concern that neither PJM's nor \nIndicated Transmission Owners' studies would evaluate resource adequacy, and contend \nthat requiring such a study would ensure system reliability. Pennsylvania Commission \nstates that the Tariff must be revised to require PJM to conduct long-term scenario \nanalysis on the potential reliability and cost impacts of Co-Location Arrangements. \n141. Several parties urge reforms to PJM's load forecasting process.301  PIOs, AEU, \nand ELCON argue for standard, transparent terminology and comparable parameters \nacross planners, operators, and users. Data Center Coalition and PIOs argue that PJM's \n297  Constellation April 23 Reply Comments at 11, 60-61 (citing Patterson Aff. \n¶ 15). \n298  Antora April 23 Reply Comments at 12. \n299  See ENGIE April 23 Reply Comments at 7; Data Center Coalition April 23 \nReply Comments at 5; Constellation April 23 Reply Comments at 22-23 (citing Kormos \nAff. ¶ 4). \n300 See CATF April 25 Reply Comments at 7, 8; California Utilities April 23 \nReply Comments at 2; Glatz/Silverman April 23 Reply Comments at 10; NRDC April 23 \nReply Comments at 8-9; PIOs April 23 Reply Comments at 22; Pennsylvania \nCommission April 22 Reply Comments at 7; OPSI April 23 Reply Comments at 3. \n301 ELCON April 23 Reply Comments at 9; PIOs April 23 Reply Comments \nat 16-18, 20, 23; AEU April 23 Reply Comments at 22; Data Center Coalition April 23 \nReply Comments at 9-10; Ohio FEA April 23 Reply Comments at 4; Constellation \nApril 23 Reply Comments at 47; ACEG April 23 Reply Comments at 5, 7; Buckeye \nApril 23 Reply Comments at 11."},{"page":71,"startToken":24756,"endToken":25143,"text":"Docket No. EL25-49-000, et al. \n- 63 - \ncurrent load forecasting methodology often reflects inconsistent assumptions. Ohio FEA \nstates that installing large off-system loads behind existing generators adds complexity, \nincluding that the load would not be captured in the annual load forecasting and planning \nprocesses conducted by LSEs and PJM. Constellation and Data Center Coalition support \nincreased transparency in forecasting. PIOs, Data Center Coalition, and ACEG argue for \nreforms to the load forecasting process to ensure that forecasted data center load is \ncommitment-backed. PIOs state that PJM's load forecasting process does not include \nsufficient controls or standards to prevent speculative additions of large load from \nentering PJM's load forecast. ELCON, PIOs, and Buckeye argue that overestimating \nload growth could lead to substantial overbuilding of infrastructure, which increases costs \nfor consumers. PIOs also argue that inaccurate load forecasting can artificially inflate the \nreserve margin in PJM's capacity market, which could result in unnecessary price \nincreases. \n142. At the same time, ELCON states that underestimating load growth could cause \nreliability challenges.302  ELCON states that enhanced transparency regarding both \nfront-of-the-meter and behind-the-meter loads is necessary to enable operators to \nascertain real-time load behavior, including the potential for excess power injection and \nreliance on back-up services during on-site interruptions. \n143. PIOs argue that consistent with the Commission's Rule of Reason doctrine, PJM's \nLarge Load Forecast Process should be in its Tariff.303  ELCON states that the \nCommission should convene a dialogue addressing load forecasting methodologies and \nhow to facilitate communication among state and federal regulators, transmission \noperators, generators, and customers to ensure all parties are positioned to serve all \ncustomers reliably and affordably.' United States Senators maintain that the \nCommission should consider broader proceedings that would standardize load forecasting \nand other practices relevant to addressing data center demand growth.' \n144. In its response to then-Chairman Rosner's letter to the RTOs/ISOs asking about \nlarge load forecasting, PJM explains that it currently relies on Electric Distribution \nCompanies (EDCs) and LSEs within the PJM footprint to provide relevant data on large \nload requests because PJM does not presently have a load interconnection process.' \n302 ELCON April 23 Reply Comments at 9. \n303 PIOs April 23 Reply Comments at 19. \n304 ELCON April 23 Reply Comments at 8. \n305 United States Senators November 25 Letter at 3. \n306 PJM Response to Then-Chairman Rosner at 4."},{"page":72,"startToken":25143,"endToken":25527,"text":"Docket No. EL25-49-000, et al. \n- 64 - \nPJM states that load interconnection processes are generally administered through retail \ntariffs. PJM states that, based on its survey of certain EDCs and LSEs, there are a wide \nrange of approaches to load adjustment processes, from requiring financial commitments \nbased on a minimum demand to using less stringent approaches. PJM also discusses how \nit recently enhanced transparency in its load adjustment request submission process by \npublishing the Load Adjustment Request Implementation Document that addresses load \nforecasting methods and PJM's need for certain information from forecast submitters.307 \nPJM explains that it relies on historical data when available for forecasting purposes, but \nwhen utilities have no historical data, utilities rely on milestone tracking and customer \nrepresentations about expected demand.308  Lastly, PJM notes that utilities share best \npractices on load adjustment at the Load Analysis Subcommittee.' \nG. \nOther Arguments \n145. Several commenters highlight the importance of data centers and AI to national \nsecurity, particularly defense operations.31° Several commenters also urge the \nCommission to act quickly, given that data centers seeking to connect and take service \nfrom the grid may face delays of seven to ten years before they can receive power. \nSeveral commenters argue that certainty is critical to foster national security goals \nassociated with AI development. Indicated Transmission Owners contend that any \nattempt to change the PJM Tariff would likely stymie data-center development, as new \nterms would require development through the PJM stakeholder process, followed by \nCommission consideration and acceptance. \n146. NOVEC and Market Monitor argue that national security is broader than AI and \nthat other customers are vital to national security, such as existing large industrial \ncustomers and commercial and residential load.311  Market Monitor also argues that any \nnational security issues relate not to co-location but to serving data center load. NOVEC \nalso notes the Commission should consider whether the price increases that Co-Located \n307  Id. at 2, 6. \n3°8  Id. at 6. \n3°9  Id. at 7. \n310 See National Security Experts April 22 Reply Comments at 1; Constellation \nApril 23 Reply Comments at 15-17; AEU April 23 Reply Comments at 25; PSE&G \nMarch 24 Response at 1, 20; BCSE April 23 Reply Comments at 2. \n311  NOVEC April 23 Reply Comments at 19; Market Monitor April 23 Reply \nComments at 7."},{"page":73,"startToken":25527,"endToken":25906,"text":"Docket No. EL25-49-000, et al. \n- 65 - \nLoad could cause may threaten national security by harming existing data centers and the \ngeneral prosperity of the United States. \n147. Parties argue that co-location offers a number of benefits to the grid that lower \ncosts for customers. Several parties argue that Co-Location Arrangements can make \nefficient use of existing transmission infrastructure and forestall the need for new \ninfrastructure investments.312  For example, California Utilities and Constellation argue \nthat Co-Location Arrangements decrease line losses. In addition, Constellation argues \nthat the benefits of co-location include speed to market, increased interconnection \navailability, and extended facility utilization. ENGIE contends Co-Location \nArrangements can offer environmental benefits by encouraging the use of renewable \nenergy sources and energy-efficient technologies.313  ENGIE also argues Co-Location \nArrangements that provide benefits to the grid such as back-up service should be \ncompensated for those benefits.314  Enchanted Rock argues that in regions with \ncentralized transmission, but insufficient local generation, co-location can help reduce \ncongestion and backfill any required transmission contingencies in the short-term.\" \nIndicated Transmission Owners note that the addition of end-use load typically benefits \nother customers with respect to transmission costs because it spreads the shared costs \nmore broadly.316  However, Indicated Transmission Owners also argue that many loads \nprovide benefits to the grid but are still required to pay their share of grid services.317 \n148.\nSeveral parties argue that Co-Location Arrangements may encourage the \ndevelopment of new generating resources that can contribute to increased capacity and \ngrid reliability.318  CATF states Co-Located Loads can provide demand response, access \n312  ENGIE April 23 Reply Comments at 7; Constellation April 23 Reply \nComments at 100-103; EDFR April 23 Reply Comments at 7; Enchanted Rock April 23 \nReply Comments at 17-18; PSE&G March 24 Response at 7, 20; AES Ohio March 24 \nResponse at 14; Enchanted Rock April 23 Reply Comments at 17; CATF April 25 Reply \nComments at 12; California Utilities April 23 Reply Comments at 2. \n313  ENGIE April 23 Reply Comments at 7. \n3141d \n315  Enchanted Rock April 23 Reply Comments at 12. \n316  Indicated Transmission Owners March 24 Response, attach. A at 22. \n317  Indicated Transmission Owners June 3 Reply Comments at 11. \n318  ENGIE April 23 Reply Comments at 7; Chevron April 23 Reply Comments \nat 6."},{"page":74,"startToken":25906,"endToken":26371,"text":"Docket No. EL25-49-000, et al. \n- 66 - \nto lower cost power, or black start and other ancillary services, and can help states to \nmeet their clean energy obligations.319  EDFR states that large loads can also benefit: \n(1) existing generators by locating in areas with surplus energy that would otherwise be \ncurtailed; (2) American industries looking for access to affordable, carbon-free energy; \nand (3) local communities through tax revenue, construction jobs, and employment.32° \n149. Constellation states that consumers bear no risk related to owning and operating \nmerchant generating resources originally paid for in base rates.321  Further, Constellation \nargues that consumers only paid for service, not for assets. On the other hand, NOVEC \nargues that given the historical cost-of-service arrangements for nuclear power plants that \nnow, in part, make them attractive for these bilateral contracts, it would be unfair to \ndedicate such legacy generation to a single private customer after customers at large paid \nfor such facilities and took the risks of construction since the time such resources were \nbuilt.322  NOVEC urges the Commission to consider the legacy costs that retail customers \nbore before allowing private parties to dedicate the remaining benefits of existing \ngeneration to Co-Located Load and argues that the Commission should not permit any \nco-location paradigm that removes nuclear generation from the capacity market. \nNOVEC contends that nuclear units serve an important role in PJM's energy and capacity \nmarket, and notes that Market Monitor has described them as \"baseload power.\" \nAlthough NOVEC agrees in principle that owners of generation assets should be able to \nseek to maximize the beneficial ownership of those assets, NOVEC argues that the \nCommission has the responsibility to reject proposals that are not just and reasonable \nbecause the Federal Power Act is a consumer protection statute.323  NOVEC notes that \nthe Commission has periodically observed how the legacy of the pre-restructuring period \nhas created inequities and the possibility of unjust and unreasonable results.324 \n319  CATF April 25 Reply Comments at 12. \n320 EDFR April 23 Reply Comments at 8. \n321  Constellation April 23 Reply Comments at 107-108. \n322  NOVEC April 23 Reply Comments at 7, 15-17. \n323  Id. at 16 (citing Xcel Energy Services, Inc. v. FERC, 815 F.3d 947, 952 (D.C. \nCir. 2016) (\"It is long-established that the `primary aim [of the FPA] is the protection of \nconsumers from excessive rates and charges.'\" (quoting Mun. Light Bds. of Reading & \nWakefield v. FPC, 450 F.2d 1341, 1348 (D.C. Cir. 1971))). \n324  Id. at 17. For example, NOVEC states that in Opinion No. 494, the \nCommission found that the costs of legacy transmission facilities which were built to \nserve the transmission systems of individual companies and their customers could not be \nallocated to the entire PJM region under the Commission's cost causation principles."},{"page":75,"startToken":26371,"endToken":26707,"text":"Docket No. EL25-49-000, et al. \n- 67 - \n150. A number of parties urge that any Commission action in this proceeding provide \nflexibility for different regions325  and/or different co-location configurations.326 \nCalifornia Utilities request that the Commission recognize that approaches to co-located \nfacilities must be tailored to account for different state regulators, self-regulated \nnon jurisdictional entities, and regions.327  ENGIE contends that flexibility can enhance \nsystem reliability as configuration design can provide multiple pathways for power \ndelivery.328 \n151. Enchanted Rock and CATF oppose PJM's suggestion in option 8 to ease air \npollution standards for co-located generation.329  Relatedly, Center argues that the \nCommission should consider the environmental implications of rules that encourage the \ngrowth of data centers or other large load facilities, including the climate change threats \nthey pose, and should encourage renewable power to these facilities.330 \nIII. \nNotice of Show Cause Proceeding and Responsive Pleadings \n152. Notice of the Show Cause Order was published in the Federal Register, \n90 Fed. Reg. 10818 (Feb. 27, 2025), with interventions due on or before March 13, 2025. \nThe Appendix identifies entities that submitted notices of intervention and motions to \nintervene, as well as abbreviations for those entities. Numerous entities submitted \ncomments and protests, as summarized in this order. Answers were submitted by \nConstellation, Vistra, Buckeye, PSE&G, PPL, and Indicated Transmission Owners. \nNOVEC explains that the instant situation is the inverse, but claims that it implicates the \nsame principle. Id. (citing PJM Interconnection, L.L. C., Opinion No. 494, 119 FERC \n¶ 61,063, at P 42 (2007)). \n325  EDFR April 23 Reply Comments at 7. \n326  Data Center Coalition April 23 Reply Comments at 4; ENGIE April 23 Reply \nComments at 5-6; EDFR April 23 Reply Comments at 9; AEU April 23 Reply Comments \nat 10. \n327  California Utilities April 23 Reply Comments at 9. \n328  ENGIE April 23 Reply Comments at 6. \n329  CATF April 25 Reply Comments at 13, 14; Enchanted Rock April 23 \nComments at 16-17. \n330 Center April 23 Reply Comments at 3-20."},{"page":76,"startToken":26707,"endToken":27132,"text":"Docket No. EL25-49-000, et al. \n- 68 - \n153.\nOn April 4, 2025, Vistra filed a motion for clarification and request for expedited \ntreatment.331  On April 9, 2025, Talen filed an answer to Vistra's motion. On April 22, \n2025, EPSA, P3, Calpine, Cogentrix, Constellation, and LS Power (together, Joint \nParties), pursuant to Rules 212 and 603 of the Commission's Rules of Practice and \nProcedure, filed Joint Comments, a Motion to Stay Proceedings, and a Request to \nEstablish Settlement Judge Procedures (Motion to Stay).332\n AMP, Indicated \nTransmission Owners, PJM, NREMC, NOVEC, and Talen filed answers to the Motion to \nStay. \n154.\nOn September 19, 2025, a letter from then-Chairman Rosner to PJM was filed in \nthis proceeding; then-Chairman Rosner's letter requests information on load forecasting. \nOn October 20, 2025, PJM's response to then-Chairman Rosner's letter was filed in this \nproceeding. \n155.\nOn November 21, 2025, Constellation filed a motion for expedited action. \nConstellation contends that the Secretary of Energy's October 23, 2025 proposal to the \nCommission of an Advanced Notice of Proposed Rulemaking (ANOPR) on large load \ninterconnection to the transmission system underscores the urgent need for clarity \nregarding Co-Location Arrangements.333  PJM timely answered and AEP, Exelon, \nIndicated Transmission Owners, ODEC, and Virginia Commission filed late answers to \nor comments on Constellation's motion for expedited action. Indicated Transmission \nOwners, ODEC, PJM, and Virginia Commission argue that Constellation's motion asks \nthe Commission to prejudge issues raised in the ANOPR proceeding. PJM alleges that \ngranting the motion would not only preempt the PJM stakeholder process concerning the \nintegration of large loads, but also violate the principle that agencies should defer taking \n331  Vistra requests clarification regarding the Commission's interpretation of the \nNovember 1, 2024 Order in Docket No. ER24-2172 regarding whether it: (1) prejudged \nthe permissibility of any particular co-location configuration; (2) indicated that the \nCommission generally opposes fully isolated behind the meter co-located load; or \n(3) prohibits parties from following the currently effective tariff rules and negotiating the \nterms of non-conforming ISAs pursuant to existing tariff provisions while this proceeding \nis underway. \n332  Joint Parties request that the Commission stay the show cause proceeding for a \nlimited period of 90 days and establish settlement judge proceedings as expeditiously as \npossible to allow the parties to develop a new replacement rate. \n333  Motion at 3-4 (citing U.S. Department of Energy, Secretary of Energy, \nDirection that the Commission Initiate Rulemaking Procedures and Proposal Regarding \nthe Interconnection of Large Loads Pursuant to the Secretary's Authority Under \nSection 403 of the Department of Energy Organization Act (Oct. 23, 2025))."},{"page":77,"startToken":27132,"endToken":27500,"text":"Docket No. EL25-49-000, et al. \n- 69 - \naction in specific adjudicatory matters where such action would supplant ongoing generic \nrulemakings.334  The Indicated Transmission Owners contend that granting the motion \nwould cause confusion and unwarranted expense if it modified the PJM Tariff on an \ninterim basis before addressing issues nationwide in the ANOPR proceeding.335  The \nIndicated Transmission Owners further allege that granting the motion would result in a \npremature, improper jurisdictional determination in this proceeding.336 \nIV. \nDiscussion \nA. \nProcedural Matters \n156. Pursuant to Rule 214 of the Commission's Rules of Practice and Procedure, \n18 C.F.R. § 385.214 (2025), the notices of intervention and timely, unopposed motions to \nintervene serve to make the entities that filed them parties to this proceeding. \n157. Pursuant to Rule 214(d) of the Commission's Rules of Practice and Procedure, \n18 C.F.R. § 385.214(d), we grant the late-filed motions to intervene given these entities' \ninterests in the proceeding, the early stage of the proceeding, and the absence of undue \nprejudice or delay. \n158. Rule 213(a)(2) of the Commission's Rules of Practice and Procedure, 18 C.F.R. \n§ 385.213(a)(2), prohibits an answer to a protest or answer unless otherwise ordered by \nthe decisional authority. We accept the answers because they have provided information \nthat assisted us in our decision-making process. \nB. \nSubstantive Matters \n159. As discussed further below, we find that the PJM Tariff is unjust and unreasonable \nbecause it does not contain provisions addressing with sufficient clarity or consistency \nthe rates, terms, and conditions of service that apply to Interconnection Customers \nserving Co-Located Load and Eligible Customers taking transmission service on behalf \nof Co-Located Load. We find that the absence of such provisions leaves entities unable \nto determine what steps they must take to effectuate Co-Location Arrangements, which \ncreates uncertainty that has resulted in disparate treatment in PJM, where transmission \nowners have taken different approaches to performing the necessary steps that apply to \nInterconnection Customers seeking to serve Co-Located Load through a Co-Location \n334  PJM Answer at 2 (citing Cities of Anaheim v. FERC, 723 F.2d 656, 659 \n(9th Cir. 1984). \n335  Indicated Transmission Owners Answer at 3. \n336  Id at 5."},{"page":78,"startToken":27500,"endToken":27996,"text":"Docket No. EL25-49-000, et al. \n- 70 - \nArrangement, leading to no consistent understanding of entities' responsibilities with \nrespect to their planned Co-Location Arrangements. We also find that PJM's Tariff is \nunjust and unreasonable because it does not include transmission services that reflect an \nEligible Customer taking service on behalf of a Co-Located Load that is willing and able \nto limit its energy withdrawals from the transmission system under certain conditions. \nFurther, we find that PJM's Tariff is unjust and unreasonable because it does not address \ncharges related to Co-Located Loads' use of regulation and black start services, which \nintroduces the risk that Co-Located Loads may benefit from regulation and black start \nservices without contributing to cost recovery for such services and, thereby, the risk that \ncosts may be allocated entirely to other transmission customers and passed through to \nresidential customers, among others. \n160. \nAs a replacement rate, we direct PJM to revise its Tariff to require that an \nInterconnection Customer who will use its generating facility to serve Co-Located Load \nspecify an Eligible Customer who will take transmission service on behalf of the Co-\nLocated Load. We also direct PJM to establish three new transmission services that \nreflect that Eligible Customers taking service on behalf of Co-Located Load are willing \nand able to limit their energy withdrawals from the transmission system under certain \nconditions. Specifically, we direct PJM to revise its Tariff to allow Eligible Customers \nseeking to take NITS on behalf of Co-Located Load to, at their option, take a new \ninterim, non-firm transmission service until all Network Upgrades necessary to provide \nNITS are complete. We further direct PJM to offer two other new transmission \nservices—a Firm Contract Demand transmission service and a Non-Firm Contract \nDemand transmission service—that an Eligible Customer can choose to take on behalf of \na Co-Located Load instead of taking NITS. These new transmission service options \nreflect a Co-Located Load's ability to limit withdrawals from the transmission system \nand potentially avoid costly and inefficient transmission system buildout that may not be \nnecessary. Eligible Customers serving Co-Located Load that seek to rely on the \ntransmission system to the same extent as Network Load customers will continue to be \neligible to take NITS, billed on a gross demand basis. All Eligible Customers taking \nNITS or one of the new transmission services on behalf of Co-Located Load must be \nassessed charges for regulation and black start services on a gross demand basis, \nregardless of which transmission service they select, to ensure Co-Located Load \ncontributes to cost recovery for such services. As noted below, a Co-Location \nArrangement is synchronized to the transmission system.\"' We also seek briefing as to \nwhether the rate paid by an Eligible Customer on behalf of a Co-Located Load taking \nonly the new Non-Firm Contract Demand transmission service that elects to not reserve \nany amount of that service for a period of time (e.g., one month) reflect not only charges \n337  See also PJM March 24 Response at 42-43."},{"page":79,"startToken":27996,"endToken":28486,"text":"Docket No. EL25-49-000, et al. \n- 71 - \nfor regulation and black start services, but also an additional charge given that regulation \nand black start services could not be provided without the transmission system. \n161. Next, we direct PJM to clarify its interconnection procedures and agreements to \nensure that it is clear to both new and existing Interconnection Customers how to \ninterconnect in a Co-Location Arrangement. Specifically, we direct PJM to revise its \nTariff to make clear how Interconnection Customers can make use of provisional \ninterconnection service, the ability to request interconnection service below nameplate \ncapacity, the potential to accelerate the interconnection process under certain \ncircumstances (e.g., where the request has no Network Upgrade costs and does not \nrequire further studies), and Surplus Interconnection Service to interconnect new \ngenerating facilities seeking to serve Co-Located Load. We also direct PJM to revise its \nTariff to clarify the procedures for the study necessary to determine any modifications to \ninterconnection facilities or Network Upgrades to the transmission system PJM finds are \nneeded to maintain transmission system reliability as a result of the Interconnection \nCustomer's request to modify its interconnection service level for an existing generating \nfacility to serve Co-Located Load. These clarifications also require existing \nInterconnection Customers to pay the full cost of any such modifications to \ninterconnection facilities or Network Upgrades to the transmission system and specify \nthat an existing generating facility cannot withdraw its capacity from the system to begin \nserving a Co-Located Load until all such modifications and Network Upgrades necessary \nto maintain reliability for existing customers are in service. \n162. In furtherance of the Commission's mandate to ensure just and reasonable rates for \nconsumers, the replacement rate will ensure that Eligible Customers on behalf of \nCo-Located Load take transmission service and incur transmission costs in a way that is \nat least roughly commensurate with their derived benefits. The replacement rate will also \nensure that Eligible Customers on behalf of Co-Located Load are able to take \ntransmission services that reflect their actual impact on the transmission system, which in \nmany cases may be more limited relative to conventional front-of-meter load and \ngeneration. Collectively, the replacement rate provides pathways that recognize \nCo-Located Loads that limit their energy withdrawals from the transmission system, \nwhich may require fewer Network Upgrades, and therefore may result in lower Network \nUpgrade costs as compared to requiring all Eligible Customers taking service on behalf \nof Co-Located Load to take NITS. \n163. The remainder of this determination is organized as follows. Part IV.B.1 \nestablishes the definition of Co-Located Load and directs PJM to incorporate this \ndefinition into its Tariff. Part IV.B.2 addresses the Commission's and the states' \njurisdiction over Co-Location Arrangements. Part IV.B.3 explains why PJM's Tariff is \nnot just and reasonable absent provisions addressing the rates, terms, and conditions of \nservice that apply to Interconnection Customers seeking to serve Co-Located Load and \nEligible Customers taking transmission service on behalf of Co-Located Load."},{"page":80,"startToken":28486,"endToken":28880,"text":"Docket No. EL25-49-000, et al. \n- 72 - \nPart IV.B.4 directs a replacement rate that establishes just and reasonable rates, terms, \nand conditions of service for Eligible Customers taking transmission service on behalf of \nCo-Located Load and for Interconnection Customers that serve Co-Located Load. \nPart IV.B.4 also establishes paper hearing procedures to gather additional record \nevidence to set the appropriate replacement rate. The remaining sections address other \nissues raised in the record. \n1. \nDefinition \n164. The Show Cause Order used the following definition of Co-Located Load: a \n\"'configuration [that] refers to end-use customer load that is physically connected to the \nfacilities of an existing or planned Customer Facility on the Interconnection Customer's \nside of the Point of Interconnection to the PJM Transmission System.'\"338  We adopt that \ndefinition in this order as well. Indicated Transmission Owners object to this definition, \narguing that this definition obscures that Co-Located Loads rely on the transmission \nsystem to receive service.339  We disagree. This definition reflects the fact that the \nCo-Location Arrangement is physically connected to and synchronized to the \ntransmission system. This relationship, and specifically the interconnection of the \ngenerator to the transmission system, is critical to the determinations we make below. \nWe thus direct PJM to incorporate this definition into its Tariff on compliance as part of \nthe replacement rate detailed below. \n2. \nJurisdiction \n165. As the Commission explained at length in the Show Cause Order, the issues \npresented in this proceeding implicate both federal and state interests, and their resolution \nwill require the involvement of both federal and state actors, including the Commission, \nstate public utility commissions, and other state and local entities.34° Recognizing the \ncareful balance that the FPA strikes between federal and state regulation, we make \nseveral findings below, including that: (1) states retain exclusive authority over the \nspecific terms of retail sales, generator siting, the generation mix, and transmissions in \nintrastate commerce; (2) the Commission retains the authority to oversee the terms and \nconditions of generator interconnection to any Commission jurisdictional distribution \nfacility or transmission facility,341  including for generators that serve or plan to serve \n338  Show Cause Order, 190 FERC ¶ 61,115 at P 3 & n.4 (citation omitted). \n339  Indicated Transmission Owners March 24 Response at 7 n.17. \n34°  See Show Cause Order, 190 FERC ¶ 61,115 at P 66. \n341  See infra P 172."},{"page":81,"startToken":28880,"endToken":29311,"text":"Docket No. EL25-49-000, et al. \n- 73 - \nCo-Located Load; and (3) the Commission has the authority to ensure that the rates for \ntransmission service in interstate commerce are just and reasonable. \n166. Because the Commission is a creature of statute, it has jurisdiction only over those \nmatters that Congress has given it the authority to regulate.' Section 201(b)(1) of the \nFPA gives the Commission jurisdiction over the transmission of electric energy in \ninterstate commerce, the sale of electric energy at wholesale in interstate commerce, and \nall facilities for such transmission or sale of electric energy.' The FPA reserves to the \nstates authority over any matters not expressly conveyed to the Commission,344  which \nincludes retail sales and wholesale sales not in interstate commerce, as well as the \nfacilities used for the generation and distribution of electricity, except as where otherwise \nprovided.345  The Supreme Court has long held regulation of these matters to be within \nthe states' historical police powers,346  and the Court has observed that the FPA's \njurisdictional divide \"was drawn with meticulous regard for the continued exercise of \nstate power, not to handicap or dilute it in any way.\"347  We adhere to those principles \nhere. \na. \nAreas of Exclusive State Authority \n167. We find that several aspects of Co-Location Arrangements fall squarely within the \njurisdiction of the states. First, states retain exclusive authority over the specific terms of \nretail sales and retail rate design, including how the costs of interstate wholesale sales and \ntransmission of electricity assigned to a wholesale customer are allocated among that \nwholesale customer's retail customers. Although \"a State may not conclude in setting \n342  Atl. City Elec. Co. v. FERC, 295 F.3d 1, 8 (D.C. Cir. 2002). \n343  16 U.S.C. § 824(b)(1). \n344  Nat'l Ass 'n of Regul. Util. Comm 'rs v. FERC, 964 F.3d at 1187 (citing N. Nat. \nGas Co. v. State Corp. Comm 'n of the State of Kan., 372 U.S. 84, 91-93 (1963)). \n345  16 U.S.C. § 824(b)(1); see Dayton Power & Light Co. v. FERC, 126 F.4th \n1107, 1129 (6th Cir. 2025). \n346  See, e.g., Munn v. People of State of Iii., 94 U.S. 113 (1876). \n347  Oneok, Inc. v. Learjet, Inc., 575 U.S. 373, 384-85 (2015) (discussing the \nanalogous provisions in the Natural Gas Act) (quoting Panhandle E. Pipe Line Co. v. \nPub. Serv. Comm 'n of Ind., 332 U.S. 507, 517-18 (1947)); see also Nw. Cent. Pipeline \nCorp. v. State Corp. Comm 'n of Kan., 489 U.S. 493, 511 (1989))."},{"page":82,"startToken":29311,"endToken":29727,"text":"Docket No. EL25-49-000, et al. \n- 74 - \nretail rates that the FERC-approved wholesale rates are unreasonable,\"348  it is within a \nstate's exclusive jurisdiction to determine how those FERC-approved rates are collected \namong the relevant retail consumers, including retail consumers that are Co-Located \nLoad.349  Therefore, states have exclusive jurisdiction over how the costs assigned to \nEligible Customers on behalf of Co-Located Load taking Commission-jurisdictional \ntransmission services — including the new transmission services directed below — are \nallocated to individual retail consumers that are Co-Located Load, just as states have \nexclusive jurisdiction over how to allocate the costs of all Commission-jurisdictional \nrates (including for energy, capacity, and transmission) among retail customers, including \nallocating costs among different classes of retail customers.3\" Regulation of wholesale \nsales that are not in interstate commerce also falls to the states; we agree with \ncommenters who note this distinction.351  We disagree with some parties' claim that \nthere could be a regulatory gap under state law,352  as Co-Located Load that is not served \nby an islanded generator353  may receive some services from the distribution and \ntransmission systems. We also agree with Pennsylvania Commission and OPSI that the \ncommission that regulates each portion of the respective systems has jurisdiction over \nthose services.354 \n168. Second, we affirm the Commission's statement from the Show Cause Order that \nstates retain the exclusive authority through state franchise laws to regulate which entities \nmay make retail sales within their borders, and thus the states determine which entities \n348  Nantahala Power & Light Co. v. Thornburg, 476 U.S. 953, 966 (1986). \n349  See, e.g., PIOs April 23 Reply Comments at 42. \n350 Order to Show Cause, 190 FERC ¶ 61,115 at P 68. \n351  See, e.g., OPSI April 23 Reply Comments at 5. \n352  Those parties specifically note concerns where, for example, a single generator \nprovides service to a single customer or one large industrial end-use customer sells \nelectricity to another large industrial end-user within the same complex. See PJM \nMarch 24 Response at 27; PPL April 23 Reply Comments at 7. \n353  A fully islanded generator is one that is engaged in a self-sufficient \narrangement with its load where the load and generation together are both fully \nelectrically isolated from the transmission system. See Farhan Noor et al., Unintentional \nIslanding and Comparison of Prevention Techniques at 90 (2005), \nhttps://ieeexplore.ieee.org/stamp/stamp.jsp?arnumber=1560507&tag=1. \n354  See Pennsylvania Commission April 22 Reply Comments at 4-5; OPSI April 23 \nReply Comments at 5-6."},{"page":83,"startToken":29727,"endToken":30153,"text":"Docket No. EL25-49-000, et al. \n- 75 - \nare legally permitted to provide electricity to retail customers in Co-Location \nArrangements.355  Nothing in this order changes who may provide, and bill for, retail \nservice to a Co-Located Load. Furthermore, as OPSI explains, that parties seeking \nclarification of the extent to which a generator's retail sale of energy to Co-Located Load \nis state jurisdictional may file a petition for declaratory order with the relevant state \ncommission.356 \n169. Third, we confirm that states have authority over their generation resource mix, \nincluding through their siting authority.357  This authority means that which generating \nfacilities are sited and allowed to serve Co-Located Load is also a question of state \nlaw.358  That is true notwithstanding the fact that PJM's markets might indirectly \ninfluence the resource mix through, for example, capacity market price signals that affect \nresource entry and exit.359 \n170. Finally, we decline in this proceeding to comprehensively address jurisdictional \nmatters regarding the interconnection of retail loads served through a Co-Location \nArrangement to the interstate transmission system. As discussed below, we conclude that \nthe Commission has jurisdiction to oversee the interconnection of generating facilities, \nincluding the generators that are used to serve Co-Located Load, to the interstate \ntransmission system, as well as jurisdiction over the provision of transmission service in \ninterstate commerce used by an Eligible Customer to serve Co-Located Load. We find \nthat these determinations are sufficient to resolve the issues in this proceeding. \nTherefore, we establish requirements below that apply to Interconnection Customers \n355  Show Cause Order, 190 FERC ¶ 61,115 at PP 68-69. \n356  OPSI April 23 Reply Comments at 5-6. \n357  See, e.g., Citizens Action Coal. of Ind., Inc. v. FERC, 125 F.4th 229, 238 (D.C. \nCir. 2025) (citing 16 U.S.C. § 824(b)(1)). \nSee FERC v. Elec. Power Supply Ass 'n, 577 U.S. 260, 267 (2016) (EPSA) (\"the \nCommission may not regulate . . . retail sales of electricity (i.e., sales directly to users)\"); \nShow Cause Order, 190 FERC 1161,115 at P 69 (\"under the FPA, the states get to \ndetermine which entities are legally permitted to provide electricity to retail customers in \nco-location arrangements\"). \n359  Accord EPSA, 577 U.S. at 281 (\"It is a fact of economic life that the wholesale \nand retail markets in electricity, as in every other known product, are not hermetically \nsealed from each other. To the contrary, transactions that occur on the wholesale market \nhave natural consequences at the retail level. And so too, of necessity, will FERC's \nregulation of those wholesale matters.