{"document":{"slug":"rec-20260715-4002","title":"Pre-filed Statement of Susan Bruce, Counsel for PJM Industrial Customer Coalition, for the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-15","accession":"20260715-4002","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM INDUSTRIAL CUSTOMER COALITION","kind":"testimony","file":"sources/filings/text/20260715-4002_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4002","tier":"record","sha256":"2003ffef0884771f2dd46796764fb2655bc6daa202bc7e29e8206eed0e0368a0","pages":19,"tokens":8039,"emptyPages":[],"textThemes":["retail"]},"pages":[{"page":1,"startToken":0,"endToken":344,"text":"UNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Governance and Stakeholder Reforms  \n: \nDocket No. AD26-7-000 \n \n \nPRE-FILED STATEMENT OF SUSAN BRUCE, COUNSEL TO  \nPJM INDUSTRIAL CUSTOMER COALITION \n \n \nOn behalf of PJM Industrial Customer Coalition (PJMICC), I am privileged to offer this \nPre-Filed Statement on PJM Governance and Stakeholder Reforms.  As discussed in more detail \nbelow, PJMICC is an ad-hoc coalition of a broad cross-section of energy-intensive manufacturers \n(e.g., steel, cement, consumer products, pharmaceuticals, and paper) and institutional customers \n(e.g., hospitals and universities) doing business in PJM Interconnection, L.L.C. (“PJM”).  PJMICC \nmembers represent major employers in the PJM region and support the regional and national \neconomy.  Thank you for the opportunity to address the Commission on these important issues. \n \nOn behalf of PJMICC, my colleagues at McNees and I have directly participated in the \nPJM stakeholder process for more than 25 years and have witnessed the evolution of PJM’s \ngovernance, including both formal processes and informal practices.  PJMICC members' \nbusinesses depend on a reliable energy supply, competitive energy costs, and options to manage \ntheir energy cost exposure through various demand response tools.  For that reason, members of \nPJMICC were the original participants of the PJM End-Use Customer Sector because they \nrecognized that, for energy-intensive manufacturers and institutional customers, wholesale energy \ncosts account for the majority of their retail electric costs.  Reliable, competitive pricing is essential \nto PJMICC members' ability to remain economically viable in the PJM region, especially as other \nareas of the country, if not the world, use energy as an economic development tool.  \n \nFor context on PJMICC’s interests in the PJM stakeholder process, PJMICC engages in the \nPJM stakeholder process in an effort to support “just and reasonable rates” by addressing:      \n \n Concerns regarding PJM administrative interventions that affect energy prices; \n Approaches to ensure system reliability at the lowest possible reasonable cost;  \n The importance of following the principles of cost causation; \n The need to address the potential for market power exercise; \n The value of independent planning; and \n Demand response as a tool for energy-intensive customers to manage their energy costs."},{"page":2,"startToken":344,"endToken":759,"text":"2 \n \nPJMICC has strongly supported PJM, even when it may have disagreed with aspects of PJM \nmarkets, operations, and planning, because of the value that PJMICC members derive from a broad \nand diverse market with shared reserves.   \n \nIn this Pre-Filed Statement, I set forth PJMICC’s view on the governance challenges within \nPJM and offer five targeted reforms: retail-impact accountability in PJM’s mission and decision-\nmaking, enhanced Board independence and transparency, lower-committee voting discipline, \nCBIR process discipline, and more useful tools for time-sensitive issues. \n \nI. \nBackground \n \nWhile PJM's markets, operations, and planning function at the wholesale level, PJM’s \ngovernance structure must appropriately recognize that end-use customers are the ultimate \nbeneficiaries of the energy, transmission, and reliability services offered within the PJM region.  \nRetail customers bear the ultimate cost of the construct, either directly or indirectly. Industrial and \ncommercial end-use customers represent roughly half of all market activity in the PJM region and \nhave invested billions of dollars in the region in reliance on stable, well-functioning markets. \nElectricity is an essential service marked by endemic market power concerns, which is precisely \nwhy a sound, balanced governance structure matters. \n \nLet me state PJMICC’s overarching position plainly: we support fundamental aspects of \nPJM’s existing governance structure, especially its sector-weighted voting foundation.  PJM’s \nframers instituted important checks and balances that, when properly implemented, strive toward \nconsensus-building and compromise and, when necessary, independent PJM Board action. \nWidespread stakeholder support for PJM’s market rules—including by retail customers—\nminimizes litigation before this Commission and the courts, builds market confidence and stability, \nand supports the prospect for legally durable outcomes.   \n \nThat is not to suggest that the PJM governance structure and stakeholder process are \nperfect; they are not.  Important reforms are necessary to improve the effectiveness of PJM \ngovernance and the stakeholder process itself, which has become unduly time- and resource-\nintensive without yielding commensurate benefits.  However, constructive reform of the existing \nframework must maintain the benefits of a broad regional market and a liquid, functional energy \nmarket.  From the vantage point of PJMICC, it is important to focus first on reforms that improve \nconfidence in PJM’s independence and accountability: both public confidence in PJM market \noutcomes and investor confidence in the value of investing in the PJM footprint, whether in terms \nof necessary resource infrastructure or energy-intensive customers’ investment in the region.  \n \nSince PJM’s inception—and in small measure due to the success of FERC’s and states’ \npolicies promoting open access and competition—there has been a marked change in the energy"},{"page":3,"startToken":759,"endToken":1229,"text":"3 \n \nlandscape, with retail customers now able to control how they produce and purchase energy, \nincluding through competitive suppliers.  Working through wholesale Curtailment Service \nProviders, PJMICC members and others have offered demand response capability to the PJM \ncapacity, energy, and ancillary service markets.  Energy-intensive customers may elect behind-the-\nmeter applications to help manage their energy costs.  Fuel cells and batteries have become part of \nindustrial customers’ plans.  Many energy-intensive customers have entered into bilateral \nagreements to support renewable energy development to reach their own corporate sustainability \ngoals.  Even residential customers have become linked to PJM wholesale markets through rooftop \nsolar and other similar applications, where they may receive LMP energy payments under state \nprograms.  FERC’s Order No. 2222 has continued to push for distributed energy resource \nengagement.1  As a result, the 21st-century modern grid looks very different from the wholesale \ngrid when PJM became a Regional Transmission Organization (“RTO”).  