{"document":{"slug":"rec-20260715-4005","title":"Pre-filed Statement of J. Arnold Quinn, Senior Vice President of Regulatory Policy for Vistra Corporation, for the PJM Governance and Stakeholder Reforms…","issued":"2026-07-15","accession":"20260715-4005","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"VISTRA CORPORATION","kind":"testimony","file":"sources/filings/text/20260715-4005_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4005","tier":"record","sha256":"cc973a7e5f95c6cc41cc73c4d41fa3cab0e5ea7fff4597cab497812f62590143","pages":12,"tokens":3442,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":268,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Governance and Stakeholder Reforms \n) \n) \n) \n \nDocket No. \n \nAD26-7-000 \n \nPRE-CONFERENCE STATEMENT OF J. ARNOLD QUINN \nSENIOR VICE PRESIDENT, REGULATORY POLICY \nVISTRA CORP. \n \nI appreciate the opportunity to participate in the Commission’s technical conference on \nPJM Governance and Stakeholder Reforms.  Vistra Corp. (Vistra) is the second-largest \nindependent power producer in the United States, owning and operating a diverse fleet of \ngeneration facilities totaling approximately 44,000 megawatts (MWs) of capacity in markets \nacross the country.  Vistra is one of the largest independent power producers in PJM (with \napproximately 15,000 MW of generation), serves millions of retail customers as a competitive \npower supplier, and is an active participant in all aspects of the PJM stakeholder process.  Vistra \noperates in every organized market in the United States except SPP.  Vistra is committed to \nstable, predictable and efficient market design, which makes the integrity and success of the PJM \nstakeholder process one of our top concerns – an interest we share with all market participants, \ncustomers, and States that depends on PJM’s markets to deliver reliable, affordable power. \nI. \nINTRODUCTION \nPJM’s core mission is to ensure reliability through competitive market mechanisms, and \nits governance and stakeholder process are the foundation for the development of market rules \nthat allow PJM to meet that mission.  Because the PJM stakeholder process is the mechanism \nthrough which technically complex, immensely consequential decisions are made, it is important \nto review the process’s health and efficacy, especially in this time of challenges and opportunities \nfor the grid and industry.  The fundamental goal of the governance structure and stakeholder"},{"page":2,"startToken":268,"endToken":566,"text":"2 \n \nprocess is to ensure that PJM is prioritizing the right issues, anticipating future challenges, \ndeveloping durable market-oriented solutions to current and future challenges, and being \nresponsive to stakeholders while remaining independent.  Vistra recognizes that PJM operates \nwith a political license that requires the PJM states to have a reasonable role in PJM’s \nfunctioning.  As a participant in five of the six FERC-jurisdictional RTOs/ISOs, we believe PJM \ncompares favorably to other RTOs/ISOs in some respects but falls short in others.  PJM’s \ngovernance and stakeholder process is not fundamentally broken, but there is significant room \nfor improvement.   \nFirst, and critically, PJM governance has become distorted by the use of fast track \nprocesses that take the Board of Directors (Board) away from its essential mission – providing \nstrategic guidance and management accountability – by tasking it with primary responsibility for \ndecisions on complex market design on compressed timelines, often in crisis mode. Second, the \nstakeholder process is bogged down by lack of prioritization and discipline and by unnecessarily \ncumbersome and slow processes.  In addition, Vistra recognizes that PJM states are expressing a \nneed for a more structured role in the governance and stakeholder process.  By addressing these \nissues through focusing on the fundamentals of the roles of the Board and PJM leadership, \nprioritizing initiatives and streamlining the stakeholder process (doing fewer, more impactful \nthings faster), and supporting the states in collaborative participation, PJM can produce better \nand timelier solutions to the significant challenges before it. \nVistra offers several actionable reforms that could improve PJM’s governance and \nstakeholder processes, as detailed in responses to many of Conference Agenda questions below: \n Ensure the Board is in a strategic, rather than market design, role, including \nthrough limiting fast track processes that shift technical responsibilities to the \nBoard.  \n Enhance participation of the PJM states."},{"page":3,"startToken":566,"endToken":854,"text":"3 \n \n Institute a proactive, structured and collaborative process to plan, prioritize, and \nmeasure progress on stakeholder initiatives.   \n Streamline the mechanics of the stakeholder process, including through setting \ntimelines for action. \n Cautiously consider filing rights reforms.   \n \nMost of these reforms can only be made by stakeholders in partnership with PJM’s management \nand Board.  