\")."},{"page":84,"startToken":30153,"endToken":30541,"text":"Docket No. EL25-49-000, et al. \n- 76 - \nseeking to serve Co-Located Load as well as Eligible Customers taking interstate \ntransmission service on behalf of Co-Located Load. \nb. \nThe Commission Has Jurisdiction over Generation \nInterconnection  \n171. The Commission retains exclusive jurisdictional authority to ensure that the rates, \ncharges, and classifications for the interstate wholesale sale and transmission of \nelectricity, as well as the practices directly affecting such sale and transmission of \nelectricity, are just and reasonable and not unduly discriminatory or preferentia1.360  We \nagree with commenters that a generator's interconnection to the interstate transmission \nsystem does not fall outside of the Commission's jurisdiction merely because there is \nCo-Located Load behind the generator's point of interconnection.'\" The Commission \nretains exclusive jurisdiction to oversee the interconnection of generating facilities to the \ninterstate transmission system, including where generators serve Co-Located Load. \n172. Regarding generation interconnection, the Commission retains exclusive authority \nto regulate the procedures and agreements that apply to the interconnection of a generator \nthat will make wholesale sales, both where the generator interconnects directly to the \ninterstate transmission system and where a generator interconnects to dual-use \ndistribution facilities.362  The standard interconnection procedures and agreements first \nadopted in Order No. 2003 apply when an interconnection customer \"that plans to engage \nin a sale for resale in interstate commerce or to transmit electric energy in interstate \ncommerce\"363  requests interconnection to the facilities of a public utility's transmission \nsystem or distribution system \"that, at the time the interconnection is requested, may be \nused either to transmit electric energy in interstate commerce or to sell electric energy at \nwholesale in interstate commerce pursuant to a Commission-filed Open Access \n360 16 U.S.C. §§ 824d, 824e; see EPSA, 577 U.S. at 278 (2016) (approving \"a \ncommon-sense construction of the FPA's language, limiting the Commission's \n`affecting' jurisdiction to rules or practices that `directly affect the wholesale rate' \n(cleaned up)). \n361  See Talen April 23 Reply Comments at 8. \n362  See NARUC, 475 F.3d at 1282 (FERC's exercise of jurisdiction \"only over \n`interconnections to a `distribution' facility when the facility is included in a public \nutility's Commission-filed OATT and the interconnection is for the purpose of \nfacilitating a jurisdictional wholesale sale of electric energy' is permissible and not an \nexample of jurisdictional \"boot-strapping\"). \n363  Order No. 2003, 104 FERC ¶ 61,103 at P 804."},{"page":85,"startToken":30541,"endToken":30977,"text":"Docket No. EL25-49-000, et al. \n- 77 - \nTransmission Tariff (OATT).\"3\" In particular as to distribution-level interconnections, \nOrder Nos. 2003 and 2006 established what is sometimes referred to as the \"first use\" \ntest, under which the first interconnection to a distribution facility for the purpose of \nmaking wholesale sales is not typically Commission jurisdictional because the facility is \nnot at the time of the request used to transmit electric energy in interstate commerce or \nsubject to wholesale open access under an OATT.365  This jurisdictional application has \nbeen found to be consistent with the FPA.366  Furthermore, once the generator has \ninterconnected, the Commission retains authority over the generator's wholesale sales in \ninterstate commerce. \nc. \nThe Commission Has Jurisdiction to Ensure that Eligible  \nCustomers Taking Service on Behalf of Co-Located Loads \nAre Allocated Costs for Transmission Service  \n173. We affirm that the Commission has exclusive jurisdiction over the provision of \ntransmission service used by an Eligible Customer to serve Co-Located Load, again \n364  Id.; see also Standardization of Small Generator Interconnection Agreements & \nProcs., Order No. 2006, 111 FERC ¶ 61,220, at P 5, order on reh'g, Order No. 2006-A, \n113 FERC ¶ 61,195 (2005), order granting clarification, Order No. 2006-B, 116 FERC \n¶ 61,046 (2006) (\"this Final Rule applies only to interconnections with facilities that are \nalready subject to the Transmission Provider's OATT at the time the Interconnection \nRequest is made\"). \n365  See Order No. 2003, 104 FERC ¶ 61,103 at P 804; Order No. 2006, 111 FERC \n¶ 61,220 at P 481 (explaining that \"only facilities that already are subject to the \nTransmission Provider's OATT are covered by this rule [and that] the Commission is not \nencroaching on the States' jurisdiction\"). The interconnection of a second generator to \nthe same distribution facility for the purpose of engaging in wholesale sales is \njurisdictional, however, because the facilities are already being used to facilitate \nwholesale transactions and are subject to wholesale open access, meaning that it and any \nsubsequent wholesale generators must utilize the Commission-jurisdictional generator \ninterconnection procedures and agreements. Participation of Distributed Energy Res. \nAggregations in Mkts. Operated by Reg'l Transmission Orgs. & Indep. Sys. Operators, \nOrder No. 2222, 172 FERC ¶ 61,247, at P 93 (2020), order on reh'g, Order No. 2222-A, \n174 FERC ¶ 61,197, order on reh'g, Order No. 2222-B, 175 FERC ¶ 61,227 (2021). \n366  See NARUC, 475 F.3d at 1280-82 (\"By establishing standard agreements FERC \nhas exercised its jurisdiction over the terms of those relationships.\") (citing TAPS, \n225 F.3d at 696 (\"FPA § 201 makes clear that all aspects of wholesale sales are subject to \nfederal regulation, regardless of the facilities used.\"))."},{"page":86,"startToken":30977,"endToken":31399,"text":"Docket No. EL25-49-000, et al. \n- 78 - \nprovided that transmission of electricity is in interstate commerce.367  As part of its \ntransmission authority, the Commission has exercised jurisdiction over the terms of \ncertain interconnections to the transmission system as \"an essential element of \n[t]ransmission [s]ervice\"368  and we agree with commenters who note the same.369  The \nCommission also \"may exercise jurisdiction over generation facilities to the extent \nnecessary to regulate interstate transmission\"370  and may require \"physical changes\" to \nthose facilities as long as the changes \"bear a close enough relation to [the \nCommission's] exercise of jurisdiction over jurisdictional transactions.\"3\" Similarly, \n367  See supra P 171. The Supreme Court has held that transmission facilities \nconnected to the interstate grid operate in interstate commerce, but the presumption that \ntransmission is in interstate commerce will not necessarily hold if transmission-level \nfacilities are not connected to that interstate grid. See New York v. FERC, 535 U.S. at 16 \n(citing FPC v. Fla. Power & Light Co., 404 U.S. 453, 466-67 (1972) (Florida Power)); \nsee also Florida Power, 404 U.S. at 462-63 (\"[The Commission's] alternative assertion \nthat energy commingles in a bus is, in our opinion, sufficient to sustain [the \nCommission's] jurisdiction.\"). See also Market Monitor April 23 Reply Comments at 13. \n368  Order No. 2003-A, 106 FERC ¶ 61,220 at P 698; see NARUC, 475 F.3d \nat 1280 (affirming Order No. 2003 and observing that \"interconnections appear to be \nrelationships between parties with respect to electricity flowing over facilities. . . . By \nestablishing standard agreements [the Commission] has exercised its jurisdiction over \nthe terms of those relationships.\"). The Commission has reiterated this finding \nrepeatedly. Pac. Gas & Elec. Co., 115 FERC ¶ 61,193, at P 36 (2006) \n(\"[I]nterconnection is part and parcel of transmission of electric energy in interstate \ncommerce, and thus interconnection service is part and parcel of jurisdictional \ntransmission service.\"); see also id. P 36 n.52 (citing Tenn. Power Co., 90 FERC \n¶ 61,238, at 61,761, reh'g dismissed, 91 FERC ¶ 61,271 (2000)). \n369  See, e.g., Talen April 23 Reply Comments at 4-5 (explaining that the basis of \nthe Commission's authority is that the ISA governing a generator serving Co-Located \nLoad is Commission-jurisdictional). \n3\" TAPS, 225 F.3d at 718; NextEra Energy Res., LLC v. FERC, 118 F.4th 361, \n369 (D.C. Cir. 2024) (holding that an upgrade to a generator's equipment directly affects \nthe transmission of electricity in interstate commerce and is therefore within the \nCommission's jurisdiction). \n371  NARUC, 475 F.3d at 1282."},{"page":87,"startToken":31399,"endToken":31810,"text":"Docket No. EL25-49-000, et al. \n- 79 - \n\"FERC may regulate electric generating facilities so long as it is addressing a practice \naffecting wholesale rates.\"372 \n174. We acknowledge, as the Supreme Court has recognized, that the boundaries \nbetween federal and state jurisdiction are not hermetically sealed.373  The application of \nthe principles outlined in this order to Co-Location Arrangements depends on the specific \nfacts and circumstances presented in particular situations. We find, however, that the \nchanges to the PJM Tariff that the Commission directs in this order properly draw on the \nCommission's authority under the FPA without infringing on states' authority. \n3. \nShow Cause Findings \na. \nOverview \n175. We find that PJM's Tariff is unjust and unreasonable because it does not contain \nprovisions addressing with sufficient clarity or consistency the rates, terms, and \nconditions of service that apply to Interconnection Customers serving Co-Located Load \nand Eligible Customers taking transmission service on behalf of Co-Located Load.374  As \nthe Commission explained in the Show Cause Order, the absence of such provisions \nleaves entities unable to determine what steps they must take to effectuate Co-Location \nArrangements of various configurations. Furthermore, this absence creates uncertainty \nthat has resulted in disparate treatment in PJM, where transmission owners have taken \ndifferent approaches to performing the necessary steps that apply to Interconnection \nCustomers seeking to serve Co-Located Load through a Co-Location Arrangement, \nleading to no consistent understanding of entities' responsibilities with respect to their \nplanned Co-Location Arrangements.375  The absence of such provisions also introduces \nthe risk that Co-Located Load may benefit from regulation and black start services \n372  Nat? Ass 'n of Regul. Util. Comm 'rs, 964 F.3d at 1186 n.5; accord La. Pub. \nServ. Comm 'n v. FERC, 522 F.3d 378, 390 (D.C. Cir. 2008) (explaining that \"the \ngenerating facility exception of Section 201(b)(1)\" conferring authority over generation \nfacilities to States \"does not apply where jurisdiction is specifically provided for in \ncertain specified sections of the [Federal Power] Act, including Sections 201 and 206.\"). \n373  EPSA, 577 U.S. at 281. \n374  See, e.g., EPSA/P3 April 23 Reply Comments at 10. \n375  See, e.g., Constellation, Complaint, Docket No. EL25-20-000 (filed Nov. 22, \n2024); Baltimore Gas & Electric Company and PECO Energy Company, Petition for \nDeclaratory Order, Docket No. EL24-149-000 (filed Sept. 30, 2024); Constellation \nApril 23 Reply Comments at 4 n.4 (stating that \"PJM is uniquely situated\" in having an \nunjust and unreasonable tariff absent co-location rules)."},{"page":88,"startToken":31810,"endToken":32303,"text":"Docket No. EL25-49-000, et al. \n- 80 - \nwithout contributing to cost recovery for such services. Many parties to this proceeding \nfiled comments supporting the Commission's preliminary finding that PJM's Tariff lacks \nsufficient clarity or consistency as to the rules for Co-Location Arrangements.376  We are \nnot persuaded by PJM's argument that its Tariff remains just and reasonable, because \nwhile PJM asserts that its existing Tariff permits Co-Location Arrangements, PJM \nrecognizes that there is a lack of clarity and consistency in the Tariff regarding the rules \nfor Co-Location Arrangements.377 \n176. First, we find the PJM Tariff unjust and unreasonable because there is a lack of \nsufficient clarity or consistency as to the rates, terms, and conditions of service that apply \nto Interconnection Customers serving Co-Located Load. As such, Interconnection \nCustomers seeking to use their generating facilities to serve Co-Located Load have no \nmeans of knowing the appropriate mechanism for setting forth the terms and conditions \nof Co-Location Arrangements. Moreover, without an Eligible Customer designated to \n376  See Constellation May 8 Answer at 9 (\"In sum, the record in this proceeding \nunequivocally supports the Commission's preliminary finding that the PJM Tariff lacks \nclear co-location rules and is unjust and unreasonable.\"); see also AEU April 23 Reply \nComments at 19 (\"Loads and generators pursuing [C]o-[L]ocation [A]rrangements need \nclarity as to how these arrangements will be studied, and how those studies will be \nevaluated. There must be a level of uniformity and detail outlining study requirements to \nensure regulatory certainty for large loads and new generation and storage resources \nseeking to serve large loads. This level of uniformity is currently lacking in PJM's \ninterconnection procedures and cost allocation methodology . . . .\"); EPSA/P3 April 23 \nReply Comments at 2 (\"EPSA and P3 agree with the Commission that PJM needs to \nestablish tariff provisions and rules to accommodate the array of [C]o-[L]ocated [L]oad \narrangements that will facilitate the timely and effective integration of large loads \nlocating in the region.\"); DCC April 23 Reply Comments at 7 (\". . . [T]he Commission \nshould direct PJM to develop clear, enforceable tariff language that affirms the \npermissibility of multiple co-location configurations, including those where load is \nserved directly from a generation resource located on or near the same site. Tariff clarity \nis essential to reduce unnecessary disputes, avoid case-by-case confusion, and enable \ntransmission providers to process interconnection and load addition requests efficiently \nand predictably.\"). \n377  PJM March 24 Response at 32 (\"Nevertheless, clarifications and enhancements \ncould well be in order given that this is an evolving area and Tariff provisions did not \ncontemplate the type of arrangements at issue in this docket or their implications.\"); id. \nat 35 (\"The extent to which netting [rules under the PJM Tariff] could or should apply to \nco-located data center load is not clear at this time.\"); see also Vistra April 23 Reply \nComments at 11 (arguing that PJM has \"effectively conceded\" that the PJM Tariff does \nnot contain sufficient clarity)."},{"page":89,"startToken":32303,"endToken":32817,"text":"Docket No. EL25-49-000, et al. \n- 81 - \ntake transmission service on behalf of a Co-Located Load, there is no mechanism for \nPJM to address situations in which a Co-Located Load withdraws energy from the \ntransmission system. As described in Part IV.B.4.a, we therefore direct PJM to file, as \nthe first part of the replacement rate, revisions to the generation interconnection \nprocedures of the Tariff, including to require an Interconnection Customer who will use \nits generating facility to serve Co-Located Load to specify an Eligible Customer who will \ntake transmission service on behalf of the Co-Located Load. We also direct PJM to file \nTariff changes specifying that an Interconnection Customer seeking to serve Co-Located \nLoad using an existing generating facility must bear the costs of all Network Upgrades \nthat PJM finds are necessary to preserve transmission system reliability for existing \ntransmission customers, and that an existing generating facility cannot begin service to a \nCo-Located Load until all required Network Upgrades are in service. This requirement \nwill protect existing transmission customers from transmission reliability risks and from \nbearing the cost of Network Upgrades required for an Interconnection Customer to begin \nserving Co-Located Load. Furthermore, as described in Part IV.B.4.d, we direct PJM to \nrevise its Tariff to clarify that an Interconnection Customer seeking to serve a \nCo-Located Load with a newly interconnecting generating facility may: (1) request \ninterconnection service at a level below its maximum facility output; (2) use existing \nprocedures in the PJM Tariff to accelerate the study of the interconnection service request \nif the request has no cost allocation for Network Upgrades and does not require further \nstudies; (3) request provisional interconnection service; and (4) request Surplus \nInterconnection Service. \n177. Second, we also find that PJM's Tariff is unjust and unreasonable because it does \nnot include transmission services that reflect Eligible Customers378  taking service on \nbehalf of Co-Located Loads that are willing and able to limit their energy withdrawals \nfrom the transmission system under certain conditions. As discussed below, requiring \nEligible Customers taking transmission service on behalf of Co-Located Load to take \nNITS, without the option to instead take the new transmission services set forth in this \norder, would be inefficient. Specifically, for Eligible Customers taking service on behalf \nof Co-Located Loads that do not reserve transmission or take energy from the \ntransmission system but which receive only regulation and black start services, or that \notherwise are willing and able to limit their energy withdrawals from the transmission \nsystem, requiring such Eligible Customers to take NITS on behalf of these Co-Located \nLoads may in some circumstances result in costly and inefficient transmission system \n378  PJM defines Eligible Customer as: \"(i) Any electric utility ... or any person \ngenerating electric energy for sale for resale ... (ii) Any retail customer taking unbundled \ntransmission service pursuant to a state requirement that the Transmission Provider or a \nTransmission Owner offer the transmission service, or pursuant to a voluntary offer of \nsuch service by a Transmission Owner, is an Eligible Customer under the Tariff . . . .\" \nPJM, Intra-PJM Tariffs, OATT, § I.1 Definitions - E-F (41.0.0)."},{"page":90,"startToken":32817,"endToken":33270,"text":"Docket No. EL25-49-000, et al. \n- 82 - \nbuildout that may not be necessary if such Eligible Customers are willing and able to take \na transmission service that requires fewer Network Upgrades to provide, and therefore \nmay result in lower Network Upgrade costs, than would NITS. Moreover, we find that \nPJM's Tariff is unjust and unreasonable because it does not address charges related to \nCo-Located Loads' use of regulation and black start services, which introduces the risk \nthat Co-Located Load may benefit from regulation and black start services without \ncontributing to cost recovery for such services and, thereby, the risk that costs may be \nallocated entirely to other transmission customers and passed through to residential \ncustomers, among others.379  Specifically, the record demonstrates that Co-Located \nLoads, which are synchronized with the PJM transmission system, use regulation and \nblack start services, as explained below. In addition to regulation and black start \nservices, Co-Located Loads that withdraw energy from the transmission system are \ntaking transmission service. \n178. Therefore, as the second part of the replacement rate, we direct PJM to revise its \nTariff to create three new transmission services that reflect that Eligible Customers taking \nservice on behalf of Co-Located Loads are willing and able to limit their energy \nwithdrawals from the transmission system under certain conditions. Specifically, we \ndirect PJM to revise its Tariff to allow Eligible Customers seeking to take NITS on behalf \nof Co-Located Load to take a new interim, non-firm transmission service until all \nNetwork Upgrades necessary to provide the requested NITS are complete. We further \ndirect PJM to offer two other new transmission services—a Firm Contract Demand \ntransmission service and a Non-Firm Contract Demand transmission service3\"—that an \nEligible Customer can choose to take on behalf of a Co-Located Load instead of taking \nNITS. Specific to these new transmission services, we establish paper hearing \nprocedures to determine the just and reasonable rates, terms, and conditions for such \nservices. \n379  While the replacement rate we establish in Part IV.B.4 applies to Eligible \nCustomers taking transmission service on behalf of Co-Located Load, we intentionally \nrefer at times only to Co-Located Load, for example, when explaining in our Show Cause \nfindings how Co-Located Load uses certain services. \n389  Under this Non-Firm Contract Demand transmission service, we note that an \nEligible Customer on behalf of a Co-Located Load may elect to not reserve any amount \nof transmission service to the extent that the Eligible Customer will not withdraw any \nelectricity from the transmission system. In such a scenario, as discussed below, the \nEligible Customer taking the Non-Firm Contract Demand transmission service on behalf \nof a Co-Located Load will be charged for regulation and black start services, subject to \nthe paper hearing established below."},{"page":91,"startToken":33270,"endToken":33776,"text":"Docket No. EL25-49-000, et al. \n- 83 - \n179. Third, we find the existing BTMG rules in the PJM Tariff to be unjust and \nunreasonable. As discussed below, under the existing Tariff, loads with BTMG are not \nfully accounted for in resource adequacy planning. As such, the existing BTMG rules \nmay lead to both reliability and resource adequacy risks because PJM, per its Tariff, is \nobligated to serve transmission customers using BTMG but does not consider such \ncustomers in transmission and resource adequacy planning. Thus, as the third part of the \nreplacement rate, we direct PJM to revise its BTMG rules. Recognizing concerns raised \nin the record about the potential impacts on existing BTMG customers of the \nCommission changing PJM's BTMG rules, however, we direct PJM to maintain the \ncurrent BTMG rules for customers that fall below a new MW materiality threshold for \nthe amount of load at a particular electrical location that Network Customers may net \nusing BTMG. We also direct PJM to implement a two-part transition process for retail \nBTMG, as discussed below, including: (1) the establishment of a three-year transition \nperiod; and (2) the ability to grandfather certain entities with existing contracts, as \ndescribed further below. A materiality threshold for all BTMG should reduce the \nreliability and resource adequacy risks that large or increasing BTMG may pose to PJM, \nwhile also allowing for Network Customers to reduce their transmission charges in a \ntransparent, not unduly discriminatory fashion. \n180. Finally, because certain aspects of PJM's interconnection procedures do not \nclearly explain how and where they apply to Interconnection Customers seeking to serve \nCo-Located Load, we direct several clarifications to PJM's Tariff regarding \ninterconnection procedures for these customers. In addition, we require PJM to file an \ninformational report on several matters related to PJM's Critical Issue Fast Path (CIFP) \nstakeholder process and PJM's integration of new generation sufficient to serve \nforecasted large load additions within 30 days of the date of issuance of this order. \nb. \nTransmission Service. Regulation and Black Start \n181. The Commission's cost causation principle requires costs to be allocated to those \nwho cause the costs to be incurred and reap the resulting benefits.381  Courts and the \nCommission have acknowledged that adherence to the cost causation principle does not \nrequire that cost allocation methods balance costs and benefits with \"exacting \n381  See S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41, 87 (D.C. Cir. 2014) (\"[T]he \nCommission's adoption of a beneficiary-based cost allocation method is a logical \nextension of the cost causation principle[;] under that basic tenet, which we have \nrepeatedly embraced, `costs are to be allocated to those who cause the costs to be \nincurred and reap the resulting benefits.\"). See also ICC v. FERC I, 576 F.3d at 476 \n(\"To the extent that a utility benefits from the costs of new facilities, it may be said to \nhave `caused' a part of those costs to be incurred, as without the expectation of its \ncontributions the facilities might not have been built, or might have been delayed.\")."},{"page":92,"startToken":33776,"endToken":34226,"text":"Docket No. EL25-49-000, et al. \n- 84 - \nprecision.\"382  Ultimately, the requirement is met so long as \"all approved rates reflect to \nsome degree the costs actually caused by the customer who must pay them[,]\"383  and this \napportioning is done by ensuring that costs are \"allocated in a manner that is at least \nroughly commensurate with benefits.\"384 \n182. There are significant costs to building, operating, and maintaining the transmission \nsystem to provide, as relevant here, transmission service, regulation service, and black \nstart service, including fixed costs such as wires, poles, transformers, and substations, as \nwell as ongoing maintenance and upgrades necessary to maintain reliability and serve \nload.385  Transmission providers undertake substantial planning and make significant \ninvestments to minimize disruptions on the transmission system that may impact \ngenerators or force generators to go offline.386 \n183. There is significant agreement in the record that Co-Located Loads that are \nsynchronized with the PJM transmission system use and benefit from at least some \nancillary services and may be reasonably charged for such benefits.387  The Commission \n382  Coal. of MISO Transmission Customers v. MISO, 172 FERC ¶ 61,099, at P 83 \n& n.228 (2020) (quoting Midwest ISO Transmission Owners, 373 F.3d at 1369). \n383  Id. P 82 (quoting KN Energy Inc. v. FERC, 968 F.2d 1295, 1300 (D.C. Cir. \n1992)). \n384  Mun. Energy Agency of Neb. v. Pub. Serv. Co. of Colo., 189 FERC ¶ 61,099, \nat PP 41, 46 (2024) (citation omitted), subsequent history omitted; see also Pub. Serv. \nElec. & Gas Co., 989 F.3d at 13 (explaining that \"although the Commission need not \n`allocate costs with exacting precision,' the costs assessed against a party must bear some \nresemblance `to the burdens imposed or benefits drawn by that party') (quoting Midwest \nISO Transmission Owners, 373 F.3d at 1368-69). \n385  See, e.g., Indicated Transmission Owners March 24 Response at 3. \n386  See, e.g., PJM March 24 Response at 42; ITC, Comments, Docket \nNo. AD24-11, at 5 (filed Dec. 9, 2024). \n387  See Constellation April 23 Reply Comments at 34 (\"[I]t may be appropriate to \ninclude some ancillary service charges, such as regulation and black start . . . .\"); \nConstellation May 8 Answer at 14 (\"To eliminate any debate and move past what always \nhas been a peripheral issue, Constellation would support generator-contingent co-location \nrules that included ancillary service charges as part of a replacement rate.\"); Vistra \nApril 23 Reply Comments at 26 (\"Vistra acknowledges that it may be reasonable to \ncharge a co-location configuration for some ancillary services . . .\"); ; Advanced Energy \nUnited April 23 Reply Commentsat 19 (\"Ultimately, when large co-located loads come \nonline, they will use some ancillary and other wholesale services, and should pay for the"},{"page":93,"startToken":34226,"endToken":34672,"text":"Docket No. EL25-49-000, et al. \n- 85 - \nhas defined ancillary services as part of the costs of transmission services, specifically as \nthose \"that must be offered with basic transmission service under an open access \ntransmission tariff ... [and] needed to accomplish transmission service while maintaining \nreliability within and among control areas affected by the transmission service.\"388  Also, \nas PJM notes, ancillary services \"pass through transmission lines.\"389 \n184. Regulation service is necessary to provide for the continuous balancing of \nresources with load and for maintaining scheduled interconnection frequency at 60 cycles \nper second (60 Hz).39° The cost of providing regulation service is currently charged or \ncredited to LSEs and wholesale loads based on their pro rata share of the regulation \nrequirements, net of BTMG, for the regulation zone for the hour (but not to be less than \nzero).391  Regardless of whether a Co-Located Load is drawing energy from the \ntransmission system, Co-Located Loads are unlikely to have a perfect load factor,392  and \nit will therefore be necessary for PJM to use regulation service to maintain the power \nbalance between the five-minute intervals of the real-time energy market. Depending on \nthe Co-Location Arrangement, variability in the Co-Located Load may be reflected in the \ngenerator's net output to the transmission system. Any moment-to-moment variability in \nservices as any customer would.\"); PIOs April 23 Reply Comments at 25 (\". . . [C]o-\nlocation arrangements should pay for their share of transmission and ancillary services \ncosts since the transmission system to which co-location arrangements connect deliver \nblackstart and other critical services to ensure reliability for these co-location \narrangements.\"). \n388  City of Holland, Mich. v. Midwest Indep. Transmission Sys. Operator, Inc., \n123 FERC 1161,187, at P 21 (2008) (citing Order No. 888, FERC Stats. & Regs. ¶ 31,036 \nat 31,705). \n389  PJM March 24 Response at 36. \n390 PJM, Intra-PJM Tariffs, OATT, sched. 3 (6.0.0). \n391  Id. See also PJM Manual 28. Regulation and Frequency Response Service is \naccomplished by committing on-line resources whose output is raised or lowered \n(predominantly through the use of automatic generating control equipment) and by other \nnon-generation resources capable of providing this service as necessary to follow the \nmoment-by-moment changes in load. Each LSE's share of the regulation requirement is \nbased on its total load net of BTMG for the hour (but not to be less than zero). However, \nas discussed below, we find PJM's existing BTMG netting rules unjust and unreasonable. \n392  Load factor refers to \"[t]he ratio of the average load to peak load during a \nspecified time interval.\" U.S. Energy Info. Admin. (EIA), Glossary (last visited \nDec. 2025), https://www.eia.gov/tools/glossary/index.php?id=L."},{"page":94,"startToken":34672,"endToken":35076,"text":"Docket No. EL25-49-000, et al. \n- 86 - \nthe Co-Located Load within real-time market intervals may be absorbed by the \ntransmission system, meaning that unless an Eligible Customer takes transmission service \non behalf of the Co-Located Load, there will be no charges for the benefits that this \nancillary service provides. This variability will exist even if the Co-Located Load takes \nno energy from the transmission system. We therefore find that Eligible Customers \ntaking one of the new transmission services on behalf of Co-Located Load must be \nassessed for regulation service on a gross demand basis at the existing Tariff rate, \nconsistent with the Commission's cost causation principles. \n185. Black start service is the ability of generators to start without an outside electric \nsupply or remain operating when disconnected from the transmission system. The \nrevenue requirements of units providing black start service are recovered from \ntransmission customers based on coincident peak load.393  While parties have noted that \nthe generating facilities of some Interconnection Customers serving Co-Located Load \nmay be able to provide black start service,394  many cannot; and even if the generating \nfacility of an Interconnection Customer can provide black start service, as long as it is \nconnected to the transmission system, black start must be coordinated with the system \noperator to avoid damage to other components of the transmission system.395  Therefore, \nCo-Located Loads that remain connected to the transmission system through an \nInterconnection Customer will benefit from black start service in a manner comparable to \nNetwork Loads. Further, as parties argue, Co-Located Loads rely on black start service \nfor the restoration of the transmission system.396  We therefore find that Co-Located \nLoads benefit from black start service even if they have zero net energy withdrawals and \nEligible Customers taking one of the new transmission services on behalf of Co-Located \nLoad must be assessed for this service based on gross demand basis at the existing Tariff \nrate. \n393  PJM, Intra-PJM Tariffs, OATT, sched. 6A (16.1.0). \n394  See, e.g., Mainspring April 23 Reply Comments at 11. \n395  See, e.g., PJM's March 24 Response at 42-43. \n396  See, e.g., Indicated Transmission Owners March 24 Response at 13 n.29. See \nalso PJM March 24 Response at 42 (\"The load and generator are connected to and \nsynchronized with the multi-state bulk power system. It is not operating as a micro grid \n(nor can it if the generating facility is a nuclear unit).\")."},{"page":95,"startToken":35076,"endToken":35506,"text":"Docket No. EL25-49-000, et al. \n- 87 - \nc. \nBTMG \n186. We find that circumstances have changed since the Commission approved PJM's \nretail BTMG rules such that these rules are no longer just and reasonable.397  PJM \nexplains that the BTMG rules were \"conceived for, and [have] been implemented for, \nsubstantially smaller loads (like a warehouse with solar panels) and not on the scale of \nlarge data centers.\"398  However, large loads, both existing and in the planning stages \nwith PJM, have proliferated in recent years, and PJM has persuasively explained the \nproblems that could occur if Network Customers with large loads were allowed to use the \nexisting BTMG rules in the Tariff.' For example, PJM explains that \"[a]llowing very \nlarge loads like data centers to net is problematic because loads in this configuration do \nnot carry reserves.\"1400  Such loads must nevertheless be served, however, allowing them \nto \"lean on the PJM system when the co-located generation is on a full or partial outage \nor if the load exceeds the rating of the co-located generation.15401 Importantly, PJM's \nexisting BTMG rules do not limit the amount of qualifying load that a Network Customer \nmay net by using BTMG and do not provide any protections against this potential \ntransmission and resource adequacy planning problem or against the costs of maintaining \nsufficient resources to serve these loads being shifted onto other customers.402  We \ntherefore fmd that PJM's BTMG rules are no longer consistent with cost causation \nprinciples, because large loads configured in a BTMG arrangement with significant \ngeneration will raise cost shifting concerns compared to loads pursuing smaller amounts \nof netting. We find that PJM's existing BTMG rules may lead to both reliability and \n397  See PJM, 107 FERC ¶ 61,113; ISO New England Inc., 173 FERC ¶ 61,198, \nat P 68 (2020) (finding new entrant rules unjust and unreasonable based on changed \ncircumstances). \n398  PJM March 24 Response at 13. \n399  See, e.g., Docket No. AD24-11-000, Large Loads Co-Located at Generating \nFacilities Tr. at 9:2-3 (noting that \"large data centers [] need these significant new \namounts of energy for their business\"); PJM Interconnection, L.L.C., 188 FERC \n¶ 61,200, at P 5 (2024) (\"PJM explains that the [tariff] proposal [to allocate load \nadjustments] was spurred by the recent proliferation of data centers that are contributing \nto large additions of forecasted load concentrated within a specific wholesale metering \narea.\"). \n400 PJM March 24 Response at 36. \n401 Id. at 13 n.5. \n402 pjm, Intra-PJM Tariffs, OATT, § III.34.2 Netting of Behind the Meter \nGeneration (0.0.0)."