Even before the “new” \nlarge computation loads – which dwarf most, if not all, industrial applications – the lines were \nbecoming blurry between retail and wholesale jurisdiction. \n \nNotwithstanding PJM’s role as a FERC-jurisdictional utility, even putting aside the latest \nissues with Large Load integration, PJM’s interface with states has been growing.  Now, states that \nmay have been willing to defer certain responsibilities to PJM may be unwilling to continue to do \nso.  However, neither PJM nor individual states can succeed on their own.  And each state has \ninterests that may diverge from those of others.  Put simply, the region is experiencing a living, \nbreathing exercise in cooperative federalism.  Yet, the current framework is limited.  For many \nreasons, including murky jurisdictional boundaries, the current framework for engagement has not \nfacilitated the robust coordination required between PJM and the states.  Even more concerning, it \nlacks open, transparent discussions with all affected stakeholders about these challenges, which \ncould lead to real problem-solving.   \n \nPJM Members have entrusted the PJM Board with the authority to act independently to \noperate markets, plan the system, and perform other functions.  But success requires genuine \nindependence.  It requires independence from the PJM Transmission Owners that “gave birth” to \nPJM; it requires independence from the generators of the energy that is forecasted to be in short \nsupply in the face of unprecedented load growth; it requires independence from customers who \nare concerned that the price tag to do what may need to be done to support abundant energy supply \nis too much for customers of any size or type to bear.   \n \nBuilding on those themes, PJMICC recommends five focused changes to PJM’s \ngovernance and stakeholder process. \n \n \n1 Participation of Distributed Energy Res. Aggregations in Mkts. Operated by Reg’l Transmission Orgs. & Indep. Sys. \nOperators, Order No. 2222, 172 FERC ¶ 61,247 (2020), order on reh’g, Order No. 2222-A, 174 FERC ¶ 61,197, order \non reh’g, Order No. 2222-B, 175 FERC ¶ 61,227 (2021)."},{"page":4,"startToken":1229,"endToken":1723,"text":"4 \n \nFirst, PJM should modify its Operating Agreement (“PJM OA”) to require express \nconsideration of the retail-customer impacts of PJM’s wholesale markets, planning, and \noperations. This consideration should include cost modeling and cost-benefit analysis, including \nthe cost implications of administrative interventions into PJM markets, and should account for \nimpacts on existing bilateral arrangements between suppliers and retail customers. This change \nwould signal that PJM’s responsibilities must be understood through the practical effects of its \nwholesale actions on retail customers, particularly in a modern grid where demand response, \ndistributed resources, and shared responsibility for resource adequacy have blurred traditional \njurisdictional lines. \n \nTo facilitate this analysis of impacts on retail customers, PJMICC also supports the PJM \nBoard qualifications and experience set forth in the OA be expanded to include a Board Member \nwith experience in managing significant energy budgets as a consumer, in addition to currently-\nestablished qualifications and experience.2  This change should be memorialized within the PJM \nOA. \n \nThese changes to the OA would complement any action to incorporate states into the PJM \ngovernance or stakeholder process in an enhanced  way.  Without more information about states’ \npreferred role, PJMICC does not take a specific position at this point on the appropriate rights each \nstate, or the states collectively, should have in PJM governance.  At a minimum, however, if a \nclearer role for states in PJM governance is being considered, it should be provided along with \nadditional guidance on the distinct roles of FERC and the states under the Federal Power Act.  \nGiven today's pressing problems, a clear and common understanding of who represents the state's \ninterests, how to give each state a unique voice in the process, and when to relay state perspectives \nto the Board is vital.    \n \nSecond, PJM should enhance Board independence and transparency. It is not \nsurprising that PJM Members struggle to reach consensus on significant “pocketbook” and cost-\nallocation issues.  In these circumstances, the Board is entrusted to act independently.  In so doing, \ngiven the stakes of these decisions, PJM Members, States, and all stakeholders must have \nconfidence that the PJM Board has all relevant information and is making the hard decisions.  The \nBoard should not make decisions out of fear influenced by the threat that their decisions may affect \ntheir tenure in Board service.  At the same time, there must be mechanisms to ensure both PJM \naccountability in general and Board accountability in particular.   \n \n \n2 “Of the nine Board Members, four shall have expertise and experience in the areas of corporate leadership at the \nsenior management or board of directors level, or in the professional disciplines of finance or accounting, engineering, \nor utility laws and regulation, one shall have expertise and experience in the operation or concerns of transmission \ndependent utilities, one shall have expertise and experience in the operation or planning of transmission systems, and \none shall have expertise and experience in the area of commercial markets and trading and associated risk \nmanagement.”  PJM OA, Section 7.2."},{"page":5,"startToken":1723,"endToken":2167,"text":"5 \n \nThe PJM Board’s decisions directly affect energy-intensive businesses' ability to compete \nwithin the United States and globally.  While different stakeholder communities may not always \nagree with the Board’s decision, they must trust that the Board had all available facts, without \nvarnish, and affected stakeholders must understand the basis for the Board’s independent actions.  \nAs such, we support requiring the Board to issue formal written justifications for its decisions, \nespecially those that exceed certain monetary or risk thresholds.  Such written justifications should \ninclude: (i) identification of the specific problem or need the decision addresses; (ii) explanation \nof the alternatives considered and the rationale for selecting the chosen approach; (iii) quantified \ncost-impact analysis, including the impact on retail markets and their customers; (iv) the success \nmetrics by which the decision’s effectiveness will be evaluated; and (v) a commitment to post-\nimplementation review at a defined interval.  Open Board meetings may be a solution, as may \nenhanced transparency into PJM's corporate goals and the drivers of PJM staff compensation. \n \nThird, PJM should address lower-committee voting practices that can hinder \ninnovation and defer customer concerns until too late in the process. Affiliate voting at lower-\nlevel committees can allow incumbent interests to shape the agenda before proposals receive \nsector-weighted review, which weakens early consideration of new technologies, new entrants, \nand customer impacts. \n \nPJMICC supports leveling the playing field from the outset of the stakeholder process.  