{"document":{"slug":"rec-20260520-5275","title":"PJM Interconnection, L.L.C. submits third supplemental Informational Report re timeline for stakeholder deliberation on the reliability backstop procurement…","issued":"2026-05-20","accession":"20260520-5275","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/filings/text/20260520-5275_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260520-5275","tier":"record","sha256":"252485f01ff9d064cc4b4b954829173137afc2ac11a066891ff2198b474e4df1","pages":6,"tokens":1207,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":243,"text":"PJM Interconnection, L.L.C. \n2750 Monroe Blvd \nAudubon, PA 19403 \n \nDaniel Vinnik \nCounsel \nT: (267) 858-9451 \nDaniel.Vinnik@pjm.com \nMay 20, 2026 \n \nHonorable Debbie-Anne A. Reese  \nSecretary  \nFederal Energy Regulatory Commission \n888 First Street, N.E. Room 1A \nWashington, D.C.  20426 \n \nRe: \nPJM Interconnection L.L.C., Docket Nos. EL25-49-000 and -001 \nThird Supplemental Informational Report \n \nDear Secretary Reese: \n \nAs referenced in the previous supplemental informational reports of PJM Interconnection, \nL.L.C. (“PJM”),1 PJM submits this third supplemental informational filing to update the Federal \nEnergy Regulatory Commission (“Commission”) regarding the timeline for stakeholder \ndeliberation on the reliability backstop procurement mechanism.  \nI. \nINFORMATIONAL FILING \nSince the March 9, 2026 second supplemental informational report, PJM has continued to \ndiscuss the framework of a reliability backstop procurement mechanism with stakeholders.  \nThrough these stakeholder workshops, it has become apparent that issues of reliability backstop \nprocurement and the connect and manage framework, which is meant to assign any shortfall in \nsupply to entities that are interconnecting new large-load customers, are too substantively linked \nto continue to be discussed in separate stakeholder processes.  As a result, the PJM Board is \n \n1 PJM Interconnection, L.L.C., Second Supplemental Informational Report, Docket No. EL25-49-000, at 2 (Mar. 9, \n2026) (pledging to notify the Commission of changes to the anticipated timeline for developing the updated \nreliability backstop procurement mechanism); PJM Interconnection, L.L.C., Supplemental Informational Report, \nDocket No. EL25-49-000, at 3 (Feb. 23, 2026) (same)."},{"page":2,"startToken":243,"endToken":488,"text":"Honorable Debbie-Anne A. Reese, Secretary \nMay 20, 2026 \nPage 2 of 2 \n \n2 \n \nextending the scope of its already initiated Critical Issue Fast Path (“CIFP”) regarding reliability \nbackstop procurement to include the already approved connect and manage issue charge as well.2  \nBased on the discussions to date, PJM plans to develop a comprehensive reliability \nbackstop proposal for stakeholder consideration by the end of June.  PJM plans to file a finalized \nproposal with the Commission shortly thereafter with the goal of procuring any shortfall resulting \nfrom the upcoming Base Residual Auction through a centralized procurement in September 2026.   \nII. \nCONCLUSION \nPJM pledges to keep the Commission informed of the timeline for submission of a filing \nto the Commission if changes to the current timeline become necessary.  PJM appreciates the \nCommission and stakeholders’ dedication and engagement on this matter. \n \nRespectfully submitted, \n/s/ Daniel Vinnik \nCraig Glazer \nVice President – Federal Government Policy \nPJM Interconnection, L.L.C. \n1200 G Street, N.W. \nSuite 600 \nWashington, D.C. 20005 \n(202) 423-4743 \nCraig.Glazer@pjm.com \n \nDaniel Vinnik \nCounsel \nPJM Interconnection, L.L.C. \n2750 Monroe Boulevard \nAudubon, PA* 19403 \n*(Licensed in the District of \nColumbia and Illinois) \n(267) 858-9451 \nDaniel.Vinnik@pjm.com  \n \n \n \nOn behalf of \nPJM Interconnection, L.L.C. \n \n2 See Attachment A, PJM Board Letter; PJM Issue Charge, Implementation of Connect and Manage Framework for \nLarge Load Interconnections, https://www.pjm.com/-/media/DotCom/committees-groups/task-\nforces/camstf/2026/20260331/20260331-item-02---1-connect-and-manage-framework-for-large-load-\ninterconnections---issue-charge.pdf."