{"document":{"slug":"rec-20260715-4000","title":"Pre-filed Statement of Stacey Burbure, Senior Vice President of Transmission Regulatory Engagement & Compliance for American Electric Power Company, Inc.…","issued":"2026-07-15","accession":"20260715-4000","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"AMERICAN ELECTRIC POWER COMPANY INC","kind":"tariff filing","file":"sources/filings/text/20260715-4000_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4000","tier":"record","sha256":"51a8beb7a1c0ba13fc1f3861de56429f9e678c2d829713b318686e6f6c0bd354","pages":23,"tokens":6872,"emptyPages":[],"textThemes":["adequacy","study"]},"pages":[{"page":1,"startToken":0,"endToken":201,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Governance and Stakeholder Reforms \n \nDocket No. AD26-7-000 \nSTATEMENT OF STACEY BURBURE \nAMERICAN ELECTRIC POWER COMPANY, INC. \nPANEL 1 \n \nAmerican Electric Power Company, Inc. (“AEP”) appreciates the opportunity to participate \non Panel 1 of the Federal Energy Regulatory Commission’s (“Commission” or “FERC”) technical \nconference on governance and stakeholder reforms in PJM Interconnection, L.L.C. (“PJM”).1 As \nSenior Vice President of Transmission Regulatory Engagement and Compliance, I support AEP’s \noperating utilities, including those operating within the PJM region. AEP operates within seven of \nthe thirteen states in PJM’s footprint (Indiana, Kentucky, Michigan, Ohio, Tennessee, Virginia, and \nWest Virginia).   \nAEP participates in four Regional Transmission Organizations (“RTO”): PJM, the \nMidcontinent Independent System Operator (“MISO”), the Southwest Power Pool (“SPP”), and \nthe Electric Reliability Council of Texas (“ERCOT”), providing the company with broad \nexperience across diverse governance models, market structures, and planning frameworks. In \naddition to my responsibilities supporting AEP’s utilities across these regions, I serve on the SPP \nMembers Committee, providing firsthand experience with RTO stakeholder governance and \ndecision-making.  \n \n \n1 The questions posed by the Commission to Panel 1 and AEP’s answers are set forth in the Appendix to this statement."},{"page":2,"startToken":201,"endToken":500,"text":"2 \nI. \nIntroduction and Summary \nThe United States has before it today one of the greatest requirements for energy \ndevelopment in generations. This required energy development is largely driven by the national \ninterest in being the worldwide leader in artificial intelligence infrastructure and technology. \nAddressing this national interest is essential to national security and presents a tremendous \nopportunity to drive economic growth. At its core, AEP’s concern with PJM is that it is \ndysfunctional, ineffective, and not capable of doing its job of supporting the deployment of \nmassive amounts of needed generation and transmission by its members. In short, PJM is broken \nand must be immediately fixed. \nTo avoid the catastrophic effects of jeopardizing our national security and economic growth, \nPJM must immediately change. PJM must change its operations and governance to allow \ncustomers to interconnect load and generation faster. PJM must have a planning process that takes \ntransmission and generation into account together. That planning process must identify and provide \nsufficient resources to meet the needs of existing and future customers. Finally, PJM governance \nmust change so stakeholders can be heard, innovation can occur, decisions can be made, and PJM \ncan move forward and get out of the deadlock it faces today.  \nAEP proposes three overarching areas of change for PJM. First, generator interconnection \nmust be reformed in PJM. Under current interconnection rules, a generator cannot reach \ncommercial operation without significant delays and inefficiencies. This discourages generation \ndevelopment. Second, PJM’s approach to ensuring resource adequacy in the region must be \nupdated. PJM’s Reliability Pricing Model has failed to send efficient investment and retirement \nsignals which has distorted price formation. The result is diminished long-term revenue certainty \nfor generation developers which discourages investment in dependable, dispatchable generation \nand undermines resource adequacy over time. Third, PJM governance and stakeholder processes"},{"page":3,"startToken":500,"endToken":783,"text":"3 \nmust be reformed. PJM is seeking to solve today’s challenges with an outdated Board of Managers \n(“Board”) governance and stakeholder process where necessary reforms cannot be implemented \nefficiently and effectively.  Too often, reforms are stymied by a stakeholder process that \nconsistently deadlocks on important issues and a Board governance model lacking clear \naccountability and the will to drive change.  \nThe need for change in these three areas is urgent. PJM is confronting the most significant \nreliability, affordability, and infrastructure challenge in its history. Demand from national security \nneeds, advanced manufacturing, data centers, and electrification is accelerating faster than the \nregion is able to plan and build the infrastructure needed to support it through PJM’s current \nmechanisms. The question before the Commission is whether PJM’s Board governance structure \nand stakeholder process enable timely, technically sound decisions that maintain reliability, \nsupport affordability, and enable economic growth. In AEP’s view, they do not.  \nPJM suffers from a governance mismatch: responsibility for outcomes rests with the Board, \nbut authority over many of the tools needed to achieve those outcomes remains fragmented. PJM’s \nexisting governance framework has not consistently enabled timely action to meet customer needs \nor address evolving reliability, planning, and market challenges. That is not a sustainable near-term \nor long-term operating condition for the region. PJM’s governance structure must align \nresponsibility, authority, and accountability so that those charged with ensuring reliability have the \nability—and the obligation—to deliver it. PJM states, accountable to their citizens, lack any formal \nrole. While every stakeholder deserves a voice, governance must better reflect who is responsible \nfor planning, financing, operating, and maintaining the infrastructure upon which reliability \ndepends, and solving the urgent generator interconnection and resource adequacy issues."