As \nsuch, we propose that PJM and its Members reconsider the role of affiliate voting on lower-level \ncommittees and task forces.  New technologies and entrants’ ideas struggle to secure the necessary \nsupport to advance their issues in the stakeholder process.  Simply put, new entrants with few \naffiliates have little chance of making real progress in bringing their ideas to the Senior PJM \nCommittees for sector-weighted consideration if their innovations affect incumbent market \nparticipants' revenue opportunities.    \n \nMoreover, customers’ voices in lower-level discussions are diluted, and as a result, \ncustomer concerns are rarely considered until discussion reaches upper-level committees.  At this \npoint, any customer concerns are wrongly viewed as a veto when, in fact, they should have been \nhelping to shape solutions as the issues progressed through the committee structure.   \n \nFourth, PJM should improve implementation of its consensus-based issue resolution \n(“CBIR”) process. CBIR remains a useful framework, but in practice the process too often \nbecomes slowed by extended disputes over problem statements, issue charges, scope, and \nprocedural gates before stakeholders can engage the merits. \n \nFor example, PJM, PJM Members, and stakeholders spend significant time following the \nCBIR process by identifying their respective interests with respect to an approved issue charge, \nbut there is little consideration of cross-checking any proposals developed pursuant to the issue"},{"page":6,"startToken":2167,"endToken":2667,"text":"6 \n \ncharge against those identified interests at the end of the process.  This results in a decay in \naccountability.  Also, given the siloed work efforts developed through CBIR, there is little \nopportunity to find common ground across market segments to address the “problem statement.”  \nThere is a risk of unintended consequences when stakeholders cannot consider the integrated \nenergy system as a whole when numerous issues are “off limits.”   \n \nFifth, PJM should use better tools to give the Board actionable information on time-\nsensitive issues. The Critical Issue Fast Path (“CIFP”) process has been open and transparent, but \nits votes on numerous divergent proposals often provide less useful guidance than targeted polling, \nwritten submissions, or structured Board questions designed to identify the most material areas of \nagreement and dispute. \n \nIn summary, PJMICC recommends five meaningful but incremental reforms that preserve \nthe stability of the PJM market platform while improving independence, accountability, \ntransparency, and stakeholder efficiency. Energy investors, energy-intensive customers, including \ndata centers, manufacturers, and institutional consumers, all depend on a stable market platform \nto make long-term commitments with confidence; accordingly, PJMICC urges the Commission to \npreserve market stability as a foundational value even as the region adapts to today’s resource \nadequacy challenges. \n \nII. \nResponse to Commission Questions  \nA. \nPJM Governance Mechanics – Board Authority, States’ Role, Filing Rights, \nand Document Architecture  \n1. \nPJM Board Role  \n \nIn responding to this question, PJMICC emphasizes the importance of the PJM Board being \nindependent and having the right to submit to FERC any changes to PJM’s market and transmission \nplanning rules that it believes are necessary, which the Board has the right to do, under Section \n205 or 206 of the Federal Power Act, as appropriate.3 The PJM OA’s requirement that the Members \nCommittee approve any change to the Operating Agreement in order for PJM to modify the PJM \nOA under Section 205 of the Federal Power Act does not detract from the Board’s essential role.4  \n \n3 See PJM OA, Section 7.7. \n4 “Except as provided by law or otherwise set forth herein, this Agreement, including any Schedule hereto, may be \namended, or a new Schedule may be created, only upon: (i) submission of the proposed amendment to the PJM \nBoard for its review and comments; (ii) approval of the amendment or new Schedule by the Members Committee, \nafter consideration of the comments of the PJM Board, in accordance with Operating Agreement, section 8.4, or \nwritten agreement to an amendment of all Members not in default at the time the amendment is agreed upon; and (iii) \napproval and/or acceptance for filing of the amendment by FERC and any other regulatory body with jurisdiction \nthereof as may be required by law.  If and as necessary, the Members Committee may file with FERC or other \nregulatory body of competent jurisdiction any amendment to this Agreement or to its Schedules or a new Schedule \nnot filed by the Office of the Interconnection.”  See OA, Section 18.6; see also PJM OA, Section 8.4."},{"page":7,"startToken":2667,"endToken":3210,"text":"7 \n \nFor the reasons explained below, PJMICC does not support the PJM Board's assumption of \nadditional Section 205 rights.  Fundamentally, Section 205 rights are about PJM’s burden of proof \nbefore this Commission when it files changes to PJM’s operative document.  PJMICC’s position \nis that where there is no broad consensus from within PJM, heightened review by this Commission \npursuant to Section 206 is appropriate.   \n \nToday, the PJM Board has unilateral Section 205 filing rights only with respect to its \nReliability Assurance Agreement, which governs the PJM capacity construct, and certain aspects \nof the Open Access Transmission Tariff (“Tariff”) not otherwise reserved by the Transmission \nOwners.5  PJM does not possess Section 205 filing authority over the PJM OA, which governs the \nenergy market, or transmission planning under the Tariff.  Only upon PJM Members’ super-\nmajority sector-weighted approval, does PJM have Section 205 rights over the PJM OA and Tariff \n(with respect to those sections for which the Transmission Owners have not reserved certain \nrights).  Otherwise, PJM must submit any PJM OA or eligible Tariff change under Section 206 of \nthe Federal Power Act.   \n \nThe D.C. Circuit has called Sections 205 and 206 of the Federal Power Act \"related but \ndistinct.\"6 Whether rates are changed through Section 205 or Section 206, both \"require that the \nrates charged by utilities subject to FERC's jurisdiction be just and reasonable.\"7  But, as the D.C. \nCircuit said recently, \"they enforce that mandate differently.”8 \n  \nProceedings initiated under Section 206 have a heavier burden to meet than those initiated \nunder Section 205.  As explained by the courts, \"In a section 205 proceeding, the utility is not \nrequired to show that a previous rate was unlawful.\"9  Rather, \"FERC has construed its Section \n205 authority as 'limited to an inquiry into whether the [proposed] rates ... are reasonable,' without \nregard to whether the rates are ‘more or less reasonable’ than other possible rate designs.\"10  The \nD.C. Circuit also stated, \"We have described FERC's role under Section 205 as 'essentially passive \nand reactive'; so long as a utility's rates fit within the zone of reasonableness, FERC is obligated \nto approve them.