It is critical that changes be considered deliberately and recognize the legal limits on \nthe Commission’s jurisdiction over RTO/ISO governance and filing rights. \nII. \nPANEL QUESTIONS \nA. Panel 1: PJM Governance Mechanics – Board Authority, States’ Role, Filing \nrights, and Document Architecture. \n1. \nWhat is the PJM Board’s role in ensuring that PJM is sufficiently tackling the \nregion’s operational and market challenges?  How does the Board evaluate its \neffectiveness in that role?  How often, and under what circumstances, does the \nBoard act unilaterally, and should this change? \nThe Board's appropriate role is strategic: providing guidance and accountability to ensure \nPJM ensures reliability through efficient competitive markets.  The Board should measure its \nsuccess by the success of the organization as a whole – is it meeting operational and market \nneeds while being responsive to stakeholders?  If the organization is falling short, the Board can \nadapt its guidance and hold leadership accountable. \nUnilateral Board action, such as in the Critical Fast Path Issues Process (CIFP) process \nthat tasks the Board itself with designing a Federal Power Act (FPA) section 205 filing based on \nany number of stakeholder presentations, puts the Board in the inappropriate role of designing \nmarkets.  Market design is done best through the collaboration of committed stakeholders and \nPJM’s expert staff, under the leadership of an expert and engaged Board.  Fast track processes \nput the Board in the untenable position of choosing among numerous complex and competing"},{"page":4,"startToken":854,"endToken":1174,"text":"4 \n \nproposals from stakeholders and PJM staff, informed by fragmented materials and fractured \nindicative votes, and under time pressure and, often, significant public scrutiny.  Simply put, \nwhen the Board is forced to design markets rather than provide strategic guidance, it is put in a \nposition to fail.  Moreover, unilateral Board action on market design undermines the health of the \nPJM organization because it diminishes the critical role of PJM leadership and its market design \nexperts, who should be driving complex market reforms collaboratively with stakeholders.  \nTherefore, unilateral Board action should be reserved for narrow issues that must be addressed \nquickly, like cost allocation for Department of Energy 202(c) actions to retain generating \nresources. \nTo some extent, the Board may have felt compelled to use the CIFP process because PJM \nmanagement and stakeholders had not already addressed an emergent issue.  Vistra believes this \nis a symptom of the stakeholder process taking on too many low priority issues, leaving too little \nspace for the most pressing matters.  If the PJM Board is going to use CIFP less, PJM \nmanagement and stakeholders need to better prioritize issues for attention, including identifying \nissues that have the potential to become emergencies if not addressed in a timely manner. \n2. \nHow should states, through the Organization of PJM States, Inc. (OPSI) or other \nstructures, interface with the Board to enable the region to meet operational and \nmarket challenges while respecting PJM’s independence? \nStates have an important role to play in PJM governance and the stakeholder process.  \nTheir participation and buy-in can help build durable solutions to important issues facing their \nresidents and market participants.  OPSI provides a platform for effective state participation, \nincluding interaction with the Board.  Indeed, when stakeholders need to reach sufficient \nagreement to enable a filing under FPA Section 205, OPSI would ideally serve as a hub for \nstakeholder consensus building.  However, it is clear that many state organizations do not feel"},{"page":5,"startToken":1174,"endToken":1490,"text":"5 \n \nthat their voices are adequately heard, and that state voices can be fragmented and diffuse.  We \nsupport working with states and other stakeholders to address these concerns.  One way to \nenhance states’ role would be to support OPSI as an organization that reflects a broader spectrum \nof state voices with the resources to robustly participate in the stakeholder process.  Providing \nmore resources to OPSI could allow it to expand its membership to include governors’ offices or \nother state representatives and increase its staffing and expertise to engage in PJM’s complex and \ntechnical process.  Another enhancement would be to include states on the PJM Nominating \nCommittee so that they are represented in selecting members of the PJM Board.  This is similar \nto ISO-New England, where the nominating process includes representatives from the New \nEngland Conference of Public Utilities Commissioners (NECPUC). \n3. \nWhat governance reforms would best improve accountability and responsiveness? \nThe most important change that would best improve accountability and responsiveness is \nlimiting unilateral Board action to design markets, especially through the use of fast track \nstakeholder processes discussed in responses to Panel 1, Q1 in Panel 2, Q 8.  