},{"page":4,"startToken":783,"endToken":1078,"text":"4 \nEffective governance is not measured by the number of committees or the degree of \nstakeholder participation. It is measured by whether responsibility, authority, and accountability \nare aligned to produce timely decisions that maintain reliability, support affordability, and enable \nfast generation interconnection to support national security and economic growth. It is ultimately \nmeasured by customer outcomes: Do the lights stay on, is growth supported on the customer’s \ndevelopment timeline, and do planning processes stay ahead of demand so growth can occur and \nimportant national interests like security and AI development can move forward unconstrained? \nReliable, affordable, and efficient customer service form the foundation of AEP’s \nrecommendations.  \nII. \nHow Process Thwarts Substance in PJM—An Illustration \nToday’s stakeholder process makes it nearly impossible to evaluate integrated solutions \nthat span the two areas most critically in need of change—generation interconnection and resource \nadequacy—as well as related areas of load interconnection and market design. A reformed process \nmust enable stakeholders to bring creative proposals designed to solve PJM’s biggest problems to \nthe table for serious review by other stakeholders, PJM management, and the Board.  \nThe current PJM stakeholder process does not encourage new innovative ideas and the \nstructure of the committee system complicates needed market reforms that hope to solve some of \ntoday’s greatest challenges. As far back as December of 2024, the PJM Board publicly \nacknowledged that they foresaw immediate capacity shortage conditions in the 2026/27 Delivery \nYear forecast. With an unprecedented challenge that should have prompted bold action, PJM \nproposed only minor changes.  This was, in part, due to the byzantine nature of the stakeholder \nprocess and an inability to bring about consensus from its membership. When faced with today’s \nunprecedented challenges, AEP believes that instead of minor tweaks, PJM should be empowered"},{"page":5,"startToken":1078,"endToken":1334,"text":"5 \nto move forward boldly with solutions which may not gain the support of entrenched market \nparticipants who benefit from the status quo. \nOne such proposal that helps to demonstrate this archaic stakeholder misalignment within \nthe PJM governance process is AEP’s Accelerated Load, Infrastructure, Generation and Network \nPlanning (“ALIGN”) concept. AEP’s ALIGN concept is for PJM to consolidate planning so that \ncommitted load, generation resources, and transmission facilities would be planned and evaluated \nas a coordinated portfolio rather than through separate and sequential processes. Eligibility would \nbe limited to projects supported by executed agreements, financial security, and other enforceable \ncommitments, thereby helping distinguish executable projects from speculative queue activity. \nALIGN would also augment PJM’s existing planning and interconnection processes, not replace \nthem. By concentrating planning studies on committed demand, the framework is intended to \nimprove queue integrity, increase planning certainty, and better align infrastructure investment \nwith actual customer need. \nAEP’s ALIGN proposal illustrates why governance reform matters: today’s stakeholder \nprocess could require the proposal to be fragmented across multiple committees and multiple filing \nauthorities before its merits could even be evaluated. Despite working as an integrated framework, \nthe proposal could be broken up among stakeholder groups focusing on generator interconnection, \nload interconnection, transmission planning, and others where aspects would be debated in \nisolation. Then, if the proposal advanced, because it would require both Tariff and Operating \nAgreement revisions, a two-sector Members Committee veto could block the whole concept. A \nwell-formed stakeholder process must not stifle big, innovative ideas; it must facilitate their \nconsideration on the merits."},{"page":6,"startToken":1334,"endToken":1616,"text":"6 \nAEP’s ALIGN concept is not without precedent. Other RTOs have been able to \nsuccessfully incorporate and demonstrate the value of integrated planning processes that evaluate \nmultiple infrastructure needs together rather than through disconnected stakeholder processes. SPP \nwas able to incorporate its Integrated Transmission Planning process which evaluates reliability, \neconomic, and public policy needs within a single coordinated planning framework. ALIGN \napplies that same planning philosophy to today’s emerging challenges and takes it one step further. \nRather than evaluating committed load, generation, and transmission through separate \ninterconnection queues, planning processes, and stakeholder committees, ALIGN would enable \nPJM to evaluate these interdependent facilities as a coordinated infrastructure portfolio.  \nThe lesson is not that PJM should replicate another RTO’s planning process. Rather, it is \nthat governance must enable planners and stakeholders to evaluate comprehensive infrastructure \nsolutions that reflect how the electric system actually functions. As load growth accelerates and \ninfrastructure development becomes increasingly complex, PJM’s governance structure must \nevolve to support the innovation that will be required to meet the needs of today and the next \ncentury. The purpose of governance reform is to enable technically superior solutions by aligning \nresponsibility, authority, and accountability.  \nIII. \nPJM And Its Stakeholders: Reform Is Needed To Facilitate Action \nPJM’s immediate market and planning issues must be addressed through the most effective \nnear-term mechanisms available, but the underlying governance deficiencies also must be \naddressed to place PJM, its members, and its states on a more durable path. A stakeholder \nframework that clearly allocates responsibility, facilitates the Board’s work, and enables timely \nCommission review will better support the Board’s independence, responsiveness, and ability to \nact—producing better results for reliability, infrastructure development, and market reforms over \nthe long term."