\"11  \n \n5 Under PJM Tariff Section 9.1, Transmission Owners have exclusive, unilateral Section 205 rights with respect to \ntransmission revenue requirements, transmission rate design, and Tariff provisions governing recovery of \ntransmission-related costs.  Individual Transmission Owners may file their own zonal revenue requirements.  \nTransmission Owners must vote under the Combined Transmission Owners Agreement (“CTOA”) Section 8.5.1 to \napprove region-wide rate design changes. \n6 Md. Office of People's Couns. v. FERC, 164 F.4th 920, 923 (D.C. Cir. 2026) (citing FirstEnergy Serv. Co. v. FERC, \n758 F.3d 346, 348 (D.C. Cir. 2014)).  \n7 Id. \n8 Id.  \n9 Emera Maine v. FERC, 854 F.3d 9, 21 (D.C. Cir. 2017). \n10 New York State Pub. Serv. Comm'n v. FERC, 104 F.4th 886, 894 (D.C. Cir. 2024) (quoting City of Bethany v. FERC, \n727 F.2d 1131, 1136 (D.C. Cir. 1984)).   \n11 Id. at 891 (citing Atl. City Elec. Co. v. FERC, 295 F.3d 1, 9–10 (D.C. Cir. 2002) (quoting City of Winnfield v. FERC, \n744 F.2d 871, 876 (D.C. Cir. 1984) (Scalia, J.)))."},{"page":8,"startToken":3210,"endToken":3674,"text":"8 \n \n \nIn contrast, under Section 206, FERC must \"determine whether an existing rate is 'unjust, \nunreasonable, unduly discriminatory or preferential....'\"12  \"Only after having made the \ndetermination that the utility’s existing rate fails that test may FERC exercise its section 206 \nauthority to impose a new rate.\"13 While Section 205 and Section 206 must both result in just and \nreasonable rates, courts have made clear that Section 206 has a higher burden, with its two-part \nanalysis.  \n \nThis statutory framework has direct implications for how Section 205 filing rights should \nbe allocated within PJM's governance structure.  Because Section 205 relieves the proponent of \nany burden to justify the unreasonableness of the status quo, the lighter burden is properly reserved \nfor changes that already command broad support within the PJM Membership.  In PJMICC’s view, \nbroad stakeholder support serves as evidence that a proposed rule reflects a balanced consideration \nof competing interests and is more likely to produce durable, workable market outcomes.  Where \na rule change lacks such support, the heightened scrutiny of Section 206 is the appropriate check. \n \nPJM's right to file under Section 205 of the FPA is a privilege.  For this reasons, the \nprivilege of filing under Section 205 should continue to require the moderating influence of sector-\nweighted supermajority support as evidence of a balanced proposal.  If PJM Members do not \nwidely support a rule change, enhanced FERC scrutiny under Section 206 of the Federal Power \nAct is appropriate, especially given the impacts on customers.  The impact, however, transcends \ncost and includes whether the proposed changes are reasonably targeted to achieve the desired \nobjective, whether they involve changes in market behavior or investment. \n \nThe practical consequences of unilateral Section 205 authority are evident in PJM's \ncapacity construct—the one area where the Board already possesses such authority.  The PJM \ncapacity construct has generated sustained, recurring stakeholder concern and dissatisfaction.  That \nobservation suggests the challenges facing PJM’s governance may be more cultural and \noperational than structural or documentary.  Notably, the non-capacity aspects of PJM's markets, \nwhere Section 205 rights require supermajority support, have not experienced comparable rule-\nrevision churn. \n \nPJMICC urges the Commission to preserve the existing balance rather than expand the \nBoard's unilateral filing authority.  If the PJM Board believes strongly that a proposed change is \njust and reasonable, it should have the confidence to pursue that change through the customary \nprocess, including filing such changes under Section 206 of the Federal Power Act, rather than \nseeking expanded unilateral filing rights.   \n \n12 Emera Maine at 21 (D.C. Cir. 2017) (quoting 16 U.S.C. § 824e(a)). \n13 Id. (citing Atl. City Elec. Co. v. FERC, 295 F.3d 1, 10 (D.C. Cir. 2002); Cities of Bethany v. FERC, 727 F.2d 1131, \n1143 (D.C. Cir. 1984)) (emphasis in original)."},{"page":9,"startToken":3674,"endToken":4078,"text":"9 \n \n2. \nStates’ and OPSI’s Interface with the Board \n \nIn PJMICC’s view, the states' role in PJM's governance is best exercised through structured \nconsultation with the Board and the PJM Membership, rather than through an expanded or \ndecisional role in PJM's stakeholder-driven, sector-weighted governance structure.  \n \nStates' perspectives on PJM's markets and operations are necessarily informed by \nconsiderations that extend beyond wholesale market outcomes, including retail policy objectives \nand states' regulatory relationships with the utilities they oversee.  PJMICC believes those \nconsiderations are best channeled through existing consultative mechanisms.  OPSI already has \nthe opportunity to meet privately with the PJM Board at OPSI’s annual meeting, and OPSI \nprovides a standing report at each PJM Members Committee meeting.  These existing channels \noffer a meaningful venue for candid dialogue between the states and the Board, reflect a sound \nfoundation on which to build further engagement and can be built upon without any need for rule \nchanges. \n \nShould the Commission or PJM consider affording states a greater voice in governance, \nPJMICC would favor a framework centered on state public utility commissions and organized \naround consultation rather than a decisional role in PJM's governance process.  In addition to \nOPSI’s current engagement (which is a strong base upon which to build),  it is worth noting that \nstate consumer advocate offices often exercise voting rights in the PJM End-Use Customer Sector.  \nWhile not direct extensions of state authority, state consumer advocate offices are, in many cases, \nappointed and, in at least some cases, confirmed by instruments of the state.  This is another vehicle \nin which states’ interests have been represented directly in PJM governance and stakeholder \nprocess.  \n \nAt the same time, PJMICC recognizes that greater state engagement may yield meaningful \nbenefits, particularly to the extent it strengthens states’ ability to help craft constructive, durable \noutcomes, especially given the cooperative federalism model.  PJMICC would support formalizing \nOPSI's existing consultative access and expanding it to include individual states —for example, \nby establishing a recognized opportunity for states to address the Members Committee or the \nbroader PJM membership in advance of a vote on matters of particular interest to states.  Such \nconsultative access should also include adequate time to address the Board on relevant issues being \naddressed in a CIFP-like stakeholder process.  PJMICC views this approach as a constructive \nmeans of enhancing states' voice within PJM's governance structure while preserving the sector-\nweighted, stakeholder-driven framework that has long supported the effective functioning of PJM's \nmarkets."},{"page":10,"startToken":4078,"endToken":4513,"text":"10 \n \n3. \nGovernance Reforms for Accountability and Responsiveness \n \nEspecially during this time of unprecedented stress on PJM as the RTO, PJMICC supports \nbuilding meaningful and enforceable accountability into PJM's governance.  