},{"page":3,"startToken":488,"endToken":552,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this 20th day of May, 2026 caused a copy of the foregoing \ndocument to be served upon each person designated on the official service list compiled by the \nSecretary in this proceeding. \n/s/ Daniel Vinnik \nDaniel Vinnik \nCounsel \nPJM Interconnection, L.L.C. \n2750 Monroe Boulevard \nAudubon, PA 19403 \n(267) 858-9451 \nDaniel.Vinnik@pjm.com"},{"page":4,"startToken":552,"endToken":554,"text":"Attachment A"},{"page":5,"startToken":554,"endToken":1031,"text":"610.666.8980 | www.pjm.com \nPaula Conboy \nChair, PJM Board of Managers \nPJM Interconnection \n2750 Monroe Blvd. \nAudubon, PA 19403 \nMay 19, 2026 \nReliability Backstop Procurement / Connect and Manage \nDear Stakeholders, \nThe PJM Board of Managers (Board) would like to express appreciation for stakeholder participation in the \ndiscussion of two Board decisional items resulting from the Critical Issue Fast Path (CIFP) Large Load Addition \nstakeholder process – the Reliability Backstop Procurement (Backstop) and Connect and Manage (C&M). In the \ninterest of utmost transparency, the Board would like to provide you with its current thinking on both items. \nFirst, it has become clear that the Backstop and C&M are too substantively linked to continue to be discussed in \nseparate stakeholder processes. Data center participation in the Backstop, whether through the proposed bilateral \nframework or the centralized procurement, is meant to remove that load from C&M consideration. With two separate \nstakeholder processes moving on two separate timelines, the melding of these efforts may not be seamless. Thus, \nthe Board is using its authority under PJM Manual 34 to extend the scope of its already initiated CIFP on the \nBackstop to include the already approved PJM C&M Issue Charge. The Exelon C&M Issue Charge relating to \ntransmission availability will remain in the Connect and Manage Senior Task Force and a new work plan will be \ndeveloped to advance that effort.   \nSecond, the Board believes that PJM should proceed with its proposed framework for the Backstop – allow discrete \ntime for bilateral contracting between willing buyers and sellers while also timely executing a centralized \nprocurement. However, the Board believes that it should expedite the conduct of the centralized procurement. \nAccelerating the centralized procurement recognizes that certainty in C&M is necessary to better support bilateral \ntransactions, but that final certainty, recognizing the potential for rehearing requests and court challenge, may not \nbe available until sometime in 2027. Waiting until 2027 to execute the centralized procurement, considering the \npace of demand from new large loads, presents a heightened reliability risk to PJM. Procuring the shortfall resulting \nfrom the upcoming Base Residual Auction through a centralized procurement in September 2026 will mitigate the \nnear-term reliability risk while not precluding future bilateral contracting opportunities for additional resources to fulfill \nnew large load demand for future delivery years.  \nFurther, PJM recently released its white paper Powering Reliability Through Market Design (PDF). PJM executing \non the centralized procurement sooner will allow PJM and stakeholders to devote their collective focus to the \nevolution of our markets and allow for a more rapid return to market fundamentals. For these reasons, and again, in \nthe interest of transparency, stakeholders should expect to see the next iteration of PJM’s proposal to include this \nmore accelerated centralized procurement time frame in tandem with changes necessary to effectuate the \nincorporation of C&M into PJM’s original Backstop proposal."},{"page":6,"startToken":1031,"endToken":1207,"text":"May 19, 2026 \nPage 2 \n \n610.666.8980 | www.pjm.com \nThird, PJM sent a correspondence to each of our governors last week requesting that they immediately start work on \ntheir commitment to allocate costs to data centers. After PJM runs the Backstop procurement, if states have not \nestablished frameworks to appropriately allocate costs to new data center loads, it is unclear to which customers those \ncosts would be assigned. Absent appropriate safeguards, it is possible that these costs will be allocated to other \nconsumers in the states, including residential consumers. We reiterate our ask here as PJM does not have the \nauthority to allocate costs directly to retail customers. \nA revised CIFP schedule combining the Backstop and C&M will be published shortly. We do know for certain that we \nwill not be conducting CIFP Stage 4 and holding a Special MC on May 27, and may instead use that date for an \nadditional CIFP meeting as we continue to receive refined proposals and feedback from stakeholders. \nSincerely, \n \nPaula Conboy \nChair, PJM Board of Managers"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":764,"startToken":0,"endToken":105},{"p":1,"at":764,"title":"I. INFORMATIONAL FILING","method":"printed heading","endPage":2,"endAt":656,"startToken":105,"endToken":341},{"p":2,"at":656,"title":"II. CONCLUSION","method":"printed heading","endPage":3,"endAt":0,"startToken":341,"endToken":488},{"p":3,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":4,"endAt":0,"startToken":488,"endToken":552},{"p":4,"at":0,"title":"Attachment A","method":"printed heading","endPage":6,"endAt":1068,"startToken":552,"endToken":1207}]}