},{"page":7,"startToken":1616,"endToken":1946,"text":"7 \nSpecifically, AEP recommends PJM create an advisory stakeholder structure aligning the \nadvisory function with an appropriate process to enable stakeholders to provide better, actionable \nadvice to the Board. This will restore balance to PJM’s governance structure and unlock the \nBoard’s ability to make decisions and address the most important issues proactively, nimbly, and \ndecisively. \nWhile an advisory stakeholder process and an empowered board are ideas borrowed from \nsome other RTOs’ approaches, PJM’s size, diversity of states, and range of regulatory paradigms \ndistinguish it. The Commission’s mantra—that one-size-fits-all approaches do not work—rings \ntrue here. AEP’s goal is not for PJM to adopt any particular structure for its own sake, but to \nachieve a balance that is fair and sensible for all stakeholders, including by appropriately reflecting \nthe interests of parties with responsibility for, and exposure to, reliability and cost impacts in the \nregion. And critically, PJM needs a structure that enables the Board to make timely decisions in \nsupport of national security, reliability, affordability, and economic development.  \nIV. \nThe Role of the States  \nStates must have a voice in PJM’s stakeholder process and revised governance structure. \nAs to the role of states in PJM processes, AEP is steadfastly supportive of proposals that result in \na governance framework that is balanced and appropriately reflects the interests of parties with \nresponsibility for—and exposure to—reliability and cost impacts in the region. The central \nobjective of this and other governance reforms must be ensuring that PJM is able to achieve the \ncore goals of regional coordination: transmission system reliability and “an abundant supply of \nelectric energy … with the greatest possible economy.”2  AEP supports providing states with \n \n2 16 U.S.C. § 824a(a); see Federal Power Act; Delegation of Authority to the Federal Energy Regulatory Commission, \n63 Fed. Reg. 53889-01 (Oct. 7, 1998) (delegating Section 202(a) authority to FERC and noting that such authority \n“could aid in … addressing reliability-related issues, thereby increasing the reliability of the transmission system”)."},{"page":8,"startToken":1946,"endToken":2184,"text":"8 \ndefined authority under Section 205 of the Federal Power Act to cause filings to be made before \nthe Commission on matters within their collective jurisdiction, recognizing that states have a direct \nresponsibility for protecting consumers and advancing resource adequacy, affordability, and public \npolicy objectives. \nToday, there is a mismatch between which entities have responsibility for reliability, \nresource adequacy, and cost impacts, and which are able to control or influence PJM decisions that \ndirectly affect those outcomes. Governance reform efforts—including rethinking the role of states \nin PJM—must seek to bridge this gap.   \nV. \nThe Role of the Board \nAEP recommends targeted modifications to PJM’s governance rules that would strengthen \nthe PJM Board’s effectiveness while preserving its independence and responsiveness. \n• PJM must adopt a preference for Board candidates who reside within the PJM \nfootprint and have significant professional experience with the region’s electric \nsystem.  \n• PJM’s Operating Agreement must be revised to make the President and CEO a \nvoting member of the Board. Under current rules, PJM’s President and CEO sits on \nthe Board ex officio, but does not have a vote.3   \n• PJM’s ex parte rules must be amended to eliminate or significantly reduce limits \non communications between the Board and stakeholders. Reforming PJM’s ex \nparte rules would improve governance by enabling Board members to receive \ntimely, balanced, and informed perspectives on complex national security, \nreliability, market, and transmission planning issues. \n \n3 PJM Operating Agreement § 7.1."},{"page":9,"startToken":2184,"endToken":2465,"text":"9 \nVI. \nConclusion \nPJM stakeholders—from transmission owners and generators to states and consumer \nadvocates—are committed to serving customers across the region reliably, at least cost. But too \noften, PJM’s governance structure has inhibited, rather than facilitated, this essential work. Action \ntakes too long, even as problems proliferate, and the solutions adopted do not meet the moment. \nPJM’s structure handcuffs the Board from leading from the front and mires stakeholders with \nprocess over substance. “[T]he status quo,” as Chairman Swett has put it, “is unacceptable and has \nbeen for some time.”4  To secure the greatest benefits for the 67 million customers who rely on \nPJM, the Board must be able to act proactively, nimbly, and decisively with useful input from \nstakeholders to solve the region’s challenges.  \nPJM’s governance structure was developed for a different era—one characterized by \nslower load growth, excess generation, and incremental infrastructure needs. Today’s environment \nis fundamentally different. Meeting the nation’s growing demand for electricity will require an \nRTO capable of making timely, informed, and accountable decisions. Governance reform must \nnot seek to diminish stakeholder participation, but rather ensure that stakeholder engagement \nproduces actionable advice, that the Board possesses the authority necessary to fulfill its statutory \nresponsibilities, and that states have a meaningful voice in the process. The next generation of grid \nchallenges will not be solved by incremental procedural reforms. They will require governance \ncapable of evaluating integrated technical solutions such as ALIGN, empowering the Board to act, \nincorporating meaningful stakeholder and state input, and aligning responsibility, authority and \naccountability.  \n \n \n4  FERC, Chairman Laura Swett’s Comments at PJM’s Annual Meeting in Baltimore, Md. (May 12, 2026), \nhttps://www.ferc.gov/news-events/news/chairman-laura-swetts-comments-pjms-annual-meeting-baltimore-md-0."