Adopting a \nstructured initiative prioritization and tracking process as described in response to Panel 2, Q 5 \nwould also increase accountability and responsiveness. \n4. \nHow does the division of Federal Power Act section 205 filing rights among PJM, \nTransmission Owners, and the Members Committee affect PJM’s ability to act \neffectively and quickly, when warranted, to address operational and market needs? \nThe appropriate allocation of FPA Section 205 filing rights in PJM has become a \nprominent and controversial topic, with alternative allocations being drawn from other regions, \nparticularly the “jump ball” FPA Section 205 filing option in ISO-New England.  The ISO-NE \n“jump ball” process is an example of a division of filing rights that has historically driven \nstakeholder consensus and organizational accountability.  Specifically, when ISO-NE develops a"},{"page":6,"startToken":1490,"endToken":1792,"text":"6 \n \ntariff revision proposal for filing at FERC, the stakeholder body, NEPOOL, can file an \nalternative proposal under FPA section 205 if 60% of stakeholders support it.  It is critical to \nemphasize that in ISO-NE, it is the stakeholders as a collective – rather than just one interest – \nthat can direct an alternative FPA Section 205 filing.  In PJM, adopting the “jump ball” process \nwould require PJM stakeholders to relinquish its existing unilateral Section 205 rights over the \nPJM Operating Agreement that covers energy market provisions in exchange for rights to \nindependently direct alternative FPA section 205 filings for changes to the Reliability Assurance \nAgreement (and having the right to direct alterative filings for changes to the Operating \nAgreement)if there is sufficient stakeholder support. \nIn ISO-NE, the ability of the stakeholders to make an independent section 205 filing \nwhen there is a supermajority of stakeholders in support provides a strong incentive for diverse \nstakeholder groups to work together to develop an alternative proposal and for the ISO to be \nresponsive to stakeholder views when developing a proposal.  States have significant influence in \nthis process because it is extremely difficult to reach a supermajority for any alternative proposal \nwithout state support.  \nIn addition to representing a supermajority of stakeholders, a primary reason the “jump \nball” process functions well in ISO-NE is because it is supported by dedicated stakeholder \nprocess infrastructure administered by NEPOOL, a non-ISO entity, that enables stakeholders to \nindependently reach consensus. Any consideration of a similar mechanism for PJM would need \nto ensure that all stakeholders are represented in the alternative filing process and grapple with \nhow comparable supporting infrastructure, which would be a fundamental change to PJM’s \nstakeholder process structure, would be built.  Adopting something like a “jump ball” without \nthat infrastructure would not be an easy or complete answer."},{"page":7,"startToken":1792,"endToken":2066,"text":"7 \n \n6. \nRecognizing regional differences, are there lessons from other regional \ntransmission organization/independent system operator (RTO/ISO) governance \nstructures that PJM could reasonably adopt to improve its responsiveness to the \nregion’s operational and market challenges? \n \nAs noted below, a common, successful practice among many RTOs/ISOs is the formal \nand collaborative planning, prioritization and tracking of stakeholder initiatives like ISO-NE’s \nAnnual Work Plan and Multi-Year Roadmap process and CAISO’s Policy Catalog and Policy \nRoadmap prioritization process discussed below.  This is a common-sense best practice that – \nbecause it provides a rational, disciplined, and forward-looking structure to the stakeholder \nprocess – would rapidly improve PJM’s ability to timely respond to the full spectrum of \noperational and market challenges. \nB. Panel 2: PJM Stakeholder Process – Design, Transparency, and Decision-making \n1. \nDo sector-weighted voting and existing voting thresholds strike the right balance \nbetween achieving consensus and taking timely action? \nSector-weighted voting and PJM’s existing thresholds are not the primary source of the \nstakeholder process’s dysfunction, and any change to them should be approached cautiously, on a \nconsensus basis, and only after deliberate consideration. The more significant drivers of slow, \nunsatisfying outcomes are procedural: the absence of a formal prioritization and roadmap process \nand an overly granular, form-over-substance proposal architecture discussed in response to Panel \n2, Q 7 below.  Reforming those elements would do more to improve the speed and quality of \ndecisions than adjusting voting thresholds. \n2. \nWhat transparency reforms would improve the quality of PJM’s stakeholder process \nand increase stakeholder confidence in its decision-making? \nAdopting a proactive issue identification, prioritization, planning and tracking process, \nalong the lines of ISO-NE’s and CAISO’s models described above, is a straightforward"},{"page":8,"startToken":2066,"endToken":2356,"text":"8 \n \ntransparency reform available to PJM.  