},{"page":96,"startToken":35506,"endToken":35906,"text":"Docket No. EL25-49-000, et al. \n- 88 - \nresource adequacy risks because PJM, per its Tariff, is obligated to serve transmission \ncustomers using BTMG but does not consider such customers in transmission and \nresource adequacy planning. We clarify that, while the order is limited to Co-Located \nLoads, this finding applies to all Network Load. \n4. \nReplacement Rate \na. \nGeneration Interconnection Procedures, pro forma GIA, \nand Common Service Provisions  \n187. We direct PJM to submit a compliance filing to establish rules for Interconnection \nCustomers serving Co-Located Load. As discussed below, we direct PJM to revise the \ngeneration interconnection procedures of the Tariff, the pro forma Generation \nInterconnection Agreement (GIA),403  and Part I, Common Service Provisions, of the \nTariff, and Attachment O, Appendix 2 of the Tariff. \n188. First, we direct PJM to submit, within 60 days of the date of issuance of this order, \na compliance filing to revise the generation interconnection procedures of the Tariff. In \nparticular, we direct PJM to revise its OATT, VIII, Subpart B, section 403 - Application \nRules to add to the list of requirements for a New Service Request that an Interconnection \nCustomer who will use its generating facility to serve Co-Located Load must specify an \nEligible Customer who will take transmission service on behalf of the Co-Located \nLoad.' As part of that compliance filing, we also direct PJM to submit revisions to the \ngeneration interconnection procedures to specify any operational procedures or data \n403 We note that, as part of reforms to its interconnection process to transition from \na serial first-come, first-served study process to a first-ready, first-served cluster study \napproach, PJM renamed its pro forma ISA to the pro forma GIA. See PJM \nInterconnection, L.L. C., 181 FERC ¶ 61,162 (2022). The new pro forma GIA applies to \ninterconnection requests subject to the transition period rules and the new rules accepted \nin the PJM queue reform proceeding. Interconnection Customers who executed \ninterconnection agreements prior to the transition period executed an ISA. Accordingly, \nwe refer to both ISAs and GIAs in this order, where applicable. \n404 An Eligible Customer could be, for example, any person generating electric \nenergy for resale or any retail customer taking unbundled transmission service under \ncertain conditions. For the full defmition of Eligible Customer, see Part I.C. For a \ndiscussion of how an Eligible Customer may take transmission service on behalf of \nCo-Located Load, see infra P 189 n.407."},{"page":97,"startToken":35906,"endToken":36362,"text":"Docket No. EL25-49-000, et al. \n- 89 - \nexchange requirements that PJM deems necessary for Co-Location Arrangements to \nremedy our finding that its Tariff lacks sufficient clarity or consistency.405 \n189. These Tariff revisions, which will apply to all Interconnection Customers \nrequesting to interconnect their generating facilities to the transmission system and \nseeking to use those facilities to serve Co-Located Load,406  will establish a requirement in \nthe Tariff for the Eligible Customer to be charged for transmission and ancillary services \nthat the Eligible Customer must take on behalf of the Co-Located Load—either NITS or \nthe new transmission services described below in Part IV.B.4.b.iii.407  To the extent that \nan Interconnection Customer wishes to serve Co-Located Load using its generating \nfacility but not identify an Eligible Customer, then the Interconnection Customer may \ntake steps to terminate its generating facility's interconnection to the PJM transmission \nsystem and serve the Co-Located Load fully islanded from PJM's transmission system. \n190. Second, we direct PJM to submit, within 60 days of the date of issuance of this \norder, a compliance filing to revise its pro forma GIA. In particular, we direct revisions \nto OATT, Part IX, Subpart B GIA to specify that an Interconnection Customer that will \nuse its generating facility to serve Co-Located Load must specify an Eligible Customer \nthat will take transmission service on behalf of the Co-Located Load. We find that this \nrevision will ensure that the charges for transmission and ancillary services taken by \nEligible Customers to serve Co-Located Load are appropriately assigned to those Eligible \nCustomers. \n191. Third, we direct PJM to submit, within 60 days of the date of issuance of this \norder, a compliance filing to add a new provision to Part I, Common Service Provisions, \n405 For example, PJM explains that \"unique operational procedures and data \nexchange requirements like those proposed in the Susquehanna [Interconnection Service \nAgreement] should be developed and specified\" and that pro forma agreements may \nrequire modification to specify, where applicable, the entities that own any Co-Located \nLoad and contact information at the Co-Located Load for use during emergency and \nnon-emergency situations. PJM March 24 Response at 60-62. \n406 See PJM Interconnection, L.L. C., 189 FERC ¶ 61,078 at P 87 (Susquehanna) \n(\"This [reliance on a generally applicable document for proposed non-conforming \nprovisions] raises questions regarding whether PJM intends to offer these terms to all \nsimilarly situated interconnection customers.\"). \n407 There are several ways that an Eligible Customer could take transmission \nservice on behalf of Co-Located Load. For example, subject to applicable state law, the \nEligible Customer could create a corporate intermediary to serve the Co-Located Load, or \nthe Co-Located Load, acting as an Eligible Customer, could request service from the \nrelevant transmission owner directly."},{"page":98,"startToken":36362,"endToken":36842,"text":"Docket No. EL25-49-000, et al. \n- 90 - \nof the Tariff that requires Interconnection Customers with ISAs or GIAs executed, or \nrequested to be filed unexecuted, prior to the effective date of the revised generation \ninterconnection procedures and pro forma GIA directed in this order that wish to add \nCo-Located Load or are currently serving Co-Located Load to publicly notify PJM of \nthat addition and identify the Eligible Customer that will take transmission service on \nbehalf of that Co-Located Load. As discussed further below, that Eligible Customer must \nabide by the terms of the Tariff, including terms regarding transmission service. \n192. As a result of these requirements, an Interconnection Customer that requests to \ninterconnect its generating facility to the PJM transmission system, or whose generating \nfacility is already interconnected to the PJM transmission system, and seeks to serve \nCo-Located Load, or is currently serving Co-Located Load, using its generating facility \nmust specify an Eligible Customer who will take transmission service on behalf of the \nCo-Located Load, thereby ensuring that the Eligible Customer will be the party \nresponsible for executing a transmission service agreement, which will ensure that the \ncharges for transmission and ancillary services are appropriately assigned. \nb. \nTransmission Services \n193. As discussed above, PJM's Tariff is unjust and unreasonable because it does not \ncontain provisions addressing with sufficient clarity or consistency the rates, terms, and \nconditions of service that apply to Eligible Customers taking transmission service on \nbehalf of Co-Located Load. Specifically, as above, we fmd that PJM's Tariff is unjust \nand unreasonable because it does not include transmission services that reflect Eligible \nCustomers taking service on behalf of Co-Located Loads that are willing and able to limit \ntheir energy withdrawals from the transmission system under certain conditions. The \nfollowing discussion relates to the types of transmission service that an Eligible Customer \ntaking transmission service on behalf of a Co-Located Load must select from when it \nrequests the required transmission service. We look to cost causation principles to \ndetermine what constitutes the Eligible Customer's just and reasonable share of \ntransmission system costs and therefore direct a three-part replacement rate based on the \ndegree to which the Eligible Customer on behalf of Co-Located Load takes transmission \nand ancillary services. Specifically, we direct PJM to submit, within 60 days of the date \nof issuance of this order, a compliance filing to modify its Tariff to require that the \nEligible Customer taking transmission service on behalf of a Co-Located Load takes one \nof three transmission services: (1) NITS or a new interim, non-firm transmission service \nwhile Network Upgrades to provide full NITS service are constructed, (2) a new Firm \nContract Demand transmission service, or (3) a new Non-Firm Contract Demand \ntransmission service. As a part of this compliance obligation, PJM must ensure a \ntransmission service agreement that reflects the rates terms, and conditions of these new \ntransmission service options is available to Eligible Customers."},{"page":99,"startToken":36842,"endToken":37309,"text":"Docket No. EL25-49-000, et al. \n- 91 - \n194. With respect to the new transmission services that we require, we establish paper \nhearing procedures to determine the appropriate rates, terms, and conditions of those \nservices. This Tariff requirement, which will apply to any Eligible Customer taking \ntransmission service on behalf of Co-Located Load, incorporates the existing \ntransmission service structure in the Tariff, which imposes rates, terms, and conditions of \ntransmission service on the Eligible Customer. The Tariff requirements that we establish \napply to the relevant Interconnection Customer taking interconnection service and the \nEligible Customer taking transmission service on behalf of the Co-Located Load. \nEligible Customers, on behalf of the Co-Located Loads that they represent, may choose \nthe transmission services that match their preferred use of the transmission system; \nhowever, they must choose at least one of the required transmission services, and may \ntake a combination of the new Firm Contract Demand and Non-Firm Contract Demand \ntransmission services that we direct herein. \ni. \nNITS \n \n \n195. First, we note that it continues to be just and reasonable for an Eligible Customer \ntaking transmission service on behalf of Co-Located Load to elect, as one of the required \ntransmission services from which the Eligible Customer must choose, to take NITS.' \nAs discussed further below, NITS provides significant benefits because a NITS customer \ngains the right to be served from the transmission system at any time, and PJM and the \ntransmission owners incorporate NITS load into their transmission planning. However, \nas discussed above, we find that the existing Tariff's BTMG rules are unjust and \nunreasonable. Thus, Eligible Customers that elect to take NITS on behalf of Co-Located \nLoads will not be able to use the existing BTMG rules and must instead take NITS on a \ngross demand basis.409  While we find that NITS charged on a gross demand basis is one \njust and reasonable transmission service option for Eligible Customers taking \ntransmission service on behalf of Co-Located Loads, it is not the only option. This order \nestablishes new transmission service options that Eligible Customers taking transmission \nservice on behalf of Co-Located Loads may use if they do not wish to take NITS on a \ngross demand basis. \n196. Consistent with our finding that the existing Tariff's BTMG rules are unjust and \nunreasonable, we find that it would be unjust and unreasonable to allow Eligible \nCustomers taking transmission service on behalf of Co-Located Loads to take NITS on a \nnet basis. The Commission has previously found that loads that are able to be served in \n408 Eligible Customers taking NITS on behalf of Co-Located Load may not \ncombine NITS with any of the other transmission services discussed herein. \n409 Eligible Customers taking service on behalf of Co-Located Loads that meet the \nnew criteria discussed below may be able to use the new BTMG rules."},{"page":100,"startToken":37309,"endToken":37735,"text":"Docket No. EL25-49-000, et al. \n- 92 - \npart through NITS and in part through behind-the-meter generation41° shift costs onto \nother transmission customers.\" Furthermore, the Commission has rejected cost \ncausation arguments made by network customers that sought to lower their load ratio \nshare based on actual use of the transmission system.412  The Commission has explained \nthat \"splitting a discrete load is antithetical to the concept of network service\" because \"a \nload at a discrete point of delivery cannot be partially integrated—it is either fully \nintegrated or not integrated.\"' In addition, the Commission found that a split system \ncreates the potential for a customer to evade some or all of its load ratio share cost \nresponsibility for network services by using behind-the-meter generation during monthly \npeaks to reduce its load ratio share below its actual, typical monthly peak usage (also \ncalled peak shaving), resulting in a rate that is subsidized by other network customers.414 \nSimilarly, in Order No. 890,415  the Commission refused to require transmission providers \nto allow netting of behind the meter generation against network transmission charges. \nThe Commission explained that its existing policy already provides customers with the \nopportunity to reduce network service costs to the extent a customer is not relying on the \ntransmission system to meet its energy needs (i.e., by taking PTPS instead of NITS).416 \n410  Here we reference behind-the-meter generation more broadly, rather than \nPJM's defined BTMG specifically. \n411  Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,259-61. \n412 See, e.g., Amtrak, 171 FERC ¶ 61,237 at P 41. See also PJM, 169 FERC \n¶ 61,041, at P 60 (2019). \n413  Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,262. \n414  Id. at 30,260-61. See also East Ky. Power Coop. Inc. v. Louisville Gas & Elec. \nCo./Ky. Utils. Co., 154 FERC 1161,144, at P 60 (2016) (\"[T]he Commission used the \n`behind-meter-generation' language as an example of transmission customers subject to \nthe provision but it did not explicitly exclude . . . other transmission customers from this \nprovision.\"). \n415  Preventing Undue Discrimination and Preference in Transmission Serv., Order \nNo. 890, 118 FERC ¶ 61,119, at P 1619, order on reh'g, Order No. 890-A, 121 FERC \n1161,297 (2007), order on reh'g, Order No. 890-B, 123 FERC ¶ 61,299 (2008), order on \nreh'g, Order No. 890-C, 126 FERC ¶ 61,228, order on clarification, Order No. 890-D, \n129 FERC ¶ 61,126 (2009). \n416  Id. The Commission also explained that it would review alternative \ntransmission provider proposals for behind-the-meter generation treatment on a \ncase-by-case basis. Id."},{"page":101,"startToken":37735,"endToken":38217,"text":"Docket No. EL25-49-000, et al. \n- 93 - \n197. Regarding Constellation's argument that it is unduly discriminatory to charge \nEligible Customers taking transmission service on behalf of Co-Located Loads for NITS \non a gross demand basis to the extent it would charge the same rates to customers who \nimpose different costs on the system,417  we reiterate that while Eligible Customers taking \ntransmission service on behalf of Co-Located Loads must take one of the required \ntransmission services, they may take one of the new transmission services instead of \nNITS. Therefore, Eligible Customers taking transmission service on behalf of \nCo-Located Loads that do not wish to be Network Load may seek the alternative \ntransmission services described below. Constellation further argues that charging all \nEligible Customers taking transmission service on behalf of large Co-Located Loads for \nNITS based on a gross demand basis would be unduly discriminatory because it is \ninconsistent with the treatment of BTMG.418  However, we direct changes to PJM's \nexisting BTMG rules, as described below. In doing so, we decline to address \nConstellation's alternative proposals to modify the BTMG provisions.\"' \n198. The Network Load that an Eligible Customer designates when taking NITS on \nbehalf of a Co-Located Load will benefit from the transmission system in the same \nmanner as the Network Load of other NITS customers. The Network Load of the \nEligible Customer taking NITS on behalf of a Co-Located Load will gain the right to be \nserved from the transmission system at any time. The Network Load of the Eligible \nCustomer taking NITS on behalf of a Co-Located Load, as any other Network Load, \nwould contribute to the need for costs to be incurred for operation and maintenance of the \ntransmission system, as well as new Network Upgrades to keep the transmission system \nreliable. Moreover, PJM explains, and we agree, that, if Co-Located Load is Network \nLoad, PJM will include the customer's full load in its models for purposes of procuring \ncapacity and will include Co-Located Load that is Network Load in the load forecast for \n417  Constellation April 23 Reply Comments at 31. \n418  Id. at 32-33, 39. \n419  See FirstEnergy Serv. Co. v. FERC, 758 F.3d 346, 353 (D.C. Cir. 2014) (\"The \nstatutory `just and reasonable' standard is the same under section 205 and section 206.\"); \nExxonMobil Oil Corp. v. FERC, 487 F.3d 945, 955 (D.C. Cir. 2007) (\"Under the arbitrary \nand capricious test, our standard of review is `only reasonableness, not perfection.' We \nneed not decide whether the Commission has adopted the best possible policy as long as \nthe agency has acted within the scope of its discretion and reasonably explained its \nactions.\"); New England Power Generators Ass 'n v. ISO New England Inc., 153 FERC \n¶ 61,222, at P 35 (2015) (explaining that, in setting a just and reasonable replacement \nrate, the Commission could accept a party's proposal or \"implement[] its own solution\")."},{"page":102,"startToken":38217,"endToken":38686,"text":"Docket No. EL25-49-000, et al. \n- 94 - \npurposes of transmission planning.420  Therefore, we find that if an Eligible Customer \ntakes NITS and designates a Co-Located Load as Network Load, the NITS charges an \nEligible Customer incurs on behalf of that Co-Located Load will be at least roughly \ncommensurate with the benefits received. \n199. We disagree with parties who argue that Co-Located Loads should only be \nallowed to take NITS, and that the NITS they must take is on a gross demand basis.421 \nAs discussed further below, we fmd that the option to take NITS on a gross demand basis \nis just one part of a just and reasonable replacement rate that also includes the \nopportunity for Eligible Customers to take on behalf of Co-Located Loads the new Firm \nor Non-Firm Contract Demand transmission services. As explained below, the record \ndemonstrates that Eligible Customers taking transmission service on behalf of \nCo-Located Loads are willing and able to limit their energy withdrawals from the \ntransmission system under certain conditions.422  It would be inconsistent with cost \ncausation principles to require Eligible Customers taking transmission service on behalf \nof Co-Located Loads that limit their energy withdrawals to take NITS on a gross demand \nbasis. Rather, Eligible Customers taking service on behalf of Co-Located Loads should \nbe allowed to choose the transmission service that aligns with their use of the \ntransmission system and therefore aligns the charges for service with the benefits \nreceived. Further, we fmd that requiring an Eligible Customer taking transmission \nservice on behalf of Co-Located Load to take NITS on a gross demand basis would be \ninefficient. Requiring this could necessitate inefficient and costly transmission buildout \nand costs paid by transmission customers that may not be necessary if Eligible Customers \ntaking transmission service on behalf of Co-Located Loads are willing to limit their \nenergy withdrawals and take a transmission service that requires fewer Network \nUpgrades to provide.423 \n420  PJM March 24 Response at 39 n.64. \n421  See, e.g., NREMC April 23 Reply Comments at 5-6; Indicated Transmission \nOwners March 24 Response at 16-17; Center April 23 Reply Comments at 27. \n422  See infra P 204. \n423  See Antora April 23 Reply Comments at 11-12 (\"Where a customer could have \ninstead taken curtailable transmission service that allows PJM and/or the EDC to curtail \nits load if that service were offered, the failure to provide a service option that \nincorporates load flexibility will directly lead to costs for the interconnecting customer \nthat do not appropriately reflect its flexibility and resulting ability to avoid using high \nvalue energy or grid capacity. And it will lead to increased costs for other customers \nbecause PJM's transmission and interconnection study processes and operating protocols \nwill apply a lack of headroom in its system based on its assumed need to serve the"},{"page":103,"startToken":38686,"endToken":39158,"text":"Docket No. EL25-49-000, et al. \n- 95 - \nii. \nInterim, Non-Firm Transmission Service \n200. Co-Located Loads are concerned with the speed to interconnect to the PJM \ntransmission system and begin operation. As a result, these types of loads have sought to \nestablish Co-Location Arrangements with existing generating facilities that can begin \nserving new large Co-Located Loads rapidly.424 In response, and to facilitate more rapid \ninterconnection and operation of Co-Located Loads, PJM and other parties discuss the \ndevelopment of a new transitional service that would allow new Co-Located Load to \nwithdraw electricity from the PJM transmission system earlier than may be otherwise \nachievable if those new Co-Located Loads could only be designated as Network Load \nand served once all of the Network Upgrades necessary to provide the requested NITS \nare complete.425  Therefore, we direct PJM to submit, within 60 days of the date of \nissuance of this order, a compliance filing to create a new interim, non-firm transmission \nservice similar, but not identical, to PJM's proposed option 7. This new interim, \nnon-firm transmission service must allow an Eligible Customer that has requested NITS \non behalf of a Co-Located Load to take non-firm transmission service that can be \ninterrupted until the Network Upgrades necessary to provide NITS are complete and the \nCo-Located Load can be designated as Network Load. We reiterate that this interim, \nnon-firm transmission service should be temporary—only available to Eligible \nCustomers that have requested NITS on behalf of Co-Located Loads that cannot yet be \nreliably served with NITS—and available only until the necessary Network Upgrades are \ncompleted and the Co-Located Load is designated as Network Load. Moreover, this new \nservice would be optional for an Eligible Customer seeking NITS on behalf of a \nCo-Located Load and would only be available to the extent PJM determines that it can \nprovide some level of interim service reliably. Eligible Customers taking this interim, \nnon-firm transmission service on behalf of Co-Located Loads would pay the NITS rate \nfor the new service, as well as ancillary services charges and charges for black start \nservice, but they would not be charged for generation capacity because, as interruptible \nentirety of the Network Load at any given moment, despite the fact that the customer is \ncapable of dispatching down pursuant to PJM and/or EDC instructions. This, in turn, will \ntrigger identification of infrastructure upgrades that could have been avoided . . . .\"); \nConstellation April 23 Reply Comments at 20 (\". . . [A] NITS-only approach to serving \nhyperscale data centers and other large new loads will create a need for massive \ntransmission upgrades and impose billions of dollars of costs on existing \ncustomers . ...\"). \n424  Show Cause Order, 190 FERC 1161,115 at P 85. \n425  See PJM March 24 Response at 18-19; Mainspring April 23 Reply Comments \nat 13; Constellation April 23 Reply Comments at 55-57; Buckeye April 23 Comments \nat 9."},{"page":104,"startToken":39158,"endToken":39602,"text":"Docket No. EL25-49-000, et al. \n- 96 - \nloads, capacity will not be procured on their behalf until such time as the Network \nUpgrades are in place to serve them. Once the required Network Upgrades to serve the \nfull gross demand are in place, the Co-Located Load would be designated as Network \nLoad and the Eligible Customer would pay on behalf of the Co-Located Load all \nNetwork Load charges. This transmission service may not be combined with the Firm \nContract Demand transmission service or Non-Firm Contract Demand transmission \nservice discussed herein. \n201.\nWe find that this new interim, non-firm transmission service will facilitate the \ntimely provision of transmission service to Eligible Customers taking transmission \nservice on behalf of Co-Located Loads, while preserving reliability for other transmission \ncustomers. As discussed above, the record in this proceeding suggests that a key driver \nof Co-Location Arrangements is delays in new large loads obtaining service through the \ntraditional front-of-the-meter load interconnection process.426  This interim, non-firm \ntransmission service would help to address such delays by allowing an Eligible Customer \nthat has requested to take NITS on behalf of a Co-Located Load to, through this new \ntransmission service, receive an interruptible transmission service before the Network \nUpgrades necessary to designate and serve the Co-Located Load as Network Load are \ncomplete. Eligible Customers taking the interim, non-firm transmission service on behalf \nof Co-Located Loads would avoid paying generator capacity costs in return for their \nwillingness to curtail their withdrawals in advance of emergency conditions (i.e., it will \nbe curtailed before existing firm transmission services and the new Firm Contract \nDemand Transmission Service).427  This willingness to curtail would potentially allow \nthem to obtain service more quickly. As part of the compliance filing ordered above, we \nseek briefmg on an appropriate point in emergency operations at which to curtail Eligible \nCustomers taking this new interim, non-firm transmission service on behalf of \nCo-Located Loads. We further note that, when curtailed, Eligible Customers taking this \ntransmission service on behalf of Co-Located Loads may be able to continue to take \nenergy from the Interconnection Customer with which they are co-located if PJM's Tariff \notherwise allows. \n202.\nWe note that, unlike in PJM's proposal in option 7, which would allow Eligible \nCustomers taking transmission service on behalf of Co-Located Loads to receive the \ntransitional service until \"any resource adequacy supply/demand imbalances associated \nwith the large load addition could be addressed,\"428  we instead direct PJM to limit the \ntransitional period to the time needed to complete any Network Upgrades identified in the \n426  Indicated Transmission Owners June 3 Answer, Powers Aff. at 16. \n427  See infra P 208. \n428  PJM March 24 Response at 18-19."},{"page":105,"startToken":39602,"endToken":40020,"text":"Docket No. EL25-49-000, et al. \n- 97 - \nstudy process as necessary to provide the requested NITS. PJM's proposal in option 7 to \nallow the transitional period to continue until any resource adequacy challenges are \naddressed is too broad and not sufficiently detailed to direct as a replacement rate. \n203.\nHowever, as discussed below, we conclude that additional record evidence is \nneeded to set the appropriate replacement rate, i.e., the terms and conditions for the new \ninterim, non-firm transmission service. Thus, we establish a paper hearing and direct \nfurther briefing. \niii. \nFirm Contract Demand and Non-Firm Contract \nDemand Transmission Services \n204.\nAs the record demonstrates, various potential Co-Location Arrangements may use \nthe transmission system to differing extents. Specifically, parties note that some \nCo-Location Arrangements include system protection facilities that prevent energy \nwithdrawals from the transmission system,' and parties have demonstrated that some \nCo-Located Loads are willing and able to control their withdrawals from the transmission \nsystem.43° System protection facilities are defined as the equipment, including necessary \nprotection signal communications equipment, required to protect (1) Transmission \nProvider's Transmission System from faults or other electrical disturbances occurring at \nthe Generating Facility, and (2) the Generating Facility from faults or other electrical \nsystem disturbances occurring on Transmission Provider's Transmission System or on \nother delivery systems or other generating systems to which Transmission Provider's \nTransmission System is directly connected.431  Instead of system protection facilities, we \n429  See, e.g., id. at 13-15. \n43°  See, e.g., SEIA April 23 Reply Comments at 8 (citing Duke University's \nNicholas Institute for Energy, Environment & Sustainability, Rethinking Load Growth: \nAssessing the Potential for Integration of Large Flexible Loads in US Power Systems, \nhttps://nicholasinstitute.duke.edu/sites/defaultifiles/publications/rethinking-load-\ngrowth.pdf (Duke Study)); id. (\"Co-located loads with the ability to curtail or shift \ndemand in coordination with generator output or grid constraints should be treated \ndifferently than firm grid-dependent load, as these loads would be capable of reducing \ntheir demand on the grid.\"); Constellation April 23 Reply Comments at 56 (\"The Duke \nStudy identifies the significant benefits to the efficient use of the transmission grid and \nexisting capacity when loads can `temporarily reduce (i.e., curtail) its electricity \nconsumption from the grid during [] peak stress periods.\") (quoting Duke Study at 5); \nEDFR April 23 Reply Comments at 9. \n431  Federal Energy Regulatory Commission, Pro forma LGIP, § 1 (Definitions) \n(Aug. 20, 2024), https://www.ferc.gov/media/pro-forma-lgip. See Reform of Generator \nInterconnection Procs. & Agreements, Order No. 845, 163 FERC ¶ 61,043, at P 367"},{"page":106,"startToken":40020,"endToken":40483,"text":"Docket No. EL25-49-000, et al. \n- 98 - \nwill use in this order the term special protection scheme, also known as a remedial action \nscheme. A special protection scheme is a plan designed to detect abnormal system \nconditions and to automatically take appropriate corrective action, to maintain system \nstability, acceptable system voltages, and acceptable facility loading. Corrective actions, \nas applicable here, may address scenarios such as generator runback or load shedding.' \n205. As such, PJM and other commenters discuss transmission services that are tailored \nto Co-Located Loads that have protection schemes to limit their energy withdrawals from \nthe system, and that recognize the reduced impact on the transmission system of such \nCo-Location Arrangements as compared to traditional Network Load.433  Parties argue \nthat these services will not require PJM to plan the transmission system to serve these \nCo-Located Loads to the same extent as PJM must plan the transmission system to serve \nNetwork Load, possibly reducing the need for new Network Upgrades.434  Parties further \nargue that Co-Located Loads may be able to receive transmission service faster with use \nof a new, limited transmission service product than they would if they selected NITS, to \nthe extent that providing NITS would require Network Upgrades that the limited \ntransmission service would not.435  We note that, in general, special protection schemes \nallow Eligible Customers on behalf of Co-Located Load to effectively limit their \nwithdrawals from the transmission system.436  For these reasons, in these instances where \n(2018), order on reh'g, Order No. 845-A, 166 FERC ¶ 61,137, order on reh'g, Order \nNo. 845-B, 168 FERC ¶ 61,092 (2019) (discussing system protection facilities in the \ncontext of a generating facility not injecting energy onto the transmission system above \nthe requested level of service). \n432  PJM Manual 07: PJM Protection Standards, Rev. 5 (eff. Sept. 25, 2025) § 17.1. \nWe recognize that PJM's manual currently does not include excess energy withdrawals as \nan abnormal system condition. \n433  See, e.g., PJM March 24 Response at 13-15, 18-19; Glatz and Silverman \nApril 23 Reply Comments at 12-13; Constellation April 23 Reply Comments at 65; \nVistra April 23 Reply Comments at 28. \n434  See Enchanted Rock April 23 Reply Comments at 17. \n435  See Constellation April 23 Reply Comments at 55-56; EPSA/P3 April 23 Reply \nComments at 14. \n436  See Constellation April 23 Reply Comments, Herling Aff. ¶ 23 (\"The \nprotection system, discussed above, is fully redundant and, while it cannot be guaranteed \nto never fail, it is unreasonable to treat the failure of both primary and secondary relay \nsystem facilities following the loss of a generator as anything other than a third \ncontingency. In fact, when I was directing transmission planning for PJM, I cannot think \nof an instance in which we treated such a situation otherwise. In practice, protection"},{"page":107,"startToken":40483,"endToken":40940,"text":"Docket No. EL25-49-000, et al. \n- 99 - \nthe Co-Location Arrangement includes special protection schemes that limit its energy \nwithdrawals, we find that it is a just and reasonable replacement rate to allow an Eligible \nCustomer taking transmission service on behalf of such load to take and be charged for \nnew types of transmission service that are alternatives, and not equivalent, to NITS. \n206.\nWe therefore direct PJM to develop two new transmission services that must be \navailable to Eligible Customers taking transmission service on behalf of Co-Located \nLoads: (1) Firm Contract Demand transmission service, and (2) Non-Firm Contract \nDemand transmission service. These new transmission services will serve as permanent \nalternatives to existing transmission services, unlike the new interim, non-firm \ntransmission service described above in Part IV.B.4.b.ii, and the new transmission \nservices would not require the Co-Located Load to become Network Load. For the \nEligible Customer taking transmission service on behalf of a Co-Located Load to be \neligible for these new transmission services, the Co-Located Load must be able and \nwilling to prevent or limit its energy withdrawals and must be separately metered from \nthe associated generator. Eligible Customers taking transmission service on behalf of \nCo-Located Loads would also be able to take a combination of Firm Contract Demand \ntransmission service and Non-Firm Contract Demand transmission service. Because firm \ntransmission service contemplates a reservation and regular withdrawal of energy, \nEligible Customers taking transmission service on behalf of Co-Located Loads that will \nnot withdraw energy from the transmission system must take Non-Firm Contract Demand \ntransmission service at 0 MW. \n207.\nThe record assembled to date does not address the appropriate rates, terms, and \nconditions for these new Firm Contract Demand and Non-Firm Contract Demand \ntransmission services. Thus, we direct further briefing to enable the Commission to set \nthe appropriate replacement rate for these services, as discussed below. Among other \ntopics with respect to this pair of new transmission services available to Eligible \nCustomers taking transmission service on behalf of Co-Located Loads, the Commission \ndirects further briefing on whether the rate paid by an Eligible Customer on behalf of a \nCo-Located Load taking only a de minimis amount of the new Firm or Non-Firm \nschemes are regularly employed on the PJM transmission system, and the successful \noperation of such protective systems is a common observance within PJM.\"). Proper \nspecial protection scheme design is also subject to NERC standards to ensure they do not \nintroduce unintentional or unacceptable reliability risks to the system. Remedial Action \nSchemes Reliability Standard, Order No. 837, 160 FERC ¶ 61,071 (2017) (approving \nReliability Standard PRC-012-2). \nAlso, as discussed below, we clarify that PJM's necessary study process assesses \nany special protection scheme that is a part of a Co-Location Arrangement. See infra \nP 227."},{"page":108,"startToken":40940,"endToken":41379,"text":"Docket No. EL25-49-000, et al. \n- 100 - \nContract Demand transmission services should reflect not only (i) charges for regulation \nand black start service and (ii) the transmission service charges for that de minimis \namount of service, but also an additional charge reflecting that the Co-Located \nArrangement is physically connected and synchronized to the PJM transmission system \nand, if so, how that additional charge, including a de minimis threshold, should be \ndetermined. \n(a) \nFirm Contract Demand Transmission \nService  \n208.