{"document":{"slug":"rec-20260706-5036","title":"Comments of Abdur Rahman re PJM Governance and Stakeholder Reforms","issued":"2026-07-06","accession":"20260706-5036","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260706-5036_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260706-5036","tier":"record","sha256":"e20fdbdb6420bb06a0b50254809d7c972ae224d8547eb20ec1854d1830bbbbb5","pages":5,"tokens":1837,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":296,"text":"1 \n \n \n \n \nCommission-Led Technical Conference on PJM Governance and Stakeholder Reforms \nDocket No. AD26-7-000 \n \nBy ABDUR RAHMAN \nPJM Governance Mechanics, Board Authority, States' Role, Filing Rights, and Document \nArchitecture \nJuly 2026 \n \nQuestion 1. The PJM Board's role in ensuring that PJM is sufficiently tackling the region's \noperational and market challenges; how the Board evaluates its effectiveness in that role; and \nhow often, and under what circumstances, the Board acts unilaterally, and whether this should \nchange. \nThe Board's highest function in the current environment is that of execution steward: the body \naccountable not for the content of every solution but for the fact that identified needs reach a \ndecision on a defined schedule. In large institutional transitions, the governing body that performs \nbest is rarely the one that decides the most; it is the one that guarantees that decisions are made, \non time, by the actor assigned to make them. That reframing matters because it gives the Board a \nrole that is both stronger and more disciplined than episodic intervention: the Board becomes the \nowner of the machinery rather than an occasional substitute for it. \nThree practices would operationalize that role. First, the Board should adopt and publish an annual \ngovernance execution review reporting, at minimum, the median and ninetieth-percentile elapsed \ntime from issue identification to terminal decision by issue category, the inventory of open issues \nby age band, the number of filings made, and the number of matters resolved by default-outcome \nprovisions. What is measured is managed, and today the performance of the governance system \nitself is largely unmeasured in any public, standardized form, which means the Board's \neffectiveness in its stewardship role cannot currently be evaluated by the Board, the states, or the \nCommission except by anecdote. Second, the Board should maintain a public decision log"},{"page":2,"startToken":296,"endToken":721,"text":"2 \n \nrecording each significant Board action or deliberate inaction, the rationale, and the positions \nreceived, converting diffuse institutional memory into an auditable record against which \neffectiveness can be judged over time. \nThird, on unilateral action: it should be rare, but it should be rule-bound rather than ad hoc. The \nBoard should publish ex ante the criteria under which it will act without a supporting stakeholder \nvote, such as a reliability need identified by PJM operations or planning staff, a binding compliance \ndeadline, or a demonstrated market integrity concern, together with the commitment that any such \naction carries a published rationale and attaches all dissenting positions. The question worth \nanswering is therefore not how often the Board should act unilaterally but under what published \nrules. Rule-bound authority is more legitimate, and therefore more usable, than discretionary \nauthority, and the existence of a credible, criteria-based backstop changes bargaining behavior \nupstream long before it is ever invoked, because participants negotiate more seriously against a \nknown alternative than against an indefinite continuation of talks. \nQuestion 2. How states, through the Organization of PJM States, Inc. or other structures, should \ninterface with the Board to enable the region to meet operational and market challenges while \nrespecting PJM's independence. \nThe design principle is structured voice without veto. State input is most valuable, and least \ndisruptive to independence, when it arrives at defined stages, through defined channels, on a \ndefined clock. Episodic or improvised access serves neither side: states cannot plan their \nparticipation, and PJM cannot demonstrate that participation was fairly provided. \nThese comments recommend that every issue charter, as described under Question 3, include two \nstate consultation windows: one at charter initiation, when scope and decision path are set and \ninput has the greatest leverage, and one before any resulting filing is finalized, when the practical \nconsequences for retail customers are clearest. Each window should have a fixed duration, a \ndesignated PJM owner responsible for receiving and responding to state input, and a requirement \nthat a written disposition of state comments accompany the record. Joint technical sessions \nbetween PJM staff and OPSI on high-impact matters, held early rather than after positions harden, \nserve the same function at lower formality. Structure protects both sides: states receive a \nguaranteed, timely, documented channel rather than episodic access, and PJM's independence is \nprotected precisely because the channel is advisory, bounded, and recorded rather than open-\nended. Over time, the written dispositions also create a factual record of how state input shaped \noutcomes, which is the most durable answer to any perception that consultation is ornamental."},{"page":3,"startToken":721,"endToken":1188,"text":"3 \n \nQuestion 3. The governance reforms that would best improve accountability and responsiveness. \nTwo reforms do the most work, and a third makes their effects visible. The first is single-owner \naccountability: every issue admitted into the governance process should have one named PJM \nexecutive sponsor accountable for driving it to terminal decision. Diffuse ownership is the most \ncommon failure mode in large-scale institutional execution; where everyone is responsible, no one \nis, and the record of stalled issues in any large organization is usually a map of unassigned \nownership rather than a map of hard problems. \nThe second is the mandatory issue charter. At the moment an issue enters the process, a short \npublic charter should fix five elements: the scope of the issue, the accountable owner, the clock to \nterminal decision, the decision path through the committee structure stated in advance, and the \ndefault outcome if the clock expires without the required support. The default outcome is the load-\nbearing element. A process with a defined default converts delay from a costless strategy into a \nchoice with known consequences, which changes participant behavior at every stage before the \ndefault is ever