As discussed in the \nIntroduction, PJMICC recommends that PJM engage in a comprehensive customer cost-impact \nassessment at the outset of any significant rule change and a clear statement of what the change is \nexpected to cost or save customers, consistent with the PJM OA amendment PJMICC proposed \nabove. Second, each significant rule change should include defined, measurable success metrics—\narticulated at the proposal stage—against which the rule’s performance can be objectively \nevaluated. Third, a structured after-the-fact review of whether the rule delivered its intended result, \nincluding with respect to its cost impact, should be required within a defined period (e.g., 18 to 24 \nmonths following implementation).  If the results did not yield the intended results, PJM should \nbe required to report publicly on the variance, identify contributing factors, and propose corrective \naction for stakeholder consideration. \n \nRecent changes to the PJM capacity construct illustrate the risk of proceeding without such \naccountability.  By way of a hypothetical example, if a change is represented by PJM as having \nminimal impact yet proves substantially more consequential once implemented, there should be \naccountability for that initial change and a willingness by PJM to address the inconsistency.  For \nthat reason, PJMICC would support building accountability mechanisms directly into any \nsignificant or fast-tracked rule changes — potentially including sunset or reversion features — so \nthat a change in rules or market design failing to deliver its represented outcome within a defined \nperiod results in a defined consequence or a path back, rather than becoming permanently \nentrenched irrespective of its actual results. \n \n4.  \nDivision of Section 205 Filing Rights \n \nThrough PJMICC’s members who are also members of PJM, PJMICC has valued having \na seat at the governance table through the Members Committee’s role in the PJM Section 205 \napproval process.  To be clear, the End-Use Customer Sector, while representing customers that \nare ultimately responsible for all of the costs of the PJM market, only has 20% of the overall vote \nin sector-weighted voting.  While a reasonable case could be made that customers should have \nmore of a voice in sector-weighted voting, PJMICC supports maintaining the status quo and the \nbalanced voting framework.  As noted above, PJMICC does not support expanding PJM’s \nunilateral Section 205 filing authority—particularly absent any requirement that PJM consider \ncustomer rate impacts as part of its mission.  We acknowledge that PJM Transmission Owners \nseparately hold the exclusive right to file changes to their own transmission rates under Section \n205."},{"page":11,"startToken":4513,"endToken":4981,"text":"11 \n \nWhile the results of the PJM Board having Section 205 rights may be swifter, the attendant \nrisks of such action are greater.  As a threshold matter, PJM’s markets are undeniably complex, \nand PJM lacks visibility into how changes to those markets may affect, for example, load-serving \nentities and their customers. PJM rule changes directly impact the region’s energy-intensive \nmanufacturers and may have far-reaching implications for their operations, opportunities to \nmanage their energy costs through demand response, and reliability.  In that same vein, PJM lacks \nvisibility into LSEs’ contractual arrangements with their retail customers.  Most retail supply \ncontracts contain Change in Law provisions, allowing LSEs to pass through the impacts of FERC-\napproved rule changes.  If End-Use Customers’ voice in the stakeholder process is muted by \nreduced voting rights, there is a risk that this important customer voice may be ignored. \n \nSeparately, any discussion of filing rights or PJM’s independence should be paired with \ncommitments from Transmission Owners not to leverage threats of withdrawal from PJM as \nnegotiating leverage.  Recent appellate-level attention to RTO independence in the context of a \nPJM TO proposal to empower PJM with Section 205 rights stressed the importance of PJM \nindependence.14   \n \n5. \nGoverning Document Provisions That Impede Timely Decision-\nMaking \n \nIn our experience, as discussed above, the primary source of delay is less about the text of \nPJM’s governing documents and more about how PJM’s consensus-based issue resolution process \n(“CBIR”), which is set forth in Manual 34, is implemented.  The CBIR process consumes \nenormous stakeholder time and resources.  In this respect, all PJM stakeholders, including PJM \nMembers, other stakeholders, and PJM itself, share responsibility for a constructive process.  For \nexample, the problem statement and issue charge process, which is a key part of the CBIR process, \nwhile well-intentioned and meant to define the scope of any stakeholder work effort, has become \nbloated and, at times, used to delay rather than advance substantive engagement.  It also warrants \nemphasizing that the complexity of PJM’s market rules means that many issues implicate \nprovisions across multiple governing documents, requiring significant education efforts before \nwork efforts can meaningfully begin.  This dynamic itself complicates and slows the pursuit of \notherwise well-supported reforms. \n \n \n14  See, e.g., PJM Transmission Owners v. Federal Energy Regulatory Commission, No. 25-1064 (D.C. Cir. June 5, \n2026)(finding that “FERC reasonably determined that this provision is unjust and unreasonable because it gives the \nTransmission Owners undue influence over Tariff modifications.  As an RTO, PJM must adopt ‘a decision making \nprocess that is independent of control by any market participant or class of participants.’ … FERC found that Sec. 7.0 \nwould give the Transmission Owners ‘an exclusive opportunity to affect FPA section 205 filings PJM submits.’ … \nFERC’s determination was well supported by the record and Commission precedents, and therefore was not arbitrary \nand capricious.”)."},{"page":12,"startToken":4981,"endToken":5397,"text":"12 \n \nIn addition, issues tend to be worked in a siloed fashion under the current process, which \nlimits stakeholders’ ability to develop cross-cutting packages or compromises—the kind of horse-\ntrading across related issues that used to occur more naturally. Stakeholders have previously \nreached a compromise across related but technically distinct issues — for example, agreeing to \nsupport one proposal in exchange for progress on a complementary reform. The current siloed \nstructure of the PJM stakeholder process makes this kind of cross-issue accommodation far more \ndifficult to achieve.  The siloed approach also makes it harder to determine whether the stakeholder \nprocess is meant to build consensus, to generate information for PJM’s independent decision-\nmaking, or both. \n \nPJMICC recommends that PJM, in consultation with its Members and stakeholders, \nstrengthen the structure and discipline of the CBIR process to ensure discussions remain focused \nand productive.  This would include creating a defined metric for success, and a mechanism for \nafter-the-fact accountability. At the same time, the process should allow more flexibility to \nconsider related issues together where appropriate.  