\nUnder the new Firm Contract Demand transmission service, Eligible Customers \nwill have the right to request transmission service on behalf of a Co-Located Load up to a \nspecified MW quantity, i.e., the contract demand. The Firm Contract Demand \ntransmission service will have the same reservation and curtailment priority as existing \nfirm transmission services, at the level of the contract demand. However, unlike NITS \ncustomers, the Eligible Customer taking Firm Contract Demand transmission service on \nbehalf of the Co-Located Load is not permitted to withdraw energy from the PJM \ntransmission system beyond the contract demand leve1.437 \n209.\nEligible Customers taking the new Firm Contract Demand transmission service on \nbehalf of Co-Located Loads will be charged for transmission, ancillary services, and \ncapacity based on the contract demand, with the exception of regulation and black start \nservices.438  As explained above, we agree with parties who argue that all Co-Located \nLoads rely on regulation and black start services to be served regardless of whether they \nare drawing energy from the transmission system,439  and we therefore find that Eligible \n437  We note an Eligible Customer may combine Firm Contract Demand \ntransmission service with Non-Firm Contract Demand transmission service to withdraw, \non an as-available basis, more energy than its firm entitlement. \n438  See, e.g., Constellation April 23 Reply Comments at 66 (\"Ancillary services \nshould be charged on a gross or net load basis for firm and interruptible configurations, as \nrequired to avoid discrimination. For generator-contingent configurations, some charge \nfor regulation or black start service may be appropriate. Energy charges should be \nassessed based on a net injection or withdrawal of the co-located load generator and load \nto the transmission system.\"). \n439  See id. at 34 (\"[I.]t may be appropriate to include some ancillary service \ncharges, such as regulation and black start . . . .\"); Vistra April 23 Reply Comments at 27 \n(\"For example, variances in the co-located load, which are seen by the grid as changes in \nthe co-located generator's output, could be viewed as related to the need for regulation \nservice. Co-location configurations with high load variation therefore can be considered \nto use regulation service.\"); ACEG April 23 Reply Comments at 2 (\"Proposed co-located"},{"page":109,"startToken":41379,"endToken":41834,"text":"Docket No. EL25-49-000, et al. \n- 101 - \nCustomers that take the Firm Contract Demand transmission service on behalf of \nCo-Located Loads must be charged for regulation and black start services based on a \ngross demand basis, rather than the contract demand. \n210.\nPJM will only have an obligation to plan for the Network Upgrades necessary to \nserve Eligible Customers taking this new Firm Contract Demand transmission service on \nbehalf of Co-Located Loads at their contract demand. Because PJM will procure \ngeneration capacity on behalf of the Co-Located Load served by Firm Contract Demand \ntransmission service based on their contract demand, we fmd it is appropriate to charge \nthe relevant Eligible Customer for generation capacity based on the full amount of the \nFirm Contract Demand transmission service.\"' We direct parties to brief the appropriate \nrate, terms, and conditions for this new Firm Contract Demand transmission service, \nincluding whether it would be just and reasonable to apply the current zonal firm PTPS \nrates to this new transmission service.\"' \n211.\nWe note that the new Firm Contract Demand transmission service does not raise \nsimilar cost shifting concerns as the split system contemplated in Order No. 888-A.442 \nFirm Contract Demand transmission service customers will be charged based on their \ncontract demand irrespective of usage and therefore will not be able to reduce their \nload-ratio cost responsibility. Further, PJM will only plan the transmission system and \nprocure generation capacity for the contract demand—not for load growth, like it does for \nNITS customers—and PJM will have no obligation to serve the Eligible Customer \nbeyond the contract demand. Therefore, we find that allowing Eligible Customers taking \ntransmission service on behalf of Co-Located Loads to take the new Firm Contract \nDemand transmission service will not cause a cost shift to other transmission customers \nload arrangements do not always function as truly islanded micro grids, and they may \nstill rely on services such as frequency regulation, voltage support, and black start \ncapability.\"). \n440 As noted in Part IV.B.2.a supra, states have exclusive authority over the \nallocation of Commission-jurisdictional costs to retail customers, including retail \ncustomers that are Co-Located Load. Therefore, states have authority over how the costs \nfor Firm Contract Demand transmission service and other services assigned to an Eligible \nCustomer are allocated among individual retail customers. \n441 See PJM, Intra-PJM Tariffs, OATT, sched. 7 (15.0.1). \n442  See Order No. 888-A, FERC Stats. & Regs. 1131,048 at 30,259 (\"The concept \nof allowing a `split system' or splitting a discrete load is antithetical to the concept of \nnetwork service. . . . Furthermore, such a split system creates the potential for a customer \nto \"game the system\" thereby evading some or all of its load-ratio cost responsibility for \nnetwork services.\")."},{"page":110,"startToken":41834,"endToken":42293,"text":"Docket No. EL25-49-000, et al. \n- 102 - \nbecause these Eligible Customers will not be able to reduce their load-ratio share to avoid \npaying transmission costs or capacity costs. Rather, these customers will pay only for the \ncontracted demand, aligning the costs for the Firm Contract Demand transmission service \nthat they take with the benefits they receive. \n212.\nShould the Eligible Customer taking transmission service on behalf of a \nCo-Located Load withdraw energy from the PJM transmission system in excess of the \ncontract demand, for example, due to a special protection scheme failure, we direct PJM \nto apply a penalty rate. The Commission has previously found that transmission \ncustomers should be subject to unreserved use penalties in circumstances where a \ntransmission customer uses transmission service in excess of its reserved capacity or if it \nuses transmission service where it does not have a reservation.443  Further, PJM states that \nit has observed that special protection schemes can fail, which may result in the Eligible \nCustomer taking unreserved service from the transmission system on behalf of the \nCo-Located Load.444  We direct parties to brief the appropriate penalty charge for a Firm \nContract Demand transmission service customer's unreserved use of the PJM \ntransmission system. We also direct parties to brief the appropriate procedures for PJM \nto curtail Eligible Customers taking the new Firm Contract Demand transmission service \non behalf of Co-Located Loads that withdraw energy in excess of the contract demand \nand any other remedial action that PJM should take to address withdrawals in excess of \nthe contract demand. We also note that, as discussed in the briefing questions below, \nPJM will determine the technical and engineering requirements of special protection \nschemes to help address reliability risks associated with unreserved use of the \ntransmission system. \n213.\nWe find that the new Firm Contract Demand transmission service must have a \nminimum term of one year, similar to NITS.445  However, generation capacity is typically \nprocured three years in advance in PJM. As such, we find that it is just and reasonable \nthat the terms and conditions for taking the new Firm Contract Demand transmission \nservice must prevent transmission customers from switching between the Firm Contract \nDemand and Non-Firm Contract Demand transmission services, i.e., must include an \nanti-toggling mechanism. Otherwise, Eligible Customers taking transmission service on \nbehalf of Co-Located Loads may attempt to switch between the two new transmission \nservices based on expected capacity market conditions. PJM's capacity market includes \nanti-toggling measures, including the \"must-offer\" requirement for existing Capacity \nResources and the five-year minimum commitment for loads seeking to procure their \n443  Order No. 890, 118 FERC ¶ 61,119 at P 834. \n444  PJM March 24 Response at 44. \n\"s See PJM, Intra-PJM Tariffs, OATT, § III.29.2 Application Procedures (2.0.0)."},{"page":111,"startToken":42293,"endToken":42714,"text":"Docket No. EL25-49-000, et al. \n- 103 - \nown capacity through the Fixed Resource Requirement alternative. Both measures exist \nto prevent loads or generators from introducing price volatility or exercising market \npower by entering and exiting the market from one year to the next based on projected \nmarket conditions. We direct parties to brief the appropriate mechanism for such a \nfeature, including the appropriate minimum service period and minimum notice period \nfor discontinuing service for the new Firm Contract Demand and Non-Firm Contract \nDemand transmission services. \n(b) \nNon-Firm Contract Demand Transmission \nService \n214.\nAs discussed above, we establish a new Non-Firm Contract Demand transmission \nservice to be offered to Eligible Customers taking service on behalf of Co-Located Loads. \nWe recognize that not all Co-Located Loads will necessarily plan to withdraw energy \nfrom the transmission system on a regular basis. Eligible Customers taking service on \nbehalf of such loads may, however, still seek to withdraw energy from the transmission \nsystem from time to time when transmission capacity is available and not needed by firm \ncustomers. For example, an Eligible Customer could seek a transmission reservation for \na Co-Located Load in advance for the duration of an expected outage of the associated \ngenerator. The new Non-Firm Contract Demand service will provide an option for \nEligible Customers seeking to use the transmission system on behalf of a Co-Located \nLoad in this more limited manner, while still charging customers for regulation and black \nstart services, for the reasons discussed above. \n215.\nWe find that the new Non-Firm Contract Demand transmission service must be \navailable during normal operations and curtailed during emergency operations (i.e., it will \nbe curtailed before existing firm transmission services and the new Firm Contract \nDemand Transmission Service). Under this service, Eligible Customers may reserve \ntransmission service on behalf of a Co-Located Load as needed during normal, \nnon-emergency system operating conditions. Reservations under this service would be \navailable only when there is available transmission capacity, similar to existing non-firm \ntransmission service options in the Tariff. Reservations for this service shall be available \nfor terms ranging from one hour to one month, consistent with the terms available for \nNon-Firm PTPS in the PJM Tariff.' As noted above, Eligible Customers may use \nNon-Firm Contract Demand transmission service to make use of the transmission system \nabove their Firm Contract Demand transmission service level, if transmission capacity is \navailable. \n446 see PJM, Intra-PJM Tariffs, OATT, § 14.1 (1.0.0) (\"Non-Firm Point-To-Point \nTransmission Service will be available for periods ranging from one (1) hour to one (1) \nmonth\")."},{"page":112,"startToken":42714,"endToken":43160,"text":"Docket No. EL25-49-000, et al. \n- 104 - \n216.\nEligible Customers taking the Non-Firm Contract Demand transmission service on \nbehalf of Co-Located Loads will be charged for transmission and ancillary services on an \nas-reserved contract demand basis, based on the reserved contract demand amount of \ntransmission service (except as noted below). As with the new Firm Contract Demand \ntransmission service, we fmd that Eligible Customers that take the Non-Firm Contract \nDemand transmission service on behalf of Co-Located Loads use and therefore should be \ncharged for regulation and black start services based on a gross demand basis, rather than \nthe reserved amount of transmission service. As discussed below, we direct parties to \nbrief the appropriate rate, terms, and conditions for this new Non-Firm Contract Demand \ntransmission service, including whether it would be just and reasonable to apply the \ncurrent zonal non-firm PTPS rates to this new service.' \n217.\nIn addition, similar to the Firm Contract Demand transmission service, should the \nEligible Customer taking the Non-Firm Contract Demand transmission service on behalf \nof the Co-Located Load make unreserved use of the transmission system by withdrawing \nenergy in excess of its transmission service reservation,'\" PJM must apply a penalty rate \nin such circumstances. We direct parties to brief the appropriate charge for such a \npenalty, including whether it should be the same as the unreserved use penalty charge \napplicable to the new Firm Contract Demand transmission service. We also direct parties \nto brief the appropriate triggers and procedures for PJM to curtail an Eligible Customer \ntaking the new Non-Firm Contract Demand transmission service on behalf of a \nCo-Located Load when it makes unreserved use of the transmission system by \nwithdrawing energy in excess of its transmission service reservation. \n218.\nThe new Non-Firm Contract Demand transmission service will not include a \ncharge for generation capacity.449  Because it is non-firm transmission service, PJM will \nnot have an obligation to serve Eligible Customers taking this new Non-Firm Contract \nDemand transmission service on behalf of Co-Located Loads; thus, unlike Network \nLoad, Co-Located Loads on whose behalf Eligible Customers are taking Non-Firm \n447  See PJM, Intra-PJM Tariffs, OATT, sched. 8 (14.0.1). \n448  As noted above, Non-Firm Contract Demand transmission service will be \ncurtailed during emergency operations and we request briefing on the appropriate \nprocedures to govern the circumstances under which PJM curtails an Eligible Customer \ntaking Non-Firm Contract Demand transmission service on behalf of a Co-Located Load \nduring emergency procedures. \n449 Regardless, however, we clarify that this option is distinct from Vistra's \nproposal to allow a secondary generator that provides occasional, interruptible backup \nservice to a Co-Located Load to also serve as a Capacity Resource. Vistra April 23 \nReply Comments at 8, 30."},{"page":113,"startToken":43160,"endToken":43543,"text":"Docket No. EL25-49-000, et al. \n- 105 - \nContract Demand transmission service would not be considered for resource adequacy \nplanning purposes. PJM will also have no obligation to include the Co-Located Loads on \nwhose behalf Eligible Customers take such service in its transmission planning. \niv. \nPaper Hearing on Rates, Terms, and Conditions of \nNew Transmission Services  \n219. As discussed above, additional record evidence is needed to set the appropriate \nreplacement rates, terms, and conditions for the new interim, non-firm transmission \nservice, Firm Contract Demand transmission service, and Non-Firm Contract Demand \ntransmission service. Parties should address the following questions with specificity. \n(1)\nWhat are the appropriate rates, terms, and conditions for the new Firm \nContract Demand transmission service, including whether it would be just and \nreasonable to apply the current zonal firm PTPS charges to this new service \nand whether it would be just and reasonable and consistent with cost causation \nto include charges for any of PJM's administrative services? \n(2)\nWhat are the appropriate rates, terms, and conditions for the new Non-Firm \nContract Demand transmission service, including whether it would be just and \nreasonable to apply the current zonal non-firm PTPS charges to this new \ntransmission service and whether it would be just and reasonable and \nconsistent with cost causation to include charges for any of PJM's \nadministrative services? \n(3)\nAs noted above, a Co-Location Arrangement is synchronized to the \ntransmission system.' Should the rate paid by an Eligible Customer on behalf \nof a Co-Located Load taking only the new Non-Firm Contract Demand \ntransmission service that elects to not reserve any amount of that service for a \nperiod of time (e.g., one month) reflect not only charges for regulation and \nblack start services, but also an additional charge given that regulation and \nblack start services could not be provided without the transmission system? If \nso, how should that additional charge be determined? \n(4)\nAs noted above, a Co-Location Arrangement is synchronized to the \ntransmission system.45' Should the rate paid by an Eligible Customer on behalf \nof a Co-Located Load taking only a de minimis amount of the new Firm or \nNon-Firm Contract Demand transmission services reflect not only (i) charges \nfor regulation and black start service and (ii) the transmission service charges \n450  See also PJM March 24 Response at 42-43. \n451 Id."},{"page":114,"startToken":43543,"endToken":43880,"text":"Docket No. EL25-49-000, et al. \n- 106 - \nfor that de minimis amount of service, but also an additional charge reflecting \nthat the Co-Location Arrangement is physically connected and synchronized to \nthe PJM transmission system? If so, how should that additional charge be \ndetermined? \n(5)\nWhat is the appropriate penalty charge or other remedial action that PJM \nshould take to address any unreserved use of the PJM transmission system for \nan Eligible Customer taking Firm Contract Demand transmission service on \nbehalf of a Co-Located Load? \n(6)\nWhat is the appropriate penalty charge or other remedial action that PJM \nshould take to address any unreserved use of the PJM transmission system for \nan Eligible Customer taking Non-Firm Contract Demand transmission service \non behalf of a Co-Located Load? \n(7)\nWhat are the appropriate mechanisms for an anti-toggling feature for the \nFirm Contract Demand transmission service, including the appropriate \nminimum service period and minimum notice period for discontinuing or \nmodifying the level of service? \n(8)\nWhat interconnection requirements and operational practices are necessary \nfor special protection schemes to maintain system reliability (e.g. the need for \nfull redundancy of such schemes) in the event that a Co-Located Load itself or \nits associated generator trips offline? \n(9)\nWhat communications, alarm, SCADA452  or other requirements are \nnecessary for PJM to monitor Co-Located Load transmission system demand \nstatus; ensure that relay settings are consistent with special protection scheme \ndesign; and inform system operator action, in order to limit withdrawals from \nEligible Customers on behalf of Co-Located Load that exceed the amount of \nFirm or Non-Firm Contract Demand transmission services? \n(10)\nWhat other eligibility requirements, e.g., interconnection requirements or \noperational practices, are necessary for an Eligible Customer to take Firm \nContract Demand or Non-Firm Contract Demand transmission service on \nbehalf of Co-Located Load? \n452 Supervisory Control and Data Acquisition (SCADA) is a system of remote \ncontrol and telemetry used to monitor and control the transmission system. See NERC \nGlossary of Terms at 42, https://www.nerc.com/globalassets/standards/reliability-\nstandards/glossary_of terms.pdf."},{"page":115,"startToken":43880,"endToken":44307,"text":"Docket No. EL25-49-000, et al. \n- 107 - \n(11) \nWhat are the appropriate procedures to govern the circumstances under \nwhich PJM curtails an Eligible Customer taking the interim, non-firm \ntransmission service, Firm Contract Demand transmission service, or \nNon-Firm Contract Demand transmission service on behalf of a Co-Located \nLoad during emergency procedures? In particular, can PJM shed all or a \nportion of a Co-Located Load on whose behalf an Eligible Customer takes \nNon-Firm Contract Demand transmission service while continuing to serve all \nor a portion of a Co-Located Load on whose behalf an Eligible Customer takes \nFirm Contract Demand transmission service? \n220.\nPJM must submit its initial brief in Docket No. EL25-49-000 on or before \nFebruary 16, 2026. The deadline to file responses to PJM's initial brief will be March 18, \n2026, and the deadline to file replies to those responses will be April 17, 2026. \nv. \nBehind the Meter Generation (BTMG) \n221.\nWe next turn to the Tariff's BTMG rules.453  Based on our finding above that \nPJM's BTMG rules are no longer just and reasonable, we direct PJM to revise the Tariff \nto revise the retail BTMG rules. However, we acknowledge that not all loads using \nBTMG are large loads that create the reliability and resource adequacy risks described \nabove. We therefore direct PJM, within 60 days of the date of issuance of this order, to \npropose a new MW threshold for the amount of load at a particular electrical location that \nNetwork Customers may net by using BTMG. Such a threshold should reduce the \nreliability and resource adequacy risks discussed above that large loads may pose to PJM, \nwhile also allowing for Network Customers to reduce their transmission charges in a \ntransparent, not unduly discriminatory fashion. We acknowledge that such a materiality \nthreshold will not eliminate the risk identified in this order, but we find that it will ensure \nthat the risk is limited. Parties will have an opportunity to comment on PJM's proposed \nthreshold before we establish this replacement rate. Although we make no finding in this \norder on a threshold that would be just and reasonable, we note as points of reference that \nPJM requires any generator larger than 10 MW to be individually metered' and that the \nCommission's definition of a small generator is 20 MW.455 \n453  We clarify that, consistent with the definition in 159,provided above, supra \nP 164, BTMG is not Co-Located Load. \n454  PJM Manual 14G: Generation Interconnection Requests, Rev. 8 (eff. July 26, \n2023), § 1.6.2. \n455  Order No. 2006, 111 FERC ¶ 61,220 at P 1."},{"page":116,"startToken":44307,"endToken":44770,"text":"Docket No. EL25-49-000, et al. \n- 108 - \n222.\nWe clarify we do not direct PJM to change its rules for non-retail BTMG.456 \nBecause non-retail BTMG is already capped, the record does not demonstrate a need for \nfurther changes at this time.457  We also recognize concerns raised in the record about the \npotential impacts of the Commission changing PJM's BTMG rules for existing BTMG \ncustomers.458  We thus make several findings and directives about the replacement rate \nbelow that are designed to minimize the impact of this transition on existing BTMG \ncustomers. \n223.\nFirst, we find that it is appropriate to establish a transition period for Network \nCustomers currently using PJM's existing BTMG rules. We thus direct PJM, within \n60 days of the date of issuance of this order, to include in its compliance filing Tariff \nrevisions to allow Network Customers already using the BTMG rules to continue to do so \nfor a transition period of three years, which aligns with the timeline to procure \nreplacement capacity in PJM,459  from the date of issuance of this order. We find that this \napproach reasonably balances concerns about expediently addressing unjust and \nunreasonable rates with concerns from parties that have relied on the existing Tariff. \n224.\nSecond, while the record indicates that parties desire the continued use of the \nexisting Tariff BTMG rules,4\" we acknowledge the possibility that entities may also \nhave contracted for the specific purpose of effectuating a BTMG arrangement. To the \nextent an entity is a party to an existing contract for such a purpose, we find that it is \n456  PJM defines Non-Retail BTMG as BTMG that is \"used by municipal electric \nsystems, electric cooperatives, or electric distribution companies to serve load.\" PJM, \nIntra-PJM Tariffs, OATT, § I.1 Definitions — L-M-N (51.0.1) (defining Non-Retail \nBTMG). \n457  Indicated Transmission Owners March 24 Response at 28 n.6 (\". . . [T]he total \namount of Non-Retail BTMG in the PJM Region is capped in any specific year and sets a \nmaximum ceiling of 3,000 MW . . . .\"); PJM, Intra-PJM Tariffs, OATT, § III.34.3 \nNetting of Non-Retail Behind the Meter Generation (1.0.0). \n458  See, e.g., AMP April 23 Reply Comments at 10-11; PSE&G May 23 Answer \nat 7. \n459  See PJM, Intra-PJM Tariffs, OATT, attach. DD.5, § 5.4(a) Reliability Pricing \nModel Auctions (10.0.0) (\"The Base Residual Auction shall be conducted in the month of \nMay that is three years prior to the start of such Delivery Year.\"). \n460 See,\n \ne.g., PSE&G May 23 Answer at 2 (\"Second, rules adopted by the \nCommission should not adversely impact existing customers in PJM who have BTMG \nand who have long relied upon the netting provisions under the PJM Tariff for purposes \nof paying wholesale grid services . . .\")."},{"page":117,"startToken":44770,"endToken":45192,"text":"Docket No. EL25-49-000, et al. \n- 109 - \nappropriate to grandfather such entity so that it may continue using BTMG for the current \nterm remaining under the existing contract.\"' We thus direct PJM, within 60 days of the \ndate of issuance of this order, to include in its compliance filing Tariff revisions to \ngrandfather entities with existing contracts for the specific purpose of effectuating a \nBTMG arrangement for the current term remaining under the existing contract. \nc. \nNecessary Study Process\"' for Existing Interconnection  \nCustomers  \n225.\nBased on our finding above that the PJM Tariff is unjust and unreasonable because \nit lacks sufficient clarity and consistency with respect to the rules for Co-Location \nArrangements, we direct PJM to revise its Tariff to provide sufficient clarity regarding \nthe responsibilities of existing Interconnection Customers seeking to serve Co-Located \nLoad using their generating facilities. \n226.\nFirst, we direct PJM to submit, within 60 days of the date of issuance of this order, \na compliance filing to revise the Tariff to clarify that an existing Interconnection \nCustomer seeking to modify its ISA or GIA to allow its generating facility to serve \nCo-Located Load, including to reflect any reduction in its CIRs, must follow the \nnecessary study process to effectuate such Co-Location Arrangement. Vistra argues that \nthe Commission should require transmission owners to cooperate in the necessary study \nprocess,463  and Indicated Transmission Owners respond that the Commission cannot \nrequire transmission owners to participate in a study process as a prerequisite to \ninterconnecting load.\"' Vistra's request is unnecessary. As part of the replacement rate \nin this order, we establish a just and reasonable process to accommodate Co-Location \nArrangements, including by requiring the designation of an Eligible Customer to take \ntransmission service on behalf of a Co-Located Load, and thereby reduce concerns raised \nin the Show Cause Order about how transmission owners approach Interconnection \n461 Cf. ISO New England Inc., 121 FERC ¶ 61,097 (2007) (accepting subject to \ncondition proposal including an option for certain customers with existing agreements for \ngrandfathered treatment); ISO New England Inc., 124 FERC ¶ 61,297 (2008) (approving \nsettlement agreement to implement proposal including grandfathering option). \n462  Necessary studies \"are essentially generator interconnection modification \nstudies.\" PJM March 24 Response at 7. This process is used for changes \"that typically \nhave relatively small MW impacts on [the generator's] ability to deliver less power to the \ngrid than the configuration reflected in an existing service agreement.\" PJM March 24 \nResponse at 47. \n463  Vistra April 23 Reply Comments at 23. \n464  Indicated Transmission Owners June 3 Answer at 23."},{"page":118,"startToken":45192,"endToken":45608,"text":"Docket No. EL25-49-000, et al. \n- 110 - \nCustomers' requests to use their generating facilities to serve Co-Located Load.465  We \nalso clarify that the above-directed requirement is on the Interconnection Customer with \nthe interconnected generating facility that is seeking to modify its ISA or GIA to use that \ngenerating facility to serve Co-Located Load. \n227. Second, we direct PJM to submit, within 60 days of the date of issuance of this \norder, a compliance filing to add to the Tariff a description of the scope of the analysis \nthat it will perform as part of the necessary study process when an Interconnection \nCustomer seeks to use its existing generating facility to serve Co-Located Load, \nconsistent with PJM's discussion of how it conducts necessary studies associated with \nInterconnection Customers seeking to amend their ISAs or GIAs to use existing \ngenerating facilities to serve Co-Located Load, including to reflect any reduction in \nCIRs.466  This should provide additional clarity and transparency regarding the steps that \nPJM and Interconnection Customers are taking to maintain transmission system \nreliability before an existing generating facility can serve Co-Located Load. In response \nto Antora's concerns,467  we require PJM to describe the information that the \nInterconnection Customer must provide about the Co-Located Load for purposes of the \nnecessary study. In response to RMI,468  we clarify that PJM's necessary study process, \nas reflected in the record, assesses any special protection scheme that is a part of a \nCo-Location Arrangement.469  We disagree with parties such as PIOs who claim that the \nnecessary study process is inappropriate for generation interconnection modification to \nserve Co-Located Load. PIOs, for example, claim this process is \"a poor fit,\"47° but they \ndo not critique PJM's detailed explanation in its Show Cause Response of the scope of its \nstudy. We also believe that the Tariff revisions required as part of this compliance filing \naddress some of the transparency concerns that parties have raised about the use of the \n465  Show Cause Order, 190 FERC ¶ 61,115 at P 75 (\"As such, the record of \nproceedings before the Commission appear to suggest that Transmission Owners are \ntaking different approaches to performing the steps necessary to accommodate a \nco-location arrangement and in the transmission service that they are requiring entities to \ntake.\"). \n466  See PJM March 24 Response at 49, 51-53. \n467  Antora April 23 Reply Comments at 8. \n468  RMI April 23 Reply Comments at 4-5. \n469  PJM March 24 Response at 49. \n47° PIOs April 23 Response at 9."},{"page":119,"startToken":45608,"endToken":46070,"text":"Docket No. EL25-49-000, et al. \n- 111 - \nnecessary study process, including questions about the scope of the analysis' and how \nthe necessary study process aligns with other studies.472  To the extent that PJM seeks to \nenhance the necessary study process, including as it gains experience evaluating requests \nfrom Interconnection Customers to modify their interconnection to serve Co-Located \nLoad, PJM may submit such enhancements in an FPA section 205 filing. \n228.\nThird, we direct PJM to submit, within 60 days of the date of issuance of this \norder, a compliance filing to revise the Tariff to indicate that the Interconnection \nCustomer will be responsible for the costs of any modifications or Network Upgrades \nthat are needed as a result of PJM's study of the change to the ISA or GIA to allow the \nexisting generating facility to serve Co-Located Load, including to reflect any reduction \nin CIRs, inclusive of all necessary Network Upgrades. This will clarify that costs \nassociated with such Co-Location Arrangements will not be unfairly shifted to other \ntransmission customers. PJM states that it requires Interconnection Customers to \ncomplete such upgrades before using their generating facilities to serve Co-Located Load \nin practice, but this requirement does not appear to be in the Tariff.473  Therefore, as part \nof this compliance directive, we direct PJM to revise its Tariff to clarify that an existing \ngenerator may not commence service to a Co-Located Load until all required Network \nUpgrades, special protection schemes, and metering are in service. \n229.\nBy directing PJM to revise its Tariff as discussed above, the Tariff will have \nsufficient clarity and consistency to facilitate Co-Location Arrangements in a just and \nreasonable and not unduly discriminatory or preferential manner. We note that we are \ndirecting a longer compliance timeline for PJM to submit these Tariff revisions related to \nInterconnection Customers seeking to serve Co-Located Load using existing generating \nfacilities, compared to the compliance timeline described below related to new generating \nfacilities, in order to expeditiously provide Interconnection Customers clarity on the steps \nthat will be needed to bring new generation online to serve Co-Located Loads. \n230.\nIn accordance with the existing rules for removing Capacity Resource status,' we \nalso clarify that an existing generating facility may not begin serving Co-Located Load \n471  OPSI April 23 Reply Comments at 3. \n472  Glatz/Silverman April 23 Reply Comments at 7. \n473  PJM March 24 Response at 50 (\"Service to the co-located load pursuant to the \nco-located load configuration may not commence until the necessary PJM \ninterconnection service agreement(s) has been fully executed by the parties, filed with \nand accepted by the Commission, and all required system reinforcements, system \nprotection facilities, and metering are in place.\") (emphasis added). \n474  See PJM, Intra-PJM Tariffs, OATT, attach. DD.6, § 6.6 Offer Requirement for"},{"page":120,"startToken":46070,"endToken":46520,"text":"Docket No. EL25-49-000, et al. \n- 112 - \nthat is not Network Load until it has delisted its CIRs for the portion of the generating \nfacility to be designated to serve any Co-Located Load that is not receiving NITS. In \norder for an existing generator to de-list its CIRs to serve Co-Located Load, the \nInterconnection Customer must revise its ISA or GIA and bear the cost of all required \nsystem upgrades, as noted above. \nd. \nNew Generating Facilities Serving Co-Located Load \n231.\nNext, we discuss several clarifications that we require PJM to make in its Tariff \nwith respect to Interconnection Customers seeking to use new generating facilities to \nserve Co-Located Load. Such revisions are necessary to clarify the steps such \nInterconnection Customers must take to effectuate Co-Location Arrangements in a \nmanner that is just and reasonable and not unduly discriminatory or preferential. \n232.\nFirst, with respect to Interconnection Customers seeking to use new generating \nfacilities to serve Co-Located Load, we direct PJM to submit, within 30 days of the date \nof issuance of this order, a compliance filing to revise section 404.A.2.a.v of its Tariff to \nclarify that PJM shall consider requests for interconnection service below the full \ngenerating capability of the generating facility, so that an Interconnection Customer may \nrequest interconnection service at a level below its maximum facility output to serve \nCo-Located Load. We direct PJM to revise any other Tariff provisions consistent with \nthis directive.' Consistent with PJM's existing Tariff process, an Interconnection \nCustomer seeking to use its generating facility to serve Co-Located Load will be studied \nat the level of interconnection service requested for the purposes of determining \nInterconnection Facilities, Network Upgrades, and associated costs, but may be subject to \nother studies at the full generating capability of the generating facility to ensure the safety \nand reliability of the transmission system, with the study costs borne by the \nInterconnection Customer.\" This revision will clarify that an Interconnection Customer \nseeking to use a new generating facility to serve a Co-Located Load may request only the \nminimum level of interconnection service it deems necessary to effectuate its \nCo-Location Arrangement. \n233.\nSecond, we direct PJM to submit, within 30 days of the date of issuance of this \norder, a compliance filing to revise its Tariff to clarify that Interconnection Customers \nseeking to use new generating facilities to serve Co-Located Load may use existing \nprocedures to accelerate a new service request if they satisfy the criteria of PJM's Tariff, \nCapacity Resources (3.0.0); PJM March 24 Response at 58. \n475  See Order No. 845, 163 FERC ¶ 61,043 at P 367. \n476  PJM, Intra-PJM Tariffs, OATT, § VIII.C.404.A.2.a.v Introduction (1.0.0)."},{"page":121,"startToken":46520,"endToken":46977,"text":"Docket No. EL25-49-000, et al. \n- 113 - \ni.e., the request has no cost allocation for Network Upgrades and does not require further \nstudies.' \n234.