reached. Charters also create the unit of account for governance metrics: without a \ndefined start, clock, and terminus, cycle time cannot even be computed. \nThe third is transparency instrumentation: the public decision log and the cycle-time reporting \ndescribed under Question 1, published quarterly by issue category. Accountability requires \nobservability. A governance system whose throughput is visible tends to improve for the same \nreason that any measured operational process tends to improve, and visible metrics allow the \nBoard, OPSI, and the Commission to distinguish between a system that is slow because its \nproblems are hard and a system that is slow because its design permits it. \nQuestion 4. How the division of Federal Power Act section 205 filing rights among PJM, the \nTransmission Owners, and the Members Committee affects PJM's ability to act effectively and \nquickly, when warranted, to address operational and market needs. \nDivided filing rights create two predictable execution problems regardless of how any particular \nallocation is drawn. The first is negative space: issues that fall between rights-holders, where each \nactor plausibly believes initiation belongs to another, and which therefore belong to no one. The \nsecond is incentive misalignment: the actor holding the right to initiate a change is not always the \nactor with the incentive to initiate it, so needed reforms can lack a motivated sponsor even when \nfew participants oppose them on the merits. Both problems are properties of the architecture, not \nof the participants, and both are treatable without reallocating any underlying legal right. \nThree responses follow. First, publish a filing-rights map that states, for each recurring category \nof tariff and agreement provision, which entity holds initiation rights, under which instrument, and"},{"page":4,"startToken":1188,"endToken":1583,"text":"4 \n \n \nthrough which amendment path, so that the negative space becomes visible and assignable rather \nthan discovered issue by issue. Second, adopt an escalation protocol: where the Board designates \na matter as a regional priority and the relevant rights-holder does not initiate within a defined \nperiod, the matter automatically proceeds to a defined alternative path, with the rights-holder's \nstated reasons attached to the record. Third, where rights are shared or contested, adopt tie-break \nmechanics built on the principle that disagreement should change the venue of decision rather than \nprevent a decision; the New England arrangements discussed under Question 6 illustrate the \nprinciple. The author takes no position here on the legal reallocation of any existing right. The \nrecommendations concern the operational machinery that surrounds whatever allocation exists, \nwhich is where most of the delay actually accrues. \nQuestion 5. The extent to which provisions in PJM's Operating Agreement, Transmission \nOwners Agreement, Open Access Transmission Tariff, Reliability Assurance Agreement, or \nManuals impede timely decision-making by PJM. \nThe impediment is less any single provision than the architecture: five instruments, drafted and \namended over decades, in which related provisions are distributed without a master index of who \ndecides what through which path. Fragmented document architecture imposes a search cost on \nevery issue before deliberation even begins, and search costs compound because they are paid by \nevery participant separately. In large corporate transitions this is a familiar condition, and the \nremedies are familiar as well. \nFirst, PJM should produce and maintain a public cross-instrument index of decision rights and \namendment paths. This is a navigational document rather than a legal amendment; it can be \ncompleted quickly, requires no vote to be useful, and pays immediate dividends by shortening the \nsearch phase of every subsequent issue. Second, PJM and its members should adopt boundary \ndiscipline between tariff-level and Manual-level content: durable rights and obligations belong in \nthe filed instruments, while operational detail belongs in Manuals governed by a defined, time-\nbound change process, so that routine operational updates do not carry tariff-amendment overhead \nand tariff amendments are not delayed by disputes that are operational in character. Third, a \nstanding sunset review should identify provisions that require sequential approval by multiple \nbodies and evaluate, category by category, whether sequential approval still serves a purpose that \nparallel or single-body review cannot, since each additional sequential gate compounds cycle time \nmultiplicatively rather than additively."},{"page":5,"startToken":1583,"endToken":1837,"text":"5 \n \nQuestion 6. Lessons from other regional transmission organization and independent system \noperator governance structures that PJM could reasonably adopt, recognizing regional \ndifferences. \nTwo design lessons travel well. In MISO and CAISO, stakeholder processes are structured as \nadvisory inputs to an independent board that retains both the authority and the obligation to act; \nthose regions demonstrate that robust multisector voice and retained filing authority can coexist. \nNew England offers a complementary lesson through a different mechanism: its governance \narrangements provide a defined path by which a stakeholder-supported alternative can travel to the \nCommission alongside the regional transmission organization's own proposal, so that a failure of \nconsensus changes the forum of decision rather than producing no decision at all. \nThe transferable element is not any single structure, and these comments do not suggest that PJM \nabandon its multisector model, which reflects the region's history and gives its process legitimacy. \nThe transferable element is the design principle common to both examples: every issue has a \nterminal decision point, the path to that point is defined in advance, and disagreement is carried \nforward in the record rather than allowed to arrest the process. PJM can adopt that principle within \nits existing sector architecture through the charter, escalation, and rule-bound backstop \nmechanisms described in these responses. Regional difference is a reason to adapt the machinery, \nnot a reason to forgo the principle. \n \nRespectfully submitted, \n \nAbdur Rahman \nHerndon, Virginia \nAbdur.rahman.giki@gmail.com \n \nThe views expressed are the author's own and are offered in the author's individual capacity."}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":5,"endAt":0,"startToken":0,"endToken":1583},{"p":5,"at":0,"title":"Page 5","method":"page range","endPage":5,"endAt":1765,"startToken":1583,"endToken":1837}]}
