{"document":{"slug":"rec-20260528-5222-2","title":"Attachment A_Reply Testimony of Lance Schafer (Final 5.28.2026)","issued":"2026-05-28","accession":"20260528-5222","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"attachment","file":"sources/filings/text/20260528-5222_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260528-5222","tier":"record","parent":"rec-20260528-5222","sha256":"dbab9783e83bbad882a6b250b8a36f85d2caa6c8a8c3113d0c8fefd35eb16488","pages":14,"tokens":3641,"emptyPages":[14],"textThemes":["study","cost","colo"]},"pages":[{"page":1,"startToken":0,"endToken":229,"text":"Attachment A \nPage 1 of 13 \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C., et al.   \n)  \nDocket No. EL25-49-000 \n)  \nDocket No. EL25-49-001 \n) \nLarge Loads Co-Located at Generating Facilities  \n) \nDocket No. AD24-11-000 \n) \nConstellation Energy Generation, LLC  \n)  \nDocket No. EL25-20-000 \nv.  \n \n) \nPJM Interconnection, L.L.C.   \n)  \n(Consolidated) \nREPLY TESTIMONY \nOF \nLANCE SCHAFER \nI.\nINTRODUCTION  \n1 \nQ.  \nPlease state your name, title, business address, and provide your professional \n2 \nbackground and relevant experience. \n3 \nA. \nMy name is Lance Schafer, and my business address is 293 Boston Post Road West, \n4 \nMarlborough, MA 01752. I am a Senior Project Manager with Concentric Energy \n5 \nAdvisors, Inc. My professional background and relevant experience was provided as \n6 \nExhibit No. PTO-0002 to the Indicated PJM Transmission Owners’ Initial Brief filed on \n7 \nFebruary 23, 2026 in these proceedings. \n8 \nQ. \nHave you previously submitted testimony in these proceedings? \n9 \nA. \nYes. I submitted testimony on behalf of the Indicated PJM Transmission Owners (“PJM \n10 \nTransmission Owners”)1 as part of the Direct Joint Testimony filed on February 23, 2026, \n11 \nand as part of the Joint Rebuttal Testimony filed on April 24, 2026 in these proceedings. \n12 \n1\nFor purposes of this reply testimony and the accompanying answer, the PJM Transmission Owners are:  \nAmerican Electric Power Service Corporation on behalf of its affiliates, Appalachian Power Company, Indiana"},{"page":2,"startToken":229,"endToken":625,"text":"Attachment A \nPage 2 of 13 \nII.\nBACKGROUND \n1 \nQ. \nWhat is the background of this proceeding? \n2 \nA. \nOn December 18, 2025, the Commission issued its order in PJM Interconnection. L.L.C., \n3 \n193 FERC ¶ 61,217 (2025) (“Order”). In the Order, the Commission found that PJM \n4 \nInterconnection, L.L.C.’s (“PJM”) Open Access Transmission Tariff (“Tariff”) “is unjust \n5 \nand unreasonable because it does not contain provisions addressing with sufficient clarity \n6 \nor consistency the rates, terms, and conditions of service that apply to generators serving \n7 \nCo-Located Load and Eligible Customers taking transmission service on behalf of Co-\n8 \nLocated Load.”2 Specifically, the Commission found PJM’s Tariff “unjust and \n9 \nunreasonable because it does not include types of transmission service that reflect Eligible \n10 \nCustomers taking service on behalf of Co-Located Loads that are willing and able to limit \n11 \ntheir use of the transmission system under certain conditions.”3\n12 \nThe Commission ordered PJM to offer three new forms of transmission service \n13 \nunder its Tariff, and identified these three new forms of transmission service as: (i) Firm \n14 \nContract Demand transmission service; (ii) Non-Firm Contract Demand transmission \n15 \nMichigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling \nPower Company, AEP Appalachian Transmission Company, Inc., AEP Indiana Michigan Transmission Company, \nInc., AEP Kentucky Transmission Company, Inc., AEP Ohio Transmission Company, Inc., and AEP West Virginia \nTransmission Company, Inc.; The Dayton Power and Light Company d/b/a AES Ohio; Dominion Energy