In PJMICC’s experience, this provides more \nopportunity to create mutual gains, an important underpinning of the CBIR process. \n \nAlso, as discussed below, delays may be attributable to the practice that lower-level \ncommittees allow affiliate voting, whereas the senior committees (i.e., the Markets and Reliability \nCommittee and Members Committee) use sector-weighted voting.  There is a structural \ninefficiency in the lower-level committees' setup: a vote that is generally doomed to fail when a \nmore balanced voting approach is used, which better reflects the votes of wholesale and retail \ncustomers.  This dynamic can be resolved and more durable outcomes developed if the lower-level \ncommittees were to model the same voting approach as the senior committees, even if on an \nadvisory basis to help discern whether proposals may garner supermajority, sector-weighted \nsupport. \n \nPJMICC's observations here apply equally to the stakeholder-process-specific questions \naddressed in Panel 2 below. \n \n6. \nLessons from Other RTO/ISO Governance Structures \n \nPJM’s stakeholder process provides arguably the most extensive customer participation of \nany RTO or ISO. That is a distinction worth preserving, not diminishing. PJMICC has participated \nin PJM governance for roughly 30 years; PJMICC has long understood the need for a seat at the \ntable to protect the interests of energy-intensive customers. \n \nPJMICC is cautious about wholesale importation of other regions’ governance models, \nparticularly proposals that would reduce RTO independence or dilute member and stakeholder \nchecks on the Board.  PJMICC would rather see PJM build on its own comparatively strong record"},{"page":13,"startToken":5397,"endToken":5853,"text":"13 \n \nof multi-sector engagement than adopt structures from regions with less robust customer \nparticipation. \n \nB. \nPJM Stakeholder Process – Design, Transparency, and Decision-making \n1. Sector-Weighted Voting and Voting Thresholds \nPJMICC’s answer is: yes, sector-weighted voting strikes the right balance—but the \nimplementation is imperfect. Sector-weighted voting works because it requires broad buy-in from \nboth supply and demand interests before a proposal receives the requisite support to enable PJM \nto file a change to the PJM OA or to certain provisions of the Tariff under Section 205. It is not an \nunanimity requirement, but it demands meaningful support from each market segment. Most \nproposals pass by broad acclamation.  Generally speaking, only the most contentious proposals do \nnot receive super-majority support.  It is in precisely these instances that Section 206’s more \nsearching review is warranted.  The structure also protects PJM’s markets and reliability against \nperceived or real favoritism. \n \nBecause customer purchases account for roughly half of all market activity in the PJM \nregion, and customers have invested billions of dollars in the region, customers must continue to \nhave a strong voice in voting outcomes. Any effort to unravel sector-weighted voting would be \nviewed by PJMICC as an unacceptable effort to disenfranchise customers. \n \nIn PJMICC’s view, the existing voting thresholds do not preclude timely action.  PJM has \ntools at its disposal, including the CIFP process, to accelerate issues when needed.  PJM can bring \nforward its own problem statements/issue charges to initiate a stakeholder discussion.  Issue \nCharges require only majority support to advance, and most Issue Charges do, in fact, generally \nmove forward.15  PJM also plays a significant role in setting the stakeholder meeting calendar, \nwhich can be used to prioritize pressing issues.  If PJM communicates a pressing reliability need \nto the Members or stakeholder community, our experience is that the stakeholder community will \nrally to support the necessary effort.   \n \nThe need for timely action has grown, given the pace of new large-load interconnection \nrequests.  This issue has proven difficult for stakeholders to resolve by consensus, despite \nsubstantial investment of time and resources by stakeholders in PJM’s two most recent CIFP \nprocesses on this topic, both of which have been focused on resource adequacy-related Tariff \nchanges where the PJM Board already has Section 205 rights.  Even if PJM Members were to \nreach consensus on issues falling within the PJM Tariff and the super-majority sector-weighted \nthreshold were exceeded, the PJM Members' votes have been  advisory only.  As such, the voting \nthreshold is not directly relevant to PJM’s decision about what to bring forward to the Commission.  \n \n15 PJM Manual 34: PJM Stakeholder Process Revision: 22, Sections 6.2.1 and 6.2.2 (Effective Date: September 25, \n2025), available at:  https://www.pjm.com/-/media/DotCom/documents/manuals/m34.pdf."},{"page":14,"startToken":5853,"endToken":6298,"text":"14 \n \nRegardless, such CIFP issues are generally precisely the kind of complex, high-stakes issues that \nwarrant rigorous Commission review.   \n \nThat said, as a general matter, as explained previously, there is inefficiency in the PJM \ncommittee process due to affiliate voting in the lower-level committees. Affiliate voting can allow \nproposals to advance to the Members Committee without adequate vetting of customer concerns, \nleading to surprise and false expectations when customers raise objections at the sector-weighted \nvote. This dynamic traces to the 2010-era compromise that created affiliate voting, alongside a \nlingering—and, in our view, inaccurate—perception that load interests hold an effective veto over \nproposals favored through affiliate voting.   \n \nTo be clear, PJMICC is not seeking to disenfranchise those with affiliate votes. PJMICC \nwill abide by affiliate voting as part of the compromise that formed PJM’s current governance \nstructure. PJMICC simply asks that lower-committee discussions to be conducted with an eye \ntoward the ultimate sector-weighted vote. This would produce more durable, well-vetted outcomes \nand reduce wasted effort. And PJMICC respectfully requests that those with affiliate votes respect \ncustomers’ right to be heard when load interests raise concerns at the Markets and Reliability or \nMembers Committees, the two PJM senior committees, which both utilize sector-weighted voting. \n2. \nTransparency Reforms \nPJMICC believes that transparency reforms are necessary to improve the quality of PJM’s \nstakeholder process and increase stakeholder confidence in its decision-making, especially when \nthe Board takes unilateral action.  As a threshold matter, especially as the effects of PJM’s markets \nare becoming broader and even more impactful, PJM customers have consistently requested more \ndetail on the practical implications of proposed changes, to help all stakeholders better understand \nthe impact of PJM’s rules and changes thereto.  More stakeholders that are not PJM Members, \nsuch as states, new data center customers, manufacturers, other energy-intensive customers, \ndevelopers, are making unprecedented investments in doing business in PJM.  They depend on \nPJM’s markets.  