{"document":{"slug":"rec-20260715-4010","title":"Pre-filed Statement of Maria Gulluni, Vice President, General Counsel, and Chief Compliance Officer for ISO New England Inc., for Panel 1 PJM Governance…","issued":"2026-07-15","accession":"20260715-4010","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"ISO NEW ENGLAND INC","kind":"tariff filing","file":"sources/filings/text/20260715-4010_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4010","tier":"record","sha256":"b3437ffdab7acd375ef54ec939eed8c35ce0808ad09d1bea3434ccc7adce84dd","pages":6,"tokens":2166,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":389,"text":"UNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPre-filed Comments of Maria Gulluni, ISO New England Inc. \nPanel 1: PJM Governance Mechanics, Board Authority, States’ Role, Filing Rights,  \nand Document Architecture \n \nI respectfully submit these comments in advance of the technical conference convened by \nthe Federal Energy Regulatory Commission (Commission) on July 23, 2026 to discuss the \ngovernance and stakeholder processes of PJM Interconnection, L.L.C. (PJM).  I appreciate the \ninvitation to join you on Panel 1. \nNew England, of course, is a smaller and more defined region than PJM’s control area, \nand its states’ energy policies and regulatory structure are generally more aligned than in PJM \n(although not perfectly so).  Given these characteristics, ISO New England Inc. (ISO-NE) may \nhave fewer challenges than PJM in working with its states and market participants on regional \nenergy issues.  Nonetheless, to the extent it is helpful, I will describe our governance structure in \nthis document. \nI outline below the governance mechanics cited in the description of the first panel, \nincluding Board authority, the states’ role, filing rights, and document architecture.  I will focus \non the ways, to my knowledge, that ISO-NE’s mechanics differ from that of PJM.1   \nDocument Architecture.  At the highest level, ISO-NE’s governing documents fall into \nthree categories:  corporate; terms and conditions of service; and market participants and states.  \nAll of these documents are referenced throughout these comments.   \nOn the corporate side, ISO-NE has a Certificate of Incorporation and By-Laws, both of \nwhich outline its internal governance.2  In the second category, ISO-NE’s terms and conditions of \nmarket and transmission service are outlined in:  the Transmission Operating Agreement, which \ndescribes the split of responsibilities between ISO-NE and the region’s transmission owners for \n \n1 These comments are largely responsive to the sixth question addressed to the panel:  “Recognizing regional \ndifferences, are there lessons from other regional transmission organization/independent system operator (RTO/ISO) \ngovernance structures that PJM could reasonably adopt to improve its responsiveness to the region’s operational and \nmarket challenges?” \n2 Third Restated Certificate of Incorporation of ISO New England Inc. (last amended September 28, 2021), available \nat second_restated_certificate_of_incorporation-copy-1.pdf (Certificate of Incorporation).  By-Laws of ISO New \nEngland Inc. (last amended September 14, 2023), available at 2021-02-18_bod_bylaws_of_iso_ne-copy-2.pdf (By-\nLaws). \nPJM Governance and Stakeholder Reforms \nDocket No. AD26-7-000"},{"page":2,"startToken":389,"endToken":859,"text":"Docket No. AD26-7-000 \n \nPage 2 \nmanaging the transmission system, and is the vehicle through which ISO-NE was assigned the \nrights to make filings with the Commission pursuant to Section 205 of the Federal Power Act (as \ndiscussed below);3 and ISO-NE’s single Tariff, which includes sections on the markets, open \ntransmission access, and ISO-NE’s rate recovery.4   \nFinally, regarding market participants and states, the relevant documents describe their \norganizations, as well as ISO-NE’s interactions with those organizations.5  Notably, as set forth \nin the Participants Agreement, New England’s market participants formed the New England \nPower Pool (NEPOOL) in 1971.  NEPOOL has its own governance structure and counsel.  The \nstates’ representative organizations are described in the next section.   \nStates’ Role.  The New England states are represented by two organizations.  The New \nEngland Conference of Public Utilities Commissioners (NECPUC) “provides regional regulatory \nassistance” to New England’s public utilities commissions on topics including water, gas, \nelectricity, and telecommunications.6  New England’s Regional State Committee, the New \nEngland States Committee on Electricity (NESCOE), was formed later than NECPUC and is \nmore narrowly focused on electricity issues.7  NESCOE is directed by a committee composed of \nrepresentatives appointed by each of the six New England governors, in his or her discretion; in \npractice, these appointees generally include energy policy officials as well as public utilities \ncommissioners.8 \nNESCOE is funded through a rate in ISO-NE’s Tariff that is paid by Regional Network \nLoad.9  The rate is based on NESCOE’s annually-filed budget that is approved by the \n \n3 Transmission Operating Agreement between the Initial Participating Transmission Owners and ISO New England \nInc. (February 1, 2005), as amended, available at v1_er07_1289_000_toa_composite.pdf \nv1_er07_1289_000_toa_composite.pdf (Transmission Operating Agreement). \n4 ISO New England Inc. Transmission, Markets, and Services Tariff, available at Transmission, Markets, and \nServices Tariff (Tariff).  