It would provide a central process for stakeholders to \npropose initiatives and PJM to publicly react to them; the resulting work plan or roadmap would \nshow stakeholders and the region what PJM plans to take up, why, and on what timeline, and \nwould let stakeholders see when and why priorities shift – and, crucially for speed, when \nprocesses are falling behind planned timelines. \n3. \nAre there structured opportunities in the stakeholder process for state participation \n(e.g., defined consultation windows, joint technical sessions) to provide input on \ntopics that are of interest to the states? \n \nOPSI and the Board are in the best position to determine the most productive way for \nthem to consult on relevant issues, whether through regular consultations, ad hoc technical \nmeetings, or other avenues.  Whatever the forum, it would be important for OPSI to be an \neffective conduit for that engagement by having sufficient resources to represent diverse state \ninterests  \n5. \nWhat reforms to the stakeholder process could ensure PJM can meet the region’s \nchallenges?  \nIn addition to the limitation of fast track stakeholder process and unilateral Board market \ndesign action discussed in other responses, a deceptively simple reform that would improve both \nquality and speed is for PJM to adopt a formal and collaborative process to proactively identify, \nprioritize, and track its major initiatives. Unlike other RTOs/ISOs, PJM currently lacks such a \nmechanism to transparently evaluate the importance of an initiative proposed by either PJM staff \nor stakeholders, assess the organization’s bandwidth to take it on, or coordinate it with other \nongoing reform efforts. As a result, initiatives are introduced by PJM or stakeholders, at any \ntime, without a plan — producing an undisciplined, uncoordinated process that too often falls"},{"page":9,"startToken":2356,"endToken":2644,"text":"9 \n \nbehind emerging critical issues.  Without such a process, there is no benchmark – including \ntimelines– that the stakeholder process can be measured against. \nISO-New England's Annual Work Plan and Multi-Year Roadmap offer a proven model. \nThe Annual Work Plan sets and publishes ISO-NE’s major priorities, projects, and activities for \nthe coming year, with a mid-year update, developed with stakeholder input through the NEPOOL \nParticipants Committee and state representatives via NECPUC and the New England States \nCommittee on Electricity (NESCOE). The Multi-Year Roadmap provides a long-term view of \nmajor programs — capacity market reforms, transmission planning, operational tools, IT \nmodernization — so stakeholders can anticipate when major topics will come forward and the \nISO can be confident that it has the resources needed to complete them. \nCalifornia ISO’s Policy Catalog and Policy Roadmap serve a similar function: \nstakeholders submit potential initiatives, CAISO runs a stakeholder-led prioritization process \nusing workshops and surveys, considers and the results in the context of CAISO’s priorities and \nresources and develops three-year Roadmap that is voted on by its Board of Directors.  The \nRoadmap is then updated as circumstances change, including through a regular mid-year review. \nThese processes create transparency (what the RTO plans to do, and why), legitimacy \n(stakeholders help shape the plan), resource alignment (initiatives are matched to budget and \nstaffing), and accountability (timely progress can be measured against a public plan).  Adopting \nan equivalent process is low-hanging fruit that could transform how the PJM stakeholder process \nfunctions. \n6. \nWhat near-term reforms to stakeholder representation could PJM and its Members \ntake to improve speed in decision-making while preserving stakeholder input? \nThe current stakeholder representation structure is deliberately built to prevent any one \nstakeholder group from capturing market design outcomes. That balance should not be sacrificed"},{"page":10,"startToken":2644,"endToken":2950,"text":"10 \n \nin the name of speed, which can be improved through other reforms like initiative prioritization \nand process streamlining.  Recognizing that Vistra sees some merit in the ISO-NE/NEPOOL \n“jump ball” process and infrastructure to drive accountability and responsiveness, we should be \ncautious about reforms whose primary effect is to reduce representation rather than to improve \nthe quality or timeliness of decisions. \n7. \nAre there elements of PJM’s committee structure that routinely contribute to delays?  \nAre there stakeholder processes or issues that could be expedited or changed to \nprovide greater focus on key issues and allow faster or more unilateral action on \nothers? \nSignificant streamlining and simplification of the PJM stakeholder process would \nimprove both focus and speed.  As it stands, the process is needlessly complex, time-consuming, \nand lacks clear objectives or timelines.  The PJM stakeholder process begins with a problem \nstatement and issue charge that can take months to be finalized.  Despite significant time devoted \nto debating these documents, they frequently lack any clear objective or guiding principle and \nare often ignored or changed as the process progresses.  