As market rules evolve, there needs to be clear communications as to their impact \nto avoid such investments becoming stranded.  Complexity of information is a real barrier to \nmeaningful stakeholder engagement, particularly for parties without large in-house technical staff. \nClear, plain-language communication about the impacts of proposed rule changes would be a \nsignificant improvement. \n \nPJMICC also supports improvements to the accessibility and organization of information \nPJM makes available, including on its website, which stakeholders have found difficult to navigate. \nAt the front end, cost-benefit studies should be a more regular, expected component of any \nsignificant rule-change proposal, including those of stakeholders.  Stakeholders cannot \nmeaningfully evaluate proposals they cannot fully understand.  Similarly, while PJM is responsible \nfor the functioning of its wholesale markets, there should be careful and public consideration of"},{"page":15,"startToken":6298,"endToken":6680,"text":"15 \n \nthe impacts of action (or inaction) on retail markets and retail customers alike.  To the extent that \nPJM Staff cannot support Members' or stakeholders’ alternate proposals, PJM should plainly \nexplain the specific reasons for its decision.    \n \nMore transparency about the basis for PJM Board decisions would also increase \nstakeholder confidence in its decision-making.  It is understandable that certain aspects of PJM \nStaff and Board interactions may need to occur without transparency, but, as discussed above, there \nshould be transparency regarding corporate goals to build stakeholder understanding.  \nAdditionally, the Board should commit to publishing, within a defined period following any \nsignificant independent action, a summary report that includes the projected outcomes and success \nmetrics underlying its decision, and the Board should affirmatively commit to convening a \nstakeholder review session at a specified interval (e.g., 18 to 24 months post-implementation) to \nassess whether the rule is achieving its intended objectives. \n3. \nStructured Opportunities for State Participation \nAs noted under Panel 1, PJMICC supports continuing and formalizing OPSI’s existing \nconsultative access to PJM’s Board and membership, including the existing practice of private \nOPSI-Board meetings at OPSI’s annual meeting and OPSI’s standing report-out opportunity at \nMembers Committee meetings. PJMICC would also support a defined opportunity for states to \naddress the membership before a vote on matters of particular interest to states.   \n \nPJMICC believes consultative engagement is the appropriate role for states within PJM’s \ngovernance structure. This preserves PJM’s independence while giving states a structured channel \nto be heard on issues that affect their ratepayers. \n4. \nImpediments to Stakeholder Decision-Making  \nEspecially with the current large-load/resource-adequacy discussions, a significant \nimpediment to stakeholder decision-making is the lack of clarity about jurisdictional limits \nbetween state and federal authority in the 21st-century modern grid.  Moreover, state jurisdiction \nmay vary under state law.  From a stakeholder perspective, it is also not always clear who is \nempowered to speak for a state.  In a very real way, the lack of clear jurisdiction to address certain \nidentified problems is an impediment to decision-making.   \n \nAnother impediment that is worth underscoring is that stakeholder discussions on many of \nthese complex proposals are siloed. Although PJMICC understands that PJM staff may be having \nholistic discussions, PJM stakeholder discussions occur on a more discrete basis, preventing a full \nunderstanding of proposed solutions to complex problems."},{"page":16,"startToken":6680,"endToken":7129,"text":"16 \n \n5. \nReforms to Help PJM Meet the Region’s Challenges \nIn response to this question, PJMICC must underscore its importance: the region’s \nchallenges must be met; the economic and human consequences of failing to do so are simply too \ngreat.  Such an effort requires coordinated efforts at all levels of government as well as with and \nwithin the PJM stakeholder community.  Meeting these challenges is a shared imperative for PJM, \nits Members, and the region's states.  As we consider governance changes, such reforms are not a \n“cure-all” for the pressing problems facing the region today and should not distract from \naddressing them. \n \nAs the Commission considers the need for timely action to enable PJM to help meet the \nregion’s challenges, PJMICC encourages the Commission to recognize a tension in capital-\nintensive industries like energy between action and stability.  Energy investors require stability to \nsupport the investments that are necessary for the region to meet today’s resource adequacy \nchallenges.  Energy-intensive customers, including not only data centers but also manufacturers \nand institutional customers, require a stable platform to make their investments, too.  Volatility \ncomes with risk, and risk is often ultimately borne by retail customers.  Acknowledging that certain \nchanges will be necessary for the region to meet today’s challenges, PJMICC encourages keeping \nan eye on stability to enable capital to be deployed with some measure of confidence. \n \nFour reforms would meaningfully improve PJM’s ability to meet regional challenges. First, \nbuilding meaningful accountability into the stakeholder process: clear success metrics identified \nat the problem statement stage, and after-the-fact review of whether implemented changes \nachieved their stated goals, including cost impacts.   \n \nSecond, allowing stakeholders to evaluate related issues as packages rather than only in \nnarrow, siloed work efforts. The ability to build cross-issue compromises—to say, ‘we will accept \nthis change if that complementary reform also moves forward’—has been lost in recent years. \nRestoring that flexibility would produce more durable outcomes and better serve the region. \n \nThird, PJMICC suggests that alternative facilitation tools be considered to make meeting \ntime, especially for pressing issues of the day, more productive.  For example, recent experience \nhas been that PJM Members and stakeholders can often wait for hours to ask clarifying questions \nand then may not have the opportunity to do so.  With advance notice (i.e., not last-minute), PJM \ncould schedule multi-day transparent working sessions with decision-makers from across the PJM \ncommunity, including federal and state regulators.  PJMICC recognizes that any such sessions \nwould need to be carefully structured to respect the Commission’s ex parte requirements and each \nparticipating state’s independent decision-making role.   \n \nFinally, while these pressing issues are being considered, PJM should consider \nconsolidating its regular cadence of stakeholder meetings, perhaps by deferring non-essential"},{"page":17,"startToken":7129,"endToken":7514,"text":"17 \n \ncommittee work, until there is adequate room in the stakeholder calendar.  The volume and pace \nof stakeholder work have been unrelenting, and these issues will require considerable thought and \neffort.   