{"document":{"slug":"rec-20260715-4003","title":"Pre-filed Statement of Suzanne Jaworowski, Secretary of Energy and Natural Resources for Indiana Governor Mike Braun's Office, for the PJM Governance and…","issued":"2026-07-15","accession":"20260715-4003","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"INDIANA DEPARTMENT OF ENERGY AND NATURAL RESOURCES","kind":"testimony","file":"sources/filings/text/20260715-4003_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4003","tier":"record","sha256":"564ed910dc854ca7372ce3899b40cc1de5e63483c3892e3465288c8253359c25","pages":4,"tokens":1448,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":450,"text":"1 \nBEFORE THE FEDERAL ENERGY REGULATORY COMMISSION \nTechnical Conference on the PJM Interconnection Stakeholder Process and Governance \nJuly 23, 2026 \nWritten Statement of Suzanne Jaworowski \nSecretary of Energy and Natural Resources, State of Indiana Office of Governor Mike Braun \nIntroduction \nChairman and Commissioners, thank you for convening this technical conference and for the \nopportunity to testify. I serve as Indiana's Secretary of Energy and Natural Resources in the \nadministration of Governor Mike Braun. Indiana sits at the seam of two regional transmission \norganizations: most of our state is served by MISO, while Indiana Michigan Power serves a \nsubstantial portion of northeastern Indiana within PJM. That dual vantage point, together with \nour responsibility for one of the fastest-growing large-load pipelines in the country, informs the \nperspective I offer today. \nIndiana's message is straightforward. PJM has served this region well for nearly a century, but \nthe demands now converging on it — unprecedented load growth, resource interconnection \nbacklogs, transmission expansion, and capacity price outcomes that have become politically \nintolerable in several states — have outpaced a stakeholder process designed for a slower era. \nGovernor Braun joined fellow PJM governors in a Statement of Principles because the states' \nconfidence in PJM's governance has eroded. Of the four multi-state RTOs, the states' voice in PJM \nis the most muted. That must change, and it can change through a focused package of reforms \ndrawn from proven practice across the organized markets. \nMy testimony draws substantially on the governance recommendations recently advanced by Pat \nWood III, former Chairman of this Commission, which Indiana broadly endorses. They are \ngrounded in a generation of experience across all seven U.S. RTOs and ISOs, and they answer the \nquestions the Commission has posed for this panel. \nStrengthening the State Role (Question 3) \nThe Federal Power Act establishes a federal-state partnership, and RTOs perform functions whose \npractical effects span both jurisdictions. Yet the structured opportunities for state participation in \nPJM today are inadequate. The Organization of PJM States (OPSI) communicates on a consensus \nbasis, which leaves it ill-suited to convey state positions when states diverge, and states are \notherwise left to write letters to a Board that has no obligation to act on them. Indiana \nrecommends two structural reforms: \n• Establish bifurcated state engagement channels. Mirroring the New England model, \nPJM should complement OPSI's technical regulatory role with a PJM States' Committee on \nElectricity (PJMSCOE) focused on state policy and economic development perspectives. \nPJMSCOE should have formal standing at PJM, a defined right to bring issues directly to the \nBoard, and the duty to appoint three state members to the current eight-member Board \nNominating Committee, which includes the PJM CEO as a voting member. One of those \nappointees could be the OPSI President."},{"page":2,"startToken":450,"endToken":912,"text":"2 \n• Clarify the Regional State Committee's authority. Indiana further supports vesting \nthe states, acting through their Regional State Committee, with Federal Power Act Section \n205 filing rights over the matters where state jurisdictional interest is clearest — resource \nadequacy program structure and the state-facing elements of regional transmission cost \nallocation. This is not a novel arrangement: SPP's Regional State Committee has exercised \nSection 205 authority over cost allocation for two decades, and it has produced durable \nregional compacts rather than serial litigation. Filing rights are what convert consultation \ninto partnership. A state position that PJM may note and set aside is advice; a state \nposition that reaches this Commission on its own Section 205 footing carries both voice \nand responsibility. Consistent with the Federal Power Act's federal-state design, Indiana \nurges that any reform of PJM's governing documents give the states that footing. \n \nVoting Thresholds and Committee Structure (Questions 1, 6, and 7) \nSector-weighted voting has value, but the current design no longer strikes the right balance \nbetween consensus and timely action. A two-thirds supermajority across all matters gives \nincumbent coalitions an effective veto over reform, and independent analysis has documented the \nconsequences: five voting sectors unchanged since 2000 despite dramatic membership growth, \nper-firm vote dilution in the oversubscribed supply sectors, average member participation of \nroughly 20 percent at the senior standing committees, and lower-level committee rules that allow \naffiliate voting to skew outcomes toward supply-side interests. The result is a process where \nproposals grind through lower