Services, \nInc. on behalf of Virginia Electric and Power Company d/b/a Dominion Energy Virginia; Duke Energy Business \nServices, LLC for Duke Energy Kentucky, Inc. and Duke Energy Ohio, Inc.; Duquesne Light Company; East \nKentucky Power Cooperative, Inc.; Exelon Corporation on behalf of its affiliates Atlantic City Electric Company, \nBaltimore Gas and Electric Company, Commonwealth Edison Company, Commonwealth Edison Company of \nIndiana, Inc., Delmarva Power & Light Company, PECO Energy Company, and Potomac Electric Power Company; \nFirstEnergy Service Company, on behalf of its affiliates American Transmission Systems, Incorporated, Jersey Central \nPower & Light Company, Mid-Atlantic Interstate Transmission LLC, The Potomac Edison Company, Monongahela \nPower Company, Keystone Appalachian Transmission Company, and Trans-Allegheny Interstate Line Company \n(collectively, the “FirstEnergy Companies”); PPL Electric Utilities Corporation; Public Service Electric and Gas \nCompany; Rockland Electric Company; and the Southern Maryland Electric Cooperative. \n2\nOrder at P 2. \n3\nId."},{"page":3,"startToken":625,"endToken":911,"text":"Attachment A \nPage 3 of 13 \nservice; and (iii) interim, non-firm transmission service.4 The Commission also established \n1 \na paper hearing to determine the just and reasonable rates, terms, and conditions for these \n2 \nnew transmission services.5\n3 \nIII.\nPURPOSE OF TESTIMONY \n4 \nQ. \nWhat is the purpose of your testimony?  \n5 \nA.   \nThe purpose of my testimony is to support the Answer of the PJM Transmission Owners \n6 \nsubmitted in response to the Motion for Leave and Answer of Constellation Energy \n7 \nGeneration, LLC (“Constellation”) filed on May 11, 2026 in these proceedings. In \n8 \nparticular, I respond to the Reply Testimony of Zachary Ming, filed on behalf of \n9 \nConstellation on May 11, 2026. Mr. Ming’s testimony replies to the PJM Transmission \n10 \nOwners’ April 24, 2026 Reply Brief, including specifically the Joint Rebuttal Testimony \n11 \nthat accompanied that Reply Brief concerning the PJM Transmission Owners’ proposal for \n12 \ncalculating a Grid Reliance Charge. \n13 \nIV.\nREBUTTAL TO MR. MING’S REPLY TESTIMONY ON THE GRID RELIANCE \n14 \nCHARGE \n15 \nQ. \nWhat is the Grid Reliance Charge? \n16 \nA. \nThe PJM Transmission Owners are proposing to charge a Grid Reliance Charge to Eligible \n17 \nCustomers6 taking the new Contract Demand services based on the difference between the \n18 \namount of their firm contract demand for Firm Contract Demand Service and their total \n19 \n(gross) on-site load. The proposed Grid Reliance Charge is designed to reflect the costs of \n20 \nusing the transmission system to deliver black start and regulation services, as well as \n21 \n4\nId. at P 160. \n5\nId. at PP 2, 194. \n6\nCapitalized terms that are not otherwise defined shall have the meanings set forth in the PJM Tariff."},{"page":4,"startToken":911,"endToken":1217,"text":"Attachment A \nPage 4 of 13 \nproviding the inherent benefits that all customers, including Contract Demand customers, \n1 \nreceive as a result of their synchronization to and reliance on the grid. The Grid Reliance \n2 \nCharge also recognizes the costs associated with the operations, maintenance, and other \n3 \nactivities that PJM transmission owners will need to perform for the grid and to \n4 \naccommodate the increased number of protection schemes that will be required for Co-\n5 \nLocated Load customers.   \n6 \nQ. \nHow do the PJM Transmission Owners propose to calculate the Grid Reliance \n7 \nCharge? \n8 \nA. \nThe PJM Transmission Owners propose to calculate a Grid Reliance Charge for each PJM \n9 \nzone based on determining an average fixed percentage of the portion of transmission \n10 \ndepreciation and operations and maintenance expense associated with providing grid \n11 \nreliance services, and then applying that average fixed percentage to each PJM \n12 \nTransmission Owner’s Attachment H annual transmission revenue requirement.   \n13 \nQ. \nMr. Ming claims that the PJM Transmission Owners “fail to address the fundamental \n14 \nshortcoming of their proposal – a transmission system built only to deliver ancillary \n15 \nservices would be nowhere near as large or expensive as a transmission system built \n16 \nto serve peak demand.”7  Do you agree? \n17 \nA. \nNo. Mr. Ming’s claim is incorrect. First, Mr. Ming continues to assume, erroneously, that \n18 \nthe sole purpose of the Grid Reliance Charge is to recover costs associated with the delivery \n19 \nof ancillary services. As I have explained, the Grid Reliance Charge is not limited to \n20 \nrecovering the costs associated with the delivery of ancillary services, but rather is intended \n21 \nto reflect the full suite of benefits that Co-Located Load will receive by virtue of the fact \n22 \n7\nReply Testimony of Zachary Ming at 9:14-16 (“Ming Reply Testimony”)."},{"page":5,"startToken":1217,"endToken":1509,"text":"Attachment A \nPage 5 of 13 \nthat it will be interconnected to the integrated transmission system, and not islanded. Mr. \n1 \nMing simply ignores these benefits, which as I discussed in my previous testimony include  \n2 \ndelivering ancillary services and a suite of essential reliability services, such as frequency \n3 \nsupport, inertia, voltage stability, fault current capability, ride-through and protection \n4 \ncoordination, and providing sufficient short-circuit capability.   \n5 \nMr. Ming’s other conceptual critique regarding the alleged unprecedented nature \n6 \nof the Transmission Owners’ proposal fares no better. The Contract Demand Transmission \n7 \nServices that the Commission has directed here are themselves based on the novel premise \n8 \nthat load will connect to the system and take transmission service without the transmission \n9 \nprovider identifying and constructing upgrades to facilitate the full amount of load. Thus, \n10 \nthe design of the Grid Reliance Charge reflects the unique circumstances of this \n11 \nproceeding, and the transmission services that the Commission has directed here.   \n12 \nFinally, Mr. Ming’s attempt to distinguish his proposal from the PJM Transmission \n13 \nOwners’ on the basis that his is somehow more “principled” rather than what he \n14 \ncharacterizes as an “improvised” approach by the Transmission Owners is spurious.8 As I \n15 \nexplained in my previous testimony, and discuss further below, Mr. Ming’s “minimum \n16 \nsystem” methodology has no relevance here, and even if it did, his proposed application is \n17 \nflawed and superficial. Thus, it is Mr. Ming who is attempting to defend what is clearly a \n18 \ncontrived effort by Constellation to attempt to minimize the Grid Reliance Charge in order \n19 \nto reduce their own costs at the expense of other ratepayers.      \n20 \n21 \n22 \n8\nMing Reply Testimony at 10:16-21, 12:11-12, 18:1-3."},{"page":6,"startToken":1509,"endToken":1810,"text":"Attachment A \nPage 6 of 13 \nQ. \nDoes Mr. Ming offer an alternative to the PJM Transmission Owners’ method for \n1 \ncalculating the Grid Reliance Charge? \n2 \nA. \nYes. Although Mr. Ming supports the application of a Grid Reliance Charge, he continues \n3 \nto argue that the Commission should reject the PJM Transmission Owners’ Grid Reliance \n4 \nCharge and adopt a charge based on the “minimum system method.”   \n5 \nQ. \nMr. Ming states that your April 24, 2026 Joint Rebuttal Testimony reflects a \n6 \nmisunderstanding of the minimum system method and how its results should be \n7 \nused.9  How do you respond? \n8 \nA. \nMr. Ming is incorrect. Mr. Ming’s statement is in reaction to my criticism that his \n9 \nrecommended 6.2% minimum system percentage only includes certain plant balances and \n10 \ndoes not include any other element typically included in a transmission revenue \n11 \nrequirement, such as rate of return, taxes, depreciation, and operation and maintenance \n12 \nexpense.10 I pointed this out in response to Mr. Ming’s argument that the PJM Transmission \n13 \nOwners’ proposal was deficient because it excluded certain cost of service components, \n14 \nsuch as rate of return and taxes.   \n \n15 \nMr. Ming’s result is the ratio of his calculated minimum system plant amount to \n16 \nthe total plant amount for the accounts he included in his study. A plant ratio is indeed \n17 \nconsistent with the expected output of a distribution minimum system study. However, Mr. \n18 \nMing then takes this plant ratio, whose purpose is only to identify the minimum-system-\n19 \nrelated portions of certain plant accounts, and applies it to the entire transmission revenue \n20 \n9\nMing Reply Testimony at 17:3-12. \n10\nSee Joint Rebuttal Testimony of Peter Blazunas, Lance Schafer, and Hanhan Hammer, Exhibit No. PTO-\n0005 at 26."},{"page":7,"startToken":1810,"endToken":2115,"text":"Attachment A \nPage 7 of 13 \nrequirement. This is methodologically unsound because the results of a minimum-system \n1 \nstudy are not intended to be applied to a revenue requirement.  \n2 \nQ. \nIf the result of a minimum system study is not intended to be applied to a revenue \n3 \nrequirement, why does Mr. Ming use the result for this purpose?   \n4 \nA. \nMr. Ming incorrectly believes that the purpose of a minimum system study is to produce a \n5 \nresult that can be applied to a revenue requirement.  He states that “[t]he minimum system \n6 \nuses the ratio of replacement costs for both the minimum system and actual system to \n7 \nidentify what portion of the entire revenue requirement is attributable to the minimum \n8 \nsystem. It does not omit any element of the revenue requirement.”11 However, as noted just \n9 \nabove, Mr. Ming’s recommended 6.2% minimum system percentage was calculated by \n10 \ncomparing gross plant amounts in certain plant accounts. Mr. Ming is therefore taking a \n11 \nratio that he developed from studying certain gross-plant account balances and applying \n12 \nthat ratio to the entire revenue requirement. But a gross-plant ratio is not directly applicable \n13 \nto the entire revenue requirement.  \n14 \nQ. \nDoes the minimum system method use either book cost or replacement cost to \n15 \ndetermine the minimum system portion of the accounts included in the minimum \n16 \nsystem study? \n17 \nA. \nPlant balances developed either on a book-cost or replacement-cost basis are used to \n18 \ncompare the “minimum system” plant balances with the total plant balances for the \n19 \naccounts included in the study. This is done to determine the percentage of plant in those \n20 \nspecific accounts associated with the minimum system. However, contrary to Mr. Ming’s \n21 \n11\nMing Reply Testimony at 17:5-9 (emphasis added)."},{"page":8,"startToken":2115,"endToken":2423,"text":"Attachment A \nPage 8 of 13 \nassertions, the minimum system study does not develop a result that appropriately describes \n1 \nthe minimum-system portion of the entire revenue requirement.   \n2 \nQ. \nDoes the National Association of Regulatory Utility Commissioner’s Electric Cost \n3 \nAllocation Manual (“NARUC Manual”) state that the purpose of the minimum \n4 \nsystem method is to develop a result that can be applied to a revenue requirement?