The Deactivation Enhancement Senior \nTask Force (DESTF) problem statement, for example, contains a vague statement about a need to \nreevaluate the rules for generator deactivation rather than a concrete problem that needs to be \naddressed. \nThe stakeholder process is also needlessly multi-layered: stakeholders move proposed \nreforms through task forces, subcommittees, and higher- level committees, each with different \nvoting structures.  These groups typically meet only on a monthly basis, which prevents timely \naction.  And these meetings do not discuss concepts or shared goals but rather break proposals \ndown into minute component parts in an often impenetrable excel spreadsheet—“the matrix”—\nthat acts as the driving force for discussion.  The DESTF matrix, for example, contains 18 \n“interests” reflecting objectives of all stakeholders.  When complex proposals move from a task"},{"page":11,"startToken":2950,"endToken":3264,"text":"11 \n \nforce to a higher committee, the process of education and consensus building must begin all \nover.  Stakeholders and state representatives that do not have the resources to devote full-time \nrepresentatives or technical experts to every issue at the task force level are at a significant \ndisadvantage.  Streamlining and simplifying the committee structure, establishing clear \nobjectives for reforms in advance, and adopting reasonable timelines could dramatically improve \nthe speed and quality of reforms.   \n8. \nShould PJM increase the use of fast-path or time-bound review procedures to \nexpedite committee action on high-importance topics?  \nThe best response to a slow stakeholder process that fails to act on major issues in a \nreasonable amount of time is common sense reforms that bring prioritization, discipline and \naccountability to that process and remove unnecessary and unproductive layers from it, as \ndiscussed above.  PJM can and should do fewer things faster, and every stakeholder initiative \nshould have a reasonable timeline to measure progress against.  Vistra also supports deadlines \n(“shot clocks”) for task force, working group, or subcommittee actions on more urgent reforms.       \nFast track processes like CIFP are not the solution to a stakeholder process that fails to \nact on major issues in a reasonable amount of time.  Indeed, last year’s large load CIFP process \nshows that fast track processes do not guarantee quick action.  And even if these processes can \nresult in faster filings, they shortcut the stakeholder input and collaboration that is critical for \ndeveloping successful, durable market design.  They do not allow stakeholders to coalesce \naround core principles and they put the Board in the position of designing markets—which, as \ndiscussed above, is a misuse of its role.  It is no wonder that last year’s CIFP process to tackle \nlarge load issues failed and this year’s reliability backstop struggled to reach consensus: \nstakeholders lacked direction and the Board was asked to make major market design decisions"},{"page":12,"startToken":3264,"endToken":3442,"text":"12 \n \nunder compressed timelines and information overload.  Fast track processes are suited to narrow \nissues that must be addressed quickly.   \nIII. \nCONCLUSION \nI thank the Commission for the opportunity to participate in this technical conference.  As \nnoted at the outset, it is healthy to review the efficacy of PJM governance and its stakeholder \nprocess at this time of industry transformation.  Improving governance and the stakeholder \nprocess is also important because when the stakeholder process does not provide solutions to \nproblems of reliability and affordability, policymakers are motivated to apply public pressure to \ndrive solutions.  But that is not how the system was intended to work.  Informed stakeholders \nand expert staff should be able to leverage an effective process to develop needed tariff reforms \nand timely file those proposals under FPA section 205.  When PJM and stakeholders have not \nadequately prioritized and addressed an emergent challenge, FPA section 206 – which is subject \nto notice and comment and ultimately judicial review - provides a path for the Commission and \nother policymakers to drive change where the tariff is unjust and unreasonable."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":1291,"startToken":0,"endToken":184},{"p":1,"at":1291,"title":"I. INTRODUCTION","method":"printed heading","endPage":3,"endAt":565,"startToken":184,"endToken":642},{"p":3,"at":565,"title":"II. PANEL QUESTIONS","method":"printed heading","endPage":3,"endAt":587,"startToken":642,"endToken":645},{"p":3,"at":587,"title":"A. Panel 1: PJM Governance Mechanics – Board Authority, States’ Role, Filing","method":"printed heading","endPage":7,"endAt":867,"startToken":645,"endToken":1908},{"p":7,"at":867,"title":"B. Panel 2: PJM Stakeholder Process – Design, Transparency, and Decision-making","method":"printed heading","endPage":12,"endAt":145,"startToken":1908,"endToken":3284},{"p":12,"at":145,"title":"III. CONCLUSION","method":"printed heading","endPage":12,"endAt":1194,"startToken":3284,"endToken":3442}]}