Capitalized terms used but not defined in this document have the meanings ascribed to them \nin the Tariff.   \n5 The New England Regional States Committee is described in the Memorandum of Understanding Among ISO \nNew England Inc., the New England Power Pool, and New England States Committee on Electricity, LLC \n(November 21, 2007), available at Microsoft Word - 41823466_2.DOC (NESCOE MOU).  The New England Power \nPool’s structure and interaction with ISO-NE is contained in the Participants Agreement Among ISO New England \nInc. as the Regional Transmission Organization for New England and the New England Power Pool and the Entities \nthat are from time to time parties hereto constituting the Individual Participants (2004), available at parts_agree.pdf \n(Participants Agreement). \n6 About NECPUC – NECPUC. \n7 NESCOE MOU at Mission section of attached Term Sheet.  See also Home | NESCOE.   \n8 Id. at Organization section of attached Term Sheet.  See also NESCOE Managers | NESCOE. \n9 Tariff at Schedule 5 to Section IV.A."},{"page":3,"startToken":859,"endToken":1329,"text":"Docket No. AD26-7-000 \n \nPage 3 \nCommission.10  For fiscal year 2026, NESCOE’s total budget is $2,731,108, largely for staff \ncompensation and consulting services for economic, engineering and financial analysis.11   \nGiven its resourcing, NESCOE is able to work through the market participant process as \na fully committed and informed partner on markets and transmission initiatives.  In fact, \nNESCOE has committed to work within that process to present policy proposals for stakeholder \nconsideration, and is required to collaborate with stakeholders to reach negotiated solutions \nwhere possible.12   \nNESCOE has committed to “make every effort to avoid duplication of efforts or \nconflicting policy positions” with NECPUC.13  NESCOE achieves this objective by meeting \njointly with NECPUC, ISO-NE and stakeholders, and formally coordinating with NECPUC.  \nWhile this coordination is required at least once annually to allocate lead responsibility for \nregional electric policy issues to “avoid conflicting recommendations and to make efficient use \nof available staff,”14 in practice it occurs much more frequently. \nISO-NE also works with the states’ consumer advocates through the NEPOOL process, as \nmany consumer advocates are members of NEPOOL’s end user sector.  Consumers and \nconsumer advocates also interact with ISO-NE through the Consumer Liaison Group, which was \nformed as part of the region’s compliance with the Commission’s Order No. 719.15   \nBoard Authority.  Unlike PJM, ISO-NE is a non-stock, not-for-profit corporation \norganized pursuant to Delaware law.  Its Board of Directors is composed of nine independent \nmembers and the CEO, who is a non-voting member.  The Board of Directors also serves as the \nmembers of the Company, filling the role that shareholders play in a for-profit company.16  The \nBoard does much of its work through its standing committees, which include Audit and Finance; \nCompensation and Human Resources; Nominating and Governance; Information Technology \nand Cyber Security; Markets; and System Planning and Reliability.17 \nThe Board’s role is to provide direction on the management of the Company;18 as such, it \nis an oversight body.  While the Board and its relevant committees are certainly made aware of \n \n10 NESCOE MOU at Cost Allocation and Revenue Collection section of attached Term Sheet. \n11 ISO New England Inc., Filing of Revised Tariff Sheet for Recovery of Costs for the 2026 Operation of the New \nEngland States Committee on Electricity, Docket No. ER26-145-000 (October 15, 2025), available at \nrevisions_for_recovery_of_costs_for_2026_operation_of_nescoe.pdf. \n12 NESCOE MOU at Section 4.3 and Consultation and Dispute Resolution section of attached Term Sheet. \n13 Id. at Section 2. \n14 Id. at Scope of Activities section of attached Term Sheet. \n15 See Consumer Liaison Group. \n16 See Certificate of Incorporation at Sections 4 (Non-Profit Status), 6 (Members), 7 (Board of Directors), and 8 \n(Non-Affiliation). \n17 See the Board committee charters at ISO New England. \n18 By-laws at Section 3.1."},{"page":4,"startToken":1329,"endToken":1777,"text":"Docket No. AD26-7-000 \n \nPage 4 \nmajor filings, including the underlying designs and stakeholder and state positions, the Board \ndoes not propose, review or vote on filings in the manner of PJM’s Board of Managers.19  \nNew members of the Board are nominated through a process that includes representatives \nof the Board, NEPOOL members, and the states, working together as part of a Joint Nominating \nCommittee.  