{"document":{"slug":"rec-20260702-5099","title":"Supplemental Comments of Persistence Analytics Group LLC re PJM Governance and Stakeholder Reforms","issued":"2026-07-02","accession":"20260702-5099","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PERSISTENCE ANALYTICS GROUP LLC","kind":"comments","file":"sources/filings/text/20260702-5099_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260702-5099","tier":"record","sha256":"0066973e7c1407031050f0c37c6c6f79736040b71ee14b5bfe24c27be8924e5d","pages":5,"tokens":1681,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":141,"text":"Persistence Analytics Group LLC | Supplemental Comments | FERC Docket No. AD26-7-000\nPublic Filing\nNeil P. Osnato | neil@persistenceanalyticsgroup.com | 609-464-9055\nPage 1\nUNITED STATES OF AMERICA\nFEDERAL ENERGY REGULATORY COMMISSION\nPJM Governance and Stakeholder Reforms\nDocket No. AD26-7-000\nSUPPLEMENTAL COMMENTS OF\nPERSISTENCE ANALYTICS GROUP LLC\nRegarding PJM Governance, Large-Load Validation, and Pre-NTP Assumption Verification\nThese comments are submitted as public, non-confidential comments in response to the\nCommission-led technical conference on PJM governance and stakeholder reforms. They are intended\nto support concrete, actionable reforms that improve timely decision-making, transparency,\naccountability, and verification of operational and market assumptions before obligations harden.\nSubmitted by:\nNeil P. Osnato\nFounder\nPersistence Analytics Group LLC | United Grid\nNational Security & Infrastructure Risk Analytics\nDemand Durability | Grid Stress | Load Integrity\nneil@persistenceanalyticsgroup.com\n609-464-9055\nhttps://persistenceanalyticsgroup.com/\nSAM.gov Registered Vendor\nUEI: D3VYU39H6DX9 | CAGE: 19T34\nD-U-N-S: 142849930\nJuly 2, 2026"},{"page":2,"startToken":141,"endToken":593,"text":"Persistence Analytics Group LLC | Supplemental Comments | FERC Docket No. AD26-7-000\nPublic Filing\nNeil P. Osnato | neil@persistenceanalyticsgroup.com | 609-464-9055\nPage 2\nI. Introduction\nPersistence Analytics Group LLC (PAG) respectfully submits these supplemental comments in Docket No.\nAD26-7-000 regarding PJM governance and stakeholder reforms. PAG supports the Commission's focus\non concrete, actionable reforms that improve PJM's ability to address operational and market needs in a\ntimely and efficient manner.\nPAG's work focuses on national security and infrastructure risk analytics, including demand durability, grid\nstress, load integrity, public-cost exposure, and implementation-risk verification. The central issue\naddressed in these comments is whether PJM's governance and stakeholder processes can distinguish\ndurable, decision-relevant infrastructure needs from incomplete, speculative, weakly supported, or\ninsufficiently verified assumptions before costs, procurement, transmission planning, interconnection\nactivity, or public obligations harden.\nPJM governance reform should not be treated only as a process-design exercise. Governance determines\nwhat evidence is required, who can require it, when decisions must move, when delay becomes harmful,\nand who bears the downside if assumptions fail. For large loads, AI and data center development,\ntransmission expansion, onsite generation, interconnection timing, resource adequacy, and cost\nallocation, the governance question is also an assumption-verification question.\nII. Summary of Recommendations\n1. Adopt a pre-NTP assumption-verification screen for high-impact load and infrastructure\ncommitments. Before Notice to Proceed (NTP), PJM and relevant stakeholders should have a structured\nway to evaluate whether demand, power deliverability, interconnection timing, contractual support, cost\nallocation, and execution readiness are sufficiently verified.\n2. Establish minimum evidence standards for large-load and project-readiness signals. PJM\ngovernance should identify what counts as a legitimate, actionable signal for planning and market\npurposes, and what remains staged, conditional, speculative, or insufficiently supported.\n3. Create fast-path or time-bound review procedures for critical operational and market issues.\nWhere delay increases reliability risk, public-cost exposure, or market uncertainty, PJM should have\ndefined procedures to escalate, review, and resolve issues within an identified timeframe.\n4. Improve transparency around assumptions, dependencies, and downside ownership.\nStakeholders, states, and the public should be able to understand which assumptions drive decisions,\nwhich dependencies must hold, what evidence supports them, and who bears consequences if they fail.\n5. Develop a durable-load and public-cost exposure framework. PJM should distinguish between\nannounced load, contracted load, financially supported load, interconnection-ready load, and load that is\ndurable enough to justify infrastructure obligations.\nIII. Why Pre-NTP Verification Matters\nThe phrase 'prior to NTP' is critical. Once a project reaches NTP, the capital stack, EPC schedule,\nprocurement chain, utility planning assumptions, onsite generation commitments, transmission\nexpectations, and public-cost exposure may already be moving. At that stage, decision-makers may be\nmanaging consequences rather than preventing avoidable risk.