\n5 \nA. \nNo. The NARUC Manual clearly explains that the minimum system method’s  purpose is \n6 \nto classify distribution plant. The NARUC Manual states the following: \n7 \nClassifying distribution plant with the minimum-size method assumes that a \n8 \nminimum size distribution system can be built to serve the minimum loading \n9 \nrequirements of the customer. The minimum-size method involves determining the \n10 \nminimum size pole, conductor, cable, transformer, and service that is currently \n11 \ninstalled by the utility. Normally, the average book cost for each piece of equipment \n12 \ndetermines the price of all installed units. Once determined for each primary plant \n13 \naccount, the minimum size distribution system is classified as customer-related \n14 \ncosts. The demand-related costs for each account are the difference between the \n15 \ntotal investment in the account and customer-related costs.12\n16 \n17 \nThe minimum system study, as explained above, serves to classify portions of certain \n18 \naccounts as either customer (i.e., pertaining to the minimum distribution system) or demand \n19 \nrelated. Mr. Ming’s result of 6.2% merely means that, of the plant accounts included in his \n20 \nstudy, he determined that 6.2% of the balances are related to a hypothetical minimum \n21 \nsystem. Therefore, Mr. Ming’s calculation does not represent true revenue requirement for \n22 \nthe minimum system represented by that 6.2%.   \n23 \n24 \n25 \n12\nNational Association of Regulatory Utility Commissioners, Electric Cost Allocation Manual (Jan. 1992), at \n90-91."},{"page":9,"startToken":2423,"endToken":2798,"text":"Attachment A \nPage 9 of 13 \nQ. \nIn addition to the NARUC Manual, do any other commonly referenced works of cost \n1 \nallocation describe the purpose of the minimum system study? \n2 \nA. \nYes. Lawrence J. Vogt’s commonly referenced book Electricity Pricing, Engineering \n3 \nPrinciples and Methodologies also describes that the purpose of the minimum system study \n4 \nis to classify certain plant as either demand or customer related.  It adds:  \n5 \n[O]n the principle of cost causation, some distribution facilities can be classified as \n6 \npurely demand related, while other distribution facilities can be classified as purely \n7 \ncustomer related. A substantial amount of distribution plant investment has cost \n8 \ncausation attributes of both demand and customer cost components. For instance, a \n9 \nline transformer is both customer related and demand related as it provides both a \n10 \nload and a no-load function. This distinction is derived through a minimum \n11 \ndistribution system analysis of poles, conductors and a variety of line equipment . . \n12 \n. .”13\n13 \n14 \nNeither Mr. Vogt’s book nor the NARUC Manual, nor any other industry manual on cost \n15 \nallocation that I am aware of, supports the notion that the purpose of the minimum system \n16 \nstudy is to produce a ratio that can be applied to a revenue requirement.  \n17 \nQ. \nMr. Ming states that the minimum system uses “the ratio of replacement costs for \n18 \nboth the minimum system and actual system to identify what portion of the entire\n19 \nrevenue requirement is attributable to the minimum system.”14  How does the 6.2% \n20 \nrepresent the minimum system portion of the entire revenue requirement?\n21 \nA. \nIt does not. In his minimum system study, Mr. Ming determined that 6.2% of the plant in \n22 \nthe following accounts were related to a transmission minimum system: overhead \n23 \nconductors, poles, towers, and substations.15 He uses plant balances—not a revenue \n24 \nrequirement—to derive the 6.2%. To be clear, plant balances are exactly what an analyst \n25 \n13\nLawrence H. Vogt, P.E., Electricity Pricing, Engineering Principles and Methodologies (2009), at 495. \n14\nSee Ming Reply Testimony at 17:5-8. \n15\nSee Constellation March 25, 2026 Reply Brief, Testimony of Zachary Ming at 20:1."