},{"page":10,"startToken":2465,"endToken":2525,"text":"10 \nIn summary, PJM is broken and must be fixed one way or the other. Our national security \nand ability to satisfy customer requirements are at risk. The current precarious state of affairs must \nbe addressed immediately. \nRespectfully,  \n \n/s/ Stacey Burbure  \nStacey Burbure  \nSVP, Transmission Regulatory Engagement and Compliance  \nAmerican Electric Power  \n8500 Smith’s Mill Road  \nNew Albany, OH 43054"},{"page":11,"startToken":2525,"endToken":2846,"text":"1 \n \nAPPENDIX \nPANEL 1 QUESTIONS \n1. What is the PJM Board’s role in ensuring that PJM is sufficiently tackling the region’s \noperational and market challenges? How does the Board evaluate its effectiveness in \nthat role? How often, and under what circumstances, does the Board act unilaterally, \nand should this change? \n \nThe resource adequacy challenges facing PJM are existential. Its fundamental charge is to \nserve customers reliably. Despite a half-decade of lead time, the issue is still not under control. \nThis struggle has revealed that the Board lacks a consistent ability to take timely action to meet \ncustomer needs or address evolving national security matters, reliability, planning, and market \nchallenges. The Board has been forced to be reactive and defensive rather than nimble and decisive, \npreventing timely action. AEP believes the cause is an imbalance among the core goals that RTOs \nunder Order No. 2000 must pursue: independence, responsiveness, and action. \nIndependence. Independence is the “bedrock upon which [PJM] must be built,”5 requiring \nthe RTO to maintain “a decision making process that is independent of control by any market \nparticipant or class of participants.” 6  PJM’s Board is structurally independent, but it lacks \nfunctional independence, impeding decision making.7  A well-functioning Board must have the \nexpertise, confidence and backbone to make hard decisions that will have significant impacts and \ndraw opposition. Those decisions, however, need not and must not be made in isolation; they must \nbe made based on experience, a robust understanding of the substance, and full consideration of \ndiverse stakeholders’ needs. This can only be achieved when Board members can engage on the \n \n5 Reg’l Transmission Orgs., Order No. 2000, FERC Stats. & Regs. ¶ 31,089 at 31,046 (1999), order on reh’g, Order \nNo. 2000-A, FERC Stats. & Regs. ¶ 31,092 (2000) (cleaned up). \n6 Order No. 2000, FERC Stats. & Regs. ¶ 31,089 at 31,060. \n7 See PJM Interconnection, L.L.C., 96 FERC ¶ 61,061 at 8 (2001)."},{"page":12,"startToken":2846,"endToken":3175,"text":"2 \n \nground through committees where the work of the RTO is done, and through formal and informal \ndiscussions with stakeholders. PJM’s structure, however, limits these opportunities. \nResponsiveness. PJM must be “responsive[] to the needs of customers and other \nstakeholders,” providing “avenue[s] for customers and other stakeholders to present their views \non RTO and ISO decision-making, and to have those views considered.” 8  Although PJM’s \nstakeholder process attempts to fulfill this requirement, 9  structural flaws in the Members \nCommittee create gridlock and stalemate rather than useful input for the Board. As PJM’s most \nsenior committee, the Members Committee reviews recommendations from all other committees \nand approves actions or recommendations with a two-thirds sector-weighted vote.10  The two-\nthirds requirement is not just limited to amending the Operating Agreement, over which the \nMembers Committee maintains Section 205 filing rights, but extends to any recommendations to \nthe Board. But because there are five sectors, any two sectors can combine to veto an action. As \nrecent history has shown,11 the Members Committee’s advice to the Board is far too often no \nadvice at all. Moreover, because the stakeholder process is split across numerous committees, \nsubcommittees, task forces, and other groups, stakeholders struggle to bring broad proposals to \naddress cross-cutting issues.  \nThis leads to a situation where transmission owners and other entities which serve load are \nunable to be responsive to customer needs, such as by fostering processes that allow new load and \ngeneration to get connected in the time the customer needs, not an RTO-mandated timeline built \n \n8 Wholesale Competition in Regions with Organized Elec. Mkts., Order No. 719, FERC Stats. & Regs. ¶ 31,281 at PP \n502-03 (2008), order on reh’g, Order No. 719-A, FERC Stats. & Regs. ¶ 31,292 (2009). \n9 PJM Interconnection, L.L.C., 133 FERC ¶ 61,071 at PP 1-2 (2010). \n10 PJM Operating Agreement § 8.4. \n11 See, e.g., PJM Interconnection, L.L.C., Docket No. ER24-98-000, Transmittal Letter. at 5, 63-64 (filed Oct. 13, \n2023)."},{"page":13,"startToken":3175,"endToken":3580,"text":"3 \n \nfor another era. A case in point is the process for interconnecting generation to serve new loads. It \nis slow and iterative with long study timelines and repeated restudies. While action is being taken \nto improve this issue, those measures are only now being studied and do not mean that PJM has \nfully addressed the core governance issues causing its lack of responsiveness overall. \nAction. The Board’s “primary responsibility” under the Operating Agreement is to take \naction to ensure PJM is run in a manner “consistent with . . . the safe and reliable operation of the \n[] Region” and with a “robust, competitive, and non-discriminatory electric power market . . . .”12  \nAs the Commission has emphasized, RTO governance must facilitate effective action, so that the \nRTO can “ensure that [it] formulates policies, operates the system, and resolves disputes in a fair \nand non-discriminatory manner.” 