\nFor large-load and data center-related infrastructure, the following questions should be answered before\ncommitments harden:"},{"page":3,"startToken":593,"endToken":983,"text":"Persistence Analytics Group LLC | Supplemental Comments | FERC Docket No. AD26-7-000\nPublic Filing\nNeil P. Osnato | neil@persistenceanalyticsgroup.com | 609-464-9055\nPage 3\n• Is the projected load real, staged, contingent, or speculative?\n• Is the load durable enough to support the life of the infrastructure being planned or financed?\n• Is the power solution a temporary bridge, a permanent requirement, or a stranded-asset risk if grid\nconditions change?\n• What happens if grid supply catches up, interconnection constraints ease, or onsite generation loses its\nscarcity premium?\n• Who owns downside exposure if the customer, site, revenue case, supply chain, contract, or AI/data\ncenter use case changes?\n• What evidence should be required before the project counts as a legitimate planning or market signal?\nA governance system that cannot answer those questions before NTP risks converting uncertainty into\nobligations. That can expose utilities, developers, lenders, generators, suppliers, states, ratepayers, and\ncustomers to avoidable cost and reliability risk.\nIV. Application to the Conference Agenda\nPAG's recommendations map directly to the agenda questions for Panel 1 and Panel 2.\nAgenda Area\nPAG Recommendation\nPanel 1, Question 3: governance\nreforms to improve accountability and\nresponsiveness\nAccountability should include a named assumption owner, a\ndefined evidence threshold, and a documented decision path\nfor high-impact operational and market issues.\nPanel 1, Question 6: lessons from\nother RTO/ISO governance structures\nRecognizing regional differences, the Commission should\nencourage minimum cross-RTO evidence standards for\nlegitimate project and load-readiness signals, especially where\nlarge loads affect reliability, transmission, interconnection, and\npublic costs.\nPanel 2, Question 2: transparency\nreforms\nTransparency should show not only stakeholder positions, but\nalso the assumptions being relied upon, evidence gaps,\ndependencies, timelines, and downside allocation.\nPanel 2, Question 5: reforms to\nensure PJM can meet regional\nchallenges\nPJM should adopt a structured Large-Load and Infrastructure\nAssumption Verification Track for issues with material\noperational, reliability, cost, or market consequences.\nPanel 2, Question 8: fast-path or\ntime-bound review procedures\nHigh-importance topics should have time-bound review, clear\nescalation triggers, written evidence maps, and defined\noutcomes that prevent endless process delay while preserving\nappropriate stakeholder input.\nV. Proposed Large-Load and Infrastructure Assumption Verification Track\nPAG recommends that PJM adopt, or that the Commission encourage PJM to develop, a Large-Load and\nInfrastructure Assumption Verification Track. The purpose would be to test whether material operational\nand market assumptions are sufficiently supported before they trigger or influence major planning,"},{"page":4,"startToken":983,"endToken":1313,"text":"Persistence Analytics Group LLC | Supplemental Comments | FERC Docket No. AD26-7-000\nPublic Filing\nNeil P. Osnato | neil@persistenceanalyticsgroup.com | 609-464-9055\nPage 4\nprocurement, interconnection, cost-allocation, or market-design consequences.\nSuch a track should not be anti-growth, anti-data center, anti-manufacturing, anti-generation, or\nanti-transmission. It should be pro-evidence. It should help good projects move with more confidence and\nidentify weak assumptions before they create avoidable harm.\nVerification Element\nCore Question\nDemand durability\nIs the load persistent, financeable, and supported by credible\ncustomer, contract, and use-case evidence?\nPower deliverability\nCan the required power be delivered on the schedule assumed, and\nwhat constraints remain unresolved?\nInterconnection and\ntransmission readiness\nWhat queue, study, upgrade, permitting, equipment, or construction\ndependencies must hold?\nContract and cost-allocation\nstrength\nWho pays, who benefits, who absorbs delay, and who bears downside\nif assumptions fail?\nBridge versus permanent\ninfrastructure\nIs onsite or dedicated generation solving a temporary scarcity problem\nor creating a long-lived asset exposure?\nPublic-cost and ratepayer\nexposure\nCould unverified assumptions shift costs to customers, ratepayers,\nstates, or other market participants?\nExit and failure scenario\nIf the project stalls, changes, or fails, what obligations remain and who\ncontrols the unwind?\nVI. Governance Reform Should Identify Assumption Ownership\nA recurring governance failure in infrastructure decision-making is not merely that assumptions are wrong.\nIt is that no one is clearly responsible for naming, testing, updating, or retiring them before they become\nembedded in planning and cost recovery. PJM reform should therefore include assumption ownership.