{"document":{"slug":"rec-20260715-4007","title":"Pre-filed Statement of Glen Thomas, President of PJM Power Providers Group, for the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-15","accession":"20260715-4007","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM POWER PROVIDERS GROUP","kind":"testimony","file":"sources/filings/text/20260715-4007_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4007","tier":"record","sha256":"8e91602a562e0ff01ff87c8d4e4fd0305bec434f2ac8276c1ab29774ad6db8af","pages":5,"tokens":1385,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":298,"text":"PRE-CONFERENCE COMMENTS OF THE PJM POWER PROVIDERS \nGROUP (P3) \n \n \n \nThe PJM Power Providers Group (P3) appreciates the opportunity to submit these pre-\nconference comments in response to the Commission’s June 5, 2026, Supplemental \nNotice of Commission-Led Technical Conference. P3 is a non-profit organization dedicated \nto promoting properly designed and well-functioning markets in the PJM region.1  P3’s \nmembers own and operate diverse generation portfolios that are vital to maintaining \nreliability for the 65 million consumers within the PJM footprint. \n \nAs the Commission explores actionable structural and procedural reforms under Docket \nNo. AD26-7-000, P3 urges FERC to anchor all discussions in a foundational premise: PJM’s \nprimary mandate must remain the operation of robust, competitive wholesale \nmarkets that ensure reliability at the lowest reasonable cost. While the PJM footprint \nfaces unprecedented operational, resource transitions, and load-growth challenges, \ngovernance reforms must not become a vehicle for compromising RTO independence or \nupending the stakeholder model that has historically delivered for the region. \n \nP3 offers the following high-level principles and specific responses to the Commission’s \nquestions to guide the upcoming technical conference. \nI. Core Principles for PJM Governance  \n1. RTO Board Independence PJM sits at the crossroads of 13 states and the District of \nColumbia—jurisdictions with fundamentally divergent energy policies, resource \nportfolios, and political priorities. While the input of PJM members, state and others, \nis vital to its success, PJM’s Board must remain fiercely independent and focused on \n \n1 Combined, P3 members own over 108,000 MWs of generation assets and produce enough power to supply \nover 63 million homes in the PJM region covering 13 states and the District of Columbia. For more information \non P3, visit www.p3powergroup.com. The comments contained herein represent the position of P3 as an \norganization, but not necessarily the views of any particular member."},{"page":2,"startToken":298,"endToken":611,"text":"its core mission of running an interstate grid and power market that are properly \ndesigned and well-functioning. \n \n2. Principled FERC Oversight – Combining an independent RTO Board that acts in the \nbest interests of the organization with regulatory oversight by an independent \nregulator who is similarly dedicated to effective oversight of the markets are the \nbedrock of any governance structure.   If the PJM Board and FERC are fulfilling their \nroles properly, taking appropriate feedback, but ultimately making principled \ndecisions in the best interest of the market, the RTO will run well and meet its core \nobjectives. \n \n3. Any Changes Should Not Undermine PJM’s Investibility Thesis – At the end of the \nday, PJM’s success hinges on its ability to attract private capital to its markets and \nany governance reforms should not undermine or weaken PJM’s aspiration to be a \ndesirable destination for merchant capital. \n \n4. Respect the FPA Section 205 Balance of Filing Rights -The division of Federal \nPower Act (FPA) Section 205 filing rights is a core feature of the PJM region. \nSuggestions to unilaterally broaden the PJM Board’s or any other stakeholder’s filing \nrights over matters traditionally reserved for Transmission Owners or the Members \nCommittee risk destabilizing the careful balance that stives to incentivize capital \ninvestment and market participation.  In addition, filing rights under section 205 are \navailable only to entities providing jurisdictional services – wholesale suppliers of \ncapacity, energy and ancillary services and transmission owners – and these \nentities cannot be forced to concede any rights under section 205 involuntarily.  \nWith so many pressing issues in PJM right now, PJM leadership and stakeholders \nshould not be distracted by a conversation about 205 filing rights that will certainly \nbe controversial and litigated. \n \n5. Enhance Process Efficiency Without Diluting Sector Voice - Delays in proactively \naddressing significant market design issues (such as capacity market rules, reserve \nmarket pricing, and interconnection queue challenges) are often a symptom of"},{"page":3,"startToken":611,"endToken":923,"text":"fractured stakeholder consensus, not inherently a failure of the governance \nstructure, which can result in over-reliance on fast-track processes that \nshortchange thoughtful deliberation and stakeholder impact. P3 supports process \nreforms to allow PJM and its stakeholders to proactively address these issues in a \nway that balances opportunities for thoughtful stakeholder feedback and \ncollaboration with timely action.  