13   And the Commission has stressed the need for RTO \ngovernance to be “workable.”14  But when the stakeholder process becomes a bottleneck, and the \nBoard lacks the necessary authority, it becomes difficult for the Board to take action when needed. \nExacerbating the challenges, the Members Committee holds Section 205 filing rights under the \nOperating Agreement not just for corporate issues of the RTO, but core functions like energy \nmarkets and regional transmission planning. Thus in many cases, the Board lacks the power to act \non holistic solutions to the most pressing challenges outside of filing a Section 206 complaint. \nWhen issues were slow-moving and the region had surplus capacity, these challenges may \nhave slipped under the radar—but this decade’s challenges have proved the status quo inadequate. \n \n12 PJM Operating Agreement § 7.7(i). \n13 Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Servs. by Pub. Utils.; \nRecovery of Stranded Costs by Pub. Utils. & Transmitting Utils., Order No. 888, FERC Stats. & Regs. ¶ 31,036 at \n31,731 (1996), order on reh’g, Order No. 888-A, FERC Stats. & Regs. ¶ 31,048, order on reh’g, Order No. 888-B, 81 \nFERC ¶ 61,248 (1997), order on reh’g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff’d in relevant part sub nom. \nTransmission Access Pol’y Study Grp. v. FERC, 225 F.3d 667 (D.C. Cir. 2000), aff’d sub nom. New York v. FERC, \n535 U.S. 1 (2002). \n14 See, e.g., Order No. 719, FERC Stats. & Regs. ¶ 31,281 at P 546; Order No. 2000, FERC Stats. & Regs. ¶ 31,089 \nat 31,065, 31,069, 31,076."},{"page":14,"startToken":3580,"endToken":3901,"text":"4 \n \nA well-functioning Board, that is independent, responsive, willing to take action, and focused on \nthe core RTO mission of maintaining reliability, supporting affordability, and enabling economic \ngrowth, would be better equipped to swiftly consider innovative approaches like AEP’s ALIGN \nconcept than the current fragmented governance structure where passage requires that integrated \nideas are rung through a time consuming gauntlet of lower level stakeholder committees.  \n2. How should states, through the Organization of PJM States, Inc. (OPSI) or other \nstructures, interface with the Board to enable the region to meet operational and \nmarket challenges while respecting PJM’s independence? \n \nStates must have an expanded and more formal role in PJM’s governance process—\nwhether through state representation on the Board, creation of a state committee, or another \nstructure—that provides states a meaningful voice while preserving PJM’s independence and fairly \nbalancing the interests of parties with responsibility for grid reliability and cost impacts.  In Order \nNo. 2000, the Commission recognized that “states have important roles to play in RTO matters,” \nbut concluded that imposing “specific requirements on the role of state agencies in RTOs … would \nbe counterproductive in light of the variation in the legal responsibilities of state commissions and \nRTO design across regions.”15  States have a key interest in reliable and affordable electric service \nfor their citizens. These issues have become critically important challenges within the PJM region \nand are directly impacted by PJM decisions and policies. Yet states do not have any formal role in \nPJM governance, either individually or via the Organization of PJM States, Inc. (“OPSI”). States \nshould be able to act as a key voice in promoting innovative, integrated solutions that they see as \nvaluable for addressing today’s issues. With a more direct role in the stakeholder process, states \ncould provide needed clarity to drive solutions—like ALIGN and similar integrated solutions that \n \n15 Order No. 2000, FERC Stats. & Regs. ¶ 31,089 at 31,212, 31,073."},{"page":15,"startToken":3901,"endToken":4173,"text":"5 \n \nwe have seen in other RTOs—that span multiple stakeholder groups in transmission planning, \ngeneration interconnection, load interconnection, and market design.  \nA variety of reform options could help right-size the role of states in PJM’s governance \nprocess. AEP offers two ideas. For example, the advisory stakeholder model discussed above \nwould give states the opportunity to directly contribute to PJM policymaking processes. Indeed, \none of the main benefits of the advisory process approach is that it would give a meaningful voice \nto states and other stakeholders who lack voting rights on the Members Committee.  \nAn expanded state role must be accompanied by stakeholder process reforms aimed at the \ncore goals of enabling timely, technically sound decisions that drive dramatically improved \nnational security, maintain reliability, support affordability, and enable economic growth. OPSI \ncommissioners have acknowledged to FERC that the PJM states have diverse regulatory \nenvironments and policy interests.16 Without additional stakeholder reforms, an expanded state \nrole could lead to further gridlock, indecision, and regulatory uncertainty. \n3. What governance reforms would best improve accountability and responsiveness? \nAn advisory stakeholder model would best improve accountability and responsiveness. A \nwell-functioning and vibrant stakeholder process will support the Board in achieving the best \noutcomes. The stakeholder process, however, has become an end unto itself, becoming a forum for \ngridlock, not advice. AEP recommends that PJM employ an advisory model that provides \nstakeholders a meaningful opportunity to explore options, find consensus, and advise the Board \nwithout the risk of obstruction and stalemate.  \n \n16 Fed. & State Current Issues Collaborative, Docket No. AD24-7-000, Transcript of the 7/27/2025 Meeting on RTO \nGovernance/Resource Adequacy (posted Aug. 25, 2025)."},{"page":16,"startToken":4173,"endToken":4530,"text":"6 \n \nA key flaw today is misalignment between stakeholders’ advisory role (on the one hand) \nand the process (on the other). Stakeholders wear many hats, from advising the Board to exercising \nSection 205 rights over the Operating Agreement. But the Members Committee has (with limited \nexceptions) a single process for approving matters: a two-thirds sector-weighted vote.17  Changing \nPJM’s decision-making rules, and recommending tweaks to the capacity market, are governed by \nthe same rules. Moreover, because there are five sectors, it just takes two to band together to veto \naction. And with no de minimis threshold for participation, small groups can form minority \ncoalitions to defeat proposals supported by majorities of the stakeholders with core interests in \nreliability and affordability. Moreover, the current sectors do not accurately reflect accountability. \nFor example, PJM states have no formal role, yet they are accountable to their citizens, all of whom \nare electric customers reliant on