\nFor each high-impact operational or market decision, PJM should identify:\n• the assumption being relied upon;\n• the source and quality of evidence supporting it;\n• the decision that depends on it;\n• the timeline on which the assumption must remain true;\n• the party or process responsible for updating the record if facts change;\n• the consequences if the assumption proves inaccurate; and\n• the trigger for reconsideration, escalation, or fast-path review.\nThis is particularly important where large loads, generation additions, transmission needs, and\ninterconnection constraints are moving faster than traditional stakeholder processes can comfortably\nabsorb."},{"page":5,"startToken":1313,"endToken":1681,"text":"Persistence Analytics Group LLC | Supplemental Comments | FERC Docket No. AD26-7-000\nPublic Filing\nNeil P. Osnato | neil@persistenceanalyticsgroup.com | 609-464-9055\nPage 5\nVII. Transparency Should Include Evidence Quality, Not Merely Process\nParticipation\nTransparency reforms should go beyond who voted, who objected, and what committee considered the\nissue. Those elements are important, but they do not reveal whether the underlying assumptions were\ndecision-grade.\nFor high-impact issues, transparency should include a public or appropriately summarized evidence map\nthat identifies: the claimed need, the supporting evidence, unresolved dependencies, cost exposure,\ntiming risk, public impact, and the consequence of inaction or delay. Where sensitive information cannot\nbe public, PJM should still provide a non-confidential summary sufficient to support governance\naccountability.\nVIII. Fast-Path Review Should Be Triggered by Risk, Not Stakeholder\nConvenience\nThe Commission's agenda asks whether PJM should increase the use of fast-path or time-bound review\nprocedures for high-importance topics. PAG supports such reforms. Fast-path review should be available\nwhere delay itself creates material operational, reliability, market, or public-cost risk.\nPotential triggers include: material reliability exposure, significant public-cost or ratepayer exposure,\nlarge-load uncertainty affecting transmission or capacity planning, interconnection or equipment\nbottlenecks with regional consequences, major fuel or power-delivery dependencies, or evidence that\nstakeholder process delay is preventing timely action on an urgent operational or market issue.\nFast-path review should not eliminate stakeholder input. It should structure that input around evidence,\ndefined timelines, written assumptions, and decision accountability.\nIX. Conclusion\nPJM's governance challenge is not only whether its stakeholder process is inclusive or whether its Board\nhas sufficient formal authority. It is whether the regional decision system can verify material assumptions\nquickly enough to prevent avoidable reliability, market, infrastructure, and public-cost consequences.\nThe Commission should encourage reforms that make PJM faster, more accountable, and more\nevidence-driven. A pre-NTP assumption-verification screen, minimum evidence standards for large-load\nsignals, transparent assumption ownership, and fast-path review for high-risk issues would improve PJM's\nability to meet immediate and future challenges while preserving appropriate stakeholder participation.\nMarkets price the headline. Infrastructure proves whether it can hold. PJM governance reform should help\nensure that the assumptions behind infrastructure decisions are verified before obligations harden.\nRespectfully submitted,\nNeil P. Osnato\nFounder\nPersistence Analytics Group LLC | United Grid\nneil@persistenceanalyticsgroup.com\n609-464-9055"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":173,"startToken":0,"endToken":162},{"p":2,"at":173,"title":"I. Introduction","method":"printed heading","endPage":2,"endAt":1545,"startToken":162,"endToken":336},{"p":2,"at":1545,"title":"II. Summary of Recommendations","method":"printed heading","endPage":2,"endAt":3035,"startToken":336,"endToken":526},{"p":2,"at":3035,"title":"III. Why Pre-NTP Verification Matters","method":"printed heading","endPage":3,"endAt":1071,"startToken":526,"endToken":743},{"p":3,"at":1071,"title":"IV. Application to the Conference Agenda","method":"printed heading","endPage":3,"endAt":2520,"startToken":743,"endToken":933},{"p":3,"at":2520,"title":"V. Proposed Large-Load and Infrastructure Assumption Verification Track","method":"printed heading","endPage":4,"endAt":1467,"startToken":933,"endToken":1171},{"p":4,"at":1467,"title":"VI. Governance Reform Should Identify Assumption Ownership","method":"printed heading","endPage":5,"endAt":173,"startToken":1171,"endToken":1334},{"p":5,"at":173,"title":"VII. Transparency Should Include Evidence Quality, Not Merely Process","method":"printed heading","endPage":5,"endAt":889,"startToken":1334,"endToken":1428},{"p":5,"at":889,"title":"VIII. Fast-Path Review Should Be Triggered by Risk, Not Stakeholder","method":"printed heading","endPage":5,"endAt":1835,"startToken":1428,"endToken":1546},{"p":5,"at":1835,"title":"IX. Conclusion","method":"printed heading","endPage":5,"endAt":2910,"startToken":1546,"endToken":1681}]}