We need to make time for it in the stakeholder calendar, even if it means deferring other \npriorities. \n \n6. \nNear-Term Reforms to Improve Speed While Preserving Stakeholder \nInput \n \nPJMICC supports restoring more robust engagement and compromise-seeking at the \nlower-committee level, rather than deferring hard conversations to the Markets and Reliability and \nMembers Committees. If lower committees were to develop proposals with an eye toward the \nultimate sector-weighted vote—rather than pushing proposals forward on the strength of affiliate \nvotes alone—the results would be more durable, surprises at the Markets and Reliability \nCommittee would diminish, and overall pace would improve.  We also support exploring a \nposition-paper process for major issues—allowing parties to submit written positions for \nconsideration in lieu of extended, time-intensive stakeholder meetings.  \n \nGiven the heavy day-to-day meeting burden the current process places on stakeholders, \nparticularly those with limited resources, a transparent paper-hearing approach could be a \nmeaningful time-saver for well-developed issues without sacrificing the quality of stakeholder \ninput.  Additionally, reducing the number of issues under active consideration at any given time \nwould allow more time between stakeholder meetings for offline discussion and deliberation. \nReducing the volume of changes to PJM’s governing documents also enhances market rule \nstability, which is something customers value highly. \n \n7. \nCommittee Structure Elements Contributing to Delay \n \nDelays are frequently attributable to components of the CBIR process becoming extended \nwithout meaningful progress, such as through extended consideration of fine-tuning the problem \nstatement and issue charge process and debates over whether issues are in or out of scope, as I \nhave described. Additionally, meeting facilitation and management challenges also can \ncontribute—for example, extended, unfocused discussion by a small number of participants can \nconsume hours without advancing the substantive work. \n \nPJMICC supports streamlining problem statement and issue charge templates and \nexploring new tools for meeting facilitation to keep discussions focused on the defined scope and \nsuccess metrics. Education is a key component of any work effort and must continue in a structured \nmanner, with PJM inviting subject matter experts when necessary.  Better discipline at the process \nlevel would reduce delay more effectively than structural changes to the committee architecture."},{"page":18,"startToken":7514,"endToken":7898,"text":"18 \n \n8. \nFast-Path and Time-Bound Review Procedures \n \nPJMICC sees value in time-bound stakeholder review for genuine emergencies. However, \nPJMICC is not convinced the current the CIFP process is well-designed to identify and prioritize \nthe right solutions.  The issues that PJM has identified for CIFP treatment have been appropriate.  \nHowever, the process was not designed to handle issues of such breadth and scope, resulting in the \nBoard considering numerous competing proposals, none of which have had the time to develop a \ncritical mass of support.   \n \nA gating question may be whether the Board’s objective is to achieve consensus, or instead \nto generate the most useful information for the Board to exercise its independent judgment.  If it \nis the former, more time should be afforded to allow for such consensus-building to occur, perhaps \nthrough small-group facilitation.  If it is the latter, it may be more useful to model a paper hearing \nprocess with an opportunity for the Board to ask clarifying questions to facilitate their review and \nmake an independent judgment.   \n \n9. \nLessons from Other RTOs \n \nPJMICC’s principal lesson from other RTOs is caution. PJM should preserve its \ncomparatively robust customer participation and stakeholder checks while adopting targeted \nprocess improvements that strengthen independence, transparency, and efficiency. \n \nIII.  \nConclusion  \n \nOn behalf of PJMICC, I appreciate the Commission's invitation to participate in this \nimportant technical conference.  PJM's markets have, for decades, delivered substantial value to \nthe region.  This record of success reflects the strength of PJM's existing governance framework, \nincluding the checks and balances embedded in its sector-weighted, stakeholder-driven structure. \nThese structures embody the checks and balances necessary for a market in which electricity is an \nessential service and market power is an ever-present concern.  \n \nPJM’s independence, neutrality, and transparency are prerequisites for any workable \ngovernance approach—without such commitments by PJM, no governance structure will succeed. \nThe recommendations set forth in this statement are offered in that spirit: as constructive, targeted \nimprovements intended to help PJM and its Members make more effective and efficient use of the \nstakeholder process and broaden the lens by which PJM views its mission to include the impact of \nits wholesale market on retail markets and customers.   \n \nWhile PJMICC does not seek fundamental restructuring, PJMICC believes that certain \nchanges are necessary to ensure PJM's stakeholder process can keep pace with the region's"},{"page":19,"startToken":7898,"endToken":8039,"text":"19 \n \nevolving operational and market needs—and that any such changes must preserve, rather than \ndiminish, the voice and representation of end-use customers in PJM's governance.  PJMICC seeks \nconcrete, actionable reforms: meaningful and enforceable accountability for the cost impacts of \nrule changes, including quantified pre-implementation projections, defined success metrics, \nmandatory post-implementation review, and clear consequences for rules that fail to meet stated \nobjectives; strengthened and disciplined stakeholder processes that permit cross-issue \ncompromise; respect for the sector-weighted vote at every level of the process; and discipline in \nthe use of fast-path procedures. These are achievable improvements that would serve the region \nwell without destabilizing the governance architecture that has supported one of the world's most \nsuccessful and competitive wholesale electricity markets for decades. \n \nThank you for the opportunity to present these views. PJMICC looks forward to continued \nengagement on these important issues."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":592,"startToken":0,"endToken":427},{"p":2,"at":592,"title":"I. Background","method":"printed heading","endPage":6,"endAt":1449,"startToken":427,"endToken":2368},{"p":6,"at":1449,"title":"II. Response to Commission Questions","method":"printed heading","endPage":6,"endAt":1489,"startToken":2368,"endToken":2373},{"p":6,"at":1489,"title":"A. PJM Governance Mechanics – Board Authority, States’ Role, Filing Rights,","method":"printed heading","endPage":13,"endAt":113,"startToken":2373,"endToken":5411},{"p":13,"at":113,"title":"B. PJM Stakeholder Process – Design, Transparency, and Decision-making","method":"printed heading","endPage":18,"endAt":1385,"startToken":5411,"endToken":7718},{"p":18,"at":1385,"title":"III. Conclusion","method":"printed heading","endPage":19,"endAt":1062,"startToken":7718,"endToken":8039}]}