\nThird, we direct PJM to submit, within 30 days of the issuance of this order, a \ncompliance filing to revise the Tariff to clarify that an Interconnection Customer seeking \nto use a new generating facility to serve Co-Located Load may request provisional \ninterconnection service. As the Commission explained in Order No. 845, Interconnection \nCustomers may seek provisional interconnection service when available studies or \nadditional studies as necessary indicate that there is a level of interconnection service that \ncan occur without any additional Interconnection Facilities and/or Network Upgrades, \nand the Interconnection Customer wishes to make use of that level of interconnection \nservice while the facilities required for its full interconnection request are completed.478 \nConsistent with PJM's existing Tariff process, whether PJM grants a request for \nprovisional interconnection service is at PJM's discretion based upon its evaluation and \nthe results of available studies.479  This revision will clarify that an Interconnection \nCustomer that requests provisional interconnection service for a new generating facility \nserving Co-Located Load can enter commercial operation and begin serving the \nCo-Located Load on an expedited basis, provided such provisional interconnection \nservice is available. We also note that an Interconnection Customer may seek provisional \nservice in combination with a request to interconnect at a level below nameplate capacity. \n235.\nFourth, we direct PJM to submit, within 30 days of the date of issuance of this \norder, a compliance filing to revise section 414 of its Tariff to clarify that an \nInterconnection Customer seeking to use a new generating facility to serve Co-Located \nLoad at an existing point of interconnection may request Surplus Interconnection Service, \nif the existing Interconnection Customer at that point of interconnection has made \nSurplus Interconnection Service available. Consistent with PJM's Tariff, Surplus \nInterconnection Service is granted if PJM concludes in its Surplus Interconnection Study \nthat no new Network Upgrades are required to accommodate the new generating \nfacility's output at the designated point of interconnection.480  This revision will clarify \n477  PJM, Intra-PJM Tariffs, 406, OATT Part VIII.C 406 Decision Point I (1.1.0), \n§ 406.A.2 (\"Only New Service Requests that have no cost allocation for Network \nUpgrades and do not require further studies are eligible for acceleration.\"); PJM, \nIntra-PJM Tariffs, 408, OATT Part VIII.C 408 Decision Point II (2.1.0), § 408.A.2.d \n(stating same). \n478  Order No. 845, 163 FERC 1161,043 at P 441. \n479  PJM, Intra-PJM Tariffs, ATTACHMENT O.A2.1.4A, OATT ATTACHMENT \nO.A2.1.4A Other Interconnection Options (2.1.0), § 1.4A.2. \n480 PJM, Intra-PJM Tariffs, 414, OATT Part VIII.E 414 Surplus Interconnection"},{"page":122,"startToken":46977,"endToken":47382,"text":"Docket No. EL25-49-000, et al. \n- 114 - \nthat an Interconnection Customer seeking to use a new generating facility to serve \nCo-Located Load has the same opportunity to use Surplus Interconnection Service that is \navailable to other new Interconnection Customers. \n236.\nLastly, we note that PJM requested guidance on its proposed options, including \noption 6.481  Noting that we direct PJM to clarify its Tariff with respect to Interconnection \nCustomers seeking to use a new generating facility to serve Co-Located Load, PJM and \nseveral commenters state that additional Tariff constructs that accelerate interconnection \nstudies for new generation associated with new Co-Located Loads (PJM proposed \noption 6) may be just and reasonable.482  We believe that such constructs may help \naddress concerns raised in this proceeding that increasing amounts of new Co-Located \nLoad seeking to be served by an Eligible Customer faster than equivalent generation can \ncome online may create resource adequacy problems.483  As PJM notes,484  additional load \non the system requires the addition of generators to serve that load reliably, and a process \nwith accelerated interconnection studies for certain generators with Co-Located Load \ncould timely match new load with needed generation. \ne. \nInformational Report \n237.\nWe also are encouraged that, in August 2025, the PJM Board of Managers (PJM \nBoard) initiated the CIFP stakeholder process to address matters that relate to but that are \nbroader than those involving Co-Location Arrangements, and specifically, \"to address the \ndevelopment of reliability-focused solutions to ensure large load additions can continue \nService (1.0.0), § 414.B.2. \n481  See PJM March 24 Response at 5, 33-34, 53. PJM's option 6 refers to \nCo-located load that elects to be Network Load and bring its own generation. \n482 PJM suggests that one possibility could be to enhance existing provisional \ninterconnection service to accelerate in a non-discriminatory manner the ability of new \ngeneration to achieve commercial operation. Id. at 17; see also Bloom April 23 Reply \nComments at 2 (arguing that an integrated interconnection approach such as that outlined \nin the Brattle Report attached to Bloom's comments, which \"shares some traits with the \napproach PJM calls New Option 6,\" could significantly accelerate the interconnection \ntimeline). \n483  See, e.g., PJM March 24 Response at 16-17; Market Monitor April 23 Reply \nComments at 11; BrightNight April 23 Reply Comments at 9; Ohio FEA April 23 Reply \nComments at 4-5; AEU April 23 Reply Comments at 14. \n484  PJM March 24 Response at 62."},{"page":123,"startToken":47382,"endToken":47844,"text":"Docket No. EL25-49-000, et al. \n- 115 - \nto be integrated rapidly and reliably, without causing resource inadequacy.\"485  PJM and \nstakeholders considered a number of potential reforms designed to accommodate large \nload additions in an efficient and reliable manner. In PJM's contemplated expedited \ninterconnection process, for example, generation projects that have a contractual \ncommitment to a new large load, in addition to standalone generation that submits a \nhigher readiness deposit to PJM, would be able to access an expedited interconnection \npathway, so long as they seek to be Capacity Resources, meet a substantial size threshold, \npay a large, non-refundable study deposit, are supported by a state commitment to \nexpedite permitting, and demonstrate three full years of 100% site control, among other \ncriteria. Other reforms considered, and that we highlight here, included, but were not \nlimited to, modifications to PJM's reliability backstop mechanism to expedite PJM's \nability to procure generation capacity on a multi-year basis during instances of resource \nadequacy shortfalls, development of enhanced load forecasting criteria and processes, and \nrules to enable the more efficient utilization of the transmission system by increasing \ndemand flexibility. \n238. Accordingly, we direct PJM to submit in Docket No. EL25-49-000, within 30 days \nof the date of issuance of this order, a detailed informational report486  on the status of the \nproposals considered in the CIFP stakeholder process, including—but not limited to—the \nstatus of the expedited interconnection process to enable shovel-ready generation projects \nto serve PJM more quickly, modifications to PJM's reliability backstop mechanism to \nimprove PJM's ability to respond to acute resource adequacy shortfalls, and the \ndevelopment of enhanced load forecasting487  and demand flexibility measures to assist \nPJM in determining the amount of new capacity that is needed to maintain system \nreliability. The informational report must include a detailed schedule of key milestones, \nsuch as stakeholder or PJM Board votes, that includes the estimated date on which PJM \nexpects to file any such proposals with the Commission. Additionally, as part of this \ninformational report, we direct PJM to identify any problem statements, issue charges, or \nother ongoing stakeholder processes that aim to increase the pace of adding generating \ncapacity in the PJM region. PJM must provide as detailed a schedule as is feasible on the \n485  PJM, Critical Issue Fast Path — Large Load Additions, \nhttps://www.pjm.com/committees-and-groups/cifp-lla (last visited Dec. 5, 2025). \n486 Upon receipt, the Commission will not act on or notice this informational \nfiling. \n487  We note that, on October 20, 2025, PJM submitted a response to \nthen-Chairman Rosner's letter on load forecasting. See supra P 154. PJM should expand \non its response to then-Chairman Rosner in the informational report that we direct here \nby explaining, in detail, any changes or updates to its load forecasting processes that it is \nconsidering."},{"page":124,"startToken":47844,"endToken":48264,"text":"Docket No. EL25-49-000, et al. \n- 116 - \ntiming of such initiatives, including updates on the stakeholder process and approximate \ndates of any anticipated filings with the Commission. The informational report also must \nidentify specifically which of these initiatives would support the addition, on an \nexpedited basis, of new generation that is sufficient to serve large loads, like data centers, \nwhile meeting PJM's near-term system resource adequacy needs \n239.\nFinally, given PJM's currently compressed auction schedule, PJM should explain \nthe proposed effective date of any proposal that it intends to file so that the Commission \ncan understand whether any of those proposals could be in place by the 2028/2029 Base \nResidual Auction (BRA) and subsequent BRAs to attract sufficient new generation to \nmaintain regional resource adequacy. \n5. \nPJM Capacity Market, Reliability, and Resource Adequacy \n240.\nThere is also insufficient evidence in the record to fmd that the existing Tariff \nprovisions governing capacity market rules, reliability, and resource adequacy are unjust \nand unreasonable or unduly discriminatory or preferential. In the Show Cause Order, the \nCommission stated that the Tariff may be unjust and unreasonable and unduly \ndiscriminatory or preferential insofar as it lacks rules necessary to provide PJM with \nsufficient information to perform appropriate analysis to ensure reliable system \noperations given the characteristics of Co-Location Arrangements.488  Commenters \nresponded with concerns, including that Co-Located Load served entirely \nbehind-the-meter will not be accounted for in PJM's planning processes and that \nCo-Located Load could unexpectedly appear online after being previously invisible to \nPJM.489 \n241.\nHowever, as directed herein, Interconnection Customers choosing to serve \nCo-Located Load using their generating facilities will be required to identify an Eligible \nCustomer who will take transmission service on behalf of that Co-Located Load. We \nfind that this requirement should address concerns that Co-Located Load would not be \nvisible to PJM or its transmission owners. We further note that Co-Located Load that \nelects to meet this requirement by taking NITS or the new Firm Contract Demand \ntransmission service through an Eligible Customer will be included in transmission \nplanning and the capacity market.49° In addition, the Eligible Customer that elects to \ninstead take the Non-Firm Contract Demand transmission service on behalf of \n488  See Show Cause Order, 190 FERC ¶ 61,115 at PP 83-86. \n489  Indicated Transmission Owners April 23 Reply Comments at 13; PPL April 23 \nReply Comments at 10-11; Pennsylvania Commission April 22 Reply Comments at 6. \n498  See PJM March 24 Response at 39 n.64; Indicated Transmission Owners \nMarch 24 Response, attach. A at 17."},{"page":125,"startToken":48264,"endToken":48652,"text":"Docket No. EL25-49-000, et al. \n- 117 - \nCo-Located Load agrees that it will be curtailed during emergency operations upon \nPJM's direction, and thus will not be included in transmission planning or in the capacity \nmarket. \n242.\nBecause PJM states that Co-Located Loads that elect to be Network Load may \nparticipate as a demand response resource under PJM's existing Tariff,' we find that \nthere is not sufficient evidence to conclude that the existing Tariff is not just and \nreasonable as it relates to the existing demand response rules. We recognize that PJM \nacknowledges that there could be an additional review of the PJM Demand Response \nrules in its stakeholder process,' which may be further addressed through a future FPA \nsection 205 filing. We also note that the Firm Contract Demand transmission service and \nNon-Firm Contract Demand transmission service we direct in this order will create \nopportunities for Co-Located Loads that do not elect to be Network Load to benefit from \nany ability they have to limit their consumption. \n243.\nRegarding broader resource adequacy and reliability concerns associated with \nmaintaining sufficient generation to serve Co-Located Load, we reiterate that load growth \ngenerally involves resource adequacy and reliability considerations, regardless of whether \nthe new load is Co-Located Load.493  Several commenters, including PJM, acknowledge \nthis fact.494  While the Commission found in the Show Cause Order that the speed at \nwhich Co-Located Load can be added to the transmission system may pose particular \nresource adequacy challenges, especially if Co-Location Arrangements are not \nadequately and transparently reflected in existing resource adequacy planning \nmechanisms,495  there is not sufficient evidence to conclude that additional Tariff changes \nregarding Interconnection Customers electing to use their generating facilities to serve \nCo-Located Load are needed with respect to capacity market rules, reliability, and \nresource adequacy to ensure that the PJM Tariff remains just and reasonable. We \nencourage PJM to continue monitoring capacity market, resource adequacy, and \nreliability issues as they relate to Co-Location Arrangements to evaluate whether \nadditional Tariff changes may be appropriate. \n491  PJM March 24 Response at 19-20. \n492  Id. at 20. \n493  Show Cause Order 190 FERC ¶ 61,115 at P 85. \n494  See, e.g., PJM March 24 Response at 57; Constellation April 23 Reply \nComments at 11, 60-61 (citing Patterson Aff.1115). \n495  Show Cause Order 190 FERC ¶ 61,115 at P 85."},{"page":126,"startToken":48652,"endToken":49049,"text":"Docket No. EL25-49-000, et al. \n- 118 - \n6. \nMotions \n244.\nIn response to the Motion to Stay, we reject the Joint Parties' request to stay the \nproceeding to allow them to develop through settlement proceedings a new replacement \nrate that establishes the services an Eligible Customer takes on behalf of Co-Located \nLoad and allocates any costs to such Eligible Customer. Because we have established \npaper hearing procedures to determine the just and reasonable rates, terms, and conditions \nfor new transmission services, and directed PJM to make related Tariff revisions on \ncompliance, we deny the Motion to Stay. \n245.\nWe note that Vistra moved for clarification in this proceeding regarding the \nmeaning of Susquehanna by April 16, 2025 so that parties could take the Commission's \nclarification of that order into account when preparing the comments due in this \nproceeding on April 23, 2025. The Commission issued the Susquehanna Rehearing \nOrder on April 10, 2025 in Docket No. ER24-2172-002, including ruling on Vistra's \nmotion in that proceeding seeking clarification of Susquehanna.496  We thus dismiss as \nunnecessary Vistra's pending motion in this proceeding. \n246.\nWe partially grant Constellation's Motion insofar as we adopt the finding in the \nShow Cause Order that the PJM Tariff is unjust and unreasonable and establish a \nreplacement rate. \n247.\nWe disagree with PJM that acting in this proceeding violates applicable case law. \nPJM selectively quotes Cities of Anaheim for the proposition that adjudication should not \nsupplant a pending rulemaking proceeding, but PJM points to no actual court decision \nthat holds that an agency has violated the Administrative Procedure Act on that basis. \nWe also disagree with parties who argue that acting in this proceeding would prejudge \nthe issues raised in the ANOPR proceeding or otherwise be improper. The Commission \nhas discretion as to whether to proceed via adjudication or rulemaking,497  and we find \nthat it is an appropriate exercise of discretion to act on the PJM co-location proceeding \nbefore taking any action in the ANOPR proceeding. \n7. \nConstellation Complaint \n248. In the Show Cause Order, the Commission consolidated the new show cause \nproceeding in Docket No. EL25-49-000 with the complaint filed by Constellation against \nthe PJM Tariff in Docket No. EL25-20-000. As summarized in detail in the Show Cause \n496  Susquehanna, 191 FERC ¶ 61,025. \n497  1V.L.R.B. v. Bell Aerospace Co. Div. of Textron, Inc., 416 U.S. 267, 294 (1974)."},{"page":127,"startToken":49049,"endToken":49477,"text":"Docket No. EL25-49-000, et al. \n- 119 - \nOrder,498  Constellation argued that the Tariff is unjust and unreasonable and unduly \ndiscriminatory because it lacks rules for interconnected generators to follow when \nseeking to serve to end-use load co-located with generation behind the meter in a \nconfiguration with system protection facilities to prevent the load from receiving \nelectricity from the transmission system.499  Constellation stated that, in establishing the \nreplacement rate, the Commission should conclude that provisions of the PJM Guidance \nDocument not on file with the Commission (particularly sections 2, 3, 5, and 7) must be \nincorporated into the Tariff under the rule of reason, which will provide certainty to \ngenerators and transmission owners by ensuring that the PJM Guidance Document is \napplied to all interconnected generators seeking to serve Co-Located Load.5\" \n249. We grant in part and deny in part the complaint. We grant the complaint insofar \nas we find, as discussed above, that PJM's Tariff is unjust and unreasonable because it \ndoes not contain provisions addressing with sufficient clarity or consistency the rates, \nterms, and conditions of service that apply to Interconnection Customers serving \nCo-Located Load, including generators serving Co-Located Load in a configuration with \nspecial protection schemes to prevent the Co-Located Load from taking energy from the \ntransmission system. We deny the complaint insofar as we direct PJM, as discussed \nabove, to revise the Tariff to establish just and reasonable replacement rates, terms, and \nconditions for Interconnection Customers serving Co-Located Load. The PJM Guidance \nDocument has been rescinded by PJM,5\" and it lacked all terms that we find above are \njust and reasonable for Interconnection Customers serving Co-Located Load. \nThe Commission orders: \n(A)\nPJM is hereby directed to submit, within 30 days of the date of issuance of \nthis order, revisions to its Tariff as described in Part IV.B.4.d. \n(B)\nPJM is hereby directed to submit, within 60 days of the date of issuance of \nthis order, revisions to its Tariff as described in Part IV.B.4.a and Part IV.B.4.c. \n(C)\nPJM is hereby directed to submit, within 60 days of the date of issuance of \nthis order, revisions to modify its Tariff to provide that the Eligible Customer taking \ntransmission service on behalf of a Co-Located Load ensure that the Co-Located Load \ntake one of three transmission services: (1) NITS, as modified in the body of this order, \n498  See Show Cause Order, 190 FERC ¶ 61,115 at P 50. \n4\"  Complaint at 1. \n500  Id. at 20. \n501 PJM March 24 Response at 33."},{"page":128,"startToken":49477,"endToken":49749,"text":"Docket No. EL25-49-000, et al. \n- 120 - \n(2) a new Firm Contract Demand transmission service, or (3) a new Non-Firm Contract \nDemand transmission service, as discussed in Part IV.B.4.b. \n(D)\nPaper hearing procedures are established to evaluate the rates, terms, and \nconditions of the interim, non-firm transmission service, Firm Contract Demand \ntransmission service, and Non-Firm Contract Demand transmission service. \n(E)\nPJM is hereby directed to submit its initial brief in Docket \nNo. EL25-49-000 on or before February 16, 2026. The deadline to file responses to \nPJM's initial brief will be March 18, 2026, and the deadline to file replies to those \nresponses will be April 17, 2026. \n(F)\nPJM is hereby directed to submit, within 60 days of the date of issuance of \nthis order, revisions to the Tariff to: (1) revise the BTMG rules, as discussed in the body \nof this order; (2) propose a new MW threshold for the amount of load that Network \nCustomers may net by using BTMG, as discussed in the body of this order; and \n(3) establish a transition period for Network Customers already using the BTMG rules, as \ndiscussed in the body of this order. \n(G)\nPJM is directed to submit an informational report within 30 days of the date \nof issuance of this order, as discussed in the body of this order. \n(H)\nJoint Parties' motion to stay is hereby denied, as discussed in the body of \nthis order. \n(I)\nVistra's motion for clarification is hereby dismissed, as discussed in the \nbody of this order. \n(J)\nConstellation's motion for expedited action is partially granted, as \ndiscussed in the body of this order."},{"page":129,"startToken":49749,"endToken":49806,"text":"Docket No. EL25-49-000, et al. \n- 121 - \n(K) \nThe Constellation complaint in Docket No. EL25-20-000 is hereby granted \nin part and denied in part, as discussed in the body of this order. \nBy the Commission. Commissioner Rosner is concurring with a separate statement \nattached. \nCommissioner Chang is concurring with a separate statement \nattached. \n(SEAL) \nDebbie-Anne A. Reese, \nSecretary."},{"page":130,"startToken":49806,"endToken":50025,"text":"Docket No. EL25-49-000, et al. \n- 122 - \nAppendix \nIntervenors \nAdvanced Energy United (AEU)+ \nAES Corporation* \nAlliant Energy Corporate Services, Inc. \nAllegheny Electric Cooperative, Inc.+ \nAlpha Generation, LLC* \nAmeren Companies502 \nAmerican Clean Power Association \nAmerican Council on Renewable Energy (ACORE)*+ \nAmerican Electric Power Service Corporation (AEP)5°3 \nAmerican Municipal Power, Inc. (AMP)+& \nAmerican Petroleum Institute* \nAmericans for a Clean Energy Grid (ACEG)+ \nAMP Transmission, LLC* \nAntora Energy LLC (Antora)*+ \nAppalachian Voices \nArevon Energy, Inc. \nArkansas Public Service Commission* \nAvangrid, Inc. \nBloom Energy Corporation (Bloom)+ \nBoston Energy Trading and Marketing LLC \nBrightNight Power Marketing, LLC (BrightNight)+ \nBrookfield Renewable Trading and Marketing LP \nBuckeye Power, Inc. (Buckeye)+& \nBusiness Council for Sustainable Energy (BCSE)+A \nCalifornia Department of Water Resources State Water Project \nCalifornia Public Utilities Commission \n502 Ameren Services Company, a wholly-owned subsidiary of Ameren \nCorporation, moves to intervene on behalf of its affiliated public utility operating \ncompanies, Ameren Illinois Company, Ameren Transmission Company of Illinois and \nUnion Electric Company d/b/a Ameren Missouri. \n503 AEP moves to intervene on behalf of its affiliates Appalachian Power \nCompany, Indiana Michigan Power Company, Kentucky Power Company, Kingsport \nPower Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian \nTransmission Company, Inc., AEP Indiana Michigan Transmission Company, Inc., AEP \nKentucky Transmission Company, Inc., AEP Ohio Transmission Company, Inc., and \nAEP West Virginia Transmission Company, Inc."},{"page":131,"startToken":50025,"endToken":50207,"text":"Docket No. EL25-49-000, et al. \n- 123 - \nCalpine Corporation (Calpine) \nCampbell Energy Advisors, LLC \nCEPM Companies5\" \nCenter for Biological Diversity (Center)# \nChevron U.S.A. Inc. (Chevron)+ \nClean Air Task Force (CATF)# \nClean Energy Buyers Association \nClearway Energy Group LLC* \nConsolidated Edison Company of New York, Inc. \nConstellation Energy Generation, LLC (Constellation)& \nConsumers Energy Company \nConsumers' Research+ \nCooperative Energy \nCordelio Services LLC* \nCrete Energy Venture, LLC \nData Center Coalition+ \nDelaware Municipal Electric Corporation, Inc. \nDelaware Public Service Commission (Delaware Commission)*+ \nDominion Energy Services, Inc. \nDTE Electric Company \nEarthjustice \nEast Kentucky Power Cooperative, Inc. \nEast Texas Electric Cooperative, Inc. \nEDF Renewables, Inc. (EDFR)*+ \nEdison Electric Institute (EEI)+ \nElectric Power Supply Association (EPSA)5°5+ \nElectricity Consumers Resource Council (ELCON)+ \nEnchanted Rock, LLC (Enchanted Rock)+ \nEnerwise Global Technologies, LLC (CPower) \nENGIE North America Inc.* (ENGIE)+ \nEnvironmental Defense Fund* \nEolian, LP* \nExelon Corporation \nExus Renewables North America (Exus)# \n\" 4  Hamilton Liberty LLC, Hamilton Patriot LLC, Lakewood Cogeneration, LP, \nEssential Power OPP, LLC, Essential Power Rock Springs, LLC, and Cogentrix Energy \nPower Management, LLC (Cogentrix) comprise CEPM Companies. \nsos EPSA submitted joint comments with P3 (EPSA/P3)."},{"page":132,"startToken":50207,"endToken":50538,"text":"Docket No. EL25-49-000, et al. \n- 124 - \nFirstEnergy Transmission Companiess°6 \nGoogle Energy LLC \nGoogle LLC \nHamilton Liberty \nIdaho Power Company \nIllinois Attorney General's Office \nIllinois Citizens Utility Board \nIllinois Municipal Electric Agency \nIndiana Office of Utility Consumer Counselor* \nIndicated Transmission Owners507+& \n5°6  First Energy Service Company moves to intervene as agent for its affiliates \nAmerican Transmission Systems, Incorporated, Jersey Central Power & Light Company, \nMid-Atlantic Interstate Transmission LLC, Keystone Appalachian Transmission \nCompany, The Potomac Edison Company, Monongahela Power Company and \nTrans-Allegheny Interstate Line Company. \n5°7  Indicated Transmission Owners include: AEP on behalf of Appalachian Power \nCompany, Indiana Michigan Power Company, Kentucky Power Company, Kingsport \nPower Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian \nTransmission Company, Inc., AEP Indiana Michigan Transmission Company, Inc., AEP \nKentucky Transmission Company, Inc., AEP Ohio Transmission Company, Inc., and \nAEP West Virginia Transmission Company, Inc.; AMP Transmission, LLC; City of \nCleveland, Department of Public Utilities, Division of Cleveland Public Power; City of \nHamilton, OH; Dominion Energy Services, Inc. on behalf of Virginia Electric and Power \nCompany d/b/a Dominion Energy Virginia; Duke Energy Corporation on behalf of its \naffiliates Duke Energy Ohio, Inc., Duke Energy Kentucky, Inc., and Duke Energy \nBusiness Services LLC; Duquesne Light Company; East Kentucky Power Cooperative; \nExelon Corporation, on behalf of Atlantic City Electric Company, Baltimore Gas and \nElectric Company, Commonwealth Edison Company, Commonwealth Edison Company \nof Indiana, Inc., Delmarva Power & Light Company, PECO Energy Company, and \nPotomac Electric Power Company; FirstEnergy Service Company, as agent for its \naffiliates American Transmission Systems, Incorporated, Jersey Central Power & Light \nCompany, Mid-Atlantic Interstate Transmission LLC, Keystone Appalachian \nTransmission Company, The Potomac Edison Company, Monongahela Power Company \nand Trans-Allegheny Interstate Line Company; Old Dominion Electric Cooperative; PPL \nElectric Utilities Corporation; Rockland Electric Company; Southern Maryland Electric \nCooperative, Inc.; UGI Utilities Inc; and Wabash Valley Power Association, Inc. \nDominion Energy Services did not join in the June 3 Answer or the June 27 Answer. \nDuquesne Light Company did not join in the June 27 Answer."},{"page":133,"startToken":50538,"endToken":50772,"text":"Docket No. EL25-49-000, et al. \n- 125 - \nIndustrial Energy Consumers of America (IECA)508+ \nInvenergy Renewables LLC and Invenergy Thermal LLC (Invenergy)509+ \nITC Companies51° \nJoint Parties511 \nKlondike Digital Infrastructure LLC \nLarge Public Power Council \nLee County Electric Cooperative, Inc. \nLincoln Generating Facility, LLC \nLS Power Development, LLC (LS Power) \nMainspring Energy, Inc. (Mainspring)+ \nMaryland Office of People's Counsel (together with New Jersey Division of Rate \nCounsel, Joint Consumer Advocates)*+ \nMaryland Public Service Commission \nMidwest Generation, LLC \nMississippi Public Service Commission \nMonitoring Analytics, LLC, acting in its capacity as the Independent Market Monitor for \nPJM (Market Monitor)+ \nNational Grid \nNational Grid Renewables Development, LLC \nNational Hydropower Association \nNational Rural Electric Cooperative Association \nNational Security Experts512+ \nNatural Resources Defense Council (NRDC)+ \nNebraska Public Power District \nNew Jersey Division of Rate Counsel+ \nNew York State Reliability Council, L.L.C.* \nNextera Energy Transmission MidAtlantic, Inc. (NEET)+ \n5°8  IECA filed joint comments with the PJM ICC. \n509 Invenergy Renewables LLC and Invenergy Thermal LLC comprise Invenergy. \n51° International Transmission Company d/b/a ITC Transmission, Michigan \nElectric Transmission Company, LLC, ITC Midwest LLC and ITC Great Plains, LLC \ncomprise ITC companies. \n511  Joint Parties is composed of EPSA, P3, Calpine, Cogentrix, Constellation, and \nLS Power. \n512  National Security Experts is composed of John B. Hashem, Robert G. F. Lee, \nJoseph L. Lengyel, Craig R. McKinley, Benny M. Paulino, Paul Stockton, Chuck Wald, \nand Darryl D. M. Wong."},{"page":134,"startToken":50772,"endToken":51027,"text":"Docket No. EL25-49-000, et al. \n- 126 - \nNorth American Electric Reliability Corporation (NERC)*+ \nNortheast Texas Electric Cooperative, Inc. \nNortheastern Rural Electric Membership Corporation (NREMC)+& \nNorthern Virginia Electric Cooperative, Inc. (NOVEC)+& \nNRG Business Marketing LLC \nOffice of the Ohio Consumers' Counsel \nOhio Federal Energy Advocate (Ohio FEA)+ \nOne Power Company* \nOrange & Rockland Utilities, Inc. \nOrganization of PJM States, Inc. (OPSI)513+^ \nPacific Gas and Electric Company (PG&E)514+ \nPennsylvania Public Utility Commission (Pennsylvania Commission)+^ \nPJM& \nPJM Industrial Customer Coalition (ICC)+ \nPJM Power Providers Group (P3) \nPPL Electric Utilities Corporation (PPL)+ \nPSE&G Companies (PSE&G)515+& \nPublic Citizen, Inc. \nPublic Interest Organizations (PIOs)516+ \n513  OPSI noted that the following of its members support its comments: Delaware \nPublic Service Commission, Public Service Commission of the District of Columbia, \nIllinois Commerce Commission, Indiana Utility Regulatory Commission, Kentucky \nPublic Service Commission, Maryland Public Service Commission, Michigan Public \nService Commission, New Jersey Board of Public Utilities, Public Utilities Commission \nof Ohio, Pennsylvania Commission, Tennessee Public Utility Commission, Virginia State \nCorporation Commission and Public Service Commission of West Virginia. The North \nCarolina Utilities Commission did not join in these comments. \n514  PG&E submitted joint comments with Southern California Edison (together, \nCalifornia Utilities). \n515  Public Service Electric and Gas Company, PSE&G Power LLC and PSE&G \nEnergy Resources & Trade LLC comprise the PSE&G Companies. Comments were filed \nby Public Service Electric and Gas Company. \n516  PIOs is composed of Appalachian Voices, CATF, Earthjustice, EDF, \nPennFuture, and the Sierra Club. Of the PIOs, PennFuture did not move to intervene."},{"page":135,"startToken":51027,"endToken":51209,"text":"Docket No. EL25-49-000, et al. \n- 127 - \nPublic Systems517 \nRepsol Energy North America Corporation \nRockland Electric Company \nRMI#A \nSan Diego Gas & Electric Company \nShell Energy North America (US), L.P. \nSierra Club \nSilver Run Electric, LLC+ \nSolar Energy Industries Association (SEIA)+ \nSouthern California Edison Company+ \nSouthern Maryland Electric Cooperative, Inc.* \nSustainable FERC Project \nSuzanne Glatz and Abraham Silverman (Glatz and Silverman)+A \nTalen Energy Corporation (Talen)+& \nThe Dayton Power and Light Company (AES Ohio)+ \nThe Retail Energy Supply Association \nUGI Utilities Inc. \nUnion of Concerned Scientists (UCS)+ \nUnited States Senators518^ \nVirginia State Corporation Commission (Virginia Commission)* \nVistra Corp. (Vistra)+& \nVote Solar \nWabash Valley Power Association, Inc. \nWest Virginia Public Service Commission* \n* moved to intervene out-of-time \n+ filed comments or reply comments \n# filed comments out-of-time \nA  filed comments without a notice of intervention or motion to intervene \n& filed an answer \n517  Connecticut Municipal Electric Energy Cooperative, Massachusetts Municipal \nWholesale Electric Company, and Vermont Public Power Supply Authority comprise \nPublic Systems. \n518  United States Senators include Senators Edward J. Markey, Chris Van Hollen, \nElizabeth Warren, Peter Welch, Raphael Warnock, Richard Blumenthal, and Adam B. \nSchiff."},{"page":136,"startToken":51209,"endToken":51389,"text":"UNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C. \nDocket Nos. EL25-49-000 \nAllegheny Electric Cooperative, Inc. \nEL25-49-001 \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. \nAEP Kentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company \nDuquesne Light Company"},{"page":137,"startToken":51389,"endToken":51659,"text":"Docket No. EL25-49-000, et al. \n2 \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public Utilities, \nDivision of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \nLarge Loads Co-Located at Generating Facilities \nAD24-11-000 \nConstellation Energy Generation, LLC \nEL25-20-000 \n(Consolidated) \nv. \nPJM Interconnection, L.L.C. \n(Issued December 18, 2025) \nROSNER, Commissioner, concurring: \n1.\nToday's order directs reforms that deliver a commonsense outcome: if a new large \nload wants to connect directly to a power plant and operate in a way that lowers grid \ncosts, we should let it. If the current rules don't let this work in a way that's fair for \neveryone, we must change those rules to deliver the cost savings that consumers so badly \nneed and ensure reliable electricity for all. Saying no to innovation is not a winning \nstrategy—whether we're trying to win the AI race, bring back American manufacturing, \nor deliver the reliable and affordable energy on which families and small businesses \ndepend. \n2.\nWhile today's outcome is commonsense, like so many Commission policies, the \norder includes a lot of regulatory jargon, which is necessary for technical precision and \nlegal durability. That being the case, I write separately to explain what we are doing and, \nimportantly, why we are doing it. \n3.\nLet's begin by explaining the problem that we are trying to solve. We are trying \nto meet surging demand while upholding two fundamental values that underpin the"},{"page":138,"startToken":51659,"endToken":52146,"text":"Docket No. EL25-49-000, et al. \n- 3 \nelectric industry in our country: first, that all customers have a right to receive electric \nservice on a timely basis, and second, that electric service should be reliable and \naffordable for all customers. Given the scale of new large loads putting demand on our \ngrid today, it is clear that fostering both of these values requires intervention. \nUnfortunately, it has become persistently difficult and increasingly expensive to build \nnew grid infrastructure in this country. Because of this, a business-as-usual approach to \nload growth—planning for generation and load separately—will not suffice to timely \nmeet growing demand while also keeping prices reasonable. \n4.\nToday's order helps break the logjam. It directs PJM to establish new pathways \nfor co-location—directly connecting a large load with the power needed to serve it at the \nsame site—and load flexibility that enable large co-located loads to reduce how much \nthey lean on the grid, while ensuring that they pay their fair share. As a result, PJM can \navoid constructing unnecessary transmission upgrades for large loads, reduce strain on \nthe grid, and make power bills cheaper for everyone—including for families and small \nbusinesses. And co-located large loads and generators can get online faster and easier \nthan would otherwise be the case. Grid operators like PJM should allow and encourage \nlarge loads and generators to pursue these time- and cost-saving co-location \narrangements. Here's how we get there. \n5.\nFirst, today's order directs PJM to create two new transmission services, which we \ncall Firm and Non-Firm Contract Demand Transmission Service. These services \nallow a load that is co-located with a generator to contract and pay for service from the \ngrid consistent with the load's actual net withdrawals, while ensuring that the load cannot \ntake more service than the contracted amount. \n6.\nFor example, consider a 1,000 MW data center that co-locates with a new 900 \nMW generator. Under PJM's status quo rules, the data center would be required to take \nthe full 1,000 MW of \"front-of-meter\" transmission service (see Figure 1), despite being \ndirectly connected to the co-located generator. Under today's order, the data center has \ntwo new options: \na. The data center may elect to purchase Firm Contract Demand Transmission \nService if, for example, it plans to take just 100 MW of firm transmission service \nfrom the grid and get the remaining 900 MW of energy it needs from the co-\nlocated generator (see Figure 2). In turn, PJM will plan enough transmission and \nprocure enough capacity to serve only that 100 MW. \nb. The data center may instead elect to purchase Non-Firm Contract Demand \nTransmission Service if, for example, it only plans to pull energy from the grid \ntemporarily while its co-located generator is undergoing scheduled maintenance \n(see Figure 3). When the data center chooses non-firm service, PJM will not plan \nany additional transmission or purchase any capacity to serve that load."