P3 suggests that these issues are best managed by \nPJM stakeholders who are familiar with the process and its challenges. \n \n6. Resist Efforts to Change PJM’s Core Mission – PJM core mission is to reliably run \nan interstate grid while optimizing the value to consumers by dispatching the lowest \ncosts resources to meet demand.   PJM should not be diverted from this core \nmission to meet the political priorities of other parties – no matter what those \npriorities are.    \n \nII. Responses to Specific Panel Areas \nPanel 1: PJM Governance Mechanics—Board Authority, States’ Role, Filing Rights, and \nDocument Architecture \n• \nThe Board’s Role and Unilateral Authority: The PJM Board possesses the \nnecessary authority under the Tariff to act unilaterally when reliability or market \ndesign failures pose an imminent threat. However, unilateral Board action should \nremain an extraordinary tool reserved for emergency fixes or when the stakeholder \nprocess has utterly deadlocked on a federally mandated filing timeline. Expanding \nthe Board's routine use of unilateral authority could easily erode investor \nconfidence by introducing regulatory unpredictability.   It also could lead to poorly \nformulated proposals to the Commission which will make the Commission’s job \nharder and increase the likelihood of court involvement. \n \n• \nThe State Role (OPSI): P3 recognizes that the role of the states in the stakeholder \nprocess is critical to developing durable market reforms.  Indeed, one would expect \nOPSI to be crucial as stakeholders seek to identify workable compromises.  The \nOrganization of PJM States, Inc. (OPSI) provides an effective foundation for state \nutility commissions to interface with PJM and its stakeholders.  Moreover, through"},{"page":4,"startToken":923,"endToken":1254,"text":"OPSI and other venues, states have unique opportunities for participation that no \nother stakeholders enjoy.  That said, P3 is open to working with the states on \nenhancements to facilitate further productive engagement in PJM’s processes.  \nBecause the Board’s duty is to the regional transmission system and the wholesale \nmarket rules approved by this Commission, it is important that changes in states’ \nroles in PJM tariff development be undertaken with careful and thoughtful \ndeliberation. \n \n• \nDocument Architecture and Manuals: P3 is increasingly concerned about the \nshifting of impactful, market-altering rules out of the Open Access Transmission \nTariff (OATT) and into PJM Manuals. Because Manual changes bypass FERC Section \n205 review, this practice reduces transparency and limits stakeholder recourse. \nActionable reform should require that any provisions substantially affecting market \nclearing, capacity accreditation, or seller obligations remain firmly within the Tariff \nor Operating Agreement.   These are changes that PJM can easily address without a \nFERC mandate to do so. \n \nPanel 2: PJM Stakeholder Process—Design, Transparency, and Decision-Making \n• \nInclusiveness and Sector-Based Voting: PJM’s five-sector voting structure \n(Generation Owners, Transmission Owners, Other Suppliers, Electric Distributors, \nand End-Use Customers) satisfies the core principles of Order No. 719 by balancing \ndiverse commercial interests. Generally, the voting structure provides sufficient \ninformation to the Board by which to make informed decisions that are in the best \ninterest of the market – which should be the hallmark of any RTO governance \nstructure.   On matters that have broad stakeholder agreement, there is a path for \nthose matters to be filed at FERC under Section 205 and stakeholders individually or \ncollectively (and PJM) can always bring matters to FERC under Section 206.    \n \n• \nEfficient Deliberations:   P3 observes that from time to time the PJM stakeholder \nprocess does languish and lacks focus.   Occasionally, the proliferation of low \npriority stakeholder efforts and PJM’s desire to hear from multiple viewpoints can \ndistract from focus on critical issues that have more pressing timelines.    At the end \nof the day, the desire for an open, transparent and inclusive stakeholder process"},{"page":5,"startToken":1254,"endToken":1385,"text":"must be balanced with the need for efficient resolution of pressing matters.  P3 \nbelieves that this balance is best structured between PJM and its stakeholders and \nnot mandated by the Commission. \n \nIII. Conclusion \nThe technical conference on July 23, 2026, should focus on practical, operational \nefficiency, not structural upheavals that inject political volatility into a market that requires \nlong-term investment signals. P3 urges the Commission to focus actionable reforms on \ncreating structured, fast-path timelines for critical issues while firmly upholding the \nindependence of the PJM Board and the integrity of the competitive, sector-weighted \nstakeholder framework.   Moreover, FERC’s role as the ultimate regulator of PJM cannot be \nunderstated.   There is no substitute for inspired, excellent and principled regulation – \nwhich should be FERC’s goal and extends well beyond the July 23rd technical conference."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":1300,"startToken":0,"endToken":177},{"p":1,"at":1300,"title":"I. Core Principles for PJM Governance","method":"printed heading","endPage":3,"endAt":903,"startToken":177,"endToken":743},{"p":3,"at":903,"title":"II. Responses to Specific Panel Areas","method":"printed heading","endPage":5,"endAt":201,"startToken":743,"endToken":1285},{"p":5,"at":201,"title":"III. Conclusion","method":"printed heading","endPage":5,"endAt":929,"startToken":1285,"endToken":1385}]}