},{"page":10,"startToken":2798,"endToken":3091,"text":"Attachment A \nPage 10 of 13 \nshould use in a minimum system study—because the object of the study is classification, \n1 \nnot the determination of a minimum system revenue requirement. Mr. Ming then applies \n2 \nhis 6.2% result to the entire transmission revenue requirement. This is a methodological \n3 \nleap that is not in any way a component of a distribution minimum system study. In short, \n4 \nMr. Ming is comparing apples to oranges in an attempt to arrive at a result that has a veneer \n5 \nof principled objectivity. But Mr. Ming’s flawed application of the minimum system \n6 \nmethodology underscores the inappropriateness of his recommendation to use the \n7 \nminimum system study for purposes of establishing the Grid Reliance Charge. \n8 \nQ. \nAre there any other problems with the manner in which Mr. Ming conducted his \n9 \nminimum system study? \n10 \nA. \nYes. Moving beyond the misapplication of the minimum system study approach, in \n11 \nconducting his minimum system study, Mr. Ming uses wood distribution poles as a \n12 \nsubstitute for transmission poles.  \n13 \nQ. \nHow does Mr. Ming defend his decision to use wood distribution poles as a substitute \n14 \nfor transmission poles? \n15 \nMr. Ming justifies his use of wood poles by stating he did so “because a minimum system \n16 \nis a theoretical system designed to deliver a de minimis amount of electricity as opposed \n17 \nto a system designed to serve peak demand.”16 However, Mr. Ming’s proposal to substitute \n18 \nwood distribution poles for transmission poles is inappropriate and not supported in \n19 \nindustry literature. For example, the NARUC Manual states that “the minimum-size \n20 \nmethod involves determining the minimum size pole, conductor, cable, transformer, and \n21 \n16\nMing Reply Testimony at 15:13-15."},{"page":11,"startToken":3091,"endToken":3339,"text":"Attachment A \nPage 11 of 13 \nservice that is currently installed by the utility.”17 I am not aware of any instance where a \n1 \ntransmission owner has installed wood distribution poles for the purposes of providing \n2 \ntransmission service.  \n3 \nQ. \nHow does Mr. Ming attempt to justify his minimum system study based on the use of \n4 \ndistribution equipment? \n5 \nA. \nMr. Ming claims that his “theoretical” minimum system, based on the use of distribution \n6 \nequipment, is justified because it represents the “cost-causation basis for determining the \n7 \nportion of the system that is necessary to provide ancillary services.”18\n8 \nQ. \nDo you agree with this claim? \n9 \nA. \nNo. On the one hand, Mr. Ming justifies the use of distribution equipment in his minimum \n10 \nsystem calculation as being acceptable because his minimum system is only “theoretical” \n11 \n(i.e., it doesn’t exist). On the other hand, he says this theoretical minimum system \n12 \ncomposed of distribution equipment represents the very system necessary to deliver \n13 \nancillary services to real-world transmission customers. These two statements are \n14 \ncontradictory. Also, I am not aware of any industry manual on cost allocation that supports \n15 \nMr. Ming’s claim that the minimum system method results in a system that is the \n16 \nappropriate size to supply ancillary services. \n17 \n18 \n19 \n20 \n17\nNational Association of Regulatory Utility Commissioners, Electric Cost Allocation Manual (Jan. 1992), at \n90 (emphasis added). \n18\nMing Reply Testimony at 8:12-16."},{"page":12,"startToken":3339,"endToken":3622,"text":"Attachment A \nPage 12 of 13 \nQ. \nIs Mr. Ming’s recommendation to employ the minimum system method in calculating \n1 \nthe Grid Reliance Charge consistent with cost causation principles? \n2 \nA. \nNo. Mr. Ming states that his recommendation to employ the minimum system method in \n3 \ncalculating the Grid Reliance Charge is based on principles of cost causation.19 This is \n4 \nsimply not the case because the minimum system method is only appropriate for and \n5 \napplicable to distribution level service. Mr. Ming ignores the very purpose of the minimum \n6 \nsystem study, and inappropriately and inaccurately attempts to translate the methodology \n7 \nto calculate a transmission service rate. By then misinterpreting the results as being \n8 \napplicable to the entire transmission revenue requirement, Mr. Ming abandons all cost-\n9 \ncausation principles that exist in a minimum-system study approach.  \n10 \nQ. \nPlease summarize your recommendation regarding Mr. Ming’s testimony? \n11 \nA. \nMr. Ming’s proposal to employ the minimum system method in calculating the Grid \n12 \nReliance Charge is fundamentally flawed. First, Mr. Ming did not conduct his minimum \n13 \nsystem study correctly because he included distribution equipment not installed for \n14 \ntransmission service. Second, Mr. Ming applies the result of his minimum-system study to \n15 \nthe entire transmission revenue requirement, which is contrary to the purpose of the study. \n16 \nThird, the minimum system method only is appropriate for and applicable to distribution-\n17 \nlevel service. It is entirely inappropriate to apply the minimum system method to calculate \n18 \na transmission service rate. The Commission should reject Mr. Ming’s proposal and accept \n19 \nthe PJM Transmission Owners’ just and reasonable mechanism for determining the Grid \n20 \nReliance Charge.    \n21 \n22 \n19\nId."},{"page":13,"startToken":3622,"endToken":3641,"text":"Attachment A \nPage 13 of 13 \nQ. \nDoes this complete your testimony at this time? \n1 \nA. \nYes.\n2"},{"page":14,"startToken":3641,"endToken":3641,"text":""}],"sections":[{"p":1,"at":0,"title":"Attachment A","method":"printed heading","endPage":1,"endAt":446,"startToken":0,"endToken":57},{"p":1,"at":446,"title":"I. INTRODUCTION","method":"printed heading","endPage":1,"endAt":595,"startToken":57,"endToken":78},{"p":1,"at":595,"title":"A. My name is Lance Schafer, and my business address is 293 Boston Post Road West,","method":"printed heading","endPage":1,"endAt":1053,"startToken":78,"endToken":151},{"p":1,"at":1053,"title":"A. Yes. I submitted testimony on behalf of the Indicated PJM Transmission Owners (“PJM","method":"printed heading","endPage":2,"endAt":0,"startToken":151,"endToken":229},{"p":2,"at":0,"title":"Attachment A","method":"printed heading","endPage":2,"endAt":28,"startToken":229,"endToken":235},{"p":2,"at":28,"title":"II. BACKGROUND","method":"printed heading","endPage":2,"endAt":98,"startToken":235,"endToken":247},{"p":2,"at":98,"title":"A. On December 18, 2025, the Commission issued its order in PJM Interconnection. L.L.C.,","method":"printed heading","endPage":3,"endAt":0,"startToken":247,"endToken":625},{"p":3,"at":0,"title":"Attachment A","method":"printed heading","endPage":3,"endAt":251,"startToken":625,"endToken":665},{"p":3,"at":251,"title":"III. PURPOSE OF TESTIMONY","method":"printed heading","endPage":3,"endAt":329,"startToken":665,"endToken":679},{"p":3,"at":329,"title":"A. The purpose of my testimony is to support the Answer of the PJM Transmission Owners","method":"printed heading","endPage":3,"endAt":993,"startToken":679,"endToken":784},{"p":3,"at":993,"title":"IV. REBUTTAL TO MR. MING’S REPLY TESTIMONY ON THE GRID RELIANCE","method":"printed heading","endPage":3,"endAt":1117,"startToken":784,"endToken":806},{"p":3,"at":1117,"title":"A. The PJM Transmission Owners are proposing to charge a Grid Reliance Charge to Eligible","method":"printed heading","endPage":4,"endAt":0,"startToken":806,"endToken":911},{"p":4,"at":0,"title":"Attachment A","method":"printed heading","endPage":4,"endAt":606,"startToken":911,"endToken":1008},{"p":4,"at":606,"title":"A. The PJM Transmission Owners propose to calculate a Grid Reliance Charge for each PJM","method":"printed