the PJM grid. Further, AEP owns over 20% of the assets in PJM \nand controls less than 2% of the vote in the stakeholder process. Both of these examples show the \ndisconnect that exists in the current system. \nMeanwhile, because the Members Committee is responsible for deciding core corporate \ngovernance issues, it does not provide voting rights to some stakeholders with important voices, \nincluding states—even when the Members Committee is serving purely in an advisory function.18  \nStates have important interests, but they lack full representation in the stakeholder process. As a \nresult, States have resorted to extraordinary means to ensure their interests are heard.19 \nPJM must create an advisory stakeholder process aligning role and function. Such a process \nwould provide stakeholders a robust and meaningful opportunity to review proposals, develop \n \n17 PJM Operating Agreement ¶ 8.4. \n18 See Memorandum of Understanding Between PJM Interconnection, L.L.C. and the Organization of PJM States, Inc. \n(June 8, 2005), https://www.pjm.com/-/media/DotCom/documents/agreements/opsi-pjm-memorandum.ashx. \n19 See, e.g., Commonwealth of Penn. v. PJM Interconnection, L.L.C., 191 FERC ¶ 61,066 at PP 1-2 (2025) (describing \nthe complaint filed against PJM by Pennsylvania Governor Josh Shapiro and subsequent settlement)."},{"page":17,"startToken":4530,"endToken":4861,"text":"7 \n \nalternatives, test ideas, and achieve consensus where it can be found. The structure would be \nflexible, ensuring matters can be carefully scrutinized by committees of stakeholders with \nparticular interests or expertise, but enabling broader, integrated proposals to be reviewed as a \nwhole. Stakeholder voting would not follow a formal voting procedure that controls outcomes. \nPJM management, instead, would develop proposals after stakeholder engagement, and the Board \nwould determine whether to proceed, weighing stakeholder input and exercising accountability for \nthe final decision. This approach would enhance stakeholder participation while enabling more \ntimely decision-making and clearer accountability. Such a structure would also enable PJM to give \na full voice to more stakeholders, including states, which have strong interests in PJM’s success \nbut currently lack a voice on the Members Committee. It could also be flexible, enabling \nstakeholders to propose big ideas, such as AEP’s ALIGN concept, to address cross-cutting issues \nthat today may be split up across numerous balkanized committees, subcommittees, task forces, \nand other groups. \n4. How does the division of Federal Power Act section 20520 filing rights among PJM, \nTransmission Owners, and the Members Committee affect PJM’s ability to act \neffectively and quickly, when warranted, to address operational and market needs? \n \nPJM’s Board holds Section 205 filing rights over the majority of PJM’s operational \nfunctions, including those in the Tariff21 and Reliability Assurance Agreement.22 But the Members \nCommittee retains Section 205 authority over some of these issues that are addressed in the \nOperating Agreement, including energy markets and the Regional Transmission Expansion \nPlanning Protocol.23 Here, gridlock in the Members Committee is a binding constraint and limits \n \n20 16 U.S.C. § 824d. \n21 PJM Open Access Transmission Tariff § 9.2(a); PJM Interconnection, L.L.C., PJM Manual 34: PJM Stakeholder \nProcess 19 (effective Sep. 25, 2025), https://www.pjm.com/-/media/DotCom/documents/manuals/m34.pdf. \n22 See PJM Reliability Assurance Agreement § 16.4. \n23 See PJM Operating Agreement Sched. 1 (Energy Markets) and Sched. 6 (RTEP)."},{"page":18,"startToken":4861,"endToken":5139,"text":"8 \n \nPJM from solving important problems. This is especially troubling for energy market provisions, \nwhich are included verbatim in both the Tariff and Operating Agreement, requiring alignment \nacross the Board and Members Committee. 24  With respect to market design, AEP supports \nproviding states with defined authority under Section 205 to cause filings to be made before the \nCommission on matters within their collective jurisdiction, recognizing that states have a direct \nresponsibility for protecting consumers and advancing resource adequacy, affordability, and public \npolicy objectives.   \nPJM’s current stakeholder sector composition no longer reflects the responsibilities of \ntoday’s electric system, as it assigns equal voting weight regardless of an entity’s accountability \nfor reliability, investment obligations, or operational responsibility, resulting in governance \noutcomes that are disconnected from those most responsible for maintaining a reliable grid. Equal \nvoting power, however, is not the same as balanced governance. Effective governance recognizes \nthat parties bearing the greatest responsibility for maintaining reliable electric service should have \na commensurate role in shaping the decisions for which they ultimately remain accountable. States \nare accountable to their citizens for affordability, reliability, economic development, and resource \nadequacy.  A governance structure that excludes them from meaningful participation ignores one \nof the principal governmental entities responsible for electric service. \nIt is time to reexamine whether it is appropriate for the Members Committee to retain \nSection 205 authority over core functional matters. The practical effect of the current system is \nthat a single integrated solution, like AEP’s ALIGN concept, can require approvals under multiple \ngoverning documents with different filing priorities. Process therefore becomes a barrier to \ntechnical innovation.  \n \n24 Compare PJM Open Access Transmission Tariff Attach. K-Appendix with PJM Operating Agreement Sched. 1."},{"page":19,"startToken":5139,"endToken":5407,"text":"9 \n \n5. To what extent do provisions in PJM’s Operating Agreement, Transmission Owner \nAgreement, Open Access Transmission Tariff, Reliability Assurance Agreement, or \nManuals impede timely decision-making by PJM? \n \nThe stakeholder process, which is subject to deadlock and delay, is the core issue impeding \ntimely decision-making by PJM. As noted above, the Members Committee must not retain Section \n205 authority over core functional matters.  \n6. Recognizing regional differences, are there lessons from other regional transmission \norganization/independent system operator (RTO/ISO) governance structures that \nPJM could reasonably adopt to improve its responsiveness to the region’s operational \nand market challenges? \n \nAEP recommends five targeted modifications to PJM’s governance rules that would \nstrengthen the PJM Board’s effectiveness while preserving its independence and responsiveness. \nThese recommendations—which draw on approaches adopted by other RTOs and ISOs to improve \ngovernance—are discussed in greater detail below. Collectively, these reforms would modernize \nPJM governance by strengthening the connection between Board oversight and operational \nexecution, improving the Board’s understanding of the unique and varied conditions within the \nPJM region, expanding the pool of qualified Board candidates, protecting against entrenchment \nand status quo bias in the Board nomination process, and allowing the Board to engage \nproductively with stakeholders to effectively guide PJM and confront the complex challenges \nfacing the region’s electric industry today. The common lesson across other RTOs is not identical \ngovernance structures, but rather that governance must align responsibility, authority, and \naccountability while enabling innovation.  \nVoting rights for PJM’s President and CEO. PJM’s Operating Agreement must be revised \nto make the President and CEO a voting member of the Board. Under current rules, PJM’s"},{"page":20,"startToken":5407,"endToken":5728,"text":"10 \n \nPresident and CEO sits on the Board ex officio, but does not have a vote.25  As the executive \nresponsible for implementing Board decisions and managing the nation’s largest wholesale \nelectricity market, PJM’s President and CEO offers unique operational expertise and \naccountability—and must be fully involved in Board decision-making.   \nIndeed, the CEOs of MISO, SPP, and NYISO are voting members of their respective \nRTO/ISOs’ boards (subject to certain recusal limits).26 Giving PJM’s President and CEO a vote on \nthe Board would make PJM more dynamic by improving information flow, enhancing Board \ndebate, and making the President/CEO a decision-making partner.  \nIn-region preference for Board candidates. PJM must adopt a preference for Board \ncandidates who reside within the PJM footprint or have significant professional experience with \nthe region’s electric system. Although PJM’s Operating Agreement imposes certain minimum \nexpertise requirements that the Board collectively must meet, it does not require or prioritize \nfamiliarity with the PJM region.27 Accordingly, few current Board members had ties to the PJM \nregion before joining the Board. Because Board decisions directly affect national security, electric \nreliability, affordability, and economic development across the PJM footprint, regional knowledge \nmust be recognized as an important qualification for Board members. Notably, both ISO-NE and \nNYISO currently have preferences for in-region directors.28 Regional knowledge is particularly \nimportant in PJM, which has a uniquely large and diverse footprint that includes both vertically \nintegrated and restructured states with significant variation in local supply and demand dynamics. \nAs PJM itself recognized in a 2011 filing, adding Board members “from the PJM region who are \n \n25 PJM Operating Agreement § 7.1. \n26 See MISO Transmission Owner Agreement, App’x F (“MISO Bylaws”), Art. IV § 4.1; MISO Bylaws Art. V § 5.4; \nSPP Bylaws § 4.2.1; NYISO Bylaws, Art. III § 3(a).  \n27 PJM Operating Agreement § 7.2. \n28 See ISO-NE Participants Agreement § 9.2.2; NYISO Bylaws, Art. III § 2."},{"page":21,"startToken":5728,"endToken":6133,"text":"11 \n \nfamiliar with the current practices and operations of PJM” “is beneficial and crucial to PJM’s \ncontinued success.”29 \nShorter cooling-off period for prospective Board members. Limiting PJM’s “cooling-off” \nperiod for prospective Board members to one year also would improve PJM’s ability to attract \nqualified Board candidates with relevant experience and local knowledge. PJM’s rules require at \nleast a two-year gap between service as a director, officer, or employee of a PJM member (or an \naffiliate or related party) and election to the PJM Board.30  This restriction unnecessarily limits the \npool of qualified candidates with recent industry experience. A one-year period would maintain \nBoard independence31 while improving PJM’s ability to recruit members with current expertise. \nThis adjustment would more closely align PJM’s governance rules with those of other RTOs. \nMISO in 2017 reduced its cooling-off period from two years to one, explaining that the longer \nrestriction had “affected MISO’s ability to recruit Board candidates” as it could “often times create \nconflicts that … disqualify an individual from consideration.”32 ISO-NE and SPP have no cooling-\noff periods for board members.33 \n \n29 PJM Interconnection, L.L.C., Docket No. ER11-630-000, Transmittal Letter at 2 (filed Sep. 23, 2011) (explaining \nthat “electing members to the Board from the PJM footprint” will allow PJM to “maximize local input” and avoid \n“expend[ing] time and resources seeking and training candidates who lack the PJM-specific expertise that adds \nsignificant value to the PJM Board”). \n30 PJM Operating Agreement § 7.2. \n31 See Order No. 2000, FERC Stats. & Regs. ¶ 31,089 at 31,062 (explaining that FERC’s “focus” in evaluating \nfinancial independence “will be on current financial interests” (emphasis added)). \n32 Midcontinent Indep. Sys. Operator, Inc., Docket No. ER17-686-000, Transmittal Letter at 8-9 (filed Dec. 28, 2016); \nsee Midcontinent Indep. Sys. Operator, Inc., Docket No. ER17-686-000, Letter Order (issued Feb. 23, 2017). PJM \nreduced its cooling-off period from five years to two years in 2011, due to the challenges the protracted cooling-off \nperiod created in finding qualified Board candidates from the PJM region. PJM Interconnection, L.L.C., Docket No. \nER11-630-000, Transmittal Letter at 2 (filed Sep. 23, 2011); PJM Interconnection, L.L.C., Docket No. ER11-630-000, \nLetter Order (Nov. 1, 2011). \n33 Instead, both ISO-NE and SPP impose restrictions on board members’ current relationships with and financial \ninterest in market participants. See ISO-NE Participants Agreement § 9.3.1; ISO-NE Code of Conduct § 2.2; SPP \nBylaws § 4.2.3."