{"document":{"slug":"rec-20260715-4008","title":"Pre-filed Statement of Jodi L. Moskowitz, Vice President Regulatory – Law, Deputy General Counsel and RTO Strategy Officer for Public Service Enterprise…","issued":"2026-07-15","accession":"20260715-4008","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED","kind":"testimony","file":"sources/filings/text/20260715-4008_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4008","tier":"record","sha256":"4f6d733eac07c7ef9b171a813b123bd0c920cd5a2131164885504fa604e9bd85","pages":16,"tokens":5770,"emptyPages":[],"textThemes":["adequacy","registry"]},"pages":[{"page":1,"startToken":0,"endToken":393,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Governance and Stakeholder Reforms  \n  \nDocket No. AD26-7-000  \n \nPRE-TECHNICAL CONFERENCE COMMENTS OF \nTHE PSEG COMPANIES \n \nThe PSEG Companies1 appreciate the opportunity to submit these comments in advance of \nthe Federal Energy Regulatory Commission’s (“Commission”) 2026 Technical Conference on \nPJM Governance and Stakeholder Reforms (“Technical Conference”) to be held on July 23, \n2026.  These comments address the issues to be discussed during Panel 2: “PJM Stakeholder \nProcess–Design, Transparency, and Decision-Making.” This panel will examine the PJM \nstakeholder process, the flaws inherent in this process and ways to fix, or at least mitigate, these \nchallenges. PSEG recognizes the Commission’s leadership in convening this technical \nconference.  This timely and needed initiative comes when PJM is at an inflection point in its \nhistory, grappling with how to address the region’s profound resource adequacy challenge before \nit becomes a major reliability crisis for customers across the region. As both a founding member \nand significant Transmission Owner (“TO”) in PJM, PSEG offers a unique and informed \nperspective on PJM’s flawed governance structure. Fixing PJM governance is not optional, and \nthere are a range of potential solutions. Fundamentally, the objective must be to achieve \nconsistently better, durable outcomes at PJM – defined as supporting (i) a system that is reliably \nplanned in the short-term and in the long-term and a well-functioning wholesale electricity \nmarket with stable, defensible rules; (ii) efficient and timely decision-making; and (iii) an RTO \n \n1 The PSEG Companies are Public Service and Gas Company (“PSE&G”), PSEG Power LLC and PSEG Energy \nResources & Trade LLC, which are each wholly-owned, direct or indirect subsidiaries of Public Service Enterprise \nGroup Incorporated (“PSEG”) (collectively, “PSEG” or the “PSEG Companies”).  PSEG is a diversified energy \ncompany based in Newark, New Jersey consisting primarily of a regulated electric and gas utility and a nuclear \ngeneration business.  Through its wholly-owned subsidiary PSE&G, PSEG owns over 2,200 circuit miles of electric \ntransmission lines within the PJM region.  PSE&G has 2.4 million electric customers in its franchised service \nterritory and an obligation to reliably serve those customers.  For 24 consecutive years, PSE&G has won reliability \nawards in the Mid-Atlantic region and has a proven record of providing reliable and affordable service to customers.  \nPSEG also has an ownership interest in approximately 3,800 MW of reliable, baseload nuclear generation."},{"page":2,"startToken":393,"endToken":782,"text":"2 \n \nthat is both empowered to make the right decisions and is fully accountable for those decisions. \nPSEG proposes actionable solutions to deliver these results.  \nThis is not an academic exercise; customer reliability is at risk. Just this year, due to the \nunsolved supply/demand imbalance, PJM has gone into emergency alert conditions across the \nregion four times, and in the process has sought and obtained multiple emergency authorizations \nfrom the Department of Energy (“DOE”) permitting it to run generating units beyond otherwise-\napplicable permit limitations and to call on large customers to run back-up generation, subject to \ncurtailment if necessary.2 This continual state of operating in “crisis mode” is not sustainable. \n  PSEG has had iron in the ground in PJM for decades. Our core concerns, and stake in the \nfuture of PJM, do not – and will not - wax and wane based on individual Regional Transmission \nExpansion Plan (“RTEP”) cycles or Base Residual Auctions. We have warned of critical flaws in \nPJM governance for years, and unfortunately those risks have fully materialized. We are deeply \ncommitted to continuing to work with PJM to keep the lights on for our customers. Our \ncomments are offered through this lens and with this long-term perspective.  \n \nI. \nExecutive Summary \nPJM’s governance model is broken. As Chairman Laura Swett stated at the May 2026 PJM \nAnnual Meeting, the “current stakeholder process is slow where it must be fast, opaque where it \nmust be transparent, and vulnerable to vetoes and agenda control exactly when the region needs \nimmediate action.”3  While it may seem counterintuitive to tackle PJM governance while PJM \nand its stakeholders are simultaneously seeking to solve the substantive issues of large load \nintegration and resource adequacy, the reality is that the flawed governance structure has (i) \nplayed a role in causing these problems and (ii) will prevent PJM and its stakeholders from \ndeveloping effective, long-term solutions. The current process is locked in an endless cycle of \nfinger pointing, lack of defined accountabilities, flawed voting and contentious stakeholder \nprocesses -- with no resolution in sight.  \n \n2 NERC EEA conditions were announced January 26, 2026; May 17 to 19, 2026; June 30 to July 2, 2026; and July \n14 to July 21, 2026.  See Emergency Procedures - Postings. \n3 See Chairman Laura Swett's Comments at PJM's Annual Meeting in Baltimore, MD | Federal Energy Regulatory \nCommission."},{"page":3,"startToken":782,"endToken":1176,"text":"3 \n \nPJM is fundamentally different from other RTOs and ISOs. ISO-NE, for example, consists of \nsix states that have relatively homogenous state policies. MISO and SPP, while representing \nlarge footprints, consist primarily of vertically integrated states. New York and California are \nsingle state ISOs, minimizing regional policy friction that affects multi-state markets. By \ncontrast, PJM is comprised of fourteen jurisdictions with a large range of state policies reflected \nin the vast membership, and a combination of retail choice and vertically integrated states. PJM’s \nvast size, broad scope and regional diversity exacerbate its governance challenges.  \nThe fundamental flaws in PJM’s governance structure were largely masked over the past two \ndecades because the relevant externalities were significantly different. During most of that time, \nPJM was in a position of excess supply and demand was manageable and somewhat predictable, \nwith largely flat or declining load growth. Under surplus capacity conditions PJM’s governance \nwas not truly stress-tested. With economics and policy causing the retirement of a significant \namount of capacity in the region4 and the recent rapid demand growth driven by the integration \nof large loads,5 the externalities have now radically changed, and PJM’s governance problems \nhave been fully exposed.   \nPJM acknowledges this reality in its recently issued whitepaper on market design reforms, \n“Powering Reliability Through Market Design.”6 As noted by PJM President and CEO David \nMills, “the conditions that made the market work for nearly two decades have changed.”7  Mills \nexplains that the problems facing the region are “more fundamental than a design that needs \nrecalibration” and that “the current situation is not tenable.”8 These statements are \nsimultaneously revealing and troubling. \nWe are not interested in assigning blame as that is neither productive nor fair.  Instead, we \nseek to be a constructive partner in resolving the governance issues that lie before us. PJM has \n \n4 See Monitoring Analytics, \"2023 State of the Market Report for PJM,\" Section 1 Introduction, page 1. Document \nfile: 2023-som-pjm-sec1.pdf, available at: https://monitoringanalytics.com. \n5 See PJM 2026 PJM Load Forecast Report (Jan. 14, 2026) (available at: https://www.pjm.com/-\n/media/DotCom/library/reports-notices/load-forecast/2026-load-report.pdf). \n6 See PJM Whitepaper entitled \"Powering Reliability Through Market Design,\" (May 6, 2026) (“PJM 2026 \nWhitepaper”) available at: https://www.pjm.com/-/media/DotCom/library/reports-notices/special-\nreports/2026/20260506-powering-reliability-through-market-design.pdf. \n7 PJM 2026 Whitepaper at 3. \n8 Id."},{"page":4,"startToken":1176,"endToken":1510,"text":"4 \n \nvast amounts of expertise, and the organization is capable of remarkable operational performance \n(e.g., during the recent heat dome in early July). But long-term organizational success is not \nadequately measured by its ability to manage crisis to crisis, capacity auction to capacity auction, \nor extreme weather event (summer or winter) to extreme weather event.   \n Our goals are straightforward.  We seek to equip PJM with the governance tools to (i) \nreliably plan the system and run its markets with clear, stable and transparent rules, (ii) \nimprove the effectiveness of the PJM stakeholder process and (iii) strengthen PJM’s \naccountability to grid asset owners and other PJM stakeholders to restore confidence in its \ndecision-making.   \nIn furtherance of these goals, we propose a targeted framework for the Commission’s \nconsideration: \n• First, the Consolidated Transmission Owners Agreement (“CTOA”) and the PJM \nOperating Agreement (“OA”) must be amended to empower PJM to make effective \nregional planning decisions while increasing its accountability to grid asset owners. \n• Second, changes to voting rules are desperately needed. Change could take one of two \nforms – either aligning voting rules with members’ actual and measurable stake in PJM \noutcomes or full advisory voting, which, when coupled with increased PJM \naccountability, may allow PJM to leverage its knowledge of the system and the markets \nto make independent, timely and bold decisions and stick with them. \n• Third, in light of the fundamental changes happening in the industry, PJM’s stakeholder \nprocess needs to accelerate to meet this moment.   \n• Fourth, there should be enhanced accountability for PJM, including regular third-party \nevaluations of the PJM Board’s and PJM senior management performance.   \nFinally, we support a revised role for the PJM states, reflecting their role in resource \nadequacy and their desire to better understand and positively impact the stakeholder process. At \nthe same time, any such change must be linked to effectuating improved outcomes in PJM, as \nmeasured by the above-listed objectives of achieving reliable system planning and stable, well-\nfunctioning markets, an effective stakeholder process and measurable PJM accountability.  \nComments"},{"page":5,"startToken":1510,"endToken":1880,"text":"5 \n \nII. \nThe CTOA and the OA must be amended to empower PJM’s regional transmission \nplanning and enhance its accountability to asset owners. \n1. What is the status quo under the current CTOA paradigm? \nThe CTOA is the foundational agreement by which the TOs collectively contracted with \nPJM to transfer control of over $80 billion of transmission assets to PJM. Under the CTOA, \nPJM is responsible for: (1) providing open-access transmission service, including processing \ntransmission service and interconnection requests; (2) directing the operation of the TOs’ \ntransmission facilities and monitoring/operating the bulk power system; (3) preparing the RTEP \nand the load forecast used as an input to the RTEP; and (4) conducting all planning of \n“expansions” and “enhancements” to the regional transmission grid.9 The TOs retain \nresponsibility to: (1) build, finance, own, acquire, sell, or otherwise transfer assets, \nincluding terminating the member’s relationship with PJM; (2) maintain, repair and replace \ntransmission assets; (3) identify and plan supplemental projects to address local reliability needs; \nand (4) seek FERC approval for new rules or changes to existing rules regarding the recovery of \ntransmission revenue requirements, rate design and cost allocation.10   \nThe CTOA is unique among the PJM governing documents in establishing a demarcated and \nfundamental split of responsibilities between PJM and its TOs. Yet, the agreement is often \nignored in discussions about PJM governance. The legal and practical reality is that it cannot be \nignored. From the TO perspective, discussions about the future of PJM governance must start \nwith the CTOA.  \n One fundamental flaw with the CTOA is that it memorializes a structure whereby the \nregional planning protocol establishing rules for regional transmission planning resides in the \nPJM OA instead of the Tariff. Pursuant to the CTOA, “Each party shall transfer to PJM, \npursuant to this Agreement and in accordance with the Operating Agreement, the \nresponsibility to prepare a Regional Transmission Expansion Plan and to provide information \nreasonably requested by PJM to prepare the Regional Transmission Expansion Plan...”11 And \nunder the OA, PJM is required to obtain the approval of the PJM Members Committee prior to \n \n9See CTOA, Sections 4.1 and 6.3. \n10 CTOA, Sections 5 and 7.  \n11 Id. section 4.1.4 (emphasis added)."},{"page":6,"startToken":1880,"endToken":2400,"text":"6 \n \nfiling any change in its planning rules under Section 205 of the Federal Power Act (absent such \napproval, PJM is required to file under Federal Power Act Section 206 to effectuate the \nchange).12 PJM has itself explained, “In the absence of such Members Committee approval, PJM \nmay only propose a change to its planning rules for the Commission’s consideration using FPA \nsection 206, thereby: (i) requiring PJM to first meet the higher statutory burden of demonstrating \nthat an existing provision (or absence of a provision) is ‘unjust and unreasonable,’ prior to \nactually proposing the rule change for consideration; and (ii) creating an indeterminate period of \ntime for Commission action on PJM’s proposed rule change.”13 This allows members to make \ndecisions about RTEP rules through the OA when the underlying responsibility to plan the \nregional transmission system clearly resides with PJM under the CTOA.    \nPJM is the only RTO that does not have independent Section 205 filing rights over \ntransmission planning. 