},{"page":139,"startToken":52146,"endToken":52673,"text":"Docket No. EL25-49-000, et al. \n4 \nUnder either new transmission service, the co-located load must uphold its side of the \nbargain by bearing the risk of being curtailed if its usage exceeds what it has contracted \nfor in advance. Therefore, regardless of whether a customer takes the new firm service, \nthe new non-firm service, or some combination of the two, PJM will plan less \ntransmission and procure less generating capacity for the data center, which reduces costs \nfor both the new co-located load and for all other PJM customers and creates the \nopportunity for both the new generator and the new load to get online more quickly. \n7.\nSecond, today's order directs PJM to revise its generator interconnection rules to \nclarify how both new and existing generators may co-locate with load, with a particular \nemphasis on accelerating new generation. \n8.\nFor new generatOrs, the order directs PJM to clarify that a generator may request \na level of service that is consistent with its actual injections to the grid, net of a co-located \nload. Consider the example above, but in reverse. If a new 1,000 MW generator co-\nlocates with a new 900 MW data center, that generator will be allowed to \"reserve\" 900 \nMW to directly serve the data center, and will thus request to inject only 100 MW onto \nthe PJM grid. As a result, new generators with co-located load will need fewer \ntransmission upgrades to access the grid, allowing much-needed electricity to get online \nmore quickly and affordably. Furthermore, the order directs PJM to file these rules for \nnew generator interconnection within 30 days. In sum, these changes will make \n\"bringing your own new generation\" co-located with new load cheaper and faster, \nbenefiting the generator, the large load it will serve, and—critically—all other PJM \ncustomers. \n9.\nFor existing generators, today's order directs PJM to clarify that a generator \ncannot remove its capacity from the grid to serve a co-located load until all transmission \nupgrades needed to maintain reliability are in service, with the costs of those upgrades \nallocated 100% to the existing generator. This means that generators comprising the \nkeystone of today's grid cannot abandon existing customers unless and until those \ngenerators and their large load customers—not other ratepayers—construct the \ntransmission upgrades and incur the costs necessary to maintain reliable service for \neveryone. And under any of the new transmission services, the large load will also pay \nits fair share for any benefits it continues to draw from the grid after the co-location \narrangement is set up. \n10.\nThird, today's order protects existing customers—including families and small \nbusinesses—by directing PJM to assign transmission costs to ensure that a co-located \nload, such as a data center, always pays its fair share. A co-located load that does not \nwithdraw energy from the grid will pay for at least the essential grid services on which it \nstill relies (i.e., regulation and black start services). Meanwhile, a co-located load that \nhas the same right to withdraw energy from the grid as a conventional front-of-meter load \nwill take and pay for the full cost of traditional network transmission service. And for all"},{"page":140,"startToken":52673,"endToken":53148,"text":"Docket No. EL25-49-000, et al. \n5 \noptions in between, a co-located load will pay a fair rate that is commensurate with its \nactual usage of the grid, protecting other customers from unfair cost shifting and price \nincreases. Unless a load and its generator are completely disconnected from the grid, \nthey will get benefits from the grid—and today's order ensures that they will pay for \nthose benefits. \n11.\nFourth, today's order directs PJM to establish a new interim service (see Figure \n4) to provide a bridge while the infrastructure needed to serve a large load with \ntraditional front-of-meter network transmission service is being built. This interim \nservice leverages speed in the near-term and unlocks the benefits of a full grid connection \nin the long-term. It will allow co-located loads and generators seeking front-of-meter \nservice to access the grid faster than they can today. In exchange for increased speed, \nthese loads will bear the risk of being curtailed when the grid is constrained until the \ntransmission upgrades needed to provide service are constructed. But that doesn't mean \nthat the load will always have to shut down completely during peak periods. Rather, if \nthe co-located load is paired with a new generator, and that generator is still waiting to \nbegin its own front-of-meter service, the load can take service directly from the generator \nin the interim until both \"graduate\" to full, front-of-meter service. This pathway is \nimportant because traditional, front-of-meter network transmission service provides the \nbroadest benefits to both load and generators—a network load can be served by any \ngenerator on the grid, and a network generator can sell its power to any customer on the \ngrid. \n12.\nFifth, today's order encourages further progress on solutions beyond co-location to \nkeep up with growing electricity demand by directing PJM to provide the Commission \nwith a detailed report that describes its ongoing initiatives to reduce both technical and \nfinancial barriers to building new generation and efficiently connect large loads. Given \nPJM's announcement yesterday that its 2027/2028 Base Residual Auction was short of its \nreliability requirement, the solutions enabled by both today's order and PJM's ongoing \ninitiatives to accelerate new generation are immensely important and urgent. The \ninformation PJM will file allows the Commission to monitor PJM's progress and ensure \nthat any further Commission actions on large load issues in the PJM region skate to \nwhere the puck is going. To that end, Secretary Wright recently asked the Commission \nto consider a range of \"potential reforms to ensure the timely and orderly interconnection \nof large loads to the transmission system.\"519  Although the Secretary's initiative is \n519  U.S. Department of Energy, Secretary of Energy, Direction that the \nCommission Initiate Rulemaking Procedures and Proposal Regarding the Interconnection \nof Large Loads Pursuant to the Secretary's Authority Under Section 403 of the \nDepartment of Energy Organization Act (Oct. 23, 2025)."},{"page":141,"startToken":53148,"endToken":53365,"text":"Docket No. EL25-49-000, et al. \n6 - \nbroader than both co-location and PJM, I am pleased that today's order makes major \nprogress on the important matters that he referred to the Commission. \n13.\nFinally, all of the Commission's actions in this proceeding respect the long-\nstanding jurisdictional line between federal and state authority provided by Congress and \naffirmed by the Supreme Court. Co-located loads will continue to receive a bill for state-\nregulated retail service just like any other load. Moreover, states retain exclusive \njurisdiction to allocate how the costs of FERC-jurisdictional transmission charges are \ndivided between their retail ratepayers, including co-located loads. The difference \ntoday's order makes is that utilities and load-serving entities will now have access to new \ntransmission service options that will help lower costs for everyone. \n14.\nToday's order is just the next step on important work that the Commission cannot \ndo alone. I encourage all parties to approach today's order, and the path forward that it \ndirects, with an open mind. Durable consensus requires your collective expertise to \nimplement a solution capable of meeting today's challenges, realizing the historic \nopportunity that load growth presents, and delivering the reliable and affordable energy \non which we all depend. Our country deserves no less. \nFor these reasons, I vote to approve today's order. \nDavid Rosner \nCommissioner"},{"page":142,"startToken":53365,"endToken":53595,"text":"PJM Grid \n1000 MW \nGenerator \n• \nO \nL.:. O00 \nO \n00 \n7:2  \n \nO00 \nLarge Load \nFigure 4: New Interim Network Integration Transmission Service \nO00 /-- \nti LT= 00 \nt• O00  \nLarge Load \n0 to 900 MW \nAs-needed \nGenerator \n1000 MW \nAs-available \nLL. \n0 to 900 MW \nAs-available \n4--\n• Load 8, Generator get non-firm \nservice ASAP, and convert to \nfirm service (Fig. 1) when  grid \nupgrades are complete \n• Generator can serve load while \nawaiting grid connection or \nwhen grid is unavailable \nPJM Grid \n100 MW \nLarge Load \n62C:)\n 900 MW \nGenerator \nO00 \n4-\nO00 TIE( \nO  O \nFigure 2: New Firm Contract Demand Transmission Service \n• Load pays for 100 MW of firm \ntransmission service \n• PJM has no obligation to serve \nload above 100 MW  \n• All or portion of the generator \nis devoted to co-located load \nPJM Grid \nFigure 3: New Non-Firm Contract Demand Transmission Service \n• Load pays for non-firm \ntransmission service on an as-\nreserved basis \n• PJM has no obligation to serve \nload if  grid is unavailable  \n• All or portion of the generator \nis devoted to co-located load \nPJM Grid \nGenerator \n• \n0 to 1000 MW \nAs-available \n900 MW \nO00 \n00 \nO00 \nLarge Load \nLL. \n\\  \nO \n4- - \nDocket No. EL25-49-000, et al. \n- 7 \nFigures  \nFigure 1: \"Front-of-Meter\" Network Integration Transmission Service \n• PJM plans all transmission and \ngeneration to serve load  \nRequires more transmission \ninfrastructure and can take \nlonger, but provides the \nbroadest benefits"},{"page":143,"startToken":53595,"endToken":53771,"text":"UNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \nBefore Commissioners: \nPJM Interconnection, L.L.C. \nDocket Nos. EL25-49-000 \nAllegheny Electric Cooperative, Inc. \nEL25-49-001 \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. \nAEP Kentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company"},{"page":144,"startToken":53771,"endToken":53975,"text":"Docket Nos. EL25-49-000, et al. \n2 \nWheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public Utilities, \nDivision of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \nLarge Loads Co-Located at Generating Facilities \nAD24-11-000 \nConstellation Energy Generation, LLC \nEL25-20-000 \n(Consolidated) \nv. \nPJM Interconnection, L.L.C. \n(Issued December 18, 2025) \nCHANG, Commissioner, concurring: \n1.\nIn today's order, the Commission addresses the rates, terms, and conditions \nthrough which Co-Located Loads may take service from the PJM Interconnection, L.L.C. \n(PJM) system. I write separately to address certain aspects of the Commission's \nproposed replacement rate and highlight the importance of developing a minimum charge \nfor the new transmission services we establish today. \nToday's Order \n2.\nDue to significant delays in PJM's ability to interconnect new generation and load, \nlarge loads, including data centers, have preferred co-location arrangements to expedite \ntheir access to the PJM system. As today's order discusses, PJM's current tariff does not \nprovide adequate clarity for the rules governing co-location arrangements. With today's"},{"page":145,"startToken":53975,"endToken":54398,"text":"Docket Nos. EL25-49-000, et al. \n3 \naction, the Commission is providing guidance on how loads and generators may co-\nlocate, including the development of new transmission services that recognize their \nability to limit their energy withdrawals from the transmission system. The responsibility \nfor setting these rules sits with the Commission. As we work together to address this \nissue, we must continue to keep protection of other customers from unnecessary risks and \ncosts at the forefront of our decision making. \n3.\nToday's order represents the first step to developing a package of solutions to \naddress co-location in the PJM footprint. Specifically, by recognizing that controllable \nCo-Located Loads might use less service from the transmission system than traditional \nloads in front of the meter, the order's revised transmission service framework may \nreduce the number of, and costs associated with, future transmission upgrades. The order \nalso helps to clarify how new generation resources may connect to the system on a \nprovisional basis to serve Co-Located Loads. \n4.\nDesigning this new co-location framework highlights an essential component of \nthe overall package: how we protect other customers from adverse reliability impacts and \nunjustified cost shifts. The Commission will ultimately resolve the rates, terms, and \nconditions of these new services following the paper hearing and compliance processes \nwe direct today. As we consider the record, we will assess how those rates, terms, and \nconditions facilitate the efficient interconnection of Co-Located Loads, control \ntransmission costs needed to serve them, and protect other customers against unjustified \ncost shifts. \nNeed for a Minimum Charge \n5.\nOne aspect of the paper hearing is particularly essential to protecting customers \nagainst transmission cost shifts under the new framework established through today's \norder: the need to establish a minimum charge for the Firm and Non-Firm Contract \nDemand transmission services. \n6.\nThe order proposes to establish these two new transmission services for use where \nthe Co-Located Loads can electrically control the amount of energy that they will receive \nfrom the PJM system. As the order explains, all Co-Located Loads are synchronized to \nthe PJM transmission system through their generators. All generators, and as relevant \nhere, all generators that are part of Co-Located Arrangements, rely on the PJM \ntransmission system to operate. Without the PJM grid, Co-Located Loads and their \nassociated generators would be islanded. In today's order, neither of the newly \ndeveloped Contract Demand transmission services requires Co-Located Loads to take any \nspecific quantity of transmission service. In particular, the order contemplates that, under \nthe new Contract Demand transmission services, if the Co-Located Load takes no service,"},{"page":146,"startToken":54398,"endToken":54856,"text":"Docket Nos. EL25-49-000, et al. \n- 4 \nit would pay only for black start and regulation service.1  Because the charges for those \nservices only account for the provision of those discrete ancillary services, they do not \ncontribute to the actual cost of building, operating, or maintaining the grid, or the Co-\nLocated Load's explicit reliance on the PJM system. Black start and regulation service \ncharges are nearly inconsequential.' Thus, just paying black start and regulation service \ncharges does not constitute the Co-Located Loads paying for their \"fair share\" of the cost \nof maintaining and operating the transmission system. Furthermore, under such a \nscenario, a Co-Located Load would not pay for a portion of PJM's administrative costs, \nwhich are typically included in transmission service rates, even though the Co-Located \nLoad benefits from services provided by PJM. \n7.\nAs a result, absent developing rates that explicitly charge the Co-Located Loads \nfor their synchronization to and reliance on the PJM system, it is possible that a Co-\nLocated Load would not contribute to the costs of operating and maintaining the system. \nSimilarly, if a Co-Located Load takes a de minimis amount of Firm or Non-Firm Contract \nDemand service, it would pay only a minimal amount of system costs. Such scenarios \nwould fail to recognize the benefits Co-Located Loads receive from the grid and risk \nshifting system costs to other customers. Simply put, Co-Located Loads electrically \nconnected to the grid (through a co-located generator) benefit from the system and should \ncover their costs. This is a foundational cost causation principle that the Commission \nmust uphold. \n8.\nIn the paper hearing established in today's order, the Commission seeks comments \non whether the rates, terms, and conditions for these two new transmission services \nshould reflect a minimum charge that recognizes that, without the transmission system, \nthe Co-Located Load and generators could not operate as envisioned. The paper hearing \nalso seeks briefmg on how such a charge should be determined3  and whether PJM \nadministrative services charges should be applied to the new services.4  To ensure the \n1  PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at P 206 (2025). \n2  According to data from the most recent State of the Markets Report by the PJM \nIndependent Market Monitor, regulation and black start services constituted an average of \n$159 million and $47.5 million, respectively, for January through September 2024 and \n2025, while transmission constituted an average of $10.81 billion for those two years. \nSee PJM Independent Market Monitor, 2025 Q3 State of the Markets Report at 18, \nhttps://www.monitoringanalytics.comireports/PJM_State_of the_Market/2025/2025q3-\nsom-pjm-secl.pdf. \nPJM Interconnection, L.L.C., 193 FERC ¶ 61,217 at P 219, questions 3 and 4. \n4  Id. questions 1 and 2."},{"page":147,"startToken":54856,"endToken":55364,"text":"Docket Nos. EL25-49-000, et al. \n5 \nCommission has a full and complete record on this issue, I encourage commenters to \naddress the following points and questions in their responses to the paper hearing. \n9.\nFirst, a just and reasonable replacement rate for the new transmission services \nshould reflect some form of minimum transmission service charge, which would protect \nother customers against cost shifts resulting from Co-Located Loads that rely upon the \ntransmission system but do not directly or meaningfully contribute to its costs via \ntransmission service payments. This minimum charge would provide a floor to the Co-\nLocated Load's cost responsibilities to pay for a portion of system costs, commensurate \nwith the benefits that the Co-Located Load receives from the system, even where it plans \nto draw little or no energy from that system. I welcome comments on the need for such a \nminimum charge, including, but not limited to: (1) whether a Co-Located Load that is \nsynchronized to the grid but does not meaningfully contribute to transmission system \ncosts violates cost causation principles; and (2) whether such minimum charge is \nnecessary for those that choose to take either the Firm and Non-Firm Contract Demand \ntransmission service. \n10.\nSecond, I welcome comments on both the rate design and the specific costs to be \nincluded in such a minimum charge. For instance, given that all Co-Located Loads rely \non the existence of the PJM grid and are synchronized to it, such loads should pay for at \nleast their fair share of the system's operations and maintenance costs. In addition, I \nwelcome comments as to whether Co-Located Loads should bear responsibility for some \nportion of the capital investments required to ensure the transmission grid continues to \nreliably serve all customers, and if so, the specific calculation of such charges. \nNext Steps and Open Issues \n11.\nWhile today's order is consequential, it is important that we place it in the proper \ncontext: it addresses a significant but discrete issue in PJM, and sets out services and \nguidance for a commercial model that may only be viable in a limited number of states \nwhere the co-located generator is eligible under state law to serve Co-Located Load. For \nstates where retail loads must be served by the local electric utility, the model \ncontemplated in this order may not apply, and thus it does not necessarily provide a \nreplicable approach for large loads generally. Therefore, the broader challenge of \nreliably, efficiently, and fairly interconnecting large loads and the generation needed to \nserve them remains before the Commission, the states, and industry. \n12.\nFurther, today's order does not address the broader reliability challenges \nimpacting the PJM footprint and its customers. While the order directs PJM to clarify \noptions that exist under its current tariff, it does not address the clogged interconnection \nqueue that has driven the interest in co-location in the first place as a way to expedite \nlarge loads' access to the grid. Solving this foundational problem will require a durable \nfix to the interconnection process that helps resources interconnect at a much more"},{"page":148,"startToken":55364,"endToken":55670,"text":"Docket Nos. EL25-49-000, et al. \n6 \nefficient pace. As part of solving this problem, PJM must ensure that the transmission \nsystem is built to adequately support the interconnection of new, needed generation. I \nhave a strong preference for durable reforms over one-off fixes.5  Sound investments are \ndriven by good data, comprehensive planning, and disciplined operations. The \nCommission, states, grid planners and operators, and utilities must balance near-term \npressures and incentives with delivering long-term value to the customers we serve. \nBeyond this proceeding, I am concerned about PJM's ability to procure sufficient \nresources to reliably serve both new and existing load. PJM's resource adequacy \nconstruct must deliver clear price signals while being mindful of ratepayer costs. \n13.\nAs we consider further reforms, the Commission's core regulatory principles —\nmost notably open access to the transmission system (including through an efficient \ninterconnection process) — remain the foundation for addressing load growth and related \nchallenges. While reform to existing approaches is likely needed, customers —\nparticularly captive ones — must not bear the cost of a data center-driven infrastructure \nbuildout, and the risks and costs associated with this buildout must not be shifted to small \nbusinesses and residential customers. \nConclusion \n14.\nFollowing the paper hearing and compliance process, the Commission will \ndetermine the just and reasonable replacement rates. This process will consider \ncomments regarding the design of these new transmission services, and how to ensure \nthat other customers are protected against unnecessary risks and costs. As we establish \nnew transmission services, it cannot come at the expense of other ratepayers. I look \nforward to reviewing the record developed in response to today's order while the \nCommission, the states, PJM, and others work to address the broader reliability and \ninterconnection challenges facing the region. \n5  See, e.g., Sw. Pwr. Pool, Inc., 192 FERC ¶ 61,062, at P 3 (2025) (Chang, \nComm'r, concurring)."},{"page":149,"startToken":55670,"endToken":55686,"text":"Docket Nos. EL25-49-000, et al. \n- 7 \nFor these reasons, I respectfully concur. \nJudy W. Chang \nCommissioner"},{"page":150,"startToken":55686,"endToken":55720,"text":"ATTACHMENT B \nPJM Interconnection, L.L. C., Notice of Denial of Rehearing \nBy Operation of Law and Providing for Further \nConsideration, 194 FERC ¶ 62,089, Docket Nos. EL25-49-\n002, AD24-11-001, EL25-20-001 (Feb. 20, 2026)"},{"page":151,"startToken":55720,"endToken":55900,"text":"194 FERC ¶ 62,089 \nUNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \nDocket Nos. EL25-49-002 \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. \nAEP Kentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company"},{"page":152,"startToken":55900,"endToken":56162,"text":"Docket No. EL25-49-002, et al. \n-2-\nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public Utilities, \nDivision of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \nLarge Loads Co-Located at Generating Facilities \nConstellation Energy Generation, LLC \nv. \nPJM Interconnection, L.L.C. \nAD24-11-001 \nEL25-20-001 \n(Consolidated) \nNOTICE OF DENIAL OF REHEARING BY OPERATION OF LAW AND \nPROVIDING FOR FURTHER CONSIDERATION \n(Issued February 20, 2026) \nRehearing has been timely requested of the Commission's order issued on \nDecember 18, 2025, in this proceeding. PJM Interconnection, L.L.C., 193 FERC \n¶ 61,217 (2025). In the absence of Commission action on a request for rehearing within \n30 days from the date it is filed, the request for rehearing may be deemed to have been \ndenied. 16 U.S.C. § 8251(a); 18 C.F.R. § 385.713 (2025); Allegheny Def. Project v. \nFERC, 964 F.3d 1 (D.C. Cir. 2020) (en banc). \nAs provided in 16 U.S.C. § 8251(a), the requests for rehearing of the above-cited \norder filed in this proceeding will be addressed in a future order to be issued consistent \nwith the requirements of such section. As also provided in 16 U.S.C. § 8251(a), the \nCommission may modify or set aside its above-cited order, in whole or in part, in such \nmanner as it shall deem proper. \nDebbie-Anne A. Reese, \nSecretary."},{"page":153,"startToken":56162,"endToken":56347,"text":"ATTACHMENT C: SERVICE LIST \nAndrew Hinz \nAndrew Hinz \n1427 PARK AVE \nBALTIMORE, MARYLAND 21217 \nUNITED STATES \nahinz61@outlook.com \nAdvanced \nEnergy United \nMichael Haugh \nPolicy Director \nAdvanced Energy United \n1010 VERMONT AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nmhaugh@advancedenergyunited.org \nAEP \nAppalachian \nTransmission \nCompany, Inc. \nStacey Burbure \n801 Pennsylvania Avenue, NW \nWashington DC, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \nslburbure@aep.com \nJessica Cano \nSenior Counsel \n1 Riverside Plaza \nCOLUMBUS, OHIO \n43215 \njacano@aep.com \nAEP Indiana \nMichigan \nTransmission \nCompany, Inc. \nJennifer Key \nPartner \n1330 CONNECTICUT AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \njkey@steptoe.com \nJessica Cano \nSenior Counsel \n1 Riverside Plaza \nCOLUMBUS, OHIO \n43215 \njacano@aep.com \nAEP Kentucky \nTransmission \nCompany, Inc. \nStacey Burbure \n801 Pennsylvania Avenue, NW \nWashington DC, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \nslburbure@aep.com \nJessica Cano \nSenior Counsel \n1 Riverside Plaza \nCOLUMBUS, OHIO \n43215 \njacano@aep.com \nAEP Ohio \nTransmission \nCompany, Inc. \nJessica Cano \nSenior Counsel \n1 Riverside Plaza \nCOLUMBUS, OHIO 43215 \nUNITED STATES \njacano@aep.com \nRobert L Pennybaker \nRegulated Pricing & \nAnalysis M \nPO Box 201 \nTULSA,OHIO 74102 \nrlpennybaker@aep.com"},{"page":154,"startToken":56347,"endToken":56479,"text":"AEP West \nVirginia \nTransmission \nCompany, Inc. \nStacey Burbure \n801 Pennsylvania Avenue, NW \nWashington DC, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \nslburbure@aep.com \nJessica Cano \nSenior Counsel \n1 Riverside Plaza \nCOLUMBUS, OHIO \n43215 \njacano@aep.com \nAES \nCorporation, The \nElizabeth Savage \nAES Corporation, The \n4300 Wilson Blvd \nArlington, VIRGINIA 22203 \nUNITED STATES \nelizabeth.savage@aes.com \nAllegheny \nElectric \nCooperative, Inc. \nTodd Sallade \nVP Power Supply & \nEngineering \nAllegheny Electric \nCooperative, Inc. \n212 Locust Street \nHarrisburg, \nPENNSYLVANIA 17101 \ntodd_sallade@ccsenergy.c \nom \nAlliant Energy \nCorporate \nServices, Inc. \nMary Emerson \nCorporate Counsel \nAlliant Energy Corporation \n801 Pennsylvania Avenue, NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \nmaryemerson@alliantenergy.com \nAlpha \nGeneration, LLC \nLiam Baker \nSenior Vice President Regulato \nAlpha Generation, LLC \n300 Atlantic Street \n5th floor \nStamford, CONNECTICUT 06901 \nUNITED STATES \nlbaker@alphagen.com"},{"page":155,"startToken":56479,"endToken":56621,"text":"Ameren Services \nCompany on \nbehalf of Ameren \nIllinois \nCompany, \nAmeren \nTransmission \nCompany of \nIllinois and \nUnion Electric \nCompany d/b/a \nAmeren Missouri \nStacey Scales \nParalegal \nAmeren Services Company \n1901 Chouteau \nMail Code 1310 \nSt. Louis, MISSOURI 63103 \nUNITED STATES \nsscales@ameren.com \nJennifer S. Moore \nSenior Corporate Counsel \nAmeren Services \nCompany \n1901 Chouteau Avenue \nMail Code 1310 \nSt. Louis, MISSOURI \n63103 \njmoore499a@ameren.com \nAmerican Clean \nPower \nAssociation \nGabriel Tabak \nCounsel \nAmerican Clean Power Association \n1501 M St NW \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \ngtabak@cleanpower.org \nAmerican Clean \nPower \nAssociation \nCarrie Zalewski \nVP & Markets and Transmission \nWashington, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nczalewski@cleanpower.org \nAmerican \nCouncil on \nRenewable \nEnergy \nElise Caplan \nDirector of Electricity Policy \nAmerican Council on Renewable \nEnergy \n1150 CONNECTICUT AVE NW \nSTE 401 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \ncaplan@acore.org"},{"page":156,"startToken":56621,"endToken":56751,"text":"American \nElectric Power \nService \nCorporation \nStacey Burbure \nAmerican Electric Power \nCompany \n801 Pennsylvania \nAvenue, NW \nWashington DC, \nDISTRICT OF \nCOLUMBIA 20004 \nslburbure@aep.com \nAmerican \nElectric Power \nService \nCorporation \nKate Daley \n1 Riverside Plaza \nColumbus, OHIO 43215 \nkbdaley@aep.com \nAmerican \nElectric Power \nService \nCorporation \nAdam Hickman \n1 RIVERSIDE PLZ FL 25 \nCOLUMBUS, OHIO \n43215 \najhickman@aep.com \nAmerican \nElectric Power \nService \nCorporation \nLaChon Turner \nAEP COMPANIES \n801 PENNSYLVANIA \nAVE NW STE 735 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20004 \nlturner@aep.com \nAmerican \nMunicipal \nPower, Inc. \nLisa McAlister \nDeputy General Counsel - FERC/ \nAmerican Municipal Power, Inc. \n1111 Schrock Road \nSuite 100 \nColumbus, OHIO 43229 \nUNITED STATES \nlmcalister@amppartners.org \nGerit F. Hull \nDeputy General Counsel -\nRegul \nAmerican Municipal \nPower, Inc. \n1111 Schrock Road \nSuite 100 \nCOLUMBUS, OHIO \n43229 \nghull@amppartners.org"},{"page":157,"startToken":56751,"endToken":56862,"text":"American \nMunicipal \nPower, Inc. \nJohn E. McCaffrey \nPartner \nStinson LLP \n1775 Pennsylvania \nAvenue NW \nSuite 800 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20006 \njohn.mccaffrey@stinson.co \nm \nAmerican \nMunicipal \nPower, Inc. \nChristopher J Norton \nDirector of Market \nRegulatory \nAmerican Municipal \nPower, Inc. \n1111 Schrock Road \nSuite 100 \nColumbus, OHIO 43229 \ncnorton@amppartners.org \nAMERICAN \nPETROLEUM \nINSTITUTE \nGrace Soderberg \nSenior Counsel \nAMERICAN PETROLEUM \nINSTITUTE \n200 MASSACHUSETTS AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nsoderbergg@api.org \nAmerican \nTransmission \nSystems, \nIncorporated \nAmanda Parker \nAttorney \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nDeborah L. Jacobson, \nESQ \nAttorney \n76 S MAIN ST \nAKRON, OHIO 44308 \ndjacobson@firstenergycor \np.com"},{"page":158,"startToken":56862,"endToken":57026,"text":"American \nTransmission \nSystems, \nIncorporated \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nTricia S Hartzell \nFirstEnergy Legal \nSpecialist \nFirstEnergy Service \nCompany \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp. \ncorn \nAmerican \nTransmission \nSystems, \nIncorporated \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nAmericans for a \nClean Energy \nGrid \nPaige Rodrigues \nAmericans for a Clean Energy Grid \n10 G St NE \nWashington, DISTRICT OF \nCOLUMBIA 20002 \nUNITED STATES \npaige.rodrigues@cleanenergygrid.org \nAMP \nTransmission, \nLLC \nLisa G McAlister \nDeputy General Counsel -\nFERC/ \n1111 Schrock Road \nSuite 100 \nColumbus, OHIO 43229 \nlmcalister@amppartners.o \nrg \nAMP \nTransmission, \nLLC \nLisa McAlister \nDeputy General Counsel - FERC/ \nAmerican Municipal Power, Inc. \n1111 Schrock Road \nSuite 100 \nColumbus, OHIO 43229 \nUNITED STATES \nlmcalister@amppartners.org \nChristopher J Norton \nDirector of Market \nRegulatory \nAmerican Municipal \nPower, Inc. \n1111 Schrock Road \nSuite 100 \nColumbus, OHIO 43229 \ncnorton@amppartners.org"},{"page":159,"startToken":57026,"endToken":57236,"text":"Antora Energy • \nLLC \nJason Evans \nVice President \nAntora Energy LLC \n1080 W. Ewing Place - Box B10 \nSeattle, WASHINGTON 98119 \nUNITED STATES \njason.evans@tuusso.com \nNoah B Long \nDirector, State & \nRegulatory P \nAntora Energy LLC \n200 W DE VARGAS ST \nSTE 200 \nSANTA FE, NEW \nMEXICO 87501 \nnoah.long@antora.com \nAppalachian \nPower Company \nJessica Cano \nSenior Counsel \n1 Riverside Plaza \nCOLUMBUS, OHIO 43215 \nUNITED STATES \njacano@aep.com \nRobert L Pennybaker \nRegulated Pricing & \nAnalysis M \nPO Box 201 \nTULSA,OHIO 74102 \nrlpennybaker@aep.com \nAppalachian \nVoices \nNicholas Guidi \nSouthern Environmental Law \nCenter \n122 C ST NW STE 325 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nnguidi@selc.org \nKatherine Rogers \nSouthern Environmental \nLaw Center \n122 CST NW STE 325 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20001 \nkrogers@selc.org \nArevon Energy, \nInc. \nMike Gahimer \nArevon Energy, Inc. \n14427 Salem Dr E \nCarmel, INDIANA 46033 \nUNITED STATES \nmgahimer@arevonenergy.com \nArkansas Public \nService \nCommission \nBridgette Frazier \nArkansas Public Service \nCommission \n1000 CENTER ST \nLITTLE ROCK, ARKANSAS 72201 \nUNITED STATES \nbridgette.frazier@arkansas.gov \nAtlantic City \nElectric \nCompany \nCynthia Holland \nAssociate General Counsel \nExelon Corporation \n701 Ninth Street NW \nWashington, DISTRICT OF \nCOLUMBIA 20068 \nUNITED STATES \ncynthia.holland@exeloncorp.com \nStan Berman \n3502 Fremont Ave N, #1 \nSeattle, WASHINGTON \n98103 \nstan@btlawllp.com"},{"page":160,"startToken":57236,"endToken":57420,"text":"Avangrid, Inc. \nJulie Morris \nCompliance \nAvangrid Power, LLC \n2701 NW VAUGHN ST STE 300 \nPORTLAND, OREGON 97210 \nUNITED STATES \navangridpowerferc@avangrid.com \nAlan Trotta \nUnited Illuminating \nCompany, The \n157 Church Street \nNew Haven, \nCONNECTICUT 06510 \nalan.trotta@uinet.com \nAvangrid, Inc. \nAmber Martin Stone \nSenior FERC Counsel \nAvangrid Networks, Inc. \n180 Marsh Hill Road \nOrange, CONNECTICUT 06477 \nUNITED STATES \namber.stone@avangrid.com \nKevin Kilgallen \nDirector, Market \nStructure & P \nAvangrid, Inc. \n411 OAKLAND DR \nDOWNINGTOWN, \nPENNSYLVANIA 19335 \nkevin.kilgallen@avangrid. \ncorn \nBaltimore Gas \nand Electric \nCompany \nCynthia Holland \nAssociate General Counsel \nExelon Corporation \n701 Ninth Street NW \nWashington, DISTRICT OF \nCOLUMBIA 20068 \nUNITED STATES \ncynthia.holland@exeloncorp.com \nStan Berman \n3502 Fremont Ave N, #1 \nSeattle, WASHINGTON \n98103 \nstan@btlawllp.com \nBloom Energy \nCorporation \nJoel Newton \nVP, Regulatory Law \nBloom Energy Corporation \n1530 WILSON BLVD STE 650 \nARLINGTON, VIRGINIA 22209 \nUNITED STATES \njoel.newton@bloomenergy.com \nBoston Energy \nTrading and \nMarketing LLC \nMichael Blasik \nDiamond Generating Corporation \n1 International Place \nSuite 910 \nBoston, MASSACHUSETTS 02110 \nUNITED STATES \nm.blasik@dgc-us.com \nDiane Janicki \nINDIVIDUAL \n500 West Madison \nChicago, ILLINOIS 60661 \nDiane.Janicki@betm.com"},{"page":161,"startToken":57420,"endToken":57568,"text":"BrightNight \nPower \nMarketing, LLC \nDuane K. Duclaux \nGeneral Counsel \nBrightNight, LLC \n515 N FLAGLER DR STE \nP200 \nWEST PALM BEACH, \nFLORIDA 33401 \nduane@brightnightpower. \ncorn \nBrightNight \nPower \nMarketing, LLC \nRobert C. Fallon \nENGELMAN FALLON, \nPLLC \n1717 K St. NW \nWashington, DISTRICT \nOF COLUMBIA 20006 \nrfallon@efenergylaw.com \nBrookfield \nRenewable \nTrading and \nMarketing LP \nNathalie Godard \nLaw Clerk \nBrookfield Energy Marketing LP \n41 Victoria Street \nGatineau, QUEBEC J8X2A1 \nCANADA \nnathalie. godard@brookfieldrenewabl \ne.com \nAleksandar Mitreski \nBrookfield Energy \nMarketing Inc. \n68 Ellington St \nLongmeadow, \nMASSACHUSETTS \n01106 \naleksandar.mitreski@broo \nkfieldrenewable.com \nBrookfield \nRenewable \nTrading and \nMarketing LP \nSteve Kelly \nDirector \nBrookfield Energy \nMarketing LP \n3261 Arters Mill Rd \nWestminster, \nMARYLAND 21158 \nstephen.kelly@brookfieldr \nenewable.com \nBuckeye Power, \nInc. \nLija Kaleps-Clark \nBuckeye Power, Inc. \n6677 Busch Blvd \nColumbus, OHIO 43229 \nUNITED STATES \nlkaleps@ohioec.org \nKurt Helfrich \nBuckeye Power, Inc. \n6677 Busch Boulevard \nColumbus, OHIO 43229 \nkhelfrich@ohioec.org"},{"page":162,"startToken":57568,"endToken":57754,"text":"California \nDepartment of \nWater Resources \nState Water \nProject \nLisa Dowden \nSenior Counsel \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nLisa.Dowden@spiegelmcd.com \nStephen C. Pearson \nSpiegel & McDiarmid \nLLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20036 \nsteve.pearson@spiegelmcd \n.com \nCalifornia \nDepartment of \nWater Resources \nState Water \nProject \nSamuel B. Whillans \nSpiegel & McDiarmid \nLLP \n1818 N ST NW \n8TH Floor \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20036 \nsamuel.whillans@spiegel \nmcd.corn \nCalifornia \nDepartment of \nWater Resources \nState Water \nProject \nAmanda Drennen \nAttorney \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \namanda.drennen@spiegelmcd.com \nNhu Nguyen \nDeputy Attorney General \nCalifornia Department of \nJustice \n1300 I Street \nSacramento, \nCALIFORNIA 95814 \nnhu.nguyen@doj.ca.gov \nCalifornia \nDepartment of \nWater Resources \nState Water \nProject \nE Service \nSpiegel & McDiarmid \nLLP \n1818 N ST NW STE 800 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20036 \neService@spiegelmcd.com \nCalifornia \nDepartment of \nWater Resources \nState Water \nProject \nRobert S Hedrick \nOffice of the General \nCounsel \nPO Box 899 \nSACRAMENTO, \nRobert.Hedrick@water.ca. \ngov"},{"page":163,"startToken":57754,"endToken":57916,"text":"California \nDepartment of \nWater Resources \nState Water \nProject \nRobin M. Hennessy \nOffice of the General \nCounsel \nDepartment of Water \nResources \nPO Box 899 \nSACRAMENTO, \nrobin.hennessy@water.ca. \ngov \nCalifornia Public \nUtilities \nCommission \nChristofer Nolan \nCalifornia Public Utilities \nCommission \n505 Van Ness Avenue \nSAN FRANCISCO, CALIFORNIA \n94102 \nUNITED STATES \nchristofer.nolan@cpuc.ca.gov \nAnand Durvasula \nCalifornia Public Utilities \nCommission \n505 VAN NESS AVE \nSAN FRANCISCO, \nCALIFORNIA 94102 \nanand.durvasula@cpuc.ca. \ngov \nCalifornia Public \nUtilities \nCommission \nSimon T. Hurd \nCalifornia Public Utilities \nCommission \n505 Van Ness Avenue \nSan Francisco, \nCALIFORNIA 94102 \nSimon.Hurd@cpuc.ca.gov \nCalpine \nCorporation \n. \nSarah Novosel \nSR Vice President Gov. Affairs \nCalpine Corporation \n717 Texas Avenue, Suite 1000 \nHouston, TEXAS 77002 \nUNITED STATES \nsnovosel@calpine.com \nCalpine \nCorporation \nRachael Marsh \nV.P. and Managing Counsel \nPO Box NA \nHouston,TEXAS 77002 \nUNITED STATES \nrachael.marsh@calpine.com \nCalpine \nCorporation \nDavid Scarpignato \nCalpine Corporation \n717 Texas Avenue \nSuite 1000 \nHouston, TEXAS 77002 \nUNITED STATES \ndavid.scarpignato@calpine.com"},{"page":164,"startToken":57916,"endToken":58077,"text":"Center for \nBiological \nDiversity \nHoward Crystal \nSenior Attorney \nCenter for Biological Diversity \n1411 K ST NW STE 1300 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nhcrystal@biologicaldiversity.org \nChevron U.S.A. \nInc. \nVanessa Colon \nSenior Counsel \nChevron U.S.A. Inc. \n1400 SMITH ST RM 06158 \nHOUSTON, TEXAS 77002 \nUNITED STATES \nvanessa.colon@chevron.com \nChevron U.S.A. \nInc. \nAndrew Davitt \nChevron U.S.A. Inc. \n1400 SMITH ST RM 06076 \nHOUSTON, TEXAS 77002 \nUNITED STATES \nandrewdavitt@chevron.com \nCity of \nCleveland, \nDepartment of \nPublic Utilities, \nDivision of \nCleveland Public \nPower \nTom Smith \n1300 Lakeside Avenue \nCleveland, OHIO 44114 \ntsmith@cpp.org \nCity of Hamilton, \nOhio \nMichael R. Perry \nDirector of Electric \n345 High Street \nSuite 450 \nHamilton, OHIO 45011 \nperrym@ci.hamilton.oh.us \nClean Air Task \nForce \nShaun Goho \n114 STATE ST FL 6 \nBOSTON, MASSACHUSETTS \n02109 \nUNITED STATES \nsgoho@catf.us \nAnn Weeks \nClean Air Task Force \n18 Tremont St \nBoston, \nMASSACHUSETTS \n02108 \naweeks@catf.us"},{"page":165,"startToken":58077,"endToken":58228,"text":"Clean Energy \nBuyers \nAssociation \nBryn Baker \nClean Energy Buyers Associatio \n1501 M ST NW STE 900 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nbbaker@cebuyers.org \nClearway Energy \nGroup LLC \nGretchen Schott \nAssistant General Counsel, Reg \nClearway Energy Group LLC \n1200 SMITH ST STE 600 \nHOUSTON, TEXAS 77002 \nUNITED STATES \ngretchen.schott@clearwayenergy.co \nm \nJohn C Miller \nDirector, Transmission \nPolicy \nClean Energy Buyers \nAssociation \n1501 M ST NW STE 900 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20005 \njmiller@cebuyers.org \nCogentrix \nEnergy Power \nManagement, \nLLC \nBrian Zimmet \nPartner \n1 THOMAS CIR NW \nROCK CREEK ENERGY GROUP, \nLLP \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nbzimmet@rockcreekenergygroup.co \nm \nMarica Sharashenidze \nRock Creek Energy \nGroup, LLP \n1 Thomas Circle \nSuite 700 \nWashington, DISTRICT \nOF COLUMBIA 20005 \nmsharashenidze@rockcree \nkenergygroup.com \nCogentrix \nEnergy Power \nManagement, \nLLC \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne \nCorporate Place \nSuite 300 \nCharlotte, NORTH \nCAROLINA 28277 \nGeorgeKnapp@cogentrix.c \nom"},{"page":166,"startToken":58228,"endToken":58394,"text":"Cogentrix \nEnergy Power \nManagement, \nLLC \nStephanie C Kueffner \nESQ \nAssociate General \nCounsel \nCogentrix Energy Power \nManagement, LLC \n13860 BALLANTYNE \nCORPORATE PL STE \n300 \nCHARLOTTE, NORTH \nCAROLINA 28277 \nstephaniekueffner@cogent \nrix.com \nCommonwealth \nEdison Company , \nCynthia Holland \nAssociate General Counsel \nExelon Corporation \n701 Ninth Street NW \nWashington, DISTRICT OF \nCOLUMBIA 20068 \nUNITED STATES \ncynthia.holland@exeloncorp.com \nStan Berman \n3502 Fremont Ave N, #1 \nSeattle, WASHINGTON \n98103 \nstan@btlawllp.com \nCommonwealth \nEdison Company \nof Indiana, Inc. \nMarianne Alvarez \nSenior Analyst \n101 Constitution Ave, NW \nSuite 400 East \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nmarianne.alvarez@exeloncorp.com \nAmy L Blauman \nAssociate General \nCounsel \n701 Ninth St. N.W. \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20001 \namy.blauman@exeloncorp \n.com \nConnecticut \nMunicipal \nElectric Energy \nCooperative \nScott Strauss \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nScott.Strauss@spiegelmcd.com \nJeffrey A. Schwarz \nSpiegel & McDiarmid \nLLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20036 \njeffrey. schwarz@spiegelm \ncd.com"},{"page":167,"startToken":58394,"endToken":58580,"text":"Connecticut \nMunicipal \nElectric Energy \nCooperative \nDave Meisinger \nChief Executive Officer \nCMEEC \n30 Stott Avenue \nNorwich, \nCONNECTICUT 06360 \ndmeisinger@cmeec.org \nConnecticut \nMunicipal \nElectric Energy \nCooperative \nE Service \nSpiegel & McDiarmid \nLLP \n1818 N ST NW STE 800 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20036 \neService@spiegelmcd.com \nConsolidated \nEdison Company \nof New York, Inc. \nand Orange and \nRockland \nUtilities, Inc. \nJoshua Kirstein \nSenior Attorney \nConsolidated Edison Company of \nNew York, Inc. \nConsolidated Edison Co. of New \nYork, Inc. \n4 Irving Place-18th Floor \nNew York, NEW YORK 10003 \nUNITED STATES \nkirsteinj@coned.com \nJoshua A Kirstein \nSenior Attorney \nConsolidated Edison \nCompany of New York, \nInc. \nConsolidated Edison Co. \nof New York, Inc. \n4 Irving Place-18th Floor \nNew York, NEW YORK \n10003 \n. \nkirsteinj@coned.com \nConsolidated \nEdison Company \nof New York, Inc. \nand Orange and \nRockland \nUtilities, Inc. \nSebrina Greene \nAssociate General Counsel \nConsolidated Edison Company of \nNew York, Inc. \n4 Irving Place \n18th Floor \nNew York, NEW YORK 10003 \nUNITED STATES \ngreenes@coned.com \nSebrina M. Greene \nAssociate General \nCounsel \nConsolidated Edison \nCompany of New York, \nInc. \n4 Irving Place \n18th Floor \nNew York, NEW YORK \n10003 \ngreenes@coned.com"},{"page":168,"startToken":58580,"endToken":58739,"text":"Consolidated \nEdison Company \nof New York, Inc. \nand Orange and \nRockland \nUtilities, Inc. \nNEELAM GALE-AHMAD \nParalegal \nCon Edison Company of \nNew York \n4 IRVING PL \nNEW YORK, NEW YORK \n10003 \ngaleahmadn@coned.com \nConsolidated \nEdison Company \nof New York, Inc. \nand Orange and \nRockland \nUtilities, Inc. \nDana Lazarus \nDirector \nCon Edison Company of \nNew York \n4 Irving Place \nNew York, NEW YORK \n10003 \nlazarusd@coned.com \nConsolidated \nEdison Company \nof New York, Inc. \nand Orange and \nRockland \nUtilities, Inc. \nDavid C Burns \nProject Manager \nConsolidated Edison \nCompany of New York, \nInc. \nConsolidated Edison Co. \nof New York, Inc. \n4 Irving Place-18th Floor \nNew York, NEW YORK \n10003 \nburnsd@coned.com \nConstellation \nEnergy \nGeneration, LLC \nChristopher Wilson \nDirector, Fed. Regulatory A \n250 Massachusetts Avenue NW \nSuite 760 \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nFERCe-filingsl@Constellation.com \nCarrie H Allen \nSVP & Deputy General \nCounsel \n101 Constitution Ave. NW \nSuite 400 East \nWashington, DISTRICT \nOF COLUMBIA 20001 \ncarrie.allen@constellation. \ncorn"},{"page":169,"startToken":58739,"endToken":58896,"text":"Constellation \nEnergy \nGeneration, LLC \nPaul Wight \nDLA Piper LLP (US) \n500 Eighth St, NW \nWashington, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \npaul.wight@us.dlapiper.com \nSeth T. Lucia \nAssistant General \nCounsel \n250 Massachusetts \nAvenue, NW \nSuite 760 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20001 \nSeth.Lucia@constellation. \ncorn \nConsumers \nEnergy Company \nRachael Moore \nSenior Attorney \nConsumers Energy Company \nOne Energy Plaza \nJackson, MICHIGAN 49201 \nUNITED STATES \nrachael.moore@cmsenergy.com \nConsumers' \nResearch \nWill Hild \nExecutive Director \nConsumers' Research \n1801 F St NW \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \ninfo@consumersresearch.org \nCooperative \nEnergy \nMatthew Rudolphi \nAttorney \nThompson Coburn LLP \n55 E MONROE ST \n37TH FLOOR \nCHICAGO, ILLINOIS 60603 \nUNITED STATES \nmrudolphi@thompsoncoburn.com \nJoshua E. Adrian \nAttorney \nThompson Coburn LLP \n1909 K Street NW \nSuite 600 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20006 \njadrian@thompsoncoburn. \ncom \nCooperative \nEnergy \nMonica Sterling \nThompson Coburn LLP \n1909 K Street, N.W. \nSuite 600 \nWashington, DISTRICT \nOF COLUMBIA 20006 \nMSterling@thompsoncobu \nrn.com"},{"page":170,"startToken":58896,"endToken":59024,"text":"Cooperative \nEnergy \nNathan T Bellville \nRegulatory Affairs \nSpecialist \nSouth Mississippi Electric \nPower Association \nPO BOX 15849 \nHATTIESBURG, \nMISSISSIPPI 39404 \nnbellville@cooperativeene \nrgy.com \nCordelio Services \nLLC \nGregory Jones \nPaul Hastings LLP \n2050 M Street, NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \ngregoryjones@paulhastings.com \nLily Hunter \nPaul Hastings \n2050 M St NW \nWashington, DISTRICT \nOF COLUMBIA 20036 \nlilyhunter@paulhastings.c \nom \nCordelio Services \nLLC \nSophia Faram \nPaul Hastings LLP \n2050 M St NW \nWashington, DISTRICT \nOF COLUMBIA 20036 \nsophiafaram@paulhasting \ns.com \nCordelio Services \nLLC \nLuke Pangman \nGeneral Counsel \nCordelio Power \n100 King St West, Suite \n7000 \nToronto, ONTARIO M5X \n1A9 \n1pangman@cordeliopower. \ncorn \nCrete Energy \nVenture, LLC \nCliff Sikora \nEarthrise Energy, PBLLC \n3033 WILSON BLVD STE 700 \nARLINGTON, VIRGINIA 22201 \nUNITED STATES \ncliff.sikora@earthriseenergy.com"},{"page":171,"startToken":59024,"endToken":59210,"text":"Data Center \nCoalition \nAaron Tinjum \nData Center Coalition \n525-K East Market Street \n#253 \nLeesburg, VIRGINIA 20176 \nUNITED STATES \naaron@datacentercoalition.org \nMorgan A Sipple, ESQ \nData Center Coalition \n1250 H ST NW \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20005 \nmorgan@datacentercoaliti \non.org \nData Center \nCoalition \nCy McNeill \nData Center Coalition \n525 K-East Market, \nStreet #253 \nLeesburg, VIRGINIA \n20175 \ncy@datacentercoalition.or \ng \nDelaware \nMunicipal \nElectric \nCorporation, Inc. \nThomas Rudebusch \nPartner \nDuncan, Weinberg, Genzer & \nPembroke PC \n1667 K Street, NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \ntlr@dwgp.com \nLinda L. Murray-Kimball \nLegal Assistant \nDuncan, Weinberg, \nGenzer & Pembroke PC \n1667 K Street, NW \nSuite 700 \nWashington, DISTRICT \nOF COLUMBIA 20006-\n1654 \nlmk@dwgp.com \nDelaware \nMunicipal \nElectric \nCorporation, Inc. \nBhaveeta Mody \nDuncan, Weinberg, Genzer & \nPembroke PC \n1667 K Street, NW \nSuite 700 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \nbkm@dwgp.com \nKimberly Schlichting \nDelaware Municipal \nElectric Corporation, Inc. \n22 Artisan Drive \nSmyrna, DELAWARE \n19977 \nkschlichting@demecinc.ne \nt \nDelaware Public \nService \nCommission \nMatthew Hartigan \nDelaware Public Service \nCommission \n861 Silver Lake Blvd. \nSuite 100 \nDover, DELAWARE 19904 \nUNITED STATES \nmatthew.hartigan@state.de.us"},{"page":172,"startToken":59210,"endToken":59390,"text":"Delmarva Power \n& Light \nCompany \nCynthia Holland \nAssociate General Counsel \nExelon Corporation \n701 Ninth Street NW \nWashington, DISTRICT OF \nCOLUMBIA 20068 \nUNITED STATES \ncynthia.holland@exeloncorp.com \nStan Berman \n3502 Fremont Ave N, #1 \nSeattle, WASHINGTON \n98103 \nstan@btlawllp.com \nDominion \nEnergy Services, \nInc. \nWesley Walker \nSenior Assistant General Couns \nDominion Companies \nPO Box 25615 \nRichmond,VIRGINIA 23260-5615 \nUNITED STATES \nwesley.walker@dominionenergy.com \nJacqulynn Hugee \nDeputy General Counsel \nDominion Energy \nServices, Inc. \n120 Tredegar Street \nRichmond, VIRGINIA \n23219 \njacqulynn.b.hugee@domin \nionenergy.com \nDominion \nEnergy Services, \nInc. \nJames G Davis \nRegulatory and Market \nPolicy S \nDominion Energy & \nDominion Generation \n120 TREDEGAR ST \nRIVERVIEW \nRICHMOND, VIRGINIA \n23219 \njames.g. davis@dominione \nnergy.com \nDTE Electric \nCompany \nAndrea Hayden \nOffice of the General. Counsel \nDTE Electric Company \nOne Energy Plaza \n1635 WCB \nDetroit, MICHIGAN 48226 \nUNITED STATES \nandrea.hayden@dteenergy.com \nTristin Rojeck \nRegulatory Strategy \nConsultant \nDTE Energy Company \n1 ENERGY PLZ \nDETROIT, MICHIGAN \n48226 \ntristin.rojeck@dteenergy.c \nom \nDuke Energy \nKentucky, Inc. \nLeah Buchanan \nDuke Energy eTariff \nAccount \n550 South Tryon Street \nCharlotte, NORTH \nCAROLINA 28202 \ne-tariff@duke-energy.com"},{"page":173,"startToken":59390,"endToken":59527,"text":"Duke Energy \nOhio, Inc. \nSheri May \nAssociate General \nCounsel \n139 East Fourth St. \nCincinnati, OHIO 45202 \nsheri.may@duke-\nenergy.com \nDuquesne Light \nCompany \nMichael Brechlin \n411 7th Ave \nPittsburgh, \nPENNSYLVANIA 15219 \nmbrechlin@duqlight.com \nDuquesne Light \nCompany \nTishekia Williams \nDirector of External Affairs a \n411 Seventh Avenue \n15th Floor \nPittsburgh, PENNSYLVANIA 15219 \nUNITED STATES \ntwilliams@duqlight.com \nEARTHJUSTIC \nE \nAaron Stemplewicz \nSenior Attorney \nEARTHJUSTICE \nClean Energy Program \n1617 John F. Kennedy Blvd \nSuite 2020 \nPhiladelphia, PENNSYLVANIA \n19103 \nUNITED STATES \nastemplewicz@earthjustice.org \nEast Kentucky \nPower \nCooperative, Inc. \nDaniel Frank \nPartner \nEversheds Sutherland (US) LLP \n700 Sixth Street, N.W. \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20001-3980 \nUNITED STATES \nDanielFrank@eversheds- \nsutherland.com \nDenise R Foster Cronin \nVice President, Federal \nand RT \nEast Kentucky Power \nCooperative, Inc. \n4775 LEXINGTON ROAD \nLEXINGTON, \nKENTUCKY 40392 \ndenise.cronin@ekpc.coop"},{"page":174,"startToken":59527,"endToken":59701,"text":"East Kentucky \nPower \nCooperative, Inc. \nAllison Salvia \nEversheds Sutherland (US) LLP \n700 Sixth Street, NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nAllisonSalvia@eversheds-\nsutherland.com \nEast Kentucky \nPower \nCooperative, Inc. \nKelly Cuthbertson \nAssociate \nEversheds Sutherland (US) LLP \n700 Sixth Street, NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nkellycuthbertson@eversheds-\nsutherland.com \nEast Kentucky \nPower \nCooperative, Inc. \nAllison Salvia \n700 Sixth Street, NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nAllisonSalvia@eversheds- \nsutherland.com\n \nDenise R Foster Cronin \nVice President, Federal \nand RT \n4775 LEXINGTON ROAD \nLEXINGTON, \nKENTUCKY 40392 \ndenise.cronin@ekpc.coop \nEast Texas \nElectric \nCooperative, Inc. \nF. Alvin Taylor \nAttorney \nMcCarter & English, LLP \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nataylor@mccarter.com \nEDF \nRenewables, Inc. \nLinda Walsh \nHusch Blackwell LLP \n750 17th Street NW \nWashington DC, DISTRICT OF \nCOLUMBIA 200067 \nUNITED STATES \nlinda.walsh@huschblackwell.com \nCorban Coffman \nAkin Gump Strauss \nHauer & Feld LLP \n2001 K Street N.W. \nWashington, DISTRICT \nOF COLUMBIA 20006 \nccoffman@akingump.com"},{"page":175,"startToken":59701,"endToken":59842,"text":"EDF \nRenewables, Inc. \nMichael Blackwell \nAttorney \nHusch Blackwell LLP \n10700 VALLEY DR \nCARMEL, INDIANA \n46280 \nmichael.blackwell@husch \nblackwell.com \nEDF \nRenewables, Inc. \nEmma Simon \nDirector, Transmission \nPolicy \nEDF Renewables \nDevelopment, Inc. \n15445 Innovation Dr \nSan Diego, CALIFORNIA \n92128 \nemmanix.simon@edf-\nre.com \nEDF \nRenewables, Inc. \nTemujin J Roach \nSenior Director -\nTransmission \nEDF Renewables, Inc. \n3600 American Blvd., W, \nSuite 400 \nMinneapolis, \nMINNESOTA 55413 \ntemujin.roach@edf-re.com \nEDF \nRenewables, Inc. \nAnton Ptak \nDirector, Transmission \nand Int \nEDF Renewables, Inc. \n3600 AMERICAN BLVD \nW STE 400 \nBLOOMINGTON, \nMINNESOTA 55431 \nanton.ptak@edf-re.com \nEdison Electric \nInstitute \nKevin Huyler \nManaging Director, Edison Elec \nEdison Electric Institute \n701 PENNSYLVANIA AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \nkhuyler@eei.org \nChristopher M Randall \nEdison Electric Institute \nEdison Electric Institute \n701 Pennsylvania \nAvenue, NW \nWashington, DISTRICT \nOF COLUMBIA 20004 \ncrandall@eei.org"},{"page":176,"startToken":59842,"endToken":59995,"text":"Electric Power \nSupply \nAssociation \nNancy Bagot \nSenior Vice President \nElectric Power Supply Association \n1401 New York Avenue, NW \nSuite 950 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nNancyB@epsa.org \nElectric Power \nSupply \nAssociation \nNancy Bagot \n1401 NEW YORK AVE NW STE 950 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nnbagot@epsa.org \nElectricity \nConsumers \nResource Council \nKaren Onaran \nVice President \nELCON \n1101 K Street NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nKOnaran@elcon.org \nElectricity \nConsumers \nResource Council \nKaren Onaran \nVice President \nELCON \n1101 K Street NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nKOnaran@elcon.org \nEnchanted Rock, \nLLC \nSteven Shparber \nMintz, Levin, Cohn, Ferris, Glovsky \nand Popeo, P.C. \n555 12TH ST NW STE 1100 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \nsshparber@mintz.com \nJoel Yu \nDirector of Regulatory & \nLegis \nEnchanted Rock, LLC \n1113 VINE ST STE 101 \nHOUSTON, TEXAS \n77002 \njyu@enchantedrock.com"},{"page":177,"startToken":59995,"endToken":60170,"text":"Enchanted Rock, \nLLC \nOmar Bustami \nMintz, Levin, Cohn, Ferris, Glovsky \nand Popeo, P.C. \n3580 Carmel Mountain Road \nSuite 300 \nSan Diego, CALIFORNIA 92130 \nUNITED STATES \nOBustami@mintz.com \nJames Huang \nDirector, Wholesale \nMarkets Po \n1113 Vine Street \nSuite 101 \nHouston, TEXAS 77002 \njhuang@enchantedrock.co \nm \nEnerwise Global \nTechnologies, \nLLC dba CPower \nAaron Breidenbaugh \nCPower Energy Management \nCPower, Inc. \n64 Westview Rd \nVoorheesville, NEW YORK 12186 \nUNITED STATES \naaron.breidenbaugh@cpowerenergy \nmanagement.com \nNancy Chafetz \nSenior Director, \nRegulatory an \nLS POWER \nCORPORATION \n1001 Fleet St Unit 400 \nBaltimore, MARYLAND \n21202 \nnancy.chafetz@cpowerene \nrgymanagement.com \nEnerwise Global \nTechnologies, \nLLC dba CPower \nKenneth D Schisler \nRegulatory Affairs \nCPower, Inc. \n7604 Cooper Point Rd \nBozman, MARYLAND \n21612 \nKenneth.Schisler@CPowe \nrEnergyManagement.com \nENGIE North \nAmerica Inc. \nSarah Bresolin Silver \nDirector Government and Regula \nENGIE North America Inc. \n1360 Post Oak Blvd \nHouston, TEXAS 77056 \nUNITED STATES \nsarah.bresolin@engie.com \nEnvironmental \nDefense Fund \nTed Kelly \nSenior Attorney \nEnvironmental Defense Fund \n1875 Connecticut Ave NW Suite 600 \nWashington, DISTRICT OF \nCOLUMBIA 20012 \nUNITED STATES \ntekelly@edf.org"},{"page":178,"startToken":60170,"endToken":60295,"text":"Eolian, LP \nBruce Grabow \nSheppard Mullin Richter & \nHampton LLP \n2099 Pennsylvania Avenue, NW \nSuite 100\n \nWashington, DISTRICT OF \nCOLUMBIA 20006-6801 \nUNITED STATES \nbgrabow@sheppardmullin.com \nEssential Power \nOPP, LLC \nBrian Zimmet \nPartner \n1 THOMAS CIR NW \nROCK CREEK ENERGY GROUP, \nLLP \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nbzimmet@rockcreekenergygroup.co \nm \nMarica Sharashenidze \nRock Creek Energy \nGroup, LLP \n1 Thomas Circle \nSuite 700 \nWashington, DISTRICT \nOF COLUMBIA 20005 \nmsharashenidze@rockcree \nkenergygroup.com \nEssential Power \nOPP, LLC \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne \nCorporate Place \nSuite 300 \nCharlotte, NORTH \nCAROLINA 28277 \nGeorgeKnapp@cogentrig.c \nom \nEssential Power \nOPP, LLC \nStephanie C Kueffner \nESQ \nAssociate General \nCounsel \nCogentrix Energy Power \nManagement, LLC \n13860 BALLANTYNE \nCORPORATE PL STE \n300 \nCHARLOTTE, NORTH \nCAROLINA 28277 \nstephaniekueffner@cogent \nrix.com"},{"page":179,"startToken":60295,"endToken":60458,"text":"Essential Power \nRock Springs, \nLLC \nBrian Zimmet \nPartner \n1 THOMAS CIR NW \nROCK CREEK ENERGY GROUP, \nLLP \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nbzimmet@rockcreekenergygroup.co \nm \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne \nCorporate Place \nSuite 300 \nCharlotte, NORTH \nCAROLINA 28277 \nGeorgeKnapp@cogentrix.c \nom \nEssential Power \nRock Springs, \nLLC \nLynn Kirshbaum \n1 THOMAS CIR NW STE 700 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nlkirshbaum@rockcreekenergygroup.c \nom \nHaley M. Franco \nEnergy Regulatory \nAdvisor \n1 Thomas Circle NW \nSuite 700 \nWashington, DISTRICT \nOF COLUMBIA 20005 \nhfranco@rockcreekenergy \ngroup.com \nEssential Power \nRock Springs, \nLLC \nBrian Zimmet \nPartner \n1 THOMAS CIR NW \nROCK CREEK ENERGY GROUP, \nLLP \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nbzimmet@rockcreekenergygroup.co \nm \nMarica Sharashenidze \nRock Creek Energy \nGroup, LLP \n1 Thomas Circle \nSuite 700 \nWashington, DISTRICT \nOF COLUMBIA 20005 \nmsharashenidze@rockcree \nkenergygroup.com \nEssential Power \nRock Springs, \nLLC \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne \nCorporate Place \nSuite 300 \nCharlotte, NORTH \nCAROLINA 28277 \nGeorgeKnapp@cogentrix.c \nom"},{"page":180,"startToken":60458,"endToken":60586,"text":"Essential Power \nRock Springs, \nLLC \nStephanie C Kueffner \nESQ \nAssociate General \nCounsel \nCogentrix Energy Power \nManagement, LLC \n13860 BALLANTYNE \nCORPORATE PL STE \n300 \nCHARLOTTE, NORTH \nCAROLINA 28277 \nstephaniekueffner@cogent \nrix.com \nExelon \nCorporation \nMax Minzner \nSVP and Deputy General Counsel \nExelon BSC-Legal Regulatory \n701 9TH ST NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nmax.minzner@exeloncorp.com \nJordan Kwok \nDirector, Federal \nRegulatory A \nExelon Business Services \n701 9TH ST NW \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20001 \njordan.kwok@exeloncorp.c \nom \nExelon \nCorporation \nCynthia Holland \nAssociate General Counsel \nExelon Corporation \n701 Ninth Street NW \nWashington, DISTRICT OF \nCOLUMBIA 20068 \nUNITED STATES \ncynthia.holland@exeloncorp.com \nExelon \nCorporation \nAlejandro Bautista \nAssistant General \nCounsel \nExelon Business Services \nCompany, LLC \n2301 Market Street \nPhiladelphia, \nPENNSYLVANIA 19101 \nalejandro.bautista@exelon \ncorp.com"},{"page":181,"startToken":60586,"endToken":60753,"text":"FirstEnergy \nService Company \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nTricia S Hartzell \nFirstEnergy Legal \nSpecialist \nFirstEnergy Service \nCompany \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp. \ncom \nFirstEnergy \nService Company \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nGoogle Energy \nLLC \nJane Rueger \nPerkins Coie LLP \n700 Thirteenth Street, N.W. \nSuite 800 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005-3960 \nUNITED STATES \njrueger@perkinscoie.com \nBrian D George \nGoogle LLC \n25 MASSACHUSETTS \nAVE NW \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20001 \nbriangeorge@google.com \nGoogle Energy \nLLC \nJacob Neeley \nAttorney \nPerkins Coie LLP \n33 E Main Street \nSuite 201 \nMadison, WISCONSIN \n53703 \njneeley@perkinscoie.com \nGoogle LLC \nJane Rueger \nPerkins Coie LLP \n700 Thirteenth Street, N.W. \nSuite 800 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005-3960 \nUNITED STATES \njrueger@perkinscoie.com \nBrian D George \nGoogle LLC \n25 MASSACHUSETTS \nAVE NW \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20001 \nbriangeorge@google.com"},{"page":182,"startToken":60753,"endToken":60870,"text":"Google LLC \nJacob Neeley \nAttorney \nPerkins Coie LLP \n33 E Main Street \nSuite 201 \nMadison, WISCONSIN \n53703 \njneeley@perkinscoie.com \nHamilton \nLiberty LLC \nBrian Zimmet \nPartner \n1 THOMAS CIR NW \nROCK CREEK ENERGY GROUP, \nLLP \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nbzimmet@rockcreekenergygroup.co \nm \nMarica Sharashenidze \nRock Creek Energy \nGroup, LLP \n1 Thomas Circle \nSuite 700 \nWashington, DISTRICT \nOF COLUMBIA 20005 \nmsharashenidze@rockcree \nkenergygroup.com \nHamilton \nLiberty LLC \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne \nCorporate Place \nSuite 300 \nCharlotte, NORTH \nCAROLINA 28277 \nGeorgeKnapp@cogentrix.c \nom \nHamilton \nLiberty LLC \nStephanie C Kueffner \nESQ \nAssociate General \nCounsel \nCogentrix Energy Power \nManagement, LLC \n13860 BALLANTYNE \nCORPORATE PL STE \n300 \nCHARLOTTE, NORTH \nCAROLINA 28277 \nstephaniekueffner@cogent \nrix.com"},{"page":183,"startToken":60870,"endToken":60991,"text":"Hamilton Patriot \nLLC \nBrian Zimmet \nPartner \n1 THOMAS CIR NW \nROCK CREEK ENERGY GROUP, \nLLP \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nbzimmet@rockcreekenergygroup.co \nm \nMarica Sharashenidze \nRock Creek Energy \nGroup, LLP \n1 Thomas Circle \nSuite 700 \nWashington, DISTRICT \nOF COLUMBIA 20005 \nmsharashenidze@rockcree \nkenergygroup.com \nHamilton Patriot \nLLC \nGeorge Knapp \n' \nGeneral Counsel \n13860 Ballantyne \nCorporate Place \nSuite 300 \nCharlotte, NORTH \nCAROLINA 28277 \nGeorgeKnapp@cogentrix.c \nom \nHamilton Patriot \nLLC \nStephanie C Kueffner \nESQ \nAssociate General \nCounsel \nCogentrix Energy Power \nManagement, LLC \n13860 BALLANTYNE \nCORPORATE PL STE \n300 \nCHARLOTTE, NORTH \nCAROLINA 28277 \nstephaniekueffner@cogent \nrix.com \nHudson \nTransmission \nPartners, LLC \nWilliam Hollaway \nGibson, Dunn & Crutcher LLP \n1050 Connecticut Ave NW \nWashington, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nWHollaway@gibsondunn.com"},{"page":184,"startToken":60991,"endToken":61159,"text":"Hudson \nTransmission \nPartners, LLC \nEd Stern \nCEO \nGibson, Dunn & Crutcher LLP \n501 Kings Highway East, Suite 300 \nFairfield, CONNECTICUT 06825 \nUNITED STATES \nestern@powerbridge.us \nIdaho Power \nCompany \nLisa O'Hara \nCorporate Counsel \nIdaho Power Company \nPO Box 70 \nBOISE,IDAHO \nUNITED STATES \nlo'hara@idahopower.com \nIllinois Attorney \nGeneral's Office \nKimberly Janas \nIllinois Attorney General's Office \n115 S LA SALLE ST \nCHICAGO, ILLINOIS 60603 \nUNITED STATES \nkimberly.janas@ilag.gov \nScott Metzger \nOffice of the Illinois \nAttorney General \n115 S LA SALLE ST \n25TH FLOOR \nCHICAGO, ILLINOIS \n60603 \nscott.metzger@ilag.gov \nIllinois Attorney \nGeneral's Office \nSusan L. Satter \nChief, Public Utilities \nBureau \nIllinois Attorney \nGeneral's Office \n115 S LA SALLE ST \nCHICAGO, ILLINOIS \n60603 \nsusan.satter@ilag.gov \nIllinois Citizens \nUtility Board \nEric DeBellis \nIllinois Citizens Utility Board \n309 W WASHINGTON ST STE 800 \nCHICAGO, ILLINOIS 60606 \nUNITED STATES \nedebellis@citizensutilityboard.org \nClara Summers \nConsumers for a Better \nGrid Ca \nCitizens Utility Board of \nIllinois \n309 W WASHINGTON ST \nSTE 800 \nCHICAGO, ILLINOIS \n60606 \ncsummers@citizensutility \nboard.org"},{"page":185,"startToken":61159,"endToken":61322,"text":"Illinois \nMunicipal \nElectric Agency \nTroy Fodor \nGeneral Counsel \nIllinois Municipal Electric Agency \n3400 Conifer Drive \nSpringfield, ILLINOIS 62711 \nUNITED STATES \ntfodor@imea.org \nIllinois \nMunicipal \nElectric Agency \nDaniel Chung \nStaff Attorney \nIllinois Municipal Electric Agency \n3400 CONIFER DR \nSPRINGFIELD, ILLINOIS 62711 \nUNITED STATES \ndchung@imea.org \nIndiana \nMichigan Power \nCompany \nStacey Burbure \n801 Pennsylvania Avenue, NW \nWashington DC, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \nslburbure@aep.com \nJessica Cano \nSenior Counsel \n1 Riverside Plaza \nCOLUMBUS, OHIO \n43215 \njacano@aep.com \nIndiana Office of \nUtility \nConsumer \nCounselor \nArthur Iler \nDeputy Consumer Counsel - Fede \nIndiana Office of Utility Consumer \nCounselor \n115 W Washington St \nSte 1500 South \nIndianapolis, INDIANA 46204 \nUNITED STATES \nailer@oucc.in.gov \nScott Jones \nIndiana Office of the \nUtility \nIndiana Office of Utility \nConsumer Counselor \n115 West Washington St. \nSte.1500 South \nIndianapolis, INDIANA \n46204 \nsj ones 1@oucc.in.gov \nIndividual \nBruce Campbell \nPrincipal \nEnerwise Global Technologies, LLC \n9204 2ND AVE \nSILVER SPRING, MARYLAND \n20910 \nUNITED STATES \nbruce@campbellea.com"},{"page":186,"startToken":61322,"endToken":61491,"text":"Industrial \nEnergy \nConsumers of \nAmerica \nKenneth Stark \nMcNees Wallace & Nurick LLC \n100 PINE ST \nHARRISBURG, PENNSYLVANIA \n17101 \nUNITED STATES \nkstark@mcneeslaw.com \nInternational \nTransmission \nCompany \nLauren Parrottino \nAssociate Attorney \nITC Holdings Corp. \n27175 ENERGY WAY \nNOW, MICHIGAN 48377 \nUNITED STATES \n1parrottino@itctransco.com \nInvenergy \nRenewables LLC \nTyler O'Connor \nPartner \nCrowell & Moring LLP \n1001 Pennsylvania Avenue, NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \ntoconnor@crowell.com \nKathryn Douglass \nAssociate \nCrowell & Moring LLP \n1001 PENNSYLVANIA \nAVE NW \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20004 \nKDouglass@Crowell.com \nInvenergy \nRenewables LLC \nWilliam Borders \nChief Compliance Officer \nInvenergy LLC \nOne South Wacker Drive \nSuite 1500 \nChicago, ILLINOIS 60606 \nUNITED STATES \nferccompliance@invenergy.com \nNicole Luckey \nSenior Vice President, \nRegulat \nInvenergy LLC \n1 S WACKER DR STE \n1800 \nCHICAGO, ILLINOIS \n60606 \nnluckey@invenergy.com \nInvenergy \nThermal LLC \nTyler O'Connor \nPartner \nCrowell & Moring LLP \n1001 Pennsylvania Avenue, NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \ntoconnor@crowell.com \nKathryn Douglass \nAssociate \nCrowell & Moring LLP \n1001 PENNSYLVANIA \nAVE NW \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20004 \nKDouglass@Crowell.com"},{"page":187,"startToken":61491,"endToken":61676,"text":"Invenergy \nThermal LLC \nWilliam Borders \nChief Compliance Officer \nInvenergy LLC \nOne South Wacker Drive \nSuite 1500 \nChicago, ILLINOIS 60606 \nUNITED STATES \nferccompliance@invenergy.com \nNicole Luckey \nSenior Vice President, \nRegulat \nInvenergy LLC \n1 S WACKER DR STE \n1800 \nCHICAGO, ILLINOIS \n60606 \nnluckey@invenergy.com \nJersey Central \nPower & Light \nCompany \nAmanda Parker \nAttorney \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nTricia S Hartzell \nFirstEnergy Legal \nSpecialist \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp. \ncom \nJersey Central \nPower & Light \nCompany \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nTricia S Hartzell \nFirstEnergy Legal \nSpecialist \nFirstEnergy Service \nCompany \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp. \ncom \nJersey Central \nPower & Light \nCompany \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nKentucky Power \nCompany \nJohn Crespo \nDeputy General Counsel \n1 Riverside Plaza \nColumbus, OHIO 43215 \nUNITED STATES \njccrespo@aep.com \nJennifer L Key, ESQ \nPartner \n1330 CONNECTICUT \nAVE NW \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20036 \njkey@steptoe.com"},{"page":188,"startToken":61676,"endToken":61836,"text":"Keystone \nAppalachian \nTransmission \nCompany \nAmanda Parker \nAttorney \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nDeborah L. Jacobson, \nESQ \nAttorney \n76 S MAIN ST \nAKRON, OHIO 44308 \ndjacobson@firstenergycor \np.com \nKeystone \nAppalachian \nTransmission \nCompany \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nTricia S Hartzell \nFirstEnergy Legal \nSpecialist \nFirstEnergy Service \nCompany \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp. \ncorn \nKeystone \nAppalachian \nTransmission \nCompany \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nKingsport Power \nCompany \nRenee Hawkins \nAssistant Treasurer \n1 Riverside Plz \nColumbus, OHIO 43215 \nUNITED STATES \nrvhawkins@aep.com \nWilliam E. Johnson, ESQ \nSenior Counsel \n1 Riverside Plaza \n23rd Floor \nColumbus, OHIO 43061 \nwejohnson@aep.com \nKlondike Digital \nInfrastructure \nLLC \nDebra Raggio \nExecutive Vice President, Head \nKlondike Digital Infrastructure LLC \n117 ORONOCO ST \nALEXANDRIA, VIRGINIA 22314 \nUNITED STATES \ndraggio@newfortressenergy.com"},{"page":189,"startToken":61836,"endToken":61980,"text":"Lakewood \nCogeneration, LP \nBrian Zimmet \nPartner \n1 THOMAS CIR NW \nROCK CREEK ENERGY GROUP, \nLLP \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nbzimmet@rockcreekenergygroup.co \nm \nMarica Sharashenidze \nRock Creek Energy \nGroup, LLP \n1 Thomas Circle \nSuite 700 \nWashington, DISTRICT \nOF COLUMBIA 20005 \nmsharashenidze@rockcree \nkenergygroup.com \nLakewood \nCogeneration, LP \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne \nCorporate Place \nSuite 300 \nCharlotte, NORTH \nCAROLINA 28277 \nGeorgeKnapp@cogentrix.c \nom \nLakewood \nCogeneration, LP \nStephanie C Kueffner \nESQ \nAssociate General \nCounsel \nCogentrix Energy Power \nManagement, LLC \n13860 BALLANTYNE \nCORPORATE PL STE \n300 \nCHARLOTTE, NORTH \nCAROLINA 28277 \nstephaniekueffner@cogent \nrix.com \nLarge Public \nPower Council \nJonathan Schneider \nStinson LLP \n1775 Pennsylvania Avenue NW \nSuite 800 \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \njonathan.schneider@stinson.com \nJohn E. McCaffrey \nPartner \nStinson LLP \n1775 Pennsylvania \nAvenue NW \nSuite 800 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20006 \njohn.mccaffrey@stinson.co \nm"},{"page":190,"startToken":61980,"endToken":62130,"text":"Large Public \nPower Council \nM. Denyse Zosa, ESQ \nStinson Leonard Street \nLLP \n1775 Pennsylvania \nAvenue NW \nSuite 800 \nWashington, DISTRICT \nOF COLUMBIA 20006 \ndenyse.zosa@stinson.com \nLee County \nElectric \nCooperative, Inc. \nJohn Adragna \nMcCarter & English, LLP \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nJadragna@mccarter.com \nF. Alvin Taylor \nAttorney \nMcCarter & English, LLP \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT \nOF COLUMBIA 20005 \nataylor@mccarter.com \nLee County \nElectric \nCooperative, Inc. \nClark Hawkins \nDirector - Electric \nOperations \n4980 Bayline Drive \nNorth Fort Myers, \nFLORIDA 33917 \nClark.Hawkins@lcec.net \nLee County \nElectric \nCooperative, Inc. \nSarah Bullock \nDirector Finance and \nSupply Ch \nLee County Electric \nCooperative, Inc. \n4980 BAYLINE DR \nNORTH FORT MYERS, \nFLORIDA 33917 \nsarah.bullock@lcec.net \nLincoln \nGenerating \nFacility, LLC \nCliff Sikora \nEarthrise Energy, PBLLC \n3033 WILSON BLVD STE 700 \nARLINGTON, VIRGINIA 22201 \nUNITED STATES \ncliff.sikora@earthriseenergy.com"},{"page":191,"startToken":62130,"endToken":62281,"text":"LS Power \nDevelopment, \nLLC \nMarjorie Philips \nVP, Wholesale Market Policy \nLS Power Associates, L.P. \n250 W 55TH ST FL 31 \nNEW YORK, NEW YORK 10019 \nUNITED STATES \nmphilips@lspower.com \nLS Power \nDevelopment, \nLLC \nTom Hoatson \n1 Tower Center \nEast Brunswick, NEW JERSEY \n08816 \nUNITED STATES \nthoatson@lspower.com \nLS Power \nDevelopment, \nLLC \nDaniel Pierpont \nVice President \nLS Power Development, LLC \n250 W 55TH ST FL 31 \nNEW YORK, NEW YORK 10019 \nUNITED STATES \ndpierpont@lspower.com \nMainspring \nEnergy \nBrian Kauffman \nDirector, Wholesale Market Dev \nMainspring Energy \n3601 HAVEN AVE \nMENLO PARK, CALIFORNIA \n94025 \nUNITED STATES \nbrian.kauffman@mainspringenergy. \ncom \nMaryland Office \nof People's \nCounsel \nWilliam Fields \nDeputy People's Counsel \n6 SAINT PAUL ST STE 2102 \nBALTIMORE, MARYLAND 21202 \nUNITED STATES \nwilliam.fields@maryland.gov \nPhilip L Sussler \nSenior Assistant People's \nCoun \nMaryland Office of \nPeople's Counsel \n6 SAINT PAUL ST STE \n2102 \nBALTIMORE, \nMARYLAND 21202 \nphilip.sussler@maryland. \ngov"},{"page":192,"startToken":62281,"endToken":62430,"text":"Maryland Office \nof People's \nCounsel \nAlexis H Lewis, ESQ \nAssistant People's \nCounsel \nOffice of People's Counsel \n6 SAINT PAUL ST \nBALTIMORE, \nMARYLAND 21202 \nalexis.lewis@maryland.go \nv \nMaryland Public \nService \nCommission \nRansom (Ted) Davis \nAssociate General Counsel - \nMaryland Public Service \nCommission \n6 St. Paul Street \n16th Floor \nBALTIMORE, MARYLAND 21202 \nUNITED STATES \nRansom.Davis@Maryland.gov \nMiles H Mitchell \nGeneral Counsel \nMaryland Public Service \nCommission \n6 St. Paul Street \n16th Floor, William \nDonald Schaefer Tower \nBaltimore, MARYLAND \n21202 \nmiles.mitchell@maryland. \ngov \nMaryland Public \nService \nCommission \nMorris Schreim \n6 St. Paul Street \nBaltimore, MARYLAND \n21202 \nmorris.schreim@maryland \n.gov \nMassachusetts \nMunicipal \nWholesale \nElectric \nCompany \nScott Strauss \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nScott.Strauss@spiegelmcd.com \nJeffrey A. Schwarz \nSpiegel & McDiarmid \nLLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20036 \njeffrey.schwarz@spiegelm \ncd.com"},{"page":193,"startToken":62430,"endToken":62570,"text":"Massachusetts \nMunicipal \nWholesale \nElectric \nCompany \n. \nMatthew J. Ide \nExec. Director of Special \nProj \nMassachusetts Municipal \nWholesale Electric \nCompany \n327 Moody St \nP.O. Box 426 \nLudlow, \nMASSACHUSETTS \n01056 \nMIde@mmwec.org \nMassachusetts \nMunicipal \nWholesale \nElectric \nCompany \nE Service \nSpiegel & McDiarmid \nLLP \n1818 N ST NW STE 800 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20036 \neService@spiegelmcd.com \nMid-Atlantic \nInterstate \nTransmission \nLLC \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nTricia S Hartzell \nFirstEnergy Legal \nSpecialist \nFirstEnergy Service \nCompany \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp. \ncom \nMid-Atlantic \nInterstate \nTransmission \nLLC \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nMid-Atlantic \nInterstate \nTransmission, \nLLC \nDeborah L. Jacobson, \nESQ \nAttorney \n76 S MAIN ST \nAKRON, OHIO 44308 \ndjacobson@firstenergycor \np.com"},{"page":194,"startToken":62570,"endToken":62724,"text":"Midwest \nGeneration, LLC \nNeal Fitch \nSr. Director, Regulatory Affai \nNRG Energy, Inc. \n804 CARNEGIE CTR \nPRINCETON, NEW JERSEY 08540 \nUNITED STATES \nneal.fitch@nrg.com \nMidwest \nGeneration, LLC \nCortney Slager \nAssistant General Counsel - Re \nNRG Companies \n804 Carnegie Center \nPrinceton, NEW JERSEY 08540 \nUNITED STATES \ncortney.slager@nrg.com \nMidwest \nGeneration, LLC \nJennifer Hsia \nManaging Senior Counsel \nNRG Energy \n804 Carnegie Center Dr. \nPrinceton, NEW JERSEY 08540 \nUNITED STATES \nJennifer.Hsia@nrg.com \nMississippi \nPublic Service \nCommission \nWilliam Booth \nMichael Best & Friedrich, LLP \n1000 Maine Ave SW \nSuite 400 \nWashington, D.C., DISTRICT OF \nCOLUMBIA 20024 \nUNITED STATES \nwdbooth@michaelbest.com \nAlex L. Peterson \nMichael Best & Friedrich, \nLLP \n1000 Maine Avenue, S.W. \nSuite 400 \nWashington, DISTRICT \nOF COLUMBIA 20024 \nalpeterson@michaelbest.c \nom \nMississippi \nPublic Service \nCommission \nBarton Norfleet \nSpecial Counsel for \nFederal En \n501 N. West Street, Suite \n201-A \nP.O. Box 1174 \nJACKSON, MISSISSIPPI \n39201 \nbarton.norfleet@psc.ms.go \nv"},{"page":195,"startToken":62724,"endToken":62895,"text":"Monitoring \nAnalytics, LLC \nJeffrey Mayes \nGeneral Counsel \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nValley Forge Corporate Center \nEagleville, PENNSYLVANIA 19403 \nUNITED STATES \njeffrey.mayes@monitoringanalytics.c \nom \nSuzette N Krausen \nExecutive Assistant \nMonitoring Analytics, \nLLC \n2621 Van Buren Ave Ste \n160 \nNorristown, \nPENNSYLVANIA 19403 \nSuzette.Krausen@monitor \ninganalytics.com \nMonitoring \nAnalytics, LLC \nJoseph Bowring \nMonitoring Analytics, \nLLC \n2621 Van Buren Avenue, \nSuite 160 \nNorristown, \nPENNSYLVANIA 19403 \nJoseph. Bowring@monitori \nnganalytics.com \nMonongahela \nPower Company \nAmanda Parker \nAttorney \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nDeborah L. Jacobson, \nESQ \nAttorney \n76 S MAIN ST \nAKRON, OHIO 44308 \ndjacobson@firstenergycor \np.com \nMonongahela \nPower Company \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nTricia S Hartzell \nFirstEnergy Legal \nSpecialist \nFirstEnergy Service \nCompany \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp. \ncom \nMonongahela \nPower Company \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com"},{"page":196,"startToken":62895,"endToken":63063,"text":"National Grid \nPatrick Tarmey \nSenior Counsel \nNational Grid \n170 Data Drive \nWaltham, MASSACHUSETTS \n02451 \nUNITED STATES \npatrick.tarmey@nationalgrid.com \nNational Grid \nRenewables \nDevelopment, \nLLC \nKurt Rempe \nNational Grid Renewables \nDevelopment, LLC \n8400 NORMANDALE LAKE BLVD \nSTE 1200 \nBLOOMINGTON, MINNESOTA \n55437 \nUNITED STATES \nkrempe@geronimopower.com \nNational Grid \nRenewables \nDevelopment, \nLLC \nMatthew Morais \nSenior Director, Federal Reg \nPJM Interconnection, L.L.C. \n8400 Normandale Lake Boulevard \nSuite 1200 \nBloomington, MINNESOTA 55437 \nUNITED STATES \nmmorais@geronimopower.com \nNational \nHydropower \nAssociation \nConnor Nelson \nNational Hydropower Associatio \nNational Hydropower Association \n200 MASSACHUSETTS AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nconnor@hydro.org \nMichael Purdie \nNational Hydropower \nAssociation \n601 NEW JERSEY AVE \nNW STE 660 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20001 \nmichael@hydro.org \nNational Rural \nElectric \nCooperative \nAssociation \nAdrienne Clair \nThompson Coburn LLP \n1909 K Street NW \nSuite 600 \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \naclair@thompsoncoburn.com \nMonica Sterling \nThompson Coburn LLP \n1909 K Street, N.W. \nSuite 600 \nWashington, DISTRICT \nOF COLUMBIA 20006 \nMSterling@thompsoncobu \nrn.com"},{"page":197,"startToken":63063,"endToken":63203,"text":"National Rural \nElectric \nCooperative \nAssociation \nMary Ann Ralls \nSenior Direct, Regulatory \nAffa \nNational Rural Electric \nCooperative Association \n4301 Wilson Blvd. \nArlington, VIRGINIA \n22203 \nmaryann.ralls@nreca.coop \nNatural \nResource \nDefense Council \nTom Rutigliano \nSr. Advocate \nNRDC/FERC Project \n1124 15th St. NW \nSuite 300 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \ntrutigliano@nrdc.org \nNebraska Public \nPower District \nDavid D'Alessandro \nAttorney \nStinson LLP \n1775 Pennsylvania Avenue, Suite \n800 \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \ndavid.dalessandro@stinson.com \nJohn McClure \nExec.VP Ext Affair/Gen \nCounsel \n1414 15th Street \nColumbus, NEBRASKA \n68601 \njcmcclu@nppd.com \nNebraska Public \nPower District \nHarold Hadland \nNebraska Public Power \nDistrict \n1414 15th Street \nColumbus, NEBRASKA \n68601 \nhlhadla@nppd.com \nNeptune \nRegional \nTransmission \nSystem, LLC \nWilliam Hollaway \nGibson, Dunn & Crutcher LLP \n1050 Connecticut Ave NW \nWashington, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nWHollaway@gibsondunn.com"},{"page":198,"startToken":63203,"endToken":63364,"text":"Neptune \nRegional \nTransmission \nSystem, LLC \nEd Stern \nCEO \nGibson, Dunn & Crutcher LLP \n501 Kings Highway East, Suite 300 \nFairfield, CONNECTICUT 06825 \nUNITED STATES \nestern@powerbridge.us \nNew Jersey \nDivision of Rate \nCounsel \nRobert Glover \nNew Jersey Division of Rate Counsel \nPO Box 003 \nTrenton,NEW JERSEY 08625 \nUNITED STATES \nrglover@rpa.nj.gov \nT. David Wand \nDivision of Rate Counsel \nNew Jersey Division of \nRate Counsel \n140 E. Front St. \n4th Flr. \nTrenton, NEW JERSEY \n08625 \ndwand@rpa.nj.gov \nNew Jersey \nDivision of Rate \nCounsel \nDebora Layugan \nNew Jersey Division of \nRate Counsel \nPO Box 003 \nTrenton, 08625 \ndlayugan@rpa.nj.gov \nNew Jersey \nDivision of Rate \nCounsel \nBrian 0 Lipman \nActing Director \nNew Jersey Division of \nRate Counsel \n140 East Front Street \n4th Floor \nTrenton, NEW JERSEY \n08625 \nblipman@rpa.nj.gov \nNew York State \nReliability \nCouncil, L.L.C. \nAmanda De Vito \nCouch White, LLP \n540 Broadway, Suite 7 \nAlbany, NEW YORK 12207 \nUNITED STATES \nadevito@couchwhite.com"},{"page":199,"startToken":63364,"endToken":63554,"text":"NextEra Energy \nTransmission \nMidAtlantic \nIndiana, Inc. \nTravis M. Contratto \nPrincipal Attorney \n801 Pennsylvania \nAvenue, N.W. \nSuite 220 \nWashington, DISTRICT \nOF COLUMBIA 20004 \nTravis.Contratto@nee.com \nNorth American \nElectric \nReliability \nCorporation \nCaelyn Palmer \n1325 G Street NW \nSuite 600 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \ncaelyn.palmer@nerc.net \nCandice Castaneda \nSenior Counsel \nNorth American Electric \nReliability Corporation \n1325 G Street, NW \nSuite 600 \nWashington, DISTRICT \nOF COLUMBIA 20005 \ncandice.castaneda@nerc.n \net \nNortheast Texas \nElectric \nCooperative, Inc. \nF. Alvin Taylor \nAttorney \nMcCarter & English, LLP \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nataylor@mccarter.com \nNortheastern \nREMC \nAlexandra Jones \nVP & Sr. Counsel of Energy and \nNORTHEASTERN REMC \n6908 GEM CREEK LN \nWHITESTOWN, INDIANA 46075 \nUNITED STATES \najones@nremc.com \neric jung \nPresident/CEO \nNORTHEASTERN REMC \n4901 e park 30 drive \ncolumbia city, INDIANA \n46725 \nejung@nremc.com \nNorthern \nVirginia Electric \nCooperative, Inc. \nAlan Robbins \nPartner \nWashington Energy Law LLP \n900 17TH ST NW STE 500-A \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \narobbins@washingtonenergylaw.com \nPatrick Toulme \nNorthern Virginia \nElectric Cooperative, \n10323 Lomond Drive \nManassas, VIRGINIA \n20109 \nptoulme@novec.com"},{"page":200,"startToken":63554,"endToken":63686,"text":"Northern \nVirginia Electric \nCooperative, Inc. \nDebra Roby \nPartner \nWashington Energy Law LLP \n900 17th Street NW \nSuite 500-A \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \ndroby@washingtonenergylaw.com \nNorthern \nVirginia Electric \nCooperative, Inc. \nThomas Steiger \nAssociate \nWashington Energy Law LLP \n900 17th Street NW \nSuite 500-A \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \ntsteiger@washingtonenergylaw.com \nNRG Business \nMarketing LLC \nNeal Fitch \nSr. Director, Regulatory Affai \nNRG Energy, Inc. \n804 CARNEGIE CTR \nPRINCETON, NEW JERSEY 08540 \nUNITED STATES \nneal.fitch@nrg.com \nNRG Business \nMarketing LLC \nCortney Slager \nAssistant General Counsel - Re \nNRG Companies \n804 Carnegie Center \nPrinceton, NEW JERSEY 08540 \nUNITED STATES \ncortney.slager@nrg.com \nNRG Business \nMarketing LLC \nJennifer Hsia \nManaging Senior Counsel \nNRG Energy \n804 Carnegie Center Dr. \nPrinceton, NEW JERSEY 08540 \nUNITED STATES \nJennifer.Hsia@nrg.com"},{"page":201,"startToken":63686,"endToken":63864,"text":"Office of the Ohio \nConsumers' \nCounsel \nDenise Goulet \nPartner \nMcCarter & English, LLP \n1301 K ST NW \nSUITE 1000 WEST \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \ndgoulet@mccarter.com \nOffice of the Ohio \nConsumers' \nCounsel \nAngela O'Brien \nDeputy Consumers' Counsel \nOffice of the Ohio Consumers' \nCounsel \n65 E STATE ST STE 700 \nOFFICE OF THE OHIO \nCONSUMERS' COUNSEL \nCOLUMBUS, OHIO 43215 \nUNITED STATES \nangela.obrien@occ.ohio.gov \nOhio Federal \nEnergy Advocate \nThomas Lindgren \nAssistant Attorney General \nPublic Utilities Commission of Ohio \n30 East Broad Street \n16th Floor \nColumbus, OHIO 43215-3793 \nUNITED STATES \nthomas.lindgren@ohioattorneygener \nal.gov \nSarah Parrot \nFederal Energy Advocate \nPublic Utilities \nCommission of Ohio \n180 E BROAD ST \nCOLUMBUS, OHIO \n43215 \nsarah.parrot@puco.ohio.go \nv \nOhio Power \nCompany \nChris Zentz \nPartner \n750 9th St. NW, #750 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nchris.zentz@akerman.com \nRobert L Pennybaker \nRegulated Pricing & \nAnalysis M \nPO Box 201 \nTULSA,DISTRICT OF \nCOLUMBIA 74102 \nrlpennybaker@aep.com \nOhio Power \nCompany \nJoe Bower \n1330 CONNECTICUT \nAVE NW \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20036 \njbower@steptoe.com"},{"page":202,"startToken":63864,"endToken":64055,"text":"Ohio Valley \nElectric \nCorporation \nNick Privette \n3932 U.S. Route 23 \npiketon, OHIO 47250 \nUNITED STATES \nnprivett@ovec.com \nScott R Cunningham \nElectrical Operations \nDirector \nPO BOX 468 \n3932 US ROUTE 23 \nPIKETON, OHIO 45661 \nscunning@ovec.com \nOld Dominion \nElectric \nCooperative \nJecoliah Williams \n555 Eleventh Street NW \nSuite 1000 \nWashington, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \njecoliah.williams@lw.com \nAdrienne Clair \n1909 K Street NW \nSuite 600 \nWashington, DISTRICT \nOF COLUMBIA 20006 \naclair@thompsoncoburn.c \nom \nOne Power \nCompany \nJames Dunn \nSenior Counsel \nOne Power Company \n12385 Township Road 215 \nFindlay, OHIO 45840 \nUNITED STATES \njdunn@onepower.com \nOrganization of \nPJM States, Inc. \nGregory Carmean \nExecutive Director \nOrganization of PJM States, Inc. \n700 Barksdale Road \nSuite 1 \nNewark, DELAWARE 19711 \nUNITED STATES \ngreg@opsi.us \nPacific Gas and \nElectric \nCompany \nCharles Middlekauff \nChief Counsel \nPacific Gas and Electric Company \nPO Box 1018 \nOakland,CALIFORNIA 94604-1018 \nUNITED STATES \nCharles.Middlekauff@pge.com \nPECO Energy \nCompany \nCynthia Holland \nAssociate General Counsel \nExelon Corporation \n701 Ninth Street NW \nWashington, DISTRICT OF \nCOLUMBIA 20068 \nUNITED STATES \ncynthia.holland@exeloncorp.com \nStan Berman \n3502 Fremont Ave N, #1 \nSeattle,.WASHINGTON \n98103 \nstan@btlawllp.com"},{"page":203,"startToken":64055,"endToken":64197,"text":"Pennsylvania \nOffice of \nConsumer \nAdvocate \nMelanie El Atieh \nDeputy Consumer Advocate \nPennsylvania Office of Consumer \nAdvocate \n555 WALNUT ST \n5TH FLOOR, FORUM PLACE \nHARRISBURG, PENNSYLVANIA \n17101 \nUNITED STATES \nmelatieh@paoca.org \nDenell Lewis \nPennsylvania Office of \nConsumer Advocate \n555 WALNUT ST \nHARRISBURG, \nPENNSYLVANIA 17101 \ndlewis@paoca.org \nPennsylvania \nOffice of \nConsumer \nAdvocate \nJosiah Harmar \nAssistant Consumer Advocate \nPennsylvania Office of Consumer \nAdvocate \n555 WALNUT ST \n5th Floor, Forum Place \nHARRISBURG, PENNSYLVANIA \n17101 \nUNITED STATES \njharmar@paoca.org \nPJM Industrial \nCustomer \nCoalition \nSusan Bruce \nMcNees Wallace & Nurick LLC \nPO Box 1166 \nHarrisburg,PENNSYLVANIA 17108 \nUNITED STATES \nsbruce@mcneeslaw.com \nPJM Industrial \nCustomer \nCoalition \nLauren Huff \nParalegal \nMcNees Wallace & Nurick \nLLC \n100 Pine Street \nP.O. Box 1166 \nHarrisburg, \nPENNSYLVANIA 17108 \nlhuff@mwn.com \nPJM Industrial \nCustomer \nCoalition \nDavid S. Mabry \nMcNees Wallace & Nurick \nLLC \n100 Pine Street \nHarrisburg, \nPENNSYLVANIA 17101 \ndmabry@mwn.com"},{"page":204,"startToken":64197,"endToken":64413,"text":"PJM \nInterconnection \nL.L.C \nMark Stanisz \nAssistant General Counsel \n2750 Monroe Blvd. \nAudubon, PENNSYLVANIA 19403 \nUNITED STATES \nmark.stanisz@pjm.com \nCraig Glazer \nV.P., Federal Gov't Policy \n1200 G Street, N.W. \nSuite 600 \nWashington, DISTRICT \nOF COLUMBIA 20005 \ncraig.glazer@pjm.com \nPJM \nInterconnection \nL.L.C \nAndrew Swers \n1200 G ST NW \nSuite 600 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nswers@wrightlaw.com \nRyan Collins \nAttorney \n1200 G Street, N.W., \nSuite 600 \nWashington, DISTRICT \nOF COLUMBIA 20005 \ncollins@wrightlaw.com \nPJM \nInterconnection, \nL.L.C. \nMark Stanisz \nAssistant General Counsel \nPJM Interconnection, L.L.C. \n2750 Monroe Blvd. \nAudubon, PENNSYLVANIA 19403 \nUNITED STATES \nmark.stanisz@pjm.com \nCraig Glazer \nV.P., Federal Gov't Policy \nPJM Interconnection, \nL.L.C. \n1200 G Street, N.W. \nSuite 600 \nWashington, DISTRICT \nOF COLUMBIA 20005 \ncraig.glazer@pjm.com \nPJM \nInterconnection, \nL.L.C. \nArleigh P. Helfer \nSenior Counsel \nPJM Interconnection, \nL.L.C. \n2750 Monroe Boulevard \nAUDUBON, \nPENNSYLVANIA 19403 \narleigh.helfer@pjm.com \nPJM Power \nProviders Group \nGlen Thomas \n101 Lindenwood Drive \nSuite 225 \nMalvern, PENNSYLVANIA 19355 \nUNITED STATES \ngthomas@gtpowergroup.com \nDiane L Slifer \n101 LINDENWOOD DR \nSTE 225 \nMALVERN, \nPENNSYLVANIA 19355 \ndslifer@gtpowergroup.com \nPJM Power \nProviders Group \nLaura Chappelle \n6688 FOREST BEACH \nDR \nHOLLAND, MICHIGAN \n49423 \nlaurac@chappelleconsulti \nng.net"},{"page":205,"startToken":64413,"endToken":64533,"text":"Potomac Electric \nPower Company \nGary Guy \nAssistant General Counsel \nExelon Corporation \n701 Ninth Street, NW \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \ngary.guy@exeloncorp.com \nPPL Electric \nUtilities \nCorporation \nSteven Nadel \nPPL Services Corporation \n645 HAMILTON ST STE 700 \nALLENTOWN, PENNSYLVANIA \n18101 \nUNITED STATES \nSMNadel@pplweb.com \nPPL Electric \nUtilities \nCorporation \nJohn Longstreth \nK&L Gates LLP \n1601 K Street, NW \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \njohn.longstreth@klgates.com \nPPL Electric \nUtilities \nCorporation \nDonald Kaplan \nK&L Gates LLP \n1601 K Street, NW \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \ndon.kaplan@klgates.com \nPPL Electric \nUtilities \nCorporation \nWilliam Keyser \nSteptoe LLP \n1330 Connecticut Avenue, NW \nWashington, DISTRICT OF \nCOLUMBIA 20036-1795 \nUNITED STATES \nwkeyser@steptoe.com"},{"page":206,"startToken":64533,"endToken":64689,"text":"PSEG Power \nLLC \nViet Ngo \nAssociate Counsel, Federal Reg \nPublic Service Enterprise Group \nIncorporated \n601 New Jersey Ave, NW \nSuite 310 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nViet.Ngo@pseg.com \nJodi Moskowitz \nDeputy General Counsel \nand RTO \nPSEG Services \nCorporation \nStrategy Officer \n80 Park Plaza, T-20 \nNewark, NEW JERSEY \n07102 \nJodi.Moskowitz@ se .com \nPSEG Power \nLLC \nRobert E. Gardinor \nParalegal \nPSEG Services \nCorporation \n80 Park Plaza, T5 \nNewark, NEW JERSEY \n07102 \nRobert.Gardinor@pseg.co \nm \nPSEG \nCompanies \nViet Ngo \nAssociate Counsel, Federal Reg \nPublic Service Enterprise Group \nIncorporated \n601 New Jersey Ave, NW \nSuite 310 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nViet.Ngo@pseg.com \nJodi Moskowitz \nDeputy General Counsel \nand RTO \nPSEG Services \nCorporation \nStrategy Officer \n80 Park Plaza, T-20 \nNewark, NEW JERSEY \n07102 \nJodi.Moskowitz@pseg.com \nPSEG \nCompanies \nRobert E. Gardinor \nParalegal \nPSEG Services \nCorporation \n80 Park Plaza, T5 \nNewark, NEW JERSEY \n07102 \nRobert.Gardinor@pseg.co \nm"},{"page":207,"startToken":64689,"endToken":64829,"text":"PSEG Energy \nResources & \nTrade LLC \nViet Ngo \nAssociate Counsel, Federal Reg \nPublic Service Enterprise Group \nIncorporated \n601 New Jersey Ave, NW \nSuite 310 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nViet.Ngo@pseg.com \nJodi Moskowitz \nDeputy General Counsel \nand RTO \nPSEG Services \nCorporation \nStrategy Officer \n80 Park Plaza, T-20 \nNewark, NEW JERSEY \n07102 \nJodi.Moskowitz@pseg.com \nPSEG Energy \nResources & \nTrade LLC \nRobert E. Gardinor \nParalegal \nPSEG Services \nCorporation \n80 Park Plaza, T5 \nNewark, NEW JERSEY \n07102 \nRobert.Gardinor@pseg.co \nm \nPUBLIC \nCITIZEN, INC \nTyson Slocum \nEnergy Program Director \nPUBLIC CITIZEN, INC \n215 PENNSYLVANIA AVE SE \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20003 \nUNITED STATES \ntslocum@citizen.org \nPublic Service \nCommission of \nWest Virginia \nJacqueline Roberts \nFederal Policy Advisor, WV Pub \nWest Virginia Public Service \nCommission \n201 Brooks Street \nCharleston, WEST VIRGINIA 25301 \nUNITED STATES \njroberts@psc.state.wv.us"},{"page":208,"startToken":64829,"endToken":65008,"text":"Public Service \nElectric and Gas \nCompany \nViet Ngo \nAssociate Counsel, Federal Reg \nPublic Service Enterprise Group \nIncorporated \n601 New Jersey Ave, NW \nSuite 310 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nViet.Ngo@pseg.com \nJodi Moskowitz \nDeputy General Counsel \nand RTO \nPSEG Services \nCorporation \nStrategy Officer \n80 Park Plaza, T-20 \nNewark, NEW JERSEY \n07102 \nJodi.Moskowitz@pseg.com \nPublic Service \nElectric and Gas \nCompany \nRobert E. Gardinor \nParalegal \nPSEG Services \nCorporation \n80 Park Plaza, T5 \nNewark, NEW JERSEY \n07102 \nRobert.Gardinor@pseg.co \nm \nPublic Service \nElectric and Gas \nCompany \nJohn Shepherd \nSpecial Asst Attorney General \n2200 Pennsylvania Avenue \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20037 \nUNITED STATES \njshepherd@hunton.com \nJodi Moskowitz \nDeputy General Counsel \nand RTO \nStrategy Officer \n80 Park Plaza, T-20 \nNewark, NEW JERSEY \n07102 \nJodi.Moskowitz@pseg.com \nPublic Service \nElectric and Gas \nCompany \nBlake Grow \n2200 Pennsylvania \nAvenue, NW \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20037 \nbgrow@hunton.com \nRepsol Energy \nNorth America \nCorporation \nJordan Kirwin \nRegulatory Affairs \nRepsol Energy North America \nCorporation \n2455 Technology Forest Blvd. \nThe Woodlands, TEXAS 77381 \nUNITED STATES \njordan.kirwin@repsol.com"},{"page":209,"startToken":65008,"endToken":65177,"text":"Rockland \nElectric \nCompany \nJohn Longstreth \nK&L Gates LLP \n1601 K Street, NW \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \njohn.longstreth@klgates.com \nRockland \nElectric \nCompany \nJoshua Kirstein \nSenior Attorney \nConsolidated Edison Company of \nNew York, Inc. \nConsolidated Edison Co. of New \nYork, Inc. \n4 Irving Place-18th Floor \nNew York, NEW YORK 10003 \nUNITED STATES \nkirsteinj@coned.com \nJoshua A Kirstein \nSenior Attorney \nConsolidated Edison \nCompany of New York, \nInc. \nConsolidated Edison Co. \nof New York, Inc. \n4 Irving Place-18th Floor \nNew York, NEW YORK \n10003 \nkirsteinj@coned.com \nSebrina M. Greene \nAssociate General \nCounsel \nConsolidated Edison \nCompany of New York, \nInc. \n4 Irving Place \n18th Floor \nNew York, NEW YORK \n10003 \ngreenes@coned.com \nRockland \nElectric \nCompany \nSebrina Greene \nAssociate General Counsel \nConsolidated Edison Company of \nNew York, Inc. \n4 Irving Place \n18th Floor \nNew York, NEW YORK 10003 \nUNITED STATES \ngreenes@coned.com \nRockland \nElectric \nCompany \nNEELAM GALE-AHMAD \nParalegal \nCon Edison Company of \nNew York \n4 IRVING PL \nNEW YORK, NEW YORK \n10003 \ngaleahmadn@coned.com"},{"page":210,"startToken":65177,"endToken":65338,"text":"Rockland \nElectric \nCompany \nDana Lazarus \nDirector \nCon Edison Company of \nNew York \n4 Irving Place \nNew York, NEW YORK \n10003 \nlazarusd@coned.com \nRockland \nElectric \nCompany \nDavid C Burns \nProject Manager \nConsolidated Edison \nCompany of New York, \nInc. \nConsolidated Edison Co. \nof New York, Inc. \n4 Irving Place-18th Floor \nNew York, NEW YORK \n10003 \nburnsd@coned.com \nSan Diego Gas & \nElectric \nCompany \nJonathan Newlander \nAttorney \nSan Diego Gas & Electric Company \n8330 Century Park Ct \nSan Diego, CALIFORNIA 92123 \nUNITED STATES \nJNewlander@sdge.com \nPamela Mills \nRegulatory Affairs Mgr \nSan Diego Gas & Electric \n8330 Century Park \nsan diego, CALIFORNIA \n92122 \npmills@sdge.com \nShell Energy \nNorth America \n(US), L.P. \nSean Chang \nDirector, Regulatory Affairs \nShell Energy North America (US), \nL.P. \n1000 Main Street \nLevel 12 \nHouston, TEXAS 77002 \nUNITED STATES \nsean.chang@shell.com \nMatthew J. Picardi, ESQ \nVice President \nShell Energy North \nAmerica (US), L.P. \n36 Pinewood Ave. \nSaratoga Springs, NEW \nYORK 12866 \nMatthew.Picardi@shell.co \nm"},{"page":211,"startToken":65338,"endToken":65510,"text":"Shell Energy \nNorth America \n(US), L.P. \nShaela McNulty Collins \nS. Power Policy Adv., \nCorp. \nShell Energy North \nAmerica (U.S.), L.P. \n1050 K Street NW \nSuite 700 \nWashington, DISTRICT \nOF COLUMBIA 20001 \nshaela.collins@shell.com \nSierra Club \nJustin Vickers \nSenior Attorney \nSierra Club \nEnvironmental Law Program \n1229 W. Glenlake Ave. \nChicago, ILLINOIS 60660 \nUNITED STATES \njustin.vickers@sierraclub.org \nDorothy E Jaffe \nManaging Attorney \n50 F St NW \nWashington, DISTRICT \nOF COLUMBIA 20001 \ndori.jaffe@sierraclub.org \nSilver Run \nElectric, LLC \nMichael R. Engleman \n1717 K St. NW \nWashington, DISTRICT \nOF COLUMBIA 20006 \nmengleman@efenergylaw. \ncorn \nSilver Run \nElectric, LLC \nSharon Segner \nVice President \n1001 19th Street North \nSuite 1200 \nArlington, VIRGINIA \n22209 \nssegner@lspower.com \nSolar Energy \nIndustries \nAssociation \nMelissa Alfano \nManager of Regulatory Affairs \nSolar Energy Industries Association \n1425 K Street, N.W., Suite 1000 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nmalfano@seia.org \nBen Norris \nManager of Federal \nRegulatory \nSolar Energy Industries \nAssociation \n1425 K St NW \nWashington, DISTRICT \nOF COLUMBIA 20005 \nbnorris@seia.org"},{"page":212,"startToken":65510,"endToken":65690,"text":"Southern \nCalifornia \nEdison Company \nEllen Kenney \nSouthern California Edison \nCompany \n2244 WALNUT GROVE AVE \nROSEMEAD, CALIFORNIA 91770 \nUNITED STATES \nellen.kenney@sce.com \nFERC Case \nAdministration \nSouthern California \nEdison Company \n2244 WALNUT GROVE \nAVE \nROSEMEAD, \nCALIFORNIA 91770 \nferccaseadmin@sce.com \nSouthern \nMaryland \nElectric \nCooperative, Inc. \nJohn Rohrbach \nED Regulatory \n4140 W 99TH ST \nCARMEL, INDIANA 46032 \nUNITED STATES \nJRohrbach@acespower.com \nDamon Krieger \nVP, Legal Affairs, Deputy \nGen \n15035 Burnt Store Road \nP.O. Box 1937 \nHughesville, MARYLAND \n20637-1937 \nDamon.Krieger@SMECO. \ncoop \nSouthern \nMaryland \nElectric \nCooperative, Inc. \nMark MacDougall \nSenior Vice President and Gene \nPO Box 1937 \nHughesville,MARYLAND 20637- \n1937 \nUNITED STATES \nmark.macdougall@smeco.coop \nEugene Bradford \nVice President, Rates and \nEner \n15035 Burnt Store Rd. \nHughesville, MARYLAND \n20637 \nEugene.Bradford@smeco.c \noop \nSouthern \nMaryland \nElectric \nCooperative, Inc. \nDamon Krieger \nVP, Legal Affairs, Deputy Gen \nSouthern Maryland Electric \nCooperative, Inc. \n15035 Burnt Store Road \nP.O. Box 1937 \nHughesville, MARYLAND 20637- \n1937 \nUNITED STATES \nDamon.Krieger@SMECO.coop \nJohn Rohrbach \nED Regulatory \nACES POWER \nMARKETING \n4140 W 99TH ST \nCARMEL, INDIANA \n46032 \nJRohrbach@acespower.co \nm"},{"page":213,"startToken":65690,"endToken":65859,"text":"Southern \nMaryland \nElectric \nCooperative, Inc. \nEugene Bradford \nVice President, Rates and \nEner \nSOUTHERN \nMARYLAND ELECTRIC \nCOOP INC \n15035 Burnt Store Rd. \nHughesville, MARYLAND \n20637 \nEugene.Bradford@smeco.c \noop \nSustainable \nFERC Project \nTom Rutigliano \nSr. Advocate \nNRDC/FERC Project \n1124 15th St. NW \nSuite 300 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \ntrutigliano@nrdc.org \nTalen Energy \nCorporation \nJennifer Mansh \nSenior VP, Regulatory Counsel \nTalen Energy Corporation \n600 Hamilton Street \nSuite 600 \nAllentown, PENNSYLVANIA 18101 \nUNITED STATES \nJennifer.Mansh@talenenergy.com \nJacqueline Fleming \nContracts and Legal \nServices A \nTalen Energy Corporation \n600 Hamilton Street, \nSuite 600 \nAllentown, \nPENNSYLVANIA 18101 \njacqueline.fleming@talene \nnergy.com \nThe Dayton \nPower and Light \nCompany \nWilliam M Rappolt \nAssistant Gen. Counsel, \nFERC \n4300 WILSON BLVD \nARLINGTON, VIRGINIA \n22203 \nwilliam.rappolt@aes.com \nEvan K Dean, ESQ \nSenior Corporate Counsel \n76 S MAIN ST # A-GO-15 \nAKRON, OHIO 44308 \nedean@firstenergycorp.co \nm \nThe Potomac \nEdison Company \nMichael Kunselman \n1301 K Street, NW Suite 500 East \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nmichaelkunselman@dwt.com"},{"page":214,"startToken":65859,"endToken":66013,"text":"The Potomac \nEdison Company \nBradley R. Miliauskas \n1251 Avenue of the \nAmericas \n21st Floor \nNew York, NEW YORK \n10020 \nbradleymiliauskas@dwt.c \nom \nThe Potomac \nEdison Company \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nTricia S Hartzell \nFirstEnergy Legal \nSpecialist \nFirstEnergy Service \nCompany \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp. \ncom \nThe Potomac \nEdison Company \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nThe Retail \nEnergy Supply \nAssociation \nElizabeth Whittle \nPartner \nNixon Peabody LLP \n799 9TH ST NW STE 500 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \newhittle@nixonpeabody.com \nTrans-Allegheny \nInterstate Line \nCompany \nEvan Dean \nSenior Corporate Counsel \n76 S MAIN ST # A-GO-15 \nAKRON, OHIO 44308 \nUNITED STATES \nedean@firstenergycorp.com \nMorgan E. Parke \nAssociate General \nCounsel \n341 White Pond Dr. \nAkron, OHIO 44320 \nmparke@firstenergycorp.c \nom"},{"page":215,"startToken":66013,"endToken":66172,"text":"Trans-Allegheny \nInterstate Line \nCompany \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nTricia S Hartzell \nFirstEnergy Legal \nSpecialist \nFirstEnergy Service \nCompany \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp. \ncom \nTrans-Allegheny \nInterstate Line \nCompany \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nTransource West \nVirginia, LLC \nStacey Burbure \n801 Pennsylvania Avenue, NW \nWashington DC, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \nslburbure@aep.com \nJessica Cano \nSenior Counsel \n1 Riverside Plaza \nCOLUMBUS, OHIO \n43215 \njacano@aep.com \nUGI Utilities \nInc. \nLindsay Berkstresser \nCounsel — Energy & Regulatory \nUGI Corporation \n500 N. Gulph Road \nKing of Prussia, PENNSYLVANIA \n19406 \nUNITED STATES \nberkstresserl@ugicorp.com \nAlexandra Colaizzi \nUGI Utilities, Inc. \n1 UGI Drive \nDenver, \nPENNSYLVANIA 17517 \nacolaizzi@ugi.com \nUGI Utilities \nInc. \nJesse Tyahla \nDirector of Energy Supply \n& P1 \nUGI Utilities Inc. \n1 UGI Drive \nDenver, \nPENNSYLVANIA 17517 \njtyahla@ugi.com"},{"page":216,"startToken":66172,"endToken":66309,"text":"UGI Utilities \nInc. \nJamie Jowers \nSenior Manager, Energy \nSupply \nUGI Utilities Inc. \n1 UGI Drive \nDenver, \nPENNSYLVANIA 17517 \njharper@ugi.com \nUGI Utilities, \nInc. \nRichard Bonnifield \nPartner \n1801 PENNSYLVANIA AVE NW \nSTE 1000 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \nrichard.bonnifield@huschblackwell.c \nom \nMichael Swerling \nUGI Corporation \n460 N Gulph Road \nKing of Prussia, \nPENNSYLVANIA 19406 \nswerlingm@ugicorp.com \nUGI Utilities, \nInc. \nCorban Coffman \n2001 K Street N.W. \nWashington, DISTRICT \nOF COLUMBIA 20006 \nccoffman@akingump.com \nUNION OF \nCONCERNED \nSCIENTISTS \nMichael Jacobs \nSr. Energy Analyst \nUNION OF CONCERNED \nSCIENTISTS \n2 BRATTLE SQ \nCAMBRIDGE, MASSACHUSETTS \n02138 \nUNITED STATES \nmjacobs@ucsusa.org \nVC Renewables \nLLC \nJason Barker \nVP, Regulatory Affairs \nVitol Inc. \n931 Metfield Rd \nTowson, MARYLAND 21286 \nUNITED STATES \nbja@vcrenewables.com \nEdwin Cambero \nCompliance officer \n2925 RICHMOND AVE \nHOUSTON, TEXAS \n77098 \nenc@vitol.com"},{"page":217,"startToken":66309,"endToken":66456,"text":"Vermont Public \nPower Supply \nAuthority \nScott Strauss \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nScott.Strauss@spiegelmcd.com \nJeffrey A. Schwarz \nSpiegel & McDiarmid \nLLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20036 \njeffrey.schwarz@spiegelm \ncd.com \nVermont Public \nPower Supply \nAuthority \nKenneth A. Nolan \nGeneral Manager \nVermont Public Power \nSupply Authority \n5195 Waterbury-Stowe \nRoad \nPO Box 126 \nWaterbury Center, \nVERMONT 05677 \nknolan@vppsa.com \nVermont Public \nPower Supply \nAuthority \nE Service \nSpiegel & McDiarmid \nLLP \n1818 N ST NW STE 800 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20036 \neService@spiegelmcd.com \nVirginia Electric \nand Power \nCompany \nKathryn Gantley \nCounsel \n400 N CAPITOL ST NW STE 875 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nkathryn.gantley@dominionenergy.co \nm \nJason B Lazos \nContracts Administrator \nIII \n201 West Blvd. \nWilliamston, NORTH \nCAROLINA 27892 \nJason.B.Lazos@dominione \nnergy.com"},{"page":218,"startToken":66456,"endToken":66630,"text":"Virginia State \nCorporation \nCommission \nFrederick Ochsenhirt \nLegal Advisor to the Commissio \nVirginia State Corporation \nCommission \n1300 E MAIN ST \nRICHMOND, VIRGINIA 23219 \nUNITED STATES \nfrederick.ochsenhirt@scc.virginia.go \nv \nVistra Corp. \nNicholas Gladd \nWilson Sonsini Goodrich & Rosati, \nP.C. \n201 Washington St. \nSuite 2000 \nBoston, MASSACHUSETTS 02108 \nUNITED STATES \nngladd@wsgr.com \nSarah Greenberg \nWilson Sonsini Goodrich \n& Rosati \n1700 K ST NW FL 5 \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20006 \nsgreenberg@wsgr.com \nAndrew Weinstein \nDirector of ISO-NE \nMarkets \nVistra Corp. \n325 7th Street, NW \nWASHINGTON, \nDISTRICT OF \nCOLUMBIA 20004 \nandrew.weinstein@vistrac \norp.com \nVistra Corp. \nJ. Arnold Quinn \nINDIVIDUAL \n325 7th Street, N.W \nSuite 520 \nWashington, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \narnie.quinn@vistracorp.com \nVitol Inc. \nSeth Cochran \nHead of Strategic Market Polic \nVitol Inc. \n2925 RICHMOND AVE \nHOUSTON, TEXAS 77098 \nUNITED STATES \nsco@vitol.com \nEdwin Cambero \nCompliance officer \n2925 RICHMOND AVE \nHOUSTON, TEXAS \n77098 \nenc@vitol.com \nVoltus, Inc. \nKimaya Abreu \nVoltus \nVoltus, Inc. \n2443 Fillmore Street \n#380-3427 \nSan Francisco, CALIFORNIA 94115 \nUNITED STATES \nkabreu@voltus.co"},{"page":219,"startToken":66630,"endToken":66783,"text":"Vote Solar \nNathan Phelps \nVote Solar \n131 FARMHOLME RD \nSTONINGTON, CONNECTICUT \n06378 \nUNITED STATES \nnathan@votesolar.org \nWabash Valley \nPower \nAssociation, Inc. \nJohn Adragna \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nJadragna@mccarter.com \nJeremy L. Fetty \n6702 Intech Blvd. \nIndianapolis, INDIANA \n46278 \nJ_fetty@wvpa.com \nWabash Valley \nPower \nAssociation, Inc. \nF. Alvin Taylor \nAttorney \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nataylor@mccarter.com \nRandolph L. Elliott \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT \nOF COLUMBIA 20005 \nrelliott@mccarter.com \nWabash Valley \nPower \nAssociation, Inc. \nJeremy Fetty \nParr Richey Obremskey & Morton \n6702 Intech Blvd. \nIndianapolis, INDIANA 46278 \nUNITED STATES \nJJetty@wvpa.com \nWheeling Power \nCompany \nWilliam Johnson \nSenior Counsel \n1 Riverside Plaza \n23rd Floor \nColumbus, OHIO 43061 \nUNITED STATES \nwejohnson@aep.com \nJulie Sherwood \n1 Riverside Plaza \nFloor 28 \nColumbus, OHIO 43215 \njasherwood@aep.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":7,"endAt":0,"startToken":0,"endToken":704},{"p":7,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":8,"endAt":0,"startToken":704,"endToken":804},{"p":8,"at":0,"title":"ATTACHMENT A","method":"printed heading","endPage":12,"endAt":1831,"startToken":804,"endToken":2016},{"p":12,"at":1831,"title":"I. Background","method":"printed heading","endPage":12,"endAt":1847,"startToken":2016,"endToken":2018},{"p":12,"at":1847,"title":"A. Show Cause Order","method":"printed heading","endPage":15,"endAt":439,"startToken":2018,"endToken":3021},{"p":15,"at":439,"title":"B. Behind the Meter Generation","method":"printed heading","endPage":16,"endAt":857,"startToken":3021,"endToken":3513},{"p":16,"at":857,"title":"C. Eligible Customer","method":"printed heading","endPage":18,"endAt":40,"startToken":3513,"endToken":3981},{"p":18,"at":40,"title":"II. PJM's Answer to Show Cause Order and Responsive Pleadings\"","method":"printed heading","endPage":18,"endAt":105,"startToken":3981,"endToken":3991},{"p":18,"at":105,"title":"A. PJM's Options for Co-Location Arrangements","method":"printed heading","endPage":21,"endAt":1846,"startToken":3991,"endToken":5490},{"p":21,"at":1846,"title":"B. General","method":"printed heading","endPage":23,"endAt":357,"startToken":5490,"endToken":6009},{"p":23,"at":357,"title":"C. Jurisdiction","method":"printed heading","endPage":31,"endAt":1764,"startToken":6009,"endToken":9301},{"p":31,"at":1764,"title":"D. Cost Allocation","method":"printed heading","endPage":51,"endAt":1157,"startToken":9301,"endToken":17221},{"p":51,"at":1157,"title":"E. Interconnection Procedures and Cost Allocation","method":"printed heading","endPage":60,"endAt":1280,"startToken":17221,"endToken":20588},{"p":60,"at":1280,"title":"Attachment M-3 was designed for supplemental transmission projects, not load","method":"printed heading","endPage":64,"endAt":1907,"startToken":20588,"endToken":22205},{"p":64,"at":1907,"title":"F. PJM Capacity Market Reliability. and Resource Adequacy","method":"printed heading","endPage":72,"endAt":993,"startToken":22205,"endToken":25284},{"p":72,"at":993,"title":"G. Other Arguments","method":"printed heading","endPage":75,"endAt":995,"startToken":25284,"endToken":26509},{"p":75,"at":995,"title":"III. Notice of Show Cause Proceeding and Responsive Pleadings","method":"printed heading","endPage":77,"endAt":544,"startToken":26509,"endToken":27208},{"p":77,"at":544,"title":"IV. Discussion","method":"printed heading","endPage":77,"endAt":561,"startToken":27208,"endToken":27210},{"p":77,"at":561,"title":"A. Procedural Matters","method":"printed heading","endPage":77,"endAt":1434,"startToken":27210,"endToken":27356},{"p":77,"at":1434,"title":"B. Substantive Matters","method":"printed heading","endPage":148,"endAt":1357,"startToken":27356,"endToken":55557},{"p":148,"at":1357,"title":"Conclusion","method":"printed heading","endPage":150,"endAt":0,"startToken":55557,"endToken":55686},{"p":150,"at":0,"title":"ATTACHMENT B","method":"printed heading","endPage":153,"endAt":0,"startToken":55686,"endToken":56162},{"p":153,"at":0,"title":"ATTACHMENT C: SERVICE LIST","method":"printed heading","endPage":174,"endAt":814,"startToken":56162,"endToken":59632},{"p":174,"at":814,"title":"F. Alvin Taylor","method":"printed heading","endPage":190,"endAt":381,"startToken":59632,"endToken":62034},{"p":190,"at":381,"title":"F. Alvin Taylor","method":"printed heading","endPage":199,"endAt":617,"startToken":62034,"endToken":63445},{"p":199,"at":617,"title":"F. Alvin Taylor","method":"printed heading","endPage":219,"endAt":421,"startToken":63445,"endToken":66689},{"p":219,"at":421,"title":"F. Alvin Taylor","method":"printed heading","endPage":219,"endAt":1080,"startToken":66689,"endToken":66783}]}