},{"page":22,"startToken":6133,"endToken":6569,"text":"12 \n \nReduce Board control over nomination process. PJM must limit the role incumbent Board \nmembers play in the Board nomination process. Under current rules, PJM’s Nominating \nCommittee—which nominates Board candidates to be elected by the Members Committee—\nincludes three incumbent Board members (one of whom must not vote on the Nominating \nCommittee) and five sectoral representatives. 34  This structure gives substantial influence to \nincumbent Board members and creates—even if unintentionally—a thumb on the scale favoring \nthe status quo. Corporate governance scholars have long recognized that self-perpetuating board \nnomination processes can lead to detrimental entrenchment and insulation.35 Allowing only one \nincumbent Board member to serve on the Nominating Committee in a non-voting role would \npreserve information flows and representation of the current Board’s perspective in the nomination \nprocess while promoting true independence, responsiveness to PJM members, and bolder, more \neffective leadership. Notably, two ISOs—CAISO and ERCOT—have board nomination processes \nthat provide no formal role for incumbent directors.36 \nEase restrictions on ex parte communications. Today, PJM’s Code of Conduct for its \nBoard includes restrictive ex parte rules that limit the Board’s ability to communicate on important \nissues.37  These restrictions prevent the Board from effectively engaging with members and other \n \n34 PJM Operating Agreement § 7.1. \n35 See, e.g., Adolf A. Berle & Gardiner C. Means, The Modern Corporation and Private Property 88 (1932) (“[C]ontrol \nwill tend to be in the hands of those who select the [nominating] committee by whom, in turn, the election of directors \nfor the ensuing period may be made. Since the [nominating] committee is appointed by existing management, the \nlatter can virtually dictate their own successors. Where ownership is sufficiently sub-divided, the management can \nthus become a self-perpetuating body even though its share in the ownership is negligible.”); Lucian A. Bebchuk, The \nMyth that Insulating Boards Serves Long-Term Value, 113 Colum. L. Rev. 1637, 1644 (2013) (“[A]rrangements that \ninsulate boards from shareholders and shareholder pressure have been consistently associated with lower firm value \nand worse operating performance.”); Bo Becker & Guhan Subramanian, Improving Director Elections, 3 Harv. Bus. \nL. Rev. 1, 1 (2013) (“It is well known that U.S. director elections are largely a formality: incumbents typically \nnominate themselves, for elections that are almost always uncontested, and are re-elected with virtual certainty. The \nresult … is what one might expect: directors who are elected not for their qualifications but rather because shareholders \nsimply have no other choice.”). \n36 See CAISO Board Selection Policy § 4.2; Tex. Utils. Code § 39.1513(a), (d). \n37 PJM Board of Managers Code of Conduct at 3 (updated Nov. 2025)."},{"page":23,"startToken":6569,"endToken":6872,"text":"13 \n \nstakeholders on important issues. Nor are these counterproductive restrictions needed to protect \nthe Board’s independence: No other RTO or ISO imposes such severe restrictions,38 and they do \nnot fit the Board’s role: PJM under the Federal Power Act is a public utility, not a regulator, and \nwe must not foster the misimpression that the Board is akin to another layer of regulation. PJM’s \nex parte rules thus must be amended to eliminate or significantly reduce limits on communications \nbetween the Board and stakeholders. Reforming PJM’s ex parte rules would improve governance \nby enabling Board members to receive timely, balanced, and informed perspectives on complex \nreliability, market, and transmission planning issues. This reform, in particular, would assist the \nBoard in considering innovative reforms necessary to move the grid forward. It will allow a freer \nexchange of new, innovative ideas from stakeholders—like AEP’s ALIGN concept—and from \nother RTOs who are also using integrated system planning and other techniques to cut through \ntoday’s load, transmission planning, and generator interconnection issues to provide solutions that \nmore nimbly meet the needs of todays’ grid.  \n \n38 See generally Christopher A. Parent et al., Exeter Assocs., Inc. Governance Structure and Practices in the FERC-\nJurisdictional ISOs/RTOs, Exeter Assocs., Inc. (Feb. 2021) (discussing PJM’s ex parte restrictions and not identifying \nany ex parte restrictions for other RTOs or ISOs), https://nescoe.com/wp-content/uploads/2021/02/ISO-\nRTOGovernanceStructureandPractices_19Feb2021.pdf; see also MISO, Principles of Corporate Governance § V.E \n(Dec. 7, 2023) (providing that if “a third party [initiates] a communication directly with a Director on Board or \nCompany business without notice to the other Directors,” the Director involved in the communication “shall promptly \nreport the substance of the discussion to the CEO and to the full Board no later than its next regularly scheduled \nmeeting.”)."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":3,"startToken":0,"endToken":202},{"p":2,"at":3,"title":"I. Introduction and Summary","method":"printed heading","endPage":4,"endAt":772,"startToken":202,"endToken":889},{"p":4,"at":772,"title":"II. How Process Thwarts Substance in PJM—An Illustration","method":"printed heading","endPage":6,"endAt":1458,"startToken":889,"endToken":1526},{"p":6,"at":1458,"title":"III. PJM And Its Stakeholders: Reform Is Needed To Facilitate Action","method":"printed heading","endPage":7,"endAt":1161,"startToken":1526,"endToken":1785},{"p":7,"at":1161,"title":"IV. The Role of the States","method":"printed heading","endPage":8,"endAt":650,"startToken":1785,"endToken":2040},{"p":8,"at":650,"title":"V. The Role of the Board","method":"printed heading","endPage":9,"endAt":3,"startToken":2040,"endToken":2185},{"p":9,"at":3,"title":"VI. Conclusion","method":"printed heading","endPage":23,"endAt":2018,"startToken":2185,"endToken":6872}]}