14 This paradigm undermines PJM’s independence to plan the grid and \npotentially hamstrings PJM from being able to pursue transmission grid initiatives due to \nstakeholder voting factions and dysfunction. Another challenge with the CTOA is that the TOs \nhave no audit rights of PJM and therefore no way under the agreement to hold PJM accountable \nfor its performance under the agreement. Other RTOs, including SPP and MISO, provide such \nrights to their TO members. In SPP, transmission owners have audit rights to “verify compliance \nby SPP with [the Membership] Agreement, to audit and verify transactions … and to assist \nMember[s] in complying with[]statutory and regulatory requirements” under the Membership \nAgreement.15 MISO TOs have nearly identical provisions in their Transmission Owners \nAgreement, which state that “MISO shall grant each Member, its employees or agents, external \nauditors, and federal and state regulatory authorities having jurisdiction over MISO or an Owner, \n \n12 See Operating Agreement, Section 18.6(a) (as amended). \n13 Duquesne Light Co., PJM Transmittal Letter, Docket Nos. ER24-2336-000, et al., at 2 (Jun. 21, 2024). \n14 In 2024, the Commission rejected proposed changes to the CTOA and OA that would have provided PJM \nindependent planning rights and addressed identified gaps and problems with the CTOA. The Commission did not \ndisagree with the underlying premise that PJM should have filing rights with respect to its RTEP rules.  See \nDuquesne Light Co., Order Rejecting Consolidated Transmission Owners Agreement Amendments and Denying \nComplaint, Docket Nos. ER24-2336-000, et al.,189 FERC ¶ 61,181 (Dec. 6, 2024).  On rehearing of that decision, \nthe Commission emphasized that the “dismissal of the PJM Complaint here does not preclude a future filing \nproposing to move the RTEP Protocol from the OA to the Tariff.  The PJM Board has the authority to petition the \nCommission under FPA section 206 to modify any provision or schedule of the OA that the PJM Board believes to \nbe unjust, unreasonable, or unduly discriminatory.” Duquesne Light Co., 192 FERC ¶ 61,051 at P 105 (July 14, \n2025) (emphasis added). \n15 See Southwest Power Pool, Inc., \"Membership Agreement,\" Section 2.4 (May 1, 2004), available at: \nhttps://spp.org."},{"page":7,"startToken":2400,"endToken":2766,"text":"7 \n \nsuch access to MISO's books and records as is necessary to verify compliance by MISO with the \nMISO Agreement and to audit and verify transactions under the MISO Agreement.”16 Nothing \ncomparable exists in either the CTOA or the PJM OA, but such rights should exist.  \n2. What changes should be made to the CTOA and related governing documents and how \ncan they be effectuated? \nSpecific changes to the CTOA and related governing documents are needed to address these \nflaws, including:  \na. Amending the CTOA to effectuate the transfer of the planning protocols from the OA \nto the PJM Tariff so that PJM has independent Section 205 filing rights with respect \nto its RTEP rules; and \nb. Incorporating audit provisions in both the CTOA and OA to monitor PJM’s \nperformance and ensure compliance with its responsibilities. \nThese changes would require a FERC filing and approval as part of either a Section 205 or \nSection 206-initiated proceeding.   \nIII. \nPJM’s voting framework must be fundamentally overhauled.   \n1. What is the status quo under current PJM voting rules? \nAs illustrated in the table below, the PJM of the late 1990s is radically different from the \nPJM of 2026.17  At its inception as an ISO in 1997, PJM was composed of only 10 TO members \nlocated in 5 states and the District of Columbia.18 Approximately thirty years later, PJM’s \nmembership has risen to over 1,100 total members and 532 voting members in 13 states and the \nDistrict of Columbia.19 The original limited membership of similar companies varied only by \ngeography, and issues were largely considered from similar points of view. PJM in 2026 reflects \nstates with different policy priorities and different degrees of reliance on the capacity market. \n  \n \n16 See Midcontinent Independent System Operator, Inc., \"Agreement of Transmission Facilities Owners to Organize \nthe Midcontinent Independent System Operator, Inc.,\" Section 10.2 (as amended), available at: \nhttps://cdn.misoenergy.org/MISO%20TOA%20(for%20posting)47071.pdf. \n17 PJM 2025 Annual Report, Meeting Each Moment (available at Welcome - PJM Annual Report 2025).  \n18 PJM Operating Agreement, Resolution and Certification page: OA, OA Resolution and Certification Page- \n19 See PJM Member List (as of July 9, 2026)."},{"page":8,"startToken":2766,"endToken":3060,"text":"8 \n \n \nPJM Facts \nLate 1990s \n2026 \nNumber of Members \n10 \n1,145 \nNumber of Voting Members \n10 \n517 \nTransmission Owner \n10 \n12 \nGeneration Owner \n0 \n110 \nEnd Use Customer \n0 \n24 \nElectric Distributor \n0 \n45 \nOther Supplier \n0 \n326 \nCustomers Served \n~25M \n>67M \nStates Served \n5 + DC \n13 + DC \nPeak Load (MW) \n>48,000 \n>165,000 \nTransmission Lines (Miles) \n~6,300 \n>88,000 \nGenerating Capacity (MW) \n>57,000 \n>185,000 \n \nPJM’s senior standing committees – the Markets and Reliability Committee and the Members \nCommittee - use sector-weighted voting, with members categorized into one of five sectors with \nequal voting strength. Each of the five sectors has 20% of the vote and a proposal must achieve \n2/3 approval from the sectors to pass.  PJM’s sector voting structure was designed to ensure that \nno one group could “disproportionately dominate” the stakeholder decision-making and voting \nprocesses. Yet the PJM voting structure when applied to today’s membership composition no \nlonger works to produce effective outcomes.  \nBelow are two real-world examples of anomalies and inefficiencies in the PJM voting \nprocess that impede resolution of critical issues: \n• Critical Issue Fast Path (“CIFP”) process for Large Loads: This stakeholder process \nwas initiated by PJM to develop rules around the important issue of the integration of \nlarge loads. Yet, when votes on proposals were taken in November 2025, only 118 of 520 \neligible Members participated, reflecting 24% of PJM’s total voting population. The \nGeneration Owner and Other Supplier sectors had less than half of their membership in \nattendance (29% and 7% respectively), but those two sectors combined for 40% of the \nsector-weighting under PJM’s voting protocol.20 The ability of two sectors to join \ntogether to “sector block” a proposal from being endorsed is magnified with limited \n \n20 PJM Operating Agreement 8.4."},{"page":9,"startToken":3060,"endToken":3409,"text":"9 \n \nvoting participation and represents a meaningful flaw in the voting process. In the case of \nthe CIFP vote, no proposal was ultimately endorsed on this key substantive matter.  \n• End of Life Transmission Planning: In 2019, PJM initiated a stakeholder process to \nestablish criteria that would apply to all transmission projects seeking to resolve “end of \nlife” drivers on PJM Tariff transmission assets.21 The process culminated in a vote at the \nMembers Committee where a proposal seeking to transfer responsibility for “end of life” \ndecision-making away from the TOs and to PJM received a 69% sector-weighted \nsupermajority vote. This proposal was brought by a coalition of “joint stakeholders” that \ndo not have any responsibility for the ownership, operation or planning of transmission \nfacilities. Ultimately, the member-endorsed proposal was filed at FERC and was opposed \nby PJM itself, who explained to FERC that the members filing conflicted with the rights \nof the Transmission Owners under the CTOA.22 This is a perfect example of a misaligned \nstakeholder process that wasted resources and produced a poor (and ultimately FERC-\nrejected) outcome.   \n2. What changes should be made to PJM’s current voting rules and how can these changes \nbe effectuated? \nWe present two types of potential solutions to revise the current PJM voting structure.  \nThe first category would involve implementing a different weighting so that votes are based \non a member’s actual level of interest in PJM and its stake in PJM outcomes. The second \ncategory would simply make all voting advisory. In PSEG’s view, this second approach will \nnot be as effective if pursued in isolation and, given the increased authority accorded to PJM \nunder this scenario, should be accompanied by meaningful changes to enhance PJM’s \naccountability and clearly delineate responsibilities.   \na. Changes to the voting structure to reflect members’ actual economic and operational \nstake in PJM outcomes  \n \n21 See PJM Interconnection, LLC, \"Issue Details: Transparency and End of Life Planning,\" PJM Issue Tracking ID: \n23b82425-6796-4b0c-8c4a-5ff9b6b5f061, available at: https://www.pjm.com/committees-and-groups/issue-\ntracking/issue-tracking-details.aspx?Issue=23b82425-6796-4b0c-8c4a-5ff9b6b5f061. \n22 PJM Interconnection L.L.C., 176 FERC ¶ 61,053 (2021)."},{"page":10,"startToken":3409,"endToken":3893,"text":"10 \n \nPJM’s current voting rules mean that asset owners with responsibility for customer reliability \nand long-lived assets in the ground have a significantly diluted vote.23 Yet, several states have \nimplicitly recognized the importance of their utilities’ role in the PJM voting process. For \nexample, last year, New Jersey enacted a law that requires the four electric utilities in the state \nthat “transmit and distribute electricity to end users within the State” to submit an annual voting \nreport to the New Jersey Board of Public Utilities that lists all recorded votes cast by the utilities, \ndescribes the context of the votes and explains how each vote “furthers the State’s goals of \npromoting affordability, reliability and sustainability of electricity production, consumption and \nconservation ….”24 No other PJM voting member with interests in New Jersey (including \ngenerators located in the state, retail default service providers, municipal electric utilities or the \nNew Jersey Division of Rate Counsel) is required to report their votes to the Board of Public \nUtilities. This requirement, which has been adopted by New Jersey, Maryland and Virginia and is \nunder consideration by Illinois and Pennsylvania, underscores the unique role of the utility in \nPJM voting and only underscores the mismatch between the nature of the utility interest and the \nactual ability to influence a PJM vote.25    \nThere are several different voting changes that could be pursued, all of which would involve \nmodification of the PJM OA, to align voting weight with “skin in the game.” One such option \nwould be to match voting interest with member responsibilities under the default cost allocation \nmethodology contained in Section 15.2.2 of the OA. These rules assign a share of member \ndefault costs to market participants based on their respective market activity (gross billings).26  \nUnder these rules, PSEG and other larger market participants face the potential for significant \ndefault allocations and must account for such risk in their risk management plans. Yet, our vote \nin the stakeholder process is disconnected from these risks that we bear. Another option would be \nto weigh TO votes more heavily for votes involving transmission planning rules. A final option is \na bicameral voting structure that would count a member’s vote on both a per capita basis and an \n \n23 Despite being a major asset owner with an obligation under state law to provide safe, adequate, and proper service \nand an obligation under the PJM governing documents to maintain, repair, and replace transmission assets for \nreliability, PSEG’s vote constitutes about 1.5% of the total vote in PJM senior standing committees and only 0.4% of \nthe vote in the lower committees. \n24  N.J.S.A. 48:2-16.5.  \n25 See Maryland House Bill 121 and Senate Bill 37; Virginia House Bill 84; New Jersey Assembly Bill 5463; IL \nHouse Bill 1802; Pennsylvania House Bill 1599. \n26 See Section 15.2.2 of the PJM Operating Agreement."},{"page":11,"startToken":3893,"endToken":4256,"text":"11 \n \nasset ownership basis. Under this approach, the asset ownership component of the vote would \nreflect MWs of generation capacity, ownership of transmission assets and/or MWs of load owned \nor controlled by members. This structure would appropriately recognize the operational and \nfinancial stake of the members in PJM’s voting process but would at the same time be balanced \nby a per capita allocation.27      \nb.  Alternatively, PJM could consider adopting advisory stakeholder voting \n  \nWe recognize that other RTOs/ISOs employ full stakeholder advisory voting and that \nPJM already uses it for certain matters falling within the PJM Tariff such as RPM capacity \nmarket rules. For example, MISO operates under an advisory stakeholder process “that provides \ninput to MISO on the regional system plan and a range of market- and tariff-related issues and \npolicy initiatives.”28 Similarly, voting in the New England Power Pool (“NEPOOL”) stakeholder \nprocess for ISO New England (“ISO-NE”) is advisory; however, if an alternative NEPOOL \nproposal meets a particular voting threshold, “then ISO-NE must include in its Section 205 filing \na description of the alternative proposal” under the “jump ball” provision.29 If advisory voting \nwere to be implemented in PJM, it would shift the ultimate responsibility for decision-making \nonto PJM and create a structure whereby PJM could independently design and propose Tariff \nrevisions to the FERC on all issues under its purview. While one may legitimately question \nwhether this type of voting has worked with respect to the RPM capacity market rules, we \nunderstand that, at least in theory, full advisory voting could help to embolden PJM to act \nindependently and more decisively. Because this approach would provide more authority to PJM \nit must be accompanied by enhanced accountability, including for the PJM Board, so that \nmembers have confidence in the decisions PJM is making. \n \n \n \n27  Comments of the PSEG Companies on PJM’s Order No. 719 Compliance filing in ER09-1063 at 11 (June 26, \n2009). \n28 NESCOE February 19, 2021White Paper on “Governance Structure and Practices in the FERC Jurisdictional \nISOs/RTOs” prepared by Exeter at Section 4.3. available at Governance Structure and Practices in the FERC \nJurisdictional ISOs/RTOs | NESCOE \n29 Id. at Section 3.4."},{"page":12,"startToken":4256,"endToken":4611,"text":"12 \n \nIV. \nThe PJM stakeholder process should be reformed to accelerate the speed of decision-\nmaking.    \nWe agree with FERC that the current PJM stakeholder process is too slow and subject to the \nobstructive agendas of various stakeholders. The inability to coalesce on issues in the PJM \nstakeholder process has resulted in tremendous inefficiencies and in some cases a complete \nfailure to act at all. One such example, referenced above, is the CIFP process to develop large \nload integration rules, which occurred between August 2025 and November 2025. Despite 11 \nstakeholder meetings, no proposal was endorsed by the members for consideration by the PJM \nBoard. This lack of action in turn resulted in direct federal and state intervention in PJM \ndecision-making, specifically the January 2026 National Energy Dominance Council and the \nthirteen PJM state agreement memorializing the “Statement of Principles Regarding PJM.30  \nModest changes can be implemented in the short term that will expedite decision-making in \nthe stakeholder process, and we offer a few for consideration: \n• Upfront identification of purpose and system benefits of all stakeholder proposals (would \nrequire revisions to PJM Manual 34): Solution proposals offered by stakeholders should \ncontain a clear purpose - tied to the defined scope of the stakeholder process at issue - \nand should explain the measurable benefits that will result if the proposal is endorsed. If \nthe proposal is lacking in any of these respects, PJM should require that the proposal, \neither be removed from consideration or changed to satisfy these criteria before a vote is \ntaken.     \n• Member-only proposal submissions (would require revisions to PJM Manual 34):  \nPJM should strongly consider limiting stakeholder proposal submission to members or \nrequiring that at least one member be a co-sponsor to a proposal. Non-member \nstakeholders may continue to participate and be heard in stakeholder meetings - and can \nseek to influence the content of proposals - but should not be permitted to sponsor \nproposals without at least one member also attached to the proposal. Otherwise, non-\nmember stakeholders are allowed a significant benefit of membership without bearing \n \n30 See Statement of Principles signed by the NEDC and the PJM Governors (available at statement-principles-\nregarding-pjm.pdf)"},{"page":13,"startToken":4611,"endToken":4932,"text":"13 \n \nany of the responsibilities that come along with membership. That asymmetry produces \npoor outcomes and is also highly inefficient.   \n• More frequent use of the CIFP process: \nPJM crafted the CIFP mechanism for use on substantive issues that are “...extremely \ndifficult to resolve, within the normal CBIR Stakeholder process...in extraordinary \ncircumstances (broad impact to markets or significant reliability issue).”31 If \naccompanied by PJM adoption of new rules that better vet the content and sponsorship of \nproposals, more frequent use of the CIFP process could facilitate efficient and effective \nengagement on critical issues in a structured and time-bounded manner.  \nV. \nReforms are critical to enhance PJM’s accountability and ensure defensible, durable \noutcomes.  Specific to resource adequacy, additional clarity is needed to delineate \nresponsibilities.  \nAccountability \nPJM’s 2026 Whitepaper on potential market design reforms captures the gravity of the \nresource adequacy problem at hand. At the same time, the whitepaper fails to identify concrete, \ntimely and actionable solutions. Rather, the white paper merely notes that relevant decisions on \nfuture market design “belong to the people and institutions with democratic accountability for \ntheir consequences – to state regulators and legislatures, to FERC, to consumers and the \nadvocates who represent them.”32 Given PJM’s status as the independent FERC-approved entity \nresponsible for the reliability of a grid that serves over 65 million customers, its choice to refrain \nfrom making a recommendation on a path forward feels inadequate.   \nOrder No. 719 requires each RTO or ISO to demonstrate “that it has in place, or will adopt, \npractices and procedures to ensure that its board of directors is responsive to customers and other \nstakeholders.”33 In compliance with this requirement, PJM must make difficult, and at times \nunpopular, decisions and then explain those decisions to its stakeholders and stand by those \ndecisions.  \n \n31 See PJM Manual 34: PJM Stakeholder Process (Sept. 25, 2025). \n32 See PJM 2026 Whitepaper at 3. \n33 See Order 719 at P 477."},{"page":14,"startToken":4932,"endToken":5297,"text":"14 \n \nThere are corporate governance principles that PJM could adopt to promote accountability \nand responsiveness from its leadership to its stakeholders. For example, PJM should utilize a \nthird party to regularly evaluate the performance of its Board and its executive leadership team, \nand its Board should in turn regularly evaluate the performance and effectiveness of its senior \nleadership. There are several questions that will need to be answered to effectively evaluate \nPJM’s performance, including: (1) what are the appropriate metrics to be used to measure \naccountability and responsiveness; (2) which entity is responsible for conducting that \nmeasurement; (3) where should those requirements be documented; and (4) what are the \nrepercussions for failing to meet those performance metrics. However, the answers to these \nquestions are secondary to beginning in earnest an effort to increase organizational \naccountability.   \nIn its compliance filing in response to Order No. 719, PJM pointed to the existence of the \nGovernance Assessment Special Team (“GAST”) stakeholder forum as a demonstration of PJM’s \ncommitment to considering further enhancements (beyond the requirements of Order No. 719) to \nits stakeholder and governance processes.34 The GAST was used to examine the concerns of PJM \nmembership regarding governance and stakeholder processes and to develop solutions. Under \nthat process, PJM implemented both the Consensus-Based Issue Resolution (“CBIR”) process \nand the Stakeholder Process Forum to more efficiently engage stakeholders.35 GAST also \nimplemented the Enhanced Liaison Committee to address important and divisive issues.36  PJM \nshould employ a forum comparable to GAST to work with its stakeholders to develop \naccountability metrics. That forum could also be used to examine whether the existing \nrequirements for PJM Board participation remain appropriate, including the two-year cooling-off \nperiod on material affiliation with a market participant and the lack of a residency or regional \nconnection requirement, or whether they should instead be modified or strengthened.37 \n \n \n34 See PJM Interconnection, L.L.C., PJM’s Compliance Filing, FERC Docket No. ER09-1063-000, at 56 (filed Apr. \n29, 2009). \n35 See PJM Interconnection, LLC, \"PJM Governance & Stakeholder Process,\" Stakeholder Process \"Super Forum\" \n(July 25, 2018), file name: 20180725-item-01-introduction.pdf, available at: https://pjm.com.  \n36 See PJM Manual 34.  \n37 See PJM Operating Agreement Section 7.2."},{"page":15,"startToken":5297,"endToken":5644,"text":"15 \n \nDefined Roles for Resource Adequacy \n \nEnhancing PJM’s accountability will restore confidence in its decision-making at this critical \ntime where it must work with its stakeholders and the PJM states to tackle resource adequacy and \nthe rapid integration of large load customers. PJM has indirect responsibility for resource \nadequacy through its use of market pricing signals to incent the addition of new generation and \nto retain existing resources. However, PJM is not an integrated resource planner and therefore \ndoes not plan generation.  \nBy contrast, the PJM states do have authority to address resource adequacy through the \nplanning of generation and a vested interest in ensuring that, to the extent they continue to rely \non PJM’s markets, rules for those markets are transparent and will procure sufficient supply to \nmaintain reliability. There is a pressing need for clarity on the respective responsibilities between \nPJM and the states on resource adequacy, and discussions should occur as to how PJM and the \nstates – with support from asset owners with responsibility for reliability - will work together to \nobtain this clarity. Those discussions need to happen now.   \nPJM, its states and the TOs have recently collaborated on load forecasting improvements, \nwhich will involve, among other things, use of a third party consultant to verify large load \nforecast data, review by the states of such data and formalized involvement by the states in the \noverall load forecasting process to ensure state policies are accurately reflected in the forecast.38  \nAppropriately involving the states in a fulsome way in load forecasting will help to ensure a \nmore accurate and defensible work product. PJM and its states could adopt a similarly productive \napproach to resource adequacy, and one way to advance progress would be through the use of a \nproperly-bounded state advisory committee, such as exists in SPP and the ISO-NE, with clearly-\ndefined roles and responsibilities.       \n \n \n \n38 See PJM Interconnection, LLC, \"Manual 19: Load Forecasting and Analysis,\" Attachment B: Load Forecast \nAdjustment Guidelines, Revision 39 (June 30, 2026), file name: m19.pdf, available at: https://www.pjm.com/-\n/media/DotCom/documents/manuals/m19.pdf."},{"page":16,"startToken":5644,"endToken":5770,"text":"16 \n \nVI. \nConclusion  \nGetting the rules right on PJM governance is critical and the time for action is now. Reforms \nmust be focused on changing and improving PJM’s decision-making and providing PJM with the \ntools to effectuate sustainable outcomes that will ensure long-term system reliability. PSEG’s \nproposed solutions – providing PJM with filing rights over transmission planning rules, changing \nvoting in a meaningful way, making stakeholder processes more efficient and enhancing PJM \naccountability for its decisions – are intended to satisfy these objectives.   \nRespectfully submitted,  \nJodi L. Moskowitz \nJodi L. Moskowitz \nVice-President and  \nDeputy General Counsel & RTO Strategy Officer \nPSEG Services Corporation \n80 Park Plaza, T20 \nNewark, NJ 07102 \n(973) 985-7958 \nJodi.Moskowitz@PSEG.com \nOn behalf of the PSEG Companies \n \nDated:  July 14, 2026 \nNewark, New Jersey"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":1286,"startToken":0,"endToken":596},{"p":2,"at":1286,"title":"I. Executive Summary","method":"printed heading","endPage":5,"endAt":5,"startToken":596,"endToken":1511},{"p":5,"at":5,"title":"II. The CTOA and the OA must be amended to empower PJM’s regional transmission","method":"printed heading","endPage":7,"endAt":957,"startToken":1511,"endToken":2557},{"p":7,"at":957,"title":"III. PJM’s voting framework must be fundamentally overhauled.","method":"printed heading","endPage":12,"endAt":6,"startToken":2557,"endToken":4257},{"p":12,"at":6,"title":"IV. The PJM stakeholder process should be reformed to accelerate the speed of decision-","method":"printed heading","endPage":13,"endAt":687,"startToken":4257,"endToken":4711},{"p":13,"at":687,"title":"V. Reforms are critical to enhance PJM’s accountability and ensure defensible, durable","method":"printed heading","endPage":16,"endAt":6,"startToken":4711,"endToken":5645},{"p":16,"at":6,"title":"VI. Conclusion","method":"printed heading","endPage":16,"endAt":890,"startToken":5645,"endToken":5770}]}