heading","endPage":4,"endAt":1358,"startToken":1008,"endToken":1123},{"p":4,"at":1358,"title":"A. No. Mr. Ming’s claim is incorrect. First, Mr. Ming continues to assume, erroneously, that","method":"printed heading","endPage":5,"endAt":0,"startToken":1123,"endToken":1217},{"p":5,"at":0,"title":"Attachment A","method":"printed heading","endPage":6,"endAt":0,"startToken":1217,"endToken":1509},{"p":6,"at":0,"title":"Attachment A","method":"printed heading","endPage":6,"endAt":156,"startToken":1509,"endToken":1536},{"p":6,"at":156,"title":"A. Yes. Although Mr. Ming supports the application of a Grid Reliance Charge, he continues","method":"printed heading","endPage":6,"endAt":609,"startToken":1536,"endToken":1613},{"p":6,"at":609,"title":"A. Mr. Ming is incorrect. Mr. Ming’s statement is in reaction to my criticism that his","method":"printed heading","endPage":7,"endAt":0,"startToken":1613,"endToken":1810},{"p":7,"at":0,"title":"Attachment A","method":"printed heading","endPage":7,"endAt":347,"startToken":1810,"endToken":1871},{"p":7,"at":347,"title":"A. Mr. Ming incorrectly believes that the purpose of a minimum system study is to produce a","method":"printed heading","endPage":7,"endAt":1412,"startToken":1871,"endToken":2047},{"p":7,"at":1412,"title":"A. Plant balances developed either on a book-cost or replacement-cost basis are used to","method":"printed heading","endPage":8,"endAt":0,"startToken":2047,"endToken":2115},{"p":8,"at":0,"title":"Attachment A","method":"printed heading","endPage":8,"endAt":444,"startToken":2115,"endToken":2184},{"p":8,"at":444,"title":"A. No. The NARUC Manual clearly explains that the minimum system method’s purpose is","method":"printed heading","endPage":9,"endAt":0,"startToken":2184,"endToken":2423},{"p":9,"at":0,"title":"Attachment A","method":"printed heading","endPage":9,"endAt":181,"startToken":2423,"endToken":2455},{"p":9,"at":181,"title":"A. Yes. Lawrence J. Vogt’s commonly referenced book Electricity Pricing, Engineering","method":"printed heading","endPage":9,"endAt":1675,"startToken":2455,"endToken":2697},{"p":9,"at":1675,"title":"A. It does not. In his minimum system study, Mr. Ming determined that 6.2% of the plant in","method":"printed heading","endPage":10,"endAt":0,"startToken":2697,"endToken":2798},{"p":10,"at":0,"title":"Attachment A","method":"printed heading","endPage":10,"endAt":857,"startToken":2798,"endToken":2943},{"p":10,"at":857,"title":"A. Yes. Moving beyond the misapplication of the minimum system study approach, in","method":"printed heading","endPage":11,"endAt":0,"startToken":2943,"endToken":3091},{"p":11,"at":0,"title":"Attachment A","method":"printed heading","endPage":11,"endAt":363,"startToken":3091,"endToken":3153},{"p":11,"at":363,"title":"A. Mr. Ming claims that his “theoretical” minimum system, based on the use of distribution","method":"printed heading","endPage":11,"endAt":670,"startToken":3153,"endToken":3203},{"p":11,"at":670,"title":"A. No. On the one hand, Mr. Ming justifies the use of distribution equipment in his minimum","method":"printed heading","endPage":12,"endAt":0,"startToken":3203,"endToken":3339},{"p":12,"at":0,"title":"Attachment A","method":"printed heading","endPage":12,"endAt":189,"startToken":3339,"endToken":3369},{"p":12,"at":189,"title":"A. No. Mr. Ming states that his recommendation to employ the minimum system method in","method":"printed heading","endPage":12,"endAt":980,"startToken":3369,"endToken":3490},{"p":12,"at":980,"title":"A. Mr. Ming’s proposal to employ the minimum system method in calculating the Grid","method":"printed heading","endPage":13,"endAt":0,"startToken":3490,"endToken":3622},{"p":13,"at":0,"title":"Attachment A","method":"printed heading","endPage":13,"endAt":85,"startToken":3622,"endToken":3638},{"p":13,"at":85,"title":"A. Yes.","method":"printed heading","endPage":14,"endAt":0,"startToken":3638,"endToken":3641}]}