committees only to die at the top, leaving the Board — and \nultimately this Commission — to resolve what the stakeholder process could not. \nIndiana supports the following reforms: \n• Move to an advisory stakeholder model. Non-binding stakeholder voting is the \napproach taken in every other U.S. RTO and ISO — now including ERCOT — and it works \nwell. It should be paired with a more structured engagement between the Members \nCommittee and the Board, akin to that employed in SPP, so that stakeholder counsel is \nelevated rather than diminished even as the veto arithmetic ends. \n• If the current structure is retained, bifurcate the threshold. Leave the \nsupermajority at two-thirds for governance issues, and apply a simple majority to everything \nelse. This preserves stability where stability matters most while restoring the ability to act \non market design. \n• Align lower-committee voting with the Members Committee. In either case, the \nvoting makeup of lower committees should mirror the sector-weighted structure of the \nMembers Committee, eliminating the structural bias introduced by unweighted affiliate \nvoting at the working level. \nTransparency and Accountability (Question 2) \nTransparency reforms are the fastest way to rebuild stakeholder and public confidence in PJM's \ndecision-making. Today, lower-level voting behavior is generally not disclosed, meeting minutes \nconvey little substance to non-participants, and the Board rarely explains its reasoning. Indiana \nrecommends that PJM:"},{"page":3,"startToken":912,"endToken":1359,"text":"3 \n• Amend the governing charter to make clear that Board members have a \nresponsibility to the public interest, consistent with the Federal Power Act. Public \nlegitimacy begins with a publicly stated duty. \n• Publish individual voting results for votes taken by stakeholders throughout the \ncommittee structure. \n• Adopt public annual and quarterly performance metrics and tie management \ncompensation to their achievement, as MISO does. \n• Publish all Board ethics documents on PJM's public website, as ERCOT does, and \nprioritize selection of Board members who live in the PJM footprint. \n• Modernize Board ex parte practices to allow more direct discussion with customers, \nstakeholders, elected officials, and regulators, subject to appropriate disclosure. Insulating \nthe Board from the region it serves has not produced better decisions — it has produced less \naccountable ones. \nGoverning Documents, Expedition, and Lessons from Other Regions \n(Questions 4, 5, 8, and 9) \nSeveral provisions of PJM's governing documents impede timely decision-making, and \nimplementing the reforms above will require amendments to those documents — the \nsupermajority provisions, the lower-committee voting rules, and the informality of the Board's \noverride authority all live there. Indiana takes no position today on the procedural vehicle. What \nmatters is that the amendments be made, and made quickly, so that PJM, the states, and \nstakeholders can turn their full attention to the substantive challenges ahead. \nOn expedition: the Board's exceptional override authority — the \"critical issue fast path\" \ndesignation — should be formalized with crisp procedures, including public articulation of the \nbasis for its decisions and a final stakeholder consultation before filing. Fast-path tools are \nappropriate for high-importance topics, but they must be rule-bound and transparent so that \nspeed does not come at the price of legitimacy or circumvent meaningful stakeholder deliberation. \nFinally, the Commission asked what PJM can learn from other regions. Each element of the \nreform package Indiana supports is drawn from practice that has worked elsewhere: New \nEngland's bifurcated state committees; the advisory stakeholder model that operates in every \nother RTO and ISO, now including ERCOT; SPP's structured engagement between its members \nand its Board; MISO's public performance metrics tied to compensation; and ERCOT's published \nethics standards. None of this is experimental. PJM would simply be adopting the best of what a \ngeneration of RTO experience has already proven. \nA Closing Note on Affordability \nGovernance reform matters because affordability is now the central energy question in every PJM \nstate, including Indiana. Recent capacity-market price outcomes became politically intolerable in \nsignificant part because default-service retail load across the footprint was not adequately hedged. \nStates will need to address that on their side of the jurisdictional line — but PJM retains a critical \nrole in managing the residual capacity market and allocating its costs, and every state needs the"},{"page":4,"startToken":1359,"endToken":1448,"text":"4 \nability to allocate those costs across customer classes consistent with the Governors' Statement of \nPrinciples and the ratepayer protections large customers have pledged. A PJM that hears its states \nclearly, votes efficiently, and explains its decisions publicly is a PJM that can carry that \nresponsibility with the public's confidence. \nBig issues await action by PJM and the states. Indiana urges the Commission and the PJM \ncommunity to resolve these governance questions quickly, so all of us can focus on the future. \nThank you, and I welcome your questions."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":283,"startToken":0,"endToken":39},{"p":1,"at":283,"title":"Introduction","method":"printed heading","endPage":4,"endAt":569,"startToken":39,"endToken":1448}]}