The Committee seeks to reach consensus on new candidates.20  Following \nnomination by the Committee, NEPOOL votes on the slate, with a vote of 70% required to \nendorse the slate.21  Finally, the Board completes the process with a vote to elect.22 \nBoard members must have a cross-section of skills, such as Commission electric \nregulatory affairs, energy industry management, corporate finance, bulk power systems, power \npool operations, public policy, distributed generation or demand response technologies, \nrenewable energy, consumer advocacy, environmental affairs, business management and \ninformation technologies.  At least three directors must have electric industry experience, and \npreference is given to New Englanders.23  Directors are subject to term limits and an age limit to \nfacilitate turnover.24  \n The Board interacts regularly with NEPOOL and the states (both NECPUC and \nNESCOE).  Per the Participants Agreement, Board members are invited to NEPOOL meetings, \nwhich they regularly attend, and additionally meet with NEPOOL at least twice per year.25  \nThese twice-yearly meetings occur between members of the Board and the individual sectors of \nNEPOOL, which are Transmission, Generation, Suppliers, Publicly-Owned Entities, Alternative \nResources, and End Users.26 \nBy practice, the Board also meets with representatives of both NECPUC and NESCOE \ntwice per year, and has developed a “state liaison” program.  Per that program, the Board assigns \ntwo directors to each New England state public utilities commission.  These liaisons are available \nfor the commissions to contact at any time, and the liaisons meet with their assigned \ncommissions at least annually.  Each state commission usually invites the state’s governor-\nappointed NESCOE manager to these meetings. \nFiling Rights.  As set out in ISO-NE’s agreement with the region’s transmission owners, \nISO-NE has the filing rights under Section 205 of the Federal Power Act with respect to both the \nmarkets and the non-rate terms and conditions of transmission service.  The transmission owners \n \n19 See, e.g., Amended and Restated Operating Agreement of PJM Interconnection, LLC, available at oa.pdf, at \nSection 7.7 (v)-(vi). \n20 Participants Agreement at Section 13.1. \n21 Id. at Section 13.2. \n22 Id. at Section 13.2.1. \n23 Id. at Section 9.2.2. \n24 By-laws at Section 3.2; Participants Agreement at Section 9.2.3. \n25 Participants Agreement at Section 10.2.6. \n26 Id. at Section 7.3.2."},{"page":5,"startToken":1777,"endToken":2100,"text":"Docket No. AD26-7-000 \n \nPage 5 \nretain their rights to set revenue requirements for transmission facilities and establish terms and \nconditions for local transmission service.27   \nISO-NE has contractually shared its Section 205 rights with NEPOOL via a “jump ball;” \npursuant to the relevant provision of the Participants Agreement, if NEPOOL approves an \nalternative to an ISO-NE market rule proposal, ISO-NE must file that alternative with the \nCommission pursuant to Section 205 on equal footing with ISO-NE’s own proposal.28  \nThis “jump ball” right extends to a proposal made by NESCOE.  As noted above, \nNESCOE has committed to work within the participant process and present its policy proposals \nthrough that process.29  If NEPOOL supports an alternative market rule change proposed by \nNESCOE, the “jump ball” provision applies to that proposal.30  The states have other rights \npursuant to the Tariff, as well, including decision-making on certain transmission planning \nprojects through the Longer-Term Transmission Planning process.31  States can also provide \nscenarios to analyze through ISO-NE’s economic studies32 and Probabilistic Energy Adequacy \nTool.  \nThe transmission owners also granted NESCOE a “jump ball” regarding proposals for the \nallocation of the costs of generation and transmission interconnection upgrades.  Pursuant to that \nprovision of the Transmission Operating Agreement, if NESCOE opposes the transmission \nowners’ cost allocation proposal for interconnection costs, NESCOE may provide the \ntransmission owners with an alternative proposal that must be included in the transmission \nowners’ filing with the Commission on equal footing.33  \n \n \n27 Transmission Operating Agreement at Section 3.4(a)-(c). \n28 Participants Agreement at Section 11.1.5.  NEPOOL’s approval requires at vote of 60%. \n29 NESCOE MOU at Section 4.3 and Consultation and Dispute Resolution section of attached Term Sheet. \n30 Id. at fn. 11 of Consultation and Dispute Resolution section of attached Term Sheet. \n31 Tariff at Section II, Attachment K, Section 16. \n32 Id. at Section 17. \n33 Transmission Operating Agreement at Section 3.04(h)(C)."},{"page":6,"startToken":2100,"endToken":2166,"text":"Docket No. AD26-7-000 \n \nPage 6 \nI respectfully request that the Commission accept these comments, and I look forward to \njoining you on July 23.  \n \nRespectfully submitted, \n \n                        ISO NEW ENGLAND INC. \n \n \n \n \n \n \n \nBy:_/s/ Maria Gulluni \nMaria Gulluni \nVice President, General Counsel and Chief \nCompliance Officer \nISO New England Inc. \nOne Sullivan Road \nHolyoke, MA  01040-2841 \nTel:   (413) 540-4473 \nE-mail: mgulluni@iso-ne.com  \n \nSubmitted on:  July 14, 2026"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":5,"endAt":0,"startToken":0,"endToken":1777},{"p":5,"at":0,"title":"Pages 5 to 6","method":"page range